  Proceedings of International Conference on Condition Monitoring, Diagnosis and Maintenance CMDM 2015 Bucharest, Romania October 5 – 8, 2015 Organized by:                            

Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

  • Upload
    lamkhue

  • View
    226

  • Download
    6

Embed Size (px)

Citation preview

Page 1: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

1   

 

Proceedings of

International Conference on Condition Monitoring,

Diagnosis and Maintenance

CMDM 2015

Bucharest, Romania

October 5 – 8, 2015

O r g a n i z e d b y :

                            

Page 2: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

2   

 

Romanian National Committee “CIGRE”

33, Gen. Gh. Magheru Blvd., postal code RO-010325, Bucharest 1 Correspondence Address: Str. Olteni, Nr. 2 - 4, RO-030786, Bucharest, Romania

Registration no. with the National Trade Register - 173/2007 – fiscal code: 20769417 Phone: +4 021 303 59 56; Fax: +4 021 303 59 18; www.cigre.org.ro

CMDM 2015 Copyright and Reprint Permission: All rights reserved by the Romanian National Committee of CIGRE. For abstracting, copying, reprint or republication permission, please write to The Romanian National Committee of CIGRE, Str. Olteni nr. 2-4, 030786, Bucharest, Romania.

ISSN 2344-245X

 

Page 3: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

ISSN 2344-245X  

 

3

International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015

CONTENTS

Foreword ......................................................................................................................................... 9

Papers 1. (#101) Health Index: the Last Frontier of TSO’S Asset Management ...................................... 13

F. SCATIGGIO, A. FRAIOLI, M. REBOLINI, S. SACCO

2. (#102) Maintenance in TPG’s Analysis for Developing New Technologies ........................... 21

D. MORAR, I. RODEAN, V. BALAN, M. BACIU

3. (#103) Silver Corrosion Failure Phenomenon Diagnostics and Mitigation in Power Transformers - Malaysian Experience .................................................................................... 30 S. GOBI KANNAN, N. THIEN LEE, W. FOOK MING, B. YOGENDRA, Z. ZULFADHLY

4. (#105) Degree of Oil Refining and It Effect on Insulating Paper Degradation ......................... 39

I. CRUSELL, L. BERGELD, B. PAHLAVANPOUR

5. (#106) Rotor Shape Recognition System ................................................................................. 47

M. CLOUTIER

6. (#107) Dispatchables Units Aggregation in SEN – Guidelines for Control and Operation ...... 54

D. ILIŞIU

7. (#108) System Operation in Presence of Large Wind and Photovoltaic Power Plants ............ 62

D. ILIŞIU , D. FIRICA

8. (#109) Towards the Real Smart Grid Deployment from DSO’S Perspective .......................... 71

J.L. PICARD, I. AGUADO, A. QUIJANO, V. FUSTER

9. (#110) High-Voltage Electrical Substation Design Using 3D Software ................................... 80

A.D. DRAGAN, A. DINA, M. POPOVICI, I. E. CHITESCU

10. (#111) Innovative Remote Monitoring and fire safeguard System for Secondary Distribution Substations using web based SCADA .................................................................. 87

M. S. S. AL MEHAIRI, M. A. M. SHAHIN

11. (#112) Analysis of SVC Implemented in the Romanian Power System .................................. 95

D. GUȘĂ, S. ILIESCU

Page 4: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

 

 

5

24. (#128) Distribution Network Reliability and Asset Management ........................................... 205

I. PAVIĆ, N. HOLJEVAC, K. JURKOVIĆ, I. KUZLE

25. (#129) Monitoring, Diagnostics, or Changing Condition? ...................................................... 215

M. TOSTRUD, B. SPARLING

26. (#130) CXI – PT5500: a unique and innovative tool for overhead lines wooden pole condition assessment .............................................................................................................. 226

M.P. GENOVESE, A. BIASUTTO, U. BOVO

27. (#131) How Can We Improve Transformer Asset Management?........................................... 233

S. RYDER

28. (#132) Residual Life Estimation for Generator Transformers ................................................. 241

S. RYDER

29. (#133) Life-expectancy Prediction of Medium voltage Vacuum Circuit Breakers Through Advanced Condition Monitoring and Diagnostic Techniques ................................. 250

J.-T. O’REILLY; J.M. VAN COLLER; N. SMIT

30. (#134) The Accuracy of the Circuit Parameter Measurement Using the Power Analyzer and External Transducers ........................................................................................................... 258

M. POPESCU, I. SBORA

31. (#135) A Novel Monitoring System to Optimize Maintenance Strategies for Generator Circuit-Breakers and Increase the Availability of Power Plants ............................................. 266

