18
CHRIS/PROBA Workshop 28/04/2004 PROBA 1 F. Teston ESA/ESTEC D/TEC-EL [email protected]

PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

PROBA 1

F. TestonESA/ESTECD/[email protected]

Page 2: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

Orbital parameters:• Altitude: 681 - 561 km• Near polar (inclination of 97.9°)• Sun-synchronous • Period 96.97min

PROBA 1 has been launched on 21 October 2001

PROBA 1 launchPROBA 1 launch

Page 3: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

start date stop date Activity

22 October 2001 Launch

22 October 2001 24 October 2001 LEOP

24 October 2001 April 2002 Commissioning

April 2002 April 2003 Technology Demonstration mission

April 2002 Start of CHRIS instrument calibration campaign & science mission

Continuous Implementation and in-flight testing of improvements of the system and operations

October 2002 Priority given to science mission

Jan 2003 March 2003 Intensive campaign to further improve system stability and reliability in preparation of ScientificUtilisation Mission

April 2003 now Scientific Utilisation Mission, main mission priority

June 2003 Start of utilisation of Kiruna as additional downlink station

PROBA 1 early activitiesPROBA 1 early activities

Page 4: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

ESA technology demonstration program (GSTP)(1) In orbit demonstration of spacecraft technology(2) Payload complement

– CHRIS: Compact High Resolution Imaging Spectrometer– HRC: High Resolution Telescope– SREM, DEBIE, MRM: Earth environment monitors

Operations centre located at ESA-Redu ground station (B)

PROBA 1 Data (1)PROBA 1 Data (1)

Page 5: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

• Mass : 94 kg• Volume : 80cm x 60cm x 60cm• Power : 40 to 120 W• High accuracy and agile ACNS

PROBA 1 Data (2)PROBA 1 Data (2)

Page 6: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

Mission managementMission management

Main elements (related to CHRIS):

•PROBA 1 Steering Group (ESA) in charge of overall mission management•CHRIS Steering Group (BNSC) in charge of CHRIS utilisation•Campaign Unit (ESA) in charge of the definition and the organisation of the CHRIS Observation Plan•RSAC (UK) in charge of CHRIS day to day planning•SIRA (UK) in charge of level 0 processing and data distribution•ESA Redu (B) in charge of spacecraft operations•Industry in charge of technical project support

Page 7: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

PROBA 1 statusPROBA 1 status

•Spacecraft is operating on its nominal chain•Degradation of power subsystem (solar arrays and battery) is compatible with the current mission and further extension is possible with some saving measures (limitation in summer of earth environment instruments)•Degradation of radiation sensitive items (electronics, CCD) was observed but remains compatible with the mission and a possible extension•Orbital natural decay and drift from SSO are very low (< 10 km semi-major axis)•Ground segment status (addressed later)Drift of the orbital plane wrt the sun (i.e. drift from sun-synchronicity): <2°/year (< 8min) in the direction of noon.

apogee height

70387040704270447046704870507052705470567058

14-Sep-01

14-Jan-02 16-May-02

15-Sep-02

15-Jan-03 17-May-03

16-Sep-03

date

km

perigee height

6922

6924

6926

6928

6930

6932

14-Sep-01

14-Jan-02 16-May-02

15-Sep-02

15-Jan-03 17-May-03

16-Sep-03

date

km

Page 8: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

PROBA 1 EO related performancesPROBA 1 EO related performances

•Spacecraft pointing performances are in line with expectations,•Data link is nominal (some data loss on board),•Thermal stability of CHRIS is adequate

The main remaining issue is related to the spacecraft robustness which is acceptable but still includes anomalies causing losses of images (success rate addressed later) .

Page 9: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

Platform stability, including onboard computer rebootsThe main problems still encountered on board after the end of the commissioning phase were the relatively frequent software reboots

and the instable attitude control. Cold reboots resulting in the loss of not yet dumped image data and reconfiguration of the spacecraft into safe mode occurred typically once every 3-6 days or once every few weeks. Although the frequency of such events varied during the mission these events were found to be related and all had a potential impact on the spacecraft scientific return (less to the technology demonstration return). Depending on the case by case situation, this impact could consist in:

•the loss of planned imaging activities between two ground segment passes•the loss of imaging data •quality loss of imaging data

Considerable effort has been put into the investigations of these events and into the definition and implementation of containment and corrective actions. As a result most of the mechanisms leading to these events were identified and corrected or worked-around, resulting finally in a complete resolution and a stable platform in April 1st 2003.

