PREPARED BY : SAGAR SHAH (09bcl027) MANSI JAIN (09bcl034) RUJUTA MEHTA (09bcl037) PRECAST BUILDING SYSTEM

PRECAST BUILDING SYSTEM

Embed Size (px)

Citation preview

Page 1: PRECAST BUILDING SYSTEM

PREPARED BY :SAGAR SHAH (09bcl027)MANSI JAIN (09bcl034)RUJUTA MEHTA (09bcl037)

PRECAST BUILDING SYSTEM

Page 2: PRECAST BUILDING SYSTEM

INTRODUCTION What is precast? Advantages Case studies of precast buildings (India/abroad) Companies involved in precast buildings (India/abroad)

ELEMENTS OF PRECAST BUILDINGS AND VARIOUS SYSTEMS Precast footings Beams Columns Slab Shear walls Partition walls Connection between precast elements

SCOPE

Page 3: PRECAST BUILDING SYSTEM

CONSTRUCTION METHODOLOGY

DESIGN OF PRECAST BUILDING SYSTEM Loads (DL, LL, WL, EL) Analysis Design Detailing of reinforcement Cost estimate

COMPARISON BETWEEN CAST-IN-SITU AND PRECAST BUILDING DESIGNS

PREPARATION OF MODEL OF PRECAST BUILDINGS Scaled model / Prototype ( to demonstrate construction and other aspects

of precast buildings)

STANDARDS

Page 4: PRECAST BUILDING SYSTEM

WHAT IS PRECAST ? Precast concrete is a construction product

produced by casting concrete in a reusable mold or "form" which is then cured in a controlled environment, transported to the construction site and lifted and set into place.

INTRODUCTION

Page 5: PRECAST BUILDING SYSTEM

PRECAST BUILDINGS CONVENTIONAL BUILDINGSDesigned, manufactured, and tested under supervision of experienced management.

Concrete cast at site where contractors do not take care of mix design proportions.

Entire concrete blocks are cured uniformly for the required amount of time.

Curing is not done uniformly at sites.

Production is not hampered with weather delays

Production is severely hampered.

Aesthetically pleasing appearance Special aesthetic design required

WHY PRECAST - ADVANTAGES

Page 6: PRECAST BUILDING SYSTEM

PRECAST BUILDINGS CONVENTIONAL BUILDINGS

Environment -friendly Non environment-friendly

Stationary equipment efficiency designed for repetitive production. Cost of formwork per unit to be lower than for site-cast production.

Special design and features developed for each project at higher costs

Greater flexibility : Design and manufacturing at same location.

Not flexible

Construction is faster. Construction is comparatively slower.

Page 7: PRECAST BUILDING SYSTEM

A precast building is constructed by assembling and connecting various prefabricated elements required in the building structure. These elements are:

Precast slabsPrecast beamsPrecast columnsPrecast wallsPrecast foundation

PRECAST CONCRETE STRUCTURAL ELEMENTS

Page 8: PRECAST BUILDING SYSTEM

Precast slabs are cast in a factory environment and include the following prestressed concrete options:Hollow core units:

A Hollow core slab offers the ideal structural section by reducing deadweight while providing the maximum structural efficiency within the slab depth. Precast floors are available with a variety of factory-formed notches, slots and reinforcement arrangements which offer various design approaches.

PRECAST SLABS

Page 9: PRECAST BUILDING SYSTEM

Double-tee units:

Double Tee (TT) slabs are two symmetrically placed beams interacting with a slab forming in one section with a “double tee” shape made in precast, prestressed concrete.

Resistant to moisture and corrosion. Parking garages, office buildings, commercial buildings, factories, industrial buildings, etc., are all ideal applications.

Made with G50 concrete and ½” strands ASTM A416 as standard, each double Tee slab is normally 2400mm wide.

Page 10: PRECAST BUILDING SYSTEM

BEARING SUPPORTS FOR DOUBLE TEE SLABS

Double tee slabs can be supported on many types of supports designed to carry the required dead and live loads. Precast beams, precast walls, poured concrete beams and walls, masonry walls, insulated concrete forming system walls and structural steel beams are all suitable for use with double tee slabs as load bearing systems.

Page 11: PRECAST BUILDING SYSTEM

Solid concrete units:

These are simple solid core slabs which appear same as solid slabs cast in situ; the only difference being that they are prefabricated.

