FIREFREEZE EST.Prequalification Documents
Head Office
FIREFREEZE EST.P.O. Box 14148Dammam – 31424Saudi ArabiaTEL : (+96613) 8462047/ 8462079FAX : (+96613) 8465254EMAIL : [email protected]
Contents
1. Company Profile
2. Mutual Confidentiality Agreement
3. Company Documents
4. Scope of work
5. Organization Chart
6. Curriculum Vitae
7. Project Management Procedure
8. Quality Assurance Procedure
9. Project Reference
10. Authorization Certificates
11. Partners/Associates
1 : Company Profile
ABSTRACT:-
FIREFREEZE is one of the leading company to provide services of design, installation, testing & commission and maintenance services for fire-protection system and fire alarm system. Our team is capable of providing onsite training to operation people and maintenance people.
Since 1995, FIREFREEZE is involved in providing high quality services to the industrial installation. Our company can provide complete range of fire protection system and Fire alarm system & gas detection system.
Our partnership with many leading manufacture of the world enables us to utilize scientific and technical skills of leaders in the field.
FIREFREEZE has engineering team, installation team, financial resource and expertise to handle the turnkey project.
FIREFREEZE have HCIS approval to work on industrial mega project along with vendor approval with Saudi Aramco, Sabic, Saudi Electricity Company (SEC), Saudi Telecom Company (STC), Ministry of Health (MOH), Ministry of interior (MOI) and saline water conversion corporation (SWCC), EPCC and Local civil defence authorities. We are approved supplier to many global EPC contractors working in Saudi Arabia.
COMPANY AIM
Our mandate is to protect you and your property from fire. FIREFREEZE is dedicated to finding the suitable solution for any fire protection problem. We offer total fire protection capabilities with quality products and trained, experienced technicians.
FIREFREEZE is aligned with the leading manufacturers who select only very qualified representation. We have a working knowledge of worldwide fire protection rules and regulations to ensure complete safety and compliance anywhere. On time, reliable, accurate, and on budget.
FIREFREEZE - FIRST For Fire Protection.
As you can see our experience covers the complete range of Fire Protection, from fire sprinklers and special hazard protection to alarms and detection we can handle your fire challenge. Understanding our customer’s needs, concerns and business is our number one priority.
FIREFREEZE - your first call for Fire Protection!
POTENTIAL OF COMPANY
Our Services are genuinely innovative, comprehensive and represent an excellent value. We consider our customers as our partners ensuring their objective are met as efficiently and economically as possible.
FIREFREEZE believes in a team approach for creating a safer facility. We work closely with our clients to formulate and implement high-quality, comprehensive programs that exceed their expectations.
OUR MISSION
The key to the success of any Fire & Safety equipment or system is its suitability for the hazard and workforce which uses it.
Fires and toxic spillage especially threaten the oil and petrochemical industries. Many other industries such as plastics, paints or paper are facing similar hazards. Offices, shops, hospitals and hotels are all at risk with fire class.
At FIREFREEZE we not only supply the entire Saudi Arabian market with firefighting and safety equipment produced by many of the US and Europe’s leading manufacturers, we also provide technical advisory services and comprehensive
testing, servicing and maintenance program which ensure the safety of working people in oil fields, petrochemical plants, electrical companies, desalination plants, industrial installations, airports, militaries, civil defense, hospitals, schools, university, offices, building and other location throughout the region. Most of our projects are industrial project with EPC contractor.
SAFETY
The company operates a safety policy in compliance with internal set objectives of recognized standard. Safety consultants are retained to advise on all safety matters related to company activities. We work with international consultant for certifying the design and drawing.
Safety awareness is highlighted for all projects and risk assessment is prepared to recognized standards to control hazards.
The safety policies followed are aimed at working together with clients to achieve the objective of zero safety related incidents.
ENVIRONMENTAL
Environmental policies are operated to ensure safeguards in respect of the environment and society in connection with all of its activities. The company additionally complies with all client requirements regarding environmental policies, which are in force at its sites or operating locations. The company policy is aimed reducing environmental impact to a minimum and ensuring that all related activities are carried out in accordance with recognized approved procedures.
INTERNAL RELATIONSHIP
It is our firm conviction that our employees are our “Best Assets” and we wish to be recognized as a “Great Place to Work” our personnel shall be guided by this desire and our approach to our employees shall be governed by the principles of “Mutual Respect” and “Trust”.
We recognize the need to nurture team spirit. For this purpose we shall provide an environment of friendliness and mutual support within the organization at the same time encourage individual initiative and creative skills. We keep training our design and operation team at manufacture factories to keep them update with knowledge and latest technologies and best design techniques
AREAS OF SPECIALIZATION
A. Fire Protection and Detection Systems Construction. B. Fire Fighting Equipment Supply. C. Maintenance and Inspection Services for Fire Protection
Systems.D.Refilling of clean Agent System. E. Room integrity test. F. Co2 concentration test. G.Training to operation & maintenance staff H.Gas detection system I. Spare parts of pumps & other Electromechanical
machineries
ACTIVITIES
1- Clean Agent Filling Capability:
We provide refilling of following I. FM-200 SystemII. NOVEC-1230 System
III. Wet Chemical System IV. Dry Chemical System V. Co2 cylinder VI. Nitrogen cylinder VII. All type of fire extinguisher
2- Consultancy and Engineering Services:
Design verification and as-built drawings in accordance to the international codes and standards.
Review of plans, P&ID drawings. Risk analysis and Process Safety Management. Issuance and review of the specification and scope of works in accordance
to the international codes and standards (ASME, OSHA, NFPA, DIN, EN, BS). Projects supervision and management. Damage analysis and loss adjustment.
3- Fire Lose Prevention Engineering:
Design,Hazard and Risk Analysis, Fire Control, Construction, Testing and Commissioning
4- Maintenance and Inspection Services For Fire Protection Systems and Fire Fighting Equipment:
Periodic Inspection Preventive Maintenance
CAPABILITIES
FIREFREEZE, cooperate with international companies. These companies offer everything from Design, Supply, Installation, Commissioning and Testing.
The company team is committed to delivering its customer's projects on time, safely, within budget and with the highest degree of quality.
PRODUCTS
In line with the comprehensive scope of our advisory services, materials supply, maintenance services, FIREFREEZE carries a large inventory of specialized fire protection and safety items.
We can supply of fire extinguishers, portable, mobile and fixed fire monitors, wide range of effective fire nozzles, a range of fire & safety valves, various diameters of industrial and municipal fire hoses, Breathing apparatus, fire hose cabinet, hydrant, hose reel station.
All types of fire-fighting fire entry suits and fire retardant station uniforms including fire helmets, fire gloves and fire boots. A large selection of chemical suits against all type of chemicals at various concentrations.
Safety equipment such stretchers, burn kits, flashlights, various types of safety shower personal protection, gas masks and accessories.
FIREFREEZE has an established firefighting and safety equipment business which is also involved in marketing and distribution of a wide range materials, services and equipment’s for many industrial activities.
Fire Fighting Flow Control group
Pipe & Pipe Fittings, Tubing, & Flow Meters Rubber Covered Hose Hose Hardware and Accessories Nozzles & Accessories
Fire Extinguishers Cartridge-OperatedPortable Fire Extinguishers Stored Pressure Portable Fire Extinguishers Wheeled Extinguisher
Fire Fighting Clean Agent (FM-200 & NOVEC-1230 System, Argonite System, FE-13 System, vehicle fire protection & marine fire protection)Foam Fire Extinguishing Carbon Dioxide Fire Extinguishing Dry Chemical/Powder Fire Extinguishing Wet Chemical
Fire Protection Specialties & Equipments
Control, Detection and Alarm Equipments
2 : Mutual Confidentiality Agreement
Please find enclosed the Mutual Confidentiality Agreement on behalf of FIREFREEZE. Should you require any further clarification, please do not hesitate to contact us.
MUTUAL CONFIDENTIALITY AGREEMENTBETWEEN FIREFREEZE EST
P.O. Box 14148Dammam 31424, Saudi Arabia(here in after together referred to as “the Parties”)
AND [Counterparty name]__________________
having a place of business at:
[Counter party current address]………………………….……………………………………..
WHEREAS : The Parties have agreed to discuss possible collaboration on programs relating to:
XXXXXX – Saudi Arabia
AND WHERAS: The Parties wish to exchange information which may be of a proprietary or a confidential nature for thepurpose of such possible collaborationNOW THEREFORE IT IS AGREED AS FOLLOWS THAT:
1. The Receiving Party shall hold in confidence all confidentialinformation relating to such possible collaboration disclosed toit by the Disclosing Party, which: (a) is marked as confidentialat the time of disclosure; or (b) is not in a form that can bereadily marked (e.g. verbal disclosures) but is verballyidentified as confidential at the time of disclosure, and isdesignated as confidential by the Disclaimer in writingto the Recipient’s primary representative within thirty days ofdisclosure. “Confidential Information” means all information inrespect of either parties’ business and finances including,without prejudice to the generality thereof, any ideas, businessmethods, finances, prices, products, specifications supplierlists, business, financial, marketing, development, manpoweror new product development plans, customer lists or details,computer systems and software, Intellectual property or othermatters connected with the parties’ products or serviceand information concerning relationships with actual orpotential customers and the needs and requirements of suchpersons.2. The Receiving Party undertakes to apply to all ConfidentialInformation disclosed in accordance with the provisions of thisagreement the same degree of care with which it treats andprotects its own proprietary information against publicdisclosure. All such information and idea shall not be disclosedto any third party without the written consent of the DisclosingParty. Where such consent is granted disclosure shall only bemade to another party where such party accepts similarobligations of confidence to those contained in thisAgreement or where such a party is a government orgovernment agency and agrees to treat such information asconfidential and proprietary information.Notwithstanding the foregoing, either party may disclose
confidential information to subsidiary, affiliate and parentcompanies, both direct and indirect, provided such companiesagree to comply with the provision of this Agreement.3. The Receiving Party undertakes to restricts its use ofConfidential Information to work performed in conjunctionwith the Disclosing Party related to such possible
c. disclosed to the Receiving Party without restriction by a thirdparty having the full right to disclose, ord. independently developed by an employee of the Receivingparty to whom no disclosure of Confidential Information hasbeen made, or e. specially required by a government body orcourt of law to be disclosed, provided that (i) prior to suchrequired disclosure, the receiving Party shall give the DisclosingParty reasonable notice of such required disclosure (to theextent permitted by the law) and shall cooperate with theDisclosing Party in any action taken by the Disclosing Party toprotest against and/or limit such disclosure and (ii) suchdisclosure shall be limited to the specific disclosurerequirements.6. This agreement shall only apply to information disclosedduring the (12 month) period commencing on the EffectiveDate (“Disclosure Period”). Any Agreementto extend the Disclosure Period shall be written in form. [selectappropriate one of [I ]or [ii] and delete the other: [i] Theconfidentiality obligations under this agreement shall continueuntil such time as the Confidential Informationbecomes part of the public domain through no act or omissionof the Receiving Party. [ii] The obligation here to relating toconfidentiality and use of information and ideas shall continuefrom the effective date until [3 years ] after the End of theagreed Disclosed Period.]7. The Receiving Party shall not assign or transfer any of itsrights or obligations hereunder without the prior writtenconsent of the Disclosing Party.8. All Confidential Information disclosed hereunder shallremain the property of the Disclosing Party. Nothing in thisAgreement shall deemed to grant a license directly or byimplication under any registered design, patent, copyright,trade secret or patent application.
9. After the end of the Disclosure Period, the Receiving Partyundertakes, upon written demand, to return to the DisclosingParty all documents & materials (and any copies ) containing,reflecting, incorporating, or based on the Disclosing Party’sConfidential Information from its computer systems to theextent possible; and/or certify in writing to the Disclosing party
collaboration and to ensure that dissemination of ConfidentialInformation within its own organization is on a strict “need toknow” basis.4. Each Party acknowledges that any breach by it of itsobligations under this Agreement would inevitably causesubstantial and irreparable damage to the otherparty , and that money damages would be an Inadequateremedy there for. Accordingly, each Party acknowledges andagrees that the other party will be entitled, in addition to anyother available remedies, to an injunction, specificperformance, and/or other equitable relief to prevent theviolation of such obligations.5. The obligations of Confidentiality in this Agreement shall notapply to those sections of confidential Information which are:a. in or passed into the public domain other than by breach ofthis Agreement or b. Known to the Receiving party prior todisclosure by the Disclosing party, or
that it has complied with the requirements of this clause,provided that the Receiving Party may retain documents andmaterials containing, reflecting incorporating, or based on theDisclosing Party’s Confidential Information to the extentrequired by law or any applicable governmental or regulatoryauthority, and to extent reasonable to permit the ReceivingParty to keep evidence that it has performed its obligationsunder this Agreement.10. This Agreement constitutes the Entire understandingbetween the Parties related to the protection of ConfidentialInformation disclosed hereunder and supersedes all prior andcollateral communications, reports and understandingbetween the parties hereto relating to ConfidentialInformation. It shall come into effect on [date] (“EffectiveDate”).11. The Agreement will be governed by and interpreted inaccordance with the Laws of [England And Wales] and will besubject to the jurisdiction of the Courtsof [England And Wales].
Place and Date: Dudley DD/MM/YYYY
Signed for and behalf of FIREFREEZE
Name:___________________________
Title: ____________________________
Place and Date:__________________________
Signed for and behalf of a[Counterpartyname):_________________________________
Name: __________________________________
Title: __________________________________
3 : Company Documents
Please find enclosed a copy of FIREFREEZE’s Registration certificate.
4 : Scope of work
FIREFREEZE offer a total integrated fire engineering solution encompassing Water, Foam, Sprinkler, Gas and Site Wide Detection systems. The solutions we offer are in accordance with internationally recognized standards on a global scale.
The services FIREFREEZE offers are: -
A. Full turnkey – Design, Supply, Installation/Erection, Testing and Commissioning and Training
B. Design & Engineering Only C. Supply Only D. Site Services – Site Supervision, Testing, Servicing &
MaintenanceE. Erection – Full installation Works F. Training – Onsite training, factory training.
