Page 1: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Precise Digital Leveling

Section 3

Collimation Check and Field Notes

Page 2: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Collimation CheckC-CheckPeg Test

Page 3: Precise Digital Leveling Section 3 Collimation Check and Field Notes

• Allow instrument and rods to acclimate prior to performing the collimation and/or leveling (allow equipment to adjust to the working environment for 10 minutes or more)

• Perform Collimation Check on level ground at the work site in the work environment

• Perform a Collimation Check at the beginning of every day that geodetic leveling is performed or when the level is jarred or any time there is a question about the instrument

Collimation Check

Page 4: Precise Digital Leveling Section 3 Collimation Check and Field Notes

• Perform a Collimation Check whenever the ambient temperature changes more than 10 degrees Celsius during the course of leveling during the day

• Remove parallax and sharply focus the instrument and ensure all circular levels are in adjustment

Apply collimation to all future measurements (also note in digital data files that this correction has been applied to all measurements)

Record collimation (arc-seconds) on Backup Recording Sheet

Collimation Check (continued)

Page 5: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Collimation Check - Kukkamaki MethodA x B x

10 m 10 m 20 m

InstrumentPosition 1

InstrumentPosition 2

Rod A Rod B

Page 6: Precise Digital Leveling Section 3 Collimation Check and Field Notes

10 m

Rod A Rod B

InstrumentPosition 1

Collimation Check - Kukkamaki MethodA x B x

Page 7: Precise Digital Leveling Section 3 Collimation Check and Field Notes

10 m

Rod A Rod B

InstrumentPosition 1

Collimation Check - Kukkamaki MethodA x B x

Page 8: Precise Digital Leveling Section 3 Collimation Check and Field Notes

20 m

Rod A Rod B

InstrumentPosition 2

Collimation Check - Kukkamaki MethodA x B x

Page 9: Precise Digital Leveling Section 3 Collimation Check and Field Notes

40 m

Rod A Rod B

InstrumentPosition 2

Collimation Check - Kukkamaki MethodA x B x

Page 10: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Collimation Check – FÖrstner MethodA x x B

15 m 15 m 15 m

InstrumentPosition 1

InstrumentPosition 2

Rod A Rod B

1/3 1/3 1/3

Page 11: Precise Digital Leveling Section 3 Collimation Check and Field Notes

15 m

InstrumentPosition 1

Rod A Rod B

Collimation Check – FÖrstner MethodA x x B

Page 12: Precise Digital Leveling Section 3 Collimation Check and Field Notes

30 m

InstrumentPosition 1

Rod A Rod B

Collimation Check – FÖrstner MethodA x x B

Page 13: Precise Digital Leveling Section 3 Collimation Check and Field Notes

15 m

InstrumentPosition 2

Rod A Rod B

Collimation Check – FÖrstner MethodA x x B

Page 14: Precise Digital Leveling Section 3 Collimation Check and Field Notes

30 m

InstrumentPosition 2

Rod A Rod B

Collimation Check – FÖrstner MethodA x x B

Page 15: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Observing Guides and Field Notes

Page 16: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Instrument SpecificDigital Level User

Guides

Leica DNA03Example

Page 17: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Instrument SpecificDigital Level User

Guides

Topcon DL101CExample

Page 18: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Instrument SpecificDigital Level User

Guides

Trimble/ZeissDiNi 12Example

Page 19: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Instrument SpecificDigital Level User

Guides

TrimbleDiNi “03”Example

Page 20: Precise Digital Leveling Section 3 Collimation Check and Field Notes
Page 21: Precise Digital Leveling Section 3 Collimation Check and Field Notes
Page 22: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Required Leveling NotesEntered at the beginning of the day Or for change in observer, or instrumentation

Entered at the beginning of a section

Temperature readings inserted after each set-up For recording gradient temperatures

Entered at the end of a section

9999 Entered at the end of day Or for change of observer or equipment

Page 23: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Required LEVEL NOTES

Beginning of Day or Change in Observer/Instrument Type

Date (mmddyy)Observer’s Number (1, 2, 3, etc – observer specific for project)Instrument Type (DNA03, DL101C, DINI12, etc)Temperature Code (0 for Celsius or 1 for Fahrenheit)

Equipment Used

Instrument Serial Number (like 90810)Collimation Check Error in Arc Seconds Rod 1 Serial Number (like 25458)Rod 2 Serial Number (like 25534)

Page 24: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Required Notes Entered Per Section

Start of Leveling Section

Start Time (hhmm, 24 hour local)Rod on Mark (1 or 2)Starting Temperature at Instrument Wind and Sun Code

Temperature Gradient (Recorded in instrument only - after each complete BF setup)

Info 1 Lower Probe (decimal or no decimal by instrument type)Info 2 Upper Probe (decimal or no decimal by instrument type)

Page 25: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Required Notes at End of Leveling Section

Ending Time (hhmm, 24 hour local)Rod on Mark (1 or 2 – should be the same as starting)Ending Temperature at Instrument Wind & Sun Code (00 = Calm/Cloudy; 02 = Calm/Sunny, etc.)

Wind Code:0 – Calm Wind speed averaged less than 6 mph during section1 – Breezy Wind speed averaged 6 to 15 mph during section2 – Windy Wind speed averaged greater than 15 mph during section

Sun Code:0 – Cloudy Less than 25% of setups are performed in sunny conditions1 – Partly Cloudy 25 to 75% of setups are performed in sunny conditions2 – Sunny More than 75 % of setups are performed in sunny conditions

9999 End of Day or Change of Observer or Change of Equipment

Page 26: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Sample BackupRecording Sheet

Page 27: Precise Digital Leveling Section 3 Collimation Check and Field Notes

1st Order, Class II4√1.47782 = 4.86262 mm

2nd Order, Class I6√1.47782 = 7.29393

mm

F = -13.23456 mB = +13.23750 m + 0.00294 m

AllowableSection Closure

Page 28: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Leica DNA03 GSI Format

Page 29: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Leica DNA03 GSI Format (Last four columns on right deleted from view)

Page 30: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Trimble DiNi T12 Raw Data

Page 31: Precise Digital Leveling Section 3 Collimation Check and Field Notes

Trimble DiNi T12 Raw Data (First column on left deleted)

Page 32: Precise Digital Leveling Section 3 Collimation Check and Field Notes
Page 33: Precise Digital Leveling Section 3 Collimation Check and Field Notes

http://tsrc.cbi.tamucc.edu/TSRC/TexasHeightModernization

Page 34: Precise Digital Leveling Section 3 Collimation Check and Field Notes
Page 35: Precise Digital Leveling Section 3 Collimation Check and Field Notes