PRE-FEASIBILITY REPORT OF Red Ochre Mining Project (ML No 32/2008, Area- 4.10 ha) At Near Village: Gowariyan, Sewli, Tehsil- Shri madhopur, Dist.-Sikar (Raj.) PROJECT PROPONENT Shri Mohan Singh S/o Shri Bhanwar Singh R/o Village – Bhonawas, Tehsil – Kotputli, Dist. - Jaipur (Raj) Contact Person: Shri Mohan Singh

PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

PRE-FEASIBILITY REPORT

OFRed Ochre Mining Project

(ML No 32/2008, Area- 4.10 ha)

At

Near Village: Gowariyan, Sewli,

Tehsil- Shri madhopur, Dist.-Sikar (Raj.)

PROJECT PROPONENT

Shri Mohan Singh S/o Shri Bhanwar SinghR/o Village – Bhonawas, Tehsil – Kotputli, Dist. - Jaipur (Raj)Contact Person: Shri Mohan Singh

Page 2: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

INDEX

S. NO. PARTICULARS PAGE NO.1.0 EXECUTIVE SUMMARY 12.0 ENVIRONMENTAL MANAGEMENT PLAN 23.0 INTRODUCTION OF THE PROJECT/ BACKGROUNDINFORMATION 34.0 PROJECT DESCRIPTION 45.0 SITE ANALYSIS 106.0 PLANNING BRIEF 127.0 PROPOSED INFRASTRUCTURE 128.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN 139.0 PROJECT SCHEDULE & COST ESTIMATES 13

10.0 ANALYSIS OF PROPOSAL 14

Page 3: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

Red Ochre Mining Project, M.L. No. 32/2008, ML Area 4.10 ha at Near Village: Gowariyan,Sewli, Tehsil Shri MadhopurDistrict Sikar (Rajasthan)

Pre- Feasibility Report

Shri Mohan Singh S/o Shri Bhanwar Singh 1

PRE – FEASIBILITY REPORT

1.0 EXECUTIVE SUMMARYThis is a existing mining lease for proposal for obtaing Environmnetal Clearance of RedOchre Mining Lease,producation Capacity 102170 TPA near Village Gowarinya, SewaliTehsil Shri Madhopur, District-Sikar. The lease area is 4.10 ha which is an Banjar andPrivate land.The lease was granted in favor of Shri Mohan Singh S/o Shri bhanwar singh on dated13/05/2010 for 30 years.Table-1

Salient features of the Project

S.No.

Particulars Details

A. Mining Lease Details1. Name of the Project Red Ochre Mining project2. Mineral Red Ochre3. Mining Lease Number M.L. No 32/20084. Mining Lease Area 4.10 ha5. Applicant Shri Mohan Singh S/o Shri Bhanwar Singh6. Lease Validity 30 yearsB. Location7. Village Gowariyan, Saweli8. Tehsil Shrimadhopur9. District Sikar10. State Rajasthan11. Latitude & Longitude Pillar Latitude - LongitudeA 27°38’33.2” N 75°27’44.7’’EB 27°38’36.4” N 75°27’47.6’’EC 27°38’32.6” N 75°27’52.7’’ED 27°38’24.9” N 75°27’45.5’’EE 27°38’27.0” N 75°27’42.7’’EF 27°38’31.6” N 75°27’47.0’’E

Page 4: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

Red Ochre Mining Project, M.L. No. 32/2008, ML Area 4.10 ha at Near Village: Gowariyan,Sewli, Tehsil Shri MadhopurDistrict Sikar (Rajasthan)

Pre- Feasibility Report

Shri Mohan Singh S/o Shri Bhanwar Singh 2

S.No.

Particulars Details

C. Other details12. Bulk Density 2.8 tonnes/cum.13. Ultimate Working Depth 12 m bgl14. Cost of the project Rs. 10 Lacs15. Cost for EnvironmentalProtection Measures Rs. 0.50 Lac per annum16. Annual Rainfall 300mm to 350 mm17. Seismic Zone II

2.0 ENVIRONMENTAL MANAGEMENT PLAN

AIR POLLUTION CONTROL

Plantation will be developed within ML areas and will also be developedoutside the ML area equal to 33% of the lease area. Periodical water spraying on the roads will be done. Proper maintenance of all machines will be carried out that will controlemission of gaseous pollutant.WATER MANAGEMENT

There is no surface water body in and around the mining lease area. The rain water collected in mining pit will be used in plantation and dustsuppression.NOISE POLLUTION CONTROL

Proper maintenance of all machines will be carried out which will reducenoise generation during operations.LAND RECLAMATIONFrom the total 4. ha lease area about 1.17 ha area will be excavated, 0.15 ha.Will be use in overburden and 0.30 ha will be used as green belt on around thelease periphery.

