BRIEF PROFILE OF EAST KALIMANTAN
Total area of Kalimantan Timur is
125.336,81 km square (or
12,726,752 hectares), consists of :
- 3 (three) Cities :
1. Samarinda
2. Balikpapan
3. Bontang
- 7 (seven) Regencies :
4. Kutai Kartanegara
5. Kutai Timur
6. Kutai Barat
7. Berau
8. Penajam Paser Utara
9. Paser
10. Mahakam Hullu
Its population up to 2014 is 3,508 million inhabitants, with the result that the average
population density is 26,14 inhabitants/km square
From geological point of view, East
Kalimantan is located in three
major tertiary sedimentary basins
which have major impact on the
process of mineral resources
formation in the region. The three
basins are :
Kutai Basin which covers the
area of Mahakam Hilir and
Mahakam Hulu.
Pasir Basin which covers the
area of Paser.
Tarakan Basin which covers
the area of Tarakan, Berau, and
Bulungan.
REGIONAL GEOLOGY .......
Coal Bearing Formations in
Kalimantan Timur are :
Balikpapan Formation
Pulaubalang Formation
Pamaluan Formation
Kuaro Formation
Wahau Formation
Batuayau Formation
Tanjung Formation
Warukin Formation
Telakai Formation
Birang Formation
Latih Formation
COAL BEARING FORMATION
COAL RESOURCES AND RESERVES IN EAST
KALIMANTAN IN 2012 – 2014
Coal Calorie 5000 up to 7000 Ccl and Sulphur 0,8 up to 1,5
Description 2012 2013 2014
Resources(MT)
31.817.269.817 32.258.774.367 30.651.444.628
Reserves(MT)
9.244.407.452 9.525.868.005 8.826.730.632
Note : Coal Resources and Reserves for 2014 only in the area of East
Kalimantan, excluding the area of North Kalimantan
COAL RESOURCES AND RESERVES IN EAST
KALIMANTAN IN 2015
NO REGENCY/CITY
RESOURCES RESERVES
INFERRED INDEXED MEASURED TOTAL ESTIMATED PROVEN TOTAL
1 SAMARINDA 331.185.099 267.828.597 154.989.788 754.003.484 48.249.074 140.678.674 188.927.748
2KUTAI
KARTANEGARA1.918.871.428 1.751.424.000 2.889.348.946 6.559.644.374 247.657.332 1.406.672.887 1.654.330.219
3PANAJAM
PASER UTARA0 9.067.682 1.007.520 10.075.202 0 7.922.311 7.922.311
4 PASER 363.472.020 646.338.610 248.257.078 1.258.067.708 182.775.400 576.787.640 759.563.040
5 KUTAI BARAT 826.226.133 640.781.169 931.010.716 2.398.018.018 65.238.769 256.697.062 321.935.831
6 KUTAI TIMUR 6.849.597.912 6.581.469.841 6.999.080.897 20.430.148.650 3.419.535.659 1.758.560.278 5.178.095.937
7 BERAU 738.005.610 1.093.377.488 563.205.213 2.394.588.311 356.593.000 246.014.331 602.607.331
TOTAL 11.027.358.202 10.990.287.387 11.786.900.158 33.804.545.747 4.320.049.234 4.393.333.183 8.713.382.417
THE IMPLICATION OF THE ENACTMENT OF THE LAW NO.
