PROCESS MANAGEMENT

Selected Exact Managerial Methods

Study supports

Darja Noskievičová

FMME VŠB-TUO

Ostrava 2016

Page 2: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

2

Language review: Mark Landry

Title: Process Management, Selected Exact Managerial Methods

Author: Prof. Ing. Darja Noskievičová, CSc.

Edition: First, 2016

No. of pages: 76

Study materials for the study support of Process Management, the Faculty of Metallurgy and

Materials Engineering.

Completion: VŠB – Technical University of Ostrava

© Prof. Ing. Darja Noskievičová, CSc.

© VŠB – Technical University of Ostrava

Page 3: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

3

STUDY INSTRUCTIONS

You have received study support for the combined study containing selected topics covered

by the course of „Process Management“ taught in the 3rd semester of the follow-up master's

degree of the study programme Quality Management study field at the Faculty of Metallurgy

and Materials Engineering.

Course objective and learning outputs

The main course objective is to offer students a complex overview of the aspects of the

process management including various exact managerial approaches covering also linear

programming.

Knowledge outputs:

- a student will be knowledgeable in the problems of process planning and controlling;

- a student will understand and learn the algorithms of various methods for process planning

and controlling.

Skills outputs:

- a student will be able to orient him/herself in the problems of the planning and controlling

of manufacturing, and auxiliary and service processes in practice;

- a student will be able to apply in practice the selected methods of operations research.

Who the course is intended for

This course is included in the follow-up master's study of the field of study of Quality

Management, but it can be studied by an applicant from any other field of study, provided that

he/she meets the required prerequisites.

This study support is divided into chapters, which logically divide up the studied matter, but

are not equally comprehensive. The estimated study time of the chapters may vary

considerably, which is why large chapters are further divided into numbered sub-chapters and

they correspond to the structure described below.

Method of communication with the teacher

This matter is presented to students within the frame of their lectures and practical exercises,

where they practically learn the topics discussed during the theoretical lectures. But the

selected topics suppose self-learning and the elaboration of written seminar work discussed

with the lecturer during consultations and via the internet.

Page 4: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

4

STRUCTURE OF THE CHAPTERS

Study time

The time necessary to study the subject matter is given at the beginning of every chapter. The

time is approximate and can serve as a rough guide for the study layout of the entire subject.

The time may seem too long to some people or, on the contrary, too short to others. There are

students who have never encountered this issue and, on the other hand, those who already

have extensive experience in this field.

Objective

There are defined objectives given for you to achieve after reading the chapter and studying

the topics - specific skills and knowledge.

Lecture

This part is the actual presentation of the studied subject matter, the introduction of new

terms, their definitions and the explanation of the principles of the studied subject matter.

Everything is accompanied by pictures, tables and solved examples.

Examples

There are solved examples to better understand the discussed subject matter.

Summary of terms

The main terms you should learn are repeated at the end of the chapter. If you still do not

understand any of the terms, go back to them again.

Questions

There are several questions to verify that you have fully and well mastered the subject matter

of the chapter.

Key to solution

You will find the solution key to the examples at the end of every chapter.

Page 5: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

5

References

There is a list of the used reference sources, from which you can draw additional information

on an issue in question, at the very end of every chapter.

The author of this educational material wishes you a successful and pleasant study using this

textbook.

Prof. Ing. Darja Noskievičová, CSc.

Page 6: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

6

CONTENTS

STUDY INSTRUCTIONS 3

STRUCTURE OF THE CHAPTERS 4

CONTENTS 6

1. 1. BASIS OF LINEAR PROGRAMMING 9

Time to study 9

Goal 9

Lecture 9

1.1 Introduction 9

1.2 Requirements of a linear programming problem 10

1.3 Introductory example (Optimal production planning) 11

1.4 Forms of LP models 12

1.4.1 General form of an LPP model 12

1.4.2 Standard and canonical form of an LP model 13

1.4.3 Summarization of additional and artificial variables 18

1.5 Assumptions of linear programming 19

1.6 Types of solutions of LPP 20

1.7 General model formulation – a typical LPP 23

1.7.1 Optimal production plan problem 24

1.7.2 Optimal mix problem 24

1.7.3 Optimal rod cutting problem 25

1.8 Techniques of solving LP problems 27

Examples 27

Summary of terms 29

Questions 30

Key to solution 30

References 32

1. 2. GRAPHICAL SOLUTION OF A LINEAR PROGRAMMING PROBLEM 33

Study time 33

Objective 33

Lecture 33

2.1 Introduction 33

2.2 Steps of the graphical solution 33

Page 7: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

7

2.2.1 Creation of a general LPP model 34

2.2.2 Construction of a feasible region 34

2.2.3 Finding the optimal solution 36

Examples 38

Summary of terms 38

Questions 38

Key to solution 39

References 40

2. 3. SIMPLEX METHOD 41

Study time 41

Objective 41

Lecture 41

3.1 Steps of the simplex method 41

3.1.1 Formulating the problem in terms of a general LPP model 42

3.1.2 Transformation of a general model into the canonical form 42

3.1.3 Setting up the initial table and calculation of the zj and cj-zj quantities 42

3.1.4 Verification of the optimality of the solution 44

3.1.5 Determination of the entering variable 44

3.1.6 Determination of the exiting (leaving) variable 45

3.1.7 Creation of a new table 46

3.1.8 Verification of the optimality of the solution 48

3.1.9 Repeating the simplex algorithm 48

3.2 Solved example 49

Examples 52

Summary of terms 52

Questions 53

Key to solution 53

References 56

3. 4. TRANSPORTATION PROBLEM 57

Study time 57

Objective 57

Lecture 57

4.1 Principle of the transportation problem solution 57

Page 8: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

8

4.2 Steps of the transportation problem 58

4.2.1 Preparation of the transportation table 58

4.2.2 Generating the initial feasible solution 60

4.2.3 Developing the optimal solution 64

4.3 MODI method 64

4.3.1 Selection of the initial solution 66

4.3.2 Setting the dual variables ui and vj 66

4.3.3 Computation of (ui + vj – cij) for unoccupied cells 67

4.3.4 Selection of the cell with maximal positive (ui + vj – cij) 67

4.3.5 Creation of the closed loop (path, cycle) 67

4.3.6 Recalculation of the last table 68

4.3.7 Repetition of the algorithm from Step 2 69

Examples 71

Summary of terms 73

Questions 73

Key to solution 74

References 76

Page 9: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

9

1. BASIS OF LINEAR PROGRAMMING PROBLEMS

Study time

600 min

Objective

After studying this chapter you should be able to

describe the type of problem that could be solved using linear programming;

formulate a general linear programming model from a description of the problem;

convert the general model into a standard and canonical form.

set an initial feasible solution.

Lecture

1.1 Introduction

In 1947, George Danzig proposed using linear algebra for determining the optimal

solutions of problems involving restrictions (constraints). For instance, the goal is to

determine the optimal amount of several products to produce a given product´s profit per unit,

respecting such constraints as working machine capacity, labour hours, raw materials needed

to make the planned products. This application has been called linear programming (LP)

which is a part of a wider class of mathematical methods called mathematical programming.

Linear programming has been widely used for solving constrained optimization problems. LP

consists of a sequence of steps that will lead to an optimal solution if it exists. [3]

The most common type of LP application involves the general problem of allocating

limited sources among competing activities in the best possible (i.e. optimal) way. More

precisely, an LP problem involves selecting the level of certain activities that compete for

scarce resources that are necessary to perform those activities. The choice of activity levels

then dictates how much of each resource will be consumed by each activity. LP involves the

planning of activities to obtain an optimal result, i.e. the result that reaches the specified best

Page 10: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

10

outcome among all feasible alternatives. LP models are used to help managers make

decisions in many different areas where it is necessary to allocate scarce resources among

competing demands (resource allocation problems) (see Tab. 1.1).

Tab. 1.1 Examples of LPP practical applications Source: [4]

Problem type Description

Production

planning

Production: finding the minimum-cost production operational plan

(schedule) for a given work-force plan, taking into account inventory

carrying subcontracting costs.

Production and work-force: finding the minimum-cost production

operational plan taking into account hiring and layoff costs as well as

carrying inventory , overtime, subcontracting costs, and subject to

various capacity and policy constraints.

Staffing: founding the optimal staffing plan for various categories of

workers, subject to various demand and policy constraints.

Distribution Shipping plans: finding optimal shipping assignments from factories to

distribution centres or from warehouses to retailers.

Inventory planning Stock control: Determination of the optimal mix of products to hold in

inventory in a warehouse.

Supplier selection: finding the optimal combination of suppliers to

minimize the amount of unwanted inventory.

Location planning Plants or warehouses: determination of the optimal location of a plant

or warehouse with respect to total transportation costs between various

alternative locations and existing supply and demand sources.

Process control Stock cutting: Given the dimensions of a roll or sheet of raw material

finding the cutting pattern that minimized the amount of scrap material

Product planning Mixes: Finding the optimal production of various ingredients such as

gasoline, alloys, paints, foods subject to certain minimal requirements.

Scheduling Determination of the minimum-cost assignment of workers to shifts,

subject to varying demand.

Vehicles: Assignment of m vehicles to n products or jobs and

determination of the number of trips to make, subject to vehicle size,

vehicle availability, and demand constraints.

Routing: Finding the optimal routing of a product through a number of

sequential processes, each with their own capacities and

characteristics.

1.2 Requirements of a linear programming problem

All LP problems (LPP) have four properties in common [2]:

1. LPP seek to maximize or minimize some quantity (usually profit or cost). We refer to this

property as the objective function of an LP problem. The major objective of a typical firm

is to maximize profits in the long run. In the case of a trucking or airline distribution

system, the objective might be to minimize shipping costs.

Page 11: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

11

2. The presence of restrictions or constraints limits the degree to which we can pursue our

objective. For example, deciding how many units of each product in a firm’s product line

to manufacture is restricted by the available labour and machinery. We want, therefore, to

maximize or minimize a quantity (the objective function) subject to limited resources (the

constraints).

