Presentation to the Portfolio Committee on Water and
Environmental Affairs
02 September 2009
1
Department of Water Affairs: Gauteng Regional Office
Support Provided to Local Government
Contents
2
• IntroductionGauteng ProfileWater Security
• Overview of past achievements in support to Local Government
• Department of Water Affairs Institutions in Water Services Provision
• Overview of Department of Water Affairs planned Interventions
• High Level Challenges and Possible Interventions
Introduction
3
M e r a f o n g C i t y M e r a f o n g C i t y M e r a f o n g C i t y M e r a f o n g C i t y M e r a f o n g C i t y M e r a f o n g C i t y M e r a f o n g C i t y M e r a f o n g C i t y M e r a f o n g C i t y [ C B L C 8 ][ C B L C 8 ][ C B L C 8 ][ C B L C 8 ][ C B L C 8 ][ C B L C 8 ][ C B L C 8 ][ C B L C 8 ][ C B L C 8 ]
W e s t o n a r i a W e s t o n a r i a W e s t o n a r i a W e s t o n a r i a W e s t o n a r i a W e s t o n a r i a W e s t o n a r i a W e s t o n a r i a W e s t o n a r i a [ G T 4 1 4 ][ G T 4 1 4 ][ G T 4 1 4 ][ G T 4 1 4 ][ G T 4 1 4 ][ G T 4 1 4 ][ G T 4 1 4 ][ G T 4 1 4 ][ G T 4 1 4 ]
E m f u l e n i E m f u l e n i E m f u l e n i E m f u l e n i E m f u l e n i E m f u l e n i E m f u l e n i E m f u l e n i E m f u l e n i [ G T 4 2 1 ][ G T 4 2 1 ][ G T 4 2 1 ][ G T 4 2 1 ][ G T 4 2 1 ][ G T 4 2 1 ][ G T 4 2 1 ][ G T 4 2 1 ][ G T 4 2 1 ]
R a n d f o n t e i n R a n d f o n t e i n R a n d f o n t e i n R a n d f o n t e i n R a n d f o n t e i n R a n d f o n t e i n R a n d f o n t e i n R a n d f o n t e i n R a n d f o n t e i n [ G T 4 1 2 ][ G T 4 1 2 ][ G T 4 1 2 ][ G T 4 1 2 ][ G T 4 1 2 ][ G T 4 1 2 ][ G T 4 1 2 ][ G T 4 1 2 ][ G T 4 1 2 ]
L e s e d i L e s e d i L e s e d i L e s e d i L e s e d i L e s e d i L e s e d i L e s e d i L e s e d i [ G T 4 2 3 ][ G T 4 2 3 ][ G T 4 2 3 ][ G T 4 2 3 ][ G T 4 2 3 ][ G T 4 2 3 ][ G T 4 2 3 ][ G T 4 2 3 ][ G T 4 2 3 ]
K u n g w i n i K u n g w i n i K u n g w i n i K u n g w i n i K u n g w i n i K u n g w i n i K u n g w i n i K u n g w i n i K u n g w i n i [ C B L C 2 ][ C B L C 2 ][ C B L C 2 ][ C B L C 2 ][ C B L C 2 ][ C B L C 2 ][ C B L C 2 ][ C B L C 2 ][ C B L C 2 ]
N o k e n g t s a N o k e n g t s a N o k e n g t s a N o k e n g t s a N o k e n g t s a N o k e n g t s a N o k e n g t s a N o k e n g t s a N o k e n g t s a T a e m a n eT a e m a n eT a e m a n eT a e m a n eT a e m a n eT a e m a n eT a e m a n eT a e m a n eT a e m a n e( G T O 2 B 1 )( G T O 2 B 1 )( G T O 2 B 1 )( G T O 2 B 1 )( G T O 2 B 1 )( G T O 2 B 1 )( G T O 2 B 1 )( G T O 2 B 1 )( G T O 2 B 1 )
M o g a l e C i t y [ G T 4 1 1 ]M o g a l e C i t y [ G T 4 1 1 ]M o g a l e C i t y [ G T 4 1 1 ]M o g a l e C i t y [ G T 4 1 1 ]M o g a l e C i t y [ G T 4 1 1 ]M o g a l e C i t y [ G T 4 1 1 ]M o g a l e C i t y [ G T 4 1 1 ]M o g a l e C i t y [ G T 4 1 1 ]M o g a l e C i t y [ G T 4 1 1 ]
S t e r k f o n t e i n S t e r k f o n t e i n S t e r k f o n t e i n S t e r k f o n t e i n S t e r k f o n t e i n S t e r k f o n t e i n S t e r k f o n t e i n S t e r k f o n t e i n S t e r k f o n t e i n ( G T D M A 4 1 )( G T D M A 4 1 )( G T D M A 4 1 )( G T D M A 4 1 )( G T D M A 4 1 )( G T D M A 4 1 )( G T D M A 4 1 )( G T D M A 4 1 )( G T D M A 4 1 )