23 OF 2014 ON LOCAL GOVERNMENT (UNDANG-UNDANG
N0. 23 TAHUN 2014 TENTANG PEMERINTAHAN DAERAH)
Government affairs
implementation on
mineral and coal mining
sector is divided
between the central
government and the
provincial government
This means the
implementation is no
longer under the
authority of the
city/regency (since
October 2, 2014)
Central Government Authorities1. Mining Permit (Izin Usaha Pertambangan/
IUP) Issuance for metallic minerals, nonmetallic minerals, coal, and rock in :
Mining Permit Areas (Wilayah Izin UsahaPertambangan (WIUP)) which arelocated within the area of inter-province
Mining Permit Areas which directlyborders with other countries
Mining Permit Areas which are located inthe sea area of more than 12 miles
2. The issuance of the Mining Permit in theForeign Direct Investment
3. The issuance of a Special Permit of Mineraland Coal Mining
Cont ..... PROVINCIAL
GOVERNMENT AUTHORITIES1. Mining Permit Issuance for metallic minerals,
non metallic minerals, coal, and rock fordomestic investment in :
Mining Permit Areas in areas located withinthe province
Mining Permit Areas in the sea area lessthan 12 miles
2. Community Mining Permit Issuance for metallicminerals, non metallic minerals, coal, and rockcommodities within the community mining area
THE FOLLOW UP OF THE IMPLEMENTATION
OF THE LAW NO. 23 OF 2014 .......1. Governer is authorized to revoke the non CnC Mining Permit which doesn’t
meet the obligations (for technical reference : Minister of Energy & MineralResources Regulation No. 43 of 2015 on Procedures for Mineral & CoalMining Permit Issuance Evaluation (Peraturan Menteri Energi &Sumberdaya Mineral No. 43 Tahun 2015 tentang Tata Cara EvaluasiPenerbitan IUP Mineral & Batu Bara))
2. Regent/Mayor submits the Mining Permit and the supporting documents tothe Governor
3. Regent/Mayor/Governor submits the Foreign Investment Mining Permit andthe supporting documents to the Central Government
4. Provincial Governments establish One Stop Services (OSS (PelayananTerpadu Satu Pintu (PTSP)) and umbrella permittance law
5. Governor may establish Technical Service Unit (Unit Pelayanan Teknis) inthe Regency/City for the implementation of the guidance and supervision,including increase the Information & Technology functional staff as well asstrengthen the mining database
6. Completion of administrative boundaries between the Regencies/Cities
COAL MINING MANAGEMENTApplied based on national regulations, to be specific :
Law No. 4 of 2009 on Mineral and Coal (Undang-Undang No. 4 Tahun 2009
tentang Pertambangan Mineral & Batu Bara)
Government Regulation No. 77 of 2014 on 3rd Amendment to Government
Regulation No. 23 of 2010 on the Implementation of Mineral & Coal Mining
Operations (Peraturan Pemerintah No. 77 Tahun 2014 tentang Perubahan Ke-3
Atas Peraturan Pemerintah No. 23 Tahun 2010 tentang Pelaksanaan Kegiatan
Usaha Pertambangan Mineral & Batu Bara)
Minister of Energy and Mineral Resources Regulation No. 32 of 2013 on
Procedures for Granting Special Permits on Mineral & Coal Mining (Peraturan
Menteri Energi & Sumberdaya Mineral No. 32 Tahun 2013 tentang Tata Cara
Pemberian Izin Khusus Dibidang Pertambangan Mineral & Batu Bara)
At provincial level (East Kalimantan) applied the East Kalimantan Governer Regulation
No. 17 of 2015 on Management of Permittance and Non Permittance Granting and
Improvement of Permittance Management on Mining, Forestry & Palm Oil
Plantation in East Kalimantan (Peraturan Gubernur Kalimatan Timur No. 17 Tahun
