Upload
vuongkhue
View
225
Download
1
Embed Size (px)
Citation preview
The pricing module is part of the SMART Estimator software solution.
You can quickly enter job details to automatically calculate the price from the built-in rates for labour and materials. Using the module a professional quote can then be quickly generated to help win the business.
The Price IT module also provides reports to help you understand the job costs (labour, materials, overheads and other costs) as well as profit margins. This can help to improve the outcome of contract negotiations. Rates for labour and materials can be configured and saved to suit each customer and several rates can be set up to suit different types of job.
www.smartscaffolder.com
Price ITThe professional pricing solution for any scaffolding business
Call +44 (0)1202 [email protected]
COST SUMMARY
Maintenance WorkAccessDescription:
Contract Number: Q16-100469-GF
OthersProfitMaterial OverheadLabour OverheadMaterialsLabourTender PriceDiscountGross PriceItem
0 %£0.0024%£626.810 %£0.000 %£0.0042
%£1,085.5034%£867.83£2,581.000 %£0.00£2,581.00
Main OfficeRoofAccess
0 %£0.0024%£3,064.040 %£0.000 %£0.0049
%£6,219.0727%£3,401.65£12,685.000 %£0.00£12,685.00Unit 2 Roof
Access
0 %£0.0025%£175.940 %£0.000 %£0.0046
%£333.3929%£207.70£718.000 %£0.00£718.00
Unit 4Tower ToRoof
0 %£0.0024%£3,866.790 %£0.000 %£0.0048
%£7,637.9628%£4,477.18£15,984.000 %£0.00£15,984.00Total :
Price IT – a flexible module for pricing.
Price IT features:
Configurable rates for labour and materials for all scaffolding types
Many pricing methods are provided to suit your company or the type of job
View and edit a detailed breakdown of the labour, material and other costs for each scaffold in your project
Automatically uses the material list for your scaffold to help you calculate a price
Create sets of rates that can be saved and used with future jobs, or exported and sent by email
Use the project pricing report to quickly cost even large projects
Check rates provided to assist in pricing negotiation.
Contract Number
Item
COST ANALYSIS
Description
Hire PeriodQuantity
Q16-100469-GF
Maintenance Work Access
Unit 2 Roof Access 8 weeks1
total price
126 items
£252.00
Safety standards
total price
574.1 m²
£459.28
Debris netting
£711.28
MATERIAL PURCHASE
per tonne£[email protected]
£1,017.45
Transport cost
£0.00
Sale expenses
weeks8per week for£0.00
£0.00
Hire expenses
£1,017.45
CONTRACT EXPENSES
fittings£2,458.78of the0.00 %
£0.00
Progressive hire rate reduction
tubular components£817.70
of the0.00 %
£0.00
Progressive hire rate reduction
weeks8per week for
£307.3480@2854 items
£2,458.78
Fittings
weeks8per week for
£1,213.86
Decking
weeks8per week for
£817.70
Tubular components
£4,490.34100.00 %X£4,490.34
MATERIAL HIRE
£6,219.07
MATERIALS
output pay£2,616.65
of the30.00 %
£785.00
Wage-on costs
£785.00
WAGE-ON COSTS
per day£0.00@hrs per [email protected]
£0.00
Labour expenses
per day£0.00@paid days10.90workers:3.00
£0.00
Labour downtime
per day£0.00@paid days10.90workers:3.00
£0.00
Travel time
per day£0.00@paid days10.90workers:3.00
£0.00
Travel expenses
£0.00
EXPENSES
£785.00
ADDITIONAL COSTS
£0.00
Carry in and carry out
£0.00
GENERAL LABOUR
erect price£1,744.43of the50.00 %
£872.22
Dismantle scaffold
£872.22
DISMANTLE
per adaption£[email protected]
£0.00
Adapt Independent 1
£0.00
ADAPTIONS
per square metre£0.20@
m² cladding574.100
£114.82
Debris netting fixing
each£[email protected]
£31.50
Safety standards fixing
each£1.50@ties60
£90.00
Drilled anchor
per metre£5.00@m of lift run301.622
£1,508.11
Independent 1
£1,744.43
ERECT
£2,616.65
OUTPUT PAY
£3,401.65
LABOUR
$TRANSPORT QUANTIFY
DXFSCHEDULE
DXFSCHEDULE
BIMBIM DXF
SCHEDULE
DXFSCHEDULE
DXFSCHEDULE
TUBE & FITTING RING SLOTCUP FRAMEWEDGETUBE & FITTING RING SLOTCUP FRAMEWEDGETUBE & FITTING RING SLOTCUP FRAMEWEDGE
2DTRANSPORTESTIMATE QUOTE MODEL DRAWMATERIALS LABOUR NETWORK TABLET
DXFPDFCOST ANALYSIS AUTOCAD
2DTRANSPORTESTIMATE QUOTE MODEL DRAWMATERIALS LABOUR NETWORK TABLET
DXFPDFCOST ANALYSIS AUTOCAD
IFC 2DTRANSPORTESTIMATE QUOTE MODEL DRAWMATERIALS LABOUR NETWORK TABLET
DXFPDFCOST ANALYSIS AUTOCAD
The Price IT module provides project pricing, including a ‘Detailed Cost Analysis’ report.
