110

Primary/Secondary Pumping Packages

  • Upload
    doandan

  • View
    252

  • Download
    5

Embed Size (px)

Citation preview

Page 1: Primary/Secondary Pumping Packages
Page 2: Primary/Secondary Pumping Packages
Page 3: Primary/Secondary Pumping Packages

An Introduction to

www.hyfabco.com

Page 4: Primary/Secondary Pumping Packages

Introduction 3

VariousHYFABPackages 19

DuplexandTriplexPumpingPackages 38

Primary/SecondaryPumpingPackages 52

HeatTransferPackages 59

BoilerPackages 77

WSHP/ChillerPumpingPackages 87

SteamPRVStations 90

PressureBoosterPackages 93

WaterHeaterandOtherPackages 100

Table of Contents

Page 5: Primary/Secondary Pumping Packages

3

QualityPackagesThroughExpertiseandtheUseofQualityComponentsforOver35Years

Page 6: Primary/Secondary Pumping Packages

4

QualityPackagesThroughExpertiseandtheUseofQualityComponentsforOver35Years

1979

Page 7: Primary/Secondary Pumping Packages

5

2014

Page 8: Primary/Secondary Pumping Packages

6

QualityThroughStandards–ASMECertifiedWelders

Page 9: Primary/Secondary Pumping Packages

7

QualityThroughStandards–ULListed

Page 10: Primary/Secondary Pumping Packages

8

QualityThroughStandards–AWSCertifiedStructuralWelders

Page 11: Primary/Secondary Pumping Packages

9

QualityThroughFactoryTesting

Page 12: Primary/Secondary Pumping Packages

10

QualityThroughWell-Trained,andWell-EquippedPersonnel

Page 13: Primary/Secondary Pumping Packages

11

QualityThroughWell-TooledProductionFacility

Page 14: Primary/Secondary Pumping Packages

12

QualityThroughMaintainedInventoryofQualityXylemComponents

Page 15: Primary/Secondary Pumping Packages

13

QualityThroughWell-TrainedandWellEducatedDesignTeam

Page 16: Primary/Secondary Pumping Packages

14

QualityThroughEngineeringCommunitySupport

Design Assistance

Page 17: Primary/Secondary Pumping Packages

15

3D Drawings

QualityThroughEngineeringCommunitySupport

Page 18: Primary/Secondary Pumping Packages

16

QualityThroughCustomerEducationandTraining

Page 19: Primary/Secondary Pumping Packages

17

QualityThroughCustomerEducationandTraining

Page 20: Primary/Secondary Pumping Packages

18

PartialListofCustomers

Page 21: Primary/Secondary Pumping Packages

VariousHYFAB Packages

19

Page 22: Primary/Secondary Pumping Packages

20

SimplexPumpingPackage

Page 23: Primary/Secondary Pumping Packages

21

DuplexPumpingPackage–FastTrack16”Header,200HP

Page 24: Primary/Secondary Pumping Packages

22

DuplexPumpingPackage–GlycolMakeup,ChilledWaterTank

Page 25: Primary/Secondary Pumping Packages

23

DuplexPumpingPackage–CustomerRequestedSpecialComponents

Page 26: Primary/Secondary Pumping Packages

24

Primary/SecondaryPumpingPackage

Page 27: Primary/Secondary Pumping Packages

25

HeatTransferPackagewithPressurePoweredCondensatePump

Page 28: Primary/Secondary Pumping Packages

26

6MillionBTUHCondensingHotWaterPlantwithVariableSpeedDistributionPumps

Page 29: Primary/Secondary Pumping Packages

27

WSHPPackagewithBoilerColdWaterProtection

Page 30: Primary/Secondary Pumping Packages

28

DuplexPumpingPackageinEnvironmentalEnclosure

Page 31: Primary/Secondary Pumping Packages

29

OutdoorPumpPackageIntegratedwithAir-CooledChiller

Page 32: Primary/Secondary Pumping Packages

30

PackagedParallel2-StageSteamPRVStation

Page 33: Primary/Secondary Pumping Packages

31

CondensingWaterHeaterPackage

Page 34: Primary/Secondary Pumping Packages

32

ModularVariableSpeedPressureBoosters(MVP)

Page 35: Primary/Secondary Pumping Packages

33

MultipleModelsinStock

Page 36: Primary/Secondary Pumping Packages

34

ModularVariableSpeedPressureBoosters(eMVPJr.)