M i d v a a l M i d v a a l M i d v a a l M i d v a a l M i d v a a l M i d v a a l M i d v a a l M i d v a a l M i d v a a l [ G T 4 2 2 ][ G T 4 2 2 ][ G T 4 2 2 ][ G T 4 2 2 ][ G T 4 2 2 ][ G T 4 2 2 ][ G T 4 2 2 ][ G T 4 2 2 ][ G T 4 2 2 ]
W e s t R a n d D CW e s t R a n d D CW e s t R a n d D CW e s t R a n d D CW e s t R a n d D CW e s t R a n d D CW e s t R a n d D CW e s t R a n d D CW e s t R a n d D C
M e d s w e d i n g D CM e d s w e d i n g D CM e d s w e d i n g D CM e d s w e d i n g D CM e d s w e d i n g D CM e d s w e d i n g D CM e d s w e d i n g D CM e d s w e d i n g D CM e d s w e d i n g D C
S e d i b e n g D CS e d i b e n g D CS e d i b e n g D CS e d i b e n g D CS e d i b e n g D CS e d i b e n g D CS e d i b e n g D CS e d i b e n g D CS e d i b e n g D C
E k h u r h u l e n iE k h u r h u l e n iE k h u r h u l e n iE k h u r h u l e n iE k h u r h u l e n iE k h u r h u l e n iE k h u r h u l e n iE k h u r h u l e n iE k h u r h u l e n i
C i t y o f C i t y o f C i t y o f C i t y o f C i t y o f C i t y o f C i t y o f C i t y o f C i t y o f J o h a n n e s b u r gJ o h a n n e s b u r gJ o h a n n e s b u r gJ o h a n n e s b u r gJ o h a n n e s b u r gJ o h a n n e s b u r gJ o h a n n e s b u r gJ o h a n n e s b u r gJ o h a n n e s b u r g
C i t y o f C i t y o f C i t y o f C i t y o f C i t y o f C i t y o f C i t y o f C i t y o f C i t y o f T s h w a n eT s h w a n eT s h w a n eT s h w a n eT s h w a n eT s h w a n eT s h w a n eT s h w a n eT s h w a n e
M p u m a l a n g aM p u m a l a n g aM p u m a l a n g aM p u m a l a n g aM p u m a l a n g aM p u m a l a n g aM p u m a l a n g aM p u m a l a n g aM p u m a l a n g a
F r e e S t a t eF r e e S t a t eF r e e S t a t eF r e e S t a t eF r e e S t a t eF r e e S t a t eF r e e S t a t eF r e e S t a t eF r e e S t a t e
N o r t h W e s tN o r t h W e s tN o r t h W e s tN o r t h W e s tN o r t h W e s tN o r t h W e s tN o r t h W e s tN o r t h W e s tN o r t h W e s t
N 1 2
N 4
N 4
N 3
N 1
R 4 7
N 1 7
N 1 2
N 1
2 5 0 2 5 5 0
K i l o m e t e r sL O C A L M U N I C I P A LB O U N D A R I E S
D I S T R I C T B O U N D A R I E S
P R O V I N C I A L B O U N D A R I E S
N A T I O N A L R O A D S
G A U T E N G P R O V I N C E : M E T R O S , D I S T R I C T & L O C A L M U N I C I P A L I T I E S
Introduction
4
No. WSA
1 City of Johannesburg Metropolitan Municipality
2 City of Tshwane Metropolitan Municipality
3 Ekurhuleni Metropolitan Municipality
4 Sedibeng District Municipality
4.1 Emfuleni Local Municipality
4.2 Lesedi Local Municipality
4.3 Midvaal Local Municipality
5 Metsweding District Municipality
5.1 Kungwini Local Municipality
5.2 Nokeng Tsa Taemane Local Municipality
6 West Rand District Municipality
6.1 Mogale City
6.2 Merafong Local Municipality
6.3 Randfontein Local Municipality
6.4 West Rand DMA
6.5 Westonaria Local Municipality
Gauteng Profile
5
• Socio-political integration of people & settlement• Economic pressures & high levels of unemployment• Institutional restructuring• Urbanization• Exodus of skills from small towns• Active migration to mines and economic centers• Expectation for higher levels of services• Uneven spread of water• Costly regional distribution of water• Backlog in informal settlement on basic services• Environmental risks (e.g. pollution)
