Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Overview and Development Status A web-based resource providing critical resources, tools best practices, and lessons learned for NASA project teams http://pbma.hq.nasa.gov NASA Quality Leadership Forum Port Canaveral, Florida March 5, 2002

Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

Embed Size (px)

Citation preview

Page 1: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

Process Based Mission Assurance Knowledge Management System

P B M AMission Success Starts With Safety

Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property

Overview and Development StatusA web-based resource providing critical resources, tools

best practices, and lessons learned for NASA project teams

http://pbma.hq.nasa.gov

NASA Quality Leadership ForumPort Canaveral, Florida

March 5, 2002

Page 2: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

2

The PBMA-KMS Overview• Web-based resource http://pbma.hq.nasa.gov

• PBMA-KMS Goal: Provide information to the NASA community related to planning and implementing life-cycle safety, risk management and mission assurance activities

– Supports NASA SMA managers, subject matter experts and their NASA program and project customers

• Supports multiple NASA objectives:– Safety and mission assurance/success– Knowledge management– Risk management

• Enables mission success knowledge management– Key knowledge access (right information/right place/right time)– Knowledge capture: explicit (documented) & tacit (corporate/tribal)– Knowledge sharing & reuse– Work groups and collaboration

Page 3: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

3

PBMA-Knowledge Management System

Whom it Serves

• Program Executives• Program Managers• Project Managers• SMA Community• Independent

Assessment Teams• Systems

Management Offices• NASA Domestic &

International Partners

• NASA Contractor Community

What it Contains

• Policies• Procedures• Guidelines • References• Links• Processes• “Video Nuggets”

(subject matter experts)

• Best Practices• Lessons Learned• Case Studies• Tools/Techniques• Contacts

What it Does

• Serves as a Mission Success Yardstick

• Assists in Planning• Assists in

Conducting IA’s• Informs • Networks/Connects• Documents• Enables• Trains• Educates

Page 4: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

Formulation Implementation

PBMA Framework (Home Tab)

Project Phase

Elements

PgmMgmt

ConceptDevel.

Acq.

1.1 2.1 3.1 4.1 5.1 6.1 7.1 8.1

1.2

1.3

1.4

1.5

2.2

2.3

2.4

3.2

3.3

3.4

4.2

4.3

4.4

4.5

5.2

5.3

5.4

5.5

6.2

6.3

6.4

6.5

7.2

7.3

8.2

8.3

8.4

HW SW Mfg Integ.Test

Ops

Policies(Rules & Req.)

Plans

Processes

Controls

Verification

Each cell contains video-nuggets, text, links

2.5 3.5

7.4

7.5 8.5

Home

Page 5: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

5

Functional Tabs

(operational modes)

Page 6: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

6

Tab Highlights

• Project life-cycle indexed guide to assurance process definition and implementation

• Provides head-start for program/project managers in developing critical safety and mission assurance planning documents

• Provides “fingertip benchmarking” capability, i.e., a window on how other NASA project managers have implemented assurance processes

• Provides access to descriptions of safety, mission assurance, and risk management processes employed on past and present NASA programs

Home

Program Profile Mode

Page 7: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

7

Tab Highlights-cont.

• Introduces first-time users to the PBMA-KMS concept and all of its various components and functionalities, including a site map and index.

• Enables the creation and implementation of password protected work groups or “communities of practice.”

• Enables document management, announcements, work group links, shared calendars, action-tracking, work group polls, threaded discussion, members list, e-mail notification

Work Group Mode

Tutorial Mode

Page 8: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

8

• Provides immediate access to NASA best practice assurance planning documents (e.g., Quality Assurance Plans, Risk Management Plans, Software Assurance Plans, System Safety Plans etc.).

• Contains a vast library of documents from across the Agency representing virtually every NASA center,

• Addresses life-cycle SMA planning needs from the earliest concept development to operations and disposal.

• Contains over 200 plans, process and procedure documents, handbooks, manuals, requirements documents, tools and techniques, and more.