Page 5: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

Red Ochre Mining Project, M.L. No. 32/2008, ML Area 4.10 ha at Near Village: Gowariyan,Sewli, Tehsil Shri MadhopurDistrict Sikar (Rajasthan)

Pre- Feasibility Report

Shri Mohan Singh S/o Shri Bhanwar Singh 3

SOLID WASTE MANAGEMENT

The generated solid waste will be sold after taking STP from the department,as whole waste will be saleable.GREEN BELT DEVELOPMENTGreen Belt/plantation will be developed equal to 33% of total lease area. Thetrees will be planted at suitable spacing to encourage proper growth around thelease boundary. The dead plants will be replaced by fresh plants. Native Plantspecies will be plantedSOCIO ECONOMIC IMPROVEMENT

As the mining activities will increase, better employment opportunity. Semi skilled & unskilled workers will be recruited from the nearby villages. Adult Education programme are proposed for up-gradation of literacy level. The leesee will associate awarness programe.HEALTH & SAFETY

Protective respiratory devices will be provided to personnel working in dustyareas with adequate training. The lessee will associate in various health and safety awarness program innearby villages.

3.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

(i) Identification of Project and Project ProponentThis is a existing Red Ochre Mining Lease, producation Capacity 102170 TPA nearVillage Gowarinya, Sewali Tehsil Shri Madhopur, District-Sikar. The lease area is 4.10ha which is an Banjar and Private land.(ii) Brief Description of the Nature of ProjectThis is a existing Red Ochre mining lease with production capacity 102170 TPA nearVillage Gowarinya, Sewali Tehsil Shri Madhopur, District-Sikar. EnvironmentalClearance is required as per EIA Notification dated 2006, as amended time to time andthis project is comes under B Category.

Page 6: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

Red Ochre Mining Project, M.L. No. 32/2008, ML Area 4.10 ha at Near Village: Gowariyan,Sewli, Tehsil Shri MadhopurDistrict Sikar (Rajasthan)

Pre- Feasibility Report

Shri Mohan Singh S/o Shri Bhanwar Singh 4

(iii) Need for the Project & Its Importance to the Country/ RegionRed Ochre is used in various Cement industries in defferent district of the state i.e. inChhitorgarh, Bhilwara, Jhalawar, Jaipur, Haryana and Himachal pardesh etc., incement industries red ochre is used as a row material to correct the deficiency ofFe2O3 to help stabilized the clinker factor at the desired rate.Presently the mineral is being dispatched to Ultra Tech Cement Kotputli. It is alsoused in paint Industry.(iv) Demand – Supply GapConsidering the demand of mineral sufficient availability of the mineral in the area,Red ochre is used as a row material to correct the deficiency of Fe2O3 to helpstabilized the clinker factor at the desired rate. It is also used in paint Industry.(v) Imports vs. Indigenous ProductionIt is a cheap mineral used in cement industries therefore export is not possible(vi) Export PossibilityThere is export possibility, Red Ochre is used in various Cement industries in defferentdistrict of the state i.e. in Chhitorgarh, Bhilwara, Jhalawar, Jaipur, Haryana andHimachal pardesh etc(vii) Domestic/Export MarketsRed Ochre is used in various Cement industries in defferent district of the state i.e. inChhitorgarh, Bhilwara, Jhalawar, Jaipur, Haryana and Himachal pardesh etc(viii) Employment Generation (Direct and Indirect) due to the ProjectThe total 30 skilled and semiskilled manpower needed to run the mine4.0 Project Description

(i) Type of Project Including Interlinked And Independent Projects, If AnyThere is no interlinked or interdependent project based on mineral produced. Themineral will be sold directly.(ii) Location (map showing general location, specific location, and project

boundary & project site layout) with coordinates

Page 7: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

Red Ochre Mining Project, M.L. No. 32/2008, ML Area 4.10 ha at Near Village: Gowariyan,Sewli, Tehsil Shri MadhopurDistrict Sikar (Rajasthan)

