21
NHDOT Roundabouts Presented to NH Chapter NH Chapter Institute of Transportation Engineers September 27, 2011

Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

  • Upload
    vohanh

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

NHDOT Roundabouts

Presented to

NH Chapter NH Chapter

Institute of Transportation Engineers

September 27, 2011

Page 2: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

AgendaAgenda

• Current NH roundabouts• Future roundabouts• ObservationsObservations• Design standards

Ch ll• Challenges• Marketing

NHITE Roundabouts

Page 3: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

Roundabout LocationsRoundabout Locations

• 22 in service– 6 State– 13 Municipal– 3 privatep

– 17 single-lane– 5 multi-lane5 multi lane

– 2 multi-lane under const. (MBRA Access Road)

NHITE Roundabouts

Page 4: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

KeeneNH 101 / Winchester StNH 101 / Winchester St

NHITE Roundabouts

Page 5: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

MeredithUS 3 / NH 106US 3 / NH 106

NHITE Roundabouts

Page 6: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

PlymouthUS 3 / NH 175A

NHITE Roundabouts

Page 7: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

RyeNH 1A / Elwyn Road

NHITE Roundabouts

Page 8: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

PeterboroughNH 101 / Shaw’sNH 101 / Shaw s

NHITE Roundabouts

Page 9: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

BoscawenUS 4 / Harris Hill RdUS 4 / Harris Hill Rd

NHITE Roundabouts

Page 10: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

Future Roundabouts

• 3 State roundabouts under const. in 2012– Pelham: Town Center (2)

Laconia: US 3 / NH 11B (“Malfunction – Laconia: US 3 / NH 11B ( Malfunction Junction”)

• 22 under design or being considered– Lee Traffic Circle

S NH 12 / L k St t– Swanzey: NH 12 / Lake Street– Newington-Dover project (2)– Meredith (7)Meredith (7)

NHITE Roundabouts

Page 11: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

Observations

• Good traffic operations• No safety problems…

bl• Public acceptance– Study stage – urge police / fire to discuss with

colleaguescolleagues– Once roundabout is approved, publicity and

education are vitalU i t k iti f – Upon opening, outspoken opposition from vocal minority is common

NHITE Roundabouts

Page 12: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

Design Standards

• No DOT policy on roundabouts

• Design guidelines– Traffic analysis: SIDRA, Synchro, NCHRP 672

d hspreadsheet, RODEL– Design: NCHRP 672 – Informational Guide v.2

NCHRP 572 Roundabouts in the US –NCHRP 572 - Roundabouts in the US (2007)

NHITE Roundabouts

Page 13: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

D i St d d ( t )Design Standards (cont.)• Key concepts

– Left offset of approach – maximize entry deflection

– Fastest path analysisFastest path analysis– Path overlap

• Design vehicle– WB 62 on State roads

WB 67 h ll d– WB 67 where allowed• Add exterior truck aprons where needed• Make exterior curb forgiving => chamfer, rounded

NHITE Roundabouts

Page 14: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

Ch llChallenges• Construction traffic control

– Difficult, but not insurmountable• Construction of truck apron and curbing

C b l hil i bi d• Curb reveal while running on binder

• Trucks• Trucks– Accommodate trucks, but control speeds– Provide forgiving design detailsProvide forgiving design details

NHITE Roundabouts

Page 15: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

Ch ll ( t )Challenges (cont.)• Pavement markingsg

– Need durable markings

• PROWAG– New standards published for public

tcomment– Accessible signals required for

multi-lane ped crossingsmulti lane ped crossings• Pedestrian Hybrid Beacons

NHITE Roundabouts

Page 16: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

M k ti Ch llMarketing Challenges• Public

Education

NHITE Roundabouts

Page 17: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

M k ti Ch ll ( t )Marketing Challenges (cont.)“Whoever was involved with the design and approval of that rotary should be

fired on the spot. It will not solve the problems that it was designed to solve. Total waste of taxpayer money.” Meredith Roundabout - June 14, 2007

www winnipesaukee comwww.winnipesaukee.com

“Another convert!! As a Parade Road resident life has become so much easier with the new roundabout. Yes, people who don't understand it will p pcontinue to gripe about it not being wide enough etc. and, yes, folks do need to use their turn signals but, all in all it really works just fine, even for trucks and cars with boats. Good job to the DOT and my sympathies if they read this site at least early on ”they read this site, at least early on. Meredith Roundabout - July 10, 2007

www.winnipesaukee.com

NHITE Roundabouts

Page 18: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

M k ti Ch ll ( t )Marketing Challenges (cont.)• Public

Education

• NHDOT com• NHDOT.comBrochuresSimulationsNH InformationPicturesDesign InformationLinks

NHITE Roundabouts

Page 19: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

M k ti Ch ll ( t )Marketing Challenges (cont.)• Thru Traffic vs. Roundabout

• Regional Traffic– MeredithMeredith– Peterborough– Boscawen

NHITE Roundabouts

Page 20: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

C h St ti tiCrash Statistics• Concord: Centre/Liberty

d b h / 86%– Pre Roundabout crash rate 5.7/yr– Post Roundabout Crash Rate 0.8/yr

-86%

• Concord: North State/Franklin– Pre Roundabout crash rate 5.0/yr– Post Roundabout Crash Rate 1.0/yr

-80%/y

• Goffstown: Center/Henry BridgePre Roundabout crash rate 1 0/yr +190%– Pre Roundabout crash rate 1.0/yr

– Post Roundabout Crash Rate 2.9/yr– After reviewing crash reports 1.25/yr

+190%+ 25%

NHITE Roundabouts

Page 21: Presented to NH Chapter Institute of Transportation ... roundabouts 27sep11.pdf · easier with the new roundabout. Yes, pppeople who don't understand it will continue to gripe about

Questions ???

NHITE Roundabouts