NOR HEA SR. No Date SHIFT ENGG Shift Plate ID 1 3/1/2015 SHIV/TANWEER A A5039108A0 2 3/1/2015 SHIV/TANWEER A A5039108D0 3 3/1/2015 SHIV/TANWEER A A5036803A0 4 3/1/2015 SHIV/TANWEER A A5022309B0 5 3/1/2015 SHIV/TANWEER A A5022312B0 6 3/1/2015 SHIV/TANWEER A A5023402A0 7 3/1/2015 SHIV/TANWEER A A5022310B0 8 3/1/2015 SHIV/TANWEER A A5022326B0 9 3/1/2015 SHIV/TANWEER A A5022312A0 10 3/1/2015 SHIV/TANWEER A A5022320A0 11 3/1/2015 SHIV/TANWEER A A5036820B0 12 3/1/2015 SHIV/TANWEER A A5022311A0 13 3/1/2015 SHIV/TANWEER A A5036816B0 14 3/1/2015 SHIV/TANWEER A A5036713A0 15 3/1/2015 SHIV/TANWEER A A5036714B0 16 3/1/2015 SHIV/TANWEER A A5036713B0 17 3/1/2015 SHIV/TANWEER A A5036714A0 18 3/1/2015 SHIV/TANWEER A A5036702A0 19 3/1/2015 SHIV/TANWEER A A5012911D0 20 3/1/2015 SHIV/TANWEER A A5012911A0 21 3/1/2015 SHIV/TANWEER A A5036817B0 22 3/1/2015 SHIV/TANWEER A A5039108B0 23 3/1/2015 SHIV/TANWEER A A5034501A0 24 3/1/2015 SHIV/TANWEER A A5036817A0 25 3/1/2015 SHIV/TANWEER A A5036803D0 26 3/1/2015 SHIV/TANWEER A A5036803B0 27 3/1/2015 SHIV/TANWEER A A5036712B0 28 3/1/2015 GOPAL/TUSHAR B A5008324A0 29 3/1/2015 GOPAL/TUSHAR B A5012909A0 30 3/1/2015 GOPAL/TUSHAR B A5012911B0 31 3/1/2015 GOPAL/TUSHAR B A5012912A0 32 3/1/2015 GOPAL/TUSHAR B A5012912D0 33 3/1/2015 GOPAL/TUSHAR B A5014907B0 34 3/1/2015 GOPAL/TUSHAR B A5029806D0 35 3/1/2015 GOPAL/TUSHAR B A5030301D0 36 3/1/2015 GOPAL/TUSHAR B A5030913B0 37 3/1/2015 GOPAL/TUSHAR B A5030914B0 38 3/1/2015 GOPAL/TUSHAR B A5033216A0 39 3/1/2015 GOPAL/TUSHAR B A5034501B0 40 3/1/2015 GOPAL/TUSHAR B A5034501D0 41 3/1/2015 GOPAL/TUSHAR B A5036205A0 42 3/1/2015 GOPAL/TUSHAR B A5036205B0

Process Report for Mechanical Engineering

Embed Size (px)

DESCRIPTION

Very Important Document for Mechanical Engineers

Citation preview

Page 1: Process Report for Mechanical Engineering

NOR HEAT TREATMENT FURNACE (AF FURNACE )DPR REP0RT MARCH-2015SR. No Date SHIFT ENGG Shift Plate ID

PLATE DIMENSI0NThickness

1 3/1/2015 SHIV/TANWEER A A5039108A0 192 3/1/2015 SHIV/TANWEER A A5039108D0 193 3/1/2015 SHIV/TANWEER A A5036803A0 104 3/1/2015 SHIV/TANWEER A A5022309B0 205 3/1/2015 SHIV/TANWEER A A5022312B0 206 3/1/2015 SHIV/TANWEER A A5023402A0 257 3/1/2015 SHIV/TANWEER A A5022310B0 208 3/1/2015 SHIV/TANWEER A A5022326B0 209 3/1/2015 SHIV/TANWEER A A5022312A0 20

10 3/1/2015 SHIV/TANWEER A A5022320A0 2011 3/1/2015 SHIV/TANWEER A A5036820B0 1812 3/1/2015 SHIV/TANWEER A A5022311A0 2013 3/1/2015 SHIV/TANWEER A A5036816B0 1814 3/1/2015 SHIV/TANWEER A A5036713A0 1815 3/1/2015 SHIV/TANWEER A A5036714B0 1816 3/1/2015 SHIV/TANWEER A A5036713B0 1817 3/1/2015 SHIV/TANWEER A A5036714A0 1818 3/1/2015 SHIV/TANWEER A A5036702A0 1819 3/1/2015 SHIV/TANWEER A A5012911D0 17.4820 3/1/2015 SHIV/TANWEER A A5012911A0 17.4821 3/1/2015 SHIV/TANWEER A A5036817B0 1022 3/1/2015 SHIV/TANWEER A A5039108B0 1923 3/1/2015 SHIV/TANWEER A A5034501A0 2024 3/1/2015 SHIV/TANWEER A A5036817A0 1025 3/1/2015 SHIV/TANWEER A A5036803D0 1026 3/1/2015 SHIV/TANWEER A A5036803B0 1027 3/1/2015 SHIV/TANWEER A A5036712B0 1828 3/1/2015 GOPAL/TUSHAR B A5008324A0 32.529 3/1/2015 GOPAL/TUSHAR B A5012909A0 17.4830 3/1/2015 GOPAL/TUSHAR B A5012911B0 17.4831 3/1/2015 GOPAL/TUSHAR B A5012912A0 17.4832 3/1/2015 GOPAL/TUSHAR B A5012912D0 17.4833 3/1/2015 GOPAL/TUSHAR B A5014907B0 2834 3/1/2015 GOPAL/TUSHAR B A5029806D0 1435 3/1/2015 GOPAL/TUSHAR B A5030301D0 2836 3/1/2015 GOPAL/TUSHAR B A5030913B0 3637 3/1/2015 GOPAL/TUSHAR B A5030914B0 3638 3/1/2015 GOPAL/TUSHAR B A5033216A0 3339 3/1/2015 GOPAL/TUSHAR B A5034501B0 2040 3/1/2015 GOPAL/TUSHAR B A5034501D0 2041 3/1/2015 GOPAL/TUSHAR B A5036205A0 9.5342 3/1/2015 GOPAL/TUSHAR B A5036205B0 9.53

Page 2: Process Report for Mechanical Engineering

43 3/1/2015 GOPAL/TUSHAR B A5036205D0 9.5344 3/1/2015 GOPAL/TUSHAR B A5036205F0 9.5345 3/1/2015 GOPAL/TUSHAR B A5036205G0 9.5346 3/1/2015 GOPAL/TUSHAR B A5036207B0 9.5347 3/1/2015 GOPAL/TUSHAR B A5036709A0 1248 3/1/2015 GOPAL/TUSHAR B A5036709B0 1249 3/1/2015 GOPAL/TUSHAR B A5036709D0 1250 3/1/2015 GOPAL/TUSHAR B A5036711A0 1251 3/1/2015 GOPAL/TUSHAR B A5036711B0 1252 3/1/2015 GOPAL/TUSHAR B A5036711D0 1253 3/1/2015 GOPAL/TUSHAR B A5036712A0 1854 3/1/2015 GOPAL/TUSHAR B A5036812B0 1255 3/1/2015 GOPAL/TUSHAR B A5036812D0 1256 3/1/2015 GOPAL/TUSHAR B A5036818D0 1057 3/1/2015 GOPAL/TUSHAR B A5036819A0 1858 3/1/2015 GOPAL/TUSHAR B A5036819B0 1859 3/1/2015 GOPAL/TUSHAR B A5036823D0 860 3/1/2015 GOPAL/TUSHAR B A5012912B0 17.461 3/1/2015 GOPAL/TUSHAR B A5021209A0 1862 3/1/2015 GOPAL/TUSHAR B A5030913A0 3663 3/1/2015 GOPAL/TUSHAR B A5030903B0 3264 3/1/2015 GOPAL/TUSHAR B A5030903A0 3265 3/1/2015 JASWANT/ABHISHEK C A5022328A0 2066 3/1/2015 JASWANT/ABHISHEK C A5022328B0 2067 3/1/2015 JASWANT/ABHISHEK C A5036829A0 2068 3/1/2015 JASWANT/ABHISHEK C A5044804B0 2569 3/1/2015 JASWANT/ABHISHEK C A5022426A0 2070 3/1/2015 JASWANT/ABHISHEK C A5036829B0 2071 3/1/2015 JASWANT/ABHISHEK C A5044804A0 2072 3/1/2015 JASWANT/ABHISHEK C A4135201A0 2073 3/1/2015 JASWANT/ABHISHEK C A5037311B0 2574 3/1/2015 JASWANT/ABHISHEK C A5037311A0 2575 3/1/2015 JASWANT/ABHISHEK C A5037306B0 2576 3/1/2015 JASWANT/ABHISHEK C A5037306A0 2577 3/1/2015 JASWANT/ABHISHEK C A5044803B0 2578 3/1/2015 JASWANT/ABHISHEK C A5044803A0 2579 3/1/2015 JASWANT/ABHISHEK C A5045613B0 2580 3/1/2015 JASWANT/ABHISHEK C A5045614B0 2581 3/1/2015 JASWANT/ABHISHEK C A5045613A0 2582 3/1/2015 JASWANT/ABHISHEK C A5045614A0 2583 3/1/2015 JASWANT/ABHISHEK C A5044808B0 2884 3/1/2015 JASWANT/ABHISHEK C A5044808A0 2885 3/1/2015 JASWANT/ABHISHEK C A5045617A0 3286 3/1/2015 JASWANT/ABHISHEK C A5045604A0 3287 3/1/2015 JASWANT/ABHISHEK C A5030915B0 3288 3/1/2015 JASWANT/ABHISHEK C A5030915A0 32

Page 3: Process Report for Mechanical Engineering

89 3/1/2015 JASWANT/ABHISHEK C A5045605A0 3290 3/2/2015 SHIV/TANWEER A A5045615A0 3291 3/2/2015 SHIV/TANWEER A A5037303D0 3292 3/2/2015 SHIV/TANWEER A A5036806D0 2593 3/2/2015 SHIV/TANWEER A A5036705A0 3294 3/2/2015 SHIV/TANWEER A A5045616A0 3295 3/2/2015 SHIV/TANWEER A A5036320A0 4096 3/2/2015 SHIV/TANWEER A A5036721B0 2897 3/2/2015 SHIV/TANWEER A A5036810A0 3298 3/2/2015 SHIV/TANWEER A A5030914A0 3699 3/2/2015 SHIV/TANWEER A A5016014B0 25

