    T#T$% PROCEDURE FOR MATERIAL PRESERVATION.

    1.0 Purpose

    2.0 Scope

    3.0 Reference.

    4.0 Definition.

    5.0 Responsibility

    5.1 Material Controller

    5.2 Project Control manaer

    5.3 Mec!anical Construction Manaer

    5.4 Sr."#uipment "nineer

    5.5 "lectrical an$ %nstrumentation Construction Manaer

    5.& 'C Manaer

    &.0 Proce$ure

    &.1 Preser(ation Re#uirements

    &.2 Preser(ation)eneral

    &.3 %ssue $istribution* +umberin an$ Re(isions

    &.4 Preser(ation $urin storae

    &.5 Preser(ation $urin construction an$ %nstallation

    ,.0 -ttac!ments

    Preser(ation Plan for "#uipments ) M3)')12.01

    Preser(ation Recor$ for "#uipments ) M3)').12.02

    Recor$ for +itroen /lanet ) M3)')12.03

    eneral Preser(ation for Materials ) M3)')12.04

    %+D"

  • 8/13/2019 Procedure for Material Preservation

    2/7

    Naser M.Al-Baddah & Partner General Trading & Contracting Co. W.l.l.

    Doc.

    No.NBTC M3 QC EQP 21. Cont. No.: 03UT02-053

    Rev. No. 0 Approved !: "ite Manager Page 2 of 7

    T#T$% PROCEDURE FOR MATERIAL PRESERVATION.

    ist of "#uipment

    1.0 Purpose

    2.0 Scope.

    This procedure describes the method of preservation activities to befollowed by NBTC for preservation of materials for the OL2KMechanical 3 ro!ect"

    3.0 Reference.

    #endor installation and maintenance instruction recommendations"

    4.0 Responsibility.

    The followin$ personnel or desi$nees shall be responsible for

    preservation and documentation of material and e%uipment durin$stora$e& fabrication& construction and installation phases" O'N() isresponsible to issue the preservation plans for each e%uipments"

    4.1 Material Controller

    The material controller or his desi$nee is responsible for thepreservation of materials and e%uipment within the stora$e lay downareas and responsible to*

    (nsure that materials and e%uipment is off loaded and stored

    as per vendor instructions and pro!ect specificationre%uirements"

  • 8/13/2019 Procedure for Material Preservation

    3/7

    Naser M.Al-Baddah & Partner General Trading & Contracting Co. W.l.l.

    Doc.

    No.NBTC M3 QC EQP 21. Cont. No.: 03UT02-053

    Rev. No. 0 Approved !: "ite Manager Page 3 of 7

    T#T$% PROCEDURE FOR MATERIAL PRESERVATION.

    (nsure the preservation activities are documented and the

    %uality records are turned over to +uality control departmentwhen the responsibility for preservation is transferred to theMechanical Construction Mana$er"

    ,efine re%uirements& establish schedules and monitor

    conditions of Bul- Materials within warehouse and lay down

    area"

    3.2 Site Manager

    .s responsible for approvin$ all preservation plans prepared by theMaterial Controller or his desi$nee"

    3.3 Construction Manager

    .s responsible to*

    (nsure (%uipment /motor& compressors& pumps etc0 is

    preserved as per manufacture1s re%uirements specified on theapplicable reservation lan"

    (stablish schedules and monitor of materials underconstruction area"

    (nsure that all (%uipment installed in their permanent place&

    without passin$ throu$h the warehouse& but released by

    material Controller on a field warehouse re%uest& arepreserved as per re%uirements"

    ,ele$ate preservation responsibilities within department"

    3.4 Equipment Engineer

    .s responsible to prepare preservation plan for e%uipment& issue&revise& update and reissue same with an issue slip and ensure thatthe e%uipment /motors& compressors& pumps& etc0 is preserved as perre%uirements specified in vendor data sheet and the preservation planby the O'N() for preservation"

    3. Electrical ! "nstrumentation Construction manager.

    .s responsible to prepare reservation plan for (. e%uipment& issuerevise update and reissue same throu$h an issue slip and ensure thatthe e%uipment/electrical motors& electrical panel boards& cable&

    transformers& control panel& control valves etc0 is preserved as per

  • 8/13/2019 Procedure for Material Preservation

    4/7

    Naser M.Al-Baddah & Partner General Trading & Contracting Co. W.l.l.

