Premset : A New generation of MV Switchgear Amith Ganasram August 15, 2014

Embed Size (px)

Citation preview

  • Slide 1

Premset : A New generation of MV Switchgear Amith Ganasram August 15, 2014 Slide 2 Schneider Electric 2 - Energy Premset Weili Ding - Sep 2013 Wiki : Innovation is finding a better way of doing something. The term innovation can be defined as something original and, as a consequence, new, that "breaks into" the market or society. Slide 3 Schneider Electric 3 - Premset Openline Whats Premset and where is it sold ? Premset core technical application Compact, modular, smart ready switchgear Circuit breaker up to 17.5KV, 1250A, 25 KA 3s, IAC 25 KA 0,5s Market main application: Low-end Primary High End Secondary Targeted segments CIB : Commercial and Industrial Buildings Utility : MV/MV Substations Data Centres Hospital Industry MMM Infrastructure Slide 4 Schneider Electric 4 - Energy Premset Weili Ding - Sep 2013 The 5 reasons why customers love Premset Safety of people and assets in any environments Highest efficiency and flexibility Smart-grid ready architecture Be the most reliable, compact and end-user friendly to operate Easy to maintain innovative technology (Shielded Solid Insulation System (2SIS)) with reduced risk of internal arcing highly modular and flexible design distributed intelligence that allows for easy integration, easy configuration, and enhanced efficiency through advanced monitoring and control. breaking-disconnecting-earthing functions in a single device with intuitive and fully interlocked operation Lowering the total cost of ownership and improving peace of mind Slide 5 Schneider Electric 5 - Energy Premset Weili Ding - Sep 2013 Voice from Customers in MV Distribution network - you have to take in account the smart grid trend - expected life duration of switchgear is increasing - maintenance-free is far more important than SF6-free - we want a switchgear with Easy Operation for our maintenance and operation teams - cost effective and compact Circuit Breakers are needed for small primary substations or loop management - no problems with GIS switchgear, because reliable in harsh environment (humidity, temperature, dust, poor installation, partial discharges) - Ill never compromise about end-users safety Slide 6 Schneider Electric 6 - Energy Premset Weili Ding - Sep 2013 New generation of switchgear - Premset Premset Slide 7 Schneider Electric 7 - Premset Openline Key Benefits Simple - Safe - Smart Safety Reliability Flexibility Efficiency Slide 8 Schneider Electric 8 - Energy Premset Weili Ding - Sep 2013 Premset Totally Shielded Solid Insulation System design for optimized safety and extended equipment life 3 1 2 1- Low Voltage cabinet 2- Cable test 3- Top connections 4 - Core unit 5 - Bottom connections 6 - Bottom compartment 7 - Sensors (CTs and VTs) 8 - Gas exhaust duct 4 5 6 7 8 Slide 9 Schneider Electric 9 - Energy Premset Weili Ding - Sep 2013 All surfaces at earth potential No dielectric ageing Long product life expectancy Reduced internal arc risk Accidentally touchable Insensitive to harsh environment Safety & Reliability - SSIS Totally Shielded Solid Insulation System design for optimized safety and extended equipment life Slide 10 Schneider Electric 10 - Energy Premset Weili Ding - Sep 2013 Safety & Reliability - SSIS Well-known Technologies (epoxy, EPDM*) All surfaces at earth potential *EPDM: Ethylene Propylene Diene Monomer rubber Single bus bar (630A) Cable connection Busbars with shielded solid insulation Patented flat connectics Solid insulation covered by a conductive layer Slide 11 Schneider Electric 11 - Energy Premset Weili Ding - Sep 2013 Safety & Reliability - SSIS Earth shield continuity ensured by Patented Flat Interface Main advantages compared with traditional conical interface Simplicity of installation Compactness Flexibility Flat interface cross-section Electrical field calculation. Slide 12 Schneider Electric 12 - Energy Premset Weili Ding - Sep 2013 Safety & Reliability 3 Position Scheme Disconnection in vacuum & earthing switch in controlled air redundancy of isolation - vacuum bottles for breaking and disconnection - controlled air for downstream earthing switch in sealed-for-life screened tank. Breaking and disconnection Earthing switch Operation of earthing switch Operation of main switch Slide 13 Schneider Electric 13 - Energy Premset Weili Ding - Sep 2013 The most intuitive operations for breaking, disconnection