Pre- Feasibility Report

Shri Mohan Singh S/o Shri Bhanwar Singh 5

Figure1: Location Map

Page 8: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

Red Ochre Mining Project, M.L. No. 32/2008, ML Area 4.10 ha at Near Village: Gowariyan,Sewli, Tehsil Shri MadhopurDistrict Sikar (Rajasthan)

Pre- Feasibility Report

Shri Mohan Singh S/o Shri Bhanwar Singh 6

(iii) Details of Alternate Sites ConsideredNo alternative site has been taken into consideration due to availability of mineralresources in the area in question.(iv) Size and magnitude of operationProducation Capacity of 102170 TPA near Village Gowarinya, Sewali Tehsil ShriMadhopur, District-Sikar. The lease area is 4.10 ha which is an Banjar and Privateland.(v) Project Description with Process Detail

1. Salient features along with project vicinity details of the Mining project is given

below:Table - 2

Salient Features of the Project

S. No. Particulars Details1 Name of the Project Red Ochre Mining Lease2 Mineral Red Ochre3 Mining Lease Number M.L. No. 32/20084 Mining Lease Area 4.10 ha5 Lease Holder (Proposed) Shri Mohan Singh S/o Shri Bhanwar Singh6. Lease Period 30 years7. Total Geological reserve 836400 Tonnes8. Mineable reserve 392780 Tonnes9. Life of Mine 4 years@102170 TPA10. Bench Height & Length 6 meters11. Elevation Range in the area 500 mRL to 494 mRL12. General ground level 480 mRL13. Ground water table 35 to 40 m bgl (440 to 445 m RL)

Page 9: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

Red Ochre Mining Project, M.L. No. 32/2008, ML Area 4.10 ha at Near Village: Gowariyan,Sewli, Tehsil Shri MadhopurDistrict Sikar (Rajasthan)

Pre- Feasibility Report

Shri Mohan Singh S/o Shri Bhanwar Singh 7

2. GEOLOGY OF THE AREAMineral resource map of district the rocks of the area belong to Ajabgarh group of DelhiSupeer Group.Strategraphic sequence of Regional Geology is given below:Recent SoilPost Delhi Pegmatite, Granite, albetiteDelhi SuperGroup Ajabgarh Group Brecciated quartzite,quartzite,OrthoQuartzite, Phyllite, Impuremarble,amphibolites,CarbonaceousPhyllite,Quartzite, calc silicateAlwar Group Massive quartzite,schist,conglomeratequartzite,calc-silicate

LOCAL GEOLOGYRecent SoilPost Delhi AbsentDelhi Super Group Ajabgarh Group Quartzite3 Estimated Reserves

Proved : 92400 TProbable : 300380 TTotal reserves : 392780 T

4. Method of MiningProposed method of mining will be manual with hand tools, hydraulic excavator/ loader andtippers are proposed for fast removal of overburden, excavation of mineral and for loading ofmineral and waste and for construction of haul road.Blasting is proposed after taking pre-consent from DGMS and other concerning authorities,The mining will be carried out by opencast method by developing the bench of height 5-6 mheight and width. Four slices are considered in a bench. The calculations are as per the fourslices of a bench. Thus the end position of the bench is 6 meter height. Width is also proposed6 meter.

Page 10: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

Red Ochre Mining Project, M.L. No. 32/2008, ML Area 4.10 ha at Near Village: Gowariyan,Sewli, Tehsil Shri MadhopurDistrict Sikar (Rajasthan)

Pre- Feasibility Report

Shri Mohan Singh S/o Shri Bhanwar Singh 8

5. PROPOSED YEAR WISE PRODUCTION DETAILS OF THE NEXT FIRST FIVE YEARSThe proposed Year-wise production plan for next five years is mentioned in the tablegiven below:Table – 3

Year Wise Production for Next Three Years

Year Total Excavation

Of Masonry StoneFirst year 25480Second year 102170Third year 100970

MINING METHOD FLOW

CHART

TOP SOIL &O.B. REMOVAL

LOADINGTRANSPORT TOCONSUMERS

DRILLINGBLASTINGAs and when required

AS

Page 11: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

Red Ochre Mining Project, M.L. No. 32/2008, ML Area 4.10 ha at Near Village: Gowariyan,Sewli, Tehsil Shri MadhopurDistrict Sikar (Rajasthan)

