10
PREPARATION OF SURVEY MAP AND ASSET MAPPING FOR PHC AT KUKUNOORPALLY (V)&(M), MEDAK (D) TELANGANA STATE AUGUST 2016 PREPARED FOR TELANGANA STATE MEDICAL SERVICES AND INFRASTRUCTURE DEVELOPMENT CORPORATION PREPARED BY S.KUMAR Architects & Engineers H.no. 3-9-7/4/B, Sharadanagar, Ramanthapur, Hyderabad-500013 Ph.no. 040-27032699, 9885852938 DETAILS OF EXISTING PHC HOSPITAL AT KUKUNOORPALLY (V)&(M), MEDAK (D) Telangana State Total Site Area -0.90 ACRES (or) 3649.37 SQM Total Construction Plinth Area - 265.62 SQM Open Area -3383.75 SQM Road Area - NO ROAD SNO Description Structure Area of Structure (Sqm) Number of floors Height (M) Frame Type Structural Assessment Year of Constructi on 1 KUKUNOORP ALLY PHC BULDING BLOCK-A RCC Sub Structure & Super Structure GF –265.62 Ground f 3.65 Rigid Frame STABLE AS ON DATE,NOT RECOMMENDE D FOR EXTRA FLOORS _

PREPARATION OF SURVEY MAP AND ASSET MAPPING FOR PHC …tsmsidc.telangana.gov.in/assets/medak/Kukunoorpally.pdf · preparation of survey map and asset mapping for phc at kukunoorpally

  • Upload
    others

  • View
    12

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PREPARATION OF SURVEY MAP AND ASSET MAPPING FOR PHC …tsmsidc.telangana.gov.in/assets/medak/Kukunoorpally.pdf · preparation of survey map and asset mapping for phc at kukunoorpally

PREPARATION OF SURVEY MAP AND ASSET MAPPING FOR PHC AT KUKUNOORPALLY (V)&(M), MEDAK (D) TELANGANA STATE

AUGUST 2016

PREPARED FOR

TELANGANA STATE MEDICAL SERVICES AND INFRASTRUCTURE DEVELOPMENT CORPORATION

PREPARED BY

S.KUMAR Architects & EngineersH.no. 3-9-7/4/B, Sharadanagar,Ramanthapur, Hyderabad-500013Ph.no. 040-27032699, 9885852938

DETAILS OF EXISTING PHC HOSPITAL AT KUKUNOORPALLY (V)&(M), MEDAK (D)

Telangana State

Total Site Area -0.90 ACRES (or) 3649.37 SQM

Total Construction Plinth Area - 265.62 SQM

Open Area -3383.75 SQM

Road Area - NO ROAD

SNO Description StructureArea of Structure (Sqm)

Number of floors

Height (M)

Frame Type

Structural Assessment

Year of Construction

1

KUKUNOORPALLY PHC BULDINGBLOCK-A

RCC Sub Structure & Super Structure

GF –265.62 Ground f 3.65Rigid Frame

STABLE AS ON DATE,NOT RECOMMENDED FOR EXTRA FLOORS

_

Page 2: PREPARATION OF SURVEY MAP AND ASSET MAPPING FOR PHC …tsmsidc.telangana.gov.in/assets/medak/Kukunoorpally.pdf · preparation of survey map and asset mapping for phc at kukunoorpally

FRONT ELEVATION

2

PHC AT KUKNOORPALLY

LEFT SIDE ELEVATION

Page 3: PREPARATION OF SURVEY MAP AND ASSET MAPPING FOR PHC …tsmsidc.telangana.gov.in/assets/medak/Kukunoorpally.pdf · preparation of survey map and asset mapping for phc at kukunoorpally

3

PHC AT KUKNOORPALLY

RIGHT SIDE ELEVATION

REAR SIDE ELEVATION

IN SIDE CORRIDOR

DOCTOR ROOM

Page 4: PREPARATION OF SURVEY MAP AND ASSET MAPPING FOR PHC …tsmsidc.telangana.gov.in/assets/medak/Kukunoorpally.pdf · preparation of survey map and asset mapping for phc at kukunoorpally

4

PHC AT KUKNOORPALLY

LABOUR ROOM

LABORATORY ROOM

GENERAL WARD

Page 5: PREPARATION OF SURVEY MAP AND ASSET MAPPING FOR PHC …tsmsidc.telangana.gov.in/assets/medak/Kukunoorpally.pdf · preparation of survey map and asset mapping for phc at kukunoorpally

5

PHC AT KUKNOORPALLY

STORE ROOM

Page 6: PREPARATION OF SURVEY MAP AND ASSET MAPPING FOR PHC …tsmsidc.telangana.gov.in/assets/medak/Kukunoorpally.pdf · preparation of survey map and asset mapping for phc at kukunoorpally

SCALE

SEP 2016

DRAWN

CHECKED

DATE

TELANGANA STATE MEDICAL SERVICESANDINFRASTRUCTURE DEVELOPMENTCORPORATION

EXISTING SITE PLAN

1. CONTRACTOR TO CHECK AND VERIFY ALL DIMENSIONS BEFORE EXECUTION OF THE WORK.2. FIGURED DIMENSIONS SHALL BE FOLLOWED.3. ALL DIMENSIONS GIVEN ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.

ROAD

BOUNDARY LINE

MAN HOLEMH MH

BORE WELL BORE

ELECTRIC POLE EP

VRNK

NTS

ASP

KUKUNOORPALLY KUKUNOORPALLY TELANGANA STATE.

KUKUNOORPALLY KUKUNOORPALLY TELANGANA STATE.

TREE

KUKUNOORPALLYKUKUNOORPALLY TELANGANA STATE.

SID

DH

IPET

HYD

ER

AB

AD

MUDROAD

GA

TE

PHCBUILDINGBLOCK-A

24.50

37.49

65.3

5

38.14

10.08

29.50

15.9

2

3.91

14.3

9

3.5

71.6

1

17.71

6.2

8

1.78

23.6

2

Page 7: PREPARATION OF SURVEY MAP AND ASSET MAPPING FOR PHC …tsmsidc.telangana.gov.in/assets/medak/Kukunoorpally.pdf · preparation of survey map and asset mapping for phc at kukunoorpally
Page 8: PREPARATION OF SURVEY MAP AND ASSET MAPPING FOR PHC …tsmsidc.telangana.gov.in/assets/medak/Kukunoorpally.pdf · preparation of survey map and asset mapping for phc at kukunoorpally
Page 9: PREPARATION OF SURVEY MAP AND ASSET MAPPING FOR PHC …tsmsidc.telangana.gov.in/assets/medak/Kukunoorpally.pdf · preparation of survey map and asset mapping for phc at kukunoorpally
Page 10: PREPARATION OF SURVEY MAP AND ASSET MAPPING FOR PHC …tsmsidc.telangana.gov.in/assets/medak/Kukunoorpally.pdf · preparation of survey map and asset mapping for phc at kukunoorpally