100 3/2/2015 SHIV/TANWEER A A5016014A0 25101 3/2/2015 SHIV/TANWEER A A5014906B0 28102 3/2/2015 SHIV/TANWEER A A5033202B0 32103 3/2/2015 SHIV/TANWEER A A5033202D0 32104 3/2/2015 SHIV/TANWEER A A5033202A0 32105 3/2/2015 SHIV/TANWEER A A5030419A0 28106 3/2/2015 SHIV/TANWEER A A5030301B0 28107 3/2/2015 SHIV/TANWEER A A5030301A0 28108 3/2/2015 SHIV/TANWEER A A5037410B0 20109 3/2/2015 SHIV/TANWEER A A5036820A0 18110 3/2/2015 SHIV/TANWEER A A5036815A0 18111 3/2/2015 SHIV/TANWEER A A5036815B0 18112 3/2/2015 SHIV/TANWEER A A5035204A0 19113 3/2/2015 SHIV/TANWEER A A5022425A0 28114 3/2/2015 SHIV/TANWEER A A5039109B0 19115 3/2/2015 SHIV/TANWEER A A5039116B0 19116 3/2/2015 SHIV/TANWEER A A5039116A0 19117 3/2/2015 SHIV/TANWEER A A5016013A0 25118 3/2/2015 SHIV/TANWEER A A5023419A0 32119 3/2/2015 SHIV/TANWEER A A5033201A0 33120 3/2/2015 GOPAL/TUSHAR B A5012914A0 16121 3/2/2015 GOPAL/TUSHAR B A5012914B0 16122 3/2/2015 GOPAL/TUSHAR B A5012917B0 20123 3/2/2015 GOPAL/TUSHAR B A5014404A0 32124 3/2/2015 GOPAL/TUSHAR B A5014404B0 32125 3/2/2015 GOPAL/TUSHAR B A5014405A0 32126 3/2/2015 GOPAL/TUSHAR B A5014405B0 32127 3/2/2015 GOPAL/TUSHAR B A5021120A0 28128 3/2/2015 GOPAL/TUSHAR B A5021120B0 28129 3/2/2015 GOPAL/TUSHAR B A5022426B0 20130 3/2/2015 GOPAL/TUSHAR B A5026508B0 45131 3/2/2015 GOPAL/TUSHAR B A5030704A0 50132 3/2/2015 GOPAL/TUSHAR B A5030706A0 50133 3/2/2015 GOPAL/TUSHAR B A5030708A0 50134 3/2/2015 GOPAL/TUSHAR B A5030807A0 50135 3/2/2015 GOPAL/TUSHAR B A5033214B0 32136 3/2/2015 GOPAL/TUSHAR B A5033214D0 32

Page 4: Process Report for Mechanical Engineering

137 3/2/2015 GOPAL/TUSHAR B A5036726A0 25138 3/2/2015 GOPAL/TUSHAR B A5036726B0 25139 3/2/2015 GOPAL/TUSHAR B A5036727A0 25140 3/2/2015 GOPAL/TUSHAR B A5036802A0 25141 3/2/2015 GOPAL/TUSHAR B A5036802B0 25142 3/2/2015 GOPAL/TUSHAR B A5036802D0 25143 3/2/2015 GOPAL/TUSHAR B A5036807D0 25144 3/2/2015 GOPAL/TUSHAR B A5037105A0 50145 3/2/2015 GOPAL/TUSHAR B A5037303A0 32146 3/2/2015 GOPAL/TUSHAR B A5037303B0 32147 3/2/2015 GOPAL/TUSHAR B A5037411A0 25148 3/2/2015 GOPAL/TUSHAR B A5037411B0 25149 3/2/2015 GOPAL/TUSHAR B A5037411E0 25150 3/2/2015 GOPAL/TUSHAR B A5021207B0 32151 3/2/2015 JASWANT/ASHUTOSH C A5044718A0 60152 3/2/2015 JASWANT/ASHUTOSH C A5036313A0 50153 3/2/2015 JASWANT/ASHUTOSH C A5037110A0 45154 3/2/2015 JASWANT/ASHUTOSH C A5045606A0 40155 3/2/2015 JASWANT/ASHUTOSH C A5037111A0 45156 3/2/2015 JASWANT/ASHUTOSH C A5041008A0 40157 3/2/2015 JASWANT/ASHUTOSH C A5041008B0 40158 3/2/2015 JASWANT/ASHUTOSH C A5036726D0 25159 3/2/2015 JASWANT/ASHUTOSH C A5036725B0 25160 3/2/2015 JASWANT/ASHUTOSH C A5036727D0 25161 3/2/2015 JASWANT/ASHUTOSH C A5036727B0 25162 3/2/2015 JASWANT/ASHUTOSH C A5036725D0 25163 3/2/2015 JASWANT/ASHUTOSH C A5022001B0 12164 3/2/2015 JASWANT/ASHUTOSH C A5022001D0 12165 3/2/2015 JASWANT/ASHUTOSH C A5036315B0 12166 3/2/2015 JASWANT/ASHUTOSH C A5051004B0 8167 3/2/2015 JASWANT/ASHUTOSH C A5051003D0 8168 3/2/2015 JASWANT/ASHUTOSH C A5051006A0 8169 3/2/2015 JASWANT/ASHUTOSH C A5051004D0 8170 3/2/2015 JASWANT/ASHUTOSH C A5051002A0 8171 3/2/2015 JASWANT/ASHUTOSH C A5051003A0 8172 3/2/2015 JASWANT/ASHUTOSH C A5051002B0 8173 3/2/2015 JASWANT/ASHUTOSH C A5051002D0 8174 3/2/2015 JASWANT/ASHUTOSH C A5051006D0 8175 3/2/2015 JASWANT/ASHUTOSH C A5045424E0 12176 3/2/2015 JASWANT/ASHUTOSH C A5045424D0 12177 3/2/2015 JASWANT/ASHUTOSH C A5036824B0 8178 3/2/2015 JASWANT/ASHUTOSH C A5036824D0 8179 3/2/2015 JASWANT/ASHUTOSH C A5036821D0 8180 3/3/2015 ABHISHEK/TANWEER A A5036821B0 8181 3/3/2015 ABHISHEK/TANWEER A A5036821A0 8182 3/3/2015 ABHISHEK/TANWEER A A5036824A0 8183 3/3/2015 ABHISHEK/TANWEER A A5036828D0 8184 3/3/2015 ABHISHEK/TANWEER A A5036828B0 8

Page 5: Process Report for Mechanical Engineering

185 3/3/2015 ABHISHEK/TANWEER A A5036828A0 8186 3/3/2015 ABHISHEK/TANWEER A A5036809D0 10187 3/3/2015 ABHISHEK/TANWEER A A5036809B0 10188 3/3/2015 ABHISHEK/TANWEER A A5036809A0 10189 3/3/2015 ABHISHEK/TANWEER A A5036719D0 8190 3/3/2015 ABHISHEK/TANWEER A A5036813A0 12191 3/3/2015 ABHISHEK/TANWEER A A5051008B0 8192 3/3/2015 ABHISHEK/TANWEER A A5051008A0 8193 3/3/2015 ABHISHEK/TANWEER A A5051007D0 8194 3/3/2015 ABHISHEK/TANWEER A A5051006B0 8195 3/3/2015 ABHISHEK/TANWEER A A5051005B0 8196 3/3/2015 ABHISHEK/TANWEER A A5051007B0 8197 3/3/2015 ABHISHEK/TANWEER A A5051004A0 8198 3/3/2015 ABHISHEK/TANWEER A A5051007A0 8199 3/3/2015 ABHISHEK/TANWEER A A5051008D0 8200 3/3/2015 ABHISHEK/TANWEER A A5051003B0 8201 3/3/2015 ABHISHEK/TANWEER A A5036814D0 12202 3/3/2015 ABHISHEK/TANWEER A A5036814A0 12203 3/3/2015 ABHISHEK/TANWEER A A5036813D0 12204 3/3/2015 ABHISHEK/TANWEER A A5036813B0 12205 3/3/2015 GOPAL/SHIV B 3405793BB2 7206 3/3/2015 JASWANT/ASHUTOSH C A5024606A0 75207 3/3/2015 JASWANT/ASHUTOSH C A5041103A0 110208 3/3/2015 JASWANT/ASHUTOSH C A5034101A0 110209 3/5/2015 SHIV/TANWEER A A5040704B0 14210 3/5/2015 SHIV/TANWEER A A5040704A0 14211 3/5/2015 SHIV/TANWEER A A5040609D0 14212 3/5/2015 SHIV/TANWEER A A5040704D0 14213 3/5/2015 GOPAL/ABHISHEK B A5040609A0 14214 3/5/2015 GOPAL/ABHISHEK B A5040611E0 14215 3/5/2015 GOPAL/ABHISHEK B A5040609B0 14216 3/5/2015 GOPAL/ABHISHEK B A5040611D0 14217 3/5/2015 GOPAL/ABHISHEK B A5037312B0 16218 3/5/2015 GOPAL/ABHISHEK B A5012908D0 17.48219 3/5/2015 GOPAL/ABHISHEK B A5012908A0 17.48220 3/5/2015 GOPAL/ABHISHEK B A5039118B0 19221 3/5/2015 JASWANT/ASHUTOSH C A5037313B0 40222 3/5/2015 JASWANT/ASHUTOSH C A5037313A0 40223 3/5/2015 JASWANT/ASHUTOSH C A5037115B0 40224 3/5/2015 JASWANT/ASHUTOSH C A5037115A0 40225 3/5/2015 JASWANT/ASHUTOSH C A5037117B0 40226 3/5/2015 JASWANT/ASHUTOSH C A5037117A0 40227 3/5/2015 JASWANT/ASHUTOSH C A5033906B0 63228 3/5/2015 JASWANT/ASHUTOSH C A5033906A0 63229 3/5/2015 JASWANT/ASHUTOSH C A5033812B0 63230 3/5/2015 JASWANT/ASHUTOSH C A5033812A0 63231 3/5/2015 JASWANT/ASHUTOSH C A5030802B0 64232 3/5/2015 JASWANT/ASHUTOSH C A5030715B0 64

