6
Preparation of D1.7 Massimo Sgaravatto INFN Padova

Preparation of D1.7

Embed Size (px)

DESCRIPTION

Preparation of D1.7. Massimo Sgaravatto INFN Padova. Introduction. D.17 Final evaluation report We should report (as we have been told): Achievements Fulfilments and deviations (explaining why) of the original plans Evaluation Future Directions. Proposed Outline. - PowerPoint PPT Presentation

Citation preview

Page 1: Preparation of D1.7

Preparation of D1.7

Massimo SgaravattoINFN Padova

Page 2: Preparation of D1.7

Introduction D.17 Final evaluation report We should report (as we have been

told): Achievements Fulfilments and deviations (explaining

why) of the original plans Evaluation Future Directions

Page 3: Preparation of D1.7

Proposed Outline Introduction and executive summary Summary of activities of WP1 in these 3

years First WMS prototype Review of WMS architecture and second

release of WMS Support and bug fixes Activities within Iteam, ATF, QA, Security

group

Page 4: Preparation of D1.7

Proposed Outline  Achievements and evaluation

Summary of capabilities of the WMS Some numbers on performance ? Use of the WP1 software

WMS used in different environments, and not only in EDG (used by LCG, CrossGrid, Grid.it, …)

Contributions to standards Activities within GGF

Grid Accounting GridCPR activities What else ?

Glue Schema activities Papers for journals and conferences ?

We didn’t do a very good job here … What else could we write for “evaluation” ?

Some performance numbers ? Which ones ? Difficult to rely on evaluation criteria written in D1.2 (they were quite

generic)

Page 5: Preparation of D1.7

Proposed Outline “Deviations” (Final results wrt what was initially

planned in the TA) What was not done (or was not deployed) but was

planned and why ? What was done even if not initially planned and why ? What was done but was not deployed and why ?

Future work See i.e. talks given by F. Prelz at INFN-GRID worksop in

Catania Going towards a Service Oriented (OGSA) architecture

Conclusions

Page 6: Preparation of D1.7

Proposed schedule Friday 14/11: first version ready for internal (WP1)

review I should basically write it, but I will ask contributions for some

specific parts (e.g. participations to ATF, QA, …, activities within GGF)

Thursday 20/11: deadline for comments Much better if comments can arrive earlier

24/11/2003: D1.7 ready for internal (EDG) review Moderator: J. Jensen (WP5) Reviewers:

M. Corvo (WP8) A. Terracina (WP9) J. Montagnat (WP10)

15/12/1003: PTB approval