PRE FEASIBILITY REPORT
FOR
ENHANCEMENT OF PRODUCTION
OF
PORTLAND POZZOLANA CEMENT GRINDING UNIT
FROM 1 MTPA TO 4 MTPA (IN 2 PHASES)
OF
ECO CEMENT LIMITED
KULHARIYA, DIST– BHABUA, BIHAR.
VISIONTEK CONSULTANCY SERVICES PVT. LTD(An Enviro Engineering Consulting Cell)
Plot No.-M 22 & 23, Chandaka Industrial Estate Patia, Bhubaneswar-24
Phone No. : [email protected] , [email protected]
Visit us at - www.vcspl.org
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. Ltd.
Bhubaneswar
Page 1
CHAPTER – 01
EXECUTIVE SUMMARY
Sl. No. Particulars Details
1 Name of the Project
Enhancement of production 1 MTPA to 4 MTPA in
two phases Portland Pozzolana Cement grinding
unit of Eco cement limited at Kulhariya village,
Durgawati Tahasil, Bhabua, Bihar
2 LocationVillage-Kulhariya,Tehsil- Durgawati, Dist- Bhabua,
Bihar
3 Area
Existing 21.100 (Ac.)
Additional 30 Ac. for Truck packing and 30 Ac. for
Railway siding
4 Product PPC (Portland Pozzolana Cement)
5 Man Power Presently- 37 , Additional-60
6 Topography Generally Flat, with minor undulation
7 Water Requirement
Requirement ( in KLD)Sl.No. Purpose Existing Additional
RequirementTotal
1. Industrial 3.8 3.8 7.6 15.2
2. Domestic 4.2 4.2 8.4 16.8
Total 8 8 16 32
Source: Rain water harvesting pond having depth of3 meter and area of 1500 m2 has been kept forsource of water for industrial use & borewell fordomestic purposes .
8Power Requirement and
Source12 MVA from BSEB
9 Cost of the Project (Rs.) 117.67Cr.(Phase-1),194.35Cr.(Phase-2)
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. Ltd.
Bhubaneswar
Page 2
(Additional)
10 Green Belt Development
Proposed Total – 12 Ac. in Truck parking area and
barrier plantation of railway siding. At present 7 Ac.
has been developed as green belt
11 Consumers Local and other industries
12 CapacityExisting 1 MTPA , proposed 4 MTPA in two
phases.
13 Consent to Operate T-7001 AND T-7002 DATED-27-12-2017
14 Consent to establish PT(NOC)- 3436/10 dated 2.4.12 (BSCPB)
15 Earlier EC
EC has been obtained for 1 MTPA . Cement
grinding unit vide F No-J-11011/287/2010/-IA.II(I)
dated 31.10.2011 .
16 Inter State boundaryUttar Pradesh State boundary falls within buffer
zone of the project . i.e 2.8 km from project site.
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. Ltd.
Bhubaneswar
Page 3
CHAPTER – 02
2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
2.1 Identification of Project and Project Proponent. In case of mining project, a copy
of mining lease/letter / letter of intent should be given.
The promoter director of Eco Cement Limited are at present operating 1 MTPA plant
at Kulhariya village, Bhabua district and managing two other PPC grinding unit
situated at Ramnagar and Chanduli. They have broad experience in the field of
cements.
M/s Eco cement limited is having its registered office at G.T Road, Howrah ,West
Bengal . M/s Eco cement has at present 1 MTPA stand alone cement grinding unit at
Bhabua District of Bihar state with an area 21.1 Ac. The cement grinding unit of 1.0
MTPA has been accorded environmental clearance vide-F No-J-1101/287/2010-I.A-
II(I) dated 31st October 2011.
2.2 Brief Description of Nature of the project
The nature of the project is cement plants and fall under activity 3(b) under category
“B” of the schedule of EIA notification Sept.2006. It has existing 1 MTPA stand
alone cement grinding unit. It is proposed to enhance the production from 1 MTPA to
4 MTPA in two phases. The principal raw materials are clinker, Fly ash, Gypsum.
Clinkers are collected from cement plants located in Satna Belt and Rajasthan.
