Proposed Time Schedule for Research Investigation (421-643) V. Kumaran (ID: 277492) Civil & Environmental Department No . Activity Start Time End Time Duration (Days) Completion (%) 1 Preliminary Proposal 18 Jul 2007 18 Jul 2007 - 100 2 Research Proposal 1 Aug 2007 1 Aug 2007 - 100 3 Literature Review Solar Cooling Technology Greenhouse Design Operating Parameter for Plant Specific 1 Aug 2007 21 Aug 2007 21 30 4 Development of Methodology Technology Assessment Greenhouse and Solar Cooling Selection Preliminary Model Selection/Development 1 Aug 2007 13 Aug 2007 16 Aug 2007 17 Aug 2007 22 Aug 2007 15 Aug 2007 16 Aug 2007 20 Aug 2007 21 0 5 Collection of Data (for methodology) Meteorological Data Cost elements 20 Aug 2007 20 Aug 2007 20 Aug 2007 27 Aug 2007 23 Aug 2007 27 Aug 2007 8 0 6 Technical and Economic Analysis of Data Final Model for Analysis Technical Analysis based on Model 3 Sept 2007 TBA TBA TBA TBA 27 Oct 2007 TBA TBA TBA TBA 55 0

Prelim Time Sched

Embed Size (px)

DESCRIPTION

Research duration

Citation preview

Proposed Time Schedule for Research Investigation (421-643)

V. Kumaran (ID: 277492) Civil & Environmental Department

No.

Activity

Start Time

End Time

Duration (Days)

Completion (%)

1

Preliminary Proposal

18 Jul 2007

18 Jul 2007

-

100

2

Research Proposal

1 Aug 2007

1 Aug 2007

-

100

3

Literature Review

Solar Cooling Technology

Greenhouse Design

Operating Parameter for Plant Specific

1 Aug 2007

21 Aug 2007

21

30

4

Development of Methodology

Technology Assessment

Greenhouse and Solar Cooling Selection

Preliminary Model Selection/Development

1 Aug 2007

13 Aug 2007

16 Aug 2007

17 Aug 2007

22 Aug 2007

15 Aug 2007

16 Aug 2007

20 Aug 2007

21

0

5

Collection of Data (for methodology)

Meteorological Data

Cost elements

20 Aug 2007

20 Aug 2007

20 Aug 2007

27 Aug 2007

23 Aug 2007

27 Aug 2007

8

0

6

Technical and Economic Analysis of Data

Final Model for Analysis

Technical Analysis based on Model

Economic Analysis based on Model

Optimization for Cost

3 Sept 2007

TBA

TBA

TBA

TBA

27 Oct 2007

TBA

TBA

TBA

TBA

55

0

7

Feasibility Assessment and Conclusion

Preliminary Report

28 Oct 2007

30 Oct 2007

3

0

8

Final Seminar

31 Oct 2007

31 Oct 2007

1

0

9

Final Report

31 Oct 2007

7 Nov 2007

6

0

10

SGS Courses and Seminars

21 Aug 2007

1 Oct 2007

22 Oct 2007

2hr

1.5hr

1.5hr

0