PRE FEASIBILITY REPORT FOR ENHANCEMENT OF PRODUCTION OF PORTLAND POZZOLANA CEMENT GRINDING UNIT FROM 1 MTPA TO 4 MTPA (IN 2 PHASES) OF ECO CEMENT LIMITED KULHARIYA, DISTBHABUA, BIHAR. VISIONTEK CONSULTANCY SERVICES PVT. LTD (An Enviro Engineering Consulting Cell) Plot No.-M 22 & 23, Chandaka Industrial Estate Patia, Bhubaneswar- 24 Phone No. : 91-674-6451781 [email protected] , [email protected] Visit us at - www.vcspl.org

PRE FEASIBILITY REPORT...During 2020, cement production is expected to reach 550 million tonnes In order to meet the rising demand, cement companies are expected to – production

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • PRE FEASIBILITY REPORT

    FOR

    ENHANCEMENT OF PRODUCTION

    OF

    PORTLAND POZZOLANA CEMENT GRINDING UNIT

    FROM 1 MTPA TO 4 MTPA (IN 2 PHASES)

    OF

    ECO CEMENT LIMITED

    KULHARIYA, DIST– BHABUA, BIHAR.

    VISIONTEK CONSULTANCY SERVICES PVT. LTD(An Enviro Engineering Consulting Cell)

    Plot No.-M 22 & 23, Chandaka Industrial Estate Patia, Bhubaneswar-24

    Phone No. : [email protected] , [email protected]

    Visit us at - www.vcspl.org

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. Ltd.

    Bhubaneswar

    Page 1

    CHAPTER – 01

    EXECUTIVE SUMMARY

    Sl. No. Particulars Details

    1 Name of the Project

    Enhancement of production 1 MTPA to 4 MTPA in

    two phases Portland Pozzolana Cement grinding

    unit of Eco cement limited at Kulhariya village,

    Durgawati Tahasil, Bhabua, Bihar

    2 LocationVillage-Kulhariya,Tehsil- Durgawati, Dist- Bhabua,

    Bihar

    3 Area

    Existing 21.100 (Ac.)

    Additional 30 Ac. for Truck packing and 30 Ac. for

    Railway siding

    4 Product PPC (Portland Pozzolana Cement)

    5 Man Power Presently- 37 , Additional-60

    6 Topography Generally Flat, with minor undulation

    7 Water Requirement

    Requirement ( in KLD)Sl.No. Purpose Existing Additional

    RequirementTotal

    1. Industrial 3.8 3.8 7.6 15.2

    2. Domestic 4.2 4.2 8.4 16.8

    Total 8 8 16 32

    Source: Rain water harvesting pond having depth of3 meter and area of 1500 m2 has been kept forsource of water for industrial use & borewell fordomestic purposes .

    8Power Requirement and

    Source12 MVA from BSEB

    9 Cost of the Project (Rs.) 117.67Cr.(Phase-1),194.35Cr.(Phase-2)

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. Ltd.

    Bhubaneswar

    Page 2

    (Additional)

    10 Green Belt Development

    Proposed Total – 12 Ac. in Truck parking area and

    barrier plantation of railway siding. At present 7 Ac.

    has been developed as green belt

    11 Consumers Local and other industries

    12 CapacityExisting 1 MTPA , proposed 4 MTPA in two

    phases.

    13 Consent to Operate T-7001 AND T-7002 DATED-27-12-2017

    14 Consent to establish PT(NOC)- 3436/10 dated 2.4.12 (BSCPB)

    15 Earlier EC

    EC has been obtained for 1 MTPA . Cement

    grinding unit vide F No-J-11011/287/2010/-IA.II(I)

    dated 31.10.2011 .

    16 Inter State boundaryUttar Pradesh State boundary falls within buffer

    zone of the project . i.e 2.8 km from project site.

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. Ltd.

    Bhubaneswar

    Page 3

    CHAPTER – 02

    2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION

    2.1 Identification of Project and Project Proponent. In case of mining project, a copy

    of mining lease/letter / letter of intent should be given.

    The promoter director of Eco Cement Limited are at present operating 1 MTPA plant

    at Kulhariya village, Bhabua district and managing two other PPC grinding unit

    situated at Ramnagar and Chanduli. They have broad experience in the field of

    cements.