5 : Organization Chart
S
As
Naseem AkhtarProject Engin
MuhammedIlyasProject Engin
MuhammedShakeerFire Alarm Engi
Giyassudin
Project Coordin
Sohail IftikhaCAD/Design Eng
Sohaib Ul HassanCAD/Design Eng
Sameer MasoodTechnical Manag
srar AhmedDesign&Estm. Engine
neer
d
neer
d
ineer
nator
rgineer
gineer
KY
Kha
MuA
M
Ays
Tah
Nah
ger
eer
Kamran YounasCAD/Design Engineer
aja NizamCAD/Design Engineer
hammed AwaisCAD/Design Engineer
ani LaalCAD/Design Engineer
sha Faleej
CAD Operator
ani Faleej
CAD Operator
hed Faleej
CAD Operator
Naeem
Proje
ShahzTaimProje
Tariq AKhaProje
Zia Ulla
Site
RawPrash
Site
Zubair AKhaProje
Jonat
Saf
M. NaUddProje
BinuSulocha
Project
uddin
ect Enginer
zada mourect Engineer
Ayub anect Engineer
h Khan
e Engineer
wat hante Engineer
Ahmed anect Engineer
than
ety Officer
aeem dinect Engineer
u nan Manager
Naeem Ahm
Mech. Fo
MuhammNasib
Mech. Fo
Kamran As
Elect. Fo
M. JavaidRasulElect. Fo
Abdul Rao
F. Alarm Fo
Zeshan Sarw
Mech. Fo
med
reman
ed
reman
lam
reman
d
reman
of
oreman
war
reman
M
M
M
M
M
M
F
Muhammed Wahed
Electrici
Muhammed Shahid
Electrici
Muhammed Ramzan
Pipe Fitt
Mohiu Ddin
Weld
Muhammed Naveed
Pipe Fitt
HafizShahzad
Electrici
Muhammed Imran
Labo
Surendra Limbu
Piper Fitt
FIREF
an
an
ter
der
ter
an
our
ter
MuhAht
Ye
Kash
Rahi
Rizwa
Nade
Abu
MuhHa
MuhSh
FREE
Mutlaq
Bassam
Operation D
hammed tisham
Electrician
sh Pall
Welder
if Sohail
Pipe Fitter
im Ullah
Labour
an Abbas
Pipe Fitter
eem Ullah
Electrician
Huraira
Pipe Fitter
hammad aroon
Pipe Fitter
hammed hakeel
Electrician
EZE O
q Azzam Al-
G
M
Parvez
Department
Nazrul I
MuhamAsif
P
DipaDanuw
E
Adna Iq
Mech
MuhamTahi
E
Naeem HUlla
P
PareeRawth
P
MuhamQaise
Pi
Atif ali Z
E
ORGA
-Khaldi
General Manager
M. Parvez NagraOperation Manage
Islam
Welder
mmed fPipe Fitter
ak warElectrician
qbal
. Tecnician
mmed irElectrician
Habib hPipe Fitter
ed herPipe Fitter
mmed erper Fitter
Zafar
Electrician
ANIZA
r
er
Zakir Hussa
Piper
Shahidusala
Elect
Prem Prasa
Pipe
Adnan Rafi
Pipe
Adnan AbdKhaliq
Pipe
Shoaib But
Elect
Ejaz Cheem
W
Hemlal Limbu
Elect
Ansar Mehmood
Elect
ATIO
ain
Fitter
am
rician
ad
Fitter
iq
Fitter
ul
Fitter
tt
rician
ma
Welder
rician
drician
Sh
M
Ab
M
A
ON
Mu
oaib LiaqatMaterial Procureme
Mubashar Hussain
Purchase
bdul Razzaq
Purchase
uhammed Zahid
Purchase
baid Ullah
Tea / Office Bo
Nauf Bin GhanamComp. Operato
hammed IrfanAdministrator
ent
er
er
er
oy
or
Muna
Adm
Muna
Adm
Sara
Ad
Abi
Adm
MuzaSaAdm
Sara
Co
Hassa
Co
Mun
Co
Sara H
Co
a Fahad
min Support
a Sultan
min. Support
Sultan
mn. Support
ir Esa
min. Support
avi Bint aoodmin. Support
Fahad
omp. Operator
a Azzam
omp. Operator
a Saad
omp. Operator
Hamood
omp. Operator
Waqar AhFinance
Abdul Rah
A/C A
hmed/ Accounts
hman
Assistant
Nasir Bin. MJahranLogistic Sup
Reem Salim
Logistic Sup
Musab
Logistic Sup
M.
port
m
port
port
6 : Curriculum Vitae
7 : Project Management Procedure
Project Management Process
FIREFREEZE will assign a single point of contact for all major projects and use modern Project Management processes and tools to execute a project which will include but not be limited to the use of “PRIMA VERA” to record the sequence of works and the time frame for completion along with all project milestones. This will be reviewed against a baseline, up-dated and submitted on a regular basis (Frequency to be project specific) during the project execution period as part of the Progress Report. The Progress Report will detail all other project information from procurement and delivery activities, design & document submittal, Technical Query (TQ’s) progress, Installation & Commissioning progress, Commercial and Contractual information and any other information deemed necessary to the scope of works.
FIREFREEZE employ a robust QEHS (Quality, Environment, Health and Safety) system that also controls and houses all other Project Management processes, procedures, forms and documents necessary for completing a successful and well documented project.
8 : Quality Assurance Procedure
TABLE OF CONTENTS
1. INTRODUCTION1.1 Purpose
2. PROJECT QUALITY PLAN, ISSUE AND AMENDMENTS2.1 Distribution2.2 Amendment record2.3 Amendment record document
3. TERMS AND DEFINITIONS
4. PROJECT QUALITY MANAGEMENT SYSTEM 4.1 General Requirements 4.2 Documentation Requirements
4.2.1 General 4.2.2 Project quality plan 4.2.3 Control of Documents 4.2.4 Control of records
5. MANAGEMENT RESPONSIBILITY5.1 Management Commitment 5.2 Customer Focus 5.3 Project Quality Policy 5.4 Planning
5.4.1 Quality Objectives 5.4.2 Quality Management System Planning
5.5 Responsibility, Authority 5.5.1 Responsibility and Authority 5.5.2 Internal communication
5.6 Management Review
6. RESOURCES MANAGEMENT6.1 Provision of Resources 6.2 Human Resources
6.2.1 General 6.2.2 Competence, awareness and training
6.3 Infrastructure 6.4 Work Environment
This Document is the property of FIRE FREEZE FIRE PROTECTION & SAFETY SOLUTIONS, Dammam KSA.
7. PRODUCT REALIZATION 7.1 Planning of Product Realization 7.2 Customer Related Processes
7.2.1 Determination of Requirements Related of the Product/Service 7.2.2 Review of Requirements Related of the Product/Service 7.2.3 Customer Communication
7.3 Design and Development 7.4 Purchasing 7.5 Production and Services Provision
7.5.1 Control of Production and Services Provision 7.5.2 Validation of Processes for Production and Services Provision 7.5.3 Identification and Traceability 7.5.4 Customer property
7.5.5 Preservation of product 7.6 Control of monitoring and measuring devices
8. MEASUREMENT, ANALYSIS AND IMPROVEMENT 8.1 General 8.2 Monitoring and measurement
8.2.1 Customer satisfaction 8.2.2 Internal Audits 8.2.3 Monitoring and measurement of processes
1. INTRODUCTION This Project Quality Plan defines the Quality Management System that shall be used to control the activities involved in FIREFREEZE.
The activities included in this project are defined in the scope of work prepared and issued to FIREFREEZE by Client.
Purpose:
The purpose of this Project Quality Plan is to demonstrate the ability of the Company to provide scope of work / services for the project which meets the requirements of ISO 9001:2008 Quality Management Systems. In addition to this, the PQP documents the commitment of the Company in meeting the Client requirements and all applicable statutory and legislative requirements.
2. PROJECT QUALITY PLAN, ISSUE AND AMENDMENTS
Once a contract signed with FIREFREEZE All amendment to this Project Quality Plan shall be reviewed by the Project QA/QC Manager and shall be approved by the Project Manager and QHSE Department Manager (If necessary). The revision, updating and distribution will be the responsibility of the Project QA/QC Manager. He will be responsible for retrieving the obsolete copies of the PQP (if necessary).Revisions to the Project Quality Plan are carried out by section by section. In case of minor change requiring the revision of one or several pages of section of the Project Quality Plan only such page or pages shall be revised.Project QA/QC Manager revised this Project Quality Plan and he or his designate will do the issue control. The issue shall be subject to the review and approval by project QA/QC Manger, Project Manager and FIREFREEZE (as applicable).The same personnel as original issue or authorization by Project Manager shall subject all subsequent revisions to review and approval. The Project Quality Plan shall be subjected to review during the course of the project by Project QA/QC Manager or his designate to ensure that any developments or improvements in the FIREFREEZEIntegrated Management Systems are accurately reflected in this document.
Distribution:
The original PQP/Master Copy shall be retained with Project QA/QC Manager. Approved copies shall be distributed to the following:
Others as directed by Project Manager (list retained with project QA/QC Manager)
The distribution shall be “Controlled” and shall be recorded. All controlled copies shall be identified with a blue color stamp “CONTROLLED COPY” “No. ……”.
All amendments shall be issued to the approved copyholders and it is the responsibility of the copyholder to replace the old one with the amendments. All old documents shall be destroyed.The project Quality Plan is the property of FIREFREEZE and shall not be reproduced or transmitted to any third party without the written approval of FIREFREEZE QHSE Manager.
Amendment record: This section will show the revisions done on this document with the reason for change. The objective is to trace the document history. It is the project quality In-charge responsibility to update these details.When changes will be made in any part of manual, the revision number will be incremented. The revised areas will be identified with blue color and italic text. Internally this document will be issued and revisions will be communicated through document Form. Internally this document will be issued to the relevant managers and they will communicate this to the relevant staffs. Any printout without original “CONTROLLED COPY” stamp will be treated as invalid.
TERMS AND DEFINITIONS: The Quality Management and related terms used in this Quality Plan are defined below. Wherever possible, reliance is placed on ISO 9000:2005 Quality Management Systems - Fundamentals and Vocabulary, and if a term is defined therein, the definition is quoted, with explanatory notes as relevant. FFE: FIREFREEZE EST. Company mean – ClientCompany representative mean – Client representative at site
Supplier Appraisal:Assessment of supplier’s capability of controlling quality carried out before placing orders.
Certification: The authoritative act of documenting compliance with requirements. The requirements can relate to personnel, processes, products, organizations and services.
Compliance: An indication or judgment that the product or service meets the requirements of the relevant specification or regulation; also the state of meeting the requirements.
Customer:Recipient of a product provided by the supplier.
1. In a contractual situation, the customer is called the “COMPANY”.
2. The customer may be, for example, the ultimate consumer, user, beneficiary or purchaser.3. The customer can be either external or internal to the organization.
Corrective Action:Action taken to eliminate the causes of an existing nonconformity, defect or other undesirable situation in order to prevent recurrence.
Documentation:Any recorded or pictorial information describing, defining, procedures or results.
Defect:Non-fulfillment of an intended usage requirement or reasonable.
Design Control: The verification that design criteria comply with specified requirements; that design data and methods are valid for the range of application; and that the completed design satisfies the design criteria.
Design Review:A documented, comprehensive and systematic examination of a design to evaluate its capability to fulfill the requirements for quality identify problems, if any and propose the development of solutions.
Work will be held until the inspection or test has been satisfactorily completed.
Improvement:Actions taken by FIREFREEZE to increase the effectiveness and efficiency of activities and processes in order to provide added benefits to both FIREFREEZE and its Sub-contractors.
Inspection:An activity such as measuring, examining, testing or gauging one or more characteristics of an entity and comparing the results with specified requirements in order to establish whether conformity is achieved for each characteristic.
Non-conformity:Non-fulfillment of a specific requirement. The definition covers the departure or absence of one or more quality characteristics (including dependability characteristics), or quality system elements form specified requirements.
Procedure:A specified way to perform an activity. In many cases, procedures are documented (e.g. quality system procedures). When a procedure is documented, the term “written procedure” or “documented procedure” is frequently used.
Product:Result of activities or processes.
1. A product may include service, hardware, processed materials, software or a combination thereof.
2. A product can be tangible (e.g. assemblies or processed materials) or intangible (e.g. Knowledge of concepts) or a combination thereof.
3. A product can be either intended (e.g. offering to customers) or unintended (e.g. Pollutant or unwanted effects.)
Quality:The totality of features and characteristics of a product or service that leads to customer satisfaction. In other words, “degree to which a set of inherent characteristics fulfill requirements”.
Quality Policy:The overall intentions and direction of an organization with regard to quality, as formally expressed by top management.
Quality Management:All activities of the overall management function that determine the quality policy, objectives and responsibilities, and implement them by means such as quality planning, quality control, quality assurance and quality improvement with FIREFREEZE. In simple “coordinated activities to direct and control an organization with regard to quality”.
Quality System:FIREFREEZE organizational structure, procedures, processes and resources needed to implement quality management.
Quality Assurance:All the planned and systematic activities implemented within FIREFREEZE quality system, and demonstrated as needed, to provide adequate confidence that an entity will fulfill requirements of quality.
Quality Control: FIREFREEZE employs operational techniques and activities that are used so that its operations and services conform to the quality requirements as laid down in Company’s documents.
Quality Plan: A document setting out the specific quality practices resources and sequence of activities relevant to a particular product, service, contract or product.
Quality Audit:A systematic and independent examination to determine whether quality activities and related results comply with planned arrangements and whether these arrangements are implemented effectively and are suitable to achieve objectives.
Repair:Action taken on a non-conforming product so that it will fulfill the intended usage requirements although it may not conform to the originally specified requirements.
Repair is one type of disposition of a non-conforming product. Repair includes remedial action taken to restore, for usage, a once conforming but now non-conforming product.
Review:An independent assessment undertaken by an individual or group for the area under review.
Rework:Action taken on a non-conforming product so that it will fulfill the original requirement. Rework is one type of disposition of a non-conforming product.
Safety-related:Pertaining to those items of plant, the satisfactory performance of that is important to the prevention of consequences of such accidents.
Specification:The document that prescribes in detail the requirements with which the product or service has to comply.
Standard:A document approved by a generally recognized body that results from the process of formulating and applying rules for an orderly approach to a specific activity.
Service:The result generated, by activities at the interface between the supplier and the customer and by supplier internal activities, to meet customer needs. Personnel or equipment may represent the supplier or the customer at the interface. Customer activities at the interface with the supplier may be essential to the service delivery. Delivery or use of tangible product may form part of the service delivery. A service may be linked with the manufacture and supply of tangible product.
Service Delivery: Those supplier activities necessary to provide the service.
Supplier:Any individual or organization that furnishes items or services to a procurement document. An all-inclusive term that may be used in place of any of the following: Vendor, Seller, Contractor, Fabricator, Consultant and Sub-tier levels.
Test:The determination or verification of the capability of an item to meet specified requirements by subjecting the item to a set of physical, chemical, environmental or operating conditions.
Witness Point:The inspection (notified in advance) will be witnessed by inspection of QC staff. Work may proceed even if the QC personnel have not witnessed the test.
4. PROJECT QUALITY MANAGEMENT SYSTEM 4.1 General Requirements Before starting the project execution, FIREFREEZE shall identify all processes involved in the project. FIREFREEZE shall identify the sequence and interaction of these processes, resources required, information required to support the execution, monitor and measure and analyze these processes, etc. FIREFREEZE submit its Project Quality Plans to COMPANY Representative for review and approval prior to the scheduled start date of the procurement, construction and pre-commissioning phases as specified in the Work Schedule provided in Schedule. Moreover, the Quality System described in the Quality Plan demonstrates that FIREFREEZE has a planned and systematic approach for obtaining and maintaining quality. It shows that personnel have the necessary training to perform their work and definitions for quality and quality related activities are reflected in the documented system and represent FIREFREEZE interpretation to suit its own objectives. Prior to commencement of any activity, FIREFREEZE shall designate one qualified personnel as Project Quality Assurance/Quality Control Manager/Engineer who from his other responsibilities shall be responsible for Implementation and Monitoring of project quality Management System.4.2 Documentation Requirements The hierarchy of the quality management system to be applied for this project mainly consists of three main levels of documents, which are described below:4.2.1 GeneralThe project quality plan documentation is structure in the order of precedence
4.2.2 Project quality plan 4.2.2.1Project quality plan Level 1Project Quality Plan (PQP) which states the overall quality management systems project specification and in which the project quality policy has been published. PQP is supported by a comprehensive series of Integrated Management System Standard Operating Procedure (SOP) that define in detail, the standard approach that shall be adopted. Wherever necessary, project specific procedures shall be prepared as supplement or otherwise developed and defined operational quality activities contains in the existing procedures.