Contact us for information on how to get an eMVPJr into your lineup. 888.902.8324 www.hyfabco.com

PR

ESS

UR

E

PR

ESS

UR

E

F L O W F L O W

The eMVPJr Advantage

Water pressure drops when demand is high.

The eMVPjr makes up the pressuredifference at peak demand for

constant water pressure

M O D U L A R V A R I A B L E S P E E D P R E S S U R E B O O S T E R

GG094_eMVPJrFlyer_12.2012_MECH.indd 1 12/14/12 8:56 AM

Contact us for information on how to get an eMVPJr into your lineup. 888.902.8324 www.hyfabco.com

Custom units available on request

Max Wt. 300#

R E V 1 2 / 2 0 1 2

eMVPjr - X X XHigh/LowPressure

1 1 = 1 1 5 / 1 / 6 02 1 = 2 0 8 - 2 3 0 / 1 / 6 0

2 3 = 2 0 8 / 3 / 6 04 3 = 4 6 0 / 3 / 6 0

Booster HP Voltage

Booster Dimensions (max.)

Model Identification

eMVPjr-1LX

eMVPjr-2LX

eMVPjr-3HX

eMVPjr-3LX

eMVPjr-5HX

Modular Variable

Speed Pressure Booster Jr.

HP = 1, 2, 3, 5

Pressure: L= Low, H = High

Inlet/Outlet Connection Size

Voltage: 11 = 115 / 1 / 60

21 = 208-230 / 1 / 60

23 = 208 / 3 / 60, 43 = 460 / 3 / 60

eMVPjr 1 L 11 1.5”eMVPjr 1 L 21 1.5”eMVPjr 2 L 21 2”eMVPjr 3 L 21 2”eMVPjr 3 L 23 2”eMVPjr 3 L 43 2”eMVPjr 3 H 21 2”eMVPjr 3 H 23 2”eMVPjr 3 H 43 2”eMVPjr 5 H 21 2”eMVPjr 5 H 23 2”eMVPjr 5 H 43 2”

Stoc

k m

odels

avail

able

39”

29”

31”

GG094_eMVPJrFlyer_12.2012_MECH.indd 2 12/14/12 8:56 AM

Page 37: Primary/Secondary Pumping Packages

35

• Meets 90.1 – 2010• Varies setpoint based on demand• Increased energy savings without remote sensor• Decreases installation costs, time and coordination• Integral touchscreen design

ASHRAE90.1 - 2010Compliant

Remote Pressure Sensor DemandSet Control

CityMain

BackflowPreventer

Adjustable Frequency Driveand Controller

30 PSIG

WaterMeter

HW CW

Kitchen

HW CW

Administration and bed tower

On

top

of b

uild

ing

HW CW

Laundry

Pump 1

Pump 2

Remotepressuresensor

Critical Fixture

CityMain

BackflowPreventer

Adjustable Frequency Driveand Controller

30 PSIG

WaterMeter

HW CW

Kitchen

HW CW

Administration and bed tower

HW CW

Laundry

Pump 1

Pump 2

Localpressuresensor

Critical Fixture

OR

States to Use 90.1-2010 by Oct. 18, 2013

ASHRAE’s Washington office is reporting that the U.S. Department of Energy (DOE) has determined that ANSI/ASHRAE/IES Standard 90.1-2010, Energy Standard for Buildings Except Low-Rise Residential Buildings, saves more energy than Standard 90.1-2007. Specifically, DOE found national source energy savings of approximately 18.2%, and site energy savings of approximately 18.5%, when comparing the 2010 and 2007 versions of Standard 90.1. As a result of the DOE final determination, states are required to certify by Oct. 18, 2013 that they have reviewed the provisions of their commercial building code regarding energy efficiency and updated their code to meet or exceed Standard 90.1-2010.

Mandatory Provisions10.4.2 Service Water Pressure Booster Systems. Service water pressure booster systems shall be designed such that:a. One or more pressure sensors shall be used to vary pump speed and/or start and stop pumps.