and earthing 3-in-1 integrated architecture: easiest and safest operation, with built-in interlocking Safety & Reliability - Interlocking Slide 14 Schneider Electric 14 - Energy Premset Weili Ding - Sep 2013 Safety & Reliability 3 Position Scheme Disconnection in vacuum & earthing switch in controlled air Slide 15 Schneider Electric 15 - Energy Premset Weili Ding - Sep 2013 Safety Cable Testing Device Cable testing and diagnosis: dedicated device, for easy access and total safety Cable testing without accessing cable box or dismantling cable connections Test device connection from the front of the switchboard, while cables remain earthed Failsafe interlocks with earthed star point Easy cabling All cables connections are aligned in front at a height of 700 mm Slide 16 Schneider Electric 16 - Energy Premset Weili Ding - Sep 2013 Safety Cable Testing Device Cable testing and diagnosis: dedicated device, for easy access and total safety Slide 17 Schneider Electric 17 - Energy Premset Weili Ding - Sep 2013 Safety & Reliablity Live Cable Interlocking Live cable interlock - Electrical lock-out of earthing switch when live cables Earthing switch lock-out function - Prevent the earthing switch to be closed on earth when cables are still alive - Positively blocked in case of auxiliary power loss - Override unlocking by key - Remote indication of locked position Slide 18 Schneider Electric 18 - Energy Premset Weili Ding - Sep 2013 Efficiency Flexible approach & Embedded intelligence in switchgear Today: set of products to connect - Protections: Sepam, Micom - Measurement metering: Power Logic - Local fault monitoring & Remote control: Easergy Sepam & Micom Easergy Power Logic Modules fully integrated in functional unit - Including sensors, switchgear interface, power supply, communication, HMI - Pre- engineered, factory-tested, cost effective - Easy integration based on :. Field bus communication between modules. Pre-cabling inside cubicle - Gradual solution : from local control up to complex feeder automation Slide 19 Schneider Electric 19 - Energy Premset Weili Ding - Sep 2013 Efficiency Integrated intelligence in MV switchgear SC100 Energy Quality Monitoring Self powered Protection Flair Modbus Fault detection VIP PM200 Switch Controller R200 PS100 Power Supply RTU/ATS - IEC61850 access to Substation automation through gateway (G3200) Slide 20 Schneider Electric 20 - Energy Premset Weili Ding - Sep 2013 Efficiency Low cost Supervision & Control system Example of web access Switchboard information is stored in a Web page Need just a PC, Tablet, Smart Phone with a standard Web browser Slide 21 Schneider Electric 21 - Energy Premset Weili Ding - Sep 2013 Flexibility A new level for MV switchgear Modularity assembly of functional bricks CB LBS CB LV cabinet Cable test Top connection Bottom connections Bottom compartment Core unit Metering Slide 22 Schneider Electric 22 - Premset Openline Technical Description & Applications Slide 23 Schneider Electric 23 - Energy Premset Weili Ding - Sep 2013 Main Characteristics Rated voltage15 kV Short time withstand25 kA x 3s*, 21 kA x 3s, 20 kA x4s Rated busbar current630 A, 1250 A (under development) Rated BIL withstand voltage95 / 110 kV Rated PF withstand voltage42 / 48 kV 1mn Cable earthing switch25 kA, M0, E2 Degree of protectionIP3X (indoor), IP54 (outdoor) Dimensions W x H x D (mm)375 x 1600 x 900 (indoor) Range * : 25kA x 3s on request Internal arc Standard design is virtually arc free Optional : type tested 21KA 1s A-FLR / 25KA 0.5s A-FLR : top or bottom exhaust Comply with new IEC standard 62271-200 ALFR INDOOR OUTDOOR Slide 24 Schneider Electric 24 - Energy Premset Weili Ding - Sep 2013 Four basic functional units 630A disconnecting load break switch 1000 operations I06 T Network management 100 or 200A disconnecting circuit breaker O-15 sec- CO 2000 operations D01-02 N Transformer protection 630A disconnecting circuit breaker O-15 sec-CO. 2000 operations D06 N Feeder protection 630A disconnecting circuit breaker O-0,3s-CO-15s-CO 10,000 operations D06 H Feeder protection Auto-reclose Slide 25 Schneider Electric 25 - Energy Premset Weili Ding - Sep 2013 Typical applications Building Industry Energy 2.25m 3.75 m 2.25 m IEC standard 62271-200 ALFR Slide 26 Schneider Electric 26 - Energy Premset Weili Ding - Sep 2013 MV Innovation in 20 years Premset ! Slide 27 Amith Ganasram Cell : 076 411 2263 Tel:011 254 6638 Email:[email protected] Thank you for your attention