Key Driving Forces
Gauteng Profile
6
• Covering an area of nearly 17,000 sq kms, Johannesburg is the provincial capital while Tshwane is the national administrative capital.
• The Gauteng population is ±10.8million • 97% of its population living in urban centres. Gauteng is
the economic centre not just of South Africa, but of all Africa.
• Though the smallest of South Africa's nine provinces, covering only 1.4% of the country's land area of the country, it contributes approximately one-third of the country's total gross domestic product (GDP), and is also responsible for 10% of Africa's total GDP.
Gauteng Profile
7
• Highly urbanised and industrialised• Mining dominates the western areas of Gauteng and
manufacturing in the eastern parts. Coal, iron and steel are predominant in the southern Vaal region
• Highest allocation for world cup 2010 venues
Gauteng Profile
8
• The key objective of the PWSP is to ensure an effective sector that will enhance effective WRM & WS delivery in support of the PGDS.
• The PGDS highlights that the key GDS mechanisms for the province are,
NEPAD engagements – build partnerships, support twinning agreementsSustainable socio-economic infrastructure developmentReduction of poverty, unemployment and promotion of sustainable livelihoodsIntergovernmental relationsInvestment and support to targeted growth sectorsSupport BBBEEIntegrated city region
9
PGDS within the GP contextSOCIALPoverty alleviationReduction in UnemploymentSustainable livelihoodsEPWP approach
SPATIALExpanding housing programmeRapid urbanizationRoad infrastructureGautrain2010Global city region
ECONOMICMineral and miningManufacturingAgricultureTourismBlue IQ
ENVIRONMENTALReduction in emissionClimate ChangeLand Use ManagementReduce the effluent dischargesWaste generation- 80% of SA in GP
Water Security Gauteng Population Scenarios
10
11
Water Security – Integrated Vaal River SystemExisting Transfer Schemes
Proposed Transfer Schemes Mokolo Catchment
Crocodile CatchmentVaal Catchment
12
DWA Past Support to Local Government (WSA’s)
12
RUSTENBURG
Bloemhof Dam
Vaal Dam
Vaal Barrage
Proposed Polihali Dam
Katse
Mohale
Vaal/Orange River System – Impacts downstream
ProposedJana Dam
ProposedMielietuin Dam
Water Security - Reconciliation Scenario (High) LHWP and TWP, unlawful irrigation (increasing)
Earliest possible delivery date
Jana Dam Yield
Mielietuin Dam Yield
Polihali Dam
13
Water Security - Reconciliation Scenario (High) LHWP and TWP
Eradicate unlawful irrigation
Jana Dam Yield
Mielietuin Dam Yield
Polihali Dam Yield
Earliest possible delivery date
14
Water Security - Reconciliation Scenario (High) 15% WC/DM, LHWP and TWP
Polihali Dam Yield
Mielietuin Dam Yield
Eradicate unlawful irrigation
Earliest possible delivery date
15
Water Security – Approved Measures
• Eradicate unlawful irrigation• Implement WC/WDM with focus on loss management
(aim to save 15%)• Treat and use effluent, start with mine water• Prepare for next augmentation scheme• Implement WQ management measures• Establish Strategy Steering Committee
16
Current DWA GP Support Programmes/Projects
• Water and Sanitation Service Delivery