3. There must be alternative courses of action to choose from. For example, if a company

produces three different products, management may use LP to decide how to allocate its

limited production resources (of labour, machinery, and so on) among them. If there were

no alternatives to select from, we would not need LP.

1.3 Introductory example (Optimal production planning)

In a plant with 3 workshops five product types (P1 – P5) are planned to be produced.

The requirements of the particular products for the working capacity of each workshop and

the whole available working capacity of each workshop can be found in Tab. 1.2.

Tab. 1.2 Data for the example

Workshop

Capacity requirement / 1 piece of product

(hours)

The whole available

capacity of the

workshop

(hours/year) P1 P2 P3 P4 P5

1 2 4 2 8 1 12 000

2 4 1 3 1 5 8 000

3 4 3 5 2 4 10 000

Profit/1 unit

of product

10 15 12 8 13

Task: Plan what products and in which amount (x1, x2, x3, x4, x5) to produce in order to achieve

maximal profit.

Solution: We are seeking such vector as xT= (x1, x2,…, x5), that enables achieving maximal

profit (the optimal solution).

Page 12: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

12

Formulation of the LP model for this example is as follows:

Z = 10x1 + 15x2 + 12x3 + 8x4 + 13x5 MAX

2x1 + 4x2 + 2x3 + 8x4 + 1x5 ≤ 12 000

4x1 + 1x2 + 3x3 + 1x4 + 5x5 ≤ 8 000

4x1 + 3x2 + 5x3 + 2x4 + 4x5 ≤ 10 000

xj 0 (j = 1, 2, ..., 5)

The key terms are resources and activities:

m denotes the number of resources; n denotes the number of activities.

Applying to the previous introductory example, m = 3 workshops with their capacity, n = 5

products.

1.4 Forms of LP models

In this subchapter we will discuss general, standard and canonical forms of the LP model.

1.4.1 General form of LP

For the introductory example the above model can be generalized as follows:

a) Objective function

Z = c1x1 + c2x2 + …….+ cnxn EXT (MAX or MIN)

b) Main (functional) constraints

a11x1 + a12x2 +… + a1nxn ≤ b1 i = 1,2,…, m

a21x1 + a22x2 +… + a2nxn ≤ b2 j = 1,2,…, n

………….

am1x1 + am2x2 +…+ amnxn ≤ bm

c) Non-negativity constraints

xj 0 (for j = 1, 2,..., n)

where

xj ...are model (decision) variables (outputs) = level of activity j;

Z....is the value of the overall measure of performance (the value of objective function);

aij are coefficients of the consumption of the i-th resource for each unit of the j-th activity

constants of main constraints;

Page 13: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

13

bi…are the right hand sides - the whole available amount of the i-th resource that is available

for allocation to activities (constants in a system of the main constraints);

cj ...are objective function coefficients (sometimes called cost coefficients) - contribution of j-

the decision variable to objective function Z, i.e. an increase in Z that would result from

each unit increase in the level of activity j.

As summarized in Tab. 1.3 the values of aij, bi and cj (for i = 1, 2, ...., m and for j = 1,

2, ..., n) are model input constants. They are also referred to as the model parameters.

Tab. 1.3 Input constants needed for a linear programming model

Resource usage per unit of activity

Amount of resource

available Activity

Resource 1 2 … n

1 a11 a12 … a1n b1

2 a21 a22 … a2n b2

.

.

.

.

.

.

m am1 am2 … amn bm

Contribution to Z

per unit of activity

c1 c2 … cn

As we can see, some of constraints in the general model could be written as greater than or

equal to () or equal to (=), depending on the problem statement. PL problems can be used to

minimize or maximize the value of the objective function (for instance waste).

In general the LPP model has 3 parts:

a) the objective function where we seek its extreme (maximum or minimum)

b) main constraints (m)

c) non-negativity constraints

and n decision variables.

1.4.2 Standard and canonical form of the LP model

Using the simplex method (see later in detail) we need to have a LP model in a so-

called standard form. The standard form of the LP model must have the following three

characteristics:

1. The objective function should be of a maximization type (but in the literature it can be

found that it is requested to be of a minimization type).

2. All the constraints should of an equality type.

Page 14: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

14

3. All the decision variables should be non-negative.

4. All right-hand side values bi should be non-negative.

The procedure to transform a general form of a LP model to its standard form is discussed

below.

Let us consider the following example:

Z = 3x1 5x2 MAX

2x1 - 3x2 ≤ 15

x1 + x2 ≤ 3

4x1 + x2 ≤ 2

xj 0 for j = 1, 2

The above LPP is violating the following criterion of the standard form:

- the constraints are not equations.

However, a standard form for this LPP can be obtained by transforming it as follows:

Z = 3x1 +5x2 + 0u1 + 0u2 + 0u3 MAX

2x1 - 3x2 + 1u1 = 15

x1 + x2 + 1u2 = 3

4x1 + x2 + 1u3 = 2

x1,2 0, u1,2, 3 0

Variables ui are called additional variables (notice that cj for uj in the objective function is

equal to 0 and aij of these additional variables are equal to +1). Their goal is to transform

inequations into equations to have left-hand sides equal to the right-hand sides. For that

reason ui are added to the left-hand side. Additional variables ui that are added to the left-hand

side are called slack variables (slack variables have physical meaning in problem formulation,

for instance it can be the idle capacity of the workplace).

The former model is in the standard form after the described modifications. It also has

a canonical form because

- all decision variables are constrained to be non-negative,

- all constraints, except the non-negativity constraints, are stated as equalities,

- right-hand side coefficients are all non-negative,

Page 15: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

15

- one decision variable is isolated in each constraint with +1 coefficient (u1 in the first main

constraint, u2 in the second constraint and u3 in the third constraint). The variable isolated in

a given constraint does not appear in any other constraint, and appears with a zero

coefficient in the objective function.

Having a canonical form of the model enables us to set the initial basic feasible

solution through setting the variable isolated in constraint j , called the j-th basic variable,

equal to the right-hand side of the j -th constraint and by setting the remaining variables,

called non-basic variables, all to zero. Collectively the basic variables are termed a basis.

In the example above, the initial basic feasible solution is as follows:

x1, x2 = 0, u1 = 15, u2 = 3, u3 = 2 and the value of the objective function Z = 0. It means that

variables x1 and x2 are non-basic variables and u1, u2 and u3 are basic variables in this initial

basic feasible solution.

For now let us consider the following different example:

Z = -3x1 -5x2 MIN

2x1 - 3x2 ≤ 15

x1 + x2 ≤ 3

4x1 + x2 2

x1 0

x2 unrestricted

The above LPP is violating the following criteria of the standard form:

1. The objective function is of a minimization type.

2. The constraints are not equations.

3. Decision variable x2 is unrestricted, i.e. it can be also negative, thus

it is violating the non-negativity criterion.

A standard form for this LPP can be obtained by transforming it as follows:

Z´= -Z = 3x1 +5x2 + 0u1 + 0u2 + 0s3 MAX

2x1 - 3x2 +1u1 = 15

x1 + x2 + 1u2 = 3

4x1 + x2 - 1s3 = 2

x1 0, u1,2 0, s3 0

x2 unrestricted.

Page 16: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

16

The first two main constraints (≤) were transformed into equations by adding the slack

variables u1, u2 to the left-hand sides as in the former example. But in the third constraint

(inequality ) the additional variable s3 called the surplus variable had to be subtracted from

the left-hand side to transform it into the equation.

For now the problem with unrestricted variable x2 must be solved. It is solved using

the simple substitution x2 = y1 - y2 where y1 and y2 are new non-negative variables.

The final standard model for our example is as follows:

Z´= -Z = 3x1 +5(y2 – y1)+ 0u1 + 0u2 + 0s3 MAX

2x1 - 3(y2 – y1) +1u1 = 15

x1 + (y2 – y1) + 1u2 = 3

4x1 + (y2 – y1) - 1s3 = 2

x1 0, u1, 2 0, s3 0, y1,2 0.

Because in the previous model it is not true that one decision variable is isolated in each

constraint with +1 coefficient (there is -1s3, not +1s3 in the third constraint) the standard

model is not in the canonical form and it is not possible to set the initial basic feasible

solution. This situation can be solved using so-called artificial variables Ai. These variables

are fictitious and cannot have any physical meaning. They are merely a mathematical

convenience useful for initiating the simplex algorithm. The artificial variable technique is a

device to get the initial basic feasible solution, so that the simplex procedure may be adopted

as usual until the optimal solution is obtained. These artificial variables would not be part of

any optimal solution, if it exists. To solve such a LPP there are two methods: the Big M

method (the "Big M" refers to a large number associated with the artificial variable,

represented by the letter M) or the Method of penalties and the Two-phase simplex method.

Using the first method means that we assign a very large penalty ' — M ' to the artificial

variable in the objective function for the maximization of the objective function (in detail see

for instance [1], [5]).

For our last example the final transformation leading to the canonical form is as

follows:

Page 17: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

17

Z´= -Z = 3x1 +5(y2 – y1)+ 0.u1 + 0.u2 + 0.s3 – M.A3 MAX

2x1 - 3(y2 – y1) +1u1 = 15

x1 + (y2 – y1) + 1u2 = 3

4x1 + (y2 – y1) - 1s3 +1A3 = 2

x1 0, u1, 2 0, s3 0, y1,2 0, A3 0

The initial basic feasible solution for this model is as follows:

x1 = 0, x2 = 0, s3 = 0 (non-basic variables); u1 = 15, u2 = 3, A3 = 2 ( basic variables).

