    THE PRINCE 2 METHOD

    Session 3 The Prince 2 Components

  • 8/8/2019 PRINCE2_Intro 3

    2/26

    Overview

    P2 Risk

    Management

    P2 Quality

    P2 Configuration

    Management

    P2 Change Control

  • 8/8/2019 PRINCE2_Intro 3

    3/26

    Overview

    P2 Risk

    Management

    P2 Quality

    P2 Configuration

    Management

    P2 Change Control

  • 8/8/2019 PRINCE2_Intro 3

    4/26

    Risk Management

    WHAT IS RISK? - DEFINITION

  • 8/8/2019 PRINCE2_Intro 3

    5/26

    Risk Management

  • 8/8/2019 PRINCE2_Intro 3

    6/26

    Risk Management

  • 8/8/2019 PRINCE2_Intro 3

    7/26

    Risk Management

    Risk Analysis

    Prevention Reduction Transference

    Contingency Acceptance

  • 8/8/2019 PRINCE2_Intro 3

    8/26

    Risk Management

    Risk Management

    Planning Resourcing Monitoring Controlling

  • 8/8/2019 PRINCE2_Intro 3

    9/26

    Overview

    P2 Risk

    Management

    P2 Quality

    P2 Configuration

    Management

    P2 Change Control

  • 8/8/2019 PRINCE2_Intro 3

    10/26

    Quality

  • 8/8/2019 PRINCE2_Intro 3

    11/26

    Quality

    Prominent Throughout the Project:

  • 8/8/2019 PRINCE2_Intro 3

    12/26

    Quality

    Four Elements Make Up A Quality System:

    1.

    Quality System2. Quality Assurance

    3. Quality Planning

    4. Quality Control

  • 8/8/2019 PRINCE2_Intro 3

    13/26

    Quality

    Four Elements Make Up A Quality System:

    1.

    Quality System2. Quality Assurance

    3. Quality Planning

    4. Quality Control

  • 8/8/2019 PRINCE2_Intro 3

    14/26

    Quality

    Four Elements Make Up A Quality System:

    1.

    Quality System2. Quality Assurance

    3. Quality Planning

    4. Quality Control

    Policy Statement

    Organization

    Processes

    Procedures

  • 8/8/2019 PRINCE2_Intro 3

    15/26

    Four Elements Make Up A Quality System:

    1.

    Quality System2. Quality Assurance

    3. Quality Planning

    4. Quality Control

    Quality

    FunctionExternal to Project

  • 8/8/2019 PRINCE2_Intro 3

    16/26

    Four Elements Make Up A Quality System:

    1.

    Quality System2. Quality Assurance

    3. Quality Planning

    4. Quality Control

    Quality

    Internalto Project

  • 8/8/2019 PRINCE2_Intro 3

    17/26

    Four Elements Make Up A Quality System:

    1. Quality System

    2. Quality Assurance

    3. Quality Planning

    4. Quality Control

    Quality

    Internaland Externalto Project

  • 8/8/2019 PRINCE2_Intro 3

    18/26

    Overview

    P2 Risk

    Management

    P2 Quality

    P2 Configuration

    Management

    P2 Change Control

  • 8/8/2019 PRINCE2_Intro 3

    19/26

    Configuration Management

    A configuration is a logically related set of products

    that need to managed as a composite set

  • 8/8/2019 PRINCE2_Intro 3

    20/26

    RepresentingDeliverablesor Products

    Equip ent

    Docu entation

    Instructions

    Infor ation

  • 8/8/2019 PRINCE2_Intro 3

    21/26

  • 8/8/2019 PRINCE2_Intro 3

    22/26

    Configuration Management

    Configuration management provide techniques and

    procedures to:

    1. Identify configuration items2. Record status

    3. Control distribution, record keeping and version

    control arrangements

    4. Deal with issues and changes, related to the

    product(s)

  • 8/8/2019 PRINCE2_Intro 3

    23/26

    Configuration Management

    In P2 configuration management is not optional and specify 5 functions:

    1. Planning which products should be controlled and at what

    level

    2. Identification of all sub components/products/deliverable

    making up the final product

    3. Control when will a product status be frozen and if changed

    at what level authority is required

    4. Status accounting ensuring that all historical and current dataare recorded and up to date

    5. Verification of records in relation to actual status of

    products/components

  • 8/8/2019 PRINCE2_Intro 3

    24/26

    Overview

    P2 Risk

    Management

    P2 Quality

    P2 Configuration

    Management

    P2 Change Control

  • 8/8/2019 PRINCE2_Intro 3

    25/26

    Change Control

    In P2 change is dealt with as

    issues, and put forward a

    techniques called Change

    Control Key is who should

    approve. If the Board can it will

    play the role, but could also

    delegate it to a change authority

    who will approve within specified

    tolerances. Key questions with

    respect to change is: Who will approve

    At what level

    How will changes be fundedChange Authority