Pre- Feasibility Report

Shri Mohan Singh S/o Shri Bhanwar Singh 9

6. LOADING & TRANSPORTTyre mounted Hydraulic machinaries will be deployed from time to time and whenrequired. Trucks and tracor troley will be deployed for transportation of Red Ochrefrom working to consumer.7. WASTE GENERATION & DISPOSALThere is no top soil and the generated waste will be second grade mineral and soldout for other purpose.8. CONCEPTUAL PLANAt the conceptual stage, total waste material of about 1000000 Tonne.(vi) Raw Material Required Along With Estimated Quantity, Likely Source, Marketing

Area of Final Products, Mode of Transport of Raw Material and Finished ProductThis is a Red ochre Mining lease, which used as a row material to correct the deficiencyof Fe2O3 to help stabilized the clinker factor at the desired rate. It is also used in paintIndustry.(vii) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if any,

should be briefly OutlinedDomestic sewage water generated from office toilet will be disposed in soak pits viaseptic tank.(viii) Availability of Water Its Source, Energy /Power Requirement and Source

A. Water requirement:Total water requirement for the proposed project will be 3 KLD which will besourced from nearby villages.B. Power requirement:The electric power will not be use for the process of mining. Only HSD Fuel will berequired for operating machineries.

(ix) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for Their

Management/Disposal:Domestic sewage water generated from office toilet will be disposed in soak pits viaseptic tank.

Page 12: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

Red Ochre Mining Project, M.L. No. 32/2008, ML Area 4.10 ha at Near Village: Gowariyan,Sewli, Tehsil Shri MadhopurDistrict Sikar (Rajasthan)

Pre- Feasibility Report

Shri Mohan Singh S/o Shri Bhanwar Singh 10

5.0 SITE ANALYSIS

(i) ConnectivityThe lease area about ~2.0 km from Village-Gowariya in E direction.Nearest RailwayStation is situated at Ranoli RS ~21 km in SW direction. Jaipur Internationl Airport is~96 km in SE direction The lease area is well connected through roads.(ii) Land Form, Land Use and Land Ownership

Existing Land Use PatternThe total ML area of 4.10 ha comprises of Banjar and Private land.(iii) TopographyThe lease area is undulated terrains .The highest contour is 500 mRL and lowest is494 mRL.(iv) Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water Bodies

(Including Area Under CRZ)}, Shortest Distances From The Periphery Of The

Project To Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco

Sensitive Areas, Water Bodies (Distance From The HFL Of The River), CRZ. In

Case Of Notified Industrial Area, A Copy Of The Gazette Notification.

Table – 4

Environmental SettingsS.No. Particular Details1 Nearest Village Gowariyan(~2.0km, E)2 Nearest city/ town Khandela(~6.0km, SE)3 Nearest Railway Station Ranoli RS (~21 km, SW)4 Nearest Airport Jaipur international Airport, Jaipur (~96.0 km,SE)5 Archaeological Important Place None, within 10 km radius area of mine site.6 Ecological Sensitive Areas(National Park, WildlifeSanctuary, Biosphere Reserveetc.)There is no National Park, Wild Life Sanctuaries,Biosphere Reserves, Tiger Reserves, WildlifeCorridors, etc. within 10 km radius7 Reserved/Protected Forestwithin 10 km radius Khandela PF~2.0km, SE directionRaghunathgarh PF ~3.0km, W direction8 Nearest River / water body None

Page 13: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

Cheja Patthar Mining Project, M.L. No. 119/1997, ML Area 1.0 haNear Village: Derwala, Tehsil & District Jhunjhunu (Rajasthan)

Pre- Feasibility ReportFigure-2 Key Plan

Shri Mohan Singh S/o Shri Bhanwar Singh 11

Page 14: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

Cheja Patthar Mining Project, M.L. No. 119/1997, ML Area 1.0 haNear Village: Derwala, Tehsil & District Jhunjhunu (Rajasthan)

Pre- Feasibility Report

Shri Mohan Singh S/o Shri Bhanwar Singh 12

(V) Existing Infrastructure:The lease area about ~2.0 km from Village-Derwala in NE direction.Nearest RailwayStation is situated at Nua RS ~6.5 km in NW direction. The lease area is well connectedthrough roads.6.0 PLANNING BRIEF