Page 6: Process Report for Mechanical Engineering

233 3/5/2015 JASWANT/ASHUTOSH C A5030716B0 64234 3/5/2015 JASWANT/ASHUTOSH C A5030716A0 64235 3/5/2015 JASWANT/ASHUTOSH C A5030715A0 64236 3/5/2015 JASWANT/ASHUTOSH C A5034001B0 63237 3/5/2015 JASWANT/ASHUTOSH C A5034001A0 63238 3/5/2015 JASWANT/ASHUTOSH C A5034002B0 63239 3/5/2015 JASWANT/ASHUTOSH C A5034002A0 63240 3/5/2015 JASWANT/ASHUTOSH C A5034015A0 80241 3/5/2015 JASWANT/ASHUTOSH C A5023908A0 100242 3/5/2015 JASWANT/ASHUTOSH C A5033909B0 63243 3/5/2015 JASWANT/ASHUTOSH C A5034004B0 63244 3/5/2015 JASWANT/ASHUTOSH C A5034004A0 63245 3/6/2015 SHIV/TANWEER A A5033910A0 63246 3/6/2015 SHIV/TANWEER A A5033910B0 63247 3/6/2015 SHIV/TANWEER A A5033811A0 63248 3/6/2015 SHIV/TANWEER A A5033811B0 63249 3/6/2015 SHIV/TANWEER A A5033909A0 63250 3/6/2015 SHIV/TANWEER A A5033810A0 63251 3/6/2015 SHIV/TANWEER A A5033813A0 63252 3/6/2015 SHIV/TANWEER A A5033813B0 63253 3/6/2015 SHIV/TANWEER A A5033810B0 63254 3/6/2015 SHIV/TANWEER A A5033708A0 56255 3/6/2015 SHIV/TANWEER A A5033708B0 56256 3/6/2015 SHIV/TANWEER A A5033706B0 56257 3/6/2015 SHIV/TANWEER A A5033814A0 80258 3/6/2015 SHIV/TANWEER A A5033714A0 50259 3/6/2015 SHIV/TANWEER A A5033714B0 50260 3/6/2015 SHIV/TANWEER A A5033808D0 32261 3/6/2015 SHIV/TANWEER A A5033214A0 32262 3/6/2015 GOPAL B A5037116A0 40263 3/6/2015 GOPAL B A5037204A0 40264 3/6/2015 GOPAL B A5037112B0 40265 3/6/2015 GOPAL B A5037112A0 40266 3/6/2015 GOPAL B A5037116B0 40267 3/6/2015 GOPAL B A5037204B0 40268 3/6/2015 GOPAL B A5037114A0 40269 3/6/2015 GOPAL B A5037114B0 40270 3/6/2015 GOPAL B A5030802A0 64271 3/6/2015 GOPAL B A5034010A0 80272 3/6/2015 GOPAL B A5034007A0 80273 3/6/2015 GOPAL B A5044814A0 80274 3/6/2015 GOPAL B A5033305A0 75275 3/6/2015 GOPAL B A5033712B0 50276 3/6/2015 GOPAL B A5037113A0 40277 3/6/2015 GOPAL B A5037113B0 40278 3/6/2015 GOPAL B A5033212D0 32279 3/6/2015 GOPAL B A5033213A0 32280 3/6/2015 GOPAL B A5033213D0 32

Page 7: Process Report for Mechanical Engineering

281 3/6/2015 GOPAL B A5033213B0 32282 3/6/2015 GOPAL B A5033212A0 32283 3/6/2015 GOPAL B A5033212B0 32284 3/6/2015 GOPAL B A5036724D0 25285 3/6/2015 GOPAL B A5049705B0 28286 3/6/2015 GOPAL B A5049705D0 28287 3/6/2015 GOPAL B A5049705A0 28288 3/6/2015 GOPAL B A5036724B0 25289 3/6/2015 GOPAL B A5036725A0 25290 3/6/2015 ABHISHEK/ASHUTOSH C A5036807B0 25291 3/6/2015 ABHISHEK/ASHUTOSH C A5036806A0 25292 3/6/2015 ABHISHEK/ASHUTOSH C A5036806B0 25293 3/6/2015 ABHISHEK/ASHUTOSH C A5030801B0 64294 3/6/2015 ABHISHEK/ASHUTOSH C A5044802A0 60295 3/6/2015 ABHISHEK/ASHUTOSH C A5044802B0 60296 3/6/2015 ABHISHEK/ASHUTOSH C A5026509A0 60297 3/6/2015 ABHISHEK/ASHUTOSH C A5035305A0 75298 3/6/2015 ABHISHEK/ASHUTOSH C A5035302A0 75299 3/6/2015 ABHISHEK/ASHUTOSH C A5035304A0 75300 3/6/2015 ABHISHEK/ASHUTOSH C A5035307B0 56301 3/6/2015 ABHISHEK/ASHUTOSH C A5035308B0 56302 3/6/2015 ABHISHEK/ASHUTOSH C A5026510B0 60303 3/6/2015 ABHISHEK/ASHUTOSH C A5026209B0 60304 3/6/2015 ABHISHEK/ASHUTOSH C A5035308A0 56305 3/6/2015 ABHISHEK/ASHUTOSH C A5035307A0 56306 3/6/2015 ABHISHEK/ASHUTOSH C A5024016A0 70307 3/6/2015 ABHISHEK/ASHUTOSH C A5024111A0 63308 3/6/2015 ABHISHEK/ASHUTOSH C A5035303A0 75309 3/7/2015 SHIV/TANWEER A A5024110A0 63310 3/7/2015 SHIV/TANWEER A A5023909A0 63311 3/7/2015 SHIV/TANWEER A A5030811A0 63312 3/7/2015 SHIV/TANWEER A A5030813A0 63313 3/7/2015 SHIV/TANWEER A A5041202A0 75314 3/7/2015 SHIV/TANWEER A A5041202B0 75315 3/7/2015 SHIV/TANWEER A A5044806A0 50316 3/7/2015 SHIV/TANWEER A A5044807A0 50317 3/7/2015 SHIV/TANWEER A A5035205A0 45318 3/7/2015 SHIV/TANWEER A A5035205B0 45319 3/7/2015 SHIV/TANWEER A A5024012A0 50320 3/7/2015 SHIV/TANWEER A A5024011A0 50321 3/7/2015 SHIV/TANWEER A A5024006A0 56322 3/7/2015 SHIV/TANWEER A A5042909A0 50323 3/7/2015 SHIV/TANWEER A A5024010A0 50324 3/7/2015 SHIV/TANWEER A A5042910A0 50325 3/7/2015 SHIV/TANWEER A A5037102A0 40326 3/7/2015 SHIV/TANWEER A A5040703A0 28327 3/7/2015 SHIV/TANWEER A A5014606A0 50328 3/7/2015 JASWANT/TANWEER B A5030707A0 50

Page 8: Process Report for Mechanical Engineering

329 3/7/2015 JASWANT/TANWEER B A5030710A0 50330 3/7/2015 JASWANT/TANWEER B A5033304A0 75331 3/7/2015 JASWANT/TANWEER B A5024104A0 70332 3/7/2015 JASWANT/TANWEER B A5023905A0 75333 3/7/2015 JASWANT/TANWEER B A5024112A0 63334 3/7/2015 JASWANT/TANWEER B A5040411B0 45335 3/7/2015 JASWANT/TANWEER B A5021109A0 40336 3/7/2015 JASWANT/TANWEER B A5021109B0 40337 3/7/2015 JASWANT/TANWEER B A5021121A0 28338 3/7/2015 JASWANT/TANWEER B A5036808B0 12339 3/7/2015 JASWANT/TANWEER B A5036808A0 12340 3/7/2015 JASWANT/TANWEER B A5014416B0 14341 3/7/2015 JASWANT/TANWEER B A4099203F0 13342 3/7/2015 JASWANT/TANWEER B A4099203A0 13343 3/7/2015 JASWANT/TANWEER B A4099203E0 13344 3/7/2015 JASWANT/TANWEER B A4099203B0 13345 3/7/2015 JASWANT/TANWEER B A5012920A0 12346 3/7/2015 JASWANT/TANWEER B A5012921D0 12347 3/7/2015 JASWANT/TANWEER B A5012920E0 12348 3/7/2015 JASWANT/TANWEER B A5012208D0 9.53349 3/7/2015 JASWANT/TANWEER B A5037307A0 42350 3/7/2015 JASWANT/TANWEER B A5030711A0 50351 3/7/2015 ABHISHEK/ASHUTOSH C A5012921B0 12352 3/7/2015 ABHISHEK/ASHUTOSH C A5012924E0 12353 3/7/2015 ABHISHEK/ASHUTOSH C A5012922D0 12354 3/7/2015 ABHISHEK/ASHUTOSH C A5012920B0 12355 3/7/2015 ABHISHEK/ASHUTOSH C A5012922B0 12356 3/7/2015 ABHISHEK/ASHUTOSH C A5012924B0 12357 3/7/2015 ABHISHEK/ASHUTOSH C A5012924D0 12358 3/7/2015 ABHISHEK/ASHUTOSH C A5012924A0 12359 3/7/2015 ABHISHEK/ASHUTOSH C A5012921E0 12360 3/7/2015 ABHISHEK/ASHUTOSH C A5012922E0 12361 3/7/2015 ABHISHEK/ASHUTOSH C A5012921A0 12362 3/7/2015 ABHISHEK/ASHUTOSH C A5012920D0 12363 3/7/2015 ABHISHEK/ASHUTOSH C A5009313B0 12364 3/7/2015 ABHISHEK/ASHUTOSH C A5036811D0 12365 3/7/2015 ABHISHEK/ASHUTOSH C A5021222B0 17366 3/7/2015 ABHISHEK/ASHUTOSH C A5036314B0 12367 3/7/2015 ABHISHEK/ASHUTOSH C A5036314A0 12368 3/7/2015 ABHISHEK/ASHUTOSH C A5049702B0 16369 3/7/2015 ABHISHEK/ASHUTOSH C A5049702A0 16370 3/7/2015 ABHISHEK/ASHUTOSH C A5049702D0 16371 3/7/2015 ABHISHEK/ASHUTOSH C A5036204D0 16372 3/7/2015 ABHISHEK/ASHUTOSH C A5036204E0 16373 3/7/2015 ABHISHEK/ASHUTOSH C A5036823B0 8374 3/7/2015 ABHISHEK/ASHUTOSH C A5051303A0 10375 3/7/2015 ABHISHEK/ASHUTOSH C A5051236D0 10376 3/7/2015 ABHISHEK/ASHUTOSH C A5051236B0 10