    M/s Eco cement limited is having its registered office at G.T Road, Howrah ,West

    Bengal . M/s Eco cement has at present 1 MTPA stand alone cement grinding unit at

    Bhabua District of Bihar state with an area 21.1 Ac. The cement grinding unit of 1.0

    MTPA has been accorded environmental clearance vide-F No-J-1101/287/2010-I.A-

    II(I) dated 31st October 2011.

    2.2 Brief Description of Nature of the project

    The nature of the project is cement plants and fall under activity 3(b) under category

    “B” of the schedule of EIA notification Sept.2006. It has existing 1 MTPA stand

    alone cement grinding unit. It is proposed to enhance the production from 1 MTPA to

    4 MTPA in two phases. The principal raw materials are clinker, Fly ash, Gypsum.

    Clinkers are collected from cement plants located in Satna Belt and Rajasthan.

    Fly ash is collected from Renukoot Thermal Power houses and Gypsum is collected

    from Paradeep, Odisha, and Bikaner Fly ash and Gypsum is fed in a predetermined

    ratio through weigh feeder in ball mill and grounded to required fineness.

    2.3 Need for the Project and its importance to the Country and/or region.

    Cement plays a crucial role in economic development of the country. Indian cement

    industry ranks second in the world in terms of cement production. India’s per capita

    consumption of about 225 kg which is the lowest as compared to world average 267

    kg.

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. Ltd.

    Bhubaneswar

    Page 4

    India cement industry is a vital part of its economic, providing employment.

    Housing sector is biggest demand driver of cement accounting 67% of total

    consumption in India.

    Total capacity of cement industry in India is 435 million tonnes (MT) and growth of

    cement industry to be 6-7 % in 2017 because of Government’s focus an infrastructure

    development. The industry is at present producing 280 MT for meeting domestic

    demand 5 MT for exports requirement.

    The Portland Pozzolana Cement (PPC) enjoys the major share(67%) of total

    production followed by ordinary Portland cement (OPC) 25%, Portland slag cement

    (PSC) 8% .Cement consumption will increase substantially with greater usage in new

    areas such as cement concrete roads, extensive cement concrete canal linings etc.

    It is expected cement production during FY-2020 will be 550 MT. Out of 550 MT ,

    98% will be from private sector and 2% will be for public sector. Hence considering

    demand, it is proposed for the expansion /enhancement of production for 1 MTPA to

    4 MTPA of clinker grinding unit, which will cater the demand of cement in the

    country and region.

    2.4 Demand & Supply Gap

    Housing sector is the biggest demand of cement accounting for about 67% of total

    consumption

    Others – Infrastructure 13% , commercial construction 11% and other industrial 9%

    Total capacity of cement industry= 435 MT

    At present industry is producing 280 MT

    The rapid increase in global cement consumption is led by increasing demand for

    infrastructure in emerging economics.

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. Ltd.

    Bhubaneswar

    Page 5

    With cement production capacity nearly 366 million tonnes as of 2015, India was

    the largest cement producer in the world. In 2016, Country’s cement production

    capacity was expected to reach 395 million tonnes.

    During 2020, cement production is expected to reach 550 million tonnes

    In order to meet the rising demand, cement companies are expected to – production

    by 56 MT during next three years.

    As per 12th five year plan , production is expected to reach 407 MT. Availability fly

    ash and use of advanced technology has increased the production .

    2.5 Imports v/s Indigenous Production

    Due to less production of cement, India is also importing cements from UAE,

    Bangladesh Pakistan and other countries.

    2.6 Export Possibility

    The proposed enhancement of production has been envisaged to cater to domestic

    market i.e within india. Thus no cement exports have been considered.

    2.7 Domestic/export markets

    Domestic cement market has been considered for proposed grinding unit. The markets

    envisaged to be catered are Bihar, Utter Pradesh.

    2.8 Employment Generation (Direct & Indirect) due to the Project.

    Employment will be generated directly and indirectly for the following reasons.

    - Smooth and efficient running of plant

    - Effective co-ordination among various departments

    - Rational distribution of responsibilities

    - Capacity utilization of the plant with optical manpower

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. Ltd.

    Bhubaneswar

    Page 6

    In addition to above, for loading and unloading of cement & cement bags. No of

    unskilled manpower will be required

    Presenting 37 persons are engaged for the existing plant. An additional 60 persons

    from different category will be employed.

    Sl.No. Designation Numbers

    1. Unit staff 44

    2. Administrative 16

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. Ltd.

