PRE-FEASIBILITY

REPORT

Page 2: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-05-26 · PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru

PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru Reddy

2

1.0 EXECUTIVE SUMMARY

1.1 Introduction

The proposed mining area of 1.40 acres (0.566 ha.) in Sy.No. 291/15-2 Goli Village,

Rentachintala Mandal, Guntur District, Andhra Pradesh. has been allotted to Sri. D. Bangaru

Reddy for a period of 10years by Assistant Director of Mines and Geology, Guntur.

The proposed area is not fit for agriculture and the Department of Mines and Geology

indicate that the subject area has mineral deposits for extraction. The salient features of the

project are given Table 1.1.

Table 1.1

The Salient Features of the Project

Project Name Proposed Napa slabs (Block) Quarry

of Sri. D. Bangaru Reddy

Mining Lease Area 1.40 acres (0.566 ha.)

Location of Mine Goli Village , Rentachintala Mandal,

Guntur District, Andhra Pradesh.

Toposheet number 56P/10

Minerals of mine Napa Slabs (Black)

Proposed production of

mine 1,600 Tons/Annum

Method of mining Opencast semi mechanized mining

Drilling/Blasting Controlled Blasting and drilling is proposed.

No. of working days 250 days

Water demand 5.0 KLD

Sources of water Water will be supplied from nearby village through

tankers.

Man power 21

Nearest railway station Nadikudu Railway Station - 21 km (E)from the lease

area.

Nearest airport Vijayavada Airport is about 136.07 km due ESE from the

lease area.

Page 3: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-05-26 · PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru

PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru Reddy

3

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

2.1 Identification of Project and Project Proponent

The Quarrying area for Building Stone has been allotted to Sri. D. Bangaru Reddy in

Goli Village, Rentachintala Mandal, Guntur District, Andhra Pradesh by the

department of Mines & Geology, over an extent of 2.96 Acres for a period 10 years.

M/s.Sri. D. Bangaru Reddy is headed by Sri. D. Bangaru Reddy they are into stone

crushing business from 10 years.

2.2 Brief Information about the Project

The mining lease area of 1.40 acres is located in Government land. Open cast semi

mechanized mining is followed and it has been proposed to produce approximately

45000 Tons/annum of building stone material. The nearest habitation from the

proposed project is at a distance of 0.53 km towards SSW direction i.e. Goli village.

2.3 Need for the Project and Its Importance to the Country or Region

Crushed stone or angular rock is a form of construction aggregate, typically produced

by mining a suitable rock deposit and breaking the removed rock down to the desired

size using crushers. The demand for road metal has increased due to rapid

industrialization and growth in infrastructure. Due to the State bifurcation there will

be rapid development in infrastructure sector.

As per EIA notification 2006 project proponent is submitting the proposal to get

Clearance for production capacity of 45000 Tons/ annum of from State Level

Environmental Appraisal Committee/State level Impact Assessment Authority of

Karnataka constituted by MoEF, GOI for the purpose of grant of quarry lease for

which Notification is issued.

2.4 Demands-Supply Gap

There is huge demand since the material is used extensively in Construction,

Railways, Roadways and many other sectors. This project will help in reducing the

Demand-Supply gap in the area.

2.5 Domestic/ Export Markets

The material is used in the domestic market and in there is no scope for exporting the

material.

Page 4: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-05-26 · PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru

PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru Reddy

4

2.6 Employment Generation

Proposed mining is semi mechanized method and this project operation will provide

livelihood to the 21 workers. It will provide employment to the people residing in

vicinity.

3.0 PROJECT DESCRIPTION

3.1 Type of Project Including Interlinked and Interdependent Projects, If Any.

The proposed mine area is of 1.45 acre area, No interlinked projects are associated with

this project.

3.2 Location of the project

The mining lease area is located in Sy.No. 291/15-2, Goli Village , Rentachintala

Mandal, Guntur District, Andhra Pradesh . The mine lease area falls in Survey of

India Top sheet No.: 56P/10. The latitude and longitude of the mine lease area is -

16°35'50.40""North & 79°31 '32. 73"East.

Google map is given in Figure - 1.Location of the mining lease in Guntur District is

shown in Figure 2.

