Naser M.Al-Baddah & Partner General Trading & Contracting Co. W.l.l.
Doc.
No.NBTC M3 QC EQP 21. Cont. No.: 03UT02-053
Rev. No. 0 Approved !: "ite Manager Page 1 of 7
T#T$% PROCEDURE FOR MATERIAL PRESERVATION.
1.0 Purpose
2.0 Scope
3.0 Reference.
4.0 Definition.
5.0 Responsibility
5.1 Material Controller
5.2 Project Control manaer
5.3 Mec!anical Construction Manaer
5.4 Sr."#uipment "nineer
5.5 "lectrical an$ %nstrumentation Construction Manaer
5.& 'C Manaer
&.0 Proce$ure
&.1 Preser(ation Re#uirements
&.2 Preser(ation)eneral
&.3 %ssue $istribution* +umberin an$ Re(isions
&.4 Preser(ation $urin storae
&.5 Preser(ation $urin construction an$ %nstallation
,.0 -ttac!ments
Preser(ation Plan for "#uipments ) M3)')12.01
Preser(ation Recor$ for "#uipments ) M3)').12.02
Recor$ for +itroen /lanet ) M3)')12.03
eneral Preser(ation for Materials ) M3)')12.04
%+D"
8/13/2019 Procedure for Material Preservation
2/7
Naser M.Al-Baddah & Partner General Trading & Contracting Co. W.l.l.
Doc.
No.NBTC M3 QC EQP 21. Cont. No.: 03UT02-053
Rev. No. 0 Approved !: "ite Manager Page 2 of 7
T#T$% PROCEDURE FOR MATERIAL PRESERVATION.
ist of "#uipment
1.0 Purpose
2.0 Scope.
This procedure describes the method of preservation activities to befollowed by NBTC for preservation of materials for the OL2KMechanical 3 ro!ect"
3.0 Reference.
#endor installation and maintenance instruction recommendations"
4.0 Responsibility.
The followin$ personnel or desi$nees shall be responsible for
preservation and documentation of material and e%uipment durin$stora$e& fabrication& construction and installation phases" O'N() isresponsible to issue the preservation plans for each e%uipments"
4.1 Material Controller
The material controller or his desi$nee is responsible for thepreservation of materials and e%uipment within the stora$e lay downareas and responsible to*
(nsure that materials and e%uipment is off loaded and stored
as per vendor instructions and pro!ect specificationre%uirements"
8/13/2019 Procedure for Material Preservation
3/7
Naser M.Al-Baddah & Partner General Trading & Contracting Co. W.l.l.
Doc.
No.NBTC M3 QC EQP 21. Cont. No.: 03UT02-053
Rev. No. 0 Approved !: "ite Manager Page 3 of 7
T#T$% PROCEDURE FOR MATERIAL PRESERVATION.
(nsure the preservation activities are documented and the
%uality records are turned over to +uality control departmentwhen the responsibility for preservation is transferred to theMechanical Construction Mana$er"
,efine re%uirements& establish schedules and monitor
conditions of Bul- Materials within warehouse and lay down
area"
3.2 Site Manager
.s responsible for approvin$ all preservation plans prepared by theMaterial Controller or his desi$nee"
3.3 Construction Manager
.s responsible to*
(nsure (%uipment /motor& compressors& pumps etc0 is
preserved as per manufacture1s re%uirements specified on theapplicable reservation lan"
(stablish schedules and monitor of materials underconstruction area"
(nsure that all (%uipment installed in their permanent place&
without passin$ throu$h the warehouse& but released by
material Controller on a field warehouse re%uest& arepreserved as per re%uirements"
,ele$ate preservation responsibilities within department"
3.4 Equipment Engineer
.s responsible to prepare preservation plan for e%uipment& issue&revise& update and reissue same with an issue slip and ensure thatthe e%uipment /motors& compressors& pumps& etc0 is preserved as perre%uirements specified in vendor data sheet and the preservation planby the O'N() for preservation"
3. Electrical ! "nstrumentation Construction manager.
.s responsible to prepare reservation plan for (. e%uipment& issuerevise update and reissue same throu$h an issue slip and ensure thatthe e%uipment/electrical motors& electrical panel boards& cable&
transformers& control panel& control valves etc0 is preserved as per
8/13/2019 Procedure for Material Preservation
4/7
Naser M.Al-Baddah & Partner General Trading & Contracting Co. W.l.l.