Fly ash is collected from Renukoot Thermal Power houses and Gypsum is collected
from Paradeep, Odisha, and Bikaner Fly ash and Gypsum is fed in a predetermined
ratio through weigh feeder in ball mill and grounded to required fineness.
2.3 Need for the Project and its importance to the Country and/or region.
Cement plays a crucial role in economic development of the country. Indian cement
industry ranks second in the world in terms of cement production. India’s per capita
consumption of about 225 kg which is the lowest as compared to world average 267
kg.
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. Ltd.
Bhubaneswar
Page 4
India cement industry is a vital part of its economic, providing employment.
Housing sector is biggest demand driver of cement accounting 67% of total
consumption in India.
Total capacity of cement industry in India is 435 million tonnes (MT) and growth of
cement industry to be 6-7 % in 2017 because of Government’s focus an infrastructure
development. The industry is at present producing 280 MT for meeting domestic
demand 5 MT for exports requirement.
The Portland Pozzolana Cement (PPC) enjoys the major share(67%) of total
production followed by ordinary Portland cement (OPC) 25%, Portland slag cement
(PSC) 8% .Cement consumption will increase substantially with greater usage in new
areas such as cement concrete roads, extensive cement concrete canal linings etc.
It is expected cement production during FY-2020 will be 550 MT. Out of 550 MT ,
98% will be from private sector and 2% will be for public sector. Hence considering
demand, it is proposed for the expansion /enhancement of production for 1 MTPA to
4 MTPA of clinker grinding unit, which will cater the demand of cement in the
country and region.
2.4 Demand & Supply Gap
Housing sector is the biggest demand of cement accounting for about 67% of total
consumption
Others – Infrastructure 13% , commercial construction 11% and other industrial 9%
Total capacity of cement industry= 435 MT
At present industry is producing 280 MT
The rapid increase in global cement consumption is led by increasing demand for
infrastructure in emerging economics.
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. Ltd.
Bhubaneswar
Page 5
With cement production capacity nearly 366 million tonnes as of 2015, India was
the largest cement producer in the world. In 2016, Country’s cement production
capacity was expected to reach 395 million tonnes.
During 2020, cement production is expected to reach 550 million tonnes
In order to meet the rising demand, cement companies are expected to – production
by 56 MT during next three years.
As per 12th five year plan , production is expected to reach 407 MT. Availability fly
ash and use of advanced technology has increased the production .
2.5 Imports v/s Indigenous Production
Due to less production of cement, India is also importing cements from UAE,
Bangladesh Pakistan and other countries.
2.6 Export Possibility
The proposed enhancement of production has been envisaged to cater to domestic
market i.e within india. Thus no cement exports have been considered.
2.7 Domestic/export markets
Domestic cement market has been considered for proposed grinding unit. The markets
envisaged to be catered are Bihar, Utter Pradesh.
2.8 Employment Generation (Direct & Indirect) due to the Project.
Employment will be generated directly and indirectly for the following reasons.
- Smooth and efficient running of plant
- Effective co-ordination among various departments
- Rational distribution of responsibilities
- Capacity utilization of the plant with optical manpower
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. Ltd.
Bhubaneswar
Page 6
In addition to above, for loading and unloading of cement & cement bags. No of
unskilled manpower will be required
Presenting 37 persons are engaged for the existing plant. An additional 60 persons
from different category will be employed.
Sl.No. Designation Numbers
1. Unit staff 44
2. Administrative 16
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. Ltd.
Bhubaneswar
Page 7
CHAPTER - 3
PROJECT DESCRIPTION
3.0 Project Description
3.1 Type of Project including interlinked and interdependent projects, if any.
The present plant is a clinker grinding unit. The project is not interlinked with any
industry. The project falls under activity 3 (b) and category “B”. Due to inter state
boundary this project will be considered at MoEF & CC. The plant is a grinding unit
which will produce PPC (Portland Pozzolana Cement). The basic raw material will be
clinker, Fly ash and Gypsum. The material will be transported from different places
by road/rail. The production will be enhanced from 1 MTPA to 4 MTPA.
3.2 Location (map showing general location, specific location, and project boundary
& project site layout) with coordinates.