• MIG Support• Bulk Infrastructure• Schools and Clinics Basic
Services Provision• Water Conservation and
Demand Management• Drinking Water Quality
Monitoring
• IGR and Sector Collaboration• Capacity Building • Free Basic Services and One
Stop Shop• Water Education Programme• Other Community Support
Programmes• Monitoring, Evaluation and
Reporting
17
18
DEMOGRAPHICS DECEMBER 2008
DECEMBER 2008 WATER DATA:
Water : Adequate:
Households
Water : No Service: Households (Priority 1)
NATIONAL TARGET: WATER BACKLOG (DECEMBER 2014)
Future date
Water : Inadequate Need - Housing : Interim solution:
Households (Priority 7)
Water : Inadequate Need - Housing :
Permanent solution: Households (Priority
8)
JOHANNESBURG 707,339 0 0 138,156
TSHWANE 598,908 12,829 12,829 153,077
EKURHULENI 710,118 0 0 184,589
EMFULENI 195,767 0 0 87,195
KUNGWINI 43,322 0 0 10,067
LESEDI 18,052 0 0 485
MIDVAAL 26,009 0 0 4,041
MOGALE CITY 54,655 973 973 6,077
NOKENG TSA TAEMANE 20,264 517 1,742 10,841
RANDFONTEIN 34,465 0 0 3,114
West Rand 1,565 135 135 630
WESTONARIA 38,570 0 0 6,823
2,449,034 14,454 15,680 605,094
19
DEMOGRAPHICS DECEMBER 2008
DECEMBER 2008 SANITATION DATA:
CURRENT SERVICE DETAIL
ABOVE RDP (ADEQUATE)
Sanitation : No Service
Households
NATIONAL TARGET:
SANITATO N
BACKLOG (DECEMBE
R 2010)
NATIONAL TARGET: SANITATION BACKLOG (DECEMBER 2014)
Future date
Sanitation : Adequate :
Waterborne Households
TOTAL Sanitation Backlog
DWAF
Sanitation : Inadequate
Need - Housing :
Interim solution:
Households
Sanitation : Inadequate
Need - Housing :
Permanent solution:
Household s
JOHANNESBURG 495,086 0 0 0 136,052
TSHWANE 485,725 0 38,862 0 153,283
EKURHULENI 455,422 0 61,700 0 184,589
EMFULENI 134,120 0 4,085 0 87,444
KUNGWINI 53,943 0 1,850 383 10,067
LESEDI 10,692 0 45 0 3,778
MIDVAAL 18,617 0 0 0 4,041
MOGALE CITY 39,494 557 0 0 6,310
NOKENG TSA TAEMANE 13,585 197 2,189 0 12,246
RANDFONTEIN 24,048 1,978 0 1,978 3,226
West Rand 1,111 135 0 135 614
WESTONARIA 31,778 0 0 0 6,823
1,763,620 2,867 108,731 2,496 608,472
20
DWA Past Support to Local Government (WSA’s)
Functional Area
Nature of Support Achievements Benefiting WSA
Water and Sanitation Service Delivery
• Technical Support
• Funding Support
• Institutional Support
• 50 No. of Projects Under Registration
• 98 No. of Projects Under Construction
• 315 528No. Of Estimated to be Served by Internal Bulk
• All WSA’s
21
DWA Past Support to Local Government MIG Exp 2008/09
Municipality 08/09 FY Spent% WaterEkurhuleni 357 597 100 60 203City of Johannesburg 327 011(70) 102 9 717City of Tshwane 273 602 93 87 742Emfuleni LM 74 230 73 3 390Midvaal LM 12 241 48 1 764Lesedi LM 12 416 100 0Nokeng LM 10 752 100 0Kungwini LM 20 293 100 4 514Mogale City LM 42 475 100 22 878Randfontein LM 16 669 100 3 992Westonaria LM 30 895 100 5 537West Rand DM 3 000 0 0
22
DWA Past Support to Local Government (WSA’s)
Functional Area
Nature of Support Achievements Benefiting WSA
Water and Sanitation Service Delivery
• Housing Support
• Institutional Support
• No. of Households benefited in 2008/09 is 21 237
• No. of Households benefited from April to July 09 is 9 925
• Integrated approach to meet 2014 target
• All WSA’s
23
DWA Past Support to Local Government (WSA’s)
Functional Area
Nature of Support Achievements Benefiting WSA