Page 5: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-05-26 · PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru

PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru Reddy

5

Figure 1

Google Map Showing the Mine Lease Area

Page 6: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-05-26 · PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru

PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru Reddy

6

Figure 2

Location Map

Andhra Pradesh

MINE SITE

Page 7: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-05-26 · PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru

PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru Reddy

7

3.3 Details of Alternate Sites

No alternate site was considered as the project is mineral specific and site specific.

3.4 Size or magnitude of operation

The proposed mine has lease over an area of 1.40 acre and the production rate is 1600

tons/annum. The lease follows open cast semi mechanized mining.

3.5 Geology and Reserves

3.5.1 Topography

The Topography of the area consists of Grey Granite Gneiss ridges and slopes towards S-

E.The general height of the mounds ranges/hill ranges from 113metres to 120 metres above

MSL. The nallas flows towards S-E direction and acts as channels during the rainy season.

3.5.2 Geology

Guntur is bounded by Nalgonda in the North, Prakasham in the South, Mahabubnagar in the

West, Krishna in the East. The district comprises older metamorphic of presumably Archean

age, Dhawwar super group of Archean to lower Proterzoic age post- Dharwar intrusive,

sedimentary rocks of cuddapahj super group and cuddalore formation of middle Miocene age

and Laterite/alluvium of quaternary age.

3.5.3 Exploration

Since this is an existing mine work has been done.

3.5.4 Reserves

Reserves = 61760 Tons

3.6 PROJECT DESCRIPTION WITH PROCESS DETAILS

3.6.1 Method of Mining

The quarrying in the sanctioned area is of open cast method by semi-mechanized way.

Considering the technical parameters like surface topography, quality variations, geo-

technical aspects are required for production and extraction of building material in the area.

It is proposed to work from the deposit by adopting benches formations with ultimate pit

slope of 45°. Only Jack Hammer, drilling is required for controlled blasting to break the

Page 8: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-05-26 · PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru

PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru Reddy

8

insitive sheet rock. The benches height and the width will be maintained as specified by

D.G.M.S. The width of the working benches shall not be less than the height. The year wise

production and development plan indicates the site for disposal of waste, site for afforestation

as shown in map. The plan showing position of the working pit proposed for extension etc.

Due care has to be taken in designing the benches and advancing the benches for production.

The ground water table is much below the proposed working level.

The machinery used to carry out the mining operations are given Table 3.3

Table 3.3

Mining Machinery

1 Excavator with breakers (Tata 210 LC) 2 Nos.

2 Air Compressor (Atlas Cop) 2 Nos.

3 Tractor Moulded Compressor 2 Nos.

4 JCBs for loading 2 No

5 Jack hammer 3 Nos.

6 Tippers 3 Nos.

7 Tractor for water supply 1 No.

3.7 Raw Material Required Along With Estimated Quantity, Likely Source,

Marketing Area of Final Product/S, Mode of Transport of Raw Material and

Finished Product

No raw material will be required in the proposed project. The operation involves the

extraction of material and dumping in stock yard. Loading of the building stone

material will be done mechanically by tippers of 10 Tons capacity and transported

from the quarry to the required site. The rejected material will be dumped separately.

3.7.1 Use of Mineral

The extracted material will be used in Construction, Railways, Road ways and many

other sectors

3.7.2 Processing

No processing at site is involved.

Page 9: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-05-26 · PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru

PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru Reddy

9

3.8 Resource Optimization/ Recycling and Reuse

Not envisaged.

3.9 Availability of Water Its Source, Energy/ Power Requirement and Source

3.9.1 Water Requirement

Water is required only for drinking purposes and dust suppression. The number of

working people is around 21 so the total water requirement will be around 5.0 KLD.

About 2.5 KLD will be required for dust suppression and greenbelt. This water will be

supplied from bore wells of nearby area.

3.10 Quantity of Wastes to be Generated (Liquid and Solid) And Scheme for their

Management/ Disposal

3.10.1 Solid Waste Generation& its Disposal

In this type of extraction the recovery factor is as high as 80 % so only 20% comes

out as waste. This waste shall be stacked in the dump yard to reuse for reclamation

purpose. The waste will be dumped along the southwest border of QL area.

