4
Preparation Data for Feasibility Study Project : Photovoltaic Owner : Client : No. Data Preparation 1 Generating Capacities in proposed Area 2 Peak Load Growth 3 4 5 6 7 8 9 10 11 12 13

Preparation Fo Pre-FS

Embed Size (px)

DESCRIPTION

45

Citation preview

Page 1: Preparation Fo Pre-FS

Preparation Data for Feasibility StudyProject : PhotovoltaicOwner :Client :

No. Data Preparation

1 Generating Capacities in proposed Area

2 Peak Load Growth

3456789

10111213

Page 2: Preparation Fo Pre-FS

Description

The whole existing generating capacity has an installed capacity of ………….

Page 3: Preparation Fo Pre-FS

RegulasiUndang-Undang Nomor 30 tahun 2009 tentang Ketenagalistrikan

Page 4: Preparation Fo Pre-FS

Kesimpulan Badan usaha swasta, koperasi, dan swadaya masyarakat dapat berpartisipasi dalam usaha penyediaan tenaga listrikKewenangan Pemerintah pusat dan daerah di bidang ketenagalistrikan