37
, Process Evaluation to Provide Sustainable Arsenic Compliance for a Potable Water Treatment System; St. Michaels, MD Christopher Curran, PE Christopher Walker, PE Mark Prouty, PE PA AWWA Conference April 23, 2015

Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

,

Process Evaluation to Provide Sustainable Arsenic Compliance for a Potable Water Treatment System; St. Michaels, MD

Christopher Curran, PE

Christopher Walker, PE

Mark Prouty, PE

PA AWWA ConferenceApril 23, 2015

Page 2: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Background

Arsenic Treatment Technologies

Existing System Challenges

Evaluation Approach

Evaluation Findings

Alternatives

Recommendations

Presentation Outline

Page 3: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Background - Arsenic

Water Treatment Facility Evaluation - St. Michaels, MD

3

• What is Arsenic?

• Sources of Environmental Arsenic

• Effects of Arsenic on Human Health

• US EPA Regulations

Page 4: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Background - Arsenic

Water Treatment Facility Evaluation - St. Michaels, MD

4

Page 5: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Background – Source Water

Water Treatment Facility Evaluation - St. Michaels, MD

5

Town of St. Michaels

Page 6: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Background

6

• St. Michaels – Vibrant Tourism

• Existing System Description

Glory Ave WTP (250,000 gpd)

Marengo St WTP (125,000 gpd)

Water Treatment Facility Evaluation - St. Michaels, MD

Page 7: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Arsenic Treatment Technologies

• Adsorption Process– Granular Ferric Hydroxide (GFH)– Granular Ferric Oxide (GFO)– Activated Alumina { Lower pH Req’d }– Media Disposal

• Ion Exchange Process– Pressure Vessel – Media Regeneration

• Oxidation/Co-Precipitation/Filtration– Ferric Chloride Addition– pH Adjustment– Pressure Filtration– Backwash Needs

Water Treatment Facility Evaluation - St. Michaels, MD

7

Page 8: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Existing System Challenges

8

• New Arsenic Systems Installed in 2006 to Meet EPA MCLs

• Ex. Treatment Systems -Arsenic Breakthrough

• Reduced Bed Life of Media

• Solids Accumulation in Filters

• Backwash Management

• Aged Raw Water / Well Pump Piping and Valving

• Operational Challenges

Water Treatment Facility Evaluation - St. Michaels, MD

Page 9: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Existing System – Glory Ave WTP

Water Treatment Facility Evaluation - St. Michaels, MD

9

• Raw H2O As: 32 – 48 ppb

• 2006 IBS System Installation (Bayoxide®)

• Media Change-Outs�2010 & 2012 & 2014

Page 10: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Existing System - Marengo St WTP

Water Treatment Facility Evaluation - St. Michaels, MD

10

• Raw H2O As: 32 – 48 ppb

• 2006 IBS System Installation

�Media Change-Outs• 3/10, 8/10 & 10/10 (Breakthrough)

• 4/2011 Ion Exchange Installation (Purolite FerrIX A33)

�Media Change-Outs• 9/11, 11/11, 6/12

• December 2012 Permanently Offline

Page 11: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Project Approach

• Review Data and Operations Records

• Engage Operations Staff and Include in Team

• Identify Alternatives

• Evaluate Alternatives in Matrix Evaluation for Cost Effectiveness and Overall Benefit

• Submit Alternative Evaluation Report to Town

• Gain Regulatory Concurrence

• Prepare Grant Application

• Develop & Execute Implementation Plan

Water Treatment Facility Evaluation - St. Michaels, MD

11

Page 12: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

General Alternatives

Water Treatment Facility Evaluation - St. Michaels, MD

12

Page 13: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Project Evaluation - Items Evaluated

1. Water Quality Parameters• Develop Sampling Program• Review Data

2. Operational Review• System Control Logic• Review Operational Set Points• Review Operations Data• Investigate Backwash Activities• Investigate Potential Cross-Connections• Verify Loading Rates and Compliance with Manufacturer O&M

Guidelines

3. Review Previous Engineering Reports

4. Discussions with Equipment Manufacturers

Water Treatment Facility Evaluation - St. Michaels, MD

13

Page 14: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Important Water Quality Parameters