Page 9: Process Report for Mechanical Engineering

377 3/7/2015 ABHISHEK/ASHUTOSH C A5051235B0 10378 3/7/2015 ABHISHEK/ASHUTOSH C A5051236A0 10379 3/7/2015 ABHISHEK/ASHUTOSH C A5051302D0 10380 3/7/2015 ABHISHEK/ASHUTOSH C A5051302B0 10381 3/7/2015 ABHISHEK/ASHUTOSH C A5051302A0 10382 3/7/2015 ABHISHEK/ASHUTOSH C A5051303D0 10383 3/7/2015 ABHISHEK/ASHUTOSH C A5051301D0 10384 3/7/2015 ABHISHEK/ASHUTOSH C A5051303B0 10385 3/7/2015 ABHISHEK/ASHUTOSH C A5051301B0 10386 3/7/2015 ABHISHEK/ASHUTOSH C A5051301A0 10387 3/7/2015 ABHISHEK/ASHUTOSH C A5051235D0 10388 3/7/2015 ABHISHEK/ASHUTOSH C A5051235A0 10389 3/7/2015 ABHISHEK/ASHUTOSH C A5051119D0 10390 3/7/2015 ABHISHEK/ASHUTOSH C A5051119B0 10391 3/7/2015 ABHISHEK/ASHUTOSH C A5051119A0 10392 3/7/2015 ABHISHEK/ASHUTOSH C A5041203B0 32393 3/7/2015 ABHISHEK/ASHUTOSH C A5041203A0 32394 3/7/2015 ABHISHEK/ASHUTOSH C A5021121B0 28395 3/7/2015 ABHISHEK/ASHUTOSH C A5051231A0 8396 3/8/2015 SHIV/JASWANT A A5012909B0 17.48397 3/8/2015 SHIV/JASWANT A A5012917A0 20398 3/8/2015 SHIV/JASWANT A A5014319A0 32399 3/8/2015 SHIV/JASWANT A A5016013B0 25400 3/8/2015 SHIV/JASWANT A A5022005A0 14401 3/8/2015 SHIV/JASWANT A A5022005B0 14402 3/8/2015 SHIV/JASWANT A A5022304A0 32403 3/8/2015 SHIV/JASWANT A A5036208B0 9.53404 3/8/2015 SHIV/JASWANT A A5036723D0 8405 3/8/2015 SHIV/JASWANT A A5036818B0 10406 3/8/2015 SHIV/JASWANT A A5036826D0 8407 3/8/2015 SHIV/JASWANT A A5037109A0 45408 3/8/2015 SHIV/JASWANT A A5039017A0 19409 3/8/2015 SHIV/JASWANT A A5040611A0 14410 3/8/2015 SHIV/JASWANT A A5049711A0 32411 3/8/2015 SHIV/JASWANT A A5049713A0 32412 3/8/2015 SHIV/JASWANT A A5051231B0 8413 3/8/2015 SHIV/JASWANT A A5051231D0 8414 3/8/2015 SHIV/JASWANT A A5036719A0 8415 3/8/2015 SHIV/JASWANT A A5036720A0 8416 3/8/2015 SHIV/JASWANT A A5036720B0 8417 3/8/2015 SHIV/JASWANT A A5036720D0 8418 3/8/2015 SHIV/JASWANT A A5022005D0 14419 3/8/2015 SHIV/JASWANT A A5036314D0 12420 3/8/2015 SHIV/JASWANT A A5036315A0 12421 3/8/2015 SHIV/JASWANT A A5036315D0 12422 3/8/2015 SHIV/JASWANT A A5036710A0 12423 3/8/2015 SHIV/JASWANT A A5036710B0 12424 3/8/2015 SHIV/JASWANT A A5036710D0 12

Page 10: Process Report for Mechanical Engineering

425 3/8/2015 SHIV/JASWANT A A5036811B0 12426 3/8/2015 SHIV/JASWANT A A5040611B0 14427 3/8/2015 GOPAL/ASUTOSH B A5033113B0 36428 3/8/2015 GOPAL/ASUTOSH B A5036701A0 36429 3/8/2015 GOPAL/ASUTOSH B A5033113A0 36430 3/8/2015 GOPAL/ASUTOSH B A4147516A0 36431 3/8/2015 GOPAL/ASUTOSH B A5042902B0 30432 3/8/2015 GOPAL/ASUTOSH B A5042901A0 30433 3/8/2015 GOPAL/ASUTOSH B A5042902D0 30434 3/8/2015 GOPAL/ASUTOSH B A5042901B0 30435 3/8/2015 GOPAL/ASUTOSH B A5042913A0 32436 3/8/2015 GOPAL/ASUTOSH B A5042913B0 32437 3/8/2015 GOPAL/ASUTOSH B A5042913D0 32438 3/8/2015 GOPAL/ASUTOSH B A5047016A0 25439 3/8/2015 GOPAL/ASUTOSH B A5047017A0 25440 3/8/2015 GOPAL/ASUTOSH B A5047016B0 25441 3/8/2015 GOPAL/ASUTOSH B A5047017B0 25442 3/8/2015 GOPAL/ASUTOSH B A5047019A0 20443 3/8/2015 GOPAL/ASUTOSH B A5047019B0 20444 3/8/2015 GOPAL/ASUTOSH B A5047021A0 20445 3/8/2015 GOPAL/ASUTOSH B A5047020A0 20446 3/8/2015 GOPAL/ASUTOSH B A5047020B0 20447 3/8/2015 GOPAL/ASUTOSH B A5047022A0 20448 3/8/2015 GOPAL/ASUTOSH B A5047023A0 20449 3/8/2015 GOPAL/ASUTOSH B A5047022B0 20450 3/8/2015 GOPAL/ASUTOSH B A5047018B0 20451 3/8/2015 GOPAL/ASUTOSH B A5047023B0 20452 3/8/2015 GOPAL/ASUTOSH B A5047018A0 20453 3/8/2015 GOPAL/ASUTOSH B A5046908D0 14454 3/8/2015 ABHISHEK/TANWEER C A5046914A0 10455 3/8/2015 ABHISHEK/TANWEER C A5047024D0 10456 3/8/2015 ABHISHEK/TANWEER C A5046912A0 10457 3/8/2015 ABHISHEK/TANWEER C A5046912B0 10458 3/8/2015 ABHISHEK/TANWEER C A5046912D0 10459 3/8/2015 ABHISHEK/TANWEER C A5046913D0 10460 3/8/2015 ABHISHEK/TANWEER C A5046915A0 10461 3/8/2015 ABHISHEK/TANWEER C A5046915B0 10462 3/8/2015 ABHISHEK/TANWEER C A5046915D0 10463 3/8/2015 ABHISHEK/TANWEER C A5046916A0 10464 3/8/2015 ABHISHEK/TANWEER C A5046916B0 10465 3/8/2015 ABHISHEK/TANWEER C A5046916D0 10466 3/8/2015 ABHISHEK/TANWEER C A5046917A0 10467 3/8/2015 ABHISHEK/TANWEER C A5046917B0 10468 3/8/2015 ABHISHEK/TANWEER C A5046917D0 10469 3/8/2015 ABHISHEK/TANWEER C A5047002A0 10470 3/8/2015 ABHISHEK/TANWEER C A5047002B0 10471 3/8/2015 ABHISHEK/TANWEER C A5047004A0 10472 3/8/2015 ABHISHEK/TANWEER C A5047004B0 10

Page 11: Process Report for Mechanical Engineering

473 3/8/2015 ABHISHEK/TANWEER C A5047021B0 20474 3/8/2015 ABHISHEK/TANWEER C A5046921B0 22475 3/8/2015 ABHISHEK/TANWEER C A5042903B0 40476 3/8/2015 ABHISHEK/TANWEER C A5042906B0 40477 3/8/2015 ABHISHEK/TANWEER C A5042907B0 40478 3/8/2015 ABHISHEK/TANWEER C A5042908A0 40479 3/8/2015 ABHISHEK/TANWEER C A5046903A0 12480 3/8/2015 ABHISHEK/TANWEER C A5046903B0 12481 3/8/2015 ABHISHEK/TANWEER C A5046903D0 12482 3/8/2015 ABHISHEK/TANWEER C A5046908A0 14483 3/8/2015 ABHISHEK/TANWEER C A5046908B0 14484 3/8/2015 ABHISHEK/TANWEER C A5046909A0 16485 3/8/2015 ABHISHEK/TANWEER C A5046909B0 16486 3/8/2015 ABHISHEK/TANWEER C A5046909D0 16487 3/8/2015 ABHISHEK/TANWEER C A5042909B0 50488 3/8/2015 ABHISHEK/TANWEER C A5042910B0 50489 3/8/2015 ABHISHEK/TANWEER C A5042903A0 40490 3/9/2015 JASWANT/ASHUTOSH A A5049922A0 32491 3/9/2015 JASWANT/ASHUTOSH A A5023418A0 32492 3/9/2015 JASWANT/ASHUTOSH A A5014411A0 32493 3/9/2015 JASWANT/ASHUTOSH A A5014410D0 32494 3/9/2015 JASWANT/ASHUTOSH A A5051118B0 10495 3/9/2015 JASWANT/ASHUTOSH A A5051118A0 10496 3/9/2015 JASWANT/ASHUTOSH A A5051232D0 8497 3/9/2015 JASWANT/ASHUTOSH A A5051232B0 8498 3/9/2015 JASWANT/ASHUTOSH A A5051232A0 8499 3/9/2015 JASWANT/ASHUTOSH A A5051118D0 10500 3/9/2015 JASWANT/ASHUTOSH A A5036718A0 8501 3/9/2015 JASWANT/ASHUTOSH A A5036718E0 8502 3/9/2015 JASWANT/ASHUTOSH A A5042911A0 32503 3/9/2015 JASWANT/ASHUTOSH A A5042911B0 32504 3/9/2015 JASWANT/ASHUTOSH A A5042911D0 32505 3/9/2015 JASWANT/ASHUTOSH A A5042908B0 40506 3/9/2015 JASWANT/ASHUTOSH A A5042906A0 40507 3/9/2015 JASWANT/ASHUTOSH A A5042902A0 30508 3/9/2015 GOPAL/ASHUTOSH B A5041310B0 100509 3/9/2015 GOPAL/ASHUTOSH B A5041310A0 100510 3/9/2015 GOPAL/ASHUTOSH B A5044805A0 75511 3/9/2015 GOPAL/ASHUTOSH B A5023915A0 80512 3/9/2015 GOPAL/ASHUTOSH B A5044811A0 80513 3/9/2015 GOPAL/ASHUTOSH B A5042912A0 75514 3/9/2015 GOPAL/ASHUTOSH B A5031604A0 56515 3/9/2015 GOPAL/ASHUTOSH B A5040219A0 50516 3/9/2015 GOPAL/ASHUTOSH B A5030916A0 63517 3/9/2015 GOPAL/ASHUTOSH B A5040219B0 50518 3/9/2015 GOPAL/ASHUTOSH B A5042904A0 40519 3/9/2015 GOPAL/ASHUTOSH B A5042905A0 40520 3/9/2015 GOPAL/ASHUTOSH B A5033201D0 32