Rates and Pricing MethodsLabour and material rates along with associated overheads and margins can be configured according to preferred options. Labour pricing can also be based upon monetary cost or labour rates and hourly labour costs. Material rental costs are calculated from the material quantities, as a percentage of the labour cost or as an ‘all-in’ rate without a separate rental cost.
Negotiate Better PricesBidding for scaffolding work has never been easier or more effective because SMART Estimator can produce a ‘Detailed Cost Analysis’. This useful confidential report provides a detailed breakdown of labour, materials and overheads to help you better understand job costs and profit margins and hence improve the outcome of contract negotiations. Check rates are also provided to ensure the job isn’t won for the wrong reason, e.g. under priced.
Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES Computer and Design Services Ltd · Arrowsmith Court, Broadstone, Dorset, BH18 8AX, UK
CUKSSPI0514/03
For a demo contact:Phone: +44 (0)1202 603031 Email: [email protected]
Authorised Developer
SMARTcover
SMART Scaffolder offers a valuable combination of learning, technical support, expert advice and software maintenance services in a single contract. SMARTcover ensures users get the help they need to fully exploit and stay current with the rapidly changing BIM technologies.
Your SMART Estimator Solution
Computer and Design Services Ltd
GLOBAL CONSTRUCTION
SOFTWARE AND SERVICES
Deliver
Create
Model in 3D using intuitive
‘drag and drop’ technologyEnter elevations
and dimensions
manually to build your scheme
Generate a TG20:13
Summary
Report for your scaffolds
Manage project pricing and
analyse costs
Create instant
material lists and
engineering drawings
Authorised Developer
DXFSCHEDULE
Scaffolds
Cost
RingTube& Fit
TUBE & FITTING RINGSLOT
CUPFRAME
WEDGE
TUBE & FITTING RINGSLOT
CUPFRAME
WEDGE
TUBE & FITTING RINGSLOT
CUPFRAME
WEDGE
TUBE & FITTING RINGSLOT
CUPFRAME
WEDGE
Cup
FrameSlot
Wedge
DXFSCHEDULE
2DTRANSPORT
ESTIMATE QUOTE MODEL
DRAW
MATERIALS LABOUR NETWORKTABLET
DXFPDFCOST ANALYSIS
AUTOCAD2DTRANSPORT
ESTIMATE QUOTE MODEL
DRAW
MATERIALS LABOUR NETWORKTABLET
DXFPDFCOST ANALYSIS
AUTOCAD
2DTRANSPORT
ESTIMATE QUOTE MODEL
DRAW
MATERIALS LABOUR NETWORKTABLET
DXFPDFCOST ANALYSIS
AUTOCAD
DXFSCHEDULE
2DTRANSPORT
ESTIMATE QUOTE MODEL
DRAW
MATERIALS LABOUR NETWORKTABLET
DXFPDFCOST ANALYSIS
AUTOCAD
My Business
PC
Single User Office
Multi-PC
Multi-user Multi-office
Server
Users Location(s)
Hardware
Tablet
2DTRANSPORT
ESTIMATE QUOTE MODEL
DRAW
MATERIALS LABOUR NETWORKTABLET
DXFPDFCOST ANALYSIS
AUTOCAD
Import of 2D plans.
Export of 3D models
and 2D drawings
BIM
Choose tube & fit or a system
Model/AnalysisDraw
Save drawings as DXF files
to import into AutoCAD
DXFSCHEDULE
DXFSCHEDULE
Generate professional,
business winning quotations
DXFSCHEDULE
DXFSCHEDULE
2DTRANSPORT
ESTIMATE QUOTE MODEL
DRAW
MATERIALS LABOUR NETWORKTABLET
DXFPDFCOST ANALYSIS
AUTOCAD
2DTRANSPORT
ESTIMATE QUOTE MODEL
DRAW
MATERIALS LABOUR NETWORKTABLET
DXFPDFCOST ANALYSIS
AUTOCAD BIMBIM
2DTRANSPORT
ESTIMATE QUOTE MODEL
DRAW
MATERIALS LABOUR NETWORKTABLET
DXFPDFCOST ANALYSIS
IFCAUTOCAD
EXCHANGEXLS
SPEADSHEET
$TRANSPORT
QUANTIFY
TUBE & FITTING RINGSLOT
CUPFRAME
WEDGETUBE & FITTING RING
SLOTCUP
FRAMEWEDGE