2015 tentang Penataan Pemberian Izin dan Non Perizinan serta Penyempurnaan
Tata Kelola Perizinan Di Sektor Pertambangan, Kehutanan & Perkebunan Kelapa
Sawit Di Provinsi Kalimantan Timur)
1. Create resource management policy
harmonization between the Central
and Provincial Government
2. Evaluate policies which have been
issued against the benefit and impact
of natural resource management
3. Provide protection against
environmental pollution and damage,
particularly forest and its ecosystem
4. Encourage entrepreneurs/investors
and other stakeholders’s compliance
on the obligations
Governer Regulation No. 17 of 2015
(Peraturan Gubernur No. 17/2015)
Accommodate
sectoral rules
Accommodate
social, economic
and
environmental
aspects
THE SCOPE OF PERMITTANCE AND NON
PERMITTANCE MANAGEMENT (Article 5,
Paragraph (2))
MINING FORESTRY
Permittance Issuance (Mining Permit/ Izin Usaha Pertambangan (IUP)) –Exploration (IUP Exp) and Operation (IUP OP)
IUP Exp & IUP OP Issuance by Regency/City
Borrow and Use of Forest Areas Permit Recommendation (Rekomendasi Izin Pinjam Pakai Kawasan Hutan (IPPKH))
Timber Forest – Natural Forest/Limited Forest Product Utilization Permit (Izin Usaha Pemanfaatan Hasil Hutan Kayu -Hutan Alam/ Hutan Terbatas (IUPHHK-HA/HT))
Forest Area Exchange Recommendation
MANAGEMENT OF PERMITTANCE AND NON
PERMITTANCE GRANTING AND IMPROVEMENT
OF PERMITTANCE MANAGEMENT ON COAL
MINING SECTOR (Article 6)
1. Postponement and management of permittancegranting are applied for the new permittance (valid in 2years since the issuance of the Governor Regulation -Article 10)
2. Penundaan dimaksud dikecualikan untuk :
Permittance for exploration activities which arealready underway
Enhancement of Exploration Mining Permit intoProduction Operation Mining Permit in the area ofOther Use Areas (Areal Penggunaan Lainnya (APL))and production forest area
Extension of Production Operation Mining Permit
Cont .....3. Enhancement and extension of the permittance and non permittance as
explained in the explanation number 2 above can be granted as long as the
requirements are fulfilled, to be spesific :
Committed to fulfil the Domestic Market Obligation, especially in the scope
of East Kalimantan
Committed to provide supplies or build power plants
Committed to support the food security program (reclamation for crops
and cattle)
Should not overlap with similar commodities permittances
Headquartered (at least has a branch office) and has an enterprises
Taxpayer Identification Number (TIN/Nomor Pokok Wajib Pajak (NPWP))
in the area of East Kalimantan
Pay attention to the carrying capacity of the environment and local
communities
Should not export raw material
Build downstream industries
4. The commitment is part of the Minutes after the presentation of the permit
applicant before the Governer (or authorized officials), and set forth in a
Statement
The issuance of new permittance and permittance extension
of NON METALLIC MINERAL AND ROCK (Article 6
Paragraph 6 Governor Regulation No. 17 of 2015 (Pasal 6
Ayat 6 Peraturan Gubernur No. 17 Tahun 2015))
The implementation can be referred to the GOVERNER OF
EAST KALIMANTAN REGULATION NO. 4 OF 2015 ON
GUIDANCE OF NON METALLIC MINERAL AND ROCK
MINING PERMIT IMPLEMENTATION (PERATURAN
GUBERNUR KALIMANTAN TIMUR NO. 4 TAHUN 2015
TENTANG PEDOMAN PELAKSANAAN IZIN USAHA
PERTAMBANGAN MINERAL BUKAN LOGAM & BATUAN
DI PROVINSI KALTIM)
PERMITTANCE PROCEDURES ....