(i) Planning Concept (Type of Industries, Facilities, and Transportation etc.) Town and

Country Planning/Development Authority ClassificationUses: This is a mining Project(ii) Population ProjectionManpower required will be engaged from nearby areas. No significant influx of people isanticipated in the area.(iii) Land Use PlanningThe The total ML area of 4.10 ha comprises of Banjar and Private land.(iv) Assessment of Infrastructure Demand (Physical & Social)Lessee will assess the demand of infrastructure (Physical & Social) in nearby area of theproposed mine site and same will be developed under social work

(v) Amenities/FacilitiesMining Management will develop the Amenities/Facilities in the nearby area of theproposed mine site as per requirement of local people of the nearby area undercorporate social responsibility programs.7.0 PROPOSED INFRASTRUCTURE

(i) Residential Area (Non Processing Area)This is not required as mine workers comes from nearby villages. Rest shelter to theworkers already exists in the major mining lease of the lessee.(ii) Green Belt

Green belt will be developed on the approach road, surrounding the pit and alsobe done outside the lease area equal to 33% of the lease area.

Page 15: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

Cheja Patthar Mining Project, M.L. No. 119/1997, ML Area 1.0 haNear Village: Derwala, Tehsil & District Jhunjhunu (Rajasthan)

Pre- Feasibility Report

Shri Mohan Singh S/o Shri Bhanwar Singh 13

(iii) ConnectivityThe lease area about ~2.0 km from Village-Gowariya in E direction.NearestRailway Station is situated at Ranoli RS ~21 km in SW direction. JaipurInternationl Airport is ~96 km in SE direction The lease area is well connectedthrough roads.(iv) Water Management (Source & Supply of water)

Total water requirement for the project will be 3 KLD which will be used fordomestic as well as dust supression purpose and sourced from nearby village .(v) Sewerage System

Domestic sewage water generated from office toilet will be disposed in soak pitsvia septic tank. Outside discharge is not envisaged.(vi) Industrial Waste Management

No industrial waste water will be generated from this mine mining operation.(vii) Solid Waste Management

The generated solid waste will be second grade mineral and sold to the market(viii) Power Requirement & Supply/Source

Electric power will not be required in mining operations.8.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN

(i) Policy To Be Adopted (Central/State) In Respect Of The Project Affected Persons

Including Home Oustees, Land Oustees And Landless Laborers (Brief Outline To Be

Given)Not Applicable as the lease area falls in Banjar, Private land.9.0 PROJECT SCHEDULE & COST ESTIMATES

(i) Likely Date Of Start Of Construction And Likely Date Of Completion (Time

Schedule For The Project To Be Given)This is a case of existing mine. Now Environmental Clearance is required as per MoEFoffice memorandum no. J13012/12/2013-I-II (I) dated 24.12.2013, the project comesunder “B” category.

Page 16: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its

Cheja Patthar Mining Project, M.L. No. 119/1997, ML Area 1.0 haNear Village: Derwala, Tehsil & District Jhunjhunu (Rajasthan)

Pre- Feasibility Report

Shri Mohan Singh S/o Shri Bhanwar Singh 14

(ii) Estimated Project Cost Along With Analysis In Terms Of Economic Viability

of the Project(i) Total Project Cost : 50.0 Lacs(ii) Environment Protection Cost : 1.0 Lakh Per annum10.0 ANALYSIS OF PROPOSAL

Proposed Masonry Mining Lease will result in growth of the surrounding areas byincreasing direct and indirect employment opportunities in the region includingancillary development and supporting infrastructure. Special emphasis on Financialand Social benefits will be given to the local people including tribal population, if any,in the area. Development of social amenities will be in the form of medical facilities, education tounderprivileged and creation of self help groups. No major adverse effect on environment is envisaged as the required mitigationmeasures are inbuilt in the project.

Page 17: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 18: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 19: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 20: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 21: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 22: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 23: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 24: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 25: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 26: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 27: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 28: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 29: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 30: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 31: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 32: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 33: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 34: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 35: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 36: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 37: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 38: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 39: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 40: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 41: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its
Page 42: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/TOR/0_0...Pre- Feasibility Report Shri Mohan Singh S/o Shri Bhanwar Singh 4 (iii) Need for the Project & Its