32
Probabilistic Seismic Probabilistic Seismic Hazard Assessment Hazard Assessment

Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

Probabilistic Seismic Probabilistic Seismic Hazard AssessmentHazard Assessment

Page 2: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

Seismic Failure ModesSeismic Failure Modes

Sliding failure through weak lift lineSliding failure through weak lift line

Horizontal crackingHorizontal cracking

Liquefaction of dam or foundationLiquefaction of dam or foundation

Cracking from severe shakingCracking from severe shaking

Surface fault displacement through the Surface fault displacement through the foundationfoundation

Overtopping from landslide failure into Overtopping from landslide failure into reservoirreservoir

Page 3: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012
Page 4: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

Liquefaction induced flow slide from M 6.6 event @ ~ 14 km; 0.5 g

Page 5: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012
Page 6: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

Fault surface rupture –

Chelongpu

fault M 7.6 Chi-Chi earthquake, Taiwan

Page 7: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012
Page 8: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

PSHA

“Probabilistic seismic hazard analysis (PSHA) is a methodology that estimates the likelihood that various levels of earthquake-caused ground motions will be exceeded at a given location in a given future time period. The results of such an analysis are expressed as estimated probabilities per year or estimated annual frequencies.”

Senior Seismic Hazard Analysis Committee (SSHAC)

Page 9: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

PSHA

“While there is considerable information on earthquake ground motions and potential future locations of earthquakes, there is also considerable uncertainty in the inputs to the analysis.”

PSHA Project for the Mid-Columbia Dams

Page 10: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

PSHA

“Recognizing the need to identify and address these uncertainties as part of a PSHA, the Senior Seismic Hazard Analysis Committee (SSHAC, 1997) established the goal for all PSHA’s

to

quantitatively assess these uncertainties and to represent the distribution of the informed technical community of alternative models and parameter values.”

PSHA Project for the Mid-Columbia Dams

Page 11: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

PSHA

Considers the contribution from all potential sources of earthquake shaking collectively

Considers the likelihood of those events

Uncertainty is treated explicitly

Annual probability of exceeding specified ground motions is computed

Page 12: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

Steps in PSHA

Page 13: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

Basic Components of a PSHA & All Seismic Hazard Analyses

I Seismic source characterizationII Development of hazard curvesIII Development of uniform hazard spectra (UHS)IV Development of acceleration time histories

Page 14: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

SEISMIC SOURCE CHARACTERIZATION

Known faults

Areal or Background sources (i.e., random seismicity)

Page 15: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012
Page 16: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012
Page 17: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

Logic Tree

Page 18: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

SEISMIC HAZARD CURVESSEISMIC HAZARD CURVES

Produced from several available computer codesProduced from several available computer codes

Incorporate uncertainties in slip rate, magnitude, faults Incorporate uncertainties in slip rate, magnitude, faults lengthslengths

Use ground motion attenuation relationships that relate Use ground motion attenuation relationships that relate PGA and SA to distance between source and site and PGA and SA to distance between source and site and earthquake magnitude earthquake magnitude --

NGA NGA Next Generation Next Generation

Attenuation modelsAttenuation models

Site conditions very important; i.e., Site conditions very important; i.e., ““soilsoil””

versus versus ““rockrock””

Page 19: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012
Page 20: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

Mean Hazard Curves by SourceMean Hazard Curves by Source

Page 21: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

Mean & Mean & FractileFractile

Curves for PHACurves for PHA

Page 22: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

Site ResponseSite Response

Period of structurePeriod of structure--Concrete (sensitive to short period, Concrete (sensitive to short period,

0.20.2--0.40.4--sec SA) verses sec SA) verses Embankment (sensitive to long period, Embankment (sensitive to long period, 11--sec SA)sec SA)

Site conditionsSite conditions--Soil verses rockSoil verses rock

Shear wave velocity (VShear wave velocity (VSS

30) 30) ––

Shear wave velocity in Shear wave velocity in upper 100 ft upper 100 ft --

Important, because most NGA Important, because most NGA

relationships now incorporate this)relationships now incorporate this)

Page 23: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

UNIFORM HAZARD SPECTRAUNIFORM HAZARD SPECTRA

Uniform hazard spectra (UHS) are computed or Uniform hazard spectra (UHS) are computed or developed from the seismic hazard curves. This is done developed from the seismic hazard curves. This is done by developing hazard curves (i.e. spectral acceleration vs. by developing hazard curves (i.e. spectral acceleration vs. exceedance probability) for several vibration periods to exceedance probability) for several vibration periods to define the response spectra. Then, for a given exceedance define the response spectra. Then, for a given exceedance probability or return period, the ordinates are taken from probability or return period, the ordinates are taken from the hazard curves for each spectral acceleration, and an the hazard curves for each spectral acceleration, and an ““equal hazardequal hazard””

response spectrum is generated. response spectrum is generated.

Page 24: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012
Page 25: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

TIME HISTORIESTIME HISTORIES

For higher level studies, accelerograms, or acceleration For higher level studies, accelerograms, or acceleration time histories, are developed for the site that represents time histories, are developed for the site that represents the seismic hazard at the return periods of interest. the seismic hazard at the return periods of interest.

The suites of motions at each return period are usually The suites of motions at each return period are usually selected to span the likely variability in spectra selected to span the likely variability in spectra responses at different periods, and to account for responses at different periods, and to account for differences in distance, magnitude, and site conditions. differences in distance, magnitude, and site conditions. The selected ground motions are then used for dynamic The selected ground motions are then used for dynamic analyses using programs such analyses using programs such FLACFLAC, , SHAKE,SHAKE,

or or LSLS--

DYNADYNA

Page 26: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

Time Histories (10K)Time Histories (10K) Scaled to Mean UHSScaled to Mean UHS

Cascadia, M 9New Zealand, M 6.6 Northridge, M 6.7

Page 27: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

Fault Displacement Hazard Fault Displacement Hazard Analysis (PFDHA)Analysis (PFDHA)

Some sites it may be a major concern (i.e., Some sites it may be a major concern (i.e., LauroLauro

& Terminal Dams, CA; Helena Valley & Terminal Dams, CA; Helena Valley

Dam, MT)Dam, MT)

Hazards calculations are analogous to Hazards calculations are analogous to probabilistic ground motion methodologyprobabilistic ground motion methodology

Methodology originally set forth by Methodology originally set forth by SteppStepp

and and

others (2001) for Yucca others (2001) for Yucca MtnMtn

Page 28: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012
Page 29: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

LauroLauro

Dam Dam Fault InvestigationsFault Investigations

Page 30: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

Rupture Length vs DisplacementRupture Length vs Displacement

0

0.5

1

1.5

2

0 100 200 300 400 500 600 700 800

Displacement, cmPd

f

SRL=15

SRL=39

SRL=57

Page 31: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

Exceedence (All)

1.E-05

1.E-04

1.E-03

1.E-02

0 100 200 300 400 500

Displacement, cm

16%

Median

84%

Page 32: Probabilistic Seismic Hazard AssessmentProbabilistic Seismic Hazard Assessment, industries, hydropower, safety, initiatives, risk informed decision making process Created Date 6/18/2012

QUESTIONS?QUESTIONS?Sheffield Dam -

1925