Financial Performance:

Requirement:

3.1 -Audit balance sheets of the last 05 years -Net worth calculated as the difference between total assets and total liabilities should be positive for all the last 05 years

3.2 Average Annual Construction Turnover-Minimum average annual construction turnover of USD 200 million as total certified payments received from contracts in progress and/or completed within the last 05 years as single entity.In case of JV must meet 25% of the requirement for each and/ or one member with 40% of the requirement

General Construction Experience:

4.1 Applicant (Single entity or JV member) shall have minimum one Civil Works Overseas contract experience with minimum USD 40 million

(1) Of contract value that have been satisfactorily completed

(2) As a prime contractor (Single entity or JV member) or management contractor

(3) Between 1st January, 2005 and application submission deadline

Specific Construction Experience:

4.2a Applicant (Single entity or JV member) shall have minimum one

(4) Contract experience with minimum USD 30 million

(1) Of contract value in Transport Sector (railway, Highway and bridges, Airport and Port Sector)

(5) By Japanese ODA that have been satisfactorily completed

(2) As a prime contractor (Single entity or JV member) or management contractor

(3) Between 1st January, 2005 and application submission deadline

4.2b Applicant (Single entity or JV member) shall have following experience as a prime contractor (single entity or JV member) that have been satisfactorily and substantially (6) completed between 1 st

January, 2005 and application submission deadline.

- One (1) contract costing more than USD 20 million (7) of a MRT/HSR/Intercity Railway/ Railway depot structures. (8) The applicant (Single entity or JV member) shall have following experience as a

Page 2: Pre Qualification

prime contractor (single entity or JV member) that have been satisfactorily and substantially (6) completed between 1st January, 2005 and application submission deadline.

-At least (1) contract of minimum value USD 15 million (7) of construction of commercial buildings/ building structural works/ Industrial buildings/Multistoried Apartments of 6 stories and above including finishing works, building services, MEP works and water proofing

Or

Two (2) separate contract each costing more than USD 10 million (7) of construction of commercial buildings/buildings Structural Works/ Industrial buildings/Multistoried Apartments

Notes for applicant:

I. In case of a JV, the value of contracts completed by ite members shall not be aggregated to determine whether the requirement of the minimum value of a single contract has been met. Instead, each member shall satisfy the minimum value of a single contract as required for single entity

II. Satisfactorily completion shall be based on 100% of the works completed under the contract, completion certificate issued by as employer shall be provided

III. An EPC is a firm which takes on the role of contract management as a “general” contractor of sort could do. It does not normally perform directly the construction works associated with the contract. Rather, it manages the works of other (Sub) contractors while bearing full responsibility and risk for price, quality and timely performance of the work contract.

IV. The phasing project in serial form (i.e. highly continuous and adjacent projects in same line/highway) should be regarded as one single contract.

V. The project experience must belong to the transport sector (Railway, Highway and bridges, airport and port). The project experience must include railways or roads or bridges or highways or airports/airport terminal buildings or port construction works as a substantial component of the project respectively. The project experience for other sectors which partly include the above construction component are not eligible

VI. Substantial completion shall be based on 805 or more of the works completed under the contract.

VII. For contracts under which the applicant participated as a JV member, only the applicants, share by value, shall be considered to meet this requirement.

VIII. The experience projects, as a minimum, must include workshop building scum rail trucks for MRT or HSR or Intercity railway or Conventional railway or other similar type of railway workshop facilities. The experience for LRT/AGT/Monorail workshop facilities is not eligible.