The sensor(s) shall either be located near the critical fixture(s) that determine the pressure required, or logic shall be employed that adjusts the setpoint to simulate operation of remote sensor(s).

b. No device(s) shall be installed for the purpose of reducing the pressure of all the water supplied by any booster system pump or booster system, except for safety devices.

c. No booster system pumps shall operate when there is no service water flow.

DemandSetControl™

Page 38: Primary/Secondary Pumping Packages

36

HYFABMakeupAssemblies(MUA)

Contact us for more information on the HYFAB MUA. 888.902.8324 www.hyfabco.com

HYFAB Makeup Assemblies (MUA’s)The design and installation of water make-up is critical to a closed-loop hydronic heating or cooling system. Incorrect pressurization may result in unwanted air which not only decreases comfort and efficiency but can also shorten the life of your system.

H Y F A B M A K E U P A S S E M B L I E S

HYFAB Makeup Assemblies (MUA’s)

HYFAB Make-up Assemblies are pre-engineered and factory built to ensure the make-up components are correctly assembled. These assemblies save time and money by reducing field labor costs.

• Reduces field labor cost by eliminating fabrication time• Pre-engineered for proper operation• Single source purchasing for all components • In stock for quick shipment• Meets Buy American Act (BAA)

Notes:1 Other pressures available by special order2 ¾" uses B&G 790 relief valve, 1" uses B&G 1170 relief valve3 RPZ and Double Check Backflow are by Apollo and same size as MUA

Item Number

Advantages

Contact us for information on how to save money with prefab MUA's. 888.902.8324 www.hyfabco.com0 7 / 2 0 1 3

M UA X X X - X - X X X - X X X - XMake-up

Assembly Size(Inch)

Relief Valve Size(Inch)

Relief Valve Setting(PSI)2

PRVPressure Range (PSI)1

Backflow Preventer3

075 – 3/4"

100 – 1"

075 – 3/4"

100 – 1"