M. PALAZZO, A. ANTONIADIS, P. FRAIOLI, A. MARMOLEJO

32. (#136) Monitoring and Diagnosis of the Current-source Inverter Based

on the Measurements Performed on DC Side ......................................................................... 274

M. POPESCU, C. CARAMIDA

33. (#137) Intelligent Switchgear Maintenance System ............................................................... 282

A. MIK, B. AVRAMOVIĆ, I. KUZLE

34. (#142) Condition Monitoring and Diagnostics of Turbine Generators Operating at Flexible Grids with High Amount of Renewable Energy .................................................... 290

J. R. WEIDNER , M. BIESEMANN, F. EWERT

35. (#143) Implementation of mobile maintenance in Slovenian TSO (Eles) .............................. 299

M. KOVAČ , M. GABROVŠEK, M. GABROVŠEK, D. KOZJEK, R. TOMAŽIČ

36. (#144) Transformers Fleet Ranking Based on Risk Analysis ................................................ 306

A. BYRNE

Igor
Highlight
Page 5: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

ISSN 2344-245X  

 

11

International Conference on Condition Monitoring, Diagnosis and Maintenance – CMDM 2015 (3rd edition)

Athénée Palace Hilton Hotel, Bucharest, Romania, October 2 - 5, 2015

Papers of

CMDM 2015

Modern Management Technology!

Bucharest, Romania

October 5 - 8, 2015

O r g a n i z e d b y :

                            

Page 6: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

 

ISSN 2344-245X  

205

International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015

#128

Distribution Network Reliability and Asset Management

I. PAVIĆ*, N. HOLJEVAC, K. JURKOVIĆ, I. KUZLE

University of Zagreb Croatia

SUMMARY

A program called DISPO (“distribution reliability”) for power system analysis was developed in Croatian Distribution System Operator Company (HEP-ODS). Its main goal is to gather data such as transformer or line outages (statistics of operation events) and to produce reports based on this data. This paper uses gathered data for reliability indices calculation such as System Average Interference Frequency Index (SAIFI), System Average Interference Duration Index (SAIDI) and Customer Average Interference Duration Index (CAIDI). The thorough model of one distribution area that incorporates above-mentioned data form DISPO is developed using power system analysis software NEPLAN. Methodology for reliability indices calculation in NEPLAN is described and used on developed network model. Reliability analyses is part of distribution network optimization and planning process, so the whole process is explained for better understanding. Numerous load point (average failure rate, average outage time, average annual outage time etc.) and system reliability indices (SAIDI, SAIFI, CAIDI etc.) are calculated using NEPLAN for feeders, substations and distribution area. Energy Not Supplied (ENS) is also calculated and analyzed. Possible network improvements such as new interconnection points between feeders or automatization of disconnect switches for feeders’ reliability increase are simulated and described. Finally, detailed asset management for observed area is formed and combined with reliability analyses. Main goal is to show on a realistic network model how statistics of operational events contribute to distribution network optimization and planning and how proper network planning can increase availability of distribution network.

KEYWORDS

Distribution network, Reliability analyses, Reliability indices, Power supply. 1. INTRODUCTION

The general definition of reliability in engineering is the ability of a system or component to perform its required functions under stated conditions for a specified period. In power systems operation and planning reliability mostly means maintaining the continuity of energy supply to the customers. As continuity of supply is their basic task, power systems were designed to overcome possible outages and failures in a manner that customers can conduct their daily activities even during contingency events. Since investing in generation units and transmission grids is capital intensive, requires long term planning and their unavailability means energy supply interruption for a large number of customers, they were the targets of reliability analyses in the past. Nowadays, due to the rapid increase in energy demand and primary energy prices, when efficient system operation is

                                                            * [email protected]

Page 7: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

 

206

imperative the focus of reliability analyses is relocating to distribution networks, as they became the most vulnerable part of power system. In other words, not sufficient amount of investments is being poured into the system and the grid is ageing. More than 90% of all customer reliability issues and costs occurs in distribution system so it is of essential value to design reliable distribution networks, [1] and [2]. Electric power systems are experiencing tremendous structural and regulation transformations from horizontally integrated entities (monopoles) to vertically structured competitive environment where electric power consumers can choose their supplier based on cost-effectiveness and reliability. In order to withhold their current consumers and to attract new, electric power utilities must ensure unobstructed power supply and reduce costs which eventually leads to the increase of profit and to sustainable operation. Interesting survey [3] was conducted in the US on large number of energy users where key drivers for customers loyalty were identified as: price, reliability, power quality and complaint handling. Important finding was that increase in reliability performances does not guarantee improved loyalty whereas decrease would be disastrous. Another important issue is that modern electricity appliances (loads) such as computers are very sensitive to energy supply interruptions and low power quality.