Meeting the Basic Services Targets
• Technical Support
• Funding Support
• Institutional Support
• H/H provided with basic services in GP
20263 in CoT
2214 in Mogale City
1757 in Kungwini
200 in Emfuleni
2500 in West Rand
• City of Tshwane
• Mogale City
• Kungwini LM
• Emfuleni LM
• West Rand Municipality
24
DWA Past Support to Local Government (WSA’s)
Functional Area
Nature of Support Achievements Benefiting WSA
Meeting the Basic Services Targets
• Technical Support
• Funding Support
• Institutional Support
• The water targets in formal areas was met in 2008/09 hence the effort will now be directed towards the informal areas in alignment with the housing 2014 planning.
• City of Tshwane
• Kungwini LM
COT WATER TARGETS CELEBRATION
25
26
Functional Area
Nature of Support Achievements Benefiting WSA
Schools and Clinics Basic Services Provision
• Technical Support
• Construction
• Project Management
• Clinics 2007/0838 completed
• Schools 2008/0912 completed
• Schools 2009/1010 completed
• All GP WSA’s
DWA Past Support to Local Government (WSA’s)
27
28
DWA Past Support to Local Government (WSA’s)
Functional Area Nature of Support Achievements Benefiting WSA
Regional Bulk Infrastructure Programme
• Technical Support
• Funding Support
• Sedibeng feasibility report complete• PPP study 90% complete• R20m provided by DWA for the detailed design and phase 1for Sedibeng scheme• R5m provided for the detailed design and phase 1 for Westonaria/ Randfontein regional sewer scheme•EIA application submitted to GDACE
• Emfuleni LM
•Randfontein LM
• Westonaria LM
• Kungwini LM
• Neighbouring Municipalities in Mpumalanga
29
INFRASTRUCTURE CAPITAL EXPENDITURE – ESTIMATED COST: Condensed Summary Table –5 Year Perspective : Water and Sanitation Bulk Services
Requirements
DWA Past Support to Local Government (WSA)
30
Functional Area Nature of Support
Achievements Benefiting WSA
Water Conservation and Demand Management
• Funding
• Skills Development
• Technical Support
•R61m contributed to WSA• Skills development in WCDM to 50 indigent youth• 20 youth trained on leak detection, data logging etc• 50 plumbers trained• 15 CLO trained on WCDM• WCDM study
• C o Joburg• Emfuleni LM•Ekurhuleni M•C o Tshwane•Mogale City•Westonaria LM•Midvaal LM•Nokeng Tsa Taemane LM•Randfontein LM•Kungwini LM
31
Potential Savings
32
DWA Past Support to Local Government (WSA’s)
Functional Area Nature of Support
Achievements Benefiting WSA
Drinking Water Quality
• Technical Support
• IT Support
• 90% of WSA load reports into the EWQMS
• Minister’s Municipal Indaba Resolutions Implemented
• All GP WSA’s
33
DWA Past Support to Local Government (WSA’s)
All Water Services Authorities are submitting Drinking Water Quality results on monthly basisDrinking Water Quality Score = 93%
34
DWA Past Support to Local Government (WSA)
35
DWA Past Support to Local Government (WSA’s)Green Drop Assessments (WWTW’s)
36
WWTP Assessment
51 WWTW’s in Gauteng
50% of WWTW’s have capacity >25Ml/d capacity
67% non- compliant to effluent standards
31% are operating beyond design capacity
16% are approaching maximum capacity
37
Average Flow as % of Design Capacity
0%
50%
100%
150%
200%
Drie
font
ein
Nor
ther
n W
orks
Bush
kopp
ies
Gou
dkop
pies
Olifa