For now it will be shown how to deal with a situation when in the general model some

main constraint in the form of equation exists. Let´s have the following general LPP model:

Z = 3x1 5x2 MAX

2x1 - 3x2 ≤ 15

x1 + x2 ≤ 3

4x1 + x2 = 2

xj 0 for j = 1, 2

The standard form of this model is as follows:

Z = 3x1 +5x2 + 0.u1 + 0.u2 MAX

2x1 - 3x2 + 1u1 = 15

x1 + x2 + 1u2 = 3

4x1 + x2 = 2

x1,2 0, u1,2 0

Because in this model it is not true that one decision variable is isolated in each constraint

with +1 coefficient (there is no such variable in the third constraint) the standard model is not

in the canonical form and it is not possible to set the initial basic feasible solution. This

situation can be solved using again artificial variables Ai:

Page 18: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

18

Z = 3x1 +5x2 + 0.u1 + 0.u2 – M.A3 MAX

2x1 - 3x2 + 1u1 = 15

x1 + x2 + 1u2 = 3

4x1 + x2 + 1A3 = 2

x1,2 0, u1,2 0, A3 0

and the initial basic feasible solution is the following one:

x1 = 0, x2 = 0 (non-basic variables); u1 = 15, u2 = 3, A3 = 2 (basic variables = base).

1.4.3 Summarization of additional and artificial variables

Slack variables:

Slack variable ui represents an unused quaintly of resources; it is added to less than or equal

(<) type constraints in order to get an equality constraint.

Surplus variables:

Surplus variable si represents the amount by which the solution values exceed a resource.

These variables are also called ‘negative slack variables’. Surplus variables like slack

variables carry a zero coefficient in the objective function. It is added to greater than or equal

to (>) type constraints in order to get an equality constraint.

Artificial variable:

Artificial variables Ai are added to constraints with equality (=) and greater than or equal to

(>) type. An artificial variable is added to the constraint to get an initial solution to an LP

problem in these cases. Artificial variables have no meaning in a physical sense and are not

only used as a tool for generating an initial solution to an LP problem.

Brief information about slack, surplus and artificial variables is given in the following table

[6]:

Tab. 1.4 Relation between additive and artificial variables and the types of inequality of

constraints

Inequality type Variable that appears

≥ - surplus + artificial

= + artificial

≤ + slack

Page 19: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

19

A more detailed comparison of additional (slack and surplus variables) and artificial variables

can be found in the following table:

Tab. 1.5 Properties and functions of additional and artificial variables ([6])

Particulars Slack Variable Surplus Variable Artificial Variable

Meaning Unused resources of

the idle resources.

Excess amount of

resources utilized.

No physical or

economic meaning. It

is fictitious.

When used ? With < constraints With > constraints With > and =

constraints

Coefficient +1 -1 +1

Coefficient in

the Z ( objective

function)

0 0 -M for maximization

(+M for minimization)

As Initial basic

variable

Used as a starting

point

Can’t be used since the

unit matrix condition is

not satisfied

It is initially used but

later on eliminated.

In Optimal

Table

Used to help for

interpreting idle & key

resources

It indicates the

infeasible solution

1.5 Assumptions of linear programming

1. Linearity (proportionality)

The objective and constraints in linear programming problems must be expressed in

terms of linear equations or inequalities. The contribution of each product (activity) to the

value of the objective function Z is proportional to the value of decision variable xj. Also the

contribution of each activity (product) to the left-hand side of each main constraint is

proportional to the value of xj. [5]

When this assumption cannot be met there must be used more complex non-linear

programming or mixed integer programming.

2. Divisibility

Noninteger values of decision variables are acceptable.In certain practical situations

some or all decision variables must be restricted to an integer value. In that case integer

programming models can be applied. [5]

Page 20: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

20

1. Certaininty

The values of the model parameters aij, cj, bi are known and constant. Sometimes the

degree of uncertainty is very large and the decision variables must be treated as random

variables. For such situations stochastic programming was developed. [5]

4. Aditivity

Every function in an LP model (in the objective function, on the left-hand side of the

main constraint) is the sum of the individual contributions of the respective activities

(products). [5]

5. Non-negativity

Negative values of decision variable xj are unacceptable. [5]

1.6 Types of solutions of LPP

When solving LP problems we work with various types of solutions.

A solution is the setting of decision variables xj, i.e. any specification of values for the

decision variables xj.

A feasible solution is a solution for which all the constraints are satisfied simultaneously,

including the non-negativity constraints.

The feasible region is the collection of all feasible solutions (see Fig. 1.1, the hatched area).

The way how to construct it – see subchapter 2.2. In Fig. 1.1 we can also see feasible

solutions (for instance points [0, 0] - initial solution, [100, 600] or [300, 0]) and others.

Fig. 1.1 Feasible region

Page 21: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

21

It is possible to have no feasible solutions (see Fig. 1.2). A linear program is infeasible if it

has no feasible solutions, i.e. the feasible region is empty.

Fig. 1.2 No feasible solution

When a feasible region exists, LP tries to find the best feasible solution - a solution which

gives the maximal value of the objective function when it is to be maximized or the minimal

value of the objective function when it is to be minimized. It is called the optimal solution (in

general it is a feasible solution that has the most favourable value of the objective function).

An LP problem can have 1) only one single solution (see Fig. 1.3) or 2) multiple optimal

solutions each with the same optimal value of the objective function (see Fig. 1.4).

Fig. 1.3 Single optimal solution

Objective function

Page 22: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

22

Fig 1.4 Multiple optimal solutions

There can be also the situation when a problem has no optimal solution. This occurs when it

has no feasible solution (see Fig. 1.2) or the constraints do not prevent improving the value of

the objective function indefinitely in the favorable direction (positive or negative). It means

that for or any choice of xj, there is a larger xj that gives a better objective function value. This

linear program is unbounded – see Fig. 1.5.

Fig. 1.5 Unbounded LPP

A corner-point feasible (CPF) solution is a solution that lies at a corner of the feasible region

(see Fig. 1.6).

Objective function

Every point of this red line represents an optimal solution with the same Z

Page 23: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

23

Fig. 1.6 Corner point feasible solutions

These solutions have useful properties including the following relationship with optimal

solutions.

Any LPP with feasible solutions and a bounded feasible region

- must posses CPF solutions and at least one optimal solution.

- the best CPF solution must be an optimal solution.

- if an LPP has exactly one optimal solution there must be a CPF solution.

- if an LPP has multiple solutions at least two must be CPF solutions.

Basic solution is a solution with at most m non-zero values if there are n variables and m

constraints.

Basic variables: m non-zero variables.

Non-basic variables: n – m of the zero–valued variables.

Conclusions:

Any LPP that is not infeasible or unbounded has an optimal solution that is basic. Basic

feasible solutions correspond to the CPF points of the feasible region.

1.7 General model formulation – typical LPP

In this subchapter we can find general models for some typical LPP.

(x1 = 600; x2 = 0)

(x1= 100; x2 = 600)

(x1 = 300; x2 = 280)

(x1 = 300; x2 = 0)

(x1 = 0; x2 = 0)

Page 24: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

24

1.7.1 Optimal production plan problem

A store has requested a manufacturer to produce pants and sports jackets. For

materials, the manufacturer has 750 m2 of cotton textile and 1000 m

2 of polyester. Every pair

of pants (1 unit) needs 1 m2 of cotton and 2 m

2 of polyester. Every jacket needs 1,5 m

2 of

cotton and 1 m2 of polyester (see Tab. 1.6).

Tab. 1.6 Summarization of LPP data

pants jackets avai lable

cot ton 1 3 750

polyester 2 1 1 000

The price of the pants is fixed at 50 $ and the jacket at 40 $.

What is the number of pants and jackets that the manufacturer must give to the stores so

that these items obtain a maximum sale?

General model formulation:

Decision variables

x1 ...number of pants

x2...number of jackets

Objective function

Z= 50x1 + 40x2→MAX

System of main constraints

x1 + 3x2 ≤ 750

2x1 + x2 ≤ 1000

Non-negativity constraints

xj 0 for j = 1, 2

1.7.2 Optimal mix problem

This problem involves specifying an alloy ingredient combination that will satisfy the

stated element content requirements at a minimum cost level.

Page 25: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

25

The alloy must contain maximally 80% of Fe and minimally 4% of Ni. It is produced

from 3 raw materials with its own content of Fe and Ni (see Tab. 1.7). The prices of the raw

materials are in money units per 100 kg. The goal is to produce the alloy with the requested

properties and with minimal cost.

Tab. 1.7 Input data

Component Content of elements in raw material (%)

Raw material 1 Raw material 2 Raw material 3

Fe 70 90 85

Ni 5 2 7

Remaining 25 8 8

Price per 100 kg 60 40 50

General model formulation:

Decision variables

xj (j = 1, 2, 3) ...portion of j-th raw material

Objective function

Z= 60x1 + 40x2 + 50x3 →MIN

System of main constraints

70x1 + 90x2 + 85x3 ≤ 80

5x1 + 2x2 + 7x3 ≥ 4

x1 + x2 + x3 = 4

Non-negativity constraints

xj 0 for j = 1, 2, 3

1.7.3 Optimal rod cutting problem

The problem is to cut rods of standard lengths to the planned amount of rods of

specific lengths with a minimum of waste.

Page 26: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

26

It is necessary to cut atypical semi-finished products A (its length is 570 mm), B (its

length is 820 mm) and C (its length is 1010 mm) up from the standard 2000 mm steel rods. It

is planned to produce 50 final products each consisting of 4 pieces of semi-finished products

A and B and 5 pieces of semi-finished product C. We need to set the amount of the original

standard 2000 mm rods cut according to the j-th cutting pattern to have minimal waste. The

cutting pattern 1 means that we cut one 2000 mm rod into 3 semi-finished products A with

290 mm of waste (see Fig 1.7).

Fig. 1.7 Example of the cutting pattern

Another cutting pattern: 2 semi-finished products A and 1 semi-finished product B and

40 mm of waste. All possible patterns are defined in Tab. 1.8.

Tab.1.8 Summary of the problem depiction

Cutting pattern

1 2 3 4 5

Semi-finished

products (the number

of pieces per one

original 2000 mm rod)

A (570 mm) 3 2 1 - -

B (820 mm) - 1 - 2 1

C (1010 mm) - - 1 - 1

Waste (mm) 290 40 420 360 170

General model formulation:

Decision variables

xj (j = 1, 2, 3, 4, 5) ... number of original 2000 mm rods cut according to the j-th cutting

pattern.

