Planning Department, Government of Maharashtra Date : 16 th May, 2013 Presentation on Annual Plan 2013-14

Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

  • Upload
    hahanh

  • View
    220

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Planning Department,Government of Maharashtra

Date : 16th May, 2013

Presentation onAnnual Plan 2013-14

Page 2: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

State Economy : GSDP

* Advance estimates ** Projected

At current Prices

At constant prices (2004-05)6.8

7.58.6

10.4

12.0

13.7

15.4

5.9 6.16.7

7.47.9

8.49.2

4

6

8

10

12

14

1620

07-0

8

2008

-09

2009

-10

2010

-11

2011

-12

* 2

012-

13

** 2

013-

14

GS

DP

(Rs.

lakh

cro

re)

2

Page 3: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

GSDP & GDP : Growth Rates

GSDP

GDP

11.3

2.6

7.19.3

6.76.2

7.1

5.0

0

2

4

6

8

10

12

2007

-08

2008

-09

2009

-10

2010

-11

2011

-12

* 20

12-1

3

Gro

wth

Rat

e (p

er c

ent)

* Advance estimates

LinkLinkLink Link 3

Page 4: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Per Capita Income : Selected States

Rs.

95,

135

Rs.

83,

395Rs.

1,0

9,06

4

Rs.

95,3

39

Rs. 54,151

Rs. 61,564

20000

40000

60000

80000

100000

120000

Har

yana

Mah

aras

htra

Guj

arat

Tam

il N

adu

Ker

ala

Pun

jab

Kar

nata

ka AP WB

UP

2010-11 2011-12

Rs.

Per capita income (India)

Per capita income (India)

4

Page 5: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Own Tax Revenue : Growth Rates

(Per cent)

Particulars X FYP XI FYP

Sales Tax 15.7 17.3

Stamps & Registration Fees 22.8 13.9

State Excise Duty 14.2 21.4

Electricity Duty 8.2 15.8

Tax on Vehicles 18.3 17.9

Total Own Tax Revenue 15.1 16.5

GraphLink 5

Page 6: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Taxation Measures

Increase in VAT on

Unmanufactured tobacco by 12.5 per cent

Cigarette by 5 per cent

Bidi by 7.5 per cent

Increase in excise duty on liquor

Rationalisation of stamp duties

Temporary tax for drought relief

Sugarcane purchase tax from 3 to 5 per cent

VAT on Gold and Jewellery from 1.0 to 1.1 per cent6

Page 7: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

State’s Debt Stock

Year GSDP (current prices)

(Rs. Lakh Crore)

Debt stock

(Rs. Lakh Crore)

Debt stock

to GSDP

(%)

Interest Payment / Revenue Receipts

(%)

Fiscal Deficit

to GSDP

(%)

2011-12 12.0 2.318.8

(26.1)14.4

1.7 (3.0)

2012-13 (RE) 13.7* 2.5

18.0(25.5)

13.31.4

(3.0)

2013-14 (BE) 15.4** 2.7

17.6 (24.8)

13.51.6

(3.0)

Note : Figures in brackets indicate CFRP (13th F.C). * Advance estimates **- ProjectedLink Graph 7

Page 8: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Agriculture : Major Challenges

Degraded Soils(42%)Shallow soil

(40%)

Low value Coarse cereals(Jowar, Bajra)

Rainfed area(83%)

Poor financial & Market access

Small Holdings (73%)

Link 8

Page 9: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Crop Item 2010-11 2011-12 2012-

13Requirement

*

Cereals

Area (lakh ha.) 90 76 68 .

Yield (kg/ha.) 1,371 1,377 1,207 .Production (lakh MT) 123 104 83 133

Pulses

Area (lakhha.) 40 33 33 .

Yield (kg/ha.) 767 701 667 .

Production (lakh MT) 31 23 22 12

Foodgrains

Area (lakhha.) 130 109 101 .

Yield (kg/ha.) 1,184 1,172 1,032 .Production (lakh MT) 154 127 104 144

Agriculture : Area, Production & Yield

9

Page 10: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Highest Production in the country : 250 lakh tonnes.

Highest production of Banana, Grapes, Pomegranate,

Sweet lime, Oranges, Cashew nut, Onion

Highest exports of Grapes, Pomegranate, Onion

Investment by Government in pre cooling, Cold-

storages, Grading & Packing units, ripening Chambers

at 50 locations.

Reforms for direct marketing, private markets, PPP

Horticulture : A success story

10

Page 11: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Agriculture : Strategy for XII FYP

Form cropwise & activitywise Common Interest Groups

Develop agriculture through end-to-end projects

Emphasise Micro Irrigation

Disseminate information through ICT

Develop market-linkages for Horticulture products

Promote Agri-business & Agri-Exports through PPP-IAD

11

Page 12: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Agriculture : Request for . . . .

Implementation of Sikka Committee recommendations

Dry Land Farming Mission

Weather Based Crop Insurance

Farm Pond Lining outside NHM

Micro-Irrigation for 5 lakh ha. per year

Encouraging PPP

Accelerating formation of FIG / CIG

Link 12

Page 13: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Irrigation: Potential Created & Utilized

Year

Potential (Lakh ha.) Potential Utilized to Created

(%)Created Utilized

2007-08 43.3 27.6 63.8

2008-09 44.9 27.3 60.0

2009-10 46.3 25.4 54.9

2010-11 47.4 29.6 62.4

2011-12 49.3 32.5 67.4

13

Page 14: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Water Conservation : Check Dams

Check Dams in series in streams

Cost : Rs. 8 – 10 lakh

Capacity : 10 TCM

Construction Period : 3-6 Months

Contd.. 14

Page 15: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Water Conservation : Check Dams

Very popular, High Demand

As a standalone watershed project

Rs. 350 crore for 2012-13 & 2013-14

Need central support for permanent drought mitigation

15

Page 16: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

MGNREGA : Performance

Particulars 2010-11 2011-12 2012-13

Expenditure (Rs. crore) 325 1,568 2,230

Works Completed (Cumulative) 1,820 61,786 94,068

Person Days (crore) 1.9 7.7 8.3

Average Employment per household (days) 40 51 53

16

Page 17: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Health : Indicators

Indicators UnitTarget for XI FYP

Present status

National Rank

IMR (2011)Per

thousand live births

17 25 3

MMR (2007-09) Per lakh live births 50 104* 3

TFR (2010) Children / woman 2.1 1.9* 3

Institutional Deliveries ( 2009) Per cent - 90.7@ 10

Malnutrition of Children (0 - 3 years) Per cent 24.8 32.7+ -

Anaemia among women (15-49 years) Per cent 24.3 57.8+ 3

17

Page 18: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Health : Malnutrition

StateChildren

Malnourished Severely Malnourished

Bihar 82.1 25.9

Andhra Pradesh 48.7 0.1

Utter Pradesh 40.9 0.2

Karnataka 39.5 2.8

Gujarat 38.5 4.6

Kerala 36.9 0.1

Tamilnadu 35.2 0

Madhya Pradesh 28.5 1.9

Maharashtra 23.3 2.6

(Per Cent)

18

Page 19: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Education : Major Initiatives

State Assessment & Accreditation Council

Revision of Recruitment Rules to ensure quality teachers

Sensitization workshops for stakeholders

Compulsory use of UDISE data

Self Finance Act

Independent evaluation of schemes

Link 19Link

Page 20: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Water Supply & Sanitation

Safe drinking water facilities to 94% habitations

Leading in the cleanliness campaign in India

Nirmal Gram Puraskar to 9,500 VPs

RIDF assisted Waste Water Management Projects of Rs.

100 Crore in large villages

LinkLink 20

Page 21: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Power : Capacity Addition

SourceAs on 31st March

Expected in 2013-14 2012 2013

Thermal 10,366 12,446 18,836

Renewable 4,198 4,609 5,164

Hydro 3,066 3,066 3,066

Natural gas 2,740 2,740 2,740

Central Sector Allocation 5,792 6,307 6,627

Total 26,162 29,168 36,433

(MW)

LinkLink 21

Page 22: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Power : Availability

Energy shortage reduced from 18% (2005) to 3% (2013)

Assured 8 to 10 hrs. power supply to agriculture

82% feeders : load shedding free

All industrial feeders : load shedding free

Load shedding only on feeders having more than 42%

DCL

Revenue up by 10-20% in loss making areas

Link 22

Page 23: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Power : Consumer Focus

101 ATP Machines installed

Online payment and connection release facility

Real Time Gross Settlement (RTGS)

IR/RF Meters (Around 22% rise in revenue)

Automatic Meter Reading for industries

Call Centre for complaint redresal

Consumer Facilitation Centre

Link 23

Page 24: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Roads : National Highways in selected states

State Area (Lakh Sq.Km.)

NH Length(Km.)

NH Length per 100 sq.

km. areaBihar 0.94 4,106 4.36

Uttar Pradesh 2.41 7,818 3.24Karnataka 1.92 4,396 2.29

Gujarat 1.96 4,032 2.06Maharashtra 3.08 5,616 1.83

Andhra Pradesh 2.75 4,537 1.65Madhya Pradesh 3.08 5,064 1.64

Link Link

Request for sanctioning 6,026 kms of NH projects

24

Page 25: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Rural Roads: Rural Connectivity (PMGSY)

ParticularsNew

connectivity ( km.)

Upgradation( km.)

