26
www.gov.uk/hs2

Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

  • Upload
    others

  • View
    21

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

www.gov.uk/hs2

Page 2: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

• HS2 overview

• Design vision

• Policy drivers

• Flood risk management aims and approach

• Case study from Phase 2a (Fradley to Crewe)

• Integrated assessment and design approach

• Application of the new climate change guidance

• Conclusions

Presentation structure

Page 3: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

• High speed rail link between London, Birmingham, Leeds and Manchester

• Phase 1 – London to West Midlands

• Phase 2a –West Midlands to Crewe

• Phase 2b –West Midlands to Leeds and Crewe to Manchester

Page 4: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

4

Page 5: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

HS2’s sustainability themes

Spreading the benefits:Economic growth and community regeneration

Opportunities for all:Skills, employment and education

Safe at Heart:Health, safety and wellbeing

Respecting our surroundings:Environmental protection and management

Standing the test of time:Design that is future-proofed

Page 6: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Resilience - Build a network which is resilient for the long term and seek to minimise the combined effect of the project and climate change on the environment.

Sustainability Policy

Page 7: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

• a revised requirement to assess the impacts of projects on climate change (for example, greenhouse gas emissions) and the vulnerability of projects to climate change; and

• the need to consider the vulnerability of major infrastructure projects to major accidents and/or natural disasters and consequential significant adverse effects on the environment.

EIA Directive 2014/52 EU

Page 8: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Other relevant policy and guidance

Page 9: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Flood risk management aims

Page 10: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

• Reductions or increases in flood conveyance.

• Losses of floodplain storage.

• Interference with existing flood defence and land drainage infrastructure

• Disruption to surface and groundwater flows

• Increases in surface water run-off

Key potential impacts considered

Page 11: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

• Assess

• Avoid

• Substitute

• Control

• Mitigate

Approach to flood resilience

Page 12: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Asset performance

12

From “Flood resistance and resilience for critical infrastructure”, CIRIA Publication C688, McBain et al, 2010

Page 13: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Flood risk and resilience design principles

• HS2 itself protected from a 1 in 1,000 (o.1%) annual probability flood from any source;

• No increase in flood risk. Where impacts are anticipated these are assessed using hydraulic modelling and mitigation is developed to avoid significant effects, where reasonably practicable;

• Design makes an explicit allowance for climate change to beyond 2080, using latest EA guidance.

Page 14: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

HS2 Phase 2a (West Midlands to Crewe)

• 60 km route

• Xx watercourse crossings

• Xx SW flowpaths

Sequential approach adopted to route selection

River Lea

Crewe

Stoke on Trent

Lichfield

Stafford

Page 15: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Impact magnitude definitions

Page 16: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Receptor flood vulnerability analysis

Taken from draft Phase 2a SMR

Page 17: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Climate change guidance – Feb 2016

Page 18: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Application

18

• Selection of appropriate allowances depending on location and vulnerability of receptors (including HS2 itself) potentially affected;

• Use of zones in EA Flood Maps for Planning (Rivers and Sea) to identify receptor location, where this determines the appropriate allowance;

• Receptor vulnerability as defined in SMR and aligned with NPPF;

• The H++ scenario used to assess performance of the scheme beyond the furthest time horizon of the UKCP09.

Page 19: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Application of the new allowances - rivers

19

River basin district Allowance category Allowance

Humber H++ 65%

Upper end 50%

Higher central 30%

Central 20%

North West H++ 95%

Upper end 70%

Higher central 35%

Central 30%

Flood Zone 2 Essential infrastructure Upper end

Highly vulnerable

More vulnerable Higher central

Less vulnerable Central

Water compatible Central

Flood Zone 3a Essential infrastructure Upper end

Highly vulnerable

More vulnerable

Less vulnerable Higher central

Water compatible Central

Flood Zone 3b Essential infrastructure Upper end

Highly vulnerable

More vulnerable

Less vulnerable

Water compatible Central

Flood Zone Vulnerability (NPPF) Uplift

Page 20: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Climate change allowances for runoff attenuation & surface water flowpaths

• Standard uplifts used for cross drainage on catchments less than 5km2 regardless of receptors present;

• 40% (Upper End) uplift in peak rainfall intensities adopted for all SuDS facilities.

20

Page 21: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Example schedule with receptors and uplifts

21

NB for illustrative purposes only

Page 22: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Fradley to Colton

NB for illustrative purposes only

Page 23: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach
Page 24: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Flood

vulnerability of

receptor

Magnitude of impact on peak flood levels

Negligible

(< +/- 10mm)

Minor

> 50mm < 100mm

Moderate

> 10mm < 50mm

Major

> 100mm

Very high Negligible - not

significant

Moderate adverse

– significant

Major adverse -

significant

Major adverse –

significant

High Negligible - not

significant

Moderate adverse

– significant

Moderate adverse -

significant

Major adverse –

significant

Moderate Negligible - not

significant

Minor adverse -

not significant

Moderate adverse -

significant

Moderate adverse -

significant

Low Negligible - not

significant

Negligible - not

significant

Minor adverse - not

significant

Minor adverse - not

significant

Reporting flood risk effect significance

Page 25: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Conclusions

• The approach to assessment and design should ensure a level of resilience suitable for this important piece of proposed CNI;

• Impact magnitude and receptor vulnerability analysis aids the development of appropriate mitigation;

• New climate change guidance promotes a risk based approach, with H++ sensitivity analysis providing a useful means of assessing the consequence of design exceedance scenarios;

• Now a tried and test methodology that can be adopted on the whole of HS2 Phase 2.

25

Page 26: Presentation title HS2 - Flood & Coast€¦ · •Flood risk management aims and approach •Case study from Phase 2a (Fradley to Crewe) •Integrated assessment and design approach

Questions?