This paper will provide detail insight into reliability analyses as part of distribution network planning in Croatia. Used software for calculations is NEPLAN – software for planning and optimization of electrical networks [4]. More information about reliability analyses and NEPLAN could be found in [5] and [6]. A comparison of different softwares for reliability analyses is provided in [7]. The developed detailed model of the observed distribution network is used to analyze the reliability of a specific distribution network as part of distribution network optimization and planning. Real data is taken into account and possible improvement from all the new technologies is considered (distant breaking operations, smart reconfiguration of the network etc.).

2. RELIABILITY IN DISTRIBUTION NETWORKS

There are many different definitions, classifications and metrics for reliability in distribution networks in existing literature, here we will use explanations provided in [8]. Definition of reliability of distribution network used in this paper is classified as availability of power supply as part of power quality. Power quality could be seen from the utility point-of-view and customer-point-of-view (perceived power quality). From the utilities point-of-view power quality is divided into three categories:

Commercial power quality, Availability of power supply, Waveform power quality,

and from the customers point-of-view into two categories: Reliability of customers installation, and Capability level of the customers’ apparatus.

There are three main categories of reliability indices, [7] and [9], global indices or load point indices calculated for every modelled load and used for system indices calculation:

Average failure rate (frequency of supply interruptions, F), Average outage time (mean interruption durations, T), Average annual outage time (probability of supply interruptions, Q);

Second category are system indices, calculated for groups of loads (feeders, areas, zones or whole distribution system):

SAIFI - System Average Interference Frequency Index, SAIDI - System Average Interference Duration Index CAIDI Customer Average Interference Duration Index,

Page 8: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

 

207

Third category are power and energy oriented indices, calculated for both single loads and groups of loads:

W – Energy Not Supplied (ENS), P – Peak power not supplied.

Later in the paper, load point indices will be displayed on distribution network figures exported from NEPLAN close to loads they are referring to, system indices will be listed in tables for feeders and distribution areas, and power and energy indices are presented both on NEPLAN figures for loads and in tables for groups of load. The summary of the results and their impact on future investments and network planning is also given.

3. DISTRIBUTION NETWORK OPTIMIZATION AND PLANNING

Croatian distribution system consists of 21 distribution area and is geographically allocated. In this paper distribution area Virovitica is used as case study for reliability analyses. Structure of distribution system is as follows (number in parenthesis refers to number of such substations in distribution area Virovitica):

110/35 kV substations (2); 35 kV network; 35/10 kV substations (8), 10 kV network, 10/0.4 kV substations (500).

100 kV network is part of transmission system and it is not part of this research. 0.4 kV network is considered as low voltage network. Low voltage network characteristics are included in substations 10/0.4 kV with realized peak power and number of customers and additionally all the large customers (above 100 kW) modeled with their exact load curves. National strategy for distribution network development in Croatia includes gradual transition from 110-35-10-0.4 kV system to 110-20-0.4 kV system, but distribution area of Virovitica is still at the beginning of the process with the more intense transition being the long term plan.

To ensure satisfactory grid operation and development constant observation and analysis of operation and development planning is required. Therefore, in order to maintain the quality of distribution service, planning process includes several steps:

Load flow analyses in normal operating state – loadings (lines and transformers) and voltages (nodes) are main trigger for distribution system investments;

Reliability analyses: Load flow analyses in emergency operating state, (N-1) criterion – manually

disconnecting 35 kV equipment (35/X kV transformers and 35 kV lines) in order to observe system’s behavior in emergency operating state; loadings (lines and transformers) and voltages (nodes) in such state are important trigger for distribution system investments;

10(20) kV grid reliability indices analyses – system reliability indices are considered as one of the triggers for the distribution system investments;

Economic justification for grid investments: Load flow analyses in normal operating state: power losses; Load flow analyses with load profiles in normal operating state: energy losses; Reliability analyses, 10(20) kV grid reliability indices: unsupplied power and energy; Losses and unsupplied energy and power are considered as one of the triggers for the

distribution system investments; Asset management – equipment age should not exceed its life expectancy, trigger for

investments;

Page 9: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

 

208

One medium voltage level distribution system strategy – if required conditions are achieved parts of distribution system should realize transition from 110-35-10-0.4 kV system to 110-20-0.4 kV system.

Reliability analyses is performed in two stages. First one includes manual disconnection of grid elements (transformers and lines) and observation of system’s behavior in emergency operating state. Mentioned detailed analyses is possible to perform just in 35 kV networks where smaller number of elements exist. In 10 kV network, with a lot more elements, such analyses is too time-consuming so reliability analyses is performed as calculation of reliability indices in NEPLAN. Eventhough it is still not the case in Croatia, there are cases where suppliers refund household customers if the rate and length of outages exceed predefined limits. Grid maintenance has become more challenging and frequent monitoring and diagnostics are required since it is not acceptable for the customers to stay without electricity even for a short period. Absence of proper maintenance is potentially harmful and eventually leads to bigger problems. So it is of key importance, especially in radial rural networks, to ensure alternative supply lines. Such investment justification is closely linked with the improvements of reliability indices that are used to identify critical network feeders.