Its implementation is based on
the Governor of East
Kalimantan Regulation No. 48
of 2015 on the Implementation
of One Stop Services (OSS)
With reference to Presidential
Decree No. 97 of 2014 on One
Stop Services (OSS)
INVESTMENT PRINCIPLE PERMIT
Head of Investment CoordinatingBoard Regulation No. 14 of 2015on Guidances and Procedures forInvestment (Peraturan KepalaBadan Koordinasi PenanamanModal No. 14 Tahun 2015 tentangPedoman & Tata CaraPenanaman Modal) - first step toconduct business (Article 9)published by BKPM/BPMPTSP orPTSP KPBPB & PTSP KEK (theauthority of permit granting isstipulated in Article 5, 6, 7 & 8)
Principle permit serves as areference to the issuance ofinvestment implementationpermittance and nonpermittance under the authorityof the Central and ProvincialGovernment (Article 10paragraph (3) and (4))
Principle Permit for ForeignInvestment is only granted tobusiness entities in the form ofa Limited Liability Company(LLC/Perseroan Terbatas (PT)),with the investment value morethan Rp 10 billion and thecapital is paid at least Rp 2.5billion (Article 13)
Investment implementation Permittance & Non
Permittance (Article 10, paragraph (4)), among
others include :
1. Land Technical Considerations
2. Location Permit
3. Building Permit
4. Ratification of the Use of Foreign Workers Plan
(Rencana Penggunaan Tenaga Kerja Asing (RPTKA))
5. Environmental Permit
6. Facility Decree
7. Technical Recommendation
8. Operation Worthy Certificate; or
9. Operational Permit
PROCEDURES OF COAL MINING PERMITTANCE
& NON PERMITTANCE ... Brief
Filing an Application to Investment and One Stop Services (OSS) Board (BPMPTSP)
Documents Verification
Incomplete Rejected
Complete
Processed (Submitted to Department of Mines and Energy of East Kalimantan (Dinas Pertambangan dan
Energi Provinsi Kalimantan Timur))
Technical Considerations
Not Recommended
RecommendedTeam Meeting (Presentation)
Disapproved
Approved
Permit Issuance
1
23
REQUIREMENTS FOR EXPLORATION
MINING PERMIT
ADMINISTRATIVE TECHNICAL
Application Letter
Structure of Directors & List of
Share Proxy Holders
Certificate of Domicile
Letter of Assignment/Power of
Attorney (Original)
Copies of Exploration Mining
Permit from beginning to end
(legalized)
Copies of Exploration Mining
Permit CnC
Taxpayer Identification Number
(TIN)
Resume & Mining Expert
Statement
Maps of Mining Permit Area
which is equipped with
coordinates
Cont .... REQUIREMENTS FOR
EXPLORATION MINING PERMIT
ENVIRONTMENTAL FINANCIAL
Statement of Capability to
comply with the environmental
management regulations
Proof of sooth guarantees
placement
Proof of payment of the
compensation value price of
Mining Permit Area auction
result information data or
proof of area reserves cost
REQUIREMENTS FOR PRODUCTION
OPERATION MINING PERMIT
ADMINISTRATIVE TECHNICAL
Application Letter
Structure of Directors & Listof Share Proxy Holders
Certificate of Domicile
Letter of Assignment/Powerof Attorney (Original)
Copies of Production OperationMining Permit from beginningto end (legalized)
Copies of Production OperationMining Permit CnC
Taxpayer Identification Number(TIN)
Map of Mining Permit Area whichis equipped with coordinates
Full Report of Exploration
Report of Feasibility Study
Plan of Exploration Reclamation& Guarantee Placement
Work Plan & Budget
Plan of Production OperationSupporting InfrastructureDevelopment
Availability of Mining Experts(with 3 years minimumexperience)
Cont .... REQUIREMENTS FOR
PRODUCTION OPERATION MINING
PERMIT
ENVIRONTMENTAL FINANSIAL
Statement of Capability to comply
with the environmental
management regulations
Approval Letter of Environmental
Document/ Environmental Permit
(EIA/ UKL - UPL/ SPPL/ Surat
Persetujuan Dokumen Lingkungan
Hidup/ Izin Lingkungan (AMDAL/
UKL - UPL/ SPPL))
Audited-last year Financial
Statements
Proof of the last 3 years Fixed
Dues Payment
Proof of investment substitute
payment in accordance with the
bidding value for the winner of
Mining Permit Area
THE NUMBER OF COAL AND OTHER MINERALS MINING PERMITS IN
EAST KALIMANTAN
No Prov/Regency/
City
Exploration Production Operation Total
Total Area (Ha) Total Area (Ha) Total Area (Ha)
I
COAL
MINING
PERMITS
1.1 Province --- - 2 4.081 2 4.081,00
1.2 Paser 40 102.553,71 37 27.970 77 130.523,57
1.3Penajam
Paser Utara59 110.229,32 46 71.374 105 181.603,80
1.4 Samarinda 0 - 53 26.000 53 26.000,25
1.5 Kutai Timur 102 840.003,00 29 219.686 131 1.059.689,02
Data Source : December 2015
Cont .....