Expenditure upto 2012-13

(Rs. crore)

Sanctioned 3,652 19,5534,978

Completed 3,329 18,668

Buldhana road, a rural road joining two Tehsils in Vidarbha, Maharashtra

Request for sanctioning 5000 kms of roads under PMGSY

25

Page 26: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Railways : Projects with State contribution

Project nameEstimated

cost(Rs. crore)

State contribution

(%)Status

Ahmednagar-Parli Vaijnath 2,826 50Sanctioned

Wardha-Nanded-Pusad 2,548 40

Manmad-Indore 1,751 50

Approval awaited

Wadsa Desaiganj-Gadchiroli 232 50

Nagpur-Nagbhir 376 50

Gadchandur - Adilabad 300 50Pune-Nashik 1,900 50

Karad-Chiplun 928 50

Total 9,985 4826

Page 27: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Projects delayed due to moratorium on environmental

clearance

Rewas project held up due to non-availability of Right of

Way through MbPT

Estimated Cargo handling by 2020 - 140 MTPA

Focus on ports connectivity

Need for VGF for rail connectivity

Ports

Link 27

Page 28: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Civil Aviation : Airports

22 Airports in the State

19 District HQs connected with airports

Night landing facilities at 4 international and 6 domestic

Airports

4 Greenfield Airports under consideration

4 Airports taken up for upgradation and expansion

Link Link 28

Page 29: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Industry

Accounts for 10% of industrial investment in India

Attracts 1/4th of country’s FDI

Accounts for over 27% share in total exportsNew Industrial Policy – 2013

Focus on Mega Projects and MSMEs

Mega Project : Investment : 100 – 750 cr.

Employment : 250 – 1500

379 mega projects since 2005

Investment : Rs. 3 lakh cr.

Employment : 3.5 lakhContd..

29

Page 30: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Industry

MSMEs : 1,66,578

Clusters formed : 70

Common Facility Centres : worth Rs. 441 cr. in last 5 yrs.

3 MSE-CDP & 4 IIUS Clusters operational

Fly-Ash Cluster, Raisin Cluster, Garment Cluster, Textile Cluster, General Engineering Cluster etc.

Proposals for 15 clusters ready for submission

30

Page 31: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Textiles

Cotton Production : 70 lakh bales, 2nd largest

Mainly in Vidarbha, Marathwada & North Maharashtra

Only 20% processed in State

Huge employment potential

Textile Policy in 2012-13

Request to continue TUFS during entire XII FYP

Request removal of sectoral caps in TUFS

31

Page 32: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Housing : BSUP and IHSDP impediments

Cost Escalation

Fixed Cost Norms of Dwelling Units in IHSDP

Reluctance for relocation : High Rise Buildings & Off-site

Slow pace of construction due to severe drought

Supreme Court’s order regarding Environmental clearances for sand mining

Link 32

Page 33: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Housing : Indira Awas Yojana

Year Target Houses Completed

Percentage to the target

2008-09 1.16 1.14 98

2009-10 2.24 2.06 92

2010-11 1.55 1.58 102

2011-12 1.51 1.53 101

2012-13 1.74 1.43 82 *

(Lakh)

*Final report awaited

Request increase in cost norms to Rs.1 lakh per unit33

Page 34: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Urban Development : JNNURM

Particulars UIG+ Bus+ e-Governance UIDSSMT

No. of Cities with approved projects 13 86

No. of Projects approved 94 95

Total cost (Rs. cr.) 12,360 2,827

GoI share (Rs. cr.) 5,491 2,261

GoI share released (Rs. cr.) 4,281 1,992

31st March, 2013

34

Page 35: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Mumbai Infrastructure Development

Ongoing Projects

Metro-I : Versova-Andheri-Ghatkopar

Metro-III : Colaba-Bandra-Seepz

Mumbai Trans Harbour Link

Mumbai Urban Transport Project-I

Mumbai Urban Transport Project-II

35

Page 36: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Only State which has a RRZ RegulatotionEnvironment awareness-

Environment Service Scheme in schoolsCall for Green Ideas – Environment protection withcommunity participation

Certificate Course in Waste Water Treatment PlantOperatorEnvironment research sponsored in technical institutionsEnvironment Status Report in all districts – an inventoryof natural resourcesEnvironment Information Centers – in all districts

36

Environment : Achievements

Page 37: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Delays in Environment Clearance due toHigh Rise Office MemorandumAction on violations

Office MemorandumMoratorium in Ratnagiri and SindhudurgKasturi Rangan Committee ReportMines below 5 Hectares in Environment Clearance

37

Environment : Challenges

Page 38: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Agriculture

Implementation of Sikka Committee recommendations

Dry Land Farming Mission

Weather Based Crop Insurance

Farm Pond Lining outside NHM

Micro-Irrigation for 5 lakh ha. per year

Encouraging PPP

Accelerating formation of FIG / CIG

Contd…

State’s Expectations . . .

38

Page 39: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

State’s Expectations . . . Water Conservation

Need central support for permanent drought mitigationPower – Coal

Intervention of MoC for allocation of tapering coallinkagesDedicated transport corridor from Odisha

• Roads

• Sanction 6,026 kms of NH projects

• Textile• Continue TUFS during entire XII FYP• Remove sectoral caps in TUFS Contd.. 39

Page 40: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Education

Private Aided School be brought under the purview of

SSA and RMSA

More grants for computer aided learning

HousingRelaxation in ACA release norms

Allow un-utilised ACA for EWS/LIG Housing in MMR, Nagpur, Pune and Nashik

Completion period be extended to 31st March 2015

• Revise the cost norms for DUs in-progress to Rs1.5 lakhContd..

State’s Expectations . . .

40

Page 41: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

• Indira Awas Yojana

• Increase cost norms to Rs.1 lakh per unit

Water Supply & Sanitation

NRDWP

• Increase ‘Sustainability Outlay’ from 10% to 15%

• Include metering cost in project cost as 100% grants

• Increase O & M outlay from 15% to 20%

Contd..

State’s Expectations . . .

41

Page 42: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

State’s Expectations . . .

42

Environment Management-Need increased focus on Waste Water TreatmentLarger outlay for National River Action Plan and NationalLake Conservation ProgrammeRiver Basin-wise action plans : technical and financial supportEnvironment awareness : more fundsSolid Waste Management : financial support

Page 43: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Sector XII FYPAnnual Plan

12-13 13-14 13-14 Revised

Agriculture and Allied Services 21,917 3,258 3,524 Revised outlay Rs 48,500 cr.

Additional 1,199 cr. for GosikhurdNational Irrigation Project

Proportionate increase in SCSP / TSP

Rural Development 9,089 1,504 1,465Irrigation and Flood Control 47,990 7,614 8,379Energy 20,695 3,063 3,376Industry and Minerals 2,175 353 403Transport 33,855 5,575 5,292

General Economic Services 3,364 742 759

Social and Community Services 1,22,776 20,524 20,919

General Services 10,989 1,777 2,112Other Programmes 2,150 590 709

Total 2,75,000 45,000 46,938 48,500

Sectoral XII FYP and Annual Plans(Rs. Crore)

LinkLink43

Page 44: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Outlays : SCSP and TSP(Rs. crore)

Year Total Plan SCSP TSP

2009-10 35,958 2,652 2,314

2010-11 37,916 3,461 3,020

2011-12 42,000 4,284 3,738

2012-13 45,000 4,590 4,005

2013-14 48,500 4,947 4,316

44

Page 45: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

PSUAnnual Plan outlay2012-13 2013-14

CIDCO 2,656 2,286MHADA 2,884 2,905MMRDA 4,663 3,917MSRDC 280 900MSRTC 575 476MIDC 1,692 2,140

MAIDC 8 18

MSEB (Generation, Transmission, Distribution)

13,321 18,529

Total 26,079 31,171

Annual Plan 2013-14 : PSUs(Rs. Crore)

45

Page 46: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

46/ NN

Thank You

Page 47: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Growth Rates : GSDP and GDP (2012-13)(Per Cent)

Sector GSDP GDP

Agriculture & Allied (-) 2.1 1.8

Industry 7.0 3.1

Services 8.5 6.6

Total 7.1 5.0

Back 47

Page 48: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

48 / NN

(Rs. crore)Sector 2008-09 2009-10 2010-11 2011-12 2012-13

Agriculture & allied activities

10.1(15.8)

10.4(14.7)

12.3(14.5)

12.4(13.9)

11.5(13.7)

Industry 31.3(28.1)

29.8 (28.1)

28.5(27.8)

28.0(27.1)

27.8(27.0)

Services 58.6(56.1)

59.8(57.2)

59.1(57.7)

59.5(59.0)

60.7(59.3)

All 100 100 100 100 100

Note : Figures in bracket indicate percentage contribution to GDP

Back

GSDP & GDP : Sectoral Contribution

48

Page 49: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Growth Rate, Share in GDP, Per Capita Income : Major States & India

49 / NN

(Per Cent)

StateGrowth Rate

(XI FYP)Per capita

income (Rs.) (2011-12)

Share in GDP (2011-12)

Andhra Pradesh 8.2 68,970 7.8

Gujarat* 9.5 89,668 7.3

Haryana 9.0 1,09,064 3.7

Karnataka 7.2 69,051 5.5

Kerala 8.2 80,924 3.8

Maharashtra 8.1 95,339 14.4

Punjab 6.7 78,594 3.1

Tamil Nadu 7.7 84,496 7.6

West Bengal 7.3 55,222 6.5

India 8.0 61,564 -* 2010-11 Note : In 2006-07, Maharashtra’s share in GDP was 15% Back 49

Page 50: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Own Tax Revenue : Share of Major Taxes

50 / NN

(Per cent)

Particulars 2011-12 2012-13 (RE)

