32
Presentation Four November 2011

Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

Presentation Four November 2011

Page 2: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

Call for Plan Projects Robyn

Safety Robyn

Congestion Andy

Today’s Presentation:

Page 3: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

TIMELINE

10/13 email

11/14 Deadline for your

input

1/31 1st Draft Fiscally-Constrained 2040

Needs List

Call For Projects:

Presenter
Presentation Notes
Who received the 10/13 email? Our 8 member counties: Boone, Butler, Campbell, Clermont, Dearborn, Hamilton, Kenton, and Warren Our 6 major cities: Cincinnati, Covington, Fairfield, Hamilton, Middletown, and Newport PLEASE NOTE that any governmental jurisdiction may submit projects, however for smaller cities, we ask that they work through their county (just as townships do). Our 3 DOTs – ODOT, KYTC and INDOT and the TIDs – Butler, Clermont, Hamilton and Warren And last, but not least, our 7 public transit agencies: Butler County Regional Transit Authority, Dearborn County Catch-A-Ride, Clermont Transportation Connection (CTC), Middletown Transit System, Warren County Transit, Southwest Ohio Regional Transit Authority (SORTA), and Transit Authority of Northern Kentucky (TANK) By Monday, November 14, YOU need to email the spreadsheet back to OKI having provided as much information as you can provide (again, I’ll go over what information we’re looking for from you in a moment – it’s all tied to the spreadsheet) This timeline will enable OKI Staff to take YOUR data and project needs and analyze the responses received from throughout our region. We will put EVERY project need through our OKI Project Prioritization Process so that on January 31, 2012 you will receive a FIRST DRAFT, FISCALLY-CONSTRAINED 2040 Plan Needs List in your monthly meeting mailout packet.
Page 4: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

Call For Projects:

Presenter
Presentation Notes
The spreadsheet contains: ALL projects currently in the 2030 OKI Regional Transportation Plan (both fiscally-constrained needs and non-fiscally-constrained needs = ALL NEEDS from last update). ALL new projects that have been identified as recommended needs in studies/plans completed since June 2008 – the last Plan Update (such as recommendations from our Regional Freight Plan, I-471 Plan, etc.) The spreadsheet is multi-modal and arranged by state and county and alphabetical order by facility/project name I want to stress that the list is in NO ORDER OF PROJECT PRIORITIZATION AT THIS TIME – that is NOT the goal. The goal is for YOU to provide to US, OKI staff, as much information and as up-to-date data on each and every project located in under your jurisdiction. I ask that you review the list and please provide us with the following:  Revisions which may include changes to the estimated cost or scope of an existing project. Additions of information to fill in missing cells (study name, project purpose, whether the project is included in an existing plan or study, etc.) Additions of any new projects that address goals of the 2040 Plan. Please include a FULL project description (location, length, improvement and cost). Consider any new projects which may improve traffic flow and/or reduce vehicle emissions and/or address safety, etc – REMEMBER the PLAN’S GOALS. Priority. Please rate the most important, top one-third, of projects as “HI,” the next one-third of projects as “MED,” and the bottom one-third as “LOW.” (for example, if you have 30 projects = 10 should be noted as “HI,” 10 as “MED,” and 10 as “LOW”   OKI will use your information along with existing conditions and travel demand forecasts in developing the Plan Update.   Please return your completed list to our office no later than Monday, November 14. We appreciate your participation. If you have any questions, feel free to call me or Robyn Bancroft.
Page 5: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

TIMELINE

10/13 email

Monday Nov 14

Deadline

1/31 1st Draft Fiscally-Constrained 2040

Needs List

Call For Projects:

Monday Nov 14

Deadline

Presenter
Presentation Notes
Who received the 10/13 email? Our 8 member counties: Boone, Butler, Campbell, Clermont, Dearborn, Hamilton, Kenton, and Warren Our 6 major cities: Cincinnati, Covington, Fairfield, Hamilton, Middletown, and Newport PLEASE NOTE that any governmental jurisdiction may submit projects, however for smaller cities, we ask that they work through their county (just as townships do). Our 3 DOTs – ODOT, KYTC and INDOT and the TIDs – Butler, Clermont, Hamilton and Warren And last, but not least, our 7 public transit agencies: Butler County Regional Transit Authority, Dearborn County Catch-A-Ride, Clermont Transportation Connection (CTC), Middletown Transit System, Warren County Transit, Southwest Ohio Regional Transit Authority (SORTA), and Transit Authority of Northern Kentucky (TANK) By Monday, November 14, YOU need to email the spreadsheet back to OKI having provided as much information as you can provide (again, I’ll go over what information we’re looking for from you in a moment – it’s all tied to the spreadsheet) This timeline will enable OKI Staff to take YOUR data and project needs and analyze the responses received from throughout our region. We will put EVERY project need through our OKI Project Prioritization Process so that on January 31, 2012 you will receive a FIRST DRAFT, FISCALLY-CONSTRAINED 2040 Plan Needs List in your monthly meeting mailout packet.
Page 6: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

