14
Presentation on City infrastructure improvements planned for CWG 2010 by Government of NCT of Delhi Timelines for various projects

Presentation on City infrastructure improvements planned for CWG 2010

Embed Size (px)

DESCRIPTION

Presentation on City infrastructure improvements planned for CWG 2010 by Government of NCT of Delhi Timelines for various projects. - PowerPoint PPT Presentation

Citation preview

Page 1: Presentation on City infrastructure  improvements planned for CWG 2010

Presentation on City infrastructure improvements planned for CWG 2010

by Government of NCT of Delhi

Timelines for various projects

Page 2: Presentation on City infrastructure  improvements planned for CWG 2010

• Govt. of NCT of Delhi had earlier demanded funds to the tune of Rs. 1314.40 Crores for improving infrastructure, for example connectivity, traffic management and parking, power, health care, civic amenities and general arrangements in Delhi .

• After meeting with Minister MYAS and Secretary MYAS this amount has been brought down to Rs. 770 Crores.

• The remaining schemes of Rs. 582.20 Crores will be undertaken in the regular Plan Schemes of GNCTD.

• The Planning Commission has given its approval for Rs. 770 Crores.

• The role of private sector participation is being explored in following fields :

i) Radio Taxisii) Parking on BOT basisiii)Improvement of bus fleet operated by private operators

Page 3: Presentation on City infrastructure  improvements planned for CWG 2010

Public Works Department

S.NO Scheme Cost of work (Rs.in Crores)

Present status of work

Date of award of work

Date of completion

Remarks

1. Bypass at Massodpur & Mahipalpur (3.7 Kms.)

30.00 Proposal for both the bypasses submitted to TC-DDA on 1/06 for approval; EFC by 08/06, tender floating 09/06

12/06 12/08

2. Tunnel by pass Connecting NH 24/ Ring Road intersection and Neela Gumbad near Nizummdin (2.2 kms.)

135.00 DPR by 2/07. Reports received from Geometric design consultants & sent to various deptts., designs to be finalized May 07, clearances required from TC, DDA, ASI, DUAC before Oct. 06

May 2007 Dec. 2009

Page 4: Presentation on City infrastructure  improvements planned for CWG 2010

Municipal Corporation of Delhi

S.NO Scheme Cost of work

Present status of work

Date of award of work

Date of completion

Remarks

1. Railway under bridge near Vivek Vihar

40.00 Cleared by technical committee, DDA; estimates finalised

03/07 03/09 To be executed by MCD/ Railways, date of award-March 07

2. Improvement

i) JLN Marg from Ring Road to Thompson Marg

ii) Mehrauli Gurgaon Road

iii) Roads near Siri Fort & Asiad Village Complex

4.55 Already approved by Corporation

04/08

04/09

March 2010

-do-

Page 5: Presentation on City infrastructure  improvements planned for CWG 2010

Municipal Corporation of Delhi

S.NO. Scheme Cost of work

Present status of work

Date of award of work

Date of completion

Remarks

1. Improvement of surrounding of Old and New Delhi Railway Station, improvement of parking area, bus stand

5.00 Already approved by Corporation; estimates finalized

04/08 03/10 -

2. 50 Mechanical sweeper,fancy dustbins, fluorescent overcoats

15.00 Already approved by Corporation

04/08 -09 03/10 -

3. Face lifting and beautification by Horticulture Deptt.

5.00 - 08-09 03/10 -

Page 6: Presentation on City infrastructure  improvements planned for CWG 2010

Transport department

S.NO. Scheme Cost of work

Present status of work

Date of award of work

Date of completion

Remarks

1. 1100 new modern air conditioned /deluxe/mini buses for participants/ managers/officers and for park & ride facility

260.00 Finalization of tender date, details, designs, specifications being done.

2008-09 March 2010

2. Renovation/ dev. of ISBTs .

Dwarka

Kashmiri Gate

Anand Vihar

Narela

Sarai Kale Khan

10.00

Tenders ready

DPR 04/07

DPR 06/07

DPR 06/07

DPR 03/07

10/06

10/07

12/07

12/07

04/08

04/09

07/09

12/09

03/09

Temporary ISBT Sarai Kale Khan is ready (PWD)

Page 7: Presentation on City infrastructure  improvements planned for CWG 2010

Health & Family Welfare

S.NO. Scheme Cost of work

Present status of work

Date of award of work

Date of completion

Remarks

1. Setting up 12 health posts

6.00 - 07/09 March 2010 Setting up of first post at each stadia

2. Poly clinic at Games Village

4.00 Putting up proposal for SFC

04/08 March 2010

3. Ambulance Services 5.00 - 04/09 March 2010 Procurement of ambulances by 2009

4. Upgradation of GTB, LBS,DHAS,Malviya Nagar, AAA Hospital/ Sushruta Trauma centre

31.00 Expecting proposals from different hospitals for upgradation

04/08 March 2010 Target to be fine tuned.