Page 27: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

27

Objective function

Z= 290x1 + 40x2 + 420x3 + 360x4 + 170x5→MIN

System of main constraints

3x1 + 2x2 + 1x3 = 200 (200 = 50 . 4)

1x2 + 2x4 + 1x5 = 200 (200 = 50 . 4)

+ 1x3 + 1x5 = 250 (250 = 50 . 5)

Non-negativity constraints

xj 0 for j = 1, 2, 3, 4, 5

1.8 Techniques of solving LP problems

There are various different LP techniques for finding the optimal solution when it

exists, some of them are of special purpose (transportation method) and others are more

general in scope. The main general-purpose solution techniques are as follows: graphical

linear programming and the simplex method. Graphical LP provides a visual representation of

many important concepts of LP. On the other hand it is limited to problems involving only

two variables. The simplex method is a mathematical approach enabling the handling of more

than two variables. For that reason it is much more useful for solving real problems.

Examples

Example 1.1

Convert the following general model into a standard form.

Z= x1 - 6x2 + 2x3 → MAX

-2x1 + 3x2 – x3 ≥ - 6

x1 - 2x2 + 3x3 ≥ 1

x1,2 0 , x3 ∈ ⟨-2, 6⟩

Page 28: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

28

Example 1.2

Convert the following general model into a form where the initial LP solution can be set.

Z= 4x1 + x2 → MIN

3x1 + x2 = 3

4x1 + 3x2 ≥ 8

x1 + 2x2 ≤ 4

xj 0

Example 1.3

Create a general model for the following situation [2]: Then convert this model into a

standard and canonical form and set the initial feasible solution.

The Shader Electronics Company produces two products: (1) the Shader Walkman, a

portable CD/DVD player, and (2) the Shader Watch-TV, a wristwatch-size internet-connected

colour television. The production process for each product is similar in that both require a

certain number of hours of electronic work and a certain number of labour-hours in the

assembly department. Each Walkman takes 4 hours of electronic work and 2 hours in the

assembly shop. Each Watch-TV requires 3 hours in electronics and 1 hour in assembly.

During the current production period, 240 hours of electronic time are available, and 100

hours of assembly department time are available. Each Walkman sold yields a profit of $7;

each Watch-TV produced may be sold for a $5 profit (this problem description is summarized

in Tab. 1.9. Shader’s problem is to determine the best possible combination of Walkmans

and Watch-TVs to manufacture to reach a maximum profit. This product-mix situation can be

formulated as a linear programming problem.

Tab. 1.9 Summary of the LPP data

Hours required to produce 1 unit Available hours

this week

Department Walkman Watch-TV

Electronic 4 3 240

Assembly 2 1 100

Profit per unit (in

money units)

7 5

Page 29: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

29

Summary of terms

linear programing problem

general model

standard form

canonical form

objective function

main constraint

non-negative constraint

decision variable

coefficients of the consumption

right-hand side

cost coefficient¨

slack variable

artificial variable

method of penalties

big M

surplus

additional variable

feasible solution

initial solution

feasible region

optimal solution

corner-point feasible solution

basic solution

basic variable

non-basic variable

Page 30: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

30

Questions

For which decision environment is linear programming most suited?

What is the structure of the typical LPP model?

What are differences between the general and standard form of an LP model?

What are the differences between a standard and canonical model?

What are the assumptions for an LPP application?

What types of LP solutions do you know? Define each type and their differences and

similarities.

What is the relation between optimal and CPF solutions?

What is the feasible region and what determines such a region?

Define the various results of LPP and try to describe them graphically.

What is the difference between additional and artificial variables? What is their function in

the LP model?

What is the difference between slack and surplus?

What is the cost coefficient for additional and artificial variables?

What mix of surplus, slack and artificial variables is used in each of the following

constraints?

a) ≤ b) = c) ≥

Key to solution

Example 1.1 solution

Substitution: x3 = y1 - y2

Z = x1 - 6x2 + 2(y1 - y2)+0.u1 +0.u2 + 0.u3 + 0.u4 → MAX

2x1 - 3x2 + y1 - y2 + u1 = 6

x1 - 2x2 + 3(y1 - y2) – u2 = 1

-(y1 - y2) + u3 = 2

y1 - y2 + u4 = 6

x1,2 0; y1,2 0 u1,2,3,4 0

Page 31: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

31

Example 1.2 solution

-Z = -4x1 - x2 + 0.s 2 + 0.u3 –M.A 1 – M.A 2 → MAX

3x1 + x2 + M.A1 = 3

4x1 + 3x2 -1s2 + M.A2 = 8

x1 + 2x2 + 1u3 = 4

xj 0; u3 0; s2; A1,2 0

Initial feasible solution: x1 = 0, x2 = 0, s2 = 0, u3 = 4, A1 =3, A2 = 8

Example 1.3 solution

Decision variables

x1.... amount of walkmans; x2...amount of watch TV

General model

Z= 7x1 + 5x2 → MAX

4x1 + 3x2 ≤ 240

2x1 + 1x2 ≤ 100

xj 0

Standard = canonical form

Z= 7x1 + 5x2 +0.u 1 + 0.u 2 → MAX

4x1 + 3x2 + u1 = 240

2x1 + 1x2 + u2 = 100

xj 0, ui 0

Initial feasible solution

x1 = 0, x2 = 0, u1 = 240, u2 = 100, Z = 0

Page 32: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

32

References

[1] Eiselt, H. A. – Sandblom, C. L.: Linear Programming and its Applications. Springer,

Berlín, 2007.

[2] Heiser, J.– Render, B.: Operations Management. 10th

ed. Pearson, Harlow, England,

2011.

[3] Hillier, F. S. – Lieberman, G. J.: Introduction to Operations Research. 7th

ed. McGraw-

Hill Ed., New York, 2001.

[4] Krajewski, L. J. – Malhotra, M. K. – Ritzman, L. P.: Operations Management. Process

and Supply Chains. 11th

ed. Pearson, Harlow, England, 2016.

[5] Stewenson, W. J.: Operations Management. 12th

ed. McGraw-Hill Ed., New York,

2015.

[6] http://freefeast.info/difference-between/difference-between-slack-surplus-and-artificial-

variables-slack-vs-surplus-vs-artificial-variables/

Page 33: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

33

2. GRAPHICAL SOLUTION OF A LINEAR PROGRAMMING

PROBLEM

Study time

480 min

Objective

After studying this chapter

you will know when and how to apply the graphical method,

you will better understand the principles of linear programming,

you will be able to construct a feasible region,

you will be able to solve simple linear programming problems using the graphical method

and interpret the obtained results.

Lecture

2.1 Introduction

The easiest way to solve a small LP problem is the graphical solution approach [1],

[2]. The graphical procedure can be used only when there are two decision variables (x1, x2).

When there are more than two variables, we must apply a more complex approach described

as the simplex method (see Chapter 3).

2.2 Steps of the graphical solution

The steps of the graphical method of the LPP solution can be defined as follows:

1. the creation of a general LPP model

2. the construction of a feasible region

3. finding the optimal solution (solutions) where it exits

Page 34: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

34

2.2.1 Creation of the general LPP model

In solving an LPP graphically, at first we must form the general LPP model. Let´s

have the following one:

Z = 5x1 + 8x2 → MAX

3x1 + 3x2 ≤ 1800 (Constraint 1)

x1 + 2x2 ≤ 1000 (Constraint 2)

xj ≥ 0

2.2.2 Construction of the feasible region

To find the optimal solution of the LPP, we must firstly identify a region of feasible

solutions (feasible region). It means that we must plot every constraint on a graph (the

variable x1 is plotted as the horizontal axis x of the graph, and the variable x2 is plotted as the

vertical axis y). In doing it we start by converting each constraint inequality into equations. [1]

For our example it is as follows:

3x1 + 3x2 = 1800 (constraint 1)

x1 + 2x2 = 1000 (constraint 2)

The equation for constraint 1 is plotted in Figure 2.1 and for constraint 2 in Figure 2.2. To plot

the line in Figure 2.1, we need to find the points at which the line 3x1 + 3x2 = 1800 intersects

the x1 and x2 axes. When x1 = 0 (the location where the line touches the x2 axis), it implies that

3x2 = 1800 and that x2 = 600. Likewise, when x2 = 0, we can see that 3x1 = 1800 and that x1 =

600. Thus, constraint 1 is bounded by the line running from (x1 = 0, x2 = 600) to (x1 = 600, x2

= 0). The hatched area represents all points that satisfy the original inequality (constraint 1).

Fig. 2.1 Constraint 1

Page 35: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

35

Constraint 2 is illustrated similarly in Fig. 2.2. When x1 = 0, then x2 = 500 and when x2 = 0

then x1 = 1000. Constraint 2, then, is bounded by the line between (x1 = 0, x2 = 500) and

(x1 = 1000, x2 = 0). The hatched area represents the original inequality (constraint 2).

Fig. 2.2 Constraint 2

Fig. 2.3 shows both constraints together. The crosshatched region is the area that satisfies both

main restrictions and non-negative constraints, too. This area is called the area of feasible

solutions, or simply the feasible region (see Chapter 1). This region must satisfy all

conditions specified by the programme’s constraints and is thus the region where all

constraints overlap. Any point in the region would be a feasible solution to the LPP. Any

point outside the crosshatched area would represent an infeasible solution.

Fig. 2.3 Feasible region

Page 36: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

36

2.2.3 Finding the optimal solution

Now when the feasible region has been graphed, we can proceed to find the optimal

solution to the problem. The optimal solution is the point lying in the feasible region that

produces the highest profit. The corner-point solution method [1] can be applied in looking

for an optimal solution.

This technique involves computing the profit at every corner point of the feasible

region (see Fig. 2.4).