Doc.
No.NBTC M3 QC EQP 21. Cont. No.: 03UT02-053
Rev. No. 0 Approved !: "ite Manager Page 4 of 7
T#T$% PROCEDURE FOR MATERIAL PRESERVATION.
re%uirements specified in manufacturer1s re%uirements and pro!ectspecification"
3.# $%&$C Manager
The +4+C mana$er or +C .nspector shall witness to ensurereservation activities are performed and documented as per pro!ectspecification re%uirements and maintained"
4.0 Proce'ure
4.1 Preser(ation Requirements
The mainiatanance& inspection and preservation of e%uipment will beperformed in accordance with manufacturer1s recommendations
inspection stora$e and maintenance records shall be preparedmaintained for each e%uipment"
4.2 Preser(ation ) *eneral
The preservation of materials and e%uipment are divided into two
distinct cate$ories as follows"
Cate$ory 5* )efers to e%uipment where& form no* M36+7652"829reservation record for (%uipments: shall be prepared for each item
of e%uipment which re%uires preservation" .t also refers to thee%uipment where form no* M36+7652"83 9)ecord ofNitro$en Blan-et: shall be prepared for e%uipment& which re%uirenitro$en blan-et" The e;ecution of preservation for e%uipment is
$overned by an approved 9reservation plan for e%uipments form no*M36+76
Cate$ory 2 *)efers to items such as flan$es& valves& end caps&moisture to cement lined pipe& dust inside stainless steel pipes&stora$e of paint& insulation etc" These items are $eneric and must be
chec-ed on a re$ular basis"
The material Controller and Mechanical Construction Mana$er shallestablish a schedule to monitor conditions of material belon$s tocate$ory 2" These schedules shall be updated as and when re%uired&preferably on an every alternate wee- basis& but these schedules
shall always reflect the current re%uired monitorin$ activities" Theseactivities shall be recorded and documented" /
8/13/2019 Procedure for Material Preservation
5/7
Naser M.Al-Baddah & Partner General Trading & Contracting Co. W.l.l.
Doc.
No.NBTC M3 QC EQP 21. Cont. No.: 03UT02-053
Rev. No. 0 Approved !: "ite Manager Page 5 of 7
T#T$% PROCEDURE FOR MATERIAL PRESERVATION.
Material controller or his desi$nee shall collect preservationre%uirements for each cate$ory of e%uipment based upon vendor
re%uirements" These may also be divided into different vendor toaccount for different brands of e%uipment"
The reservation lan for e%uipment shall be clearly listed"
=tora$e re%uirements& i"e" indoor& outdoor& air6conditioned&
covered& wrapped& sealed& etc" List of preservation activities"
7re%uency of reservation& such as daily& wee-ly& bi6wee-ly&
monthly etc"
The Material Controller or his desi$nee shall send all reservation lanfor (%uipment to the +4+C Mana$er for review prior to issue"
4.3 "ssue +istribution, -umbering an' Re(isions"
The Material controller shall ensure preservation plan for e%uipment is
prepared& reviewed& approved and issued in time to start preservationactivities in accordance with manufacturer instruction"
The preservation plan for e%uipments shall be issued to a minimum&
as follows"
5" +C Mana$er
2" Material Controller"
3" Mechanical Construction Mana$er"
> + Mana$er"
The Material controller shall maintain an up to date inde; of all issuedpreservation plan of e%uipment" This list shall accompany the issue of
approved preservation plan for e%uipment"
4.4 Preser(ation 'uring Storage.
The Material Controller shall ensure that the preservationre%uirements for materials and e%uipment stored in warehouse or lay
down area are implemented and recorded" The stored materials shallbe monitored& to ensure that these are stored and preserved in
8/13/2019 Procedure for Material Preservation
6/7
Naser M.Al-Baddah & Partner General Trading & Contracting Co. W.l.l.