No Prov/Regency/
City
Exploration Production Operation Total
Total Area (Ha) Total Area (Ha) Total Area (Ha)
1.6Kutai
Kartanegara194 466.878,62 194 248.258 388 715.136,59
1.7 Kutai Barat 50 303.797,00 68 292.975 118 596.772,00
1.8 Berau 64 187.571,60 21 62.977 85 250.548,73
Total of Mining
Permits509 2.011.033,25 450 53.321,71 959 2.964.354,96
IITotal of
PKP2B7 251.490,00 23 754.649,63 30 1.006.139,63
IIIOTHER
MINERALSMetallic Mineral, Non Metallic Mineral, and Rock 1.256.640,95
TOTAL (I + II + III) 989 5.227.135,54
Data Source : December 2015
TOTAL OF CNC COAL MINING PERMITS (IUP) & PKP2B IN EAST
KALIMANTAN
No. Prov/Regency/City
S t a t u s
CNC Area Non CNC Area
1 EAST KALIMANTAN 2
Production
Operation Mining
Permits :
1.361.030,23
Exploration
Mining Permits :
1.603.325,47
PKP2B :
1.006.139,63I
--
132 PASER 64
23PENAJAM PASER
UTARA 103
4 SAMARINDA 521
5 KUTAI TIMUR 4784
6KUTAI
KARTANEGARA 313
75
7 KUTAI BARAT 10018
8 BERAU 70 15
TOTAL 751 3.970.494,87 208 1.256.640,67
Data Source : December 2015
COAL PRODUCTION DATA OF SURFACE MINING
UP TO NOVEMBER 2015
Province/Regency
/City
2012
(Ton)
2013
(Ton)
2014
(Ton)
2015
(Ton)
PKP2B 157.505.476,42 172.437.465,66 167.042.763,09 128.036.681,79
East Kalimantan 1.408.672 1.387.788 892.213,05 600.514,64
Paser 1.233.421 2.232.564 669.229,20 313.504,30
Penajam Paser
Utara636.421,66 1.587.092,84 1.206.281,87 527.136,72
Samarinda 11.327.858,64 9.847.170,47 5.925.160,91 4.728.904,59
Kutai Timur 2.420.551 2.592.462 1.919.747 1.902.477,00
Kutai
Kartanegara38.146.600,94 55.534.330,76 56.220.172,08 41.862.105,42
Cont .....
Province/Regency
/City2012
(Ton)
2013
(Ton)
2014
(Ton)
2015
(Ton)
Kutai Barat 3.211.180,12 3.056.421,89 1.055.863,54 643.638,83
Berau 6.438.223,88 9.051.449,42 7.147.364,23 10.143.230,77
Total 222.330.417,66 256.340.970,04 242.120.677,97 188.758.194,06
Data Source : December 2015
GROUND DISTURBANCE, RECLAMATION AND REVEGETATION
LAND DATA UP TO 2014
NoProvince/Regency/
City
Concession Area
of Production
Operation (Ha)
Ground
Disturbance
Area (Ha)
Reclamation
Land Area
(Ha)
Revegetation Land
Area (Ha)
ICOAL MINING
PERMITS
1 East Kalimantan 4.081,00 1.679,25 1.213,45 908,59
2 Paser 27.217,86 1.644,07 615,70 461,32
3Penajam Paser
Utara71.374,48
118,70 48,00 30,40
4 Samarinda 26.000,25 558,19
196,07 194,00
5 Kutai Timur 195.126,02 459,71
147,07 147,07
6 Kutai Kartanegara 245.867,59 22.604,38 5.070,88 5.070,88
7 Kutai Barat 292.975,00 1.292,80 220,52 165,28
Cont ......