Slab Depths: range from 75mm to 240mm with upstands – giving overall depths between 150mm and 300mm.

Slab Widths: Usually manufactured to 600mm or 1200mm nominal size. Rapid Construction: Precast slabs are manufactured to the specific needs

of the building, eliminating shuttering and adding to speed of construction. 

Design Efficient: Composite floors can be designed to act compositely with the structure of the building to reduce member sizes.

Soffit Finish: The soffit of the solid prestressed slab is generally from a steel mould and is therefore suitable for an exposed finish in structures such as car parks, industrial buildings and for a wide variety of applied finishes in other types of buildings.

Page 12: PRECAST BUILDING SYSTEM

Biaxial voided slabs : A relatively new technology developed in Europe has taken

the efficiency of cast-in-place flat plate slabs to new heights. Floor spans up to 17 meters (~56 feet) and overall slab

thicknesses up to 60 cm (~24 inches). These slabs are more efficient than traditional structural

floor systems commonly used in the construction of office buildings. The main effect of the voided slab system is to decrease the overall weight by as much as 35% when compared to a solid slab of the same capacity, while still offering other advantages.

The voided slab system has the same bearing capacity as conventional concrete solid slabs, and standard design and detailing techniques can be directly applied.

Page 13: PRECAST BUILDING SYSTEM

Beams and beam shells are both used for suspended flooring. Beams are typically used as ledges for other forms of precast flooring to sit on, but can also be used as a flooring option in their own right. They are generally manufactured to suit each particular situation and profiles can include Tee-beams, L-beams, Rectangular beams, U-beams and Beamshells.

Beams can be either reinforced or prestressed.

PRECAST BEAMS

Page 14: PRECAST BUILDING SYSTEM

Tee-Beams :Tee-beams (either single or double) cover the

span range beyond slab-type members such as hollowcore planks.

Tee-beams are a very efficient structural shape. The units are generally cast with straight

strands or deflected strands, depending on design considerations.

The Tee-beams are the basis for the design of economical, fire rated structures where construction time, long spans or heavy loadings are important cost influences.

Page 15: PRECAST BUILDING SYSTEM

Inverted Tee-Beams (Ledger) :Inverted Tee-beams are generally used for

flooring systems like beam and infill where they provide a ledger for precast floor units to sit on. Inverted Tee-beams are structurally similar to a standard single Tee-beam.

 

Page 16: PRECAST BUILDING SYSTEM

L-Beam (Spandrel):L-beams have an 'L' shape profile which

provides a ledge for a precast flooring system to sit on.

These beams are generally used to span clear sections and are reinforced and/or prestressed.

Page 17: PRECAST BUILDING SYSTEM

Rectangular Beams: Rectangular beams get their name from the end

profile. These beams are generally used to span clear sections and are reinforced and/or prestressed.

U-Beams: U-beams as the name suggests have a 'U' shaped

profile. These beams are generally used to span clear sections and are reinforced and/or pretensioned.

They are more commonly used for single-unit pedestrian bridges than with composite flooring systems.

Page 18: PRECAST BUILDING SYSTEM

Beam Shells: This is a complimentary composite system of precast

elemnts that contain all the positive main beam reinforcement and most/all of the stirrups in a minimum volume of concrete for economy and ease of handling.

They are generally ‘U’ shaped and mostly used in conjunction with precast flooring such as hollowcore or permanent formwork panels to eliminate on site forming.

Page 19: PRECAST BUILDING SYSTEM

Precast concrete columns are modular in design in order to be made into different heights.

Widths are 12", 18" and 24". Columns are not structural, but can be used

as such only after a structural engineer has adapted them to a building.

Precast column can be produced as either single storey corbel column or multi storey corbel column.

PRECAST COLUMNS 

Page 20: PRECAST BUILDING SYSTEM

Columns can either be rectangular or circular in section.

Projecting rebar can be provided for tying in to in-situ floors. Options for foundation connections include cast in base plates, dowel tubes or projections.

Beam support is achieved by either flared heads, corbels or bolt-on brackets.

Page 21: PRECAST BUILDING SYSTEM

A wall system can be comprised of : flat or curved panels (solid, hollow-core, or

insulated)window or mullion panels ribbed panels double-tee .