ntsv
lei
Enne
rdal
eBa
viaa
nspo
ort
Sund
erla
nd R
idge
Babe
legi
Them
baR
ooiw
aal (
3 w
orks
)D
aspo
ort
Klip
gat
Rie
tgat
Sa
ndsp
ruit
Zeek
oega
tO
lifant
sfon
tein
H
arte
bees
font
ein
Dek
ama
Vlak
plaa
sR
onde
bult
Wat
erva
l Far
mAn
cor
Tsak
ane
Car
l Gru
ndlin
gH
erbe
rt Bi
ckle
yBe
noni
Jan
Smut
sD
avey
ton
J.P.
Mar
ais
Ryn
field
Wel
geda
tch
Hei
delb
erg
Rat
anda
Mey
erto
nLe
euku
ilR
iets
prui
tSe
boke
ngFl
ip H
uman
Wat
er W
orks
Perc
y St
ewar
d M
agal
ies
Ran
dfon
tein
Han
nes
van
Nie
kerk
N ame o f WWT W
38
Interventions on WWTPRietspruit WWTP, R9.5m 2008/09
39
DWA Past Support to Local Government (WSA’s)
Functional Area
Nature of Support Achievements Benefiting WSA
IGR and Sector Collaboration
• Management Support on Sector activities
• Skills Development
• Institutional Support
•1st WS Forum meeting for 09/10 held in April 09• Capacity building to DWA officials• Alignment of Water Sector Forum with Provincial IGR forum•Coordinate preparations for the implementation of MSB III
• All GP WSA’s benefit from sector collaboration
40
DWA Past Support to Local Government (WSA’s)
Gauteng Water Sector Forum
Water Conservation and
Demand Management TT
Institutional Dev & Capacity Building TT
Water Resources Planning TT
Meeting Targets/ Backlogs
TT
Premier’s Coordinating Forum
Technical Steering Committee/WFGD Strategic Task Team
SALGA(Rand water)
DLG&HDLG &H DWA
WSLG
MCC
Environmental Man. and Pollution
Control TT
GDACE
41
Sector Partners: Gauteng Water Sector Collaboration Forum
GDACE
Eco Care Trust
WISA
DBSA
MUNICIPALITIES
SAICE
SAICA
DME DOA
AGRISA
CHAMBER OF MINES
42
• Gauteng Sector Forum• SALGA PEC• Premier’s Coordinating Forum• Provincial Parliament (LG Portfolio Committee)
Visit of the both National and Provincial Portfolio Committees, Sept 2007Presentation of meeting the water targets to the Provincial Portfolio CommitteePresentation on WWTW and pollution to Provincial Portfolio CommitteePresentation on the Sedibeng Regional Sewer Scheme
IGR Forum
43
DWA Past Support to Local Government (WSA’s)
Functional Area Nature of Support Achievements Benefiting WSA
Capacity Building Grant
• Funding Support
• Skills Development
• Institutional Support
• Research on water and sanitation Tertiary Educational Institutions
•Sourced funding from LGSETA • Business Plan approved for R5m to train Process Controllers • Capacity Building programme introduced to all identified WSA•Establish provincial steering committee • Conducted Municipal Skills Indaba • Training equipment on WCDM (leak repairs, meter repairs etc)
•Mogale City•Westonaria LM•Nokeng Tsa Taemane LM•Randfontein LM•Kungwini LM• Lesedi LM• Midvaal LM
44
45
DWA Past Support to Local Government (WSA’s)
Functional Area
Nature of Support Achievements Benefiting WSA
Free Basic services and One Stop Shop
• Technical Support
• Management Support
• Institutional Support
• Administration Support
•Total H/H served with FBW – 88.26%• Total poor H/H served with FBW 90.29%• 95% donor materials implemented• WSA/WSP contracts reviewed• GP portal development – procurement• All CRM queries resolved
• All GP WSA’s
46
DWA Past Support to Local Government (WSA’s)
Functional Area
Nature of Support Achievements Benefiting WSA
2020 Vision – Water Education Programme