The existing plant is located at village Kulhariya, Tahasil- Durgawati, Dist- Bhabua,
State- Bihar. The area is generally flat. The area falls in Toposheet No. 63 ,
The co-ordinates of the existing & proposed site.
Direction Latitude Longitude
SE 25013’20.24” 83027’46.11”
SN 25013’21.19” 83027’37.03”
NW 25013’31.15” 83027’38.19”
NE 25013’30.11” 83027’48.34”
The present area is 21.1 Acrs. and an additional land of 60 Ac.(30 Ac. for Truck
parking & 30 Ac. for Railway siding) will be required for the expansion/ enhancement
as details.
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. Ltd.
Bhubaneswar
Page 8
Details of Land Breakup:
Land Break up (Existing, Additional & Total)
Sl.No.
Description
Area Required In Acres
ExistingExistingunused
Phase - 1 Phase - 2
ExistingTo
purchaseExisting
ToPurchase
1 Cement Mill 0.185
8.735
0.175 0 0.175 0
2 Packing House 0.16 0.358 0 0.518 0
3Raw Material, Product storageyard and silo
2.1 0.275 0 0.905 0
4
Auxiliary plant facilities (PumpHouse, O/H tank, WaterReservoir, Rain WaterHarvesting Pond, Settling tank,Central Control Room,Switchyard etc.)
0.75 0.11 0 0.15 0
5 Internal Road 1 0 0 0 0
6 Truck Parking 1 0 0 0 30
7Admn. Building, Canteen,Workshop, First Aid, SecurityShed, time office etc.
0.17 0 0 0 0
8Railway Siding (Rail Link,Wagon Loading/ Unloading)
0 0 30 0 0
9 Green Belt 7 0 0 0 0
Total 12.365 8.735 0.918 30 1.748 30
Total Land
Existing(1 MTPA)
12.365 Ac.
Unused 8.735
Additional Land(To be purchased)(Phase-1)
30 .000Ac.
Additional Land(To be purchased)(Phase-II)
30.000 Ac.
Total 81.100 Ac.
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. Ltd.
Bhubaneswar
Page 9
KEY PLAN
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. Ltd.
Bhubaneswar
Page 10
GOOGLE MAP
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 11
TOPO MAP
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 12
Map Showing Inter State Boundary
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 13
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 14
3.3 Details of Alternative sites considered and the basis of selecting the proposed site,
particularly the environmental considerations gone into should be highlighted.
Total land at present is 21.10 Ac. Since the project unit has suitable land at project
site, therefore, no alternative site has been considered.
3.4 Size or Magnitude of operation.
The unit is clinker grinding. The capacity of existing plant is 1 MTPA. The
production will be enhanced to 4 MTPA by additional equipment as follows in two
phases (1st phase -1 MTPA and 2nd phase- 2 MTPA)
Equipment Details
Sl.No. Existing Nos. Proposed Nos.
1 Cement Grinding
150 (TPH)
1 Cement Grinding 450
TPH only enhancing
the capacity
2
1 = 150 TPH
2= 300 TPH
2 Packer 240 TPH 1 Packer (240 TPH) 2
3 Truck loaders
90TPH
5 Truck loader 90 TPH 10
3.5 Project Description with Process Details (a schematic diagram/flow chart
showing the project layout, components of the project etc. should be given)
A standalone closed circuit Ball mill has been considered. The project will enhance
its cement grinding from 1 MTPA to 4 MTPA ( in two phases). Clinkers (65% ) , Fly
Ash (30 %). Gypsum (0.05 %) are main raw materials
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 15
Clinker , Fly ash and Gypsum is fed in a pre-determined ratio through weight feeder
in the Ball mill and grounded to the required fineness and stored in cement silo.
After extraction from cement silo, cement shall be packed in 50 kg Bags by packing
machine. It is proposed to store the raw materials for trouble free .