Page 12: Process Report for Mechanical Engineering

521 3/9/2015 GOPAL/ASHUTOSH B A5036807A0 25522 3/9/2015 GOPAL/ASHUTOSH B A5036724A0 25523 3/9/2015 GOPAL/TANWEER B A5046923B0 22524 3/9/2015 GOPAL/TANWEER B A5035204D0 19525 3/9/2015 GOPAL/TANWEER B A5046924A0 22526 3/9/2015 GOPAL/TANWEER B A5021110B0 32527 3/9/2015 GOPAL/TANWEER B A5021110A0 32528 3/9/2015 GOPAL/TANWEER B A5047010B0 25529 3/9/2015 GOPAL/TANWEER B A5047010A0 25530 3/9/2015 GOPAL/TANWEER B A5047014B0 25531 3/9/2015 GOPAL/TANWEER B A5047014A0 25532 3/9/2015 GOPAL/TANWEER B A5047013B0 25533 3/9/2015 GOPAL/TANWEER B A5047013A0 25534 3/9/2015 SHIV/TANWEER C A5046924B0 22535 3/9/2015 SHIV/TANWEER C A5047011B0 25536 3/9/2015 SHIV/TANWEER C A5047011A0 25537 3/9/2015 SHIV/TANWEER C A5009208A0 12.7538 3/9/2015 SHIV/TANWEER C A5045424B0 12539 3/9/2015 SHIV/TANWEER C A5014906A0 28540 3/9/2015 SHIV/TANWEER C A5012922A0 12541 3/9/2015 SHIV/TANWEER C A5022025E0 10542 3/9/2015 SHIV/TANWEER C A5056113E0 10543 3/9/2015 SHIV/TANWEER C A5056113D0 10544 3/9/2015 SHIV/TANWEER C A5056113A0 10545 3/9/2015 SHIV/TANWEER C A5056113B0 10546 3/9/2015 SHIV/TANWEER C A5036823A0 8547 3/9/2015 SHIV/TANWEER C A5036718D0 8548 3/9/2015 SHIV/TANWEER C A5046922A0 22549 3/9/2015 SHIV/TANWEER C A5023913A0 20550 3/9/2015 SHIV/TANWEER C A5036816A0 18551 3/9/2015 SHIV/TANWEER C A5023913B0 20552 3/9/2015 SHIV/TANWEER C A5042904B0 40553 3/9/2015 SHIV/TANWEER C A5046921A0 22554 3/9/2015 SHIV/TANWEER C A5036722A0 8555 3/9/2015 SHIV/TANWEER C A5036723A0 8556 3/9/2015 SHIV/TANWEER C A5036208A0 9.53557 3/9/2015 SHIV/TANWEER C A5036827D0 8558 3/9/2015 SHIV/TANWEER C A5036817D0 10559 3/9/2015 SHIV/TANWEER C A5036827B0 8560 3/9/2015 SHIV/TANWEER C A5036723B0 8561 3/9/2015 SHIV/TANWEER C A5036719E0 8562 3/9/2015 SHIV/TANWEER C A5036804D0 10563 3/9/2015 SHIV/TANWEER C A5036804B0 10564 3/9/2015 SHIV/TANWEER C A5036722D0 8565 3/9/2015 SHIV/TANWEER C A5036804A0 10566 3/9/2015 SHIV/TANWEER C A5022001A0 12567 3/9/2015 SHIV/TANWEER C A5035204B0 14568 3/9/2015 SHIV/TANWEER C A5031906D0 20

Page 13: Process Report for Mechanical Engineering

569 3/9/2015 SHIV/TANWEER C A5036212B0 20570 3/10/2015 GOPAL/ABHISHEK A A5022003B0 10571 3/10/2015 GOPAL/ABHISHEK A A5036205E0 9.53572 3/10/2015 GOPAL/ABHISHEK A A5036718B0 8573 3/10/2015 GOPAL/ABHISHEK A A5036722B0 8574 3/10/2015 GOPAL/ABHISHEK A A5036818A0 10575 3/10/2015 GOPAL/ABHISHEK A A5036822A0 8576 3/10/2015 GOPAL/ABHISHEK A A5036822B0 8577 3/10/2015 GOPAL/ABHISHEK A A5036822D0 8578 3/10/2015 GOPAL/ABHISHEK A A5036825A0 8579 3/10/2015 GOPAL/ABHISHEK A A5036825B0 8580 3/10/2015 GOPAL/ABHISHEK A A5036825D0 8581 3/10/2015 GOPAL/ABHISHEK A A5036826A0 8582 3/10/2015 GOPAL/ABHISHEK A A5036826B0 8583 3/10/2015 GOPAL/ABHISHEK A A5036827A0 8584 3/10/2015 GOPAL/ABHISHEK A A5035105A0 38585 3/10/2015 GOPAL/ABHISHEK A A5035105B0 38586 3/10/2015 GOPAL/ABHISHEK A A5035108A0 38587 3/10/2015 GOPAL/ABHISHEK A A5035107A0 38588 3/10/2015 GOPAL/ABHISHEK A A5035107D0 38589 3/10/2015 GOPAL/ABHISHEK A A5035107B0 38590 3/10/2015 GOPAL/ABHISHEK A A5035108B0 38591 3/10/2015 GOPAL/ABHISHEK A A5035102A0 60592 3/10/2015 JASWANT/TANWEER B A5035103A0 60593 3/10/2015 SHIV C A5046906D0 14594 3/10/2015 SHIV C A5046904B0 12595 3/10/2015 SHIV C A5046904A0 12596 3/10/2015 SHIV C A5046910A0 16597 3/10/2015 SHIV C A5047007A0 20598 3/10/2015 SHIV C A5046904D0 12599 3/10/2015 SHIV C A5046907A0 14600 3/10/2015 SHIV C A5046907B0 14601 3/10/2015 SHIV C A5046907D0 14602 3/10/2015 SHIV C A5047001A0 10603 3/10/2015 SHIV C A5047001B0 10604 3/10/2015 SHIV C A5046902B0 18605 3/10/2015 SHIV C A5046902D0 18606 3/10/2015 SHIV C A5046905A0 12607 3/10/2015 SHIV C A5046905B0 12608 3/10/2015 SHIV C A5046905D0 12609 3/10/2015 SHIV C A5046911D0 16610 3/10/2015 SHIV C A5046911B0 16611 3/10/2015 SHIV C A5046911A0 16612 3/10/2015 SHIV C A5046920A0 22613 3/10/2015 SHIV C A5046920B0 22614 3/10/2015 SHIV C A5046925A0 22615 3/10/2015 SHIV C A5047015B0 25616 3/10/2015 SHIV C A5047012B0 25

Page 14: Process Report for Mechanical Engineering

617 3/10/2015 SHIV C A5047012A0 25618 3/10/2015 SHIV C A5047015A0 25619 3/10/2015 SHIV C A5047003A0 30620 3/10/2015 SHIV C A5042905B0 40621 3/10/2015 SHIV C A5042907A0 40622 3/10/2015 SHIV C A5046906B0 14623 3/10/2015 SHIV C A5046906A0 14624 3/10/2015 SHIV C A5057210B0 16625 3/10/2015 SHIV C A5057210D0 16626 3/10/2015 SHIV C A5057309A0 16627 3/10/2015 SHIV C A5057309B0 16628 3/10/2015 SHIV C A5057309D0 16629 3/11/2015 GOPAL/TANWEER A A5057210A0 16630 3/11/2015 GOPAL/TANWEER A A5057203D0 18631 3/11/2015 GOPAL/TANWEER A A5057203B0 18632 3/11/2015 GOPAL/TANWEER A A5057203A0 18633 3/11/2015 GOPAL/TANWEER A A5057319D0 16634 3/11/2015 GOPAL/TANWEER A A5057319B0 16635 3/11/2015 GOPAL/TANWEER A A5057319A0 16636 3/11/2015 GOPAL/TANWEER A A5046910D0 16637 3/11/2015 GOPAL/TANWEER A A5046910B0 16638 3/11/2015 GOPAL/TANWEER A A5046918B0 18639 3/11/2015 GOPAL/TANWEER A A5032009B0 18640 3/11/2015 GOPAL/TANWEER A A5032009A0 18641 3/11/2015 GOPAL/TANWEER A A5044812A0 36642 3/11/2015 GOPAL/TANWEER A A5043911A0 40643 3/11/2015 GOPAL/TANWEER A A5045608A0 25644 3/11/2015 GOPAL/TANWEER A A5037405B0 20645 3/11/2015 GOPAL/TANWEER A A5037405A0 20646 3/11/2015 GOPAL/TANWEER A A5044810A0 20647 3/11/2015 GOPAL/ABHISHEK B A5036207A0 9.53648 3/11/2015 GOPAL/ABHISHEK B A5036207D0 9.53649 3/11/2015 GOPAL/ABHISHEK B A4099203G0 13650 3/11/2015 JASWANT/ABHISHEK B A5037219A0 12651 3/11/2015 JASWANT/ABHISHEK B A5009517B0 16652 3/11/2015 JASWANT/ABHISHEK B A5031911A0 20653 3/11/2015 JASWANT/ABHISHEK B A5031911D0 20654 3/11/2015 JASWANT/ABHISHEK B A5046913B0 10655 3/11/2015 JASWANT/ABHISHEK B A5046913A0 10656 3/11/2015 JASWANT/ABHISHEK B A5046914B0 10657 3/11/2015 JASWANT/ABHISHEK B A5046914D0 10658 3/11/2015 JASWANT/ABHISHEK B A5051009D0 8659 3/11/2015 JASWANT/ABHISHEK B A5051009B0 8660 3/11/2015 JASWANT/ABHISHEK B A5057315B0 13661 3/11/2015 JASWANT/ABHISHEK B A5057315A0 13662 3/11/2015 JASWANT/ABHISHEK B A5057315D0 13663 3/11/2015 JASWANT/ABHISHEK B A5057305B0 16664 3/11/2015 JASWANT/ABHISHEK B A5057305A0 16