    Bhubaneswar

    Page 7

    CHAPTER - 3

    PROJECT DESCRIPTION

    3.0 Project Description

    3.1 Type of Project including interlinked and interdependent projects, if any.

    The present plant is a clinker grinding unit. The project is not interlinked with any

    industry. The project falls under activity 3 (b) and category “B”. Due to inter state

    boundary this project will be considered at MoEF & CC. The plant is a grinding unit

    which will produce PPC (Portland Pozzolana Cement). The basic raw material will be

    clinker, Fly ash and Gypsum. The material will be transported from different places

    by road/rail. The production will be enhanced from 1 MTPA to 4 MTPA.

    3.2 Location (map showing general location, specific location, and project boundary

    & project site layout) with coordinates.

    The existing plant is located at village Kulhariya, Tahasil- Durgawati, Dist- Bhabua,

    State- Bihar. The area is generally flat. The area falls in Toposheet No. 63 ,

    The co-ordinates of the existing & proposed site.

    Direction Latitude Longitude

    SE 25013’20.24” 83027’46.11”

    SN 25013’21.19” 83027’37.03”

    NW 25013’31.15” 83027’38.19”

    NE 25013’30.11” 83027’48.34”

    The present area is 21.1 Acrs. and an additional land of 60 Ac.(30 Ac. for Truck

    parking & 30 Ac. for Railway siding) will be required for the expansion/ enhancement

    as details.

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. Ltd.

    Bhubaneswar

    Page 8

    Details of Land Breakup:

    Land Break up (Existing, Additional & Total)

    Sl.No.

    Description

    Area Required In Acres

    ExistingExistingunused

    Phase - 1 Phase - 2

    ExistingTo

    purchaseExisting

    ToPurchase

    1 Cement Mill 0.185

    8.735

    0.175 0 0.175 0

    2 Packing House 0.16 0.358 0 0.518 0

    3Raw Material, Product storageyard and silo

    2.1 0.275 0 0.905 0

    4

    Auxiliary plant facilities (PumpHouse, O/H tank, WaterReservoir, Rain WaterHarvesting Pond, Settling tank,Central Control Room,Switchyard etc.)

    0.75 0.11 0 0.15 0

    5 Internal Road 1 0 0 0 0

    6 Truck Parking 1 0 0 0 30

    7Admn. Building, Canteen,Workshop, First Aid, SecurityShed, time office etc.

    0.17 0 0 0 0

    8Railway Siding (Rail Link,Wagon Loading/ Unloading)

    0 0 30 0 0

    9 Green Belt 7 0 0 0 0

    Total 12.365 8.735 0.918 30 1.748 30

    Total Land

    Existing(1 MTPA)

    12.365 Ac.

    Unused 8.735

    Additional Land(To be purchased)(Phase-1)

    30 .000Ac.

    Additional Land(To be purchased)(Phase-II)

    30.000 Ac.

    Total 81.100 Ac.

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. Ltd.

    Bhubaneswar

    Page 9

    KEY PLAN

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. Ltd.

    Bhubaneswar

    Page 10

    GOOGLE MAP

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 11

    TOPO MAP

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 12

    Map Showing Inter State Boundary

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 13

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 14

    3.3 Details of Alternative sites considered and the basis of selecting the proposed site,

    particularly the environmental considerations gone into should be highlighted.

    Total land at present is 21.10 Ac. Since the project unit has suitable land at project

    site, therefore, no alternative site has been considered.

    3.4 Size or Magnitude of operation.

    The unit is clinker grinding. The capacity of existing plant is 1 MTPA. The

    production will be enhanced to 4 MTPA by additional equipment as follows in two

    phases (1st phase -1 MTPA and 2nd phase- 2 MTPA)

    Equipment Details

    Sl.No. Existing Nos. Proposed Nos.

    1 Cement Grinding

    150 (TPH)

    1 Cement Grinding 450

    TPH only enhancing

    the capacity

    2

    1 = 150 TPH

    2= 300 TPH

    2 Packer 240 TPH 1 Packer (240 TPH) 2

    3 Truck loaders

    90TPH

    5 Truck loader 90 TPH 10

    3.5 Project Description with Process Details (a schematic diagram/flow chart

    showing the project layout, components of the project etc. should be given)

    A standalone closed circuit Ball mill has been considered. The project will enhance

    its cement grinding from 1 MTPA to 4 MTPA ( in two phases). Clinkers (65% ) , Fly

    Ash (30 %). Gypsum (0.05 %) are main raw materials

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 15

    Clinker , Fly ash and Gypsum is fed in a pre-determined ratio through weight feeder

    in the Ball mill and grounded to the required fineness and stored in cement silo.

