REHABILITATION PROCESS FOR
NEW TOWNSHIP, SILIGURIKAWAKHALI - PORAJHAR
NEW TOWNSHIP PROJECT LAND AREA
PROJECT LAND AREA IN MOUZA MAP
DETAILS OF REHABILITATION PACKAGE
Have Get
House on > 10 katha retained land
5 katha developed plot
5 – 10 katha retained land
3 katha developed plot / 750 Sq.ft flat
> 2 katha and < 5 katha retained land
2 katha developed plot / 500 Sq.ft flat
1 decimal – 2 katha retained land
1.5 katha developed plot / 380 Sq.ft flat
DETAILS OF REHABILITATION PACKAGE
Have Get
Squatters on vested land
2 katha developed plot
Upto 20.5 katha retained land in a single deed of members of different families
Proportionate plot category wise
Joint deed in a single family
plot for one and flat for others
Other affected families with retained land, through lottery
Flats in respective category
DETAILS OF REHABILITATION PACKAGE
CATEGORY PRICE
Upto 2 Katha developed plot
Nil
More than 2 Katha developed plot
LA Cost for above 2 Katha portion
For B.P.L./Economically Weaker
Nil
380 Sq.ft flat Rs.75,000/-(Rs.197/-per Sq.ft )
500 Sq.ft flat Rs.2,00,000/-(Rs.400/-per Sq.ft )
380 Sq.ft flat Rs.3,00,000/-(Rs. 400/-per Sq.ft )
COMPENSATION FOR STRUCTURECATEGORY COMPENSATION
Structures on retained land before 2004
Compensation by LA Dept
Structures on retained land after 2004
Compensation by SJDA directly
Kuchha house / Bamboo wall & Tin shed on vested land
Rs. 5000.00
Above and pucca toilet on vested land
Rs. 10000.00
Kuchha wall, R.C.C foundation & Tin shed on vested land
Rs. 12000.00
Pucca wall & Tin shed on vested land
Rs. 20000.00
Shifting Cost Rs. 4000.00
OTHER BENEFITS
CATEGORY/TYPE COMPENSATION
Consent Award 10% of LA Compensation
Building Grant for BPL /poor allottee
Rs. 80000.00
compensation for occupiers of vested land/ Unregistered bargadar
60% land value (LA Cost)
Shop for shop owners identified by the survey 2007
at construction cost
Stamp Duty & Registration charge for land registration
Nil
SOCIAL FACILITIES
Education grant / scholarship
Reimbursement of medical treatment cost
Vocational training for one member of intending family
Old age pension for BPL landowners > 65 years
Identity card to each affected families
Shop for dependant family member like mentally retarded or physically handicapped child
Shop for unmarried daughter over the age of 35 years or widow or married daughter deserted by her husband
Supply of building materials through Co-operatives
DETAILS OF REHABILITATION PLAN
REHABILITATION PLAN REVISED
DETAILS OF MASTER PLAN
Small commercial plots 1.98 acre
Parks and open space 5.80 acre
Area for group housing 3.01 acre
Market Complex 2.11 acre
Haat / Sit —out commercial 0.93 acre
Health care Education facilities 12.35 acre
Roads balance
Total 80.06 acre
DETAILS OF MASTER PLAN
Residential plots
No. of Units
1st & 2nd phase
For 3rd phase
Vacant
A 1.5 katha
149 43 11 95
B 2.0 katha
462 380 59 23
C 3.0 katha
281 181 98 2
D 5.0 katha
05 05 Nil Nil
DETAILS OF LAND ACQUISITION / SETTLEMENT
Land area of Township
a) Jalpaiguri District 208.87 acre
i) Retained land 180.88 acre
ii) Vest land (acquired) 27.99 acre
iii) Total L.A Cases 25
b) Darjeeling District
i) Retained land 82.26 acre
ii) Vest land (to be settled) 12.35 acre
iii) Total L.A Cases 3
DETAILS OF LAND ACQUISITION / SETTLEMENT
Compensation deposited with Collector by SJDA
a) Jalpaiguri District Rs. 30,84,52,034/-
b) Darjeeling District Rs. 12,20,32,770/-
Compensation disbursed by Collector to Land Owners
a) Jalpaiguri District Rs. 18,55,25,013/-
b) Darjeeling District Rs. /-
DETAILS OF LAND ACQUISITION / SETTLEMENT
Nos. of affected retained Land Owners families (as per award)
a) Jalpaiguri District 879
b) Darjeeling District 974
Nos. of affected families given compensation (as per award)
a) Jalpaiguri District 724
b) Darjeeling District 677
Nos. of pending cases (not disbursed)
a) Jalpaiguri District 155
b) Darjeeling District 297
DETAILS OF LAND ACQUISITION / SETTLEMENT
Court case (area affected)
a) Jalpaiguri District 31.58 acre
b) Darjeeling District 4.30 acre
Nos. of persons involved in court case
a) Jalpaiguri District 148
b) Darjeeling District 49
Payment / package taken by persons involved in court case
a) Jalpaiguri District 84
b) Darjeeling District 23
DETAILS OF LAND ACQUISITION / SETTLEMENT
Occupiers on vest / patta land (settled)
a) Jalpaiguri District 84
b) Darjeeling District 119
Occupiers on vest land (given compensation)
a) Jalpaiguri District 15
b) Darjeeling District 15/
Further claims on vested land (not settled)
a) Jalpaiguri District 48
b) Darjeeling District 15
DISBURSEMENT OF PACKAGE BENEFITS
Affidavit submitted to accept package
a) Jalpaiguri District 545
b) Darjeeling District 361
c) Vest / patta 166
Consent award taken
a) Jalpaiguri District 545
b) Darjeeling District 361
School / college education grant disbursed – 633
Higher education grant disbursed – 28
Health grant disbursed – 51
Old age pension disbursed - 9
DISBURSEMENT OF PACKAGE BENEFITS
Allotment of plots
a) 1st & 2nd phase lottery 609
b) possession handed over 470
c) various problems in 126
handing over in possession
d) allotment letter issued but 168
lottery not done
e) Affidavit submitted for plots 80
requires verification
DISBURSEMENT OF PACKAGE BENEFITS
House building grant disbursed
a) upto Rs. 20,000/- ???
b) upto Rs. 60,000/- ???
c) upto Rs. 80,000/- ???
Structure compensation 156 nos.
Shifting charge 130 nos.
Identity card issued
a) Jalpaiguri District 564
b) Darjeeling District 462
c) Occupiers on vest / patta lands ???
FACILITIES & INFRASTRUCTURE IN REHABILITATION AREA
Streets & Roads: 3 categories (10M , 7.5M, 6M wide) 6.780 K.M.– Rs. 594.93 lakh
Land Development: Rs. 138.70 lakh
Peripheral and Internal Drainage: Rs. 300.00 Lakh
Safe Drinking Water: by PHE, street points
Electricity: Rs. 213.00 lakh, 204 street light, LT & HT infrastructure
Protection of embankment of River Balason
LOTTERY ON 10.08.2008
LOTTERY ON 26.07.2009
LAND DEVELOPMENT
Houses Built on Rehabilitation Plots
Infrastructures provided
Infrastructures provided
Thank YouThank You