New Challenges…Older Drivers

Presenter
Presentation Notes
I worked with Mary Luebbers on this topic and rather than discuss transportation safety issues in general, we thought we’d focus on two specific concerns…both of which were highlighted in our 2040 Public Open Houses this past September. Older drivers… A major shift in the composition of the traveling population is occuring: With the Baby Boomers entering their senior years, the number of persons 65 and older in the OKI region will increase 80% by 2040 CLICK: Boomers, like the rest of us, are accustomed to driving and expect to continue to do so as long as they can. This presents a whole new challenge for us as transportation planners who are faced with keeping a multitude of older drivers safe and providing mobility options for older non-drivers. What can you expect? First, older drivers often restrict their auto travel to daytime, so we can expect heavier traffic on local roads during the daytime.
Page 7: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

Elderly Drivers

All

Drivers Drivers

65+ Intersection Crashes 30% 40%

Angle Crashes 14% 23%

Daylight 69% 83%

Presenter
Presentation Notes
Secondly, expect an increase in crashes and more severe crashes again during the daytime hours. Nationally and locally, crash data analysis indicates that the older driver is over-represented in right angle crashes and in crashes at intersections compared to the general motoring population. These crashes are related to physical changes which negatively impact driving skills, most notably decline in vision, reaction time and hearing. In addition, older persons, particularly those over 80, are at a greater risk of a more severe crash due to physical frailty. To help safeguard the driving public, improvements to driving conditions that need to be considered include: enhanced signage, more and better lighting and Increased lane widths, particularly on local roads where the elderly will more likely travel. Consideration also must be given to supporting a smoother transition from driving to other alternatives…which leads to….
Page 8: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

Elderly Non- Drivers

Few alternatives Social isolation

Presenter
Presentation Notes
The topic of Elderly non-drivers. Especially those who reside in suburban locations, currently have few alternatives to driving. The lack of alternatives: creates a loss of independence and decreased opportunity for shopping, social, recreational and medical trips. This, in turn, leads to greater isolation. As a result, over the planning period, transportation planners will be challenged to: create practical alternatives for those who no longer drive. Such as: continuing to identify and respond to transit service gaps for elderly riders and supporting greater coordination of transit service with elderly service providers to extend funding as far as possible.
Page 9: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

Railroad Safety

Presenter
Presentation Notes
Then, I wanted to touch upon another transportation safety issues – this one was a recent hot topic during the development of our OKI Regional Freight Plan… Railroad Grade Crossing Safety. Railroad Crossing Collision Probability is show in the map where: A Red dot = greater than 10% probability that a collision will occur annually An Orange dot = 5-10% probability that a collision will occur annually The Source for this information is the Federal Railroad Administration’s Web Accident Prediction System. Of the 5 crossings with 10% probability that a collision will occur annually: All 5 crossings are located in Ohio 3 of the 5 are located in Butler County All 5 crossings have experienced one or two collisions between 2005 and 2008 This issue was included in the OKI Regional Freight Plan as the At-Grade Crossing Safety Study recommendation and will be rolled into the 2040 Plan Progress is already being made!!! - The Waneta Street crossing is currently planned for improvement under an agreement between the Ohio Rail Development Commission, city of Middletown and Norfolk Southern Railroad.
Page 10: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

Congestion Management Process (CMP)

• Required in metro with 200,000+ population

• The CMP results in performance measures and strategies that can be reflected in the Plan and TIP.

• OKI CMP completed November 2011.

Page 11: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

Performance Measures • Intensity • Extent • Accessibility • Reliability • Bicycle/Pedestrian

Page 12: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

OKI’s Performance Measures • Peak Period Travel Time • Travel Speed • Travel Time “Tax” • Level-of-Service • Intersection Delay • Truck Percentage • Total Vehicle Delay • Travel Time between Major Destinations • % of Jobs near Transit • Incident Clearance Time • Crash Rates • Miles of Preferred Bike Routes

Page 13: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀
Page 14: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

AM Bottlenecks • KY I-71/75 NB from I-275 to 5th St.