    After extraction from cement silo, cement shall be packed in 50 kg Bags by packing

    machine. It is proposed to store the raw materials for trouble free .

    Particular 1st phase enhancement 2nd phase enhancement

    Clinker 10 days production 10 days

    Gypsum 1 rake of 4000T 2 rake 4000T

    Flyash 10 days production 10 days production

    Cement in silo 3 days production 3 days production

    Clinkers along with Fly ash, Gypsum will be used for manufacturing cement. All

    raw materials are used in a pre-fixed formula and through different ways feeds to ball

    mill . The ball mill grind the mix to a homogeneous mixture. The mixture is known

    as cement. The homogenous mixture is then stored in the silos and packed when

    needed. Cement extracted from cement silos are packed by electronic packing

    machine. Enhancement of production will be carried out in two phases Stand alone

    Ball mill in closed circuit using high efficiency separators is envisaged. High

    efficiency Bag house & Bag filters will be installed to maintain dust emission.

    Clinker (65 %), Fly ash ( 30 %), Gypsum (05 %) will be used.

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 16

    3.6 Raw Materials required along with estimated quantity, likely source, marketingarea of final products. Mode of transport of raw material and finished product.

    Raw Material Requirement :

    Sl. No. ParticularsExisting for 1

    MTPA

    Additional Due to

    Incremental Production Total for 4

    MTPA

    1st phase(1 MTPA)

    2nd phase(2 MTPA)

    1. Clinker (65%) 1950 TPD 1950 TPD 3900 TPD 7800 TPD

    2. Gypsum (05 %) 150 TPD 150 TPD 300 TPD 600 TPD

    3. Fly ash (30%) 900 TPD 900 TPD 3600 TPD 3600 TPD

    Storage Facilities:

    3.7 Resource Optimization/recycling and reuse envisaged in the project, if any, should be briefly outlined.

    Fly ash generated from Renukoot power thermal station will be used for PPCmanufacturing

    Materials collected from Bag filters will be recycled.

    No solid waste generation from grinding unit

    Sl. No. Raw Material Storage 1st phase 2nd phase

    1. Clinker 35000T 70000T

    2. Gypsum 4000 T 8000T

    3. Flyash 5000 T 10000 T

    1. Cement Storage 5000T 10000T

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 17

    3.8 Availability of water its source, energy/power requirement

    (in KLD)

    Sl.No. Purpose Existing AdditionalRequirement

    Total

    1. Industrial 3.8 3.8 7.6 15.22. Domestic 4.2 4.2 8.4 16.8

    Total 8 8 16 32Source: Rain water harvesting pond having depth of 3 meter and area of 1500 m2 has

    been kept for source of water for industrial use & borewell for domestic purposes .

    3.8.1 Power Requirement

    132/33 KV power substation is located in karmnasa which is at 3 km from plant site.

    Estimated power = 12 MVA

    3.9 Quantity of waste to be generated (liquid and solid) and scheme for their

    management/disposal.

    No waste water will be discharged to outside.

    No industrial waste will be generated. Domestic waste water generated will be treated

    in soak pit combination .

    Used oil and grease will be generated from plant machinery .These will be sold to

    authorized recycler.

    The plant is based on zero discharge concept .

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 18

    3.10 Details of Flow Chart

    Clinker

    Storage

    Gypsum

    Storage

    Additives Storage

    (Fly ash etc)

    Cement

    grinding Cement Silo

    Bulk

    ShippingCement

    Bagging Cement Silos

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 19

    CHAPTER-04

    SITE ANALYSIS

    4.0 Site Analysis

    The proposed site is located at village Kulhariya, Durgawati Tahasil in district of

    Bhabua (Bihar). The site has been established by 1 MTPA stand alone cement

    grinding unit which has been accorded environmental clearance.

    4.1 Connectivity

    The site is well connected through road ways from Varanasi. The Varanasi air port is

    at a distance of 85 km. Karmnasa Railway Station is at a distance 3 km from the side.

    4.2 Land form, Land use and Land ownership.

    Present land is 21.100 Ac. Additional land 60 Ac. (30 Ac. for Truck parking & 30 Ac.

    for Railway siding) will be required. Total land is 81.100 Ac. Green belt 7 Ac. has

    been developed. 33% of Truck parking area will be developed as green belt. Barrier

    plantation will be developed in and around railway siding.