    Doc.

    No.NBTC M3 QC EQP 21. Cont. No.: 03UT02-053

    Rev. No. 0 Approved !: "ite Manager Page 4 of 7

    T#T$% PROCEDURE FOR MATERIAL PRESERVATION.

    re%uirements specified in manufacturer1s re%uirements and pro!ectspecification"

    3.# $%&$C Manager

    The +4+C mana$er or +C .nspector shall witness to ensurereservation activities are performed and documented as per pro!ectspecification re%uirements and maintained"

    4.0 Proce'ure

    4.1 Preser(ation Requirements

    The mainiatanance& inspection and preservation of e%uipment will beperformed in accordance with manufacturer1s recommendations

    inspection stora$e and maintenance records shall be preparedmaintained for each e%uipment"

    4.2 Preser(ation ) *eneral

    The preservation of materials and e%uipment are divided into two

    distinct cate$ories as follows"

    Cate$ory 5* )efers to e%uipment where& form no* M36+7652"829reservation record for (%uipments: shall be prepared for each item

    of e%uipment which re%uires preservation" .t also refers to thee%uipment where form no* M36+7652"83 9)ecord ofNitro$en Blan-et: shall be prepared for e%uipment& which re%uirenitro$en blan-et" The e;ecution of preservation for e%uipment is

    $overned by an approved 9reservation plan for e%uipments form no*M36+76

    Cate$ory 2 *)efers to items such as flan$es& valves& end caps&moisture to cement lined pipe& dust inside stainless steel pipes&stora$e of paint& insulation etc" These items are $eneric and must be

    chec-ed on a re$ular basis"

    The material Controller and Mechanical Construction Mana$er shallestablish a schedule to monitor conditions of material belon$s tocate$ory 2" These schedules shall be updated as and when re%uired&preferably on an every alternate wee- basis& but these schedules

    shall always reflect the current re%uired monitorin$ activities" Theseactivities shall be recorded and documented" /

  • 8/13/2019 Procedure for Material Preservation

    5/7

    Naser M.Al-Baddah & Partner General Trading & Contracting Co. W.l.l.

    Doc.

    No.NBTC M3 QC EQP 21. Cont. No.: 03UT02-053

    Rev. No. 0 Approved !: "ite Manager Page 5 of 7

    T#T$% PROCEDURE FOR MATERIAL PRESERVATION.

    Material controller or his desi$nee shall collect preservationre%uirements for each cate$ory of e%uipment based upon vendor

    re%uirements" These may also be divided into different vendor toaccount for different brands of e%uipment"

    The reservation lan for e%uipment shall be clearly listed"

    =tora$e re%uirements& i"e" indoor& outdoor& air6conditioned&

    covered& wrapped& sealed& etc" List of preservation activities"

    7re%uency of reservation& such as daily& wee-ly& bi6wee-ly&

    monthly etc"

    The Material Controller or his desi$nee shall send all reservation lanfor (%uipment to the +4+C Mana$er for review prior to issue"

    4.3 "ssue +istribution, -umbering an' Re(isions"

    The Material controller shall ensure preservation plan for e%uipment is

    prepared& reviewed& approved and issued in time to start preservationactivities in accordance with manufacturer instruction"

    The preservation plan for e%uipments shall be issued to a minimum&

    as follows"

    5" +C Mana$er

    2" Material Controller"

    3" Mechanical Construction Mana$er"

    > + Mana$er"

    The Material controller shall maintain an up to date inde; of all issuedpreservation plan of e%uipment" This list shall accompany the issue of

    approved preservation plan for e%uipment"

    4.4 Preser(ation 'uring Storage.

    The Material Controller shall ensure that the preservationre%uirements for materials and e%uipment stored in warehouse or lay

    down area are implemented and recorded" The stored materials shallbe monitored& to ensure that these are stored and preserved in

  • 8/13/2019 Procedure for Material Preservation

    6/7

    Naser M.Al-Baddah & Partner General Trading & Contracting Co. W.l.l.