Page 15: Process Report for Mechanical Engineering

665 3/11/2015 JASWANT/ASHUTOSH C A5057304A0 16666 3/11/2015 JASWANT/ASHUTOSH C A5057304B0 16667 3/11/2015 JASWANT/ASHUTOSH C A5057307A0 16668 3/11/2015 JASWANT/ASHUTOSH C A5057307B0 16669 3/11/2015 JASWANT/ASHUTOSH C A5057307D0 16670 3/11/2015 JASWANT/ASHUTOSH C A5046919D0 18671 3/11/2015 JASWANT/ASHUTOSH C A5046919A0 18672 3/11/2015 JASWANT/ASHUTOSH C A5046918D0 18673 3/11/2015 JASWANT/ASHUTOSH C A5046919B0 18674 3/11/2015 JASWANT/ASHUTOSH C A5046918A0 18675 3/11/2015 JASWANT/ASHUTOSH C A5051009A0 8676 3/11/2015 JASWANT/ASHUTOSH C A5051218B0 12677 3/11/2015 JASWANT/ASHUTOSH C A5051216B0 8678 3/11/2015 JASWANT/ASHUTOSH C A5023430A0 10679 3/11/2015 JASWANT/ASHUTOSH C A5023430B0 10680 3/11/2015 JASWANT/ASHUTOSH C A5023430D0 10681 3/11/2015 JASWANT/ASHUTOSH C A5049909B0 12682 3/11/2015 JASWANT/ASHUTOSH C A5049909A0 12683 3/11/2015 JASWANT/ASHUTOSH C A5043905A0 40684 3/11/2015 JASWANT/ASHUTOSH C A5051322A0 10685 3/11/2015 JASWANT/ASHUTOSH C A5051322B0 10686 3/11/2015 JASWANT/ASHUTOSH C A5051320D0 10687 3/11/2015 JASWANT/ASHUTOSH C A5051321D0 10688 3/11/2015 JASWANT/ASHUTOSH C A5051321B0 10689 3/11/2015 JASWANT/ASHUTOSH C A5051321A0 10690 3/11/2015 JASWANT/ASHUTOSH C A5051322D0 10691 3/11/2015 JASWANT/ASHUTOSH C A5051320B0 10692 3/11/2015 JASWANT/ASHUTOSH C A5051320A0 10693 3/11/2015 JASWANT/ASHUTOSH C A5051323D0 10694 3/11/2015 JASWANT/ASHUTOSH C A5051323B0 10695 3/11/2015 JASWANT/ASHUTOSH C A5051323A0 10696 3/11/2015 JASWANT/ASHUTOSH C A5057204D0 14697 3/11/2015 JASWANT/ASHUTOSH C A5057310B0 16698 3/11/2015 JASWANT/ASHUTOSH C A5057205D0 14699 3/11/2015 JASWANT/ASHUTOSH C A5057205A0 14700 3/11/2015 JASWANT/ASHUTOSH C A5057204B0 14701 3/11/2015 JASWANT/ASHUTOSH C A5057204A0 14702 3/11/2015 JASWANT/ASHUTOSH C A5014401B0 20703 3/11/2015 JASWANT/ASHUTOSH C A5051234D0 8704 3/11/2015 JASWANT/ASHUTOSH C A5036719B0 8705 3/12/2015 GOPAL/ABHISHEK A A5051234B0 8706 3/12/2015 GOPAL/ABHISHEK A A5051234A0 8707 3/12/2015 GOPAL/ABHISHEK A A5036221A0 40708 3/12/2015 GOPAL/ABHISHEK A A5024002A0 56709 3/12/2015 GOPAL/ABHISHEK A A5008318A0 32.5710 3/12/2015 GOPAL/ABHISHEK A A5008217A0 32.5711 3/12/2015 GOPAL/ABHISHEK A A5008326A0 32.5712 3/12/2015 GOPAL/ABHISHEK A A5008414A0 32.5

Page 16: Process Report for Mechanical Engineering

713 3/13/2015 JASWANT/ASHUTOSH B A5046902A0 18714 3/14/2015 IRFAN/ASHUTOSH B A5035310D0 24715 3/14/2015 IRFAN/ASHUTOSH B A5035310E0 24716 3/14/2015 IRFAN/ASHUTOSH B A5035310B0 24717 3/14/2015 IRFAN/ASHUTOSH B A5035310A0 24718 3/14/2015 IRFAN/ASHUTOSH B A5039014A0 19719 3/14/2015 IRFAN/ASHUTOSH B A5039101B0 19720 3/14/2015 IRFAN/ASHUTOSH B A5051125A0 20721 3/14/2015 IRFAN/ASHUTOSH B A5009318D0 16722 3/14/2015 IRFAN/ASHUTOSH B A5051211A0 12723 3/14/2015 IRFAN/ASHUTOSH B A5051218A0 12724 3/14/2015 IRFAN/ASHUTOSH B A5049909D0 12725 3/14/2015 Irfan/Tushar C A5057302B0 25726 3/14/2015 Irfan/Tushar C A5057302A0 25727 3/14/2015 Irfan/Tushar C A5057303B0 25728 3/14/2015 Irfan/Tushar C A5057303A0 25729 3/14/2015 Irfan/Tushar C A5057211B0 22730 3/14/2015 Irfan/Tushar C A5057301B0 13730 3/14/2015 Irfan/Tushar C A5057301A0 13731 3/14/2015 Irfan/Tushar C A5057301D0 13732 3/14/2015 Irfan/Tushar C A5057312A0 13733 3/14/2015 Irfan/Tushar C A5057311A0 13734 3/14/2015 Irfan/Tushar C A5057311B0 13735 3/14/2015 Irfan/Tushar C A5051225B0 12736 3/14/2015 Irfan/Tushar C A5051225A0 12737 3/14/2015 Irfan/Tushar C A5057311D0 13738 3/14/2015 Irfan/Tushar C A5057312B0 13739 3/14/2015 Irfan/Tushar C A5057312D0 13740 3/14/2015 Irfan/Tushar C A5057211A0 22741 3/14/2015 Irfan/Tushar C A5021222A0 17742 3/15/2015 JASWANT/ABHISHEK A A5056804D0 25743 3/15/2015 JASWANT/ABHISHEK A A5056804A0 25744 3/15/2015 JASWANT/ABHISHEK A A5056804B0 25745 3/15/2015 JASWANT/ABHISHEK A A5045601B0 22746 3/15/2015 JASWANT/ABHISHEK A A5045601A0 22747 3/15/2015 JASWANT/ABHISHEK A A5049813B0 22748 3/15/2015 JASWANT/ABHISHEK A A5049813A0 22749 3/15/2015 SHIV/GOPAL B A5049913A0 20750 3/15/2015 SHIV/GOPAL B A5049913B0 20751 3/15/2015 SHIV/GOPAL B A5049913D0 20752 3/15/2015 SHIV/GOPAL B A5049921A0 20753 3/15/2015 SHIV/GOPAL B A5049921B0 20754 3/15/2015 SHIV/GOPAL B A5051102A0 20755 3/15/2015 SHIV/GOPAL B A5051102B0 20756 3/15/2015 SHIV/GOPAL B A5051313A0 16757 3/15/2015 SHIV/GOPAL B A5056817B0 19.05758 3/15/2015 SHIV/GOPAL B A5056817D0 19.05759 3/15/2015 SHIV/GOPAL B A5051313B0 16

Page 17: Process Report for Mechanical Engineering

760 3/15/2015 SHIV/GOPAL B A5051305A0 14761 3/15/2015 SHIV/GOPAL B A5051305B0 14762 3/15/2015 SHIV/GOPAL B A5051305D0 14763 3/15/2015 SHIV/GOPAL B A5036307D0 16764 3/15/2015 SHIV/GOPAL B A5041303A0 105765 3/15/2015 SHIV/GOPAL B A5059506A0 50766 3/15/2015 SHIV/GOPAL B A5036203D0 9.53767 3/15/2015 SHIV/GOPAL B A5036203E0 9.53768 3/15/2015 SHIV/GOPAL B A5036203A0 9.53769 3/15/2015 SHIV/GOPAL B A5036203B0 9.53770 3/15/2015 SHIV/GOPAL B A5036204A0 9.53771 3/15/2015 SHIV/GOPAL B A5036204B0 9.53772 3/16/2015 JASWANT/ASHUTOSH A A5049703A0 22773 3/16/2015 JASWANT/ASHUTOSH A A5049703B0 22774 3/16/2015 JASWANT/ASHUTOSH A A5056811A0 20775 3/16/2015 JASWANT/ASHUTOSH A A5056807B0 20776 3/16/2015 JASWANT/ASHUTOSH A A5056810B0 20777 3/16/2015 JASWANT/ASHUTOSH A A5056811B0 20778 3/16/2015 JASWANT/ASHUTOSH A A5056809B0 20779 3/16/2015 JASWANT/ASHUTOSH A A5056807A0 20780 3/16/2015 JASWANT/ASHUTOSH A A5056809A0 20781 3/16/2015 JASWANT/ASHUTOSH A A5062806B0 32782 3/16/2015 JASWANT/ASHUTOSH A A5062806A0 32783 3/16/2015 JASWANT/ASHUTOSH A A5009313A0 12784 3/16/2015 JASWANT/ASHUTOSH A A5036203F0 9.53785 3/16/2015 JASWANT/ASHUTOSH A A5036203G0 9.53786 3/16/2015 JASWANT/ASHUTOSH A A5057313D0 13787 3/16/2015 JASWANT/ASHUTOSH A A5057313B0 13788 3/16/2015 JASWANT/ASHUTOSH A A5049708B0 14789 3/16/2015 SHIV/IRFAN B A5051316B0 16790 3/16/2015 SHIV/IRFAN B A5051310B0 16791 3/16/2015 SHIV/IRFAN B A5051325E0 10792 3/16/2015 SHIV/IRFAN B A5057318D0 13793 3/16/2015 SHIV/IRFAN B A5057318B0 13794 3/16/2015 SHIV/IRFAN B A5057318A0 13795 3/16/2015 SHIV/IRFAN B A5057316D0 13796 3/16/2015 SHIV/IRFAN B A5057316B0 13797 3/16/2015 SHIV/IRFAN B A5057316A0 13798 3/16/2015 SHIV/IRFAN B A5057314D0 13799 3/16/2015 SHIV/IRFAN B A5057314B0 13800 3/16/2015 SHIV/IRFAN B A5057314A0 13801 3/16/2015 SHIV/IRFAN B A5049715D0 14802 3/16/2015 SHIV/IRFAN B A5049715B0 14803 3/16/2015 SHIV/IRFAN B A5049923B0 22804 3/16/2015 SHIV/IRFAN B A5049923A0 22805 3/16/2015 SHIV/IRFAN B A5049908B0 22806 3/16/2015 SHIV/IRFAN B A5049908A0 22807 3/16/2015 SHIV/IRFAN B A5045610D0 20