PRECAST WALLS

Page 22: PRECAST BUILDING SYSTEM
Page 23: PRECAST BUILDING SYSTEM

Precast footings are a recent innovation. No holes need to be dug for footings, as the

precast blocks are set on grade, and the posts, columns or beams fit in pockets cast in the concrete block.

Precast concrete foundations are pre-engineered systems manufactured in a controlled environment.

PRECAST FOOTINGS

Page 24: PRECAST BUILDING SYSTEM

Precast footings Cast in situ footings

• Built off site • Formed and cast on site

• Lowest site impact (0.5-1.0 days) • High site impact (5-8 days)

• Negligible impact by weather • Construction impacted by weather

• Panelized = joints for expansion andContraction

• Monolithically cast = cracks

Page 25: PRECAST BUILDING SYSTEM

The type of structural system should be determined keeping in mind the purpose of building, the efficiency of the system, the location and the client’s need.

Depending on the load-bearing structure, precast systems can be divided into the follow categories: Large-panel systems Frame systems Slab-column systems with walls Mixed systems

TYPES OF PRECAST SYSTEMS

Page 26: PRECAST BUILDING SYSTEM

“Large-panel system” refers to multistory structures composed of large wall and floor concrete panels connected in the vertical and horizontal directions so that the wall panels enclose appropriate spaces for the rooms within a building.

These panels form a box-like structure.

Both vertical and horizontal panels resist gravity load.

Wall panels are usually one storey high.

Horizontal floor and roof panels span either as one-way or two-way slabs.

When properly joined together, these horizontal elements act as diaphragms that transfer the lateral loads to the walls.

LARGE PANEL SYSTEMS:

Page 27: PRECAST BUILDING SYSTEM

Depending on wall layout, there are three basic configurations of large-panel buildings:

Cross-wall system : The main walls that resist gravity and lateral loads are placed in the short direction of the building.

Longitudinal-wall system: The walls resisting gravity and lateral loads are placed in the longitudinal direction.

Two-way system. The walls are placed in both directions.

Page 28: PRECAST BUILDING SYSTEM

Precast frames can be constructed using either linear elements or spatial beam column sub-assemblages.

The use of linear elements generally means placing the connecting faces at the beam-column junctions. The beams can be seated on corbels at the columns, for ease of construction and to aid the shear transfer from the beam to the column.

The beam-column joints accomplished in this way are hinged.

However, rigid beam-column connections are used in some cases, when the continuity of longitudinal reinforcement through the beam-column joint needs to be ensured.

FRAME SYSTEMS:

Page 29: PRECAST BUILDING SYSTEM

The components of a precast reinforced concrete frame are shown in Figure:

Page 30: PRECAST BUILDING SYSTEM

SLAB-COLUMN SYSTEMS:These systems rely on shear walls to sustain

lateral load effects, whereas the slab-column structure resists mainly gravity loads.

There are two main systems in this category:

Lift-slab system with walls

Prestressed slab-column system

Page 31: PRECAST BUILDING SYSTEM

Lift –slab system: The load-bearing structure consists of precast

reinforced concrete columns and slabs. Precast columns are usually two stories high. All precast structural elements are assembled by

means of special joints. Precast concrete floor slabs are lifted from the

ground up to the final height by lifting cranes. The slab panels are lifted to the top of the column

and then moved downwards to the final position. Temporary supports are used to keep the slabs in the

position until the connection with the columns has been achieved.

Page 32: PRECAST BUILDING SYSTEM

The prestressed slab-column system:

Horizontal prestressing in two orthogonal directions to achieve continuity.

The precast concrete column elements are 1 to 3 stories high.

After erecting the slabs and columns of a storey, the columns and floor slabs are prestressed by means of prestressing tendons that pass through ducts in the columns at the floor level and along the gaps left between adjacent slabs.

After prestressing, the gaps between the slabs are filled with in situ concrete and the tendons then become bonded with the spans.

post-tensioned slab column connection

Page 33: PRECAST BUILDING SYSTEM

Connections are locations of high stress concentrations and are weak points in the structural systems.

Connections of different precast concrete components like footing beams, columns, slabs and wall panels are very essential in precast concrete building.

Depending upon the type of connection, a joint can be considered simply supported, fixed and hinged.

Primarily precast building connections can be classified as: Typical European prefabrication. Equivalent monolithic moment resisting connection. Post-tensioned dry joint. Hybrid connection.

