Maryland State Highway

AdministrationDesign-Build

Overview

Presented By:Jeffrey T. Folden, P.E.

Assistant Chief, Innovative Contracting Division

Overview• Design-Build Procurement Process• Upcoming Design-Build Projects• Other Project Opportunities

Design-Build Procurement Process

• Competitive Sealed Proposals• Best Value Selection• Low Price Selection

• Multi-Step Sealed Bidding

Design-Build Procurement Process

• Project Development• Establish Project Goals• Project Goals tie directly to Project Technical

Evaluation Factors• Goals will help determine relative importance

of Technical Proposal vs. Price Proposal for Trade Off Analysis• Price = Technical• Price > Technical• Technical > Price

Design-Build Procurement Process

• Statement of Qualifications (SOQ)• Lead Design Firm Qualifications and Past

Performance• Lead Construction Firm Qualifications and Past

Performance• Project Understanding and Design-Build Approach

Design-Build Procurement Process

• Evaluation Process• Each SOQ is broken down to individual evaluation

factors for separate teams to rate a factor or factors.• Each evaluation factor and subfactor are rated by

consensus team ratings• Leaders of each team are part of Evaluation

Committee• Evaluation Committee reviews all ratings and

determines consensus overall ratings and recommended Reduced Candidate List

• Recommendation presented to Selection Committee by Chairman of Evaluation Committee for approval.

Design-Build Procurement Process

• Adjectival Rating Process• Establish Ratings Guidance before evaluations• Exceptional, Good, Acceptable, Unacceptable w/ +/-• Weighting of Evaluation Factors and Subfactors

• Critical (3 times more than important)• Significant (2 times more than important)• Important

• No Numbers or Formulas are used.

Design-Build Procurement Process

• Key Staff• Relevant Project Experience – Role on projects,

what they did on projects, and how it is relevant to project under procurement

• Project Description – Demonstrate how projects are similar/relevant to project under procurement

• Design-Build project not necessarily better than DBB, depends on experience and type of project.

Design-Build Procurement Process

• Past Project Experience (3 projects)• Name, location, owner, project delivery method,

construction cost, and schedule performance, and brief project description.

• What work is relevant and why.• Successful methods, approaches and

innovations on the project – relevancy to project under procurement

Design-Build Procurement Process

• Project Understanding & Design-Build Approach• Understanding of Project Goals and Scope

including significant risks and issues• Approach to Design-Build• Organizational Chart

Design-Build Procurement Process

• One-on-One Meetings w/ RCL• Design-Builder sets agenda prior to meeting – more

detail the better• Don’t focus on general clarifications of RFP• Focus on issues that need discussion • Focus on potential ATCs

• Alternative Technical Concepts• Submit Early as possible!!• Alternative solutions/”Practical Design” that will advance

the project goals - Explain• Specific Deviations and why they are better or equal

Design-Build Procurement Process

• Technical Proposal• Same evaluation process as SOQ w/ exception Price is

brought in after consensus Technical Ratings by Evaluation Committee

• Show level of commitment – No consideration for tentative or ambiguous commitments (“we may” “we are considering”)

• Fully answer each question and do it in section of the question – No credit for references to other sections or appendices.

• Ensure it is clear how commitments are beneficial and will realisitically advance and achieve Project Goals.

Upcoming Design-Build Projects

MD 404 – US 50 to E. of Holly Road

◦ +/-9 miles 4 lane divided highway

◦ Request for Qualifications – 10/20/15◦ SOQs due – 11/23/15

◦ Fast track schedule NTP – July 2016 Substantial Completion – November 21, 2017

◦ Project Goals Schedule Cost Safety Customer Satisfaction Mobility

I-270 Innovative Congestion Managment

◦ “Progressive” Design-Build◦ Fixed Price, Best Value Contract◦ Looking for Design-Builder solutions to move the most vehicles

the fastest◦ No predetermined or preconceived solutions◦ Goals – Mobility, Reliability, Safety, Ease of Operations &

Maintenance, Performance Warranty/Incentives◦ I 270 = Laboratory to implement innovative solutions (usage in

other congested corridors)

◦ Request for Qualifications – Spring 2016◦ Two –Phase Contract

Preliminary Design/Preconstruction Services Guaranteed Maximum Price (GMP) for Construction May be multiple GMPs within Fixed Price

Design-Build Project Opportunities

Design-Build Funded◦ US 113 (Phase 4) 4 Lane Roadway (Spring 2016)◦ US 219 – Interchange at I-68 and 4 Lane roadway

(Spring 2016)

Design-Build Unfunded◦ US 13 Bridge Deck Replacements (end-2015)◦ MD 32/Rosemary Lane Interchange Construction

(Fall 2016)

Future Project Opportunities Contracts, Bids & Proposals

http://www.roads.maryland.gov/Index.aspx?PageId=17

Contractor AD Schedule - All Projectshttp://www.roads.maryland.gov/pages/contractadschedule.aspx

Design-Buildhttp://www.roads.maryland.gov/pages/dsbinfo.aspx

Construction Management at Riskhttp://www.roads.maryland.gov/index.aspx?pageID=866

Jeffrey T. Folden, P.E.Assistant Chief, Innovative Contracting

Division Maryland State Highway Administration

[email protected]