• 15-24 mph, travel time tax up to 313% • OH I-75 NB from Hopple to Paddock • OH I-71 SB from Fields Ertel to Red Bank • KY I-471 NB from I-275 to Ohio River

Page 15: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

PM Bottlenecks • OH I-71 NB, Smith to I-275

• 22-50 mph, travel time tax up to 267% • OH I-75 NB, Hopple to I-275 • OH I-71 SB, Fields Ertel to Cross-County

Presenter
Presentation Notes
SR 32 Mt. carmel tobaso to old SR 74
Page 16: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀
Presenter
Presentation Notes
Demonstrates extent of congestion Total vehicle delay = delay per vehicle x volume
Page 17: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

Most Total Delay - Daily Freeways • I-75 NB, I-74 to Mitchell –

1196 hours • I-71/75 NB, Buttermilk to

Dixie – 808 hours • I-71 SB, I-275 to Pfeiffer –

701 hours

Non-Freeways • SR125 EB, Five Mile to

Eight Mile - 374 hours • SR4 SB, Crescentville to I-

275 - 352 hours • KY18 WB, KY3168 to

KY237 – 339 hours

Page 18: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

Delay in OKI Region • Daily person hours of delay 2004-2007 = 50,629 hours 2007-2010 = 54,309 hours Cost ≈ $1.4 million

Presenter
Presentation Notes
Total vehicle hours x AVO
Page 19: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

Faster Sections County Facility Section Cycle 2

PM Speed Cycle 3 PM Speed

Comment

Clermont SR 28 WB Branch Hill Guinea to Buckwheat

9 24 TIP Project Complete 2006

Clermont SR 28 WB Buckwheat to SR28 Bus

19 25 TIP Project Complete 2006

Hamilton US 22 NB I-275 to Kemper

19 28 TIP Project Complete 2007

Hamilton US 27 NB Galbraith to SR 126

15 23

Hamilton US 27 NB SR 126 to Compton

17 24

Page 20: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

PM Peak Period Observed Travel Times between Major Destinations: 2008-2011 (minutes)

From To

CVG Airport

Downtown Cincinnati

Eastgate Northern KY Univ.

Kings Island

Sharonville

CVG Airport X 13 22 16 50 31

Downtown Cincinnati

11 X 15 8 32 21

Eastgate 22

17 X 15 19 22

Northern KY Univ.

16 8 13 X 40 28

Kings Island 39 29 18 33 X 14

Sharonville 29 19 19 33 12 X

Presenter
Presentation Notes
Accessibility - Little change in these time since last cycle
Page 21: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀
Page 22: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀
Page 23: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

On-Road Bicycle Facilities

Signed Bike Lanes

Shared Roads Side Paths Signed Routes Wide Curb Lane/Shoulder

23.0 miles 115.1 miles 37.1 miles 16.9 miles 13.9 miles

OKI Bike Route Guide identifies an additional 2968 road miles as “preferred routes”

Page 24: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

Performance Objectives • Specific

• Measurable

• Agreed

• Realistic

• Timebound

Page 25: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

Evaluation of Performance Objectives Performance Measure Cycle 2

Value Cycle 3 Value

Objective Objective met?

Percent of Congested CMN miles

21% 23% Limit increase to no more than

3%

Average PM peak period travel time between major destinations

22 minutes 22 minutes Limit increase to no more than

20%

Average incident clearance time

Not measured

56 minutes No more than 60 minutes

Share of regional jobs within ¼ mile of transit

Not measured

59% Increase by at least 1%

--

Miles of congested high truck volume roadways

58 miles 64 miles Limit increase to no more than

3% Miles of preferred bike routes Not

measured 3,184 miles

Increase by at least 1%

--

Page 26: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

Evaluation of CMP Strategies • Evaluation matrix: Appropriate

congestion management strategies identified for each congested location

• Strategies grouped by 4 categories. – Travel demand management – Traffic operational improvements – Public transportation – New road capacity

Page 27: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

1) Travel Demand Management

Page 28: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

2) Traffic Operational Improvements

Presenter
Presentation Notes
The second category is traffic operational improvements: Access management, improved traffic signals, center turn lanes, turn lanes at intersections, and geometric improvements such as continuous flow intersections.
Page 29: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

3) Public Transportation

Presenter
Presentation Notes
Public Transportation Expanding bus transit, adding rail transit, expanding/adding park-n-ride lots, bus-on-shoulder programs, expanding/adding transit centers.
Page 30: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

4) New Road Capacity

Presenter
Presentation Notes
And finally, adding new road capacity.
Page 31: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

CMP Integration into Plan Process • Congestion maps assist project evaluation • Evaluation matrix of CMP strategies

screens alternatives • Observed speeds help calibrate OKI

Travel Model • Full Report at www.oki.org • next report Fall 2015

Presenter
Presentation Notes
Congestion maps – identify problem areas CMP strategy matrix – used for screening Update cycle – changing from 3 to 4 years to match Transportation Plan schedule.
Page 32: Presentation Four - OKI Regional Council of …...Who received the 10/13 email?\爀 伀甀爀 㠀 洀攀洀戀攀爀 挀漀甀渀琀椀攀猀㨀 䈀漀漀渀攀 䈀甀琀氀攀爀

Robyn Bancroft, Strategic Projects Manager

Andy Reser, Model Applications Coordinator

…2040 is closer than you think!