Fig. 2.4 Feasible region with the corner points

The mathematical theory behind linear programming states that an optimal solution to

any problem (that is, the values of x1, x2 that yield the maximum profit in our example) will

lie at a corner point, or extreme point, of the feasible region.[1] So, it is necessary to find

only the values of the variables x1 and x2 at each corner; the maximum profit or optimal

solution will lie at one (or more) of them. Once again we can see (in Figure 2.4) that the

feasible region for our example is a four-sided polygon with four corner or extreme, points.

These points are marked with A, B, C and D on the graph. To find the [x1, x2] values

producing the maximum profit, we find out what the coordinates of each corner point are and

then we determine and compare their profit levels:

Point A: (x1 = 0, x2 = 0); profit 5 . 0 + 8 . 0 = 0 (money units)

Point B: (x1 = 0, x2 = 500); profit 5 . 0 + 8 . 500 = 4000 (money units)

Point D: (x1 = 600, x2 = 0); profit 5 . 600 + 8 . 0 = 3000 (money units)

Page 37: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

37

We skipped corner point C momentarily because to find its coordinates accurately, we will

have to solve for the intersection of the two constraint lines. As you may recall from algebra,

we can apply the method of simultaneous equations to these two constraint equations:

3x1 + 3x2 = 1800

x1 + 2x2 = 1000

To solve these equations simultaneously, we multiply the second equation by -3

-3(x1 + 2x2 = 1000) = -3x1 – 6x2 = -3000

and then add it to the first equation:

3x1 + 3x2 = 1800

-3 x1 - 6x2 = -3000

- 3x2 = -1200

Hence

x2 = 400.

Doing this has enabled us to eliminate one variable, x1, and to solve for x2. We can now

substitute 400 for x2 in either of the original equations and solve for x1. Let us use the first

equation. When x2 = 400, then

3x1 + 3.400 = 1800

3x1 = 600, hence

x1 = 200

Thus, point C has the coordinates (x1 = 200, x2 = 400). We can compute its profit level to

complete the analysis:

Point C: (x1 = 200, x2 = 400); profit = 5 . 200 + 8 . 400 = 4200 (money units)

Because point C produces the highest profit of any corner point, x1 = 200,

x2 = 400 is the optimal solution to our LPP. This solution will yield a profit of 4200

per production period.

Page 38: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

38

Examples

Example 2.1

Let´s have the following general LPP model:

Z = 34x1 + 40x2 → MAX

4x1 + 6x2 ≤ 48

2x1 + 2x2 ≤ 18

2x1 + 1x2 ≤ 16

xj ≥ 0 for j = 1, 2

a) Is it possible to solve this LPP graphically? If it is possible, why?

b) If it is possible to find the optimal solution for this LPP do it using the graphical method.

Summary of terms

feasible region

feasible solution

optimal solution

objective function

corner point

corner point solution

simultaneous equations

Questions

When is it suitable to solve the LPP graphically?

What are the steps of the graphical method of the LPP solution?

What depicts the feasible region?

How to construct the feasible region?

Page 39: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

39

What is the principle of the corner point solution method?

What is the relation between the corner point and the optimal solution?

How do we find out that the LPP has only one optimal solution?

How do we find out that the LPP has no feasible solution?

How do we find out that the LPP has multiple optimal solutions?

What does an unbounded LPP mean?

Key to solution

Example 2.1

Ad a) It is possible because we have only two decision variables.

Ad b)

Optimal solution

Optimal solution: x1 = 3; x2 = 6

Page 40: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

40

Conclusions:

Optimal solution: x1 = 3, x2 = 6, Z = 342.

It is also possible to compute the values of the additive (slack) variables u1, u2, u3 from the

main constraint equations:

u1 = 0, u2 = 2, u3 = 4

For instance: 4x1 + 6x2 + u1 = 48 ⇒ u1 = 0 and so on.

References

[1] Heiser, J.– Render, B.: Operations Management. 10th

ed. Pearson, Harlow, England,

2011.

[2] Stewenson, W. J.: Operations Management. 12th

ed. McGraw-Hill Ed., New York,

2015.

Page 41: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

41

3. SIMPLEX METHOD

Study time

600 min

Objective

After studying this chapter

you will know when and how to apply the simplex method,

you will be able to solve an LPP using the simplex method,

you will be able to interpret the obtained results.

Lecture

3.1 Steps of the simplex method

The simplex method is an iterative algebraic procedure for solving an LPP. After

starting with an initial solution, the procedure systematically evaluates CPF (see Chapter 2) in

such a way that the objective function improves (or at worst stays the same) at each iteration.

The simplex algorithm can be applied through the following steps [1]:

1. Formulating the problem in terms of the general LPP model.

2. Transformation of the general model into the canonical form.

3. Setting up the initial table and calculating the zj and (cj – zj) quantities, ((cj – zj) is the

criterion of optimality.

4. The verification of the optimality of the solution using the criterion of optimality. If all

(cj – zj) are zero or negative the optimal solution has been found (in maximization

problem). If these conditions do not hold, steps 5 – 7 must be implemented.

5. The determination of the entering variable (in the key column) with the largest (cj – zj)

value (in maximizing problems).

6. The determination the exiting variable (the key row) by finding the ratio of the value

in the quantity column to the corresponding substitution rate in the entering variable

column for each row and selecting the smallest positive ratio.

Page 42: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

42

7. The creation of the new table through the calculation of the new row for entering a

variable by dividing the old row for an exiting variable by the pivot element (it is the

intersection of the key column and key row) and placing it in the new table. Using

Gaussian elimination to transform the values in the remaining rows and placing them

in the new array. The calculation of the new zj and (cj – zj) values for the new table.

8. The verification of solution optimality. If all (cj – zj) are zero or negative the optimal

solution (criterion of optimality) has been found (in maximization problem). If these

conditions do not hold, steps 5 – 7 must be repeated.

For practical applications computers are applied but to demonstrate the logic of the

simplex method we will solve it manually step by step. We will consider the same LP

problem as in the chapter with the graphical solution.

3.1.1 Formulating the problem in terms of the general LPP model

Z = 5x1 + 8x2 → MAX

3x1 + 3x2 ≤ 1800

x1 + 2x2 ≤ 1000

xj ≥ 0

3.1.2 Transformation of the general model into the canonical form

The general model must be modified for it to be possible to set the initial basic feasible

solution (for more detail see Chapter 1). For our example the standard form is equal to the

canonical one.

Z = 5x1 + 8x2 + 0u1 + 0u2 → MAX

3x1 + 3x2 + 1u1 = 1800

x1 + 2x2 + 1u2 = 1000

xj ≥ 0, ui ≥ 0

3.1.3 Setting up the initial table and the calculation of the zj and (cj – zj) quantities

The most convenient way for applying the simplex method is to use tables. Each table

corresponds to one basic feasible solution.

In this step the initial table for the initial basic feasible solution is created (see Tab. 3.1).

Most of it merely duplicates aij, cj and bi constants and variables from the canonical model.

Page 43: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

43

Tab. 3.1 Initial table (table1)

In the first row there are the objective function (cost) coefficients cj for each variable

from the canonical model, i. e. including slack variables ui (see the second row). The basic

non-zero variables are listed under Basis (the second column). In the initial table for our

example the slack variables u1 and u2 are chosen for the initial solution to the problem. In the

first column there are cost coefficients for the basic variables (we know that these coefficients

for the slack variables are equal to zero).

In our example we have two main constraints. The column called Quantity shows the current

value of the basic variables. In the initial table these values are merely the quantities on the

right-hand side of the constraint equations in the canonical model bi, i. e. 1800 and 1000. By

convention the variables that are not in the current basic solution (non-basic variables) have

the values of zero. Thus in the initial solution x1 = 0 and x2 = 0. This solution corresponds to

the origin (0, 0) in the graph of the feasible regions in Chapter 2.

All the variables in the canonical model are listed to the right of the Quantity column

(there are variable x1, x2, u1, u2) for our example. In the initial table the coefficients aij of the

canonical model are listed under the variable name. These coefficients in the initial and all

subsequent tables have a special meaning. They indicate the substitution rate for a particular

non-basic variable relative to the basic variables. For example, the 3 and 2 in the x2 column

tell us that for each unit of x2 introduced into the solution, u1 will be reduced by 3 units and u2

will be reduced by 2 units. In subsequent tables these substitution rates will change. This

information will be useful in determining how to improve the current solution at any iteration.

The last two rows of the table provide summary information about the trade-offs in

introducing a variable into the solution.

The zj row shows the profit forgone by introducing 1 unit of variable j into the solution.

To calculate zj we use the substitution rates for variable j (in the column for variable j) and the

cost coefficients for the basic variables (the first column).

Page 44: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

44

Consider variable x1: when introducing 1 unit of variable x1 into the solution it must be given

up 3 units of u1 and 1 unit of u2. As slack variables provide no contribution to profit (cj = 0)

the total profit forgone is by introducing 1 unit of x1, i. e. z1 = 0 . 3 + 0 . 1 = 0 (see Tab. 3.2).

All it is doing is giving up slack resources at this stage of the solution process. Similarly, z2 =

0 . 3 + 0 . 1 = 0.

Tab. 3.2 Table 1 - cont. 1

Similarly, z2 = 0 . 3 + 0 . 2 = 0; z3= 0 . 1 + 0 . 0 = 0 and z4= 0 . 0 + 0 . 1 = 0 and Z = 0 . 1 800

+ 0 . 1 000 = 0. Z in the Quantity column shows the current value of the objective function.

The (cj - zj) row contains the net contribution effect of introducing 1 unit of a variable

into the solution. It is the difference between objective function coefficients cj and the profit

forgone zj by the introducing 1 unit of variable j. For x2 we have c2 – z2 = 8 – 0 = 8.

3.1.4 Verification of the optimality of the solution

There can be read from the initial table that no resources are being used in the

production because only slack variables are in the solution (in the basis). In addition it also

shows that the current solution is not optimal as the (cj – zj) are not all zero or negative. It

means that this current solution can be improved. For now there must be set a new better basic

feasible solution that will lead to a better value of the objective function. To set such a

solution we must set the so-called entering and exiting variables.