• Skills Development
• Curriculum Support
• Institutional Support
• School children awareness on Water and Sanitation programmes, e.g. Save water •Bursaries and International exposure•WIN facilities, computers, laboratory• Career pathing interest• Family influence on water and sanitation issues
• All GP WSA’s
47
48
DWA Past Support to Local Government (WSA’s)
Functional Area
Nature of Support
Achievements Benefiting WSA
Monitoring, Evaluation and Reporting
• Technical Support
• Reporting
• Planning
• Provincial report to MSB • Alignment of department’s strategic business plan with regional business plan• Operational Plan• Business Plan – Chief Directorate• Business Plan - Directorate• Monthly and quarterly reports – Chief Directorate and Directorate• Water and Sanitation Project Monitoring
• All GP WSA’s
49
DWA Past Support to Local Government (WSA’s)
Functional Area Nature of Support
Achievements Benefiting WSA
Other Community Support Programmes•(Sustainability Pillars)•(River Health)•(War on Poverty)
• Technical Support
• Social
• Boreholes for food gardens and fruit trees•Training on HIV/Aids, health and hygiene• Tools for O&M gardens• Project Management Skills• Vegetables and Fruits for Aids orphans• 20 women employed in a project• Indigent to be further trained and participate on WCDM and WWTP• Water and sanitation facilities repaired• River cleaning
• All GP WSA’s
50
51
DWA Institutions in WSPInstitutions Role in Service DeliveryRand Water Provides 90% of Gauteng
WCDMTraining and Capacity Building
Magalies Water Water Services Provider
Institutions Role in Service DeliveryERWAT Rietspruit WCDM training
WISA WWTP assessments
Department of Education Schools basic services provision
Department of Health Clinics basic services provision
GDACE Environmental management and pollution control
DLG&H Meeting the targets backlog
Salga Institutional development and capacity building
Other Institutions in WSP
52
Department’s Planned Interventions
Functional Area Planned Intervention Timeframes
WCDM (loss management)
R33m funding support for the implementation of WCDM
Pressure ManagementRetrofitting and removal of wasteful
devicesMains replacementLeak detection and repairsPotential savings, 15% of use
24months
53
Department’s Planned Interventions
Functional Area Planned Intervention Timeframes
WCDM (improved efficiency)
Efficient appliances: (washing machines, toilet cisterns etc) Low flow shower heads Water efficient gardensPotential savings, further 15% of use
24months
Department’s Planned Interventions Study Area WC/WDM Budget Requirements : Loss Management
54
Current WDM funding in Gauteng R50 to R100million
55
Department’s Planned Interventions
Functional Area Planned Intervention Timeframes
WWTW’s
R5.2m for Midvaal Regional SchemeR12m for Emfuleni Vaal Spillages
InterventionR10m for Percy Stewart WWTW
12 months
56
High Level Challenges and Possible Intervention
Challenge Intervention
DWQ monitoring programme efficiencyDirect engagement with Kungwini, Western Highveld, Lesedi and West Rand
Funding for Water and Sanitation Bulk Infrastructure
Assessment of future needs of WWTP and bulk water
Local Government Skills and Capacity Training plant operators in 8 local municipalities
57
Thank You