Page 18: Process Report for Mechanical Engineering

808 3/16/2015 SHIV/IRFAN B A5045610B0 20809 3/16/2015 SHIV/IRFAN B A5045610A0 20810 3/16/2015 SHIV/IRFAN B A5045609A0 22811 3/16/2015 SHIV/IRFAN B A5044809D0 26812 3/16/2015 SHIV/IRFAN B A5044809B0 26813 3/16/2015 SHIV/IRFAN B A5044809A0 26814 3/16/2015 SHIV/IRFAN B A5041010D0 30815 3/16/2015 SHIV/IRFAN B A5041010A0 30816 3/16/2015 SHIV/IRFAN B A5049914B0 22817 3/16/2015 SHIV/IRFAN B A5049914A0 22818 3/16/2015 SHIV/IRFAN B A5041009D0 22819 3/16/2015 SHIV/IRFAN B A5041009B0 22820 3/16/2015 SHIV/IRFAN B A5041009A0 22821 3/16/2015 SHIV/IRFAN B A5035313B0 22822 3/16/2015 SHIV/IRFAN B A5035313A0 22823 3/16/2015 SHIV/IRFAN B A5051103A0 26824 3/16/2015 GOPAL/TUSHAR C A5023301A0 20825 3/16/2015 GOPAL/TUSHAR C A5036811A0 12826 3/16/2015 GOPAL/TUSHAR C A5037403G0 20827 3/16/2015 GOPAL/TUSHAR C A5037405D0 20828 3/16/2015 GOPAL/TUSHAR C A5037405E0 20829 3/16/2015 GOPAL/TUSHAR C A5041010B0 30830 3/16/2015 GOPAL/TUSHAR C A5049706A0 16831 3/16/2015 GOPAL/TUSHAR C A5049706B0 16832 3/16/2015 GOPAL/TUSHAR C A5049706D0 16833 3/16/2015 GOPAL/TUSHAR C A5051214A0 12834 3/16/2015 GOPAL/TUSHAR C A5051216D0 8835 3/16/2015 GOPAL/TUSHAR C A5051307A0 10836 3/16/2015 GOPAL/TUSHAR C A5051307D0 10837 3/16/2015 GOPAL/TUSHAR C A5051307E0 10838 3/16/2015 GOPAL/TUSHAR C A5051314A0 16839 3/16/2015 GOPAL/TUSHAR C A5051314B0 16840 3/16/2015 GOPAL/TUSHAR C A5051318B0 16841 3/16/2015 GOPAL/TUSHAR C A5051319A0 10842 3/16/2015 GOPAL/TUSHAR C A5051319B0 10843 3/16/2015 GOPAL/TUSHAR C A5051319D0 10844 3/16/2015 GOPAL/TUSHAR C A5051325A0 10845 3/16/2015 GOPAL/TUSHAR C A5051325B0 10846 3/16/2015 GOPAL/TUSHAR C A5051325D0 10847 3/16/2015 GOPAL/TUSHAR C A5056808A0 16848 3/16/2015 GOPAL/TUSHAR C A5056808B0 16849 3/16/2015 GOPAL/TUSHAR C A5056815A0 16850 3/16/2015 GOPAL/TUSHAR C A5056815B0 16851 3/16/2015 GOPAL/TUSHAR C A5056818A0 16852 3/16/2015 GOPAL/TUSHAR C A5056818B0 16853 3/16/2015 GOPAL/TUSHAR C A5057202B0 22854 3/16/2015 GOPAL/TUSHAR C A5057213B0 16855 3/16/2015 GOPAL/TUSHAR C A5057320A0 16

Page 19: Process Report for Mechanical Engineering

856 3/16/2015 GOPAL/TUSHAR C A5057320B0 16857 3/16/2015 GOPAL/TUSHAR C A5061108A0 50858 3/16/2015 GOPAL/TUSHAR C A5061109A0 50859 3/16/2015 GOPAL/TUSHAR C A5061113A0 50860 3/16/2015 GOPAL/TUSHAR C A5057202A0 22861 3/16/2015 GOPAL/TUSHAR C A5057202D0 22862 3/16/2015 GOPAL/TUSHAR C A5057206B0 25863 3/16/2015 GOPAL/TUSHAR C A5062803B0 22864 3/16/2015 GOPAL/TUSHAR C A5062803D0 22865 3/17/2015 SHIV/JASWANT A A5031907D0 20866 3/17/2015 SHIV/JASWANT A A5032010D0 30867 3/17/2015 SHIV/JASWANT A A5056810A0 20868 3/17/2015 SHIV/JASWANT A A5056820A0 14869 3/17/2015 SHIV/JASWANT A A5056820B0 14870 3/17/2015 SHIV/JASWANT A A5056820D0 14871 3/17/2015 SHIV/JASWANT A A5057206A0 25872 3/17/2015 SHIV/JASWANT A A5057206D0 25873 3/17/2015 SHIV/JASWANT A A5057206E0 25874 3/17/2015 SHIV/JASWANT A A5057212A0 13875 3/17/2015 SHIV/JASWANT A A5057212E0 13876 3/17/2015 SHIV/JASWANT A A5057213A0 16877 3/17/2015 SHIV/JASWANT A A5057213B0 16878 3/17/2015 SHIV/JASWANT A A5057213D0 16879 3/17/2015 SHIV/JASWANT A A5057214A0 20880 3/17/2015 SHIV/JASWANT A A5057214B0 20881 3/17/2015 SHIV/JASWANT A A5057216A0 16882 3/17/2015 SHIV/JASWANT A A5057216B0 16883 3/17/2015 SHIV/JASWANT A A5057216D0 16884 3/17/2015 SHIV/JASWANT A A5057306B0 13885 3/17/2015 SHIV/JASWANT A A5057306D0 13886 3/17/2015 SHIV/JASWANT A A5057316A0 13887 3/17/2015 SHIV/JASWANT A A5057317A0 13888 3/17/2015 SHIV/JASWANT A A5057317B0 13889 3/17/2015 SHIV/JASWANT A A5057317D0 13890 3/17/2015 SHIV/JASWANT A A5056816A0 16891 3/17/2015 SHIV/JASWANT A A5031906B0 20892 3/17/2015 SHIV/JASWANT A A5014401D0 20893 3/17/2015 SHIV/JASWANT A A5033207B0 30894 3/17/2015 SHIV/JASWANT A A5056816A0 16895 3/17/2015 SHIV/JASWANT A A5056806A0 20896 3/17/2015 SHIV/JASWANT A A5056806B0 20897 3/17/2015 GOPAL/ABHISHEK C A5051324A0 10898 3/17/2015 GOPAL/ABHISHEK C A5051122A0 12899 3/17/2015 GOPAL/ABHISHEK C A5051122B0 12900 3/17/2015 GOPAL/ABHISHEK C A5057207A0 18901 3/17/2015 GOPAL/ABHISHEK C A5045602A0 22902 3/17/2015 GOPAL/ABHISHEK C A5045603A0 25903 3/17/2015 GOPAL/ABHISHEK C A5045609B0 22

Page 20: Process Report for Mechanical Engineering

904 3/17/2015 GOPAL/ABHISHEK C A5051326A0 18905 3/17/2015 GOPAL/ABHISHEK C A5051326B0 18906 3/17/2015 GOPAL/ABHISHEK C A5057207B0 18907 3/17/2015 GOPAL/ABHISHEK C A5057207D0 18908 3/17/2015 GOPAL/ABHISHEK C A5057209B0 16909 3/17/2015 GOPAL/ABHISHEK C A5057209E0 16910 3/17/2015 GOPAL/ABHISHEK C A5062715A0 16911 3/17/2015 GOPAL/ABHISHEK C A5045602B0 22912 3/18/2015 JASWANT/ASHUTOSH A A5051324D0 10913 3/18/2015 JASWANT/ASHUTOSH A A5051324B0 10914 3/18/2015 JASWANT/ASHUTOSH A A5039004A0 14915 3/18/2015 JASWANT/ASHUTOSH A A5062715B0 16916 3/18/2015 JASWANT/ASHUTOSH A A5016011G0 20917 3/18/2015 JASWANT/ASHUTOSH A A5039044B0 14918 3/18/2015 JASWANT/ASHUTOSH A A5051122B0 12919 3/18/2015 JASWANT/ASHUTOSH A A5051122D0 12920 3/18/2015 JASWANT/ASHUTOSH A A5039004D0 14921 3/18/2015 JASWANT/ASHUTOSH A A5051306A0 14922 3/18/2015 JASWANT/ASHUTOSH A A5051306D0 14923 3/18/2015 JASWANT/ASHUTOSH A A5051311A0 16924 3/18/2015 JASWANT/ASHUTOSH A A5051311B0 16925 3/18/2015 JASWANT/ASHUTOSH A A5061105A0 22926 3/18/2015 JASWANT/ASHUTOSH A A5061105B0 22927 3/18/2015 JASWANT/ASHUTOSH A A5051214B0 12928 3/18/2015 JASWANT/ASHUTOSH A A5057310A0 16929 3/18/2015 JASWANT/ASHUTOSH A A5057205B0 14930 3/18/2015 JASWANT/ASHUTOSH A A5057212D0 13931 3/18/2015 JASWANT/ASHUTOSH A A5057212B0 13932 3/18/2015 JASWANT/ASHUTOSH A A5056805B0 14933 3/18/2015 JASWANT/ASHUTOSH A A5056805A0 14933 3/18/2015 IRFAN B A5062803A0 22934 3/18/2015 IRFAN B A5051318A0 16935 3/18/2015 IRFAN B A5051316A0 16936 3/18/2015 IRFAN B A5041313A0 140937 3/18/2015 IRFAN B A5063413A0 80938 3/18/2015 IRFAN B A5063417A0 80939 3/18/2015 IRFAN B A5063414A0 80940 3/18/2015 IRFAN B A5063404A0 50941 3/18/2015 IRFAN B A5063406A0 50942 3/18/2015 IRFAN B A5063405A0 50943 3/18/2015 IRFAN B X5061007A0 40944 3/18/2015 GOPAL/ABHISHEK C X5061006A0 40945 3/18/2015 GOPAL/ABHISHEK C A5062411A0 40946 3/18/2015 GOPAL/ABHISHEK C A5044813A0 40947 3/18/2015 GOPAL/ABHISHEK C A5057111B0 30.96948 3/18/2015 GOPAL/ABHISHEK C A5057111A0 30.96949 3/18/2015 GOPAL/ABHISHEK C A5057112A0 30.96950 3/18/2015 GOPAL/ABHISHEK C A5057103A0 32.5