Distribution network planning described above is performed for present year and for future projections with justified investments and network modifications. Consumption increase, both in households and in industry customers, is included in future projections alongside the new grid elements (lines, substations, circuit breakers, disconnect switches etc.) and modifications in grid topology that is also being optimized. As last part of distribution system optimization and planning all above described analyses are considered and overlapped to create investment plan for long term distribution system development.

Next chapter will provide explanation of reliability indices calculation methodology for 10 kV network for long outages (>3min). Afterwards, system reliability indices analyses will be performed on several different data sets:

data set based on historical data, data set based on present grid state modelled in NEPLAN, data set derived from future states of grid also in NEPLAN.

4. RELIABILITY INDICES ANALYSIS

Apart from input data necessary for load flow analyses (substation and line data) reliability indices analyses requires the following:

Number of customers served on each substation 10/0.4 kV, Average element failure rate, Average element outage time (or average time needed to repair affected element), Location of circuit breakers (CB) and disconnect switches (DS), Feeders interconnections, Average required time for switching operations (manual or automatic), Allowable limits of loadings and voltages during emergency operating state.

Exact number of customers is entered for each 10/0.4 kV substation. Standard failure rates and element outage times are assigned to each 10 kV line as listed in table (Table 11). Substations, CB and DS are considered as ideal elements (which assumes that device will function ideally since no sufficient data was available to model and empirical data shows the reliability of these devices is quite high). CB and DS are drawn on their exact location as in the real network. Required time for switching operations of manually operated DS is 60 min, and for automatically operated CB is 10 min.

Page 10: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

 

209

Table 1. Standard element failure rates and outage times

Grid element Average element failure rate

(f/km·year) Average element outage time (min)

Cables 0.07 960

Lines 0.14 300

Required standards for system reliability indices in Croatian Distribution System Operator

(DSO) are listed in table (Table 22).

Table 2. System reliability indices standards in Croatian DSO

Standards Network type SAIDI (min/year) SAIFI (failure/year)

Standard 1 Urban areas with mostly cable network 120 2

Standard 2 Suburban areas and bigger settlements 240 4

Standard 3 Overhead lines in rural areas 360 8

Additional global criterion Retaining present state if it is better than standard

4.1. Realized system reliability indices

Realized system indices are calculated based on historical data provided by DSO (Table 33) for the whole distribution area. This data will be used in next chapter to compare with those obtained from NEPLAN calculations. Cells in table (Table 33) are colored in accordance with satisfied standard:

Satisfied standard 1 – light green; Satisfied standard 2 – dark green; Satisfied standard 3 – yellow; None of the standards satisfied – red.

While observing table (Table 33) it could be concluded that in average distribution area as a whole satisfies standard 3 for SAIFI and standard 1 for SAIDI.

Table 3. Achieved system reliability indices

Dis

trib

uti

on a

rea

Vir

ovit

ica

Year ENS (MWh)  SAIDI (min/year) SAIFI

(failure/year) CAIDI

(SAIDI/SAIFI)

2010. 27,64 324,64 1,22 267,08

2011. 18,35 89,10 0,77 115,14

2012. 34,29 390,98 1,13 346,02

2013. 38,18 231,33 0,86 270,54

2014. 28,73 188,02 0,97 193,93

Average 29,44 250,93 0,99 253,78

4.2. Calculated system reliability indices – present state

Entire network of distribution area Virovitica is modelled in NEPLAN with above described assumptions and observed part of it is displayed in Figure 1. There are 8 substations 35/10 kV and more than 50 10 kV feeders in observed distribution area, but because of conciseness of the paper table (Table 4) lists system reliability indices just for two 35/10 kV substations and their 10 kV

Page 11: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

 

210

feeders for the present state (which will be latter used as a reference). Considering lack of data and assumptions mentioned above in text, it can be seen that results obtained from the model match those from Table 33 very well, 15% difference is noticeable in SAIDI and 42% difference in SAIFI. Green color of cells in last column indicates that both SAIFI and SAIDI satisfy required standard, while red indicates the opposite. Load point indices for two 10/0.4 kV substations of feeder “Bistrica” are shown at Figure 22 and Figure 3 for different scenarios observed.