Particular 1st phase enhancement 2nd phase enhancement
Clinker 10 days production 10 days
Gypsum 1 rake of 4000T 2 rake 4000T
Flyash 10 days production 10 days production
Cement in silo 3 days production 3 days production
Clinkers along with Fly ash, Gypsum will be used for manufacturing cement. All
raw materials are used in a pre-fixed formula and through different ways feeds to ball
mill . The ball mill grind the mix to a homogeneous mixture. The mixture is known
as cement. The homogenous mixture is then stored in the silos and packed when
needed. Cement extracted from cement silos are packed by electronic packing
machine. Enhancement of production will be carried out in two phases Stand alone
Ball mill in closed circuit using high efficiency separators is envisaged. High
efficiency Bag house & Bag filters will be installed to maintain dust emission.
Clinker (65 %), Fly ash ( 30 %), Gypsum (05 %) will be used.
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 16
3.6 Raw Materials required along with estimated quantity, likely source, marketingarea of final products. Mode of transport of raw material and finished product.
Raw Material Requirement :
Sl. No. ParticularsExisting for 1
MTPA
Additional Due to
Incremental Production Total for 4
MTPA
1st phase(1 MTPA)
2nd phase(2 MTPA)
1. Clinker (65%) 1950 TPD 1950 TPD 3900 TPD 7800 TPD
2. Gypsum (05 %) 150 TPD 150 TPD 300 TPD 600 TPD
3. Fly ash (30%) 900 TPD 900 TPD 3600 TPD 3600 TPD
Storage Facilities:
3.7 Resource Optimization/recycling and reuse envisaged in the project, if any, should be briefly outlined.
Fly ash generated from Renukoot power thermal station will be used for PPCmanufacturing
Materials collected from Bag filters will be recycled.
No solid waste generation from grinding unit
Sl. No. Raw Material Storage 1st phase 2nd phase
1. Clinker 35000T 70000T
2. Gypsum 4000 T 8000T
3. Flyash 5000 T 10000 T
1. Cement Storage 5000T 10000T
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 17
3.8 Availability of water its source, energy/power requirement
(in KLD)
Sl.No. Purpose Existing AdditionalRequirement
Total
1. Industrial 3.8 3.8 7.6 15.22. Domestic 4.2 4.2 8.4 16.8
Total 8 8 16 32Source: Rain water harvesting pond having depth of 3 meter and area of 1500 m2 has
been kept for source of water for industrial use & borewell for domestic purposes .
3.8.1 Power Requirement
132/33 KV power substation is located in karmnasa which is at 3 km from plant site.
Estimated power = 12 MVA
3.9 Quantity of waste to be generated (liquid and solid) and scheme for their
management/disposal.
No waste water will be discharged to outside.
No industrial waste will be generated. Domestic waste water generated will be treated
in soak pit combination .
Used oil and grease will be generated from plant machinery .These will be sold to
authorized recycler.
The plant is based on zero discharge concept .
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 18
3.10 Details of Flow Chart
Clinker
Storage
Gypsum
Storage
Additives Storage
(Fly ash etc)
Cement
grinding Cement Silo
Bulk
ShippingCement
Bagging Cement Silos
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 19
CHAPTER-04
SITE ANALYSIS
4.0 Site Analysis
The proposed site is located at village Kulhariya, Durgawati Tahasil in district of
Bhabua (Bihar). The site has been established by 1 MTPA stand alone cement
grinding unit which has been accorded environmental clearance.
4.1 Connectivity
The site is well connected through road ways from Varanasi. The Varanasi air port is
at a distance of 85 km. Karmnasa Railway Station is at a distance 3 km from the side.
4.2 Land form, Land use and Land ownership.
Present land is 21.100 Ac. Additional land 60 Ac. (30 Ac. for Truck parking & 30 Ac.
for Railway siding) will be required. Total land is 81.100 Ac. Green belt 7 Ac. has
been developed. 33% of Truck parking area will be developed as green belt. Barrier
plantation will be developed in and around railway siding.
4.3 Topography
The land is generally flat with minor undulation. The Karmnasa and Durgawati river
flows through the district.
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 20
4.4 Existing Land Use pattern (agriculture, non-agriculture, forest, water bodies
(including area under CRZ), shortest distances from the periphery of the project to
periphery of the forests, national park, wild life sanctuary, eco sensitive area, water
bodies (distance from the HFL of the river), CRZ, in case of notified industrial area, a
copy of the Gazette notification should be given.