�Arsenic Speciation

�pH

�Chloride

�Selenium

�Fluoride

�Silica

�Sulfate

�Nitrate

�Phosphate

�Total Dissolved Solids

�Total Organic Carbon

�Iron

�Manganese

�Turbidity

Water Treatment Facility Evaluation - St. Michaels, MD

14

Page 15: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Project Findings – Water Quality DataRaw Water Quality Parameter

Acceptable Range

Detected RangeMarengo WTP

Detected RangeGlory WTP

Total Arsenic ** 32-48 32-48

pH 5.5-9.0 6.9-9.4 7.7-8.8

Ferrous Iron <0.25 ppm 0.13 0.18

Manganese <0.05 ppm 0.014-0.037 ND

Aluminum <0.2 ppm 0.089-0.096 ND

Silica <20 ppm 12.4-13.8 12.0-15.0

Phosphate <0.05 ppm 0.05-0.076 0.02-0.31

Water Treatment Facility Evaluation - St. Michaels, MD

15

Page 16: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Evaluation Findings – pH Effect on IBS

Water Treatment Facility Evaluation - St. Michaels, MD

16

Courtesy of Siemens

Page 17: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Project Findings – Filter Inspections

Water Treatment Facility Evaluation - St. Michaels, MD

17

Marengo WTP Filters

Page 18: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Project Findings – Filter Inspections

Water Treatment Facility Evaluation - St. Michaels, MD

18

Marengo WTP Lead Bed – Inlet Piping / Strainer

Page 19: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Project Findings – Filter Inspections

Water Treatment Facility Evaluation - St. Michaels, MD

19

Marengo WTP Lag Bed – Uneven Media Surface

Uneven Media Surface

Page 20: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Project Findings – Filter Inspections

Water Treatment Facility Evaluation - St. Michaels, MD

20

Marengo WTP Lead Bed – Underdrains

Page 21: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Operational Parameters Effect: IBS Bed Life (GFH)

Water Treatment Facility Evaluation - St. Michaels, MD

21

Courtesy of Siemens

Page 22: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Evaluation Findings – Well Production

Water Treatment Facility Evaluation - St. Michaels, MD

22

0

50

100

150

200

250

300Ja

n-0

6

Ap

r-0

6

Ju

l-0

6

Oct-

06

Ja

n-0

7

Ap

r-0

7

Ju

l-0

7

Oct-

07

Ja

n-0

8

Ap

r-0

8

Ju

l-0

8

Oct-

08

Ja

n-0

9

Ap

r-0

9

Ju

l-0

9

Oct-

09

Ja

n-1

0

Ap

r-1

0

Ju

l-1

0

Oct-

10

Ja

n-1

1

Ap

r-1

1

Ju

l-1

1

Oct-

11

Ja

n-1

2

Ap

r-1

2

Ju

l-1

2

Flo

w R

ate

(1

,00

0 G

PD

)

Well Flow Rates

Well #2 - Marengo StWTP

Well #3 - Glory AveWTP

Well #3 Target Flow Rate = 250,000 GPD

Well #2 Target Flow Rate = 125,000 GPD

Page 23: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Evaluation Findings – Hydraulic Loading

Water Treatment Facility Evaluation - St. Michaels, MD

23

Parameter Target Value Marengo WTP Glory WTP

Empty Bed Contact Time (min)*

3.5 – 5.0 2.64 3.68

HydraulicLoading (gpm/sf)

8 10 gpm/sf 8.1 gpm/sf

Flow Rate Marengo (gpm) 211 280 --

Flow Rate Glory (gpm) 400 -- 408

Underdrain Loading Rate (gpm/sf)

N/A 724 272

* EBCT was 28% Lower at Marengo WTP than Glory WTP

Page 24: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Evaluation Findings – Backwashing

Water Treatment Facility Evaluation - St. Michaels, MD

24

• Glory WTP� Operator Intensive – Hoses� Supply Water From Well Pump� Receiving Pump Station Lacks Capacity� No Floor Drains