L - 10 to 25H - 25 to 60

N - 15 – 75

N - NoneR - RPZ with Air GapD - Double Check

*Only available with 3/4" Relief Valve Selection

015*030036045050075100125

Page 39: Primary/Secondary Pumping Packages

37

HeatTransferPackages

Page 40: Primary/Secondary Pumping Packages

Duplex and Triplex Pumping Packages

38

Page 41: Primary/Secondary Pumping Packages

3939

DuplexPumpingPackage

Page 42: Primary/Secondary Pumping Packages

40

DuplexPumpingPackage

Page 43: Primary/Secondary Pumping Packages

41

DuplexPumpingPackage

Page 44: Primary/Secondary Pumping Packages

42

DuplexPumpingPackage

Page 45: Primary/Secondary Pumping Packages

43

DuplexPumpingPackage

Page 46: Primary/Secondary Pumping Packages

44

DuplexPumpingPackage

Page 47: Primary/Secondary Pumping Packages

45

DuplexPumpingPackage

Page 48: Primary/Secondary Pumping Packages

46

DuplexPumpingPackage

Page 49: Primary/Secondary Pumping Packages

47

DuplexPumpingPackage

Page 50: Primary/Secondary Pumping Packages

48

DuplexPumpingPackage

Page 51: Primary/Secondary Pumping Packages

49

TriplexPumpingPackage

Page 52: Primary/Secondary Pumping Packages

50

TriplexPumpingPackage

Page 53: Primary/Secondary Pumping Packages

51

TriplexPumpingPackage

Page 54: Primary/Secondary Pumping Packages

Primary/Secondary Pumping Packages

52

Page 55: Primary/Secondary Pumping Packages

5353

Primary/SecondaryPumpingPackage

Page 56: Primary/Secondary Pumping Packages

54

Primary/SecondaryPumpingPackage

Page 57: Primary/Secondary Pumping Packages

55

Primary/SecondaryPumpingPackage

Page 58: Primary/Secondary Pumping Packages

56

Primary/SecondaryPumpingPackage

Page 59: Primary/Secondary Pumping Packages

57

Primary/SecondaryPumpingPackage

Page 60: Primary/Secondary Pumping Packages

58

Primary/SecondaryPumpingPackage

Page 61: Primary/Secondary Pumping Packages

Heat Transfer Packages

59

Page 62: Primary/Secondary Pumping Packages

60

HeatTransferPackage

Page 63: Primary/Secondary Pumping Packages

61

HeatTransferPackage

Page 64: Primary/Secondary Pumping Packages

62

HeatTransferPackage

Page 65: Primary/Secondary Pumping Packages

63

HeatTransferPackage

Page 66: Primary/Secondary Pumping Packages

64

HeatTransferPackage

Page 67: Primary/Secondary Pumping Packages

65

HeatTransferPackage

Page 68: Primary/Secondary Pumping Packages

66

HeatTransferPackage

Page 69: Primary/Secondary Pumping Packages

67

HeatTransferPackage

Page 70: Primary/Secondary Pumping Packages

68

HeatTransferPackage

Page 71: Primary/Secondary Pumping Packages

69

HeatTransferPackage

Page 72: Primary/Secondary Pumping Packages

70

HeatTransferPackage

Page 73: Primary/Secondary Pumping Packages

71

HeatTransferPackage

Page 74: Primary/Secondary Pumping Packages

72

HeatTransferPackage

Page 75: Primary/Secondary Pumping Packages

73

HeatTransferPackage

Page 76: Primary/Secondary Pumping Packages

74

HeatTransferPackage

Page 77: Primary/Secondary Pumping Packages

75

HeatTransferPackage

Page 78: Primary/Secondary Pumping Packages

76

HeatTransferPackage

Page 79: Primary/Secondary Pumping Packages

Boiler Packages

77

Page 80: Primary/Secondary Pumping Packages

78

BoilerPackage

Page 81: Primary/Secondary Pumping Packages

79

BoilerPackage

Page 82: Primary/Secondary Pumping Packages

80

BoilerPackage

Page 83: Primary/Secondary Pumping Packages

81

BoilerPackage

Page 84: Primary/Secondary Pumping Packages

82

BoilerPackage

Page 85: Primary/Secondary Pumping Packages

83

BoilerPackage

Page 86: Primary/Secondary Pumping Packages

84

BoilerPackage

Page 87: Primary/Secondary Pumping Packages

85

BoilerPackage

Page 88: Primary/Secondary Pumping Packages

86

BoilerPackage

Page 89: Primary/Secondary Pumping Packages

WSHP/Chiller Pumping Packages

87

Page 90: Primary/Secondary Pumping Packages

88

WSHP/ChillerPumpingPackage

Page 91: Primary/Secondary Pumping Packages

89

WSHP/ChillerPumpingPackage

Page 92: Primary/Secondary Pumping Packages

Steam PRVStations

90

Page 93: Primary/Secondary Pumping Packages

91

SteamPRVStation

Page 94: Primary/Secondary Pumping Packages

92

SteamPRVStation

Page 95: Primary/Secondary Pumping Packages

Pressure Booster Packages

93

Page 96: Primary/Secondary Pumping Packages

94

PressureBoosterPackage

Page 97: Primary/Secondary Pumping Packages

95

PressureBoosterPackage

Page 98: Primary/Secondary Pumping Packages

96

PressureBoosterPackage

Page 99: Primary/Secondary Pumping Packages

97

PressureBoosterPackage

Page 100: Primary/Secondary Pumping Packages

98

PressureBoosterPackage

Page 101: Primary/Secondary Pumping Packages

99

PressureBoosterPackage

Page 102: Primary/Secondary Pumping Packages

Water Heater and Other Packages

100

Page 103: Primary/Secondary Pumping Packages

101

WaterHeaterPackage

Page 104: Primary/Secondary Pumping Packages

102

WaterHeaterPackage

Page 105: Primary/Secondary Pumping Packages

103

PressurePoweredPumpPackage

Page 106: Primary/Secondary Pumping Packages

104

CustomControlPanel

Page 107: Primary/Secondary Pumping Packages

105

OtherPumpingPackages

Page 108: Primary/Secondary Pumping Packages
Page 109: Primary/Secondary Pumping Packages
Page 110: Primary/Secondary Pumping Packages

P.O. Box 16706 • 206 Seneca RoadGreensboro, NC 27406

336.378.9911 • 800.365.9010www.hyfabco.com