5. Training/disaster preparedness

3.00 Training to trainees Sep.-Oct. 2006; 702 trainees to be trained

Oct. 06 March 2010 Training on basic emergency, disaster management; the trainees will be kept ready.

Page 8: Presentation on City infrastructure  improvements planned for CWG 2010

New Delhi Municipal Council

S.NO. Scheme Cost of work

Present status of work

Date of award of work

Date of completion

Remarks

1. Upgradation of Talkatora Stadium & Shivaji Stadium

14.20 Statutory approval to be applied by 10/06

02/07 03/09 Approval expected by 12/06 & inviting tender bids by 01/07

Consultant appointed & EKS to give detailed technical specification

2. Improvement of major road around stadia

19.55 Proposal to DUAC by 01/07

03/07 03/09 -

-

3. Upgradation of Central Vista and its environs

To be finalized

Proposal to be submitted to DUAC by 01/07

08/07 12/09 Approval expected by 04/07.

Page 9: Presentation on City infrastructure  improvements planned for CWG 2010

Delhi Jal Board

S.NO. Scheme Cost of work

Present status of work

Date of award of work

Date of completion

Remarks

1. Upgradation of water supply at

I.G. Stadium

Ambedkar Stadium

Chattersal Stadium

JLN Stadium

Sirifort Stadium

DLTA Stadium

1 MGD STP

16.50 Clearance received from Technical committee

Tender recd.for consultant

06/2008

06/2009

06/2009

04/2007

06/2008

06/2008

04/2007

9/2008

9/2008

09/2009

01/2008

12/2008

03/2009

03/2009

Additional demand is being received from concerned authority

2. 1 STP 23.50 Apptt. of consultant to be initiated

04/2007 03/2009 Land is yet to be allotted.

Page 10: Presentation on City infrastructure  improvements planned for CWG 2010

Education Department

S.NO. Scheme Cost of work

Present status of work

Date of award of work

Date of completion

Remarks

1. Tyagraj Nagar Sport Complex Net Ball

35.00 Bid for design consultants invited. Consultant to be finalized by 10/2006

March 2007 March 2009 PWD is constructing the stadium.

Details of technical required to be provided by EKS/OC

2. Chhatrasal Stadium (Training venue)

5.00 - - - Decision whether the stadium is to be remodeled or only improvements are required, is to be taken

Page 11: Presentation on City infrastructure  improvements planned for CWG 2010

State Plan Flyovers / Bridges providing connectivity to Games Village / Venues / Hospitals

• 1 (A) Flyovers Cost Connectivity Completion Date (Rs. Cr.)

1 ITO Chungi (underpass) 70 Games Village to IG Stadium 12/08

2 Rao Tula Ram Marg 40 Airport to Village/Venues12/08

3 R.K. Puram / 40 --do— 12/08

Nelson Mandela Marg

4 Africa Avenue / 40 --do— 12/08

Aruna Asaf Ali Road

5 Neela Haus on 50 --do-- 03/08

Aruna Asaf Ali Road

Page 12: Presentation on City infrastructure  improvements planned for CWG 2010

Flyovers at Cost Connectivity Completion Target (Rs. Cr.)

6 Geeta Colony Bridge 130 Games Village to I.G. Stadium, 02/08

7 Raja Ram Kohli Marg 35 Chhatarsal Stadium & Delhi 12/08

8 Shastri Park Pushta 40 University Sports Complex 12/08

(Disused canal)

9 BSZ Marg 150 Games Village /Venues to LNJP & 12/09G.B. Pant Hospital

10 Ring Road bypass 200 Games Village to I.G. Stadium, 03/09

Salimgarh Fort to Chhatarsal Stadium & Delhi

Velodrome Road University Sports Complex

(Shantivan & Rajghat)

11 Elevated East West 325 Games Village to Talkatora 12/09

Corridor from Games & Shivaji Stadium

Village to Rajiv Chowk

Total 1120

All the above flyovers are six lane except Geeta Colony Bridge which is 8 lane corridor.

Contd…

Page 13: Presentation on City infrastructure  improvements planned for CWG 2010

Flyovers / Bridges for intracity connectivity

• Flyovers at Cost

(Rs.Cr.)1. Naraina 1252. Shastri Park 403. Azadpur 1204. Mangolpuri 405. Mukerba Chowk 2006. ISBT Anand Vihar & NH-24 near (Gazipur drain) 907. Shyamlal College 408. Apsara Border 509. U P Link Road on NH-24 crossing 6010.Nangloi 8011.Behra Enclave 3012.Road over bridge on Road no.63 3513.Road under bridge connecting road no. 58 & 64 35

Total 945

These flyovers will be completed progressively by Dec. 2009

Page 14: Presentation on City infrastructure  improvements planned for CWG 2010

Thank You