Table 4. Calculated reliability indices for present state

Area/Feeder ENS

(MWh) SAIDI

(min/year) SAIFI

(failure/year) CAIDI

(SAIDI/SAIFI) Standard

Centar 0,74 27,83 0,22 124,26 1

Industrija 0,10 7,36 0,09 80,03 1

Limex 0,09 6,91 0,12 60,10 1

Mikleuš 6,90 504,45 2,13 237,28 3

Radosavci 2,29 313,01 1,40 222,94 3

Slatina Istok 0,26 24,28 0,22 110,89 1

Slatina Zapad (Slatina I) 0,80 42,62 0,27 155,55 2

35/10 kV substation Slatina I

11,33 128,21 0,64 200,02 2

Bistrica 2,88 472,86 1,48 318,64 3

Čađavica 11,54 456,52 2,34 194,84 3

Gornji Miholjac 5,99 619,19 2,50 248,07 3

Kapinci 2,88 294,98 2,29 128,92 3

Medinci vodovod 0,73 209,37 0,94 223,44 2

Spojni vod 0,05 44,58 0,12 374,61 1

35/10 kV substation Slatina II

21,19 432,66 2,27 190,27 3

Distribution area Virovitica

114,43 271,33 1,41 192,43 3

Figure 1. Observed part of distribution area Virovitica

Page 12: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

 

211

Feeders with long mostly overhead lines with small number of interconnection have very high reliability indices (for example 10 kV feeder “Gornji Miholjac”), which means they are very unreliable. On the other hand, feeders with short cables have very low reliability indices (for example 10 kV feeder “Slatina istok”) meaning they are very reliable. Main reasons for insufficient reliability indices are summarized as follows:

Feeder length, Percentage of overhead lines, Number and position of switching devices (CB, DS etc.), Rate of automatization, Rate of interconnections between feeders, Climate and geographic factors, Customer density, Distribution elements’ loadings and voltages, Adequacy of maintenance and diagnostics of distribution elements.

4.3. Calculated system reliability indices – future state

Possible strategies and actions for reliability increase are listed in Table 5. Int this paper three different future grid states will be presented: future grid with new interconnection points, future grid with new interconnection points and automatization of DS and future grid with replaced old elements. Within those future states of grid three different actions (one from each strategy) form Table 5 are considered: proper asset management, distribution network automatization and reconfiguration of distribution network topology (new interconnection lines between feeders). Because of its poor reliability 35/10 kV substation Slatina I along with its 10 kV feeder is chosen as representative for reliability increase.

Introducing new interconnection lines between feeders (red circles on Figure 1) decreases SAIDI index and ENS because separated area during failure have new alternative way for power supplay. It can be seen from Table 6 that feeder “Bistrica” is now in green zone, i.e. required standards are satisfied. Although, SAIDI is decreased for feeders “Čađavica” and “Gornji Miholjac” they are still in red zone. Right part of Figure 22 also indicates that reliability has increased. Mean interruption duration (T) and probability of supply interruptions (Q) has decreased by 80 %.

Table 5. Strategies and actions for increased reliability of distribution networks

Strategies Actions

Reduction of number of faults

Preventive maintenance

Monitoring critical elements

Proper asset management (replacement of spent equipment)

Upkeep of elements surroundings (vegetation…)

Protection against human or animal contacts with elements

Reduction of time of interruption

Distribution network automatization

Network topology modification while in emergency state

Faster fault detection

Faster crew response (both for repair of affected elements and for manual operation of switching devices)

Reduction of number of affected customers

Reconfiguration of distribution network topology

More protective and switching devices

Resonant transformer grounding

Page 13: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

 

212

TR BISTRICA I

LV BISTRICA I0,4 kV

Load BISTRICA IF=1,470 1/yr

T=5,281 hQ=465,734 min/yrW=0,498 MWh/yrP=0,094 MW/yr

TR BISTRICA II

LV BISTRICA II0,4 kV

Load BISTRICA IIF=1,488 1/yr

T=5,410 hQ=482,937 min/yrW=0,330 MWh/yrP=0,061 MW/yr

Line

MV BISTRICA II10 kV

MV BISTRICA I10 kV

TR BISTRICA I

LV BISTRICA I0,4 kV

Load BISTRICA IF=1,470 1/yr

T=1,000 hQ=88,194 min/yrW=0,094 MWh/yrP=0,094 MW/yr

TR BISTRICA II

LV BISTRICA II0,4 kV

Load BISTRICA IIF=1,488 1/yr

T=1,181 hQ=105,397 min/yrW=0,072 MWh/yrP=0,061 MW/yr

Line

MV BISTRICA II10 kV

MV BISTRICA I10 kV

Figure 2. Load point indices of two 10/0.4 kV substations, end of feeder Bistrica (left figure is for present state, while right is for future state with new connection points)

Table 6. Calculated reliability indices for future state – new interconnection points

Area/Feeder ENS (MWh)

SAIDI (min/year)

SAIFI (failure/year)

CAIDI (SAIDI/SAIFI)