The Project QA/QC Manger or his designate in consultation with the Project Manager shall review and update the PQP, as necessary, to ensure that it matches with the scope of work. Any such modifications shall be agreed by Project Manager and approved by QHSE Department Manager (as appropriate) prior to submission for FIREFREEZE Approval.A list of the following is attached at the end of this PQP:
Audit Schedule. Processes. Inspection and Test Plan- Project Specific. Standard Operating Procedures – Project Specific. Method of Statement / Work Instructions- Project Specific.
4.2.2.2IMS Company procedures (Level2)Standard Operating Procedure (SOP) which describes the responsibilities and methods to be followed for carrying out various activities and task in adequate manner. These procedures define how the requirements of applicable clauses of ISO 9001:2008 are applied to the services. These are confidential and their circulation is restricted to internal use without authorization. 4.2.2.3 Work instructions (Level 3)Work Instructions (WI) for the execution of specific activities on the project form level 3 of the IMS. It includes drawings, Welding Procedures, Construction method statements. The preparation and control of above-mentioned documents shall be included in project requirements as appropriate.4.2.3 Control of DocumentsFIREFREEZE has an established maintained procedure for control of all documentation relating to the Project Quality Plan.
All essential documents affecting quality shall be reviewed for adequacy and approved for release by project QA/QC Manager.FIREFREEZE shall make the applicable issues of such documents based on the contractual freeze date available at all functional areas, inspection and test points where they apply so they are readily accessible to the personnel concerned.
The issue, control and recall of all engineering documents, is under the jurisdiction of the project QA/QC Manager. Inspection and Test Plans and other related instructions (ITP & IC) shall be issued by the project QA/QC Manager.Test Reports shall be prepared and issued by Discipline Quality Control personnel. The system of documentation and data control shall ensure that essential drawings, technical requirements, contract change information, inspection instructions, specifications or any other document required by Quality Management, are available at the time and place of the operation.Approved IMS documents (latest issue) – Forms, etc. shall be distributed by the QHSE Department Manager to all locations, where required, for the effective functioning of the Quality Management System.
All changes to these documents shall be implemented in writing and processed in a manner that ensures prompt action at the specified locations. Changes to documents shall receive the same authorizations as the original documents. Records shall be
maintained for changes as they are made. Provision shall be made to promptly remove obsolete documents from all points of issue and activity locations.
4.2.4 Control of recordsRecords are generated and maintained in order to demonstrate achievements of the required quality of the products and effective operation of the documented Quality System.The records to be generated during a process are defined in the Quality plan, Process Document and Work Instructions. The records are stored and maintained in a way, which would prevent damage, deterioration or loss and are readily retrievable. Identification, collection, indexing, filling, maintenance and retention are carried out by authorized persons, as per relevant Process Document and Work Instruction.
Method of retentionThe records are identified date-wise, customer- wise, supplier/client –wise, component code-wise as the case may be.Every effort will be made by FIREFREEZE to cultivate joint working relationships with Client, to enable an open and free exchange of information, in order to ensure that the project is completed safely, on time, within budget, to the required quality and in conformity with all applicable statutory/Legislative requirements, commitment to achieve client satisfaction.5.4 Planning5.4.1 Quality Objectives The quality objectives for the project are as follows:
a. Project Quality Performance Index
b. Equipment’s/Material Delivered to Site: Zero EDR c. Weld Rejection Rate (on joint basis): <5.0% on Weekly basisd. Weld Rejection Rate (On Linear basis): <1.0% on weekly basis e. RTFI Assessment Disagreement: <5.0% f. Client NCR 0g. Client Worksheet: 0h. Non-Authorized Manufacturers 0i. Inspection acceptance rate of RFI Shall be more than 95%
5.4.2 Quality Management System Planning In order to achieve the project quality policy, the commitment of policy statement is translated in terms of SMART (Specific, Measurable, Achievable, Relevant and Time Framed) or SWOT (Strength, weakness, opportunity, threat) Project Quality Objectives for each functional activities and are communicated to the relevant personnel to continuously monitor and periodically measure the achievement. It is ensured that the defined objectives are in the service and other business requirements. These objectives reflect the following principles;
Improve service quality by comparing the service quality of projects and maintain a better completion time compared to our competitors.
Identify and implement improvements within the quality management system by utilizing the systems and through involvement of the employees.
Reduce the wastage of raw materials and other resources. Maintain the Integrity of the project quality system.
5.5 Responsibility, Authority This section of the Quality Plan sets forth the organizational arrangement employed by FIREFREEZE in providing support services and in executing projects they undertake. It also defines the organizational relationship, responsibility, authority and lines of communication of the Quality Management function.In providing effective management of projects and support services, FIREFREEZEassures optimum use of manpower, technological and financial resources utilizing expertise from a variety of disciplines to meet the requirements of their customers. Such expertise is developed in engineering and construction techniques.To this end, FIREFREEZE has an obligation to ensure that the final product i.e. “result of activities or processes meets its fitness for purpose” and has been carried out in accordance with the Job Specification and is consistent with design requirements. The overall organization for the project shall be in accordance with the organization chart attached to this Project Quality Plan.
FIREFREEZE Site organization consists of the following: Project Manager Construction Managers Project QA/QC Manager QA/QC Supervisor Procurement /Material Engineer Project Engineers Planning and scheduling Engineer QC Inspectors for various disciplines Document Controllers
The mobilization of key personnel shall be as per approved mobilization plan. As a general principle, only trained, qualified and experienced personnel shall be assigned to the work.The Project QA/QC Manger shall has close liaison with Project Manager concerning day to day project execution matters and QHSE Department Manager with reference to QA/QC and HSE related problems that require FIREFREEZE Management resolution. All project QA/QC personnel shall be made available for interview with FIREFREEZE, ifrequired, prior to assignment ensuring they meet the Client requirements. 5.5.1 Responsibility and Authority The organization of the Company has been defined and is illustrated in Appendix of this project quality plan.The responsibilities, authorities of personnel and their communication have been defined and documented in order to facilities effective quality management system. The duties, responsibilities of the key personnel are as follows: Project Manager Project Manager has the overall authority and responsibility for all aspects of the Project.His responsibilities include but are not limited to the following:
Representation of towards Company for all matters relating to the Contract. Overall management of the project activities and control of the related personnel. Approval of the Project Master Schedule and control of its fulfillment. Implementation of any step that may be required to prevent or minimize delays
budget over-running, conditions adverse to quality objectives. Submittal of progress reports to the Client. Coordination and supervision of activities of the subcontractors.
Maintenance and coordination of contacts with the local authorities for all matters related to the work execution.
The above task will be achieved by coordinating activities of the Project Personnel. Project QA/QC ManagerThe Project QA/QC Manager directs activities of the Project Quality Organization, reporting to QHSE Department Manager.His responsibilities include but are not limited to:
Preparation, review, updating and distribution of the Project Quality Plan. Issue of Project Quality Control Procedures, Inspection and Test Plans and Forms. Review of Quality documentations issued by FIREFREEZE. Assignment of Quality related tasks within the framework of the project. Review of Inspection Reports and Non-conformance Reports, if any. Evaluation of Suppliers/Sub-contractor’s Quality systems. Verification, by means of a planned Audit schedule that Sub-contractors are
implementing the established Quality Program. Verification by means of a planned Audit schedule that the requirements set in the
Quality Plan is met. Coordination and supervision of activities related to the collation of the “Project
Record Books”. Determine and inform to the Project Manager the principal causes of quality loses. Determine with the Project Manager where improvements are required and where
necessary, recommending corrective action. Managing Quality Control functions for the Project including planning of Quality
Control inspections and preparation of reports controlling corrective actions Assign Quality Control personnel to various areas of activity. Monitor inspections
progress; review Inspector’s reports and documentation. Upon completion of the work, ensure that all requirements have been met and the required Quality records have been collated and filed.
Monitor on day-to-day basis, and review the deviations reported, if any, with the approved quality plans(s).
Following a suitably start and approved procedure for the formal control of deviation/waivers from the project specification.
Review and approve as necessary, quality related procedures such as: - Welding procedure specifications & welding procedure qualifications.- Welder qualifications NDT procedures. - Heat Treatment Procedures Cleaning and Pressure Testing Procedures.
- Preservation Procedures. Monitor the content and consistency of subordinate’s daily inspection activities. Preparation and submission of “Two Week look Ahead Schedule” for both
construction and procurement phases as per “Client” requirements. Preparation and submission of “Monthly Management Review Reports” on monthly
basis as per the requirements of “Client”. Establishing Inspection and Test Plan for procurement, construction and
commissioning phases as required by ‘Client. Procurement and Project Inspection, witnessing, & monitoring in accordance with
the approved inspection and test plan. Note: Supervisor and discipline inspectors support the Project QA/QC Manager. Construction ManagersThe Construction Manager controls and coordinates all Work activities carried out in the construction site. His responsibilities include but are not limited to:
Establishment and implementation of work procedures for the execution of work. Review detailed construction schedule, including redefinition of priorities, where
necessary. Control and coordination of the work entrusted to Sub-contractors. Planning and scheduling of the work force and equipment. Review of the materials delivery schedule. Preparation of data required for compilation of the Work Progress Report. Preparation of the change order proposals. Assistance to the Project Manager in discussions with Company (Client)
QA/QC SupervisorThe duties and responsibilities of QA/QC Supervisor. QUALITY
Prepare Inspection and Test Plans, Inspection Check-Lists, Work Instruction etc., in accordance with project requirements.
Prepare / review of quality Procedures for special process such as welding, NDE concreting, refectory, RTR pipe–work etc.
Implement and monitor Quality procedures, monitor, and control and supervise inspection activities.
To prepare and submit “Two Week look Ahead Schedule” of all inspections and activities for both construction and procurement phases as per the requirements of “Client”.
To highlight all the QA/QC concerns and issues during the “Weekly Project Progress Meetings”.
To make sure the distribution of only control documents (Quality records, Procedures, Instruction and IFC drawings) within the quality department and at site.
Co-ordinate with construction group, Company representative and / or third party inspection agency to perform stage inspection in line with the approved Inspection & Test Plans, Inspection Check-list etc.
Monitoring the implementation of Receiving Inspection, Identification and Traceability of all materials for the project.
Monitoring the use of proper calibration instruments at proper location for delivering inspection activities.
Control of Non-conformance and corrective as well as preventive action. Identify the activities where improvement can be done.
Procurement / Materials Engineer The Materials Engineer reports to the Project Manager. His responsibilities include but are not limited to:
Receiving inspection and record keeping of all material-both ‘free issue’ from Company and FIREFREEZE supplied material and purchased material.
Reporting of non-conformances, the monitoring of careful segregation of quarantined material and rectification of defects and clearance of materials from quarantine.
Assuring the traceability of uniquely identified critical materials while materials are in storage.
The monitoring and recording of the condition and state of preservation of materials at store until released for processing and /or construction.
With the assistance of Construction personnel, perform maintenance of equipment and materials at store as per approved procedures.
Procurement Quality Control Supervisor He shall report to Project QA Manager. His responsibilities include but are not limited to:
Review of requisitions dossier for compliance with contract requirements and submit to Company for review.
Preparation of inspection assignment packages. Review of sub-vendors quality procedures. Establish agenda for pre-inspection meeting.
Ensure inspection assignment packages are correctly distributed. Scheduling and coordination of source inspection Assist Vendor inspectors in all aspects of their work to ensure that all project
requirements are fulfilled and that all inspections required are carried out and correctly recorded.
Drawing and Document Controller The Drawings and Document Controller assists Project Manager and Project QA/QC Manager for all the information concerning the Project Documents.His responsibilities include but are not limited to:
Promote the formal management of the information system. Record and manage incoming and outgoing Technical documents. Distribute documents in a “Controlled” manner.
Discipline QA/QC Inspectors (civil, mechanical, HVAC, Painting, communication, electrical, instrumentation, etc.)The Quality Control Inspectors for various disciplines report to Project QA/QC Engineer.His responsibilities include but are not limited to:
Ensure compliance with the requirements of the contract scope of work, technical specifications and contract quality plan insofar as it applies to: - Civil construction job
(Excavation, backfilling, concreting, asphalting etc.)- Structural work - Piping installation - Instrumentation work - Electrical work- Painting work- Welding work
Assisting the Procurement/ Material Coordinator in the task of overseeing final dimension checking.
Reporting both verbally and in writing any non-conformance discovered. Reporting daily a descriptive of each day’s work. Conduct weekly QA/QC Toolbox meeting. Conduct of inspection as per FIREFREEZE ITPS & SAICs etc. Shall report/coordinate with personnel for witnessing all inspections and acceptance
of the work items.
5.5.2 Internal communication FIREFREEZE has an established internal communication system. The communication within the Company takes place in various formats, such as internal internet facilities, memos, letters, internal meeting with concerned personnel, non-conformance reports and management review meetings to ensure effectiveness on the quality management system.The Project Manager conducts a meeting once in month at the project site along with concerned site personnel to ensure effective implementation of quality system processes/procedures. The conclusion of the meeting or action required to be taken is recorded and distributed accordingly by the site Secretary. 5.6 Management Review
A Management Committee, that comprises the senior executives of FIREFREEZE shall monitor and review project specific quality systems and continued effectiveness of FIREFREEZE QMS.The Project QA/QC Manager, who shall be responsible for setting the agenda and recording of minutes, shall convene the meeting at approximately six months intervals.These management reviews are additional to the findings of internal audits conducted to ensure continued adherence to the system.The Management Review shall:
Ensure that management quality policy objectives, assignments, delegations and methods are achieving the required results.
Reveal defects or irregularities in any of the elements examined. Indicate possible improvements. Check on the effectiveness of Management at all levels. Uncover potential danger spots to eliminate waste or loss. Examine the complaints received from customers/end users. Verify that corrective action procedures are effective.
FIREFREEZE shall ensure that Senior Management Reviews are scheduled event included in the quality audit schedule approved by Company Representative.
FIREFREEZE shall inform the Company Representative in writing of the results and recommended actions of Management reviews within two (2) weeks after the scheduled review date. Changes to the Quality System that result from Management Reviews shall be incorporated in the project Quality Plans, with the approval of Company Representative.