3.10.2 Liquid Effluent

No liquid effluent will be generated at the mine site. The domestic wastewater

generated will be sent to septic tanks followed by soak pits.

4.0 SITE ANALYSIS

4.1 Connectivity

4.1.1 Nearest Railway Station

Nadikudu Railway Station is about 21 km distance towards E direction from the mine

area.

4.1.2 Nearest Airport

Vijayawada Airport is about 136.07 km ESE distance from mine site.

Page 10: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-05-26 · PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru

PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru Reddy

10

4.2 LANDFORM, LANDUSE AND LAND OWNERSHIP

The notified area is Government land. It is barren with boulders and followed sheet

rock is exposed in the area and also sheet rock is seen in the surface level with soil

cover. The proposed land use is given below.

4.3 Topography

Entire lease area of 0.566 ha land shall be utilized for quarrying only. The

Topography of the area consists of Grey Granite Gneiss ridges and slopes towards S-

E. The general height of the mounds ranges/hill ranges from 114 meters to 110 meters

above MSL.

4.4 Climatic data from secondary sources

The average rainfall is about 658.2 mm/annum. The observed maximum temperature

is 45.30C in summer season and minimum temperature is 13.2

0C in winter seasons.

The rainfall does not disturb the mining activities. Moderate wind velocities,

prevailed in north east to south west direction.

5.0 PLANNING BRIEF

5.1 Planning Concept

The quarrying in the sanctioned area is of open cast method by semi-mechanized way.

Considering the technical parameters like surface topography, quality variations, geo-

technical aspects are required for production and extraction of building material in the

area. It is proposed to work from the deposit by adopting benches formations with

ultimate pit slope of 45°. Only Jack Hammer, drilling is required for controlled

blasting to break the insitive sheet rock. The benches height and the width will

bemaintained as specified by D.G.M.S. The width of the working benches shall not

be less than the height. The year wise production and development plan indicates the

site for disposal of waste, site for afforestation as shown in map. The plan showing

position of the working pit proposed for extension etc. Due care has to be taken in

designing the benches and advancing the benches for production. The ground water

table is much below the proposed working level.

5.2 Population projection

The project will employ mostly workers from nearby villages. There will not be any

increase in population due to the project.

Page 11: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-05-26 · PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru

PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru Reddy

11

5.3 Land use planning

The project site is Government land. There will be change in landuse as the material is

excavated.

5.4 Assessment of Infrastructure Demand (Physical & Social)

On the basis of the preliminary site visit, the infrastructure demand in the villages was

assessed on the basis of need and priority. The existing infrastructure is satisfactory

but the approach road has to be maintained regularly.

5.5 Amenities/Facilities

Site Services like Work shed, First Aid, Drinking water as required will be provided

within the leased area.

6.0 PROPOSED INFRASTRUCTURE

6.1 Industrial Area (Processing Area)

No infrastructure is proposed.

6.2 Residential Area (Non Processing Area)

As the local persons will be given employment, no residential area/ housing is

proposed within the mining lease area.

6.3 Green Belt

Green belt will be developed along the boundaries of mine lease area.

6.4 Water Management

About 2.5 KLD will be required dust suppression and greenbelt purpose and about 1.0

KLD for drinking therefore total water requirement is 5.0 KLD. This water will be

supplied from bore wells of the nearby area.

6.5 Sewerage System

The domestic wastewater generated will be sent to septic tanks followed by soak pits.

6.6 Industrial Waste Management

Not applicable.

Page 12: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/District/pfr/... · 2017-05-26 · PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru

PROJECT: Napa Slabs (Black) Quarry PRE-FEASIBILITY REPORT APPLICANT: Sri D. Bangaru Reddy

12

6.7 Solid Waste management

The waste generated which is about 20% will stacked in the dump yard proposed in

the mine area.

7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN

Not Applicable.

8.0 PROJECT SCHEDULE & COST ESTIMATES

The Total cost of project would be around Rs. 15 lakhs.

9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

9.1 Financial and Social Benefits with Special Emphasis on the Benefit to the Local

People Including Tribal Population, If Any, In the Area.

The extraction of the material will be done in semi mechanized manner so local

labour will be used. Supporting ancillary facilities will help the local people once the

project commences.

***********