Doc.
No.NBTC M3 QC EQP 21. Cont. No.: 03UT02-053
Rev. No. 0 Approved !: "ite Manager Page 6 of 7
T#T$% PROCEDURE FOR MATERIAL PRESERVATION.
accordance with the re%uirements" Monitorin$ durin$ stora$e shall bedocumented on schedule basis"
On delivery to the warehouse& all material and e%uipment shall bechec-ed for any brea-down or e;istence of the #endor reservation& if
pplicable" .f preservation brea-down is observed& old preservation
shall be removed and re6protected"
The material controller shall ensure that e%uipment preservationrecords are prepared and implemented for received e%uipment" Thisis only applicable to e%uipment& which re%uires specific preservation"
The material controller shall maintain and -eep an up to date list ofe%uipment& which re%uires preservation"
'hen e%uipment is transferred to the mechanical construction site
mana$er the e%uipment preservation record shall also be turned overby the material controller to the +C department for stora$e and
handover to Owner" copy of these records shall be sent toMechanical construction mana$er to ensure continuity"
4. Preser(ation 'uring Construction an' "nstallation.
The Mechanical construction mana$er shall ensure that thepreservation re%uirements for e%uipment& awaitin$ installation 4Construction or already installed 4 constructed& are implemented as
specified in the preservation plan for e%uipment"
ll material bein$ stored by the construction department shall bepreserved as per re%uirements" This applies to material stored on theconstruction site awaitin$ incorporation into the permanent wor-s andmaterials that have been finalised and are mechanically complete"
The mechanical construction mana$er shall ensure that e%uipment
preservation forms are prepared for e%uipment that has already beenincorporated into permanent wor-s"
The e%uipment shall be initially preserved upon arrival at its
permanent position if re%uired"
The mechanical construction mana$er shall maintain and -eep an upto date list of e%uipment& which re%uires preservation"
8/13/2019 Procedure for Material Preservation
7/7
Naser M.Al-Baddah & Partner General Trading & Contracting Co. W.l.l.
Doc.
No.NBTC M3 QC EQP 21. Cont. No.: 03UT02-053
Rev. No. 0 Approved !: "ite Manager Page 7 of 7
T#T$% PROCEDURE FOR MATERIAL PRESERVATION.
The Mechanical construction Mana$er shall prepare and maintain aschedule to chec- the condition of such items li-e pipes& fittin$s&flan$es& valves and protectin$ cables etc"
-ote Preser(ation Plan s/all be prepare' base' on a(ailability of(en'or 'ocuments an' Proect specification requirements for
preser(ation.
4.# Preser(ation Recor's
t mechanical completion the contractor shall return all completedpreservation records to owner alon$ with the pro!ect hand overdocumentation"
The preservation documentation shall be prepared and handed overto the +C department at the mechanical completion sta$e"
The e%uipment preservation records& from the warehouse& shall be
handed over to +C upon completion of each preservation activity asdefined in the preservation plan for e%uipment& i"e" upon transfer of
preservation responsibility to construction" reservationresponsibilities shall be transferred from material controller to theMechanical Construction Mana$er 4 =r" (%uipment (n$ineer when there%uirements are transferred to construction site" The $eneral
preservation records for materials shall be handed over to +C, at themechanical completion sta$e"
The (%uipment preservation record forms shall be included in the
approved documentation system by +C ,epartment
.0 %ttac/ments
?"5 reservation lan for (%uipment" 6M36+7652"85
?"2 reservation record for (%uipment" 6M36+7652"82
?"3 )ecord for Nitro$en Blan-et" 6M36+7652"83
?">
?"? List o of e%uipment
?"@ reservation plan for each item of e%uipment