6. RESOURCES MANAGEMENT 6.1 Provision of Resources Resources are identified primarily through quality planning stages, also it is identified during as and when needs arise. Based on the quality planning & needs, resources are provided.Main aim of this exercise is to have adequate resources:
To implement and maintain the quality management systems. To continually improve the quality management system effectiveness. To ensure customer satisfaction through consistent achievement of customer
requirements.FIREFREEZE shall be responsible for maintaining up-to-date procedures for his area of management.FIREFREEZE identifies the requirements of resources including competent/trained personnel, equipment, machine, and software, with regards to meeting the project quality plan requirements.6.2 Human Resources 6.2.1 General Job Description is defined for each position in the organization, which will be independently handling the activities; which affect the product or service quality and hence contributes to customer satisfaction. The profile shall include the minimum academic qualification, training undergone, skill, industrial experience, certification, etc. required for the position. This job description forms the basic input for the recruitment. It is ensured that the competence of all potential recruits is complying with those defined in these job descriptions.6.2.2 Competence, awareness and training All new employees are given an induction training (to an extent necessary as per their responsibilities) to familiarize the organization, its business operations, Established QMS, etc. Quality documents relevant to one’s job are issued to the employees, whenever required. New employees are assigned to an existing employee for “on-job” training, if found required. The performance of all employees is reviewed by the reporting superior, at least once in a year; to identify the training need required for the employee. The identified training is reviewed and feasible trainings are provided in co-ordination with external agencies, wherever required.
Upon completion of the training, the effectiveness of the training is evaluated through one or more of the following methods:
Based on the quality of material presented in the classroom. Certificates of completion for externally provided training. Measuring process outcomes before and after training. Performance monitoring and reviews of new hires.
The Project Manager shall be responsible for assessing the training needs of personnel assigned to the project team. Any training needs shall be arranged in conjunction with the HR & A Manager. HR & A Manager or his coordinator shall arrange for updating the training records in employees personnel file.
— Recruiting Process — Performance Management System Process — Training & Development Process — Leave Application / Vacation Process
6.3 Infrastructure Infrastructure for the project is maintained as required and as appropriate to the location and operations. The management has planned, implemented, provided and shall periodically review the infrastructure needs.
Office Facilities. Facilities associated with Office. Equipment’s & machinery — Hardware & Software. Support Services — Transportation, Communication, etc.
The adequacy of such infrastructure is reviewed during the Management Review Meeting and any additional requirements are identified and made available.6.4 Work Environment Work Environment is maintained as per the requirements and as appropriate to the operations. Department Managers are responsible to identify these requirements and provide the same. Most significant areas are:
• Facilities• Health and Safety• Housekeeping
• Work Ethics
7. PRODUCT REALIZATION 7.1 Planning of Product Realization All the product & services requirements are determined as per Client needs and guidelines. For existing/new product & services proper quality planning are done.Once a contract is signed, it is turned over to the Project Team. The flow of information both at the Home Office and to/from the Field Site shall be established. This process is further detailed by description of the following functional groups responsible for the process:
Project Management Engineering QA/QC Purchasing Project Controls Environmental Health & Safety
7.2 Customer Related Processes7.2.1 Determination of Requirements Related of the Product/Service Service requirements are identified based on the following:
Stated requirements specified by customer. Implied requirements not specified by customer but necessary for specified or
intended use. Statutory and regulatory requirements related to the service.
Activities such as inquiry receipt, estimation, providing the quotation/proposal, order receipt, handling order amendments, etc. are carried out by the Sales & marketing. 7.2.2 Review of Requirements Related of the Product/Service Prior to the submission of the quotation/proposal, acceptance of order/contract and acceptance of the amendments in accepted order/contract, a review of requirements of the product & service is conducted to ensure that:
Product & Services requirements are clearly defined. All the ambiguities and queries are resolved with the Client.
FIREFREEZE has the ability to meet the requirements Where documented requirements are not provided by the customer, the customer is consulted with the requirements proposed by FIREFREEZE and customer approval is obtained for such requirements. In case of changes to the requirement, concerned documents are amended and circulated to the personnel involved in the product & service provision and support activities.
Service order, Contracts7.2.3 Customer Communication Customer communications are practiced in the following modes:
Requisitions, Client enquiries, tenders, orders/contracts and amendments are handled as per process description.
Meetings, Discussions, etc. during visits by staff at the customer premises. Through identifying customer feedback (complaint, appreciation, satisfactory job
completion, etc.) Suitable records of such communications are maintained. 7.2.3.1Technical requirements All technical requirements forming part of the contract shall be identified, reviewed, confirmed as acceptable or for further negotiation and record. These shall include as applicable:
Work scope. Technical standards or specifications to be followed. Space, loading and environmental requirements. Company supplied product/services/information of any type, e.g. Standard drawings
or details, standard specifications, materials, equipment, etc. Use of methods of analysis specified by Company. Regulatory requirements.
7.2.3.2Project program – Delivery schedules Key dates for delivery of documents, drawings, and material/equipment shall be reviewed, confirmed as acceptable or for further negotiation, and record.7.3 Design and Development FIREFREEZE Quality Management System shall ensure that design and development is a controlled function. Procedures shall be established and implemented that assure activities are performed effectively and efficiently.FIREFREEZE ensures that design decisions are made by authorized qualified agencies that are in possession of or have access to the pertinent design criteria, contractual requirements, codes, regulations, standards and guidelines.Essential design considerations, calculations and decisions are precisely, clearly and completely documented in design documents, such as design calculation sheets, specifications, drawings, computer programs, documented quality procedures and instructions, those are free of ambiguities and conflicting requirements and conform to all governing standards and system procedures for such documents. Design documents and the design concepts and requirements expressed therein, are subjected to review and approval by qualified personnel, other than those who did the
original design, with clearly designated responsibility and authority to do so, prior to release for purchasing, fabrication or construction.Design approvals are based on one or more of the following:
Evidence of related experience. Independent review of analysis and calculations involved in design concepts and
decisions. Other appropriate and adequate objective evidence that the design criteria. And documentation requirements have been satisfied.
FIREFREEZE engineering department shall also review independently essential aspects of the design by third parties.Design documents shall identify those items of the design that are crucial to its safe and proper functioning and specify the quality standards to which these items shall be produced. Deletions, additions and changes to design documents, subsequent to approval for release shall be identified and documented.Deviations from the requirements of design and contract documents, including designated quality standards, shall be subject to the same authorizations as the requirements involved.Incomplete, ambiguous, or conflicting requirements shall be resolved by those responsible for generation and approval of the requirements.In order to control and verify the design of products to meet the criteria as cited above, FIREFREEZE shall implement and operate design controls.7.4 Purchasing Supply of raw material, fabrications, services and finished items shall be processed from acceptable suppliers.To the extent practical, FIREFREEZE will procure its equipment and material from Company approved sources as per “SABIC”, attachment IV. Company shall approve alternative sources for material identified in Company’s Regulated Vendors Lists (RVL) prior to placing of purchase orders. Other sources for material selected by purchasing function shall be evaluated and approved by project QA/QC Manager prior to placing them on the acceptable supplier/sub-contractors list. Material, for which inspection requirements are specified on Company Form 175, shall be evaluated as specified in Schedule.The extent of control over purchasing includes quality surveys and monitoring at the supplier’s premises as required.Material Requisition and/or Purchase Orders shall be reviewed and endorsed by the Project QA/QC Manager to the extent required to ensure that all pertinent drawings, specifications and complete information relative to the item(s) procured are listed and that the sources of supply have all the data required to supply goods of an acceptable
quality. All purchase orders and associated reference data shall be available for review by Company when requested. Project QA/QC Manager shall review all procurement documents prior to release to Company to assure that the appropriate quality levels are designated for materials or services purchased.Project QA/QC Manager shall evaluate all purchased items where any of the following conditions apply.Inspection of quality characteristics cannot be verified during subsequent processing or would require destructive testing Inspection is necessary to verity that specific processes, tests or inspections required by the supplier were adequately accomplished Inspection at any other point would destroy or require the replacement of costly packaging materials Amendments to the purchase orders (PO) shall be processed in the same way as the original with reference made to the original PO. 7.5 Production and Services Provision7.5.1 Control of Production and Services Provision FIREFREEZE shall carryout the project under controlled conditions with known information of project. The work instruction or construction method of statement will be constituted of the project quality plan.7.5.2 Validation of Processes for Production and Services Provision Validation of processes shall demonstration the ability to achieve planned results and such special processes will be perform by qualified personnel either using documented procedures or under continues monitoring. 7.5.3 Identification and Traceability FIREFREEZE shall establish and maintain systems that:
Identify each item (lot, component or part) to the applicable drawing, specification or other technical document, from receipt through fabrication and construction.
Assign to each item a unique identification. This will distinguish those items that are otherwise identical, but have been produced in separate batches. Record this identification on all process, inspection and test records where traceability is specified.
Ensure alloy steels, stainless steel or non-ferrous alloys in contact with service fluids are tested for Positive Material Identification.
FIREFREEZE Traceability System shall operate from the specification of the material through its manufacture to its inclusion as finished product in a facility, pipeline or platform.FIREFREEZE Traceability requirements shall be kept to the minimum consistent with the safe and efficient operation of the installation concerned, and shall only be applied when failure of the equipment or material could result in a hazard to persons or the environment, or a significant loss of production output.
7.5.4 Customer property FIREFREEZE shall establish and maintain procedures for the verification, storage and maintenance of Company or FIREFREEZE supplied product such as equipment and material, information and data supplied by the customer, which shall be incorporated into the work. Product realization.FIREFREEZE procedure shall set out details of verification to be carried out on receipt of any Company supplied items. It might require the QC Inspector, in consultation with leaders of any other disciplines involved, to determine the extent of verification requiredin order to satisfy the project requirements, so far as this is possible, as to the suitability/accuracy, and so on, of the Company supplied items.7.5.5 Preservation of product Handling, storage, preservation and delivery A system shall be maintained for the handling, storage and shipping, including cleaning, packing and preservation of all items through the entire manufacturing and construction process. Precautions shall be taken to protect material from abuse, misuse, damage, deterioration and unauthorized use.Items subject to deterioration or corrosion due to environment shall be cleaned and preserved to fully protect at all times. The responsible inspector in the particular discipline shall monitor handling and marking of parts during construction/installation.Unsatisfactory conditions shall be brought to the attention of the project QA/QC Manager for resolution.Suspected items shall be placed on “Hold” and transferred to a restricted storage area until acceptability is established or other disposition arranged.Restricted storage areas shall be made available for the isolation and protection of accepted raw material, semi-finished parts and finished parts pending use or shipment.FIREFREEZE shall develop and maintain procedures for handling, storage and preservation of all material and equipment.For critical, sensitive, perishable or high-value items, specific written procedures shall be used. Handling tools and equipment shall be provided and controlled as necessary to ensure safe and adequate handling.Where preservation and/or packaging are disturbed, it shall be restored to its original condition unless other appropriate and acceptable storage arrangements have been made.To prevent deterioration, items in stock shall be inspected periodically for condition or shelf life expiry.Data concerning, handling storage and preservation shall be included on the Monthly Material Procurement Status Report as specified in Schedule.
7.6 Control of monitoring and measuring devices All Inspection, measuring and test equipment and devices used to determine
conformance to FIREFREEZE specification, including that used for welding, nondestructive testing, dimensional control, pressure testing, coating thickness, shall be controlled, calibrated and maintained with an established written calibration and maintenance schedule.Equipment/instrument shall be calibrated and certified by approved facilities having standards traceable to “National Standard”. Where no National Standard exists the basis employed for calibration shall be documented. Records shall be evaluated periodically to ascertain adequacy of inspection intervals presently in use. The system shall be designed to ensure all measurement resources have the capability of making measurements within limits designated as appropriate to these requirements. It shall provide in the prevention of inaccuracy by prompt detection of deficiencies and timely action for their correction.All measuring and test equipment and devices having an effect on quality shall bear a tag, sticker or other suitable marking, indicating status. The validity of previous inspection and test results when measuring and test equipment are found be out of calibration shall be assessed and documented. The standards and masters shall be made available for verification by Company.Equipment and devices used for measuring, testing and inspection shall require an initial inspection for accuracy, or shall be proven prior to release for use on production.The system shall provide for a pre-planned calibration frequency chart showing all applicable test and inspection equipment, calibration frequency and status. In no case shall equipment/instrument calibration cycles exceed six (6) months per Schedule. 8. MEASUREMENT, ANALYSIS AND IMPROVEMENT 8.1 General FIREFREEZE has established and implemented the required processes of the quality system to demonstrate conformity of the product/project and to continually improve the effectiveness of the quality management system.8.2Monitoring and measurement 8.2.1 Customer satisfaction FIREFREEZE attaches critical importance to satisfy the client’s requirements. The method for obtaining information relating to the client’s satisfaction is either by conforming appreciation letter, awards / repeated order from the client or meeting with the client’s personnel before and/or after completion of the project as appropriate.8.2.2 Internal Audits Third Party Client Approved Lead Auditor as appropriate shall establish, document and implement a plan for audits that shall objectively evaluate the effectiveness and adequacy of the functions, systems and procedures as referenced in this Project Quality Plan.
The audit plan shall define: The functions, systems and procedures to be audited. Schedule of audits. Method of reporting findings and recommendations and corrective and preventive
actions. The means for having corrective actions agreed upon an implemented.
FIREFREEZE shall submit a quality audit schedule to Company for review and approval within 30 calendar days from effective date of the Contract. Audits shall be carried out at fifteen percent (15%) and sixty percent (60%) of completion stage for design, procurement and construction WORK phases. This schedule is a part of the Project Quality.Audits shall include an evaluation of:
Activities, processes, work areas, items and services being produced. Quality practices, systems, procedures and instructions.
Certification documents and records.Audits shall be performed in accordance with documented procedures and checklists that identify essential characteristics.Personnel performing audits shall not have direct responsibility for the areas being audited. The minimum requirements of the auditor shall be as per Client requirements.Management responsible for the area audited shall review, agree and correct deficiencies revealed in the audit reports. All actions taken to correct deficiencies shall be re-audited to verify compliance and a close out report issued.FIREFREEZE shall submit to Company a copy of each audit report within two (2) weeks of its completion. 8.2.3 Monitoring and measurement of processes8.2.3.1 Inspection and inspection schedule A 2-week look ahead schedule for procurement, construction and pre-commissioning phases including current week Inspection Schedule shall be submitted every week to the Company to schedule their inspection activities. 8.2.3.2 Inspection and test plan – Guidelines to prepare ITP FIREFREEZE shall use Client typical Inspection Plans (ITP) that indicates the QC activities necessary to verify that the work has been carried out in compliance with the technical and quality requirements set out in the Contract.The approved and relevant inspection Checklist (ICs) shall be utilized for the project.Process Description will briefly describe the process e.g. welding, coating, etc.
Quality Control requirements. Brief description of the inspection or test, that verifies compliance with specified requirements notification requirements, for Request for Inspection (RFI). 24 hr., 48 hr., etc.Responsibilities - identifies the personnel responsible for each item. Applicable procedures. Identify the specific procedure used for this particular quality control activity. Acceptance Criteria will be the acceptance criteria specified in the Technical Specification for the QC activity undertaken. This can be a value or specific reference to a national, Company or Contractor standard. Verifying Document will be the document that is produced as objective evidence that the component or equipment or test has been inspected in accordance with and complies with the specified requirements (e.g. checklist, test report, etc) .
9 : Project Reference
LIST OF PROJECTS Completed By M/s FIREFREEZE Formerly Khaldi World Communication & Protection is as follows :
Sr.No.