3.1.5 Determination of the entering variable

In linear programming we select one variable to enter the solution and one variable to

leave the solution at each iteration until we reach the optimal solution when it exists. The

values (cj - zj) tells us whether an improvement of the solution is possible. In our problem

there is a positive net contribution of 5 money units per unit of x1 and 8 money units per unit

of x2. As we are interested in maximizing the objective function it would make sense to select

Page 45: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

45

the variable with the largest net contribution (cj – zj) as a new basic to enter into the new basic

solution. This is variable x2 in our example (see Tab. 3.3 and the column in the red frame

which is called the key column).

Tab. 3.3 Table 1 – cont. 2

The general rule for the setting the entering variable can be defined as follows:

Select a variable with the largest value of (cj – zj) to introduce it into the next solution

(in maximizing a problem).

3.1.6 Determination of the exiting (leaving) variable

In this step we must select the exiting variable that will be removed from the base of the

next solution and will be replaced by the entering variable set in the previous step. For such a

solution we must compute value hi which is the ratio of the value in the quantity column to

the corresponding substitution rate in the key column for each constraint (the last column in

Tab. 3.4). For our example h1 = 1800/3 = 600 and h2 = 1000/2 = 500.

Tab. 3.4 Table 1- cont. 3

Page 46: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

46

The exiting (leaving) variable is determined by the smallest positive hi. In our example

it is variable u2 (see the row in the red frame in Tab. 3.4 – this row is called the key row) as h2

= 500 (it is less then h2 = 600).

The general rule for the setting the exiting variable can be defined as follows:

Compute hi which is the ratio of the value in the quantity column to the corresponding

substitution rate in the key column for each constraint. Consider only positive values for the

substitution rates and select the row with the lowest ratio hi (the key row).

After steps 4 and 5 we can create the new table relating to the next basic feasible

solution.

3.1.7 Creation of the new table

In the new basic feasible solution (new table 2) there will be in the basis an entering

variable instead of an exiting one. For our example it means that there will be variable x2

instead of variable u2 (see Tab. 3.5). For that reason cj in the first column in the row for x2 will

be changed into 8.

Tab. 3.5 Table 2

As we mentioned earlier, we use the simplex method for the systematic evaluation of

CPF of a feasible region. Because the corners CPF are formed by the intersection of lines

representing linear equations we need to solve a system of linear equations. For that reason

we will apply a method called Gaussian elimination to transform the previous table to reflect

a new solution to our LPP. Commonly in every tableau the coefficients in the column of a

basic variable consist of a number 1 in the row associated with that variable and zeros in the

rest of rows. For u2, the exiting variable in our example, we have 0, 1 in a column (see Tab.

3.4). The values in the column for x2, the entering variable in our example, are 3, 2 (see again

Tab. 3.4). Using the Gaussian elimination method we will transform the column for x2 into 0,

1. It reflects the fact that x2 was entered into the new basic feasible solution and replaced u2.

Page 47: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

47

These transformations will be done by performing various mathematical operations on

the rows of the table. At first we must calculate the new row for the entering variable. It is

done as follows: at the intersection of the key column and the key row there is a value called

the pivot element. We replace the old key row with the new row of the entering variable (see

the pink row in Tab. 3.5) having a value of 1 for the pivot element (the red value in the Tab.

3.5). So, we will divide the values in the old key row in the previous table by the pivot

element to create a new entering variable row for the new table. In our example the pivot

element is equal to 2 (see the yellow box in Tab. 3.4). With this value we will divide all

elements in the old key row for the variable u2 in the previous table 1 and so we will have the

new row for the x2 variable in new table 2 (see Tab. 3.5).

After transforming the old key row we proceed with the transformation of the other

rows. Each other row is transformed according the following scheme

new row = old row – (the coefficient from the key column in the old row) x (new entering

variable row)

element by element, to the recomputed row in order that we have a 0 in the new entering

variable column.

In our example we must re-compute only one row, i.e. the row for the variable u1. The

computations of the elements for the new row for the variable u1 are contained in the

following table, the last column in the red frame.

Tab. 3.6 Re-computation of the elements in the u1 row

The new row for variable u1 will be transferred into table 2 (Tab. 3.7) and zj and (cj – zj) can

be computed in the same way as in the previous table (see Tab. 3.7).

Page 48: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

48

Tab. 3.7 Table 2 – cont.

3.1.8 Verification of the optimality of the solution

From this table we can read that the current basic solution is: x1 = 0, x2 = 500, u1 =

300, u2 = 0 and the value of the objective function Z = 4 000. As there is one value which if

positive means that this solution is not optimal and it can be improved (we can find the

solution with the higher value of the objective function). It means that we must create a third

table repeating the simplex algorithm from step 5.

3.1.9 Repeating the simplex algorithm

Looking at Tab. 3.7 we can find out that only variable x1 has a positive

(cj – zj) and for that reason it will be the variable entering into the basis of the next solution. It

will substitute for variable u1, because u1 has the smallest positive value (h1 = 200). Now we

can start to create the third table – see Tab. 3.8.

Tab. 3.8 Table 3

The re-computed values in the row for x2 were set as it is in the following table, the last

column in the red frame.

Page 49: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

49

Tab. 3.9 Re-computation of the elements in the x2 row

These recomputed values were inserted into the third table and zj and (cj – zj) were

computed (see Tab. 3.8).

Tab. 3.8 contains the following basic feasible solution: x1 = 200, x2 = 400, u1 = 0, u2 =

0 with the value of the objective function Z = 4 200 money units. As there is no positive value

(cj – zj), this solution is also optimal. As the slack values are equal to 0, it means that the both

resources were wholly utilized.

3.2 A solved example

A company produces plastic pipes with big flexibility. The necessary information can

be found in Tab. 3.10. All data are expressed in units per 100 feet of pipe.

Tab. 3.10 Input data

Pipe type

Resource 1 2 Resource availability

Extrusion 4 hr 6 hr 48 hr

Packaging 2 hr 2 hr 18 hr

Additive mix 2 lb 1 lb 16 lb

Price per 100 feet 34 money units 40 money units

Set what amount of pipe type 1 and what amount of pipe type 2 could be produced to obtain a

maximal profit. Solve this LPP using the simplex method.

1. Definition of the variables and creation of the general model

X1 ….. amount of the pipe of type I

X2….. amount of the pipe of type II

Page 50: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

50

Z = 34x1 + 40x2 → MAX

4x1 + 6x2 ≤ 48

2x1 + 2x2 ≤ 18

2x1 + 1x2 ≤ 16

xj ≥ 0 for j = 1, 2

2. Transformation of the model into canonical form

Z = 34x1 + 40x2 + 0u1 + 0u2 + 0u3 → MAX

4x1 + 6x2 + 1u1 = 48

2x1 + 2x2 + 1u2 = 18

2x1 + 1x2 + 1u3 = 16

x1,2 ≥ 0, u1,2,3 ≥ 0

3. Creation of the table for the initial solution, testing the optimality of the initial solution,

setting the entering and exciting variables (see Tab. 3.11)

Tab. 3.11 Table 1 (initial solution)

Initial basic solution

x1 = 0, x2 = 0, u1 = 48, u2 = 18, u3 = 16, Z = 0

4. Creation of the recomputed table (the second basic solution), testing the optimality

of the second solution, setting the entering and exciting variables – see Tab. 3.12.

Page 51: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

51

Tab. 3.12 Table 2 (the second basic solution)

Actual basic feasible solution:

x1 = 0, x2 = 8, u1 = 0, u2 = 2, u3 = 8, Z = 320.

It is a better solution than the first one but it is not the optimal solution.

5. Creation of the recomputed tableau (the third basic solution), testing the optimality

of the third solution, setting the entering and exciting variables – see Tab. 3.13.

Tab. 3.13 Table 3 (the third basic solution)

As no value of (cj – zj) is positive, it is the optimal solution:

x1 = 3, x2 = 6, u1 = 0, u2 = 2, u3 = 4, Z = 342

Conclusion:

The plant could produce 300 feet of type 1 pipe and 600 feet of type 2 pipe to reach a profit of

432 money units. 4 units of additive mix would not be utilized.

Page 52: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

52

Examples

Example 3.1

Two products A and B can be produced on a certain machine. There are 12 hours of

machine time available to produce these products. Product A requires 1 hour per unit, product

B requires 3 hours per unit. Both products require one row material: product A uses 4 kg of

raw material per one unit and product B uses 3 kg. There are 24 kg of this raw material

available for these products. The goal is to maximize the profit from these products and unit

profit for the product A is 4 money units and 5 money units for product B. What quantity of

each should be produced? This information is summarized in the following table. Solve it

using the graphical method and verify the result using the simplex method.

Tab. 3.14 Input data

Product

Resource A B Resource availability

Machine time 1 hr 3 hr 12 hr

Raw material 4 kg 3 kg 24 kg

Profit per 1 product 4 money units 5 money units

Summary of terms

exciting variable

entering variable

criterion of optimality

substitution rate

pivot element

net contribution

Gaussian elimination

key row

key column

base

Page 53: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

53

profit forgone

Questions

When is it suitable to solve the LPP using the simplex method?

What are the steps of the simplex method?

How to construct the simplex table?

What is the optimality criterion?

How to set the variable that will be removed from the next solution?

How to set the variable that will be inserted into the next solution?

How to re-compute the actual solution to obtain the an even better basic solution?

What is the function of the value (cj – zj)?

What is the function of the value hi?

How to interpret the simplex table? What can be read from it in each iteration?

Key to solution

Example 3.1 Graphical solution

Definition of the variables:

x1 ….. amount of the product A

x2….. amount of the product B

Creation of the general model:

Z = 4x1 + 5x2 → MAX

x1 + 3x2 ≤ 12

4x1 + 3x2 ≤ 24

xj ≥ 0 for j = 1, 2

Page 54: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

54

Conclusion: to maximize profit it is necessary to produce 4 units of product A and 2.67 units

of the product B. It ensures a maximal profit of 29.34 money units.