Sales Tax 57.7 59.1

Stamps and Registration Fees 16.5 16.4

State Excise Duty 9.8 9.5

Electricity Duty 5.5 5.3

Tax on Vehicles 4.7 4.4

Other Taxes on Income &Expenditure * 2.1 1.9

Other Taxes 3.7 3.4

Total Own Tax Revenue 100.0 100.0* Includes taxes on profession, trades, callings & employment

Back 50

Page 51: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Own Tax Revenue & Tax Revenue to GSDP

51 / NN

Tax/GSDP

OTR/GSDP

8.0

8.4

6.9

7.3

6.4

6.8

7.2

7.6

8.0

8.4

2008 -09 2009 -10 2010 -11 2011 -12 2012 -13 (RE)

Per c

ent

8.4

7.3

Back 51

Page 52: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

State’s Debt Stock

Note : Figures in brackets indicate CFRP (13th F.C). * Advance estimates **Projected

52 / NN

Year GSDP (at

current prices)

(Rs. Lakh

Crore)

Debt stock (Rs. Lakh

Crore)

Debt stock

to GSDP

(%)

Interest Payments(Rs. Lakh

Crore)

Interest Payments

to Revenue Receipts

(%)

Fiscal deficit

to GSDP

(%)

2011-12 12.0 2.318.8

(26.1)0.18 14.4

1.7 (3.0)

2012-13 (RE) 13.7* 2.5

18.0(25.5)

0.19 13.31.4

(3.0)

2013-14 (BE) 15.4** 2.7

17.6 (24.8)

0.21 13.51.6(3.0)

Back 52

Page 53: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

53 / NN

1.6 per cent of GSDP (Margin)

Percentage of fiscal deficit to GSDP

Consolidated Fiscal Reform Path

Back

2.0 1.7

1.4

3.0 3.0 3.0

-1

0

1

2

3

4

2006

-07

2007

-08

2008

-09

2009

-10

2001

0-11

2011

-12

2012

-13(

RE

)

Per

cen

t

Consolidated Fiscal Reform Path (13th FC)

53

Page 54: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Financing : XII FYP & Annual Plans(Rs. Crore)

Sources of Fund XII FYP AP 2012-13 AP 2013-14 (Proposed)

State’s Own Resources 1,03,260(38%)

14,102(32%)

15,435(32%)

State’s Borrowings 1,21,425(44%)

22,651(50%)

25,350(52%)

Central Assistance 50,315(18%)

8,247(18%)

7,715(16%)

Total 2,75,000 45,000 48,500

Back 54

Page 55: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Sectoral Share : XII FYP and Annual Plan 2013-14

(Per Cent)

55 / NN

SectorAnnual Plan 2013-14 (Proposed) XII FYP

State Level District Level

Total

Agriculture and Allied Services 6.1 13.1 7.5 8.0

Rural Development 2.9 4.1 3.1 3.3Irrigation and Flood Control 21.1 4.6 17.9 17.5Energy 8.3 2.5 7.2 7.5Industry and Minerals 1.0 0.5 0.9 0.8Transport 10.8 13.1 11.3 12.3General Economic Services 1.5 2.1 1.6 1.2Social and Community Services 41.8 55.7 44.6 44.6

General Services 4.5 4.3 4.5 4.0Other Programmes 2.0 0.0 1.4 0.8

Total 100.0 100.0 100.0 100.0Back55

Page 56: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

56 / NN

Crop Item 2010-11 2011-12 2012-13

Oilseeds

Area (lakh ha.) 36 38 38

Yield (kg./ha.) 1,392 1,236 1,350

Production (lakh Tonne) 51 46 52

Cotton

Area (lakh ha.) 39 42 42

Yield (kg./ha.) 322 278 284

Production (lakh Bales*) 75 68 69

Sugarcane

Area (lakh ha.) 10 10 9

Yield (MT/ha.) 89 88 64

Production (lakh Tonne) 857 895 597

Source : Commissionerate of Agriculture, GoM * One bale of 170 kg.

Agriculture : Area, Production & Yield

Back 56

Page 57: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Sikka Committee recommendationsSpecial drought mitigation package for 7 districts – Pune(1,830 cr.), Satara (2,318 cr.), Sangli (2,658 cr.), Solapur(1,625 cr.), Ahmadnagar (1,641 cr.), Beed (1,159 cr.) and Osmanabad (552 cr.)

Total 11,783 cr.

Cluster of area and watershed management 1078 cr.

Water resources augmentation 8,331 cr.

Water use management 1,521 cr.

Agriculture and diversification to horticulture 456 cr.

Drinking water 184 cr.

Livestock and fodder development 131 cr.

Fringe forest management Back 57

Page 58: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

0

10

20

30

40

50

60

70

80

90

100

Pun

jab

Har

ayan

a

U. P

.

Bih

ar

T. N

.

W. B

.

A. P

.

Guj

.

Odi

sha

Raj

.

M. P

.

Kar

n.

Mah

aras

htra

Ker

ala

97.6

85.3

76.4

6158.3 56.2

48.745.6

35 34.7 32.5 31.9

17.7 17

%

Agriculture : Irrigation Status of Major States

Back

National Average – 45.30%

58

Page 59: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Agriculture : Irrigation Status

59 / NN

• Flow - 20.13 lakh Ha.• Wells - 19.40 lakh Ha.• Total - 39.53 lakh Ha.• Percent - 17.70 %

Surface Irrigation

Well Irrigation

Surface Irrigation

59

Page 60: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

MGNREGA : Performance

Particulars 2010-11 2011-12 2012-13

Expenditure (Rs. crore) 325 1,568 2,230

Works Completed (Cumulative) 1,820 61,786 94,068

Person Days (crore) 1.9 7.7 8.3

Average Employment per household (days) 40 51 53

Share of SCs in Employment (%) 6.9 7.8 7.0*

Share of STs in Employment (%) 15.6 19.7 14.5*

Share of women in Employment ( %) 48.5 46.0 44.5

Employment generating Cost per day (Rs.) 172 203 268

Source – EGS & Water Conservation Dept., GOM *Data under updation 60 / 5260

Page 61: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Power : R-APDRP

Part-A :Rs. 324 crore estimated cost for 130 towns61 towns completedCurrent Network Digitized

Part-B :Rs. 2,927 crore estimated cost for 120 Towns20% work completed

Aim to :Reduce lossImprove ReliabilityRelease Connections

Back 61

Page 62: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Power : Coal issue

Coal linkage from MCL 15.56 MMTPACoal linkage materialization @ 48%Intervention of MoC/Railways required to step upthe supply from MCL to supply sufficient rakes asper linkageThermal power stations facing problems of low coalstocks due to shortage of coal rakes/inadequatecoal rake movementsConsistently raising this issue with MCL, Railways,CEA 62 / NNContd..Back 62

Page 63: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Power : Coal issue

New up-comming projects Chandrapur2x500MW,Koradi 3X660MW, Parli 1x250MWlinked with Machhakata coal block, allocated jointlyto Mahagenco & GSECLFacing hurdles in starting coal production fromMachhakata

Back63 / NN

63

Page 64: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Power : Gas IssuesUran Gas Station

GTPS Uran plant 672 MW capacity requires 3.5 mmscmdgasAverage gas supply from M/s Gail @ 1.9 to 2.3 mmscmdNot receiving gas from M/s RIL due to drop in productionPresent Generation dropped to 400 MW

RGPPL Gas issuesInstalled Capacity - 1967 MWGas allocated from GoI

KG06 from RIL – 7.6mmscmdONGC C -series from Gail - 0.9 mmscmdTotal Gas allocated – 8.5 mmscmd

Generation availability vary from 0 to 600 MWPlant completely shut down due to non availability of Gas64 / NN

Back64

Page 65: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Power : Renewable Energy Installed Capacity

65 / NN

SourceInstalled Capacity as on March 31

2009 2010 2011 2012 2013

Wind 1932 2071 2310 2717 3006

Bagasse 393 422 620 893 1088

Biomass 95 115 155 155 170

Solid waste 11 11 16 20 24

Solar 0 0 1 20 175

Small Hydro Project 214 230 247 265 271

Total 2634 2838 3348 4070 4734

Back 65

Page 66: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Power : Infrastructure

66 / NN

Infra-I :Total cost Rs. 9,014 crore

596 Substations added67,418 Distribution transformer added

Distribution Transformer Failure rate reduced from 16.1% inFY 2005-06 to 5.7% in FY 2012-13

Infra-II :Total Cost Rs. 6,500 crore, next 3 years31.6 Lakhs connections to release in next 3 years

Agriculture – 4.8 LakhResidential – 24.6 LakhCommercial – 1.8 LakhIndustrial - 0.4 Lakh

Back 66

Page 67: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Power : Per Capita Consumption

67 / NN

TypeIndia Maharashtra

2010-11 2010-11 2011-12

Industrial 190 307 321

Domestic 131 175 185

Agriculture 107 145 191

Source: Economic Survey of Maharashtra 2012-13

(Units)

Back 67

Page 68: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Power : Renewal energy

68 / NN

Back

125 MWP Sakri, Dhule

68

Page 69: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Power : Transmission and Distribution losses

69 / NN

Source : Energy Dept.

4.6 4.3 4.2 4.2

20.6

17.316.0

14.5

25.8

22.321.3 20.7

0

5

10

15

20

25

30

2009-10 2010-11 2011-12 2012-13(Provisional)

Loss

es (p

er c

ent)

Transmission Loss Dist. Loss AT & C loss

Back 69

Page 70: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Automatic Meter Reading (AMR)

Centralized call center (Bhandup) Consumer Facilitation Center (Thane)

ATP Machine

Consumer Focus

Back70

Page 71: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Roads : Road Length in selected States

71 / NN

StateArea

(Lakh sq.km.)Road Length(Lakh km.)