Project Client Description Of Project Work
1 Addressable Fire Alarm System in Water Desalination Plant
SWCC – Al Khobar
Installation , Testing , Commissioning of Addressable fire Alarm panel along with detectors, bells etc.
2 Door Holders in Trenches for Fire Protection System
SWCC – Al Khobar
Installation of Automatic magnetic door holders in cable trenches for fire protection system.
3 FM-200 fire Protection System & Addressable Fire Alarm System in Ibn Zahr Sub Station
SaudiEuropean
Petrochemical Co. (Ibn Zahr )
MainContractor :
ABB
Installation , Testing , Commissioning of FM-200 Fire Protection System and Addressable Fire Alarm System along with all equipment .
4 FTH Computer Room SWCC – Jubail Re-installation of Halon Control Panel & BGT boxes in FTH Computer Room at Saline Water Conversion Corporation-Jubail Plant
5 Emergency Warning Siren System
SWCC – Al Khobar
Supply, Engineering, Installation, Testing and Commissioning of New Emergency Warning System in Turbine Halls of SWCC Plant and Integration of same with Fire Alarm System
LIST OF PROJECTS Completed By M/s FIREFREEZE Formerly Khaldi World Communication & Protection is as follows :
Sr.No.
Project Client Description Of Project Work
6 Refixing Of Fire Alarm System
SWCC-Jubail Refixing of conduits and Renewal of Existing System.
7 FM-200 Fire Protection System
SHOW TIME Supply, Engineering, Installation, Testing & Commissioning of FM-200 fire protection system at their facility in Al Khobar
8 Water Sprinkler System National Gases Company
Installation , Testing and Commissioning of Water Sprinkler System in Administration Building of National Gases Company
9 Fire Alarm System / Fire Fighting System
Fire Fighting Main
Contractor
Installation of fire Alarm and fire protection system on various projects for other main contractors.
10 Hazardous Chemical Warehouse
SWCC – Al Khobar
Installation of fire Alarm and Gas Detection system in Hazardous Chemical Warehouse.
11 Deluge Foam Spray System – Helipad
Al Mansouryah Est.
Installation of Deluge Foam Spray System on Helipad in King Fahd Specialist Hospital.
LIST OF PROJECTS Completed By M/s FIREFREEZE Formerly Khaldi World Communication & Protection is as follows :
Sr.No.
Project Client Description Of Project Work
12 Fire Alarm System & Gas Detection System
SWCCAl Khobar
Installation of fire Alarm and Gas Detection system in New Hydrogen Plant.
13 Fire Alarm System ARAMCO / AFI
Supply , Testing & Commissioning of fire Alarm System in Bachelors Building Tanajib.
14 Fire Alarm System AFI Supply , Testing & Commissioning of fire Alarm System in Rubber Factory Dammam.
15 Gas Detection System Petrokemya / Binzagr
Supply , Testing & Commissioning of Gas Detection System in Olefins-I of Petrokemya.
16 Gas Detection System Petrokemya / Binzagr
Supply , Testing & Commissioning of Gas Detection System in PVC of Petrokemya.
17 Fire Alarm System & Fire Protection Systems
Hi-TechSystems - Dammam
Supply , Installation, Testing& Commissioning of Fire Alarm System and fire protection system in Hi-tech factory Dammam –2nd Industrial Estate.
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
18 Fire Protection System Fowzan – Riyadh
Supply, Engineering ,Installation, Testing of fire Protection system at GSM Warehouse.
19 Fire Alarm System ARAMCO Supply of Fire Alarm Systems Spares, Fire Fighting Systems Spares on Various ARAMCO requirements.
20 Fire Alarm System- Govt Hospital Hafr Al Batin
Govt Hospital / Main
contractorNasir Khaliwy
Supply, Installation, testing, commissioning of of Fire Alarm Systems at Govt hospital in Hafr Al Batin.
21 CO2 Fire Protection System – Press , Dammam , KSA
ALUPCO Supply, Installation, testing, commissioning of of CO2 Fire Protection system on Underneath of Press at Aluminium Product Company Limited.
22 Fire Extinguishing System Naval Base - Jubail
Testing Commissioning & Trouble Shooting of Halon 1301 Fire Extinguishing at three sub stations. Supply of Water sprinklers for different locations.
23 Deluge Water Spray System – Transformers , Bisha Shudaig Power Plant
ABB Supply, Installation, testing, commissioning of of Water Deluge Spary System at Shudaig Power Plant.
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
24 Fire Alarm System- Fire Protection System Saudi Electric Company – Western Region ( Four Locations )
SEC / Segia Supply, Installation, testing, commissioning of of Fire Alarm Systems at Administration buildings & in polyclnic. Supply, Installation, testing, commissioning of of Fire Protection System at Administration buildings & in polyclnic
25 Fire Fighting Pump Set UL listed in Hospital Project
Govt Hospital / Main
contractorNasir Khaliwy
Supply, Installation, testing, commissioning of of Fire Fighting Pump Set at Govt hospital in Hafr Al Batin.
26 FM-200 Fire Protection System in Civil Affairs building Al Hasa
Civil Affairs , M.O.I. / Main
contractorSRACO
Supply, Installation, testing, commissioning of of FM-200 Fire Protection System at Civil Affairs Building Al Hasa – M.O.I.
27 Deluge Foam Spray System – Helipad
Al Mansouryah Est.
Installation of Deluge Foam Spray System on Helipad in Al Rass General Hospital at Al Rass.
28 CO2 Fire Protection System – Press , Dammam , KSA
ALUPCO Supply, Installation, testing, commissioning of of CO2 Fire Protection system on Press -4 at all sensitive location of Press at Alupco Dammam.
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
29 Water Sprinkler System, Fire Hose Cabinets, Fire Extinguisher
UDI Factory / Project Build
Supply, Installation, testing, commissioning of of Water Sprinkler System, Fire Hose Cabinets, Fire Extinguisher at UDI factory at industrical city –II.
30 Conduiting work for Royal Commission facility
RoyalCommission
Jubail / Delta
Installation of RGS conduiting work at Royal commission Jubail & Cable Pulling.
31 Fire Hose Cabinets & Fire Fighting Pump Set at Fatima Bin Abu Bakr Siddik School
F.B.A.B.S / Sffeco
Installation, testing, commissioning of of Fire Hose Cabinets, Fire Fighting Pump Set at F.B.A.B.S. School At H. Al Doha
32 FM-200 Fire Protection System & Addressable Fire Alarm System
KFUPM – Dahran
Installation, testing, commissioning of FM-200 Fire Protection System & Addressable Fire Alarm System at Telephone Exchange Building.
33 Fire Alarm System – Academic Building # 2
KFUPM – Dahran
Installation, testing, commissioning of Fire Alarm System at Academic Building # 2
33 Fire Alarm System – Academic Building # 3
KFUPM – Dahran
Installation, testing, commissioning of Fire Alarm System at Academic Building # 3
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
34 Fire Alarm System Camp # 9, # 10, # 11
RoyalCommission/
ZamilOperation & Maintenance
Supply, engineering , Installation, testing, commissioningof Fire Alarm System at All Camps.(Awarded to us, to be started in May 2005 )
35 Fire Alarm System & Siren System
SWCC – Al Khobar
Supply, engineering , Installation, testing, commissioningof Fire Alarm System at All MMD office & Inaugration Building.
36 FM-200 Fire Protection System – Class Room Project
Al Ohadeih / KFUPM
Installation, testing, commissioning of FM-200 Fire Protection System at Electrical Rooms of Class Room Project.
37 Fire Alarm System – Black Start Diesel Generator , Bisha Shudaig Power Plant
Al Sharief Supply, Installation, testing, commissioning of of Fire Alarm System at Black Start Diesel Generator at Shudaig Power Plant.
38 FM-200 Fire Protection System – Server Room
United Arab CAN
ManufacturingCo.
Installation, testing, commissioning of FM-200 Fire Protection System at Server Room.
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
39 Deluge Water Spray System – LPG Tanks , NABISCO Dammam – Saudi Arabia
NABISCO Supply, Installation, testing, commissioning of of Water Deluge Spary System at LPG Tank , NABISCO.
40 Fire Protection System Al Jouf Power Plant
KANOO Supply, Installation, testing, commissioning of of Deluge Foam Water Spary System at Fuel Treatment Room and FM-200 System in Control Room at Al Jouf Power Plant.
41 Zamil Steel Dammam KSA Zamil Steel Supply, Installation of Fire Alarm System for Monitoring All Fire Alarm Panel in Guard House and New System in Paint Storage Area.
42 Water Sprinkler System – Chemical Warehouse
SWCC-Al Khobar
Design , Supply, Installation of Water Sprinkler System at Chemical Warehouse in SWCC – Al Khobar
43 Utility Control Room – Saudi Aramco – Abqaiq
Saudi Aramco Design , Supply, Installation of FM-200 Fire Protection System at Control Building in UCR - Abqaiq
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
44 Fire Alarm Building # 23 KFUPM – Dahran
KFUPM Design, Supply, Installation of Fire Alarm System in KFUPM Dahran.
45 Modification of Fire Alarm System And fire Protection system Building # 1770 / 8730 , Saudi Aramco Dahran
Al Nassar Supply & Testing Commissioning of fire Alarm and Fire Protection System in Saudi Aramco Dahran
46 Fire Protection System – Show Room & Offices – JAMJOOM
JAMJOOM Design , Supply, Installation of Water Sprinkler System & Fire Protection System at Showroom & Offices for JAMJOOM – Al Khobar
47 North Control Room – Saudi Aramco – Abqaiq
Saudi Aramco Design , Supply, Installation of FM-200 Fire Protection System at Control Building in UCR – Abqaiq
48 South Control Room – Saudi Aramco – Abqaiq
Saudi Aramco Design , Supply, Installation of FM-200 Fire Protection System at Control Building in UCR – Abqaiq
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
49 Sub Station , Pump Stn # 6 Saudi Aramco / Nesma
Design , Supply, Installation of FM-200 Fire Protection System at Pump Stn # 6.
50 Wet Chemical Kitchen Fire Protection System
Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Wet Chemical Fire Protection System in Saudi Aramco Dahran- 5 areas
51 Wet Chemical Kitchen Fire Protection System
Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Wet Chemical Fire Protection System in Saudi Aramco Abqaiq – 2 areas
52 Server Room EniRepSa Gas Ltd / MTTS
Design , Supply, Installation of FM-200 Fire Protection System at Server Room
53 Server Room Zamil operations & Maintenance
Design , Supply, Installation of FM-200 Fire Protection System at Server Room
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
54 Hazardous Chemical Warehouse
SWCC – Al Khobar
Design , Supply, Installation of Water Sprinkler System , Hose Cabinets , & Hydrant System for Chemical Warehouse.
55 Eastern Water Tower – Al Khobar
SaudiTechnical
Supply, Engineering, Installation, Testing Commissioning of Water Sprinkler System , FM-200 System, CO2 System in Water Tower ( on going )
56 Al Hugayat Tower – Al Khobar
ATCO Supply, Engineering, Installation, Testing Commissioning of Water Sprinkler System Tower ( on going )
57 Saudi Aramco – Khafji Angus Fire UK Supply, Engineering, FM-200 Fire Protection System
58 KFUPM – Bldg # 14 KFUPM Supply, Engineering, Installation, Testing Commissioning of FM-200 System for Bldg # 14. ( on going )
59 Warehouse – Tabuk Tabuk Pharm. Company
Deluge Foam Spray System in warehose complete with design, supply and installation.
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
60 Shifting of 5000 GPM fire fighting pump set.
SWCC – Al Khobar
Complete shifting of fire fighting pump set at SWCC Al khobar.
61 Communication Room – Sea Island
Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of CO2 System in Communication Room on Sea Island
62 Generator Room & Boiler Room
Movenpick Hotel / Saudi
Pan Gulf
Supply, Engineering, Installation, Testing Commissioning of Dry Chemical System in Generator Room & Boiler Room in MovenPick Hotel.
63 Faras Power Plant SEC / Al Toukhi
Supply, Engineering, Installation, Testing Commissioning of Complete Fire Alarm , Fire Protection & Gas Detection System for Extension of Faras Power Plant ( Recently awarded )
64 ABHA East Sub Stn SEC / ABB Supply, Engineering, Installation, Testing Commissioning of Complete Fire Alarm System for ABHA East Sub Station.
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
65 Crystal Plant – Yanbu , sub Station
ABB Design, supply , Engineering of Deluge spray system and complete fire alarm system.
66 Ministry Of Petroleum – Server Room
InfoSys Global Supply, Engineering, Installation, Testing Commissioning of FM-200 System in Server Room.
67 CATV & RADIO Room R.C. Jubail
Seder Telcom Supply, Engineering, Installation, Testing Commissioning of FM-200 Fire Protection System in CATV and Radio Room.
68 Amal field Libya ABB Supply, Engineering, Installation, Testing Commissioning of FM-200 Fire Protection System in Prtable Sub Stations.
69 Saudi Aramco – Hawtah Al Nassar Supply, Engineering, Installation, Testing Commissioning of Complete Fire Alarm System , Water sprinkler system, fire extinguishers, wet chemical system.
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
70 Saudi Kayan – Jubail KAMCO Supply of equipments for water sprinkler system and fire extinguishers.
71 Video Library – Saudi Aramco – Dhahran
Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of FM-200 System in Video Library.
72 Muhayel Sub Stn Siemens Supply, Engineering, Installation, Testing Commissioning of CO2 fire protection system
73 Namerah Sub Stn Siemens Supply, Engineering, Installation, Testing Commissioning of CO2 fire protection system
74 Majardah Sub Stn Siemens Supply, Engineering, Installation, Testing Commissioning of CO2 fire protection system
75 Server Room Arab Medical Supply
Al hussaini Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system
76 Fire Alarm System Saudi Aramco – Rabigh
Isam Kabbani Supply,Testing & Commissioning of Fire Alarm system
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
77 Deluge Water Spray System Guard Dryer – United
SABIC HK SadiqSons
Design and Supply & Installation of Deluge System for Guard Dryer .
78 Server Room Enirepsa 135 / 136
EniRepSa Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system- Two server Rooms
79 Server Room South Ruba Khali co.
South Ruba Khali
Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system- One server Rooms
80 Control Room Abqaiq
Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Reserve FM-200 fire protection system
81 Piping Work SWCC
SWCC Installation of piping work in SWCC Al Khobar
82 Wet chemical system Saudi Aramco
Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Wet Chemical Fire Protection System in Saudi Aramco Abqaiq
83 Wet chemical system Saudi Aramco
Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Wet Chemical Fire Protection System in Saudi Aramco Riyadh
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
84 Fire Alarm System ABB Supply and testing commissioning of fire alarm system for ABB Tihama Project.
85 Heat Detector Replacement Petrokemya Replacement of all exisitng heat detector by new technology Detect-A-Fire heat detectors.
86 Water Sprinkler System NABISCO Complete design and installation of water sprinkler system in finished good warehouse and raw material warehouse.
87 PQA LAB sharq Sharq Supply, Engineering, Installation, Testing Commissioning of NOVEC 1230 fire protection system
88 Control Room - SABIC Isam Kabbani Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system
89 Weapon Test Facility MAC Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
90 Data Centre & Security Room – Weather Ford Facility
ARCON Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system for two rooms
91 Industrial Training – Saudi Aramco Wet chemical system
OSAIS Supply, Engineering, Installation, Testing Commissioning of wet chemical system for kitchen.