• Marengo WTP� Operator Intensive – Hoses� Supply Water From Well Pump� No Floor Drains

Page 25: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Evaluation Findings - Summary

Water Treatment Facility Evaluation - St. Michaels, MD

25

• Competing Chemical Compounds in

Raw Water

• Poor Hydraulics Through Vessels

• Insufficient Contact Time with Media

(Marengo WTP)

• Better Control on Water Production

and Flow Rate Necessary at Both

WTPs

Page 26: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Evaluation Findings - Summary

Water Treatment Facility Evaluation - St. Michaels, MD

26

• Testing Indicated IX Media was Only 50% Exhausted at

Breakthrough

• Odors Generated from Ion Exchange Media Following

Idle Periods

• Lack of Backwash Disposal Capacity at Glory Street WTP

• Lack of Backwash Drainage Appurtenances at Both Wells

Page 27: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Alternatives

• Oxidation / Co-Precipitation / Filtration with Catalytic Greensand Plus®

– Pre-oxidation

– Ferric Chloride Addition

– pH Adjustment

– Backwash

• Proven Technology

• Removes Iron

• Minimum Operational Complexity

Water Treatment Facility Evaluation - St. Michaels, MD

27

Page 28: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Alternatives

Water Treatment Facility Evaluation - St. Michaels, MD

28

• Iron Based Sorption Media Improvements

• Flow Control

• pH Adjustment

• Hybrid Approach

• Maintain IBS System at Glory WTP

• Install Co-Precipitation / Filtration System at Marengo WTP

Page 29: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Alternatives

Alternative Capital Cost Annual Cost Present Worth

IBS Media $770,000 $73,900 $1,774,325

CatalyticOxidation/Filtration $1,490,000 $21,800 $1,786,171

Hybrid Approach $1,110,000 $48,393 $1,767,677

Water Treatment Facility Evaluation - St. Michaels, MD

29

Page 30: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Recommendations

• Install Catalytic Oxidation System at Marengo Street

• Implement Improvements to Ex. Treatment System (Glory)

– Precondition Raw Water

• Provide Backwashing Improvements

– Backwash Supply / Metering

– Backwash Holding Tanks

– Backwash Recycle (Marengo WTP)

• Well Flow Control Improvements (Need VFDs)

• Safety Improvements – Convert to NaOCl

Water Treatment Facility Evaluation - St. Michaels, MD

30

Page 31: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Recommendations – Marengo WTP

Water Treatment Facility Evaluation - St. Michaels, MD

31

Well House

Generator

Well

Filter Building

Page 32: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Recommendations – Marengo WTP

Water Treatment Facility Evaluation - St. Michaels, MD

32

New Chemical Room

Blow-off

Backwash Tank

New FiltrationEquipment

New Piping Gallery /Trench Drain

Page 33: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Recommendations – Marengo WTP

Water Treatment Facility Evaluation - St. Michaels, MD

33

Backwash Tank

Backwash Pipe to 12,000 gal Aqua StoreBackwash Recycle Tank

Backwash Tank

Page 34: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Recommendations – Glory WTP

Water Treatment Facility Evaluation - St. Michaels, MD

34

Well HouseGenerator

Well

Filter Building

Page 35: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Recommendations – Glory WTP

Water Treatment Facility Evaluation - St. Michaels, MD

35

25,000 gal Concrete Backwash Holding Tank

Backwash Tank

New Chemical Room

New Piping Gallery /Trench Drain

Well House

Filter Building

Page 36: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

Water Treatment Facility Evaluation - St. Michaels, MD

36

Acknowledgements

Town of St. Michaels

• Jean Weisman (Town Administrator)

• Jeff Richardson (Public Works Director)

Page 37: Process Evaluation to Provide Sustainable Arsenic ...Installation (Purolite FerrIX A33) Media Change-Outs • 9/11, 11/11, 6/12 • December 2012 Permanently Offline. Project Approach

April 23, 2015

Questions

Contact Information:Christopher Curran, P.E.Sabre Building, Suite 300

4051 Ogletown Road, Newark, DE 19713

302.781.5888

[email protected]