Example 3.1 Solution using the simplex method

Creation of the general model:

Page 55: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

55

Z = 4x1 + 5x2 → MAX

x1 + 3x2 ≤ 12

4x1 + 3x2 ≤ 24

xj ≥ 0 for j = 1, 2

Transformation into the canonical model:

Z = 4x1 + 5x2 → MAX

x1 + 3x2 + 1u1 ≤ 12

4x1 + 3x2 + 1u2 ≤ 24

x1,2 ≥ 0, u1,2 ≥ 0

The table for the initial solution (see Tab. 3.15)

Tab. 3.15 Table 1 (initial solution)

cj 4 5 0 0 hi

Basis Quantity x1 x2 u1 u2

0 u1 12 1 3 1 0

0 u2 24 4 3 0 1

zj Z = 0 0 0 0 0

cj – zj 4 5 0 0

Initial basic solution:

x1 = 0, x2 = 0, u1 = 12, u2 = 24, Z = 0

Page 56: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

56

Optimal solution (see Tab. 3.16)

Tab. 3.16 The last table with an optimal solution

cj 4 5 0 0 hi

Basis Quantity x1 x2 u1 u2

5 x2 8/3 (2,67) 0 1 4/9 -1/9

4 x1 4 1 0 -1/3 1/3

zj Z = 88/3

(29,34)

4 5 8/9 7/9

cj – zj 0 0 -8/9 -7/9

Optimal solution: x1 = 4, x2 = 2.67, u1 = 0, u2 = 0, Z = 29.34.

Conclusion:

Using the simplex method we have obtained the same solution as using the graphical method.

References

[1] Krajewski, L. J. – Malhotra, M. K. – Ritzman, L. P.: Operations Management. Process and

Supply Chains. 11th

ed. Pearson, Harlow, England, 2016.

Page 57: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

57

4. TRANSPORTATION PROBLEM

Study time

600 min

Objective

After studying this chapter

you will know what is a transportation problem

you will be able to solve a transportation problem

you will be able to apply approximate methods

you will be able to find the optimal solution

you will be able to interpret the results

Lecture

4.1 The principle of a transportation problem

Suppose a company has m warehouses (suppliers) and n retail outlets. A single

homogenous product is to be shipped from the warehouses (suppliers) to the outlets

(customers). Each warehouse (supplier) has a given level of supply (capacity) and each outlet

(customer) has a given level of demand. We are also given the transportation costs between

every pair of warehouse and outlet, and these costs are assumed to be linear. More explicitly,

the assumptions are:

The total supply of the product from supplier i is ai, where i = 1, 2, . . ., m.

The total demand for the product at a customer j is bj , where j = 1, 2, . . ., n.

The cost of sending one unit of the product from supplier i to customer j is equal to

cij , where i = 1, 2, . . ., m and j = 1, 2, . . ., n.

The total cost of a shipment is linear in the size of the shipment.

The problem of interest is to determine the optimal transportation scheme between

suppliers and customers, subject to specified supply and demand constraints.

Page 58: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

58

Graphically, a transportation problem can be depicted as follows:

Suppliers Customers

Fig. 4.1 Graphical description the transportation model

where is

xij (decision variables) - the size of the shipment from supplier i to customer j, where i = 1, 2, .

. ., m and j = 1, 2, . . ., n (xij ≥ 0);

cijxij - total cost of the shipment from i-th supplier to j-th customer.

The objective function is the overall transportation cost for all supplier-customer

combinations:

minimize ∑ ∑ 𝑐𝑖𝑗𝑥𝑖𝑗𝑛𝑗=1

𝑚𝑖=1 .

Such a problem leads to a very complex model using a general LP model. For that reason a

more efficient algorithm (of the transportation model) for solving such problem was defined.

It consists of three steps: the preparation of the transport table, generating an initial feasible

solution and developing the optimal solution [1], [2], [3].

4.2 Steps of the transportation problem solution

In this chapter the steps in solving the transportation problem are described in detail

using an example.

4.2.1 Preparation of the transportation table

The second and third steps are implemented using so-called transportation tables

where supply availability ai at each source is shown in the far right column and the customer

Page 59: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

59

requirements bj are shown in the bottom row. Each cell represents one route. The unit

shipping cost cij is shown in the upper right corner of each cell, the amount of shipped

material (decision variable xij) is shown in the centre of each cell (see Tab. 4.1).

Tab. 4.1 Transportation table for a balanced transportation model

where is

m … number of sources (suppliers)

n.......number of destinations (customers)

ai … capacity of i-th supplier (in tons, pounds, litres, etc.)

bj … demand of j-th customer (in tons, pounds, litres, etc.) customer (in money units or as a

distance in kilometres, miles, etc.)

xij … amount of material shipped between i-th supplier and j-th customer (in tons, pounds,

litres etc.)

The green parameters are input parameters, the red ones are output parameters.

Page 60: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

60

4.2.2 Generating the initial feasible solution

At the beginning of the second step of the transportation problem solution the initial

table must be prepared (see Tab. 4.2) – at the beginning it does not contain the values of xij.

Tab. 4.2 Initial table

It is important at this step to make sure that the total supply availabilities ia and total

demand requirements jb are equal (the transportation problem must be balanced – it is the

standard model). Often there is an excess supply or demand. In such situations, for the

transportation method to work, a dummy customer or supplier must be added. This involves

inserting an extra row (for an additional supplier) or an extra column (for an ad customer).

The amount of supply or demand required by the ”dummy” – fictional supplier or customer

equals the difference between the row and column totals ji ba or ij ab . This

procedure converts an unbalanced transportation model into a balanced one. The following

solution of such a transportation problem can be found in Tab. 4.3 and Tab. 4.4.

Page 61: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

61

Tab. 4.3 The initial table for an unbalanced problem

ji ba - adding fictive customer C5 with demand b5 = 3000 – 2650 = 350 and cij = 0:

unbalanced model.

Tab. 4.4 Balancing the unbalanced transportation problem using the fictive customer

( ji ba )

As in the simplex method in searching for the optimal solution we must start with setting the

initial feasible solution applying the initial table – see the previous step. The feasible solution

means that the sum of xij in the row equals the capacity of that row ai and the sum of xij in the

column equals the demands for that column bj. These two sets of constraints are called rim

conditions. To set such an initial solution it is necessary to allocate quantities xij to cells in the

initial table (see Fig. 4.4) so that the rim conditions will be met.

There are many various methods to do so, called approximate methods but we will present

two approaches: the north-west-corner approach and the least-cost method.

Page 62: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

62

A. North-west corner approach

The steps of this approximate method are as follows:

1. Starting from the north-west corner (cell (1, 1)) of the transportation table, allocate as much

quantity as possible to cell (1, 1) within the supply constraint of capacity 1 and the demand

constraint of customer 1.

2. The first allocation will satisfy either the supply capacity of supplier 1 or the customer

requirement of customer 1.

a) If the demand requirement of customer 1 is satisfied but the supply capacity of supplier

1 is not exhausted, move on to cell (1, 2) for the next allocation.

b) If the demand requirement of customer 1 is not satisfied but the supply capacity of

supplier 1 is exhausted, move to cell (2, 1)

c) If the demand requirement of customer 1 is satisfied and the supply capacity of supplier

1 is also exhausted, move on to cell (2, 2).

3. Continue the allocation in the same manner toward the southeast corner of the

transportation table until the supply capacities of all suppliers are exhausted and the

demands of all customers are satisfied.

An initial table developed using the north-west corner method is in Tab. 4.5 (see that fictional

customer C5 was applied in order to have the balanced model).

Tab. 4.5 Transportation table – North-west corner method

Like the first variable x11 = b1 = 600 was assigned to the cell S1-C1 because it is the north-west

corner (NVC) of the table and the value 600 is min (a1; b1). Then the first column C1 was

removed and the reduced table has NVC in the cell (S1-C2). The rest of xij were assigned in the

same way (the order of filling the cells expresses the red number on the left in the adequate

Page 63: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

63

cell.) To check the feasibility of the obtained solution we must verify if Σxij = ai in the rows or

Σxij = bj in the columns. When it is valid we have the feasible initial basic solution with

objective function Z = ΣΣcijxij, i. e. for example:

Z = 6 . 600 + 4 . 400 + 1 . 450 + 13 . 550 + 5 . 200 + 12 . 450 + 0 . 350 = 19 200.

As it can be seen this algorithm of generating the initial feasible solution does not consider cij

coefficients when assigning xij. For that reason this very simple method is not as efficient as

the next approach that commonly leads to the solution that is closer to the optimal solution or

sometimes it leads to the optimal solution.

B. Least-cost method

It is another method used to obtain the initial feasible solution for the transportation

problem. Here, the allocation begins with the cell which has the minimum cost cij. The lower

cost cells are chosen over the higher-cost cell with the objective to have the least cost of

transportation. This method usually provides a better initial basic feasible solution than the

north-west corner method since it takes into account the cost variables cij in the problem.

The steps of this method are as follows:

1. Determine the cell with the least positive cost cij among all the rows of the transportation

table.

2. Identify the row and allocate the maximum feasible quantity in the cell corresponding to

the least cost in the row. Then eliminate that row (column) when an allocation is made.

The cells with cij = 0 (corresponding to the fictional supplier of fictional customer) are

filled in as the last ones.

3. Repeat steps 1 and 2 for the reduced transportation table until all the available quantities

are distributed to the required places. If the minimum cost is not unique, the tie can be

broken arbitrarily (for instance fill in preferentially the cell with the lowest i and j).

The initial table developed using the least cost method is in Tab. 4.6 (see that fictive customer

C5 was applied to have the balanced model).

Page 64: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

64

Tab. 4.6 Transportation table - Least cost method example

In this table we can find the initial feasible solution obtained using the least-cost method. (The

order of filling in the cells is expressed by the red number on the left in the appropriate cell.)