Sl.No. Particulars Details
1 Nearest Town/City Karmnasa Town
2 Nearest National/State Highway NH-(GrantTrunk Road) (Delhi-Kolkata)
NH-2
3 Nearest Railway Station Karmnasa Railway Station 3 km
4 Nearest Airport Varanasi 85 km
5 Plant Area (Land use) Present 21.10 Ac.(Additional- 60 Ac.)
Total 81.10 Ac.
6 Archaeological Important Place Nil
7 Ecological Sensitive Areas (National
Park, Wild Life Sanctuary,
Biosphere reserve, Tiger Reserve,
Elephant Reserve etc.)
No National Park, Wildlife Sanctuary,
Biosphere Reserve, Protected Forest
exists within 10 km radius
8 Reserved/Protected Forest within
10km radious
There is no Reserve/Protected forest
within the 10 km radius of the proposed
project site
9 Water Bodies Kohira main Canal- 2.4 km (N)Karmnasa River – 2.4 km(N)Durgawati River- 5.6 km (E)Gurabani River- 2.77 km (N)
10 Seismic Zone Zone III [as per IS 1893 (part-I):2002]
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 21
4.5 Existing Infrastructure
The present area is 21.10 Ac. which includes grinding unit , pump houses, settling pond,
rain water harvesting pond, control room , canteen, administrative building etc.
Workshop
A common mechanical and electrical workshop to take care of the regularmaintenance/repair of jobs.
First aid centre
A small first aid center with all facilities has been provided in side.
Weigh bridge
Electronic weigh bridge has been envisaged to care of incoming and outgoingmaterials.
Bags godown
Space has been provided in side plant premises for storage of bags .
Storage facilities has been provided for storage of raw materials.
4.6 Soil Classification
The secondary sources of soil sample have been collected. Soil type found mainlyclay loam soil, sandy loam, Re lateral soil .
4.7 Climatic data from secondary sources
The climate of the district is subtropical monsoon ,mild and dry winter and hotsummer. January is the coldest month when the mean minimum temperature comesdown to approximately 40 C. The temperature starts rising from March and reaches itspeak in May when the mercury touches 450 C. Rain starts sometime in mid june andlast till mid September. The district gets easterly wind from June to September, andfrom October to May and August (289 mm)
4.8 Social Infrastructure available
Schools, colleges, hospital & healthcare centers & bazaars, community centers etcfacilities are available in the nearby towns. Almost all the villages in the buffer zoneare electrified
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 22
CHAPTER-05
5.0 Planning Brief
5.1 planning concept (type of industries, facilities, transportation etc.,) town and
country planning/development authority classification
The present site is located in plot No.-1644 Khata No.-219 , having an area of 21.100
Ac. .The industry falls under Red category. Transportation of raw material and final
product will be done via existing road and rail net work and concrete road will be
developed within plant premises.
5.2 Population Projection
Manpower requirement has been considered on the basis of functional requirement. It
is planned keeping in view of the following
- Smooth and effluent running of plant
- Effective co-ordination
- Capacity utilization
- Rational distribution of responsibilities
Existing manpower is 37 persons. An additional 60 persons from different category
will be employed. The managerial and supervisory staff will be from outsides skilled
& unskilled will be required from near by villages. There will be temporary influx of
people.
5.3 Land Use Planning (breakup along with greenbelt etc.,)
About 33% of total land will be developed for green belt. Presently 7Ac. has been
developed as greenbelt. Plantation will be done along plant boundary with local
species. About 12 Ac. in truck parking area will be developed as green belt and also
along the boundary of railway siding.
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 23
5.4 Assessment of Infrastructure Demand (physical & social)
The study area i.e within 10 km radius from the project are having all
facilities/amenities like medical, educational, housing, transportation, communication,
shopping etc are available in abundance.
5.5 Amenities/Facilities
School, colleges, Primary health center other facilities are available nearby towns.
The company also provides basic amenities for the employees.