92 SEC Sub stations – 6 nos. Siemens Supply, Engineering, Installation, Testing Commissioning of co2 fire protection system and fire extinguishers on SEC sub stations
93 SHARQ – SABIC Detection for NOVEC-1230
SHARQ Supply, Engineering, Installation, Testing Commissioning of fire extinguishing panel and devices addressable to control 3 NOVEC 1230 systems.
94 Dry chemical system Olaya Tower
SFFECO Supply, Engineering, Testing Commissioning of Dry chemical fire protection system.
95 Saudi Aramco – Shedgum Plant NOVEC-1230
Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Novec 1230 fire extinguishing system in raised floor of control room.
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
96 WeatherFord Facility Wet chemical system
ARCON Supply, Engineering, Installation, Testing Commissioning of wet chemical system for kitchen.
97 Nesma – Camp – Jubail Refinery Wet chemical system
Nesma Supply, Engineering, Installation, Testing Commissioning of wet chemical system for kitchen.
98 Die Sub Station – Fire Alarm System
Saudik Supply, Engineering, Installation, Testing Commissioning of fire alarm system for complete sub station.
99 Tihama Sub Station – co2 fire protection system
ABB Supply, Engineering, Installation, Testing Commissioning of co2 fire protection system in two portable sub stn.
100 Petrokemya heat detector replacement
Petrokemya Supply, Engineering, Installation, Testing Commissioning of new heat detector in place of existing smoke detectors
101 Sharq Deluge Fog System
Sharq Supply, Engineering, Installation, Testing Commissioning of water fog system , fire alarm and complete fire protection on unloading bays.
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
102 Nesma – Camp2 – Jubail Refinery Wet chemical system
Nesma Supply, Engineering, Installation, Testing Commissioning of wet chemical system for kitchen.project 2
103 Al Rashed Tower–Riyadh FM-200 system
Al Rashed Supply, Engineering, Installation, Testing Commissioning of FM-200 fire extinguishing system in 3 nos. server rooms. On going
104 Fire Alarm System – P1 Saudi Aramco - Tanajib
Saudi Aramco Supply, installation and testing commissioning of fire alarm system for control room – Tanajib Project 1 – on going
105 Fire Alarm System – P2 Saudi Aramco - Tanajib
Saudi Aramco Supply, installation and testing commissioning of fire alarm system for control room – Tanajib Project 2 – on going
106 Fire Alarm System – Saudi Aramco - Uthmaniya
Saudi Aramco Supply, installation and testing commissioning of fire alarm system for control room – Uthmaniya – on going
107 Saudi Aramco – Bakery – UdhailiyaWet chemical system
Rezayat Supply, Engineering, Installation, Testing Commissioning of wet chemical system for kitchen.project 2
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
108 FM-200 System Package # 1 Jubail Export Refinery Project
Tecnicas Reunidas
Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system. On going
109 FM-200 System Package # 4 Jubail Export Refinery Project
Nesma Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system. On going
110 FM-200 System Package # 2A Jubail Export Refinery Project
SFFECO Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system. On going
111 Weatherford Base Facility FM-200 Fire Protection System
ARCON Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system
112 Weatherford Base Facility Wet Chemical Fire Suppression System
ARCON Supply, Engineering, Installation, Testing Commissioning of Wet Chemical fire suppression system
113 Tecnimount Arabia Co. Ltd. FM-200 Fire Protection System
TecnimountArabia.
Supply, Engineering, Installation, Testing Commissioning of FM-200 fire protection system
114 Aramco Riyadh Bldg. 370 Wet Chemical Fire Suppression System
Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Wet Chemical fire suppression system
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
Sr.No.
Project Client Description Of Project Work
115 Fire Alarm System Ras-Tanura, Saudi Aramco
Saudi Aramco Supply, Engineering, Installation, Testing Commissioning of Fire Alarm System. On going
116 FM-200 Fire Protection System King Abdullah Financial District Riyadh
ETA Star Supply, Enigneering, Testing & Commissioning of FM200 Fire Protection System
117 FM-200 Fire Protection System Jubail Export Refinery Project – Package 5C
MR Al-Khathlan
Supply, Engineering, Installation, Testing & Commissioning of FM-200 Fire Protection System
118 FM-200 Fire Protection System P-3 Technology Center Baker Huges
ARCON Supply, Engineering, Installation, Testing & Commissioning of FM-200 Fire Protection System
119 Wet Chemical Fire Protection System Jubail Export Refinery Project – Package 2A
Ali Bin Ghashash Al
OmairiTrading
Supply, Engineering, Testing & Commissioning of Wet Chemical Fire Protection System
120 FM-200 Fire Protection System King Abdullah Financial Disctric, Riyadh
Sterling & Wilson
Supply, Engineering Testing & Commissioning of FM-200 Fire Protection System
121 Fire Alarm & Detection System, MARAFIQ, JUBAIL
MARAFIQ Supply, Engineering, Installation, Testing & Commissioning of Fire Alarm & Detection System
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
122 Fire Protection System, Construction of Safaniyah 380/230 kV BSP
Siemens Supply, Engineering, Installation, Testing & Commissioning of FM-200 Fire Protection System, Fire Alarm System & Fire Hydrants.
123 Installation of Flame Detectors, Saudi Aramco Riyadh Refinery, Riyadh
Saudi Aramco Supply, Engineering Installation, Testing & Commissioning of Flame Detectors.
124 Fire Fighting System, MARAFIQ, Yanbu
Hanbu Supply, Engineering, Testing & Commissioning of Fire Fighting System
125 Fire Alarm System, Gulf Connect Supply, Engineering, Installation, Testing & Commissioning of Fire Alarm System
126 Fire Alarm System, (Berri Gas Plant)
Saudi Aramco Supply, Engineering, Installation, Testing & Commissioning of Fire Alarm System
127 Fire Alarm System, (Rastanura Plant)
Saudi Aramco Supply, Engineering, Installation, Testing & Commissioning of Fire Alarm System
128 Novec 1230 System Shedgum Plant
Saudi Aramco Supply, Engineering, Installation, Testing & Commissioning of Novec 1230 in raised floor of Computer Room (On - Going)
129 FM-200 System Al-Rashid Tower
RTCC Supply, Engineering, Installation, Testing & Commissioning of FM-200 system in few Room st Rashid Tower - Riyadh
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
130 FM-200 System SAMCO Project
Samsung Supply, Engineering, Installation, Testing & Commissioning of FM-200 system on SAMCO Plant Jubail (On-Going)
131 FM-200 System SOCC Project
Samsung / INDECO
Supply, Engineering, Installation, Testing & Commissioning of FM-200 system on SOCC Plant (On-Going)
132 FM-200 System Tasnee Plant, CCR Room
Samsung Supply, Engineering, Installation, Testing & Commissioning of One Room FM-200 system and modification in CCR Room (On-Going)
133 Novec 1230 System SAMAPCO CA EDC Project
Daelim / INDECO
Supply, Engineering, Testing & Commissioning of Two Rooms Novec 1230 system (On-Going)
134 Novec 1230 System Marafiq Stg. Unit 5 & 6
Hanwha / INDECO
Supply, Engineering, Installation, Testing & Commissioning of five Rooms Novec 1230 system (On-Going)
135 Novec 1230 System Ibn Sina Plant
Ibn Sina Supply, Engineering, Installation, Testing & Commissioning of Novec 1230 system five Rooms (On-Going)
136 Faisal Steel CO2 System
Faisal Steel Supply, Engineering, Testing & Commissioning of CO2 system (On-Going)
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
137 King Abdullah Financial District Foam System
ETA Star Supply, Engineering, Testing & Commissioning of foam system in Generator Rooms & fuel Rooms at many tower (On-Going)
138 King Abdullah Financial District Foam System
Sterling Wilson Supply, Engineering, Testing & Commissioning of foam system in Generator Rooms & fuel Rooms at many tower (On-Going)
139 Novec 1230 System (Deluge & other Fire Fighting System) KJO Plant – Aramco Gulf Water Treatment Plant
JGC Supply, Engineering, Installation, Testing & Commissioning of Novec 1230 system Deluge System (On-Going)
140 FM - 200 System (Deluge & other Fire Fighting System) KJO Plant – Aramco Switchgear Transfer Project
JGC Supply, Engineering, Installation, Testing & Commissioning of FM - 200 system (On-Going)
141 CO2 Fire Protection SystemSharourah PP1 Sub Station (SEC Project)
AL Gihaz Supply, Engineering, Installation, Testing & Commissioning of CO2 fire suppression system and complete fire alarm & detection system for Sub Station (On-Going)
142 CO2 Fire Protection SystemSharourah PP2 Sub Station (SEC Project)
AL Gihaz Supply, Engineering, Installation, Testing & Commissioning of CO2 fire suppression system and complete fire alarm & detection system for Sub Station (On-Going)
LIST OF PROJECTS Completed By M/s FIREFREEZE is as follows :
143 Wet Chemical System Sprinkler System Fire Alarm System Saudi Aramco Gulf Course Project
Al-Hammam Supply, Engineering, Testing & Commissioning of subject system (On-Going)
144 Wet Chemical System Saudi Aramco – Dhahran
Alasco Supply, Testing & Commissioning of wet chemical system (On-Going)
145 NOVEC-1230 Fire Protection System Hilton Hotel & Residential Tower Riyadh
ETA Star Supply, Engineering, Testing & Commissioning of subject system (On-Going)
146 Foam Fire Suppression System. (KAFD) King Abdullah Financial District Riyadh. KSA.
ETA Star Supply, Engineering, Testing & Commissioning of subject system (On-Going)
147 Co2 Fire Protection System Mikwah Substation KSA.
ISCOSA Supply, Engineering, Installation, Testing & Commissioning of subject system (On-Going)
148 FM-200 & CO2 Fire Protection System at Zuluf Safania Offshore. GOSP-1 & GOSP-4.
Saudi Aramco Supply, Engineering, Installation, Testing & Commissioning of subject system (On-Going)
149 FM-200 & CO2 Fire Protection System at Marjan Safania Offshore. GOSP-2 & GOSP-3.
Saudi Aramco Supply, Engineering, Installation, Testing & Commissioning of subject system (On-Going)
150 FM-200 Fire Protection System at Saudi Railway
Yapi Markazi Supply, Engineering, Installation, Testing & Commissioning of subject system (On-Going)
151 FM-200 & Co2 Fire Protection System & fire alarm system at Tihama CPS, Bisha CPS & Bisha South
ISCOSA Supply, Engineering, Installation, Testing & Commissioning of subject system (On-Going)
10 : Authorization Certificates Please find enclosed certifications that the company engineer holds.
11 : Partners/Associates
FIREFREEZE partners include the following:
As the providerelatedfirefightConsumeand comlife safe
Chemguunmatchto meecertifiedproven mChemgudisplacefrom cofor foam
Potter RGlee K.modernAngeles)equipme1930’s.protectiCabinetsConnect
world’s larsolutions thazards. F
ters have rers will fin
mmercial smety product
ard serveshed custom
et customed, we leadmanufacturard also
ement foamrrosion-res
m concentra
Roemer waPotter anheadquar
), CA, Pottent, while Over the yon equipms, Fire Hotions, Speci
rgest manuthat protec
For more threlied on Knd that sammoke alarms.
the fire sumer supporter requiremd throughring excellemanufactu
m concentraistant brasate pump p
as foundednd Ray H. rters and er Roemerchanging dyears, our
ment and aose & Accialty Equipm
ufacturer oct people han 90 yea
Kidde to deme advancems, carbon
uppressiont, high-quaments thro
advancedence, and pres a lineate pumpsss and stainperformanc
in 1937 aRoemer. Omanufacturemains de
dramaticallproduct raccessories
cessories,ment and a
of fire safeand proper
ars industryeliver supeed fire safemonoxide
and speciaality and fieough produ
research,prompt serve of UL L
for the firnless steel,e and relia
as a manufOperating furing faciliedicated toly from theange has gto includeFire Exting
a refined lin
ety producrty from thy leaders, rior fire deety technolalarms, fir
alty chemiceld-testeduct custom
exactingvice and deListed andre-protecti, the pumpability.
facturer’sfrom its neity in Cityo its core be companyrown to co
e Fire Extinguishers, Fne of Archi
cts, Kidde’he effectsthe militaretection anlogy in Kidre extinguis
cals fields wproducts,
mization. engineerin
elivery. d FM Appron industry
ps have set
representaew 110,000y of Indusbusiness of that was over a widnguisher, HFire Departectural Pr
s mission of fire an
ry, airlinesnd suppresde's resideshers and o
worldwideand the abISO 9001:
ng and de
roved posiy. Construnew stand
ative agenc0 sq. ft. ustry (nearfire protecfounded ine range ofHose and Vrtment Varoducts.
is to d its
s and sion.
ential other
withbility 2008
esign,
itive-ucted dards
cy by ultra-
Los ction n the f fire Valvealves,
KennedyAWWA a
The VikValves,
MuellerPreferreSince 1Productspotablesystem f
Jones Wgreatly e
water diquality w
y Valve hasand UL/FM
king CorporSystems, a
ed Source fo857, the s of superioWater Dis
from source
Water Produexpanded s
istributionwater distr
the countrhydrants a
ration is a Lnd Devices
or Water DMueller naor quality. Wstribution Pe to custom
ucts featureselection of
systems. Cribution val
ry's most cond valves.
Leading Ma. Providing
istribution Pame has bWe are NorProducts. Omer.
e the leadinf bronze wa
Customers cves, hydran
omplete pr
anufacturer the World
Products fobeen knowrth AmericaOur produc
ng brand ofater service
can dependnts and fitt
roduct line
r of Fire Pro with Fire P
or more thanwn for innoa's largest acts are us
f Wet Barree valves an
d on Jones ftings.
and suppor
otection SpProtection.
n 150 yearsovative Waand only fused through
el Fire Hydrnd fittings f
for a reliab
rt system o
prinklers, .
s...ater Distribllline supplihout the w
rants, and afor potable
ble source o
of
ution ier of water
a
of
Amerexand INNworldwiextinguisystemsdevices.
Sierra MEnvironmthat is dthe safeautomatbetweenSierra Msafety oand tele
CorporatioNOVATIVEde as a lishers, pre-, gas dete.