Standard

Bistrica 1,73 252,39 1,48 170,07 3 Čađavica 7,57 389,48 2,58 150,84 3 Gornji Miholjac 5,39 553,15 2,50 221,61 3 Kapinci 2,59 265,06 2,29 115,85 3 Medinci vodovod 0,73 209,37 0,94 223,44 2 Spojni vod 0,05 44,58 0,12 374,61 1 35/10 kV substation Slatina II 18,05 365,09 2,27 160,55 3 Distribution area Virovitica 110,76 261,91 1,41 185,75 3

In order to further increase reliability, DS on all new interconnection lines and few existing DS

between feeders (blue circles on Figure 11) are modified to remote control (they used to be manually operated). As it can be observed from Table 7, reliability indices decreased. Again only ENS and SAIDI decreased because automatization doesn’t reduce the number of failures just duration of switching operation. But still feeder “Gornji Miholjac” does not satisfy required standard. The only ways how to decrease SAIDI more are faster fault detection and quicker crew response, but this cannot be conducted by technical improvments so it is not simulated in this paper. Load point indices (T and Q on left part of Figure 3) on observed 10/0.4 kV substations are decreased by additional 17% (97% decrease in total).

Table 7. Calculated reliability indices for future state – automatization of disconnect switches

Area/Feeder ENS

(MWh) SAIDI

(min/year) SAIFI

(failure/year)CAIDI

(SAIDI/SAIFI) Standard

Bistrica 1,50 208,95 1,48 140,80 3

Čađavica 5,52 307,23 2,58 118,99 3

Gornji Miholjac 5,28 509,84 2,50 204,26 3

Kapinci 1,98 202,67 2,29 88,58 3

Medinci vodovod 0,60 194,03 0,94 207,07 2

Spojni vod 0,05 44,58 0,12 374,61 1

35/10 kV substation Slatina II 14,63 304,11 2,27 133,73 3

Distribution area Virovitica 106,98 253,54 1,41 179,81 3

Page 14: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

 

213

TR BISTRICA I

LV BISTRICA I0,4 kV

Load BISTRICA IF=1,470 1/yr

T=0,167 hQ=14,699 min/yrW=0,016 MWh/yrP=0,094 MW/yr

TR BISTRICA II

LV BISTRICA II0,4 kV

Load BISTRICA IIF=1,488 1/yr

T=0,357 hQ=31,902 min/yrW=0,022 MWh/yrP=0,061 MW/yr

Line

MV BISTRICA II10 kV

MV BISTRICA I10 kV

TR BISTRICA I

LV BISTRICA I0,4 kV

Load BISTRICA IF=0,754 1/yr

T=5,000 hQ=226,113 min/yrW=0,242 MWh/yrP=0,048 MW/yr

TR BISTRICA II

LV BISTRICA II0,4 kV

Load BISTRICA IIF=0,772 1/yr

T=5,000 hQ=231,489 min/yrW=0,158 MWh/yrP=0,032 MW/yr

Line

MV BISTRICA II10 kV

MV BISTRICA I10 kV

Figure 3. Load point indices of two 10/0.4 kV substation, end of feeder Bistrica (left figure is for future state with automatization of switches, while right is for future state with replaced old overhead line sections)

4.4. Distribution network reliability increase with proper asset management

As an example of distribution network reliability increase using asset management, feeder “Bistrica” is chosen due to its very old overhead line’s sections. Most of the sections is older than 48 years (66.7%) and more than 96% of sections are older than 38 years (Figure 4). If those parts are replaced with new sections, SAIDI would decrease by 51.5% and SAIFI by 48.6% in regard to the present state of the grid (Table 4).

Table 8. Calculated reliability indices for future state – replacement of old equipement

Area/Feeder ENS

(MWh) SAIDI

(min/year) SAIFI

(failure/year) CAIDI

(SAIDI/SAIFI) Standard

Bistrica 1,40 228,89 0,76 299,99 3

Figure 4. Feeder “Bistrica”, overhead lines age distribution

Page 15: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

 

214

5. CONCLUSIONS

Reliability of distribution networks is an important part of distribution system planning and optimization. Systematic and justified investment in new switching devices and gradual automatization improves networks ability to supply high number of customers even in emergency operating state. Along with such improvements, continuous monitoring and diagnostics of grid elements and replacement of old and unreliable equipment can further increase system’s reliability. Proper asset management combined with reliability analyses is required to maintain sufficient reliability standards.

Analyses as those provided in this paper will become more and more important as customers (along with their appliances) are becoming more sensitive to power quality and supply interruptions and as customer density increases. BIBLIOGRAPHY [1]. T. Dorji, “Reliability Assessment of Distribution Systems,” MASTER THESIS (Norwegian

University of Science and Technology Department of Electrical Power Engineering). [Online]. Available: http://www.diva-portal.org/smash/get/diva2:348747/FULLTEXT01.pdf. [Accessed: 28-Jul-2015].