Road Length per 100 Sq. Km.

area (Km.)

Andhra Pradesh 2.75 2.38 87

Gujarat 1.96 1.56 80

Haryana 0.44 0.42 94

Karnataka 1.92 2.82 147

Kerala 0.39 2.01 518

Maharashtra 3.08 2.43 79

Punjab 0.50 0.84 167

Tamil Nadu 1.30 1.92 148

Uttar Pradesh 2.41 3.90 162

As on 31st March, 2011

Back 71

Page 72: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Roads : Status

72 / NN

Category of Road Status as on Today (In Kms)

National Highway 5,616

State Highway/Expressway 32,910

Major District Road 50,256

Other District Road 47,529

Village Road 1,06,601

Total 2,42,912

Back 72

Page 73: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Ports

73 / NN

Development of ports on “BOOST” basis

Agreement signed for greenfield portdevelopment:

Ratnagiri District : Dhamankhol -Jaigad & Angre

Raigad District : Rewas-Aware & Dighi

Sindhudurg District : Vijaydurg & Redi

Proposed investment of Rs.15,000 crore; alreadyinvested Rs. 4,000 crore

Dhamankhol-Jaigad, Angre & Dighi portsoperational Back 73

Page 74: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

74 / NN

Civil Aviation : Navi Mumbai International Airport

Approvals / Clearances awaited from MoEF

Forest Clearance & Wild Life (ESZ) Clearance for Karnala

Bird Sanctuary

Forest Clearance appraised by Forest Advisory Committee

(FAC) for 250 ha. forest land

Permission from Mumbai High Court for removal

of MangrovesBack 74

Page 75: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Civil Aviation : Navi Mumbai International Airport

Estimated Base Cost : Rs.14,573 Crore

Phase 1 Base Cost : Rs.5,250 Crore

Project Period : 30 year

Project Phases : 4

D/E Ratio : 70 : 30

Equity IRR (Hybrid till) : 20% approx.

75 / 52Back 75

Page 76: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

76 / NN

Civil Aviation : Airport Development

A greenfield international airport with two parallel runways 4 km long planned at PuneWork of 2500 metre runway at Shirdi near completionClerance from MoEF to Navi Mumbai International Greenfield Airport awaited.Started work of Greenfield Airport at Chippiparule in Sindhudurg by MIDC.Land acquired for development of new airport at Boramani, SolapurAirports at Amravati, Kolhapur and Karad taken for upgradation and expansion 76

Page 77: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Housing : JNNURM

Sub-Mission

ApprovedDUs

(lakh)

Project cost (Rs.

Crore)

ACA(Rs.

Crore)

DUs

Completed in XI FYP 2012-13 In

progress

BSUP 1.4 5,838 2,819 54,295 2,551 25,469

IHSDP 1.1 2,559 1,604 16,762 5,779 20,897

Total 2.5 8,397 4,423 71,057 8,330 46,366

77 / 52Back 77

Page 78: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Health : IMR and MMR

44

6270

76

104

130

30

50

70

90

110

130

150

2004

-06

2007

-09

2012

-13

2013

-14

2014

-15

2017

MM

R

14

19

25

28

3133

34

10

15

20

25

30

35

4020

07

2008

2009

2010

2011

2012

2017

IMR

Source : Public Health Department, GoMBack 78

Page 79: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Health : MDG

No. Goal Target

1Eradicate extreme poverty and hunger

To halve the percentage of population belowthe National Poverty Line between 1990 and2015

To halve the proportion of people sufferingfrom hunger between 1990 and 2015.

2Achieve universal primary education

To ensure that all the children will be able tocomplete a full course of primary educationby 2015.

3 Promote gender equality and empower women

To eliminate gender disparity in primary andsecondary education preferably by 2005,and in all levels of education by 2015.

4 Reduce child mortality To reduce the Under-five mortality rate bytwo-thirds between 1990 and 2015.

5 Improve maternal health To reduce the Maternal Mortality Ratio bythree quarters between 1990 and 2015.

Contd.. 79 / NN79

Page 80: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Health : MDG No. Goal Target

6 Combat HIV / AIDS, Malaria and other diseases

To halt the spread by 2015 and reverse thespread of HIV/AIDS.To halt the spread by 2015 and reverse thespread of Malaria and other major diseases.

7 Ensure environmental sustainability

To integrate the principles of sustainabledevelopment into country policies &programmes and reverse the loss ofenvironmental resources.To halve the proportion of population withoutsustainable access to safe drinking waterand basic sanitation by 2015.To achieve significant improvement in thelives of atleast 100 million slum dwellers by2020.

8 Develop a global partnership for development

To make available the benefits of newtechnologies to the people, especiallyinformation and communication, in co-operation with the private sector.

Back 80

Page 81: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Water Supply & Sanitation: NRDWP

YearNo. of habitations

Target Achievement Percentage

2009-10 11,639 7,465 64.1

2010-11 9,745 8,987 92.2

2011-12 6,502 6,364 97.9

2012-13 5,940 4,637 78.1

2013-15 14,030 - -

Back

81

Page 82: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Water Supply & Sanitation: Nirmal Bharat Abhiyan

Component Target (‘000)

Achievement(‘000)

IHHL 12,525 6,032

Community toilet (SCW)* 17 7

Upto March, 2012

Source – Baseline survey conducted between 2nd October 2012 – 31st January, 2013*100% target achieved for school and Aanganwadi toilets

Back82

Page 83: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Education : RTE Compliance

School Type Number

of Schools

Enrolment No. of Teachers

Pupil Teacher

Ratio

Government including local authority

0.7 62.5 2.8 22

Private aided 0.2 65.8 2.6 25

Private un-aided 0.1 33.0 1.2 27

Total 1.0 161.3 6.6 24

(Lakh)As on September, 2012

• Primary schools within 1 km., upper primary schools within 3 km. and secondary schools within 5 km.

• Literacy Rate : 82.9% (Second in India) 83Back

Page 84: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Education : Infrastructure

Item Performance (%)

Girls toilet 98.3

Boys toilet 94.3

Water facility 98.0

Ramps 70.1

Boundary walls 68.8

Play ground 75.8

School Building 99.7

Electricity 88.6

As on 31st March, 2013

84Back

Page 85: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Out of School Children : 86,856Gender Gap : 12.6%Educationally Backward Blocks : 43High early primary drop out rate : Ahmadnagar,

Jalna & BeedLearning outcomes : Low (As per

ASER)Shifting from

ZP to Private SchoolsLocal Languages to English Medium School

Poor capacity of Teachers & Supervisory officersPrivate Schools / D.Ed. Colleges with poor infrastructure

Education : Challanges

85

Back

Page 86: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Education : Higher & Technical

StreamEnrollment (Lakhs)

2011-12 2012-13

General Education 17.69 18.29

Technical Education 9.09 9.28

Medical Education 0.20 0.20

Veterinary and Fishery Science 0.02 0.02

Agriculture 0.11 0.12

Total 27.08 27.89

86

Page 87: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

87 / NN

Metro- I : Versova-Andheri-GhatkoparProject Scope 11.4-km fully elevatedProject Significance

Connectivity to eastern and western suburbsReduction in travel time by 70 minutes

Commencement March, 2008Project Completion December, 2013Project Cost Rs. 2,356 croreFinancial Structure VGF Rs.650 crore. GoI Contribution : Rs.471

crore ; Received Rs.310.50 crorePresent Status Phase I commissioning in Sept.,13 from

Versova to AirportPhase II commissioning in Dec.,13 from Airport to GhatkoparTen Metro Rakes arrived Back

Mumbai Infrastructure

87

Page 88: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

88 / NN

Metro- III : Colaba-Bandra-Seepz

Project Scope Fully underground - 33.50 km.Project Significance

Will provide connectivity to areas nothaving rail based transport.Four-coach Metro with capacity of 1178passengers

Project Implementation

2013 – 2019

Project Cost Rs.23136 crore :Equity by GoI Rs. 2403 crore, GOM Rs.2403 crore

Present status Process to secure JICA loan completeGoI cabinet approval awaited Back

Mumbai Infrastructure

88

Page 89: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

89 / NN

Mumbai Trans Harbour Link

Project Scope Sewri - Nhava Sheva 6-Lane 22 km Link Road16.5 Km Sea Bridge

Project Significance

Decongestion of island city. Development of main land. Connectivity with ports. Faster access to Navi Mumbai International Airport,Pune Expressway and to Southern India

Project Period 5 years (2013 to 2018)Project Cost Rs.9630 crore (VGF of Rs.1920 crore)Present status RFP issued – January, 2013

Receipt of proposals – 24 May 2013Award of Work – 24 June 2013Financial Closure and project commencement – Dec., 2013

Mumbai infrastructure

Back 89

Page 90: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

90 / NN

Mumbai Urban Transport Project - I

Project Scope Providing additional 5th and 6th lines from Kurla to Thane and 101 new rail rakes Develope 12-km Jogeshwari-Vikhroli Link Road and 3.5-km Santacruz-Chembur Link Road Procuring 644 environment friendly buses

Project Cost Rs.5127 croreFinancial Structure

40% World Bank contribution, 60% Counter Part Fund, GoI (Indian Railways) fund contribution Rs.2,055 cr.

