Experiment-02 Preparation of a cement paste of
Standard Consistency.
Reference
O ASTM C 187
Objective/Theory
O Consistency is a measure of wetness or fluidity of a cement.
O The main purpose of the consistency test is to determine the
required quantity of water to obtain a standard or
homogeneous paste ,and water quantity is enough to
hydration process
O The standard consistency of a cement paste is defined as
that “consistency which will permit the vicat plunger to
penetrate to a point 10 ± 1 mm below the original surface in
30 s after being released”
Apparatus 1. VICAT APPARATUS
• The vicat apparatus consists of a frame having a movable
rod with a cap at one end and at the other end the
attachment, which are interchangeable.
2. PLUNGER FOR STANDARD CONSISTANCY
• It is of polished brass 10 ± 0.05mm in diameter with a
projection at the upper end for insertion into the movable
rod. The lower end is flat.
3. GRUADUATED SCALE
• Graduated scale is 40mm in length and the smallest
division of scale is 1mm
4. VICAT MOULD
The vicat mould is in the foam of a frustum of a cone having
an internal diameter of 60 ± 0.5mm at the top, 70 ± 0.5mm at
the bottom and height 40 ± 0.5mm.
Apparatus
Vicat’s Apparatus
With accessories
Procedure
1. Mix 650 g of cement with a measured quantity of water and
smooth the top, with a few light touches of the pointed end
of the trowel.
2. Quickly form the cement paste into the approximate shape
of a ball with gloved hands.
3. Then toss six times through a free path of about 150 mm (6
in.) from one hand to another so as to produce a nearly
spherical mass that may be easily inserted into the Vicat
ring with a minimum amount of additional manipulation.
4. Press the ball, resting in the palm of one hand, into the
larger end of the conical ring held in the other hand,
completely filling the ring with paste.
Procedure
5. Remove the excess at the larger end by a single
movement of the palm of the hand.
6. Place the ring on its larger end on the base plate and
slice off the excess paste at the smaller end at the top
of the ring and smooth the top.
7. During these operations of cutting and smoothing, take
care not to compress the paste.
8. Center the paste confined in the ring, resting on the
plate, under the rod, the plunger end of which shall be
brought in contact with the surface of the paste, and
tighten the set-screw .
Procedure 9. Then set the movable indicator to the upper zero mark of
the scale, or take an initial reading, and release the rod
immediately.
10. This must not exceed 30 s after completion of mixing.
11. The apparatus shall be free of all vibrations during the
test.
12. The paste shall be of normal consistency when the rod
settles to a point 10 ± 1 mm below the original surface in
30 s after being released.
13. Make trial pastes with varying percentages of water until
the normal consistency is obtained. Make each trial with
fresh cement.
OBSERVATIONS AND CALCULATIONS
Weight of cement taken (g) = _________
Sr. No
Weight OF WATER
ADDED
(g)
Amount of water
(%)
Depth of
penetration
(mm)
O Standard Consistency
=(Quantity of water for 10 ± 1 penetration from Top
Surface of mould /Weight of cement) X 100
Significance of Testing
O This method is intended to be used to determine the
amount of water required to prepare hydraulic cement
pastes for testing.