    Doc.

    No.NBTC M3 QC EQP 21. Cont. No.: 03UT02-053

    Rev. No. 0 Approved !: "ite Manager Page 6 of 7

    T#T$% PROCEDURE FOR MATERIAL PRESERVATION.

    accordance with the re%uirements" Monitorin$ durin$ stora$e shall bedocumented on schedule basis"

    On delivery to the warehouse& all material and e%uipment shall bechec-ed for any brea-down or e;istence of the #endor reservation& if

    pplicable" .f preservation brea-down is observed& old preservation

    shall be removed and re6protected"

    The material controller shall ensure that e%uipment preservationrecords are prepared and implemented for received e%uipment" Thisis only applicable to e%uipment& which re%uires specific preservation"

    The material controller shall maintain and -eep an up to date list ofe%uipment& which re%uires preservation"

    'hen e%uipment is transferred to the mechanical construction site

    mana$er the e%uipment preservation record shall also be turned overby the material controller to the +C department for stora$e and

    handover to Owner" copy of these records shall be sent toMechanical construction mana$er to ensure continuity"

    4. Preser(ation 'uring Construction an' "nstallation.

    The Mechanical construction mana$er shall ensure that thepreservation re%uirements for e%uipment& awaitin$ installation 4Construction or already installed 4 constructed& are implemented as

    specified in the preservation plan for e%uipment"

    ll material bein$ stored by the construction department shall bepreserved as per re%uirements" This applies to material stored on theconstruction site awaitin$ incorporation into the permanent wor-s andmaterials that have been finalised and are mechanically complete"

    The mechanical construction mana$er shall ensure that e%uipment

    preservation forms are prepared for e%uipment that has already beenincorporated into permanent wor-s"

    The e%uipment shall be initially preserved upon arrival at its

    permanent position if re%uired"

    The mechanical construction mana$er shall maintain and -eep an upto date list of e%uipment& which re%uires preservation"

  • 8/13/2019 Procedure for Material Preservation

    7/7

    Naser M.Al-Baddah & Partner General Trading & Contracting Co. W.l.l.

    Doc.

    No.NBTC M3 QC EQP 21. Cont. No.: 03UT02-053

    Rev. No. 0 Approved !: "ite Manager Page 7 of 7

    T#T$% PROCEDURE FOR MATERIAL PRESERVATION.

    The Mechanical construction Mana$er shall prepare and maintain aschedule to chec- the condition of such items li-e pipes& fittin$s&flan$es& valves and protectin$ cables etc"

    -ote Preser(ation Plan s/all be prepare' base' on a(ailability of(en'or 'ocuments an' Proect specification requirements for

    preser(ation.

    4.# Preser(ation Recor's

    t mechanical completion the contractor shall return all completedpreservation records to owner alon$ with the pro!ect hand overdocumentation"

    The preservation documentation shall be prepared and handed overto the +C department at the mechanical completion sta$e"

    The e%uipment preservation records& from the warehouse& shall be

    handed over to +C upon completion of each preservation activity asdefined in the preservation plan for e%uipment& i"e" upon transfer of

    preservation responsibility to construction" reservationresponsibilities shall be transferred from material controller to theMechanical Construction Mana$er 4 =r" (%uipment (n$ineer when there%uirements are transferred to construction site" The $eneral

    preservation records for materials shall be handed over to +C, at themechanical completion sta$e"

    The (%uipment preservation record forms shall be included in the

    approved documentation system by +C ,epartment

    .0 %ttac/ments

    ?"5 reservation lan for (%uipment" 6M36+7652"85

    ?"2 reservation record for (%uipment" 6M36+7652"82

    ?"3 )ecord for Nitro$en Blan-et" 6M36+7652"83

    ?">

    ?"? List o of e%uipment

    ?"@ reservation plan for each item of e%uipment