Present status 12-km JVLR completedSCLR to be completed in DecemberBack

Mumbai Infrastructure

90

Page 91: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

91 / NN

Mumbai Urban Transport Project - II

Project Scope Conversion of DC to AC

95 rail rakes

Additional railway tracks

Project Significance Improvement of suburban rail system

Project Cost Rs.5,300 crore

Financial Structure World Bank assistance - Rs.1910 crore

Mumbai Infrastructure

Back 91

Page 92: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

GSDP & GDP : Sectoral Growth Rates (XI FYP)

92 / NN

Sector 2007-08 2008-09 2009-10 2010-11 2011-12 XI FYP

Agriculture & allied activities

13.8(5.8)

-15.5( 0.1)

1.0(0.8)

17.8(7.9)

4.6(3.7)

4.3(3.7)

Industry 11.7(9.7)

-1.1(4.4)

6.9(9.2)

8.8(9.2)

5.2(3.5)

6.3(7.2)

Services 10.5(10.3)

8.0(10.0)

11.7(10.5)

10.0(9.8)

8.4(8.2)

9.7(9.7)

GSDP (GDP)

11.3(9.3)

2.6(6.7)

9.3(8.6)

10.2(9.3)

7.1(6.2)

8.1(8.0)

Figures in bracket indicate growth rates in respect of GDP

Back

(Per cent)

92

Page 93: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

93 / NN

Leadership in eGovernanceMore than 35,000 Common Service Centers established

State Data Centre set up to act as a common depository of Government

Data and applications, with focus on cloud computing

Signed MoU with Bharat Broad Band Network Limited (BBNL) for

implementing National Optical Fibre Network (NOFN) to facilitate

connectivity to rural areas

e-Tendering made compulsory for all tenders above Rs. 10 lakh

e-Office, a Mission Mode Project aimed at bringing in paperless office,

being rolled out at State Head Quarters and a few districts

93

Page 94: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

94 / NN

Pioneers in AadhaarNearly 6 crore residents enrolled, of which 5.43 crore UIDs

generated

12 districts selected for Aadhaar linked Financial Inclusion and

DBT

Introduced an innovative mechanism of testing the accuracy of

UID and linked account by pushing Re. 1 into each of the seeded

account, appreciated by Hon. Chairman of UIDAI

First State to establish State Resident Data (SRDH)

Introduced the concept of USRDH (Usable SRDH) wherein the

data is being cleaned and standardized and also introduced the

concept of Self Seeding 94

Page 95: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Receipts and Expenditure

95 / NN

(Rs. crore)

Particulars X FYP XI FYP 2012-13 (RE)

Revenue Receipts 2,17,120 4,74,918 (119)

1,44,623

Capital Receipts 1,41,693 1,03,243(-27)

27,557

Revenue Expenditure 2,47,866 4,65,404(88)

1,44,598

Capital Expenditure 1,10,780 1,14,778(4)

27,423

Note : Figures in brackets indicate percentage increase over previous FYP

95

Page 96: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

96 / NN

Civil Aviation : New Plans

All 6 Divisional HQ will be air-connected with Boeing/Airbus landing with Night Landing facilityState Government will link up all District HQ with air-connectivity during 12th FYPState Government planning to construct Heliport with Night Landing facility at important places in the State including MumbaiAllocation for Airport Development/Air connectivity has increased from Rs. 760 crores in 11th FYP to Rs. 1350 crores in 12th FYPThe Budget Allocation has been increased from Rs.240 crores (2012-13) to Rs. 440 crores during 2013-14

96

Page 97: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

OTR- Growth Rates

97 / NN

(Rs. crore)

ParticularsX Plan XI Plan

2002-03 2006-07 Growth rate

2007-08 2011-12 Growth rate

OTR 22,814 40,098 15.1 47,528 87,648 16.5Sales Tax 13,488 24,131 15.7 26,753 50,596 17.3

Stamps & Registration Fees 2,823 6,416 22.8 8,550 14,407 13.9

State Excise Duty 1,939 3,301 14.2 3,963 8,605 21.4

Electricity duties 1,149 1,577 8.2 2,688 4,431 15.8

Taxes on Vehicles 941 1,841 18.3 2,143 4,137 17.9

Other taxes on income & expenditure

1,032 1,246 4.8 1,488 1,830 5.3

97

Page 98: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Agriculture : Operational Holdings (2010-11)

98 / NN

Holding Size (Ha.)

No. of Operational

Holdings(‘000)

Percentage to total

Area of operational

holdings (‘000 Ha.)

Percent-age to total

Marginal (Up to 1.0) 6,709 49.0 3,186 16.1

Small (1.0 - 2.0) 4,049 29.6 5,734 28.9

Semi-medium (2.0 - 5.0) 2,158 15.8 5,761 29.0

Medium (5.0 - 10.0) 710 5.2 3,989 20.1

Large (10.0 and above) 73 0.4 1,171 5.9

Total 13,699 100.0 19,842 100.0

Back 98

Page 99: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Yield Rates of Some Major States

99 / NN

(2011-12)

StateYield Rate (kg./ha.)

Cereals Pulses Total Foodgrains

Andhra Pradesh 646 2,525Gujarat 823 1,961Karnataka 455 1,637

Madhya Pradesh 803 1,411

Maharashtra 695 1,150Tamil Nadu 512 2,687Uttar Pradesh 991 2,495West Bengal 911 2,675India 694 2,059

Source : Commissionerate of Agriculture, GoM 99

Page 100: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

RAY- Issues

100 / NN

The Cut-Off Date for eligibility of Slum-dwellers forrehabilitation (under State Legislation) is 1st January 1995; this issue is presently sub-judiced in Hon. Supreme Courtof IndiaUn-availability of adequate land with State Government &ULBs for In-Situ Rehabilitation and service constraints inobserving the viable density norms of 500 Tenements/NetHectareFinalisation of Policy Guidelines for In-Situ redevelopmentof slums on lands belonging to various Ministries andDepartments of GoIUnlocking Potential of Salt Pan and NDZ lands of GoI foreffective Slum Free City planning and for creation of largestocks of Affordable Housing in Mumbai MetropolitanRegion Back 100

Page 101: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Growth Rates: Selected States (XI FYP)

101 / NN

(Per cent)

State Agriculture & allied activities

Industry Services Total

Andhra Pradesh 5.3 8.1 9.6 8.3Gujarat* 4.1 10.3 10.8 9.6Haryana 3.3 6.9 12.7 9.1Karnataka 5.7 5.3 9.5 7.6Kerala 0.0 5.9 10.3 8.0

Maharashtra 4.3 6.3 9.7 8.1Punjab 1.7 9.0 8.3 6.7Tamil Nadu 2.2 7.6 8.8 7.7West Bengal 2.7 5.1 9.0 6.9India 3.7 7.2 9.7 8.0Note : Figures in bracket indicate rank among listed States *(2007-08 to 2010-11)

101

Page 102: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Interest payments and average cost of borrowings

102 / NN

8.18.2

9.4

19,205

17,505

12,932

7.0

8.0

9.0

10.0

11.0

2007

-08

2008

-09

2009

-10

2010

-11

2011

-12

2012

-13

(RE

)

Year

Aver

gae

cost

of B

orro

win

g (

per

cent

)

10000

12000

14000

16000

18000

20000

Inte

rest

Pay

men

t (R

s. C

rore

)

Average cost of borrowing Interest payments

102

Page 103: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

State Finances : Fiscal & Revenue Deficit

103 / NN

-2.2

0.2 0.0

-0.4

1.71.4

-3

-2

-1

0

1

2

3

4

2007

-08

2008

-09

2009

-10

2010

-11

2011

-12

2012

-13

(RE

)

(Per cent)

103

Page 104: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Revenue Expenditure : Composition

104 / NN

2011-12 2012-13 (RE)

Salary & Wages

37%

Pension10%Interest

Payments14%

Subsidies9%

Others30% Salary &

Wages38%

Pension10%

Interest Payments

13%

Subsidies9%

Others30%

104

Page 105: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Plan Expenditure

105 / NN

(Rs. crore)

Expenditure includes CSS

19,9

98 25,6

92 33,2

56 37,5

07

4494

3

31,8

79

9,70

9

13,2

72

15,1

55

16,0

71

15,4

72

1700

0

48.6

37.8

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 (RE)

Year

Exp

endi

ture

0.0

10.0

20.0

30.0

40.0

50.0

60.0

Percentage

Total plan expenditurePlan capital expenditureCapital expenditure/Total plan expenditure (%)

41.3

105

Page 106: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

ADF

YearMilk (lakh MT) Eggs (crore) Meat (lakh MT)

Target Achieve-ment

Target Achieve-ment

Target Achieve-ment

2011-12 84.5 84.7 436 439 5.8 5.9

2012-13 85.4 85.4 438 438 5.9 5.9

Source: ADF, GoM

106 / 52106

Page 107: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Literacy Rates of Selected States (2011)

107 / NN

State2001 2011

Male Female Person Gender Gap Male Female Person Gender

GapAndhra Pradesh 70.3 50.4 60.5 19.9 75.6 59.7 67.7 15.9

Gujarat 79.7 57.8 69.1 21.9 87.2 70.7 79.3 16.5

Haryana 78.5 55.7 67.9 22.8 85.4 66.8 76.6 18.6

Karnataka 76.1 56.9 66.6 19.2 82.9 68.1 75.6 14.8

Kerala 94.2 87.7 90.9 6.5 96.0 92.0 93.9 4.0

Maharashtra 86.0 67.0 76.9 19.0 89.8 75.5 82.9 14.3

Punjab 75.2 63.4 69.7 11.8 81.5 71.3 76.7 10.2

Tamil Nadu 82.4 64.4 73.5 18.0 86.8 73.9 80.3 12.9

West Bengal 77.0 59.6 68.6 17.4 82.7 71.2 77.1 11.5

India 75.3 53.7 64.8 21.6 82.1 65.7 74.4 16.4

Source : Registrar General of India Back 107

Page 108: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Literacy Rates : Rural, Urban, State

108 / NN

Source Rural Urban State

M F All M F All M F All

Population Census 2001 81.9 58.4 70.4 91.0 79.1 85.5 86.0 67.0 76.9

All(NSS 2007-08)

82.2 63.3 73.0 93.0 82.8 88.2 86.6 71.0 79.1

Population Census 2011 86.4 67.4 77.1 93.8 85.4 89.8 89.8 75.5 82.9

(Per cent)

Back 108

Page 109: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Power : Non-Conventional Energy

109 / NN

500

2 ,807

3 ,408

4 ,198

4 ,546

2 , 000

2 , 500

3 , 000

3 , 500

4 , 000

4 ,

5 , 000M

W

2009

-10

2012

-13*

2010

-11

2011

-12

* - Upto Dec., 2012.