• Documents and links provided by NASA Center Directors in response to a call letters issued in October 2000 and April 2001 by the Associate Administrator for Safety and Mission Assurance.

• Provides links to NASA, US government (public domain), and worldwide aerospace, lessons learned web sites.

Best Practice Mode

Lessons Learned Mode

Tab Highlights-cont.

Page 9: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

9

• "Build-a-Plan" Wizard – supports program/project and SMA managers in developing safety and mission assurance plans

• "Acquisition Wizard" - supports program/project manager in developing indexed assurance, and risk management acquisition language text usable "as is" or tailorable to a specific procurement or acquisition.

• Development in cooperation with Quality Leadership forum and others.

• Provides gap analysis and benchmarking capability for:• SMA Planning Documents• SMA Implementation Planning• Project Team Maturity• Individuals

• Development in cooperation with APPL

Wizard Mode

Maturity Assessment Mode

In Development – June 2002 Target

<<<<<< On Hold >>>>>>

Tab Highlights-cont.

Page 10: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

10

Implementation Schedule- PBMA Initial Operability - March 2001

- Preview & Workshop at Assurance Technology Conference, Glenn Research Center - May 2001

- Community of Practice Workshop – September 2001

Completed deployments:

GRC on 10/16 & 11/19-20, GSFC on 11/14, ARC on 12/05-06

SSC on 12/11, MSFC-SLI on 12/10

Upcoming deployments:

JSC on 1/23-24/02, LaRC on 2/05-06/02, MSFC on 02/19-20/02,

JPL on 2/26-27/02, DFRC on 02/28/02

NASA HQ/TBD, KSC/TBD

Page 11: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

11

http://pbma.hq.nasa.gov- content rich - easy access

- intuitive navigation - it’s free and available now !

…………Check it out !

“If you want to teach people a new way of thinking, don’t bother trying to teach them. Instead, give them a tool, the use of which

will lead to new ways of thinking.”

- Buckminster Fuller

Page 12: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

12

BACKUP

CHARTS

Page 13: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

13

Growth in Work Groups

Working Group Membership

0

50

100

150

200

250

300

350

400

450

500

8/2

0/2

001

8/2

7/2

001

9/3

/2001

9/1

0/2

001

9/1

7/2

001

9/2

4/2

001

10/1

/2001

10/8

/2001

10/1

5/2

001

10/2

2/2

001

10/2

9/2

001

11/5

/2001

11/1

2/2

001

11/1

9/2

001

11/2

6/2

001

12/3

/2001

12/1

0/2

001

12/1

7/2

001

12/2

4/2

001

12/3

1/2

001

1/7

/2002

1/1

4/2

002

1/2

1/2

002

1/2

8/2

002

Date

Mem

bers

Workmanship

Ultra

ISO 9000

Systems Engineering

Supplier RM

Software Assurance

SMA Budget

Risk Management

QLF

Process Control

Management

MAF

NSRS

NASA Software

LLSC

JAPC

JPL PQA

GIDEP

GSFC SA HB

GSFC Mission Success

GMSEC

GSFC NGST

GSFC FSW

GSFC Flight Control

GRC PS

GRC KM

FEANICS

Explosive Safety

Champions

NASA Office of Safety & Mission Assurance Sponsored KMS Working Group Membership

Community of Practice(work group) growth rate in members since August 2001:

Page 14: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

14

The PBMA-KMS Web-Based ResourceFrom: "STRICKLER, EMILY R. (JSC-ER) (NASA)"

<[email protected]>

To: "'[email protected]'" <[email protected]>

Subject: PBMA Site Info

Date: Tue, 15 Jan 2002 13:10:42 -0600

X-Mailer: Internet Mail Service (5.5.2653.19)

 

I accessed today for the first time the Process Based Mission Assurance web

site. What an excellent site! I support the JSC Chief Engineer on several

systems and software activities, and this site will be a great resource.

