GODSHALL KANE O’ROURKE ARCHITECTS, LLC
12 East Butler Avenue, Suite 205, Ambler, PA 19002
T: 215.646.2003 F: 215.646.5707 www.gkoarchitects.com
New Hope-Solebury School District
High School Revitalization Plan
Preliminary Design
Options February 17, 2014
Page: 2
New Hope-Solebury School District Design Options
Existing Building:
Lower Level
Page: 3
New Hope-Solebury School District Design Options
Existing Building:
Upper Level Plan
Page: 4
New Hope-Solebury School District Design Options
Design Option 1:
Lower Level Plan
New Gymnasium / Fitness
Center / Wrestling Room
Improved & Secure Public
Access
Secure Entrances
No Exterior Circulation for
Students
New Large Group
Instruction
Expanded Art Room
Moves one Music Room
Infrastructure
Improvements
Page: 5
New Hope-Solebury School District Design Options
Design Option 1:
Upper Level Plan
Additional Second Floor
Classrooms
Replace existing
rooms that are not
accessible
New Computer Lab
New TV Studio
Instructional Planning
Centers
Page: 6
New Hope-Solebury School District Design Options
Design Option 2:
Lower Level Plan
New Fitness Center /
Wrestling Room
No Exterior Circulation
for Students
Infrastructure
Improvements
No improvement to:
Size of MS Gym
Public Access
Security of Entry
Large Group Instruct.
Non-accessible CRs
Music Room
Page: 7
New Hope-Solebury School District Design Options
Design Option 3:
Lower Level Plan
Enclose Link
Infrastructure
Improvements
No other improvements
to the Building
Page: 8
New Hope-Solebury School District Design Options
Other Design Options
Range of Options
Various Sizes of new
Gymnasium
Different placement and
layout of Secure
Administration Suites
Different Scope of Interior
Renovations
Page: 9
New Hope-Solebury School District Budgets
Preliminary Budget Estimates:
Option 1: $30-35 million (includes 10% Contingency & 20% Soft Costs)
Sitework - $2,900,000
New Construction - $13,300,000
Renovations - $2,600,000
Infrastructure - $7,500,000
Option 2: $ 18-20 million (includes 10% Contingency & 20% Soft Costs)
Sitework - $750,000
New Construction - $4,400,000
Renovations - $1,800,000
Infrastructure - $7,400,000
Option 3: $14-15 million (includes 10% Contingency & 20% Soft Costs)
Sitework – (infrastructure only)
New Construction - $2,500,000
Renovations - $1,000,000
Infrastructure - $7,400,000
Page: 10
New Hope-Solebury School District Budgets
Preliminary Budget Estimates:
Other Considerations
PDE Reimbursement currently in Moratorium
Project must comply with Act 34
Page: 11
New Hope-Solebury School District Closing
Discussion