[2]. G. Kjolle, L. Rolfseng, and E. Dahl, “The economic aspect of reliability in distribution system planning,” IEEE Trans. Power Deliv., vol. 5, no. 2, pp. 1153–1157, Apr. 1990.

[3]. R. Billinton, L. Salvaderi, J. D. McCalley, H. Chao, T. Seitz, R. N. Allan, J. Odom, and C. Fallon, “Reliability issues in today’s electric power utility environment,” IEEE Trans. Power Syst., vol. 12, no. 4, pp. 1708–1714, 1997.

[4]. “NEPLAN - Planning and optimization system for electrical, gas, water and district heating networks.” [Online]. Available: http://www.neplan.ch/.

[5]. P. BANGALORE, “Development of Test System for Distribution System Reliability Analysis, Integration of Electric Vehicle into the Distribution System,” Master’s Thesis in the Master’s Electric Power Engineering, 2011. [Online]. Available: http://webfiles.portal.chalmers.se/et/MSc/PramodBangalore.pdf. [Accessed: 28-Jul-2015].

[6]. R. Uhunmwangho and O. Eseosa, “Reliability Prediction of Port Harcourt Electricity Distribution Network Using NEPLAN,” The International Journal Of Engineering And Science (IJES), 2014. [Online]. Available: http://www.neplan.ch/wp-content/uploads/2015/02/ReliabilityPredictionPortHarcourt.pdf. [Accessed: 28-Jul-2015].

[7]. O. K. P. Mokoka and K. O. Awodele, “Reliability Evaluation of distribution networks using NEPLAN & DIgSILENT power factory,” in 2013 Africon, 2013, pp. 1–5.

[8]. A. Sumper, A. Sudria, and F. Ferrer, “International Reliability Analysis in Distribution Networks,” Report ( Centre d´Innovació Tecnològica en Convertidors Estàtics i Accionaments CITCEA, Universitat Politècnica de Catalunya ), 2015. [Online]. Available: http://www.icrepq.com/PONENCIAS/4.299.SUMPER.pdf. [Accessed: 28-Jul-2015].

[9]. R. N. Allan, R. Billinton, I. Sjarief, L. Goel, and K. S. So, “A reliability test system for educational purposes-basic distribution system data and results,” IEEE Trans. Power Syst., vol. 6, no. 2, pp. 813–820, May 1991.

* . *

Page 16: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

528

International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015

AUTHORS’ INDEX

Papers of CMDM 2015

Name of the author..................... Paper .... Page Name of the author .................... Paper ..... Page

A ADAM M. .................................. #159, ...... 405 AGUADO I. ............................... #109, ....... 71 AL MEHAIRI M. S. S. .............. #111, ....... 87 ALMEIDA V. ............................ #157, ..... 389 ANDERSKI T. ........................... #177, ..... 519 ANTONIADIS A. ...................... #135, ...... 266 ANTUNES S. ............................. #163, ...... 410 AVRAMESCU M. ..................... #170, ...... 456 AVRAMESCU M. ..................... #171, ...... 467 AVRAMESCU M. ..................... #172, ...... 481 AVRAMESCU M. ..................... #173, ...... 491 AVRAMOVIĆ B. ...................... #137, ..... 282

B BACIU M. ................................. #102, ........ 21 BADICU L.V. ............................ #118, ...... 129 BALAN V. ................................. #102, ........ 21 BALASIU F. .............................. #154, ...... 366 BALTEANU S. M. .................... #175, ...... 501 BĂRBULESCU C. .................... #150, ...... 340 BEIU C. ..................................... #176, ...... 511 BENÍTEZ I. ............................... #115, ...... 120 BERGELD L. ............................. #105, ........ 39 BIASUTTO A. ........................... #130, ...... 226 BIDWELL D. ............................. #165, ...... 427 BIESEMANN M. ....................... #142, ...... 290 BOGDAN M. ............................. #145, ...... 314 BOVO U. ................................... #130, ...... 226

BREZOIANU V. ....................... #171, ...... 467 BREZOIANU V. ....................... #172, ...... 481 BRIKCI F. .................................. #164, ...... 419 BRISSETTE A. .......................... #123, ...... 161 BRONIECKI U. ......................... #118, ...... 129 BRUNINX K. ............................ #177, ...... 519 BUCUR D. ................................. #154, ...... 366 BUDAN M. ................................ #170, ...... 456 BUDAN M. ................................ #171, ...... 467 BUICĂ G. .................................. #176, ...... 511 BYRNE A. ................................. #144, ...... 306