Monitor Corment Measudeployed oety, efficiention industn subsystem
Monitor provof personneecom remot
on is an affirefightingleader in -engineered
ection, clea
poration, aurement ann proprietancy and cotries. Embems using provides gas d
el and plantte site man
ffiliate of Mg productsthe manufd automatian agent s
a public cond Controlary hardwammunicatioedded softotocol anddetection syts, protoconagement s
McWane Ins for overfacture ofic restaurasystems, ind
rporation,by developre platformons capabilware in thphysical mystems, fla
ol gatewaysystems.
nc. and hasr 40 yearsf hand pornt systemsdustrial sys
delivers Inping speciams. These plities in prohese produ
medium traname detects to interfa
s been provs. Amerexrtable ands, vehicle fstems and
nformationalized embeproduct solocess contructs enablenslation.tors, and gace devices
viding QUAis recogn
d wheeledfire suppre
fire detec
Technologyedded softwlutions enhrol and buie data tran
as monitors and netwo
ALITYnized
fire ssionction
y for wareance ldingnsfer
rs for orks,
o
Fire Detqualitydistinguat preseproductsqualityEuropelong-ter
tection Profire dete
ished by itent buildss per yearcontrol toensures ev
rm reliable
oducts fromectors andts experien
in excessr. By emploo ISO 9001very producfire detect
m Hochiki,alarms f
ce and expof 500,00
oying the and Envirct installedtion.
one of thfor commepertise in t0 conventilatest manronmentald will conti
he Worlds' ercial andthis field siional and nufacturing
Managemeinue to en
leading ma industriance 1918. intelligent
g techniqueent to ISOhance Hoc
anufacturel applicatHochiki Eufire detec
es and rigo14001, Ho
chiki's name
rs of ions,
uropection orousochikie for
July 2, 2003
To Whom It May Concern;
FIREFREEZE, P.O. Box 14148, Dammam – 31424 Saudi Arabia is an authorized
distributor of Sierra Monitor Corporation products which includes a complete range of
gas monitoring system. The systems are comprised of sensor modules, controllers and
various ancillary equipments necessary for full integration of complete gas detection
systems. FIREFREEZE has the technical capability and the factory direct assistance to
engineering and install our products and systems.
We recommend FIREFREEZE as our representatives and resellers in Saudi Arabia, our
experience with the principals of the company has been excellent and their customer
feedback has been positive. We remain committed to supporting FIREFREEZE with
high quality engineering support, strong customer service and rapid response to
application inquiries.
Sincerely,
Gordon Arnold, President
Sierra Monitor Corporation
1991 Tarob Court
Milpitas, CA USA
To: Whom It May Concern June 20, 2011
SUB: KING ABDULLAH FINANCIAL DISTRICT PROJECT
FIREFREEZE is an authorized non-exclusive distributor to Chemguard in the Kingdom of Saudi Arabia. We have already quoted them the above mentioned project and they will receive our support till all the involved bodies are satisfied.
FIREFREEZE is capable of the following responsibilities in the project: marketing, quotations, sales, supply, commission, inspection and after sales service of Chemguard’s foam equipment, foam concentrates and discharge devices.
We would also like to inform you that as long as the materials are still being manufactured the spare parts would be available for purchase within the next 10 – 15 years. We would have no control over items that are discontinued or no longer manufactured. Please note that our bid does not include any spare parts.
Chemguard offers a full scope of supply including fire fighting foam concentrates, fire fighting dry chemicals and all related foam equipment hardware. For further information, you are directed to our web site: www.chemguard.com or contact the undersigned for clarifications.
Duly approved and confirmed this date by:
Mahmoud Omar Senior Manager – Fire Suppression Division Middle East – Africa – EuropeChemguard Inc. GSM: + 2 01 139 38 36 [email protected]
� ������������������������������������ �
MGC Systems International Limited
Sales Office: Business Center World, Jafza View 18 & 19 | Dubai, U.A.E., P.O. Box 262746
Administrator: 25 Interchange Way | Vaughan (Toronto) ON L4K 5W3 | T 905 660-4655 | F 905 660-4113
�
�
�������������
�
��������������� ��������� � �
�
�
�������������������������������������������������� �� �������������� ���������������� �!�"�����������!�#�$���������� �������������������������%��&�%�'����'����()����*��'&��+����,�&�-��������&��*�&�&������&��.�&������#&��&(/�0��+&���&�&����(��)����&(�,/�1.2��32���
4&��������������������+�(&������&����������(�-������/��)������-��������,��5&(�)��,/���&����'��������)����)�&����
���5��'�/�)���(����)���'�/�)�����)��,&������&��������(��&�+��&�����������&���
�
$���&�&�/�/�)���
�
6'���7�'�+&&+� � � � � � � � � � � ��������������&������������'&�� � � � � � � � � � � �����������1.2�"�+����������32�6��&���������� � � � � � � � � ������������3��)�����2������&��
� ������������������������������������ �
MGC Systems International Limited
Sales Office: Business Center World, Jafza View 18 & 19 | Dubai, U.A.E., P.O. Box 262746
Administrator: 25 Interchange Way | Vaughan (Toronto) ON L4K 5W3 | T 905 660-4655 | F 905 660-4113
�
�
����������� ��
�
��������������� ��������� � �
�
�
�������������������������������������������������� �� �������������� ������������� � !�"�#������$� �"�%�&�'�������� �������������������������(���(�)����)���*+����,��)������-��-��.����'�������*��+//-��*��0�123��43���
5���-�������������/���*���--���������-���*�.����0��+//���.�����������6�*�+/��0�������)���-����+����+���
����6��)�0�+���*����+��)�0�+�����+������������������*������������--��������
�
&�����-0�0�+���
�
7)��8�)������ � � � � � � � � � � �������������/������������)�� � � � � � � � � � � �����������123�#������������43�7����������-� � � � � � � � � �����������4�+/����3��/������
400 Main Street Ashland, MA 01721 USA
508.881.2000
Sunday, May 20, 2012
To whom it may concern:
Dear Sir / Madam,
Herby to confirm that: Firefreeze located in Dammam, P.O.Box 14148, Kingdom of
Saudi Arabia, is our fully authorized distributor for the Eastern Provinces of The
Kingdom of Saudi Arabia. As our certified distributor Firefreeze is fully capable of
calculating, designing, commissioning, installing and servicing clean agent
suppression systems (FM-200, Novec 1230, Argonite and CO2), wet and dry
chemical suppression systems as well as specialized detection systems. (Linear
Heat Detection, HSSD, Kidde Panels, and Detect-A-Fire)
Firefreeze has full access to spare parts, technical and commercial information. All
Kidde Fire systems installed and commissioned by Firefreeze will be covered by our
manufacturer’s warranty as stated in our terms and conditions of sale.
Nothing further
Sincerely,
Sincerely,
Michael Z. Yakine
Regional Manager, MEA
971(0)566967745
Accredited Body: UL DQS Inc., 1130 West Lake Cook Road, Suite 340, Buffalo Grove, IL 60089 USA 1 / 2
CERTIFICATEThis is to certify that
Kidde Fenwal Inc.400 Main StreetAshland, MA 01721United States of America
with the organizational units/sites as listed in the annex
has implemented and maintains a Quality Management System.
Scope:The design, production and distribution of gas ignition systems, process control equipment,controlling devices, industrial explosion protection equipment, fire detection systems, firesuppression systems and testing services.
Through an audit, documented in a report, it was verified that the management systemfulfills the requirements of the following standard:
ISO 9001 : 2008
Certificate registration no.
Date of original certification
Date of revision
Date of certification
Valid until
10001342 QM08
1999-08-20
2012-03-15
2012-01-25
2015-01-24
UL DQS Inc.
Ganesh RaoManaging Director
Annex to CertificateRegistration No. 10001342 QM08
Kidde Fenwal Inc.400 Main StreetAshland, MA 01721United States of America
This annex (edition: 2012-03-12) is only valid in connectionwith the above-mentioned certificate. 2 / 2
Location Scope
10003832Kidde Fenwal Inc.184 Meadowlake ParkwaySwainsboro, GA 30401United States of America
The site at Swainsboro, GA performs The productionand distribution of fire prevention equipment, firedetection systems and fire suppression systemsincluding water mist, foam skids and foam equipmentand big flow products.
Remote Location Scope
10009653Kidde Fenwal Inc.90 Brook StreetHolliston, MA 01746United States of America
The remote location at Holliston, MA performs thefollowing primary functions: the provision of testingservices.
10011051Kidde Fenwal Inc.dba Chemetron Fire Systems16 W 361 South Frontage RoadBurr Ridge, IL 60527United States of America
The remote location at Matteson, IL performs thefollowing primary functions: design and customer servicecenter.
CERTIFICATE
UL DQS Inc.Management Systems Solutions
hereby certifies that the company
has implemented and maintains a Quality Management System.
Through an audit, documented in a report, it was verified that the management systemfulfills the requirements of the following standard:
ISO 9001 : 2008
Certificate Registration No. 10001342 QM08
Date of Certification 2009-02-24
Valid until 2012-02-23
Ganesh RaoPresident
1130 West Lake Cook Road, Suite 340, Buffalo Grove, IL 60089 USA
UTC Fire & Security North America Operations400 Main StreetAshland, MA 01721USA
Scope:The design, production and distribution of fire detection and fire alarm systems andcomponents, gas ignition systems, process control equipment, controlling devices, industrialexplosion protection equipment, testing services and fire prevention equipment including thedesign and manufacture of gaseous fixed fire fighting components, foam skids, foamequipment and Big Flow products.
Annex to CertificateRegistration No. 10001342 QM08
UTC Fire & Security North America Operations
400 Main StreetAshland, MA 01721USA
Including the following site
UTC Fire & Security
184 Meadowlake Parkway,Swainsboro, GA 30401Reference No. 10003832
xxx
This annex is only valid in connection with the above-mentioned certificate.
HMRZ.EX783Gate Valves
Page Bottom
Gate Valves
See General Information for Gate Valves
KENNEDY VALVE, DIV OF MCWANE INC EX783
1021 E WATER ST
ELMIRA, NY 14901 USA
O.S. and Y. pattern, Model "Ken-Seal", iron body resilient wedge, 3, 4, 6 and 8 in. sizes, 200 psig rated pressure; (ductile iron) 300 psig rated pressure: flanged ends only.
N.R.S., Model "Ken-Seal", iron body, resilient wedge, 3, 4, 6 and 8 in. sizes, 200 psig rated pressure: Slip Joint Ends, Flanged by Slip Joint Ends, Flanged by Mechanical Joint Tapping Valve.
N.R.S. and O. S. and Y. pattern, Model "KS II" (Ken-Seal II), resilient wedge, iron body 2-1/2, 3, 4, 6, 8, 10 and 12 in. sizes for working pressure of 200 psi with flanged, mechanical joint, push-on, PVC, ring-tite and threaded end connections.
NRS and OS and Y pattern, Model KS-FW, resilient wedge, iron body 2-1/2, 3, 4, 6, 8, 10 and 12 in. for working pressure of 200 psig with flanged, SMJ, flg X smJ, SMJ X Tap, PVC, Tyton, and flg X Tyton ends.
The O.S. and Y. pattern, Models "Ken Seal", "KS II" (Ken-Seal II) and KS-FW valves, may be supplied with a factory installed valve position signal attachment.
N.R.S. pattern, Model "KS-D" (Ken-Seal-D) resilient wedge, iron body 4, 6, 8, 10 and 12 in. sizes for rated pressure of 200 psi with flanged, mechanical joint, push-on and PVC end connections.
N.R.S and O.S. and Y. pattern, Model KS300, ductile iron body, resilient wedge, 2-1/2, 3, 4, 6 and 8 in. sizes, 300 psig rated pressure.
Model KS-RW gate valves in the 4, 6, 8, 10, and 12 in. sizes (NRS) and 2/1/2, 3, 4, 6, 8, 10 and 12 in. (OS&Y), for a rated pressure of 200 psig. The valves incorporate a ductile iron body, resilient wedge and various type end configurations.
N. R. S. pattern, Model 2620, iron body 2-1/2, 3, 4, 5, 6, 8 and 10 in. sizes for rated pressure of 200 psig, 12 in., 14 in. size for rated pressure of 175 psig.
N.R
.S.
and O
.S.&
Y.
pat
tern
, M
odel
KS-R
W r
esili
ent
wed
ge,
duct
ile iro
n b
ody,
4,
6,
8,
10 a
nd 1
2 in.
size
s fo
r ra
ted p
ress
ure
of
200 p
sig w
ith fla
nged
, m
echan
ical
join
t, g
roove
d,
Tyt
on a
nd P
VC e
nds.
N.R
.S.
pat
tern
, M
odel
KS-R
W r
esili
ent
wed
ge,
duct
ile iro
n b
ody,
14 a
nd 1
6 in.
size
s fo
r ra
ted p
ress
ure
of
200
psi
g w
ith f
langed
, m
echan
ical
join
t, g
roove
d,
MJ
by
flan
ge
,MJ
by
tappin
g a
nd T
yton e
nds.
N.R
.S a
nd O
.S&
.Y p
atte
rn,
Model
KS-F
W r
esili
ent
wed
ge,
iro
n b
ody
2-1
/2,
3,
4,
6,
8,
10 a
nd 1
2 in.
for
rate
d
pre
ssure
of
200 p
sig w
ith f
langed
, flan
ged
by
gro
ove
d,
gro
ove
d,
SM
J, fla
nged
by
MJ,
MJ
by
tappin
g,
Tyt
on,
Tyt
on
by
flan
ged
, th
read
ed a
nd P
VC e
nd c
onfigura
tions.
Tra
dem
ark
and/o
r Tra
den
ame:
Last
Updat
ed o
n 2
006-1
0-1
3
Ques
tions?
Notice
of D
iscl
aim
erPa
ge
Top
Copyr
ight
© 2
007 U
nder
write
rs L
abora
tories
Inc.
®
The
appea
rance
of
a co
mpan
y's
nam
e or
pro
duct
in t
his
dat
abas
e does
not
in its
elf
assu
re t
hat
pro
duct
s so
id
entified
hav
e bee
n m
anufa
cture
d u
nder
UL'
s Fo
llow
-Up S
ervi
ce.
Only
those
pro
duct
s bea
ring t
he
UL
Mar
k sh
ould
be
consi
der
ed t
o b
e Li
sted
and c
ove
red u
nder
UL'
s Fo
llow
-Up S
ervi
ce.
Alw
ays
look
for
the
Mar
k on t
he
pro
duct
.
UL
per
mits
the
repro
duct
ion o
f th
e m
ater
ial co
nta
ined
in t
he
Onlin
e Cer
tifica
tion D
irec
tory
subje
ct t
o t
he
follo
win
g c
onditio
ns:
1.
The
Guid
e In
form
atio
n,
Des
igns
and/o
r Li
stin
gs
(file
s) m
ust
be
pre
sente
d in t
hei
r en
tire
ty
and in a
non-m
isle
adin
g m
anner
, w
ithout
any
man
ipula
tion o
f th
e dat
a (o
r dra
win
gs)
. 2.
The
stat
emen
t "R
eprinte
d f
rom
the
Onlin
e Cer
tifica
tions
Direc
tory
with p
erm
issi
on fro
m U
nder
write
rs L
abora
tories
Inc.
" m
ust
ap
pea
r ad
jace
nt
to t
he
extr
acte
d m
ater
ial. I
n a
dditio
n,
the
reprinte
d m
ater
ial m
ust
incl
ude
a co
pyr
ight
notice
in
the
follo
win
g f
orm
at:
"Copyr
ight
© 2
007 U
nder
write
rs L
abora
tories
Inc.
