The views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent. ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequence of their use. Terminology used may not necessarily be consistent with ADB official terms.

Citation preview

Page 1: Presentation by LG Chem, December 13, 2011

13 Dec, 2011

ADB - LG Chem Meeting

Page 2: Presentation by LG Chem, December 13, 2011

Contents

1. Introduction

- LG Chem, Ltd.

- TFT organization

2. Li-B Battery Pack

- Overview of LG Chem Li-B

- Electrical Design

- Mechanical Design

- Reliability Test

3. Charger, BMS

- Introduction of ETH, Ltd and Charger

- Introduction of PowerLogics (BMS)

Page 3: Presentation by LG Chem, December 13, 2011

1. Overview of Li-B

1 8 6 5 0

Diameter : Φ18 mm Height : 65 mm

LixC6 LixCoO2

Li + Conducting Electrolyte Cu Current Collector

Al Current Collector

Separator

Li +

e-

e-

e-

e-

e-

e-

e- A

C6 + LiCoO2 LixC6 + Li1-xCoO2

Charging

Discharging (Anode) (Anode) (Cathode) (Cathode)

Charging/Discharging Principle Structure (Cylindrical cell)

Anode (-) Cathode (+)

Li-B is a rechargeable battery in which Li ions move from the anode(-) to

the cathode(+) during discharge, and back in charging.

Page 4: Presentation by LG Chem, December 13, 2011

2. Manufacturing Process

•Active material •Current Collector •Binder

Coating / Drying Roll Press Slitting Vac. Dry

DRY ROOM

Formation & QC

Winding & Assembly Washing & Dry Shipment

•Solvent

mixer

mixing

•Anode (Cu-foil) •Cathode (Al-foil)

•Pancakes

•Cathode

•Anode

•winding

•J/R insertion

•EL feeding

Page 5: Presentation by LG Chem, December 13, 2011

Contents

1. Introduction

- LG Chem, Ltd.

- TFT organization

2. Li-B Battery Pack

- Overview of LG Chem Li-B

- Electrical Design

- Mechanical Design

- Reliability Test

3. Charger, BMS

- Introduction of ETH, Ltd and Charger

- Introduction of PowerLogics (BMS)

Page 6: Presentation by LG Chem, December 13, 2011

We LGC designed Li-B pack based on the system information given by ADB

through several conference calls

Items Value

Atmosphere temp. 22℃ ~ 34℃

Max target speed 50 km/h

Wheel inch 18.7"

Max load 500kg

Target gradeability 15deg

Pack capacity 3kWh

<E-Trike information> <Motor Spec.>

1. System Information

Page 7: Presentation by LG Chem, December 13, 2011

Item ADB Requirement Li-B Pack remarks

Capacity (discharging) 3kWh Min. 3kWh

Test result 80% Charging time 100min. 80% : 91min.

Weight ≤ 50kg Max. 42kg

Warning Low battery warning LED indicator Optional feature

Voltage control must done

Fully controlled by BMS

Current control must done

Temp. control must done

Cell balancing must done Safe

ty

Perf

orm

an

ce

2. Design Concept - Performance Summary

Page 8: Presentation by LG Chem, December 13, 2011

From test data, LGC Li-B pack shows fulfilling customer request

<30A Discharge & Charge Test result> <Li-B pack feature>

2.4kWh

3kWh

Item ADB

Requirement Li-B Pack

Capacity

(discharging) 3kWh Min. 3kWh

80% Charging

time 100min. Max. 95min.

Weight ≤ 50kg Max. 42kg

Warning Low battery

warning LED indicator

2. Design Concept - Performance Capacity, Charging Time

Page 9: Presentation by LG Chem, December 13, 2011

LED Display

51.5V↓ 51.5V↑ 54V↑ 57V↑

1 LED

ON

2 LED

ON

3 LED

ON

4 LED

ON

Use LED Display in order to warn low battery status (Option item)

<Voltage Vs. LED> <LED indicator>

Warning time is adjustable value

→ Need to discuss about optimized warning time for E-trike

Warning

time

Current Voltage

0 3

0

6

0

9

0

110

Time [min]

Vo

lta

ge

[V

] 2. Design Concept - Performance Low battery warning

Page 10: Presentation by LG Chem, December 13, 2011

3. Design Concept - Safety

Item ADB Requirement Li-B Pack remarks

Capacity (discharging) 3kWh Min. 3kWh

Test result 80% Charging time 100min. 80% : 91min.

Weight ≤ 50kg Max. 42kg

Warning Low battery warning LED indicator Optional feature

Voltage control must done

Current control must done

Temp. control must done

Cell balancing must done Safe

ty

Perf

orm

an

ce

Summary

Page 11: Presentation by LG Chem, December 13, 2011

<BMS Top Side>

<BMS Schematic>

.

<BMS Bottom Side>

Voltage

Protection

Circuit

Temp.

Protection

Circuit

Cell balancing

Circuit

Current

Protection

Circuit

3. Design Concept - Safety BMS

Page 12: Presentation by LG Chem, December 13, 2011

Billing Err. Detection

Status

Repair

4. Further Suggestion Diagnosis System

Page 13: Presentation by LG Chem, December 13, 2011

Contents

1. Introduction

- LG Chem, Ltd.

- TFT organization

2. Li-B Battery Pack

- Overview of LG Chem Li-B

- Electrical Design

- Mechanical Design

- Reliability Test

3. Charger, BMS

- Introduction of ETH, Ltd and Charger

- Introduction of PowerLogics (BMS)

Page 14: Presentation by LG Chem, December 13, 2011

1. Design Concept

Pack Specification

Pack Concept

Basic Pack Etrike Inner Pack

Item Requirement Li-B Pack

Capacity 3 kWh Min. 3 kWh

Size Trunk size 457 x 353 x 348 mm

(L x W x H)

Weight Max. 50 kg Max. 42 Kg

Configuration - 1 kWh pack × 3 ea

Voltage Range - 49.5 ~ 63 V

(nominal 54 V)

427.2 mm

255 mm

323.5 mm

- Capacity: 1 kWh

X 3 373 mm

85 mm

290 mm

348 mm

353 mm

457 mm

- Capacity: 3 kWh - Capacity: 3 kWh

LGC can meet Customer Mechanical Requirements with Basic Pack 3 set

Etrike Pack

Page 15: Presentation by LG Chem, December 13, 2011

2. Pack Assembly

Page 16: Presentation by LG Chem, December 13, 2011

Contents

1. Introduction

- LG Chem, Ltd.

- TFT organization

2. Li-B Battery Pack

- Overview of LG Chem Li-B

- Electrical Design

- Mechanical Design

- Reliability Test

3. Charger, BMS

- Introduction of ETH, Ltd and Charger

- Introduction of PowerLogics (BMS)

Page 17: Presentation by LG Chem, December 13, 2011

/ Test Item

Test Method

Criteria Result

Condition SOC

1 Short Circuit 5mΩ register No Fire, No Explosion Under test

2 Short Circuit 5mΩ register No Fire, No Explosion Under test

3 Over Charge charging until 200% SOC No Fire, No Explosion Under test

4 Over Discharge discharging pack during 1 hr with 1C current No Fire, No Explosion Under test

Electrical Reliability Test (EV)

1. Reliability Test Items Electrical

Page 18: Presentation by LG Chem, December 13, 2011

2. Vibration / Shock

Vertical (Z) Horizontal (X, Y)

Z

X / Y

Page 19: Presentation by LG Chem, December 13, 2011

3. HALT (Highly Accelerated Life Test)

X

Y

Z

Page 20: Presentation by LG Chem, December 13, 2011

4. Drop

1.2 M