    4.3 Topography

    The land is generally flat with minor undulation. The Karmnasa and Durgawati river

    flows through the district.

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 20

    4.4 Existing Land Use pattern (agriculture, non-agriculture, forest, water bodies

    (including area under CRZ), shortest distances from the periphery of the project to

    periphery of the forests, national park, wild life sanctuary, eco sensitive area, water

    bodies (distance from the HFL of the river), CRZ, in case of notified industrial area, a

    copy of the Gazette notification should be given.

    Sl.No. Particulars Details

    1 Nearest Town/City Karmnasa Town

    2 Nearest National/State Highway NH-(GrantTrunk Road) (Delhi-Kolkata)

    NH-2

    3 Nearest Railway Station Karmnasa Railway Station 3 km

    4 Nearest Airport Varanasi 85 km

    5 Plant Area (Land use) Present 21.10 Ac.(Additional- 60 Ac.)

    Total 81.10 Ac.

    6 Archaeological Important Place Nil

    7 Ecological Sensitive Areas (National

    Park, Wild Life Sanctuary,

    Biosphere reserve, Tiger Reserve,

    Elephant Reserve etc.)

    No National Park, Wildlife Sanctuary,

    Biosphere Reserve, Protected Forest

    exists within 10 km radius

    8 Reserved/Protected Forest within

    10km radious

    There is no Reserve/Protected forest

    within the 10 km radius of the proposed

    project site

    9 Water Bodies Kohira main Canal- 2.4 km (N)Karmnasa River – 2.4 km(N)Durgawati River- 5.6 km (E)Gurabani River- 2.77 km (N)

    10 Seismic Zone Zone III [as per IS 1893 (part-I):2002]

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 21

    4.5 Existing Infrastructure

    The present area is 21.10 Ac. which includes grinding unit , pump houses, settling pond,

    rain water harvesting pond, control room , canteen, administrative building etc.

    Workshop

    A common mechanical and electrical workshop to take care of the regularmaintenance/repair of jobs.

    First aid centre

    A small first aid center with all facilities has been provided in side.

    Weigh bridge

    Electronic weigh bridge has been envisaged to care of incoming and outgoingmaterials.

    Bags godown

    Space has been provided in side plant premises for storage of bags .

    Storage facilities has been provided for storage of raw materials.

    4.6 Soil Classification

    The secondary sources of soil sample have been collected. Soil type found mainlyclay loam soil, sandy loam, Re lateral soil .

    4.7 Climatic data from secondary sources

    The climate of the district is subtropical monsoon ,mild and dry winter and hotsummer. January is the coldest month when the mean minimum temperature comesdown to approximately 40 C. The temperature starts rising from March and reaches itspeak in May when the mercury touches 450 C. Rain starts sometime in mid june andlast till mid September. The district gets easterly wind from June to September, andfrom October to May and August (289 mm)

    4.8 Social Infrastructure available

    Schools, colleges, hospital & healthcare centers & bazaars, community centers etcfacilities are available in the nearby towns. Almost all the villages in the buffer zoneare electrified

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 22

    CHAPTER-05

    5.0 Planning Brief

    5.1 planning concept (type of industries, facilities, transportation etc.,) town and

    country planning/development authority classification

    The present site is located in plot No.-1644 Khata No.-219 , having an area of 21.100

    Ac. .The industry falls under Red category. Transportation of raw material and final

    product will be done via existing road and rail net work and concrete road will be

    developed within plant premises.

    5.2 Population Projection

    Manpower requirement has been considered on the basis of functional requirement. It

    is planned keeping in view of the following

    - Smooth and effluent running of plant

    - Effective co-ordination

    - Capacity utilization

    - Rational distribution of responsibilities

    Existing manpower is 37 persons. An additional 60 persons from different category

    will be employed. The managerial and supervisory staff will be from outsides skilled

    & unskilled will be required from near by villages. There will be temporary influx of

    people.

    5.3 Land Use Planning (breakup along with greenbelt etc.,)

    About 33% of total land will be developed for green belt. Presently 7Ac. has been

    developed as greenbelt. Plantation will be done along plant boundary with local

    species. About 12 Ac. in truck parking area will be developed as green belt and also

    along the boundary of railway siding.

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 23

    5.4 Assessment of Infrastructure Demand (physical & social)

    The study area i.e within 10 km radius from the project are having all

    facilities/amenities like medical, educational, housing, transportation, communication,

    shopping etc are available in abundance.