®"
Dosyalanmam
Dry-chemical Extinguishers, Hand and Wheeled
Cartridge-activated-type Extinguishers
Stored-pressure-type Extinguishers
GBAR.EX2764 Dry-chemical Extinguishers, Hand and Wheeled
Page Bottom
See General Information for Dry-chemical Extinguishers, Hand and Wheeled
AMEREX CORP EX2764
7595 GADSDEN HWY E
PO BOX 81
TRUSSVILLE, AL 35173 USA
Model
Nominal Agent
Capacity, lb
Min Use Temp, °F
Rating
Marine Type
Ammonium phosphate
470, 467, 450 125 -65 30-A:240-B:C Yes
491 300 -65 40-A:320-B:C Yes
Potassium bicarbonate
452, 469, 472 125 -65 320-B:C Yes
493 300 -65 320-B:C Yes
Sodium bicarbonate
451, 468, 471 150 -65 240-B:C Yes
492 350 -65 320-B:C Yes
Model
Nominal Agent
Capacity, lb
Min Use Temp, °F
Rating
Marine Type
Ammonium phosphate
B417 2.5 -65 1-A:10-B:C Yes
B424, B500 5 -65 2-A:10-B:C Yes
B402 5 -65 3-A:40-B:C Yes
B461, B443 6 -65 3-A:40-B:C Yes
720 10 -65 1-A:20-B:C Yes
B456, B441 10 -65 4-A:80-B:C Yes
592 13.2 -65 4-A:80-B:C Yes
594 13.2 -65 2-A:40-B:C Yes
581 20 -65 4-A:40-B:C Yes
760 20 -65 4-A:60-B:C Yes
423, 564, A411 20 -65 10-A:120-B:C Yes
589 30 -65 10-A:160-B:C Yes
567 30 -65 4-A:40-B:C Yes
763 30 -65 4-A:80-B:C Yes
495 50 -40 20-A:160-B:C Yes
488 125 -65 30-A:240-B:C Yes
573 250 -40 40-A:160-B:C Yes
Potassium bicarbonate
B410 2 .5 -65 10-B:C Yes
B416 5 -65 10-B:C Yes
B479 5 -65 30-B:C Yes
722 10 -65 20-B:C Yes
B460 10 -65 80-B:C Yes
595 13.2 -65 40-B:C Yes
599 13.2 -65 80-B:C Yes
584 20 -65 20-B:C Yes
580 20 -65 40-B:C Yes
762 20 -65 60-B:C Yes
566, A413, 415 20 -65 120-B:C Yes
569 30 -65 40-B:C Yes
764 30 -65 80-B:C Yes
591 30 -65 160-B:C Yes
497 50 -40 160-B:C Yes
689, 690 125 -40 120-B:C Yes
490 125 -65 320-B:C Yes
575 250 -40 160-B:C Yes
Sodium bicarbonate
A620 1 -65 2-B:C No
B403, C403 2.5 -65 10-B:C Yes
B409 5 -65 10-B:C Yes
B453 5.5 -65 40-B:C Yes
B459, B462 6 -65 40-B:C Yes
721 10 -65 20-B:C Yes
B457, B447 10 -65 60-B:C Yes
593 13.2 -65 40-B:C Yes
A412, 408 20 -65 120-B:C Yes
582 20 -65 40-B:C Yes
761 20 -65 60-B:C Yes
568 30 -65 40-B:C Yes
496 50 -40 160-B:C Yes
489 150 -65 240-B:C Yes
574, 579
High-flow Extinguishers
Trademark and/or Tradename: "Sure Shot"
© 2013 UL LLC
When the UL Leaf Mark is on the product, or when the word "Environment" is included in the UL Mark, please search the UL Environment database for additional information regarding this product's certification.
The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow-Up Service. Always look for the Mark on the product.
UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and/or Listings (files) must be presented in their entirety and in a non-misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from UL" must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "© 2013 UL LLC".
250 -40 160-B:C Yes
Extinguishing Agent Model
Ammonium phosphate 581, 567, 495, 470, 467, 450, 488, 573, 491, 720, 760, 763
Potassium bicarbonate 580, 569, 584, 497, 689, 690, 490, 575, 452, 469, 472, 493, 722, 762, 764
Sodium bicarbonate 582, 568, 496, 489, 574, 579, 451, 468, 471, 492, 721, 761
Last Updated on 2011-06-16
Questions? Print this page Terms of Use Page Top
HBOR.EX1774Hydrants
Page Bottom
Hydrants
See General Information for Hydrants
KENNEDY VALVE, DIV OF MCWANE INC EX1774
1021 E WATER ST
ELMIRA, NY 14901 USA
Base valve design.
ModelBase Valve
Size In.Hose Outlet
In.Pumper Outlet
In.Rated Pressure
(psig)
K-81 4-1/2 (2) 2-1/2 — 175
"Traffic Type"
K-81 5-1/4 (2) 2-1/2 — 175
"Traffic Type"
K-81 4-1/2 (2) 2-1/2 (1) 4-1/2 or 5 175
"Traffic Type"
K-81 5-1/4 (2) 2-1/2 (1) 4-1/2 or 5 175
"Traffic Type"
K-81D 4-1/2 (2) 2-1/2 — 175
"Traffic Type"
K-81D 5-1/4 (2) 2-1/2 — 175
"Traffic Type"
K-81D 4-1/2 (2) 2-1/2 (1) 4-1/2 or 5 175
"Traffic Type"
K-81D 5-1/4 (2) 2-1/2 (1) 4, 4-1/2 or 5 175
"Traffic Type"
Note — The model K-81 with 5-1/4 in. base valve may be supplied with a 3 in. monitor elbow and/or gate valve flange.
Last Updated on 1996-07-23
Questions? Print this page Notice of Disclaimer Page Top
Copyright © 2010 Underwriters Laboratories Inc.®
The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured underUL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow-Up Service.Always look for the Mark on the product.
UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The GuideInformation, Designs and/or Listings (files) must be presented in their entirety and in a non-misleading manner, without any manipulation of the data(or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from Underwriters Laboratories Inc." mustappear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "Copyright ©2010 Underwriters Laboratories Inc.®"
Carbon Dioxide Extinguishers
© 2013 UL LLC
When the UL Leaf Mark is on the product, or when the word "Environment" is included in the UL Mark, please search the UL Environment database for additional information regarding this product's certification.
The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow-Up Service. Always look for the Mark on the product.
UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and/or Listings (files) must be presented in their entirety and in a non-misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from UL" must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "© 2013 UL LLC".
FXHV.EX2835 Carbon Dioxide Extinguishers
Page Bottom
See General Information for Carbon Dioxide Extinguishers
AMEREX CORP EX2835
7595 GADSDEN HWY E
PO BOX 81
TRUSSVILLE, AL 35173 USA
Model
Nom Agent Capacity, lb
Min Use Temp, °F
Rating
Marine Type
322 5 -22 5-B:C Yes
330 10 -22 10-B:C Yes
331 15 -22 10-B:C Yes
332 20 -22 10-B:C Yes
333 50 -22 20-B:C Yes
334 100 -22 20-B:C Yes
Last Updated on 2010-12-27
Questions? Print this page Terms of Use Page Top
Dry-chemical Extinguishers, Portable, Marine
Stored-pressure-type Extinguishers
GPCZ.EX2764 Dry-chemical Extinguishers, Portable, Marine
Page Bottom
See General Information for Dry-chemical Extinguishers, Portable, Marine
AMEREX CORP EX2764
7595 GADSDEN HWY E
PO BOX 81
TRUSSVILLE, AL 35173 USA
Model
Nominal Agent
Capacity lb
Min Use Temp, °F
Rating
Marine Classification
Type A Size
Type B:C Size
Ammonium phosphate
B417 2.5 -65 1-A:10-B:C — I
B424, B500 5 -65 2-A:10-B:C II I
B402 5 -65 3-A:40-B:C II I
B461, B443 6 -65 3-A:40-B:C II I
B456, B441 10 -65 4-A:80-B:C II II
592 13.2 -65 4-A:80-B:C II II
594 13.2 -65 2-A:40-B:C II II
581 20 -65 4-A:40-B:C II III
423, 564, A411 20 -65 10-A:120-B:C II III
589 30 -65 10-A:160-B:C II IV
567 30 -65 4-A:40-B:C II IV
763 30 -65 4-A:80-B:C II IV
Potassium Bicarbonate
B410 2.5 -65 10-B:C — I
B416 5 -65 10-B:C — I
B479 5 -65 30-B:C — I
B460 10 -65 80-B:C — II
595 13.2 -65 40-B:C — II
599 13.2 -65 80-B:C — II
584 20 -65 20-B:C — III
580 20 -65 40-B:C — III
566, A413, 415 20 -65 120-B:C — III
569 30 -65 40-B:C — IV
764 30 -65 80-B:C — IV
© 2013 UL LLC
When the UL Leaf Mark is on the product, or when the word "Environment" is included in the UL Mark, please search the UL Environment database for additional information regarding this product's certification.
The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow-Up Service. Always look for the Mark on the product.
UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and/or Listings (files) must be presented in their entirety and in a non-misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from UL" must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "© 2013 UL LLC".
693 30 -65 120-B:C — IV
591 30 -65 160-B:C — IV
Sodium bicarbonate
B403, C403 2.5 -65 10-B:C — I
B409 5 -65 10-B:C — I
B453 5.5 -65 40-B:C — I
B459, B462 6 -65 40-B:C — I
B457, B447 10 -65 60-B:C — II
593 13.2 -65 40-B:C — II
A412, 408 20 -65 120-B:C — III
582 20 -65 40-B:C — III
568 30 -65 40-B:C — IV
Last Updated on 2011-06-16
Questions? Print this page Terms of Use Page Top
Strainers, Pipeline
Strainers, basket type, Fig. N. 595 in the 4, 6, 8, 10, 12 in. sizes for working pressures not exceeding 175 psi.
Loss of head will approximate 3.95 psi for the 12 in. size at 5233 GPM.
Strainers, "Y" type, Fig. 911, 911CS in sizes 2-1/2, 3, 4, 5, 6, 8, 10 and 12 in. for working pressures not exceeding 175 psig. Loss of head will approximate 3.3 psi for the 3 in. size at 350 GPM, 3.2 psi for the 4 in. size at 600 GPM, 3.6 psi for the 5 in. size at 950 GPM, 3.6 psi for the 6 in size at 1350 GPM, 3.1 psi for the 8 in. size at 2350 GPM and 3 psi for the 10 in. size at 3700 GPM .
© 2012 UL LLC
When the UL Leaf Mark is on the product, or when the word "Environment" is included in the UL Mark, please search the UL Environment database for additional information regarding this product's certification.
The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow-Up Service. Always look for the Mark on the product.
UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and/or Listings (files) must be presented in their entirety and in a non-misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from UL" must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "© 2012 UL LLC".
HLCV.EX3258 Strainers, Pipeline
Page Bottom
See General Information for Strainers, Pipeline
MUELLER STEAM SPECIALTY, DIV OF CORE INDUSTRIES INC EX3258
HWY 20 W
SAINT PAULS, NC 28384 USA
Last Updated on 2004-12-09
Questions? Print this page Terms of Use Page Top
Fire Hose, Lined, Uncoupled, for Municipal and Industrial Use Certified for Canada
"Proflo" 38.1, 50.8, 63.5 and 76.2 mm nitrile rubber/polyvinyl chloride hose having a reinforcement of polyester filament synthetic warp threads and Polyamide nylon filament filler threads and nitrile/polyvinyl chloride cover judged equivalent to single-jacketed 250 psig service test pressure fire hose.
"Proflo" 101.6 and 127 mm nitrile rubber/polyvinyl chloride hose having a reinforcement of polyester filament synthetic warp threads and Polyamide nylon filament filler threads and nitrile/polyvinyl chloride cover judged equivalent to double-jacketed 200 psig service test pressure fire hose.
"DuraFlo" 44.5 and 63.5 mm nitrile rubber/polyvinyl chloride hose having a reinforcement of polyester filament synthetic warp threads and Polyamide nylon filament filler threads and nitrile/polyvinyl chloride cover judged equivalent to single-jacketed 250 psig service test pressure fire hose.
Single-jacketed fire hose, 1-1/2 in. size ("SP15"), 2 in. size ("SP20"), and 2-1/2 in. size ("SP25").
Double-jacketed fire hose, 1-1/2 in. size ("DP15"), 1-3/4 in. size ("DP17"), 2 in. size ("DP20"), 2-1/2 in. size *("DP25"), 3 in. size ("DP30"), 3-1/2 in. size ("DP35"), and *4 in. size ("DP40").
© 2012 UL LLC
When the UL Leaf Mark is on the product, or when the word "Environment" is included in the UL Mark, please search the UL Environment database for additional information regarding this product's certification.
The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow-Up Service. Always look for the Mark on the product.
UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and/or Listings (files) must be presented in their entirety and in a non-misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from UL" must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "© 2012 UL LLC".
MZQE7.EX4211 Fire Hose, Lined, Uncoupled, for Municipal and Industrial Use Certified for Canada
Page Bottom
See General Information for Fire Hose, Lined, Uncoupled, for Municipal and Industrial Use Certified for Canada
KEY FIRE HOSE CORP EX4211
2926 COLUMBIA HWY
DOTHAN, AL 36303 USA
Last Updated on 2012-09-17
Questions? Print this page Terms of Use Page Top
Fire Hose, Lined, Uncoupled, for Municipal and Industrial Use
"Proflo" 1-1/2, 2. 2-1/2 and 3 in. nitrile rubber/polyvinyl chloride hose having a reinforcement of polyester filament synthetic warp threads and Polyamide nylon filament filler threads and nitrile/polyvinyl chloride cover judged equivalent to single-jacketed 250 psig service test pressure fire hose.
"Proflo" 4 and 5 in. nitrile rubber/polyvinyl chloride hose having a reinforcement of polyester filament synthetic warp threads and Polyamide nylon filament filler threads and nitrile/polyvinyl chloride cover judged equivalent to double-jacketed 200 psig service test pressure fire hose.
"DuraFlo" 1-3/4 and 2-1/2 in. nitrile rubber/polyvinyl chloride hose having a reinforcement of polyester filament synthetic warp threads and Polyamide nylon filament filler threads and nitrile/polyvinyl chloride cover judged equivalent to single-jacketed 250 psig service test pressure fire hose.
Single-jacketed fire hose, 1-1/2 in. size ("SP15"), 2 in. size ("SP20"), and 2-1/2 in. size ("SP25").
Double-jacketed fire hose, 1-1/2 in. size ("DP15"), 1-3/4 in. size ("DP17"), 2 in. size ("DP20"), 2-1/2 in. size *("DP25"), 3 in. size ("DP30"), 3-1/2 in. size ("DP35"), and *4 in. size ("DP40").
© 2012 UL LLC
When the UL Leaf Mark is on the product, or when the word "Environment" is included in the UL Mark, please search the UL Environment database for additional information regarding this product's certification.
The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow-Up Service. Always look for the Mark on the product.
UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and/or Listings (files) must be presented in their entirety and in a non-misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from UL" must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "© 2012 UL LLC".
MZQE.EX4211 Fire Hose, Lined, Uncoupled, for Municipal and Industrial Use
Page Bottom
See General Information for Fire Hose, Lined, Uncoupled, for Municipal and Industrial Use
KEY FIRE HOSE CORP EX4211
2926 COLUMBIA HWY
DOTHAN, AL 36303 USA
Last Updated on 2012-09-17
Questions? Print this page Terms of Use Page Top