C CARAMIDA C. ......................... #136, ...... 274 CHIMIREL C. ........................... #149, ...... 332 CHITESCU I. E. ........................ #110, ........ 80 CHIULAN T. ............................. #156, ...... 381 CHIULAN T. ............................. #170, ...... 456 CHIULAN T. ............................. #171, ...... 467 CLOUTIER M. .......................... #106, ........ 47 COENEN S. ............................... #156, ...... 381 COUCKUYT D. ........................ #177, ...... 519 CRUSELL I. .............................. #105, ........ 39 CURIAC P. ................................ #173, ...... 491

D DELGADO I. ............................. #115, ...... 120 DI GIULIO A............................. #167, ...... 441 DÍEZ J. ....................................... #115, ...... 120 DINA A...................................... #110, ........ 80

Page 17: Proceedings of International Conference on Condition ... 2344-245X 3 International Conference on Condition Monitoring, Diagnosis and Maintenance - CMDM 2015 CONTENTS Foreword

 

529

DOLATA B. .............................. #156, ...... 381 DRAGAN A.D. .......................... #110, ........ 80 DRAGOMIR A. ......................... #159, ...... 405 DRAGOMIR M. ........................ #159, ...... 405

E EWERT F. ................................. #142, ...... 290

F FAGARASAN T. ....................... #124, ...... 169 FAGARASAN T. ....................... #125, ...... 178 FAGARASAN T. ....................... #146, ...... 324 FANTANA N.L. ........................ #158, ...... 398 FANTONI P. F. ......................... #166, ...... 434 FIRICA D. ................................. #108, ........ 62 FLAMANZEANU D., .............. #151, ....... 348 FLOREA C.G. ........................... #113, ...... 103 FLOREA G. ............................... #145, ...... 314 FLOREA M. ............................. #170, ...... 456 FLOREA M. ............................. #171, ...... 467 FOFANA I. ................................ #124, ...... 169 FOFANA I. ................................ #125, ...... 178 FOOK MING W. ....................... #103, ........ 30 FRAIOLI A. ............................... #101, ........ 13 FRAIOLI P. ............................... #135, ...... 266 FUSTER V. ................................ #109, ........ 71

G GABROVŠEK M. ..................... #143, ...... 299 GABROVŠEK M. ..................... #143, ...... 299 GAL S. ....................................... #124, ...... 169 GAL S. ....................................... #125, ...... 178 GENOVESE M.P. ...................... #130, ...... 226 GIGUÈRE P. A. ......................... #164, ...... 419 GOBI KANNAN S. ................... #103, ........ 30 GOLOVANOV N. ..................... #176, ...... 511 GOMES-MOTA J. ..................... #157, ...... 389 GOMES-MOTA J. ..................... #163, ...... 410 GRIGORAȘ G. .......................... #150, ...... 340 GRISEY N. ................................ #177, ...... 519 GUȘĂ D. .................................... #112, ........ 95

H HATEGAN I. D. ........................ #149, ...... 332

HATEGAN I. D. ........................ #170, ...... 456 HATEGAN I. D. ........................ #171, ...... 467 HOLJEVAC N. .......................... #128, ...... 205

I IACOBICI L. ............................. #149, ...... 332 ILIESCU S. St. .......................... #120, ...... 138 ILIESCU S. ................................ #112, ........ 95 ILINCA F. .................................. #149, ...... 332 ILIŞIU D. ................................... #107, ........ 54 ILIŞIU D. ................................... #108, ........ 62 IONITA I. .................................. #170, ...... 456 IONITA I. .................................. #171, ...... 467 IORDACHE (PRESADĂ) G. .... #120, ...... 138 IULIANI V. ............................... #167, ...... 441

J JURKOVIĆ K. ........................... #128, ...... 205

K KOBAYASHI T. ....................... #121, ...... 145 KOLTUNOWICZ W. ................ #118, ...... 129 KOVAČ M. ................................ #143, ...... 299 KOZJEK D. ............................... #143, ...... 299 KUZLE I. ................................... #128, ...... 205 KUZLE I. ................................... #137, ...... 282

L LAVOIE E. ................................ #123, ...... 161 LEBLOND A. ............................ #123, ...... 161 LINN T. ..................................... #165, ...... 427 LIPAN A. ................................... #145, ...... 314 LISMAN C. ............................... #151, ...... 348 LUNGU C. ................................. #145, ...... 314

M MARGINEAN D. ...................... #149, ...... 332 MARINOIU M. ......................... #155, ...... 372 MARMOLEJO A. ...................... #135, ...... 266 MATIAS S. ................................ #157, ...... 389 MIK A. ....................................... #137, ...... 282 MIRCEA P. M. .......................... #175, ...... 501 MIRON A. ................................. #159, ....... 405 MIZUTANI M. .......................... #121, ...... 145

Igor
Highlight