109

Page 110: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Industry: Mega Projects

Particulars

2011-12 2012-13No.

Investment

(Rs. Crore)

Employment

No.

Investment

(Rs. Crore)

Employment

Mega Projects Offer Letters (Since 2005)

82 87,741 56,307 56 40,912 31,244

MOUs signed 13 7,970 7,153 31 16,975 17,848

110 / NN

110/ NN

Page 111: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Industry: MSME

MSME

2011-12 2012-13No. Investment

(Rs. Crore)Employment (Lakh)

No. Investment(Rs. Crore)

Employment (Lakh)

Proposed 44,452 7,193 3.5 13,007 3,905 1.5

Functioning 15,606 4,443 2.1 14,738 4,331 1.6

111 / NN

111 / NN

Page 112: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Industry: FDI & Export

Particulars2011-12 2012-13

No. Investment (Rs. Crore)

Employment No. Investment(Rs. Crore)

Employment

FDI - 44,664 - - 40,909 -

Export from the State - 3,94,005 - - 3,54,582 -

112 / NN

112/ NN

Page 113: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Housing : JNNURM

Sub -Mission

Project Cost

Fund Released DUs completed

2011-12 2012-13 2011-12 2012-13 Cumulative till March 2013

BSUP 6,241 442.6 115.5 22,636 2,551 55,747

IHSDP 2,672 208.2 261.7 7,894 5,793 19,435

Total 8,913 650.8 377.2 30,530 8,344 75,182

(Rs. crore)

113/ NN

Page 114: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Geographical Area (GA) - 307 Lac ha

Cultivable Area (CA) - 225 Lac ha(73% GA)

Annual Rainfall - 400 to 6000 mm

Ultimate Potential

Through Surface Water - 85 Lac ha (38% CA)

Through Surface & G.W. - 126 Lac ha (56% CA)

Potential created 06/2012 - 49.26 Lac ha

Percentage of IP wrt. CA - 21.89 %

Percentage of IP wrt. ultimate potential - 58%

Status of Irrigation Potential

114 / NN114

Page 115: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

490450

370333

376453

416466

555

709746 765 762

195252

377 378448

413494

627673

803746

627 632

0

100

200

300

400

500

600

700

800

900

O&M cost(Establishment+M&R)Total Recovery

Am

ou

nt

Rs.

in

Cro

res

O&M Cost and Recovery

Back115 / NN

115

Page 116: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

There are 589 projects under construction through five Irrigation Development Corporations.

investment of about Rs.57,850 crore is made on these projects

Balance estimated cost of works of these projects is about Rs.72,000 crore.

Allocation for the irrigation sector increased from Rs. 1600 crore in 2003-04, to Rs.7,500 crore in 2013-14.

this increased allocation can only cater the price escalation.

On-going projects

116 / NN116

Page 117: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

AIBP

117 / NN

So far received Rs. 11069 Crore

Till now 69 projects/ project components of Major andMedium

Projects and 186 MI schemes included in this Programme

39 Major and Medium projects and 100 MI schemescompleted

Created 6.43 lakh ha. irrigation potential under AIBP

117

Page 118: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Strategy for completion of ongoing projectsIt is utmost important to give early benefits to the farmers, Dueto large balance cost and limited budgetary provisions, itbecomes difficult to complete the project or project components

A Committee has been appointed by the Government ofMaharashtra consisting of Principal Secretary Planning,Finance and Water Resources to decide the priority of projects

Emphasis is given for creation of irrigation potential / storagesand completion of project / project component accruing earlybenefits.

This has resulted in reduction in number of on-going projectsfrom 1092 in 2010-11 to 589 in 2013-14. It is planned complete140 projects during 2013-14.

118 / NN118

Page 119: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Permanent measures for mitigation of drought

119 / NN

State traditionally remained drought prone State

Almost 70% of the State’s Geographical Area lies in semi-aired region rendering it vulnerable to water scarcity.

Every year, some or other part of the State affected bydrought or drought like condition

To ameliorate the situation arising out of such droughtconditions, relief measures planned & State Governmentspends huge sum of money on relief measures

Taking permanent drought proofing measures is need ofthe hour

119

Page 120: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Permanent measures for mitigation of drought

120

A Central team under the chairmanship of Shri Alok Sikka,Technical expert, National Rainfed Area Authority, PlanningCommission, Government of India visited the scarcity areaof Pune division and Beed, Osmanabad Districts ofMarathwada division in June 2012

The Committee recommended Special Drought MitigationPackage of Rs.11783.6 crore for seven Districts of the State,namely Pune, Satara, Sangli, Ahmednagar, Solapur, Beedand Osmanabad

The Committee recommended completion of 27 projects (9Major, 7 Medium and 11 Lift Irrigation Schemes). Fast trackcompletion of these projects at a total cost of Rs. 6615.72crore will bring 3.17 lakh under irrigation. 120

Page 121: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

SrNo. Name of Corporation No of

Projects

Proposed funds

requirement

Irrigation Area to be created

(Rs. Cr.) (In Ha.)1 Maharashtra Krishna Valley

Development Corporation26 8680.21 430005

2 Godavari Marathwada Irrigation Development Corporation (RoM)

6 878.92 73272

3 Tapi Irrigation Development Corporation 26 1450.18 137198

Total (RoM) 58 11009.31 6404754 Maharashtra Krishna Valley

Development Corporation (Marathwada)1 160.13 7955

5 Godavari Marathwada Irrigation Development Corporation (Marathwada)

10 2878.43 86364

Total (Marthawada) 11 3038.56 94319TOTAL 69 14047.87 734794

Permanent measures for mitigation of drought

121

Abstract of proposed Central assistance under the droughtmitigation programme :.

121

Page 122: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

The funds allocated for the Irrigation Sector in Maharashtra State are distributed as per the formula prescribed by Hon’ble Governor of Maharashtra issued in the form of Directives. As per the directives the distribution of normal funds amongst the development boards is as below

Development Board

% of Distribution of funds

Total Funds required as per fomula

(Rs. in crore)

Rest of Maharashtra 51.81 11009

Marathwada 22.54 4790

Vidarbha 25.65 5451

Total 100.00 21250

Additional projects from Vidarbha and Marathwada to keep the proposal in consonance with the Hon’ble Governor’s directives. The estimated cost of these projects is Rs.5353 Cr. and Rs.1589 Cr. respectivly. The total cost of all the project is 14208 + 5453 + 1589 = Rs.21250 Cr.

Permanent measures for mitigation of drought

122122

Page 123: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

123 / NN123

Page 124: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Minority DevelopmentScholarship - Rs25,000 to 72,900 studentsSecond shift in 42 ITI and 2 new it is – covering 7099 studentsSecond shift in 12 Polytechnics – covering 2316 studentsAssistance to average 179 local bodies for infrastructure development20 girls hostel construction startedAround 1800 schools given infrastructure development Grants636 Anganwadis and 1500 Indira Awaj Houses taken up under GOI MSDPShare Capital of Maulana Azad Minorities Financial Development Corpi\enhanced from Rs 50 Cr to Rs .250 Cr and Rs. 139.78 Cr released underthe Plan period.Police pre-recruitment Training and UPSC exam training programmesHaj House constructed at Nagpur and sanctioned for AuranagbadScheme for setting up 2600 Self Help Groups of Minority women with SHGfederation structure sanctioned in 11 towns.

124

Page 125: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Proposals under the XII FYPInfrastructure development grant of Rs 10 lac for minority

concentrated villages approved – 440 villages in 2013-14

Scope and ambit of skilled dev to be expanded to 3 lac

beneficiaries

Training for UPSC, MPSC, Banking, profession studies –

CET to be expanded.

Madrassa Modernisation programme proposed

Financial limit of grants to municipal corporations for

infrastructure development to be enhanced substantially.

Minority Development

125

Page 126: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

18.5

20.4 20.0

17.5

20.1

23.1

26.2

20.5

0

5

10

15

20

25

30

2009 2010 2011 2012

Institution

Disposal

Cases instituted and disposed

Law and Judiciary (Cases in lakhs)

126

Page 127: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Substantial reduction in pendency

30.06.2010 31.12.2010 31.12.2011 31.12.20120

5

10

15

20

25

30

35

40

45

41.3539.04

32.7629.77

127

(Figures in lakhs)

Page 128: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Reduced pendency of 5/10 year old cases in last 2 years.