NoProvince/Regency/
City
Concession Area
of Production
Operation (Ha)
Ground
Disturbance
Area (Ha)
Reclamation
Land Area (Ha)
Revegetation Land
Area (Ha)
8 Berau 62.977,13 1.281,72 640,00 410,70
9 Bontang - - - -
10 Balikpapan - - - -
Total of Mining Permits 925.619,33 29.638,82 8.151,69 7.388,24
II PKP2B 698.415,63 73.433,98 33.389,89 30.561,78
T o t a l ( I + II ) 1.624.034,96 103.072,80 41.541,58 37.950,02
Data Source : December 2015
MINING CONDITIONS IN 2015
Province/Regency/
City
Total of Mining Permit Concession Area (Ha)
Exploration Production
OperationExploration
Production
Operation
Province - 2 - 4.081
Berau 64 21 187.572 62.977
Bontang - - - -
Samarinda - 53 - 26.000
Balikpapan - - - -
Kutai
Kartanegara 194 194 435.289 248.258
Kutai Timur 102 29 840.003 219.686
Kutai Barat 50 68 303.797 292.975
Penajam Paser
Utara 59 46 110.229 71.374
Paser 40 37 102.554 27.970 Total of Mining
Permits (1) 509 450 1.979.444 953.321
PKP2B (2) 7 21 300.350 698.416
T o t a l (1+2) 516 471 2.279.794 1.651.737 Data Source : December 2015
MINING PERMIT CONDITIONS IN 2015 AND ESTIMATION IN 2035
Regency/CityGround
Disturbance
Area (Ha)
Reclamation
Land Area (Ha)
Revegetation
Land Area (Ha)
Total of Mining
Permits After
2035
Mining Permits
Concession Area
After 2035 (Ha)
Province 1.679,25 1.213,45 908,59 2 4.081
Berau 1.281,72 640 410,7 85 229.146
Bontang - - - - -
Samarinda 558,19 196,07 194 59 25.613
Balikpapan - - - - -
Kutai
Kartanegara 22.604,38 5.070,88 5.070,8898
215.913
Kutai Timur 459,71 147,07 147,07 108 871.268
Kutai Barat 1.292,80 220,52 165,28 54 289.068
Penajam Paser
Utara 118,7 48 30,416
24.565
Paser 1.644,07 615,7 461,32 20 27.611
Total (1) 29.638,82 8.151,69 7.388,24 442 1.687.264,31
PKP2B (2) 73.433,98 33.389,89 30.561,78 28 998.765,63
Total (1+2) 103.073 41.542 37.950 470 2.686.030
Data Source : December 2015
NoProvince/Regency/
City
Amount of Guarantee
Rp USD
1 East Kalimantan 12.531.166.365,00 -
2 Paser 14.234.127.190,01 -
3 Penajam Paser Utara 4.699.132.018,20 -
4 Samarinda 226.277.339.967,21 -
5 Kutai Timur 11.366.364.672,00 14.718,36
6 Kutai Kartanegara 649.008.362.543,08 -
7 Kutai Barat 42.513.232.338,90 -
8 Berau 21.601.272.121,07 -
T o t a l 982.230.997.215,47 14.718,36
RECLAMATION GUARANTEE
Data Source : December 2015
No.Province/Regency/
City
Amount
Rp USD
1 East Kalimantan 3.742.473.331,00 -
2 Paser 1.970.858.966,57 -
3 Penajam Paser Utara 2.585.192.747,00 -
4 Samarinda 41.857.472.437,80 -
5 Kutai Timur 1.164.001.572,00 -
6 Kutai Kartanegara 40.107.669.425,87 542.667,01
7 Kutai Barat 5.941.212.323,63 -
8 Berau - -
T o t a l 97.368.880.803,87 542.667,01
POST-MINE GUARANTEE
Data Source : December 2015