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 24
CHAPTER-06
6.0 Proposed Infrastructure
6.1 Industrial Area (processing area)
The present area is 21.1 Ac. and additional land in 1st phase (30 Ac.) and in 2nd phase
(30 Ac.) will be required. Total land will be 81.100 Ac.
6.2 Residential area (Non-processing area)
Temporary sheds will be provided during 1st phase and 2nd phase construction. No
residential colony is envisaged a most workers will be employed from local area.
6.3 Green Belt
About 33% of total land will be developed for green belt. Presently 7Ac. has been
developed as greenbelt. Plantation will be done along plant boundary with local
species. About 12 Ac. in truck parking area will be developed as green belt and also
along the boundary of railway siding.
6.4 Social Infrastructure
Expansion project will result in growth of the surrounding areas by increased indirect
employment opportunities in the region including ancillary development and
supporting infrastructure, school, colleges etc. Presently the industry has resulted in
the growth of surrounding areas by increasing indirect employment opportunities.
Civic amenities are all available nearby.
6.5 Connectivity (traffic and transportation road/rail/ metro/water ways etc.,)
The site is well connected by roads. Karmnasa Railway Station is at a distance 3 km
from the plant. Varanasi air port is at a distance of 85 km from the site. The site is
well connected and communication facilities like Telephone, Fax etc.
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 25
6.6 Drinking water management (source & supply of water)
Requirement : ( in KLD)Sl.No. Purpose Existing Additional
RequirementTotal
1st 2nd
1. Industrial 3.8 3.8 7.6 15.22. Domestic 4.2 4.2 8.4 16.8
Total 8 8 16 32
Source: Rain water harvesting pond having depth of 3 meter and area of 1500 m2 has
been kept for source of water for industrial use & borewell for domestic purposes .
6.7 Sewerage system
Domestic waste water generated will be treated through septic tank and disposed via
soak pit.
6.8 Industrial waste management
No industrial waste will be generated .
6.9 Solid waste Management
There will be no solid waste generation. Dust collected from air pollution control
equipment will be recycled in the process.
6.10 Power requirement & supply/ source.
132/33 KV power substation is located in Karmnasa, which is at a distance of 3 km
from the plant site. The power will be drawn from BSE. Estimated requirement is
12.0 MVA.
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 26
CHAPTER-07
Rehabilation & Resettlement (R&R) Plan
7.1 policy to be adopted (central/state) in respect of the project affected persons
including home oustees, land oustees and landless laboureres (a brief out line to
be given).
No person will be affected due to expansion of the project. Hence there will be no
rehabilitation & resettlement.
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 27
CHAPTER-08
PROJECT SCHEDULE & COST ESTIMATES
8.0 Project Schedule & Cost Estimates
8.1 Likely date of start of construction and likely date of completion (time schedule
for the project to be given).
The project will be start after obtaining necessary statutory approvals and other
clearances. Commissioning of the plant will be after 18 months from ordering of main
machinery.
8.2 Estimated project cost along in terms of economic viabity
Cost of the Project
Particulars Rs.in Lakhs Rs.in Lakhs
Land & Site
development
1800 1800
Factory building 4390 7682.50
Plant & Machinery 4780 8773.96
MISC fixed Assest. 200 209.78
Preliminary expans 409.89 589.64
Contingencies 187.40 373.32
Total 11767.29 19429.20
Considering investment analysis , pay back period, break even point, Internal rate of return,
Cash flow and balance sheet etc. The project is technically feasible and financially viable.
M/s. Eco Cement Limited
Enhancement of production 1 MTPA to 4 MTPA in two phases Portland Pozzolana Cement
grinding unit of Eco cement limited at Kulhariya village, Durgawati Tahasil, Bhabua, Bihar
Visiontek Consultancy Services Pvt. LtdBhubaneswar Page 28
CHAPTER-09
ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)
9.0 Analysis of Proposal (final recommendations)
9.1 Financial and social benefits with special emphasis on the benefit to the local
people including tribal population, if any, in the area.
The state of Bihar will get revenue in terms of taxes, local people will get
opportunities in terms of indirect employment.
Cement transportation will increase business communities. Nearby people will get
opportunities to improve their livelihood.