(Figures in lakhs)

4.43

2.84

8.73

4.67

0

1

2

3

4

5

6

7

8

9

10

30.06.2010 31.12.2012

10 Years oldBetween 5 to 10 years old

128/ NN

Page 129: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Cases under Section 138 of N.I. Act, 1881

(1 July 2010 to 31 December 2012)

Courts

Pendency on

1 July 2010

Institution Disposal

Pendencyon

31 December 2012

Courts of Metropolitan Magistrate, Mumbai

3.27 2.26 4.46 1.08

Other Courts in the State 3.77 2.59 4.04 2.32

Total 7.04 4.85 8.50 3.40

129

(Figures in Lacs)

Page 130: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Lok Adalats held & matters disposed of during last 3 years

Years Lok Adalats held (All Categories)

Total SetteledCases

No. of Beneficiaries

Jan. 2010 – Dec. 2010 3,470 1,19,958 2,45,174

Jan. 2011 – Dec. 2011 3,454 4,57,425 8,34,414

Jan. 2012 – Dec. 2012 2,887 5,97,123 10,11,565

Total 9,811 11,74,506 20,91,153130/ NN

Page 131: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Number of Judges Number of Cases(as on 05.03.2013)

Case load per Judge

2027 28.27 1424

Number of Judges Population Judge Population Ratio per million

2027 11.24 CroresOr

112.4 million

18 : 1

Judge- Population Ratio

131

Page 132: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Court Buildings in the State

Particulars Total Buildings In own premises

In rented premises

District Court s 34 32 2

Taluka Courts 339 256 83

Family Courts 10 6 4

Total 383 294 89

132

Page 133: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Court Buildings completed

Situated in no. of Districts

Total Cost(In Crores)

49(171 Court Halls)

22 164.46

Residential quarters

completed

Situated in no. of Districts

Total Cost(In Crores)

33(75 Res. Qtrs.)

16 14.15

Infrastructure Development in last 2 years

133

Page 134: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

No. of Court Buildings

Situated in no. of Districts

Total Cost(In Crores)

74(420 Court Halls)

28 430.78

No. of Residential quarters

Situated in no. of Districts

Total Cost(In Crores)

68(144 Res. Qtrs.)

26 35.24

Ongoing Projects

134

Page 135: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Total Court Buildings Till June 2013 Till December

2013 Till June 2014

74 30 30 14

Total Residential quarters Till June 2013 Till December 2013

148 70 78

Ongoing Projects of Court Complex and Residential quarters

(Expected period of completion)

135

Page 136: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

No. of Court Buildings

Situated in no. of Districts

Estimated Cost(In Crores)

37(150 Court Halls)

19 293.14

Proposals under consideration for administrative sanction

No. of Residential quarters

Situated in no. of Districts

Estimated Cost(In Crores)

76(337 Res. Qtrs)

25 95.62

Other works of Court Buildings & Residential qutrs.

Situated in no. of Districts

Estimated Cost(In Crores)

87 32 26.90

136

Page 137: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Utilization of Central & State Share

Sr. No.

Financial Year

No. of Court buildings

constructed in the State *

No. of Residential Buildings

constructed in the State **

Central Share

Utilized (Rs.in Lacs)

State Share Utilized

(Rs.in Lacs)

1 2007-08 66 40 1330.00 2670.00

2 2008-09 68 30 1517.00 4983.00

3 2009-10 64 15 1890.00 9677.00

4 2010-11 98 21 1458.52 10577.48

5 2011-12 105 42 5421.60*** 12034.06

6 2012-13 114 97 9862.85**** 11516.04

137

* It covers the court buildings of which work completed as well as the work in progress.** It covers the residential quarters of which work completed as well as the work in progress.*** Actually received Rs. 129.15 lacs from Central Government in this financial year 2011-12.**** Actually received Rs. 5920.24 lacs from Central Government in this financial year 2012-13.

Page 138: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Allocation proposed by Central Government (vide its letter No. J-1107/6/2010-JR, Dtd. 04/01/2012)

Name of the States/UT

No. of court

Complexes

Proposed allocation of funds year wise Total estimated

cost2011-12 2012-13 2013-14 2014-15 2015-16

Maharashtra 375 131.89 131.89 131.89 131.89 131.89 659.43

Gujarat 280 596.12 470.42 222.54 30.00 0.00 1319.08

Karnataka 32 143.19 143.19 143.19 143.19 143.19 715.93

Andhra Pradesh 145 169.72 169.72 179.39 179.39 179.39 877.62

138

It is necessary that the Central Government should increase its share for the State of Maharashtra and at least Rs.375 crore be allocated per year for next 5 years i.e. up to 2006-17.

Rs. In Crores

Page 139: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

e-Scholarship Being implemented since 2011Maintenance allowance credited to student’s accountTuition and other fees credited to the accounts of the concernedcollegesReceived e-Award for the years 2011-12 & 2012-13 from ComputerSociety of India

Social Justice

139

Page 140: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

E-Scholarship

SchemeExpenditure (Rs. Crore) Beneficiaries (‘000)

2010-11 2011-12 2012-13 2010-11 2011-12 2012-13

SC Scholarship 469 616 597 443 429 359

SC Free ship 71 152 77 32 60 29

VJNT Scholarship 283 239 265 233 202 198

OBC Scholarship 341 415 543 365 607 534

SBC Scholarship 106 76 80 89 69 41

VJNT Freeship 100 62 75 44 25 25

OBC Freeship 210 159 195 87 79 95 140

Page 141: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Year Beneficieries('000) Total Expdt.

Central Assistance Received

Balance Central Assistance

2009-10 786 274.9 25.9 244.72010-11 686 0 56.8 02011-12 878 137.7 61.2 72.12012-13 773 354 90.7 191.5

Since Inception Upto March 2013

5182 1721.2 282.2 1387.1

(Rs. Crore)Social Justice

141

Page 142: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Balance Central Assistance for OBC Scholarship from Government of India

The scheme was introduced for OBC students from the year 2001-2002.

The Income limit for scholarship is Rs. 1 lakh.

The Outstanding Central Assistance up to 2012-2013 is Rs.1387 crore (excluding State liability).

Social Justice

142

Page 143: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

RAMAI AWAS YOJANA (GHARKUL)

State level scheme for the BPL & APL Families of Schedule caste and Navbuddhas. The construction cost for one House is –

In Rural Area – 0.70 Lakhs In Municipal Council Area – 1.50 Lakhs In Municipal Corporation Area – 2.00 Lakhs

143 / NN

Page 144: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

YearTarget Completed Houses In progress Houses

Rural Urban Rural Urban Rural Urban

2010-11 68.5 25.0 7.3 0.4 - -

2011-12 121.6 64.3 73.2 9.3 - -

2012-13 57.6 28.4 36.3 2.0 46.4 23.0

Total 247.7 117.7 116.8 11.7 46.4 23.0

Ramai Awas Yojana (Gharkul)

Social Justice

144 / NN

Page 145: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Government Residential Schools for SC Boys and Girls

Policy decision to open residential schools in each taluka

100 residential schools were sanctioned in the first phase

66 Residential schools started functioning from 2011-12.

145

Page 146: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Government Hostels for SC Boys and Girls

The State Government is running 381 hostels for Boys and Girls

Intake capacity of these hostels per year is 33000

Lodging and Boarding, Clothes, beddings, books etc., are provided

Maintenance allowance per student per month is of Rs.500 to Rs.800

146

Page 147: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Requests from Agriculture Sector

Increased provision for micro-irrigation under NMMI.VIIDP to be included under NMSA and excluded from RKVY.Sikka Committee recommendations on drought proofing to be accepted.RKVY provision to be increased as MMA is discontinued.An outlay for promotion of FIG/CIG.A platform for PPP with convergence of GOI schemes be created.Agricultural marketing to be included for VGF by MoF

147 / NN

Page 148: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Micro-Irrigation in Maharashtra

50 lakh Ha under Micro-irrigation in the country.State’s share in area under micro-irrigation (15 lakh Ha) = 30%Support from GOI under NMMI for 1 lakh Ha / year. Current achievement by the State – 2.5 to 3 Lakh Ha / year.Special package requested to bring in 5 lakh Ha area per year.Support needed – Rs. 1500 Crore / year at least for remaining part of 12th Plan.

148 / NN

Page 149: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Environment

Delays in Environment Clearance due to• High Rise Office Memorandum• Action on violations• Moratorium in Ratnagiri and Sindhudurg• Kasturi Rangan Committee Report• Mines below 5 Hectares in Environment Clearance.

149 / NN

Page 150: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Achievements

• Only State which has a RRZ River Regulatotion• Environment awareness-

- Environment Service Scheme in schoos- Call for Green Ideas – Environment protection with community participation.

• Certificate Course in Waste Water Treatment Plant Operator

• Environment Research sponsored in technical institutions

• Environment Status Report in all districts – an inventory of natural resources

• Environment Information Centers – in all districts 150 / NN

Page 151: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

.