Infant anomaliesInfant anomalies

Centre timesThe CHRIS image times that the PPU manager takes from the ACNS represent centre times of the image. No factor was used to start the imaging sooner. Consequently, the selected target was not in the centre of the image, but always at the edge of the image (the image scan starts at the target). Therefore, the 5 images taken with CHRIS were not of the exact same area. Forward scans would show an area starting with the target and moving in the flight direction. Backward scans would also start at the target and move in the opposite of the flight direction. A patch in RAM has been uploaded with a configurable time offset, that will correct the values obtained from the ACNS. This patch successfully adjusts the start time of the CHRIS imaging, such that the target is located in the centre of the image. Depending on the image taken (e.g. number of lines), the time offset needed can be up to 5 seconds for a 10 second image.Furthermore, the presence of this patch provides the spacecraft operators to choose between overlapping images (images of the same area taken under different angles) or to “pave” the images in order to increase the actual field of view.

Page 10: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

Thermal Subsystem (CHRIS)Thermal Subsystem (CHRIS)

-4.0

-2.0

0.0

2.0

4.0

6.0

8.0

0.0 24.0 48.0 72.0

hours in terrestrial

CH

RIS

tem

pera

ture

(°C

)

-6.0

-4.0

-2.0

0.0

2.0

4.0

6.0

8.0

10.0

12.0

0.0 20.0 40.0 60.0 80.0 100.0

orbit time (minutes)

tem

pera

ture

(°C

)

COLD_MODEL_CHRISHOT_MODEL_CHRISMEASURED_CHRIS

In orbit results: CHRIS TemperatureTransient from Bdot to Terrestrial

Measurements versus simulation results

Page 11: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

InstrumentsInstruments

Page 12: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

High Resolution Camera (HRC)• Panchromatic • 3D Packaging Technology CCD• Fixed target pointing• Strong requirements platform stability• 8 m ground resolution• Image size 4 x 4 km

High Resolution CameraHigh Resolution Camera

Page 13: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

Terrestrial : Fixed target pointingTerrestrial : Fixed target pointing

4 km

Line-of-sightof imager

HRCImage

No scanning: ground speed = 0 m/sec

Fixed target pointing• Used for HRC and WAC imaging and optimal ground contact

• HRC: 8 m resolution

• Off-track pointing of 25° possible

Page 14: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

High Resolution Camera resultsHigh Resolution Camera results

Page 15: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

CHRISCHRIS

• Bi-directional Reflectance Distribution Function measurements

• 19 spectral bands (415 - 1050 nm)• Push-broom• 20 m resolution• Image size 15 x 15 km

Compact High Resolution Imaging Spectrometer (CHRIS)

Page 16: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

Terrestrial : ImagingTerrestrial : Imaging

15km

Beginimaging

Endimaging

Line-of-sightof imager

Image2Image4Image5 Image1Image3

Scanning speed = 1/5 of spacecraft ground speed

Imaging mode:• CHRIS BRDF images

• 5 images per sequence in observation cone with 55° co-elevation angle

• Motion compensation of factor 5 wrt traditional push-broom! images takes 10 seconds

• 20 m resolution

• Off-track pointing of 25° possible

Page 17: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

Earth targettingEarth targetting

• Prediction of the satellite flying by a target over the next day within some Roll constraints.• Fine prediction and count down for fixed target pointing and CHRIS imaging.• Used for sorting/selecting multiple targets and implement command sequence relative to fly-by (e.g

switch on camera 100 sec before image taking).

γ*

γSpacecraftUser-selected

imaging targetPitch

Earth

γmax

Observation Cone

rREL

rrT

αOBS0)(sin)()(cos)(0cos =+⇒= tutBtutA

dtd γ

TREL

TREL

TREL

TREL

rrrr

rrrr rr

rr

rr ⋅−=⋅−=γcos

Target prediction

Find the extrema of cosγ

Page 18: PROBA 1 - Earth Onlineearth.esa.int/workshops/chris_proba_04/pres/2_FTeston.pdf · CHRIS/PROBA Workshop 28/04/2004 Orbital parameters: • Altitude: 681 - 561 km • Near polar (inclination

CHRIS/PROBA Workshop 28/04/2004

ConclusionConclusion

The PROBA mission - although designed as a technology demonstrator with a lifetime of 1 year – has demonstrated adequate capabilities for science, disaster monitoring, education and outreach by the Earth observation community. The life time can be further extended for a period of at least 2 years (this extension is based on the status of the limited life on board items not on reliability estimation).

The extension would require adequate support to cover technical support from project at ESTEC and industry in addition to the operation of the ground segment elements at Redu, Sira, RSAC, ESRIN.

Depending on the mode of operations PROBA can support EO needs with a capability ranging from 2 sets of 5 multi-spectral, multi-angle scientific images to 50 push-broom 3 bands pseudo-colour images per day (depending on viewing opportunities and ground station visibility). Additional capability would require modification of the ground station locations.