This basic feasible solution leads to the objective function value Z = 6 . 600 + 9 . 100 + 8 .

300 + 1 . 850 + 5 . 350 + 10 . 450 + 0 . 350 = 14 000. This is less than the value Z obtained

using the north-west method where Z = 19 200. It means that the solution obtained using the

least-cost method is better. For now we must verify if this solution is optimal and when it is

not true we must find the optimal solution.

4.2.3 Developing the optimal solution

The methods commonly lead to the optimal solution coming out of some basic initial

solution obtained in the previous step using some approximate method. To develop an optimal

solution involves evaluating each unused cell to determine whether a shift into it is

advantageous from a total-cost stand point. If it is, the shift is made, and the process is

repeated. When all cells have been evaluated and appropriate shifts made, the problem is

solved. It means that we iteratively improve the initial solution and after a finite number of

iterations we reach the optimal solution (one or more). One such method is called MODI.

4.3 MODI method

The algorithm of this method could be described using the following steps [1], [2], [3]:

1. The determination of the initial basic feasible solution (see Chapter 4.2.2).

2. Setting dual Variable ui, for each row and variable vj for each column as follows:

a) u1 = 0.

b) the remaining ui’s and vj’s for occupied cells ((where xij ˃ 0) are calculated by solving

the relationship cij = ui + vj.

Page 65: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

65

3. Calculation of values (ui + vj – cij) for unoccupied cells (where xij = 0) and their recording

into the left upper corner of the cell.

a) when applying relation (ui + vj – cij) ≤ 0, we have the optimal solution (if for some

unoccupied cell there is valid (ui + vj – cij) = 0, then there exists another equivalent

optimal basic solution). The algorithm finishes.

b) when applying relation (ui + vj – cij) ˃ 0 at least for one unoccupied cell then we don´t

have the optimal solution and we procced with its improvement.

4. Selection of the cell with maximal positive (ui + vj – cij).

- This cell will be newly occupied (the entering variable) and must be marked with the sign

“+”.

5. a) Creation of the closed loop (path, cycle) starting in this cell and going through the

occupied cells (the corners of this cycle are occupied cells); these corners are

alternatively marked with the signs “-“ and “+”.

In Fig. 4.2 some examples of closed loops (paths, cycles) are depicted.

Fig. 4.2 Closed loops (paths, cycles) examples

Occupied cell

Non-occupied cell

b) Assignment of the minimal value of xij in the cycle cells marked with the sign “-“ to the

entering variable. The cell with this minimal value of xij also represents the exiting

(leaving) variable.

6. Recalculation of the last tableau: this minimal xij will be added to the value of xij in the

cycle cell with the sign “+” and subtracted from the value of xij in the cycle cell with the

sign “-“: it is a new better basic feasible solution.

7. Repetition of the algorithm from step 2.

+ -

+ -

- +

- +

- +

Page 66: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

66

The MODI method is shown in the example solved in Chapter 4.2.

4.3.1 Selection of the initial solution

As an initial solution we use the solution obtained using the north-west corner method

(see Tab. 4.7).

Tab. 4.7 MODI - step 1 Initial solution set using the north-west corner method

4.3.2 Setting the dual variables ui and vj

See Tab. 4.8

Tab. 4.8 Initial tables with dual variables

ui + vj = cij for occupied cells

6

Page 67: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

67

Partial steps:

u1 = 0

v1 = c11 – u1 = 6 – 0 = 6

v2 = c12 – u1 = 4 = 0 = 4

u2 = c22 = v2 = 1 – 4 = -3

v3 = c23 – u2 = 13 – (-3) = 16

v4 = c24 - u2 = 5 – (-3) = 8

u3 = c34 = v4 = 12 = 8 = 4

v5 = c35 – u3 = 0 – 4 = -4

4.3.3 Computation of (ui + vj – cij) for unoccupied cells

See the next table - the red numbers in the cells.

Tab. 4.9 Initial table with the values of (ui + vj – cij) for the unoccupied cells

This initial solution has the objective function Z = 19 200.

As some of the values (ui + vj – cij) are positive it is not the optimal solution and we must find

a new basic feasible solution with a better objective function.

4.3.4 Selection of the cell with maximal positive (ui + vj – cij)

See the cell S1-C3 in the red frame in Tab. 4.9. That means that decision variable x13

will be entered into the next basic feasible solution.

4.3.5 Creation of the closed loop (path, cycle)

See the next table.

Page 68: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

68

Tab. 4.10 Initial solution – closed loop

As it can be seen in the Tab. 4.10 in every column or row their cells are a part of the closed

loop there are only one sign „+“ and one sign „-„.

The value which will be added or subtracted is x12 = 400 (the green vale in the table as it is the

lowest value in the cells signed with „-„.

4.3.6 Recalculation of the last table

The last table (Tab. 4.10) is recalculated using the set closed loop and the new table

with a new better solution and a lower value of the objective function is created (see Tab.

4.11).

Tab. 4.11 The 2nd

basic feasible solution

This new basic feasible solution has a lower value of objective function Z = 16 400 (as

compared to Z = 19 200 for the previous initial solution).

Page 69: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

69

4.3.7 Repetition of the algorithm from step 2

For this new solution dual variables ui and vj and values (ui + vj – cij) we compute in

the same way as in the previous initial solution (see Tab. 4.12).

Tab. 4.12 The 2nd

solution with dual variables

Because there are again some positive values of (ui + vj – cij) it is not the optimal solution and

we must continue to find a new basic feasible solution with a better objective function by

suitably setting the closed loop and re-computation of the table (see Tab. 4.13 and Tab. 4.14).

Tab. 4.13 Evaluation of the optimality of the 2nd

solution and setting the new closed loop

(path, cycle)

The value which will be added or subtracted is x23 = 150 (the green value in the previous table

as it is the lowest value in the cells signed with „-„.

Page 70: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

70

4.14 Tab. Table with the 3rd

basic feasible solution

The value of the objective function for this 3rd basic feasible solution Z = 14 900.

Again we must verify the optimality of this solution computing ui, vj and (ui + vj – cij) - it can

be found in the previous table. Because one value of (ui + vj – cij) is positive it means that it is

not the optimal solution and we must search for a better solution again. By setting the closed

loop (see Tab. 4.15) and re-computing the third solution we will obtain the 4th

basic feasible

solution (see Tab 4.16).

Tab. 4.15 Cycle in the third solution

Page 71: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

71

Tab. 4.16 The 4th

basic feasible solution

The value of the objective function for this solution Z = 13 100. After computing ui, vj and (ui

+ vj – cij) we can see in this 4th

solution (Fig. 4.16) that there are no positive values of (ui + vj

– cij). It means that it is the optimal solution:

x11 = 450 units; x12 = 0; x13 = 550 units; ……..x35 = 350 units with the minimum of the

transport cost Z = 13 100 money units. We have obtained the optimal solution after 3

iterations.

Examples

Example 4.1

Find the optimal solution for the same transportation problem as in the previous example but

use as the initial solution the result obtained using the least-cost method (see Tab. 4.17).

Page 72: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

72

Tab. 4.17 A table with the initial solution obtained using the least-cost method (the same as

Tab. 4.6)

Example 4.2

A. Find the initial solution for the transportation problem using the north-west method.

B. Find the initial solution for the transportation problem using the least-cost method.

C. Find the optimal solution for the transportation problem. As the initial solution use the

solution obtained in point A.

The transportation problem can be described by the following table:

Tab. 4.18 Data for example 4.2

Page 73: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

73

Summary of terms

supply

demand

supplier

customer

transportation cost

transportation tableau

balanced transportation problem

unbalanced transportation problem

fictional supplier

fictional customer

dummy

supplier capacity

customer demand

rim conditions

approximate methods

north-west point method

least-cost method

MODI

dual variables

closed loop (cycle, path)

Questions

What is a transportation problem?

What is the relation between the transportation problem and the general LP problem?

What are the steps of solving a transportation problem?

How to set the initial solution of a transportation problem?

What are the steps of the north-west corner method?

What are the steps of the least-cost method?

Page 74: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

74

What are the similarities and differences of the north-west corner and the least- cost

methods?

What method of the previously discussed ones is more effective and why?

What is the goal of the MODI method?

What are the steps of MODI?

What is the optimality criterion in MODI and how to compute it?

How to decide about solution optimality using the MODI method?

Key to solution

Solution of example 4.1

4.19 Table for the initial solution with added ui, vj and (ui + vj – cij) and a closed loop

4.20 Table for the 2nd

basic feasible solution (recomputed previous table) with added ui, vj

and (ui + vj –cij)

Page 75: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

75

This is the optimal solution (no positive (ui + vj – cij) with Z = 13 100 obtained only after 1

iteration (as compared to 3 iterations in Chapter 4.3 when the initial solution was obtained

using the north-west method). This result confirms the statement about the low effectivity of

the north-west method.

Solution of example 4.2

Ad A

Tab. 4.21 Initial table with the initial solution (using the north-west method)

Z = 1 295

Ad B

Tab. 4.22 The initial table with the initial solution (using the least-cost method)

Z = 665

Page 76: PROCESS MANAGEMENT Selected Exact Managerial Methods …katedry.fmmi.vsb.cz/Opory_FMMI_ENG/2_rocnik/QM/Process... · 2016-07-14 · Scheduling Determination of the minimum-cost assignment

Darja Noskievičová Process Management

76

Ad C

Tab. 4.23 Table with the optimal solution

It is the optimal solution obtained after 3 iterations. Z = 665

References

[1] Hillier, F. S. – Lieberman, G. J.: Introduction to Operations Research. 7th

ed. McGraw-

Hill Ed., New York, 2001.

[2] Krajewski, L. J. – Malhotra, M. K. – Ritzman, L. P.: Operations Management. Process

and Supply Chains. 11th

ed. Pearson, Harlow, England, 2016.

[3] Stewenson, W. J.: Operations Management. 12th

ed. McGraw-Hill Ed., New York,

2015.