CONNECTIONS

Page 34: PRECAST BUILDING SYSTEM

In this type of connection concrete structures are designed with plastic hinges occurring at column bases and beams are hinged to the column.

Advantages : increases speed of construction. high quality control can be maintained as all precasted

elements are required to be dry jointed at site.Limitations :

lack of lateral stability since beams and slab are simply supported; moment resisting connections are required to achieve adequate stiffness.

not preferable as it causes significant deformation and high lateral displacement during a seismic event.

TYPICAL EUROPEAN PREFABRICATION

Page 35: PRECAST BUILDING SYSTEM

Typical European fabrication for industrial building

Page 36: PRECAST BUILDING SYSTEM

Precast concrete structures are traditionally designed as moment resisting frames with plastic hinges occurring at the column base, and beams hinged to the columns.

A ductile moment resisting connection between the column and the beam can provide, with respect to a simply supported precast beam, the advantage of designing continuous beams with a reduced beam depth, or with an increase of either span length or carried load.

EQUIVALENT MOMENT RESISTING FRAMES

Page 37: PRECAST BUILDING SYSTEM
Page 38: PRECAST BUILDING SYSTEM

Schematic diagrams explaining different type of cast-in-place connections.

Page 39: PRECAST BUILDING SYSTEM
Page 40: PRECAST BUILDING SYSTEM

Picture of factory set of components

Page 41: PRECAST BUILDING SYSTEM
Page 42: PRECAST BUILDING SYSTEM
Page 43: PRECAST BUILDING SYSTEM
Page 44: PRECAST BUILDING SYSTEM
Page 45: PRECAST BUILDING SYSTEM
Page 46: PRECAST BUILDING SYSTEM

They show a good seismic behavior due to limited residual structural deformations, which allow immediate occupancy of the buildings after a seismic event.

The post-tensioned tendons act as elastic springs re-centering the joint and in this way resetting the initial conditions existing before the seismic event.

In such connection a tendon is passed through the connection and post-tensioned.

POST TENSIONED DRY JOINT

Page 47: PRECAST BUILDING SYSTEM
Page 48: PRECAST BUILDING SYSTEM

In the hybrid solutions, the beams are jointed to the column by ordinary longitudinal reinforcement, dissipating the energy, and post-tensioned unbonded tendons allowing a controlled rocking of the beam.

The typical effect is a “flag-shaped” hysteretic behavior, with a reduction of the damage of the jointed elements due to opening and closing of the pre-existing gap at the beam-column interface.

HYBRID CONNECTION

Page 49: PRECAST BUILDING SYSTEM
Page 50: PRECAST BUILDING SYSTEM
Page 51: PRECAST BUILDING SYSTEM

CONSTRUCTION CONSIDERATIONS

All safety issues on site when handling precast elements,

The lifting capacity of the crane used.

The working boom-radius of the crane.

The suitability of construction materials for the purpose of use, i.e. sealant, grouting, shim plate, propping etc.

Co-ordination with the precaster and specialist supplier to achieve the best performance and working method.

CONSTRUCTION METHOD FOR PRECAST SYSTEM

Page 52: PRECAST BUILDING SYSTEM

SEQUENCE OF WORK

QUICK CHECK Ensure the correct panel before hoisting.

Ensure the crane lifting capacity before hoisting the panel.

Ensure the desired crane’s working radius.

Ensure the anchorage for the propping does not damage cast-in building services.

Ensure the desired verticality/position is achieved.

Estimated time to install a typical precast element is 1/2 to 3/4 hour

Page 53: PRECAST BUILDING SYSTEM

THE PROCEDURE

Diagram below illustrates the sequence of installation for the precast beam-slab system:

Page 54: PRECAST BUILDING SYSTEM
Page 55: PRECAST BUILDING SYSTEM
Page 56: PRECAST BUILDING SYSTEM

Post installationVerify alignment and verticality of every wall.Verify cast slab level at 1 m grid.Report deviation and rectify if required.

Page 57: PRECAST BUILDING SYSTEM

CONSTRAINTS AND SOLUTIONS

Access

Page 58: PRECAST BUILDING SYSTEM

CRANE CAPACITY AND REACH

COORDINATION

Page 59: PRECAST BUILDING SYSTEM

INSTALLATION

HANDLING

Page 60: PRECAST BUILDING SYSTEM