    5.5 Amenities/Facilities

    School, colleges, Primary health center other facilities are available nearby towns.

    The company also provides basic amenities for the employees.

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 24

    CHAPTER-06

    6.0 Proposed Infrastructure

    6.1 Industrial Area (processing area)

    The present area is 21.1 Ac. and additional land in 1st phase (30 Ac.) and in 2nd phase

    (30 Ac.) will be required. Total land will be 81.100 Ac.

    6.2 Residential area (Non-processing area)

    Temporary sheds will be provided during 1st phase and 2nd phase construction. No

    residential colony is envisaged a most workers will be employed from local area.

    6.3 Green Belt

    About 33% of total land will be developed for green belt. Presently 7Ac. has been

    developed as greenbelt. Plantation will be done along plant boundary with local

    species. About 12 Ac. in truck parking area will be developed as green belt and also

    along the boundary of railway siding.

    6.4 Social Infrastructure

    Expansion project will result in growth of the surrounding areas by increased indirect

    employment opportunities in the region including ancillary development and

    supporting infrastructure, school, colleges etc. Presently the industry has resulted in

    the growth of surrounding areas by increasing indirect employment opportunities.

    Civic amenities are all available nearby.

    6.5 Connectivity (traffic and transportation road/rail/ metro/water ways etc.,)

    The site is well connected by roads. Karmnasa Railway Station is at a distance 3 km

    from the plant. Varanasi air port is at a distance of 85 km from the site. The site is

    well connected and communication facilities like Telephone, Fax etc.

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 25

    6.6 Drinking water management (source & supply of water)

    Requirement : ( in KLD)Sl.No. Purpose Existing Additional

    RequirementTotal

    1st 2nd

    1. Industrial 3.8 3.8 7.6 15.22. Domestic 4.2 4.2 8.4 16.8

    Total 8 8 16 32

    Source: Rain water harvesting pond having depth of 3 meter and area of 1500 m2 has

    been kept for source of water for industrial use & borewell for domestic purposes .

    6.7 Sewerage system

    Domestic waste water generated will be treated through septic tank and disposed via

    soak pit.

    6.8 Industrial waste management

    No industrial waste will be generated .

    6.9 Solid waste Management

    There will be no solid waste generation. Dust collected from air pollution control

    equipment will be recycled in the process.

    6.10 Power requirement & supply/ source.

    132/33 KV power substation is located in Karmnasa, which is at a distance of 3 km

    from the plant site. The power will be drawn from BSE. Estimated requirement is

    12.0 MVA.

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 26

    CHAPTER-07

    Rehabilation & Resettlement (R&R) Plan

    7.1 policy to be adopted (central/state) in respect of the project affected persons

    including home oustees, land oustees and landless laboureres (a brief out line to

    be given).

    No person will be affected due to expansion of the project. Hence there will be no

    rehabilitation & resettlement.

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 27

    CHAPTER-08

    PROJECT SCHEDULE & COST ESTIMATES

    8.0 Project Schedule & Cost Estimates

    8.1 Likely date of start of construction and likely date of completion (time schedule

    for the project to be given).

    The project will be start after obtaining necessary statutory approvals and other

    clearances. Commissioning of the plant will be after 18 months from ordering of main

    machinery.

    8.2 Estimated project cost along in terms of economic viabity

    Cost of the Project

    Particulars Rs.in Lakhs Rs.in Lakhs

    Land & Site

    development

    1800 1800

    Factory building 4390 7682.50

    Plant & Machinery 4780 8773.96

    MISC fixed Assest. 200 209.78

    Preliminary expans 409.89 589.64

    Contingencies 187.40 373.32

    Total 11767.29 19429.20

    Considering investment analysis , pay back period, break even point, Internal rate of return,

    Cash flow and balance sheet etc. The project is technically feasible and financially viable.

  • M/s. Eco Cement Limited

    Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement

    grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar

    Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 28

    CHAPTER-09

    ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

    9.0 Analysis of Proposal (final recommendations)

    9.1 Financial and social benefits with special emphasis on the benefit to the local

    people including tribal population, if any, in the area.

    The state of Bihar will get revenue in terms of taxes, local people will get

    opportunities in terms of indirect employment.

    Cement transportation will increase business communities. Nearby people will get

    opportunities to improve their livelihood.

    COVER PAGE.pdf (p.1)ECO-Cement-PFR.pdf (p.2-29)