Environment Management-• Need increased focus on Waste Water

Treatment• Larger outlay for Natural River Action Plan

and National Lake Conservation Programme• River Basin wise Action Plan need technical

and financial support • Environment Awareness – requires focus

and funds• Solid Waste Management

Expectations

151 / NN

Page 152: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Power: Capacity Addition (MW) 1

966510366

12446

Thermal, 18836

34084198

4609Renewable 5164

30663066 3066 Hydro 3066

2714 2740 2740 Natural Gas , 2740

53765792

6307

Central Sector Allocation, 6627

2422926162

29168

Total , 35363

-3000

2000

7000

12000

17000

22000

27000

32000

37000

0

2500

5000

7500

10000

12500

15000

17500

20000

2010-11 2011-12 2012-13 2013-14

Cap

acit

y (M

W)

Financial Year

152152 / NN

Page 153: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Transmission and Distribution Losses30.97 29.64

25.8522.33 21.31 20.71

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

2007-08 2008-09 2009-10 2010-11 2011-12 2012-13

AT

& C

Los

s

Financial Year

AT & C Loss

Collection

153

Category

FY 2010-11 FY 2011-12 FY 2012-13

Demand (Rs.Crs.)

Collection (Rs.Crs.)

% Collection Efficiency

Demand (Rs.Crs.)

Collection (Rs.Crs.)

% Collection Efficiency

Demand (Rs.Crs.)

Collection (Rs.Crs.)

% Collection Efficiency

Residential 5976 5896 99 6650 6469 97 8516 8249 97

Commercial 4630 4637 100 4952 4917 99 6448 6247 97

Industrial 2221 2292 103 18484 18497 100 20931 21075 101

AG 865 571 66 1297 751 58 1865 410 22

153 / NN

Page 154: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Power AvailabilityEnergy Shortage in 2005 – 18%Energy Shortage in 2013 – 3%24 x 7 Power to industryAgriculture - 8 hrs/10hrsTargeted Load shedding - Out of 7,754 feeders, 6,339 feeders are load shedding free. 82% Maharashtra no load shedding.Load shedding only on feeders where Distribution and Commercial loss is above 42%.Average revenue up by around 10-20% in high loss areas.

154154 / NN

Page 155: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Targeted Load Shedding

5401 5444 5496 5502 5515

59225994 5932 5991

6111

6339

4800

5000

5200

5400

5600

5800

6000

6200

6400

6600

Feed

ers

Total feeders - 7754

Month

155155 / NN

Page 156: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Electricity Tariffs (2012-13)Average Power Purchase Cost - 3.39 Rs./unitCost of Supply - 5.56 Rs./UnitNo. of

ConsumerAmount

Rs.Crs2012-13 2012-131 Industrial (LT and HT) 347,262 6,363 2 Commercial (LT and HT) 1,265,407 1,933 3 Others * 2,567,279 1,210

4 Total 1,868,948 9,506

No. of Consumer

Amount Rs.Crs

2012-13 2012-131 Domestic (LT) 16,474,882 1,008 2 Agriculture (LT and HT) 3,459,790 6,935 3 Others $ 194,983 1,563 4 Total 20,129,655 9,506

DETAILS OF SUBSIDIZING CONSUMERS

DETAILS OF SUBSIDIZED CONSUMERS

Category

Sr. No.

$ Others include HT-PWW, HT-Bulk Supply, LT-Street Light, LT-PWW, Mula Pravara and Bhivandi Franchisee

Category

Sr. No.

*Others include HT-Railway, LT Advertising, LT-Temporary and Standby charges

• Ag. Tariff raised from average of 50 paise per unit to Rs. 1 per unit in 2012-13• Ag. Consumers horse power (HP )on record increased by 34,39,790 HP (23%)over Three years 156156 / NN

Page 157: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

R-APDRPPart-A : 130 Towns at estimated cost of Rs. 324 Crs61 Towns completed and energy audit done.Current Network DigitizedPart-B : 120 Towns at estimated cost of Rs. 2,927 Crs. Work Started, 20% completed.Aim : Reduce lossImprove ReliabilityRelease Connections157157 / NN

Page 158: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

InfrastructureInfra-ITotal cost Rs. 9,014 Crs. 596 Substations added67,418 Distribution transformer added

• Distribution Transformer Failure rate reduced from 16.14% in FY 2005-06 to 5.68% in FY 2012-13. Infra-IITotal Cost Rs. 6,500 Crs., To be completed in 3 years.Connections to release in 3 years Total – 31.60 LakhsAgriculture – 4.80 LakhsResidential – 24.63 LakhsCommercial – 1.80 LakhsIndustrial - 0.36 Lakhs

158158 / NN

Page 159: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Consumer Focus1. Centralized Call Center2. Online connection release system3. Web based payment facility 4. Automatic Teller Payment (ATP) Machines (101 nos. installed in FY 2012-13)5. Real Time Gross Settlement (RTGS)6. IR/RF Meters (Around 22% rise in revenue) 7. Automatic Meter Reading (AMR)1. HT Consumers – 15,833 Meters2. LT Consumers – 4,102 Meters8. Consumer Facilitation Center

159159 / NN

Page 160: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Linkage materialization overall only 71.61%, MCL is 44.5 %Implementation Problems at Machakatta Odisha, Tapering linkage for 2 x500 Chandrapur 3 x 660 Koradi, 1 x 250 Parali, needed.Improve rail corridor to move Orissa Coal, availability.Dabhol 1967MW (7.6 MMSCMD, KG Basin & 0.9 MMSCMD, ONGC) notavailable.Uran gas plant of 672 MW running at 400 MW. Average gas supply is 1.9 to2.3 instead of 3.5 MMSCMD.

Primary Fuel Issues

160160 / NN

Page 161: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Highlights

•Out of 100600 habitations, 89300 habitations have full coverage ofdrinking water supply as on 31.3.2013

•98% of the 40900 pipe water schemes are operated and maintained byPRIs

•State has decided to link all habitations and drinking water sources withCensus Code

•State has 129 laboratories for testing of water sources and this will beenhanced to 169 in next couple of months. With this infrastructure, it willbe possible to test all sources thrice a year

•State has set up an autonomous body “ MEETRA” as centre forexcellance for water supply and sanitation.

161 / NN

Page 162: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

DemandsTo tackle recurrent problem of drought strengthening of water sources is important. For this

purpose it is proposed to increase outlay for sustainability under National Rural Drinking

Water Programme from 10% to 15%.

To rationalise water usage it is proposed to include metering as part of project cost under

National Rural Drinking Water Programme with 100% grant from Government of India.

For better utilisation of assets created it is proposed to increase outlay for Operation and

Maintainance from 15% to 20% under National Rural Drinking Water Programme.

100% saturation approach for Individual Household Latrines under “ Nirmal Bharat Abhiyan”

has adversely affected the programme. It is proposed to allow Individual Household Latrines

programme to be taken in all GPs.

162 / NN

Page 163: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Expectations from GoINorms for release of next ACA installments be relaxed frompresent 70 % expenditure of last installment to 50 %Cost Norms of Dwelling Units for in-progress IHSDP projectsto be revised to Rs. 1.50 Lakhs.Special Criteria for Environmental Clearances of SlumRedevelopment ProjectsUn-utilised ACA with State Government be allowed to be re-appropriated for construction of EWS/LIG Housing by StateHousing Authority.Extension of Mission Period for IHSDP and BSUP projects upto 31st March 2015 on the backdrop of Severe Drought

163 / NN

Page 164: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

High Early Primary Drop out Rate at Ahmadnagar , Beed & Jalana

DISE 2006-07 DISE 20011-12

Ahmadnagar - 2.9 Ahmadnagar - 0.3

Beed- 5.7 Beed- 4.9

Jalana- 6.3 Jalana- 3.3

Date: 164 / NN 164 / NN

Page 165: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Environment• Environment clearance required, if built-up area is more

than 20,000 sq. mt.• Problems of establishing industries in Western Ghats • Implementation of Dr. Kasturirangan Committee

recommendations for industrial development of Western Ghats

165 / NN

Page 166: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

NH Length - 5616 km

Road length proposed for upgradation as NH - 6026 km*

Comparison of NH road length with other States :-

National Highways in the State

Name of the State Area in sq.km. NH Length in kms

NH Length per 100 sq.km.area

Bihar 94163 4,106 4.36

Uttar Pradesh 240928 7,818 3.24

Karnataka 191791 4,396 2.29

Gujarat 196024 4,032 2.06

Maharashtra 307713 5,616 1.83

Andhra Pradesh 275069 4,537 1.65

Madhya Pradesh 308144 5,064 1.64

*

• Request to notify proposed 6026 km as new NH in Maharashtra.

• National average of NH is 2.43 km per 100 sq.km.

• Maharashtra state average will be 3.78 km per 100 sq.km. after declaration of proposed 6026 km as NH.

166 / NN

Page 167: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Additional

167 / NN

Page 168: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Agenda

State Economy

State Public Finance

Annual Plan 2013-14

Sectoral Issues

State’s expectations

168 / 52168

Page 169: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

GSDP

GSDP & GDP : Growth Rates

Per Capita Income : Selected States

State Economy

169 / 52169

Page 170: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Own Tax Revenue : Growth Rates

Taxation Measures

State’s Debt Stock

State Public Finance

170 / 52170

Page 171: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Taxation Measures

More efficient tax collection by automation of

Sales Tax Department

Establishment of cyber forensic laboratory to

detect tax evasion

Contd.. 171 / 52171

Page 172: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Sectoral XII FYP and Annual Plans

Financing: XII FYP & Annual Plans

Annual Plan 2013-14

172 / 52172

Page 173: Presentation on Annual Plan 2013-14 - Planning …planningcommission.nic.in/plans/stateplan/Presentations...Power: Capacity Addition Source As on 31st March Expected in 2013-14 2012

Agriculture

ADF

Irrigation

MGNREGA

Power

Roads / Rural Roads

Railway, Ports & Airports

Industries

Textile

Housing

Health, Women &

Child Development

Water Supply &

Sanitation

Education

Urban Infrastructure

Sectoral Issues

173 / 52173