Preliminary Solution Proposal For Data Center-MumbaiModular Redundant Scalable UPS By Gamatronic
Feb 2013
• Data Center Environment: Critical IT loads.• Configuration: Tier IV, 2N+1 distributed
redundancy. • Initial Capacity: 200KVA.• Ultimate Capacity, at later-stage: 400KVA.• Preferred by the user to upgrade/add capacity
without load-shutdown.
Requirement
• Mega Power+ Modular Redundant Scalable UPS• Initial Capacity: 200KVA/KW N+1 = 225KVA/KW, total 9 power
modules each 25KVA/25KW. • Ultimate Capacity: 475KVA/KW N+1= 500KVA/KW, total 20 power
modules each 25KVA/25KW. • Hot-swap power modules, hot-swap interface controller.• Distributed redundant control architecture.• No load shutdown required to upgrade capacity. • The upstream infrastructure need to be prepared for the ultimate
final power capacity. • It is possible to replace/add battery banks without to shutdown the
system. The connection circuitry of the battery banks to the UPS need to be prepared accordingly.
Description
• Power+ Modular Redundant Scalable UPS, 3 units 80KVA in parallel • Initial Capacity: 3X80KVA= 240KVA= 210KVA N+3. (210KVA/168KW).
Total 24 power modules each 10KVA/8KW.• Ultimate Capacity: 5X100KVA= 500KVA= 450KVA N+5. (450KVA/360KW) .
Total 50 power modules each 10KVA/8KW.• Hot-swap power modules, hot-swap interface controller.• Distributed redundant control architecture.• The upstream infrastructure need to be prepared for the ultimate final
power capacity (of each single UPS) • It is recommended to shutdown the system when adding additional UPS
unit. • No need to take a shutdown when adding 10KVA/8KW power modules. • Each Power+ unit has its own separate battery bank.
Description
• Conventional 2X200KVA=400KVA=200KVA N+1 in parallel. • Initial Capacity: 2X200KVA= 400KVA= 200KVA N+1. • Ultimate Capacity: 3X200KVA= 600KVA= 400KVA N+1. • It is recommended to shutdown the system when adding
additional UPS unit.
Description
Mega Power+Parallel Power+Conventional
Initial Total Capacity225KVA200KVA N+1
240KVA210KVA N+3
400KVA200KVA N+1
Ultimate Total Capacity
500KVA475KVA N+1
500KVA450KVA N+5
600KVA400KVA N+1
Initial Total Footprints (HXWXD)mm
1970X2200X6553X(1550X600X950)=1550X1800X950
2X(1900X1350X800)= 1900X2700X800
Ultimate Total Footprints (HXWXD)mm
1970X2200X6555X(1550X600X950)=1550X3000X950
3X(1900X1350X800)=1900X4050X800
Loading factor at Initial stage at 200KVA total load , at 2N+1 configuration
44.4% 41.6% 25%
Efficiency at given loading factor
>94.5%>94.5%<91%
Losses at given loading factor at 100KW load
<5.8KW<5.8KW>9.8KW
Quick Comparison