 

I noted that under "Best Practices", then under "Project Management" then

under "Other Prg Mgmt Docs" you listed the JSC GFE Project Management work

instruction. I was the lead for developing this document and wanted to send

you the current baseline, since I noted you had a working draft version.

 

I apologize for the large file, but wanted to get you the baselined

document.

 

Thanks,

Recent User Comment(emphasis added)

Page 15: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

15

PBMA-KMS Conceptual Foundation• Provides a mission success management framework

Themes: program-project management life cycle / systems thinking /recurrent risk management behavior / reuse of knowledge / safety & mission success driven

• Consolidates safety, assurance, and risk management elements into an integrated project life-cycle systems engineering (7120.5A) context

• Supports NASA SMA managers, subject matter experts and their program customers

• Enables mission success knowledge management– key knowledge access (right information/right place/right time)– knowledge capture: explicit (documented) & tacit (corporate/tribal)– knowledge sharing & reuse– work groups and collaboration

Page 16: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

16

• Center-based PBMA Champions• NASA Knowledge Management Working Group• NASA-wide SMA Organizations• NASA Procurement Office• NASA Academy of Program & Project Leadership

(APPL)• NASA Quality Leadership Forum• NASA CI (Hardware/Software Interoperability)• Design for Safety (Engineering Complex Systems)• International Council on Systems Engineering

(INCOSE)• Knowledge Management Consortium (local

government / university / industry partners)

Current Partnerships

Page 17: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

17

• Chief Engineer• Systems Engineering Working Group• Systems Management Offices• Center-based Engineering Organizations

Prospective & Expanding Partnerships

Page 18: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

18

Key Briefings

- Chief Engineer’s Office (November 20, 2001)

- Engineering Complex Systems (ECS) (formerly Design for Safety) Dec 5/6 Ames Research Center

- NASA/Knowledge Management (KM) Working Group (December date TBD)

- Program Management Council Working Group (PMCWG) / Systems Management Office (SMO) Meeting  at JPL the week of Jan. 21

- RAMS (January 29, 2002 – Seattle)

- CQSDI (March 4-5, Cape Canaveral)

- Joint NASA/ESA Safety Conference (June 2002)

Page 19: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

19

Ongoing Development-1

• Video Nugget Recording / HQ Oct 15-17– Procurement

• AA/Office of Procurement, Tom Luedtke• Procurement Policy Analyst, Jeffery Cullen

– Training& Development• APPL Director: Ed Hoffman• APPL Program Manager: Tony Matura

– Office of Safety & Mission Assurance• Orbital Debris, Wayne Frazier• Nuclear Payloads, John Lyver• Information and Data Security, Mike Card

– GSFC• EEE Parts, Mike Sampson

Note: Over 110 video nuggets currently operational

Page 20: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

20

• Video Nugget Recording / Nov 13-15 / GSFC• Software Assurance, V&V, Metrics: Linda Rosenberg--• Systems Management: Rich Day• GSFC CIO: Milt Halem• Project Management: Jim Barrowman (GSFC Retired)• Systems Engineering: Mike Bay• SS Operations: William Worrall• Stories on Small Explorer Systems Engineering and the WIRE Failure and

Recovery: Dave Everett • Project Management: Ron Browning (GSFC Retired)• Space Operations: Mike Cully (Swales)• EEE Parts / Tin Whiskers Story: Mike Sampson• Benefits of using the NASA LLIS on HESSI: Dennis Lee • Resources Management Perspective: (Richard Weiss--Boeing) • Design Rules: (Rich Katz)

Preliminary

Listing & Subject Area

Ongoing Development-2

Page 21: Process Based Mission Assurance Knowledge Management System P B M A Mission Success Starts With Safety Protecting the Public, Astronauts and Pilots, the

21

Mission Assurance

Formulation Implementation

PROJECT / SYS ENG

LIFE-CYCLE

PBMA LIFE-CYCLE THEMES

Risk Management

Safety