Page 21: Process Report for Mechanical Engineering

951 3/18/2015 GOPAL/ABHISHEK C A5057102A0 32.5952 3/18/2015 GOPAL/ABHISHEK C A5057104A0 32.5953 3/18/2015 GOPAL/ABHISHEK C A5057105A0 32.5954 3/18/2015 GOPAL/ABHISHEK C A5057117A0 32.5955 3/18/2015 GOPAL/ABHISHEK C A5057113B0 30.96956 3/18/2015 GOPAL/ABHISHEK C A5057112B0 30.96957 3/18/2015 GOPAL/ABHISHEK C A5014908B0 20958 3/18/2015 GOPAL/ABHISHEK C A5014908A0 20959 3/18/2015 GOPAL/ABHISHEK C A5045607E0 20960 3/18/2015 GOPAL/ABHISHEK C A5045607B0 20961 3/18/2015 GOPAL/ABHISHEK C A5044810E0 20962 3/18/2015 GOPAL/ABHISHEK C A5045810F0 20963 3/18/2015 GOPAL/ABHISHEK C A5045607D0 20964 3/18/2015 GOPAL/ABHISHEK C A5044810B0 20965 3/18/2015 GOPAL/ABHISHEK C A5044810D0 20966 3/18/2015 GOPAL/ABHISHEK C A5045607A0 20967 3/19/2015 JASWANT SINGH A A5033209E0 28968 3/19/2015 JASWANT SINGH A A5037403F0 20969 3/19/2015 JASWANT SINGH A A5037403A0 20970 3/19/2015 JASWANT SINGH A A5033209D0 28971 3/19/2015 JASWANT SINGH A A5009517A0 16972 3/19/2015 JASWANT SINGH A A5037403B0 20973 3/19/2015 JASWANT SINGH A A5056805D0 14974 3/19/2015 JASWANT SINGH A A5051228D0 8975 3/19/2015 JASWANT SINGH A A5051304B0 14976 3/19/2015 JASWANT SINGH A A5051228B0 8977 3/19/2015 JASWANT SINGH A A5051310A0 16978 3/19/2015 JASWANT SINGH A A5051306B0 14979 3/19/2015 JASWANT SINGH A A5036715B0 16980 3/19/2015 JASWANT SINGH A A5014401A0 20981 3/19/2015 JASWANT SINGH A A5009517D0 16982 3/19/2015 JASWANT SINGH A A5036812A0 12983 3/19/2015 JASWANT SINGH A A5036212E0 20984 3/19/2015 JASWANT SINGH A A5036212A0 20985 3/19/2015 JASWANT SINGH A A5062811A0 36986 3/19/2015 JASWANT SINGH A A5062811B0 36987 3/19/2015 JASWANT SINGH A A5040801B0 38988 3/19/2015 JASWANT SINGH A A5040801D0 38989 3/19/2015 JASWANT SINGH A A5040801A0 38990 3/19/2015 JASWANT SINGH A A5062812A0 40991 3/19/2015 JASWANT SINGH A A5062812D0 40992 3/19/2015 JASWANT SINGH A A5062812B0 40993 3/19/2015 JASWANT SINGH A A5062812E0 40994 3/19/2015 JASWANT SINGH A A5037404A0 30995 3/19/2015 JASWANT SINGH A A5033209B0 28996 3/19/2015 JASWANT SINGH A A5033205E0 16997 3/19/2015 JASWANT SINGH A A5036214B0 16998 3/19/2015 JASWANT SINGH A A5036715D0 16

Page 22: Process Report for Mechanical Engineering

999 3/19/2015 JASWANT SINGH A A5037219B0 121000 3/19/2015 JASWANT SINGH A A5037219D0 121001 3/19/2015 JASWANT SINGH A A5056802D0 141002 3/19/2015 JASWANT SINGH A A5051304A0 141003 3/19/2015 JASWANT SINGH A A5056802A0 141004 3/19/2015 JASWANT SINGH A A5056802B0 141005 3/19/2015 JASWANT SINGH A A5036715A0 161006 3/19/2015 SHIV/ASHUTOSH B A5022003A0 101007 3/19/2015 SHIV/ASHUTOSH B A5022003D0 101008 3/19/2015 SHIV/ASHUTOSH B A5051319E0 101009 3/19/2015 SHIV/ASHUTOSH B A5051307B0 101010 3/19/2015 SHIV/ASHUTOSH B A5051104A0 181011 3/19/2015 SHIV/ASHUTOSH B A5051104B0 181012 3/19/2015 SHIV/ASHUTOSH B A5051315A0 201013 3/19/2015 SHIV/ASHUTOSH B A5036814B0 121014 3/19/2015 SHIV/ASHUTOSH B A5049709B0 161015 3/19/2015 SHIV/ASHUTOSH B A5049709D0 161016 3/19/2015 SHIV/ASHUTOSH B A5033108A0 201017 3/19/2015 SHIV/ASHUTOSH B A5051216A0 81018 3/19/2015 SHIV/ASHUTOSH B A5051315B0 201019 3/19/2015 SHIV/ASHUTOSH B A5051212B0 121020 3/19/2015 SHIV/ASHUTOSH B A5031906A0 201021 3/19/2015 SHIV/ASHUTOSH B A5051215B0 121022 3/19/2015 SHIV/ASHUTOSH B A5049707A0 181023 3/19/2015 SHIV/ASHUTOSH B A5049707B0 181024 3/19/2015 SHIV/ASHUTOSH B A5014318A0 181025 3/19/2015 SHIV/ASHUTOSH B A5014318D0 181026 3/19/2015 SHIV/ASHUTOSH B A5014318E0 181027 3/19/2015 SHIV/ASHUTOSH B A5062813B0 221028 3/19/2015 SHIV/ASHUTOSH B A5062813A0 221029 3/19/2015 SHIV/ASHUTOSH B A5062813D0 221030 3/19/2015 SHIV/ASHUTOSH B A5062813E0 221031 3/19/2015 SHIV/ASHUTOSH B A5056812B0 201032 3/19/2015 GOPAL/ABHISHEK C A5056812A0 201033 3/19/2015 GOPAL/ABHISHEK C A5033209A0 281034 3/19/2015 GOPAL/ABHISHEK C A5036720E0 81035 3/19/2015 GOPAL/ABHISHEK C A5036216H0 201036 3/19/2015 GOPAL/ABHISHEK C A5016011A0 201037 3/19/2015 GOPAL/ABHISHEK C A5036213G0 201038 3/19/2015 GOPAL/ABHISHEK C A5037403D0 201039 3/19/2015 GOPAL/ABHISHEK C A5037403E0 201040 3/19/2015 GOPAL/ABHISHEK C A5037403B0 201041 3/19/2015 GOPAL/ABHISHEK C A5049717B0 141042 3/19/2015 GOPAL/ABHISHEK C A5051215A0 121043 3/19/2015 GOPAL/ABHISHEK C A5014610A0 361044 3/19/2015 GOPAL/ABHISHEK C A5049717D0 141045 3/19/2015 GOPAL/ABHISHEK C A5051309B0 12.71046 3/19/2015 GOPAL/ABHISHEK C A5051309D0 12.7

Page 23: Process Report for Mechanical Engineering

1047 3/19/2015 GOPAL/ABHISHEK C A5051309A0 12.71048 3/19/2015 GOPAL/ABHISHEK C A5049915B0 161049 3/19/2015 GOPAL/ABHISHEK C A5049812B0 181050 3/19/2015 GOPAL/ABHISHEK C A5049915A0 161051 3/19/2015 GOPAL/ABHISHEK C A5049808B0 201052 3/19/2015 GOPAL/ABHISHEK C A5049808A0 201053 3/19/2015 GOPAL/ABHISHEK C A5049910A0 161054 3/19/2015 GOPAL/ABHISHEK C A5049911B0 161055 3/19/2015 GOPAL/ABHISHEK C A5049916B0 161056 3/19/2015 GOPAL/ABHISHEK C A5049916A0 161057 3/19/2015 GOPAL/ABHISHEK C A5049910B0 161058 3/19/2015 GOPAL/ABHISHEK C A5049807A0 181059 3/19/2015 GOPAL/ABHISHEK C A5049911A0 161060 3/19/2015 GOPAL/ABHISHEK C A5049814B0 181061 3/19/2015 GOPAL/ABHISHEK C A5049814a0 181062 3/19/2015 GOPAL/ABHISHEK C A5049807B0 181063 3/19/2015 GOPAL/ABHISHEK C A5049917B0 161064 3/20/2015 IRFAN/ASHUTOSH A A5049917A0 161065 3/20/2015 IRFAN/ASHUTOSH A A5049811B0 181066 3/20/2015 IRFAN/ASHUTOSH A A5049810B0 181067 3/20/2015 IRFAN/ASHUTOSH A A5049812A0 181068 3/20/2015 IRFAN/ASHUTOSH A A5049810A0 181069 3/20/2015 IRFAN/ASHUTOSH A A5049811A0 181070 3/20/2015 IRFAN/ASHUTOSH A A5051327A0 121071 3/20/2015 IRFAN/ASHUTOSH A A5049821D0 121072 3/20/2015 IRFAN/ASHUTOSH A A5049821B0 121073 3/20/2015 IRFAN/ASHUTOSH A A5049821A0 121074 3/20/2015 IRFAN/ASHUTOSH A A5049905D0 121075 3/20/2015 IRFAN/ASHUTOSH A A5051327D0 12.71076 3/20/2015 IRFAN/ASHUTOSH A A5049816B0 121077 3/20/2015 IRFAN/ASHUTOSH A A5049816D0 121078 3/20/2015 IRFAN/ASHUTOSH A A5049902A0 121079 3/20/2015 IRFAN/ASHUTOSH A A5049902B0 121080 3/20/2015 IRFAN/ASHUTOSH A A5049902D0 121081 3/20/2015 IRFAN/ASHUTOSH A A5049816A0 121082 3/20/2015 IRFAN/ASHUTOSH A A5051327B0 12.71083 3/20/2015 IRFAN/ASHUTOSH A A5049803A0 181084 3/20/2015 IRFAN/ASHUTOSH A A5049803B0 181085 3/20/2015 IRFAN/ASHUTOSH A A5049803D0 181086 3/20/2015 IRFAN/ASHUTOSH A A5049818D0 121087 3/20/2015 IRFAN/ASHUTOSH A A5049818B0 121088 3/20/2015 IRFAN/ASHUTOSH A A5049818A0 121089 3/20/2015 IRFAN/ASHUTOSH A A5049802D0 181090 3/20/2015 IRFAN/ASHUTOSH A A5049802B0 181091 3/20/2015 IRFAN/ASHUTOSH A A5049802A0 181092 3/20/2015 IRFAN/ASHUTOSH A A5049806A0 161093 3/20/2015 IRFAN/ASHUTOSH A A5049806B0 161094 3/20/2015 IRFAN/ASHUTOSH A A5049806D0 16

Page 24: Process Report for Mechanical Engineering

1095 3/20/2015 IRFAN/ASHUTOSH A A5049801D0 161096 3/20/2015 IRFAN/ASHUTOSH A A5049801B0 161097 3/20/2015 IRFAN/ASHUTOSH A A5049801A0 161098 3/20/2015 IRFAN/ASHUTOSH A A5049907A0 121099 3/20/2015 IRFAN/ASHUTOSH A A5049907D0 121100 3/20/2015 IRFAN/ASHUTOSH A A5049907B0 121101 3/20/2015 IRFAN/ASHUTOSH A A5049817D0 121102 3/20/2015 IRFAN/ASHUTOSH A A5049817B0 121103 3/20/2015 IRFAN/ASHUTOSH A A5049817A0 121104 3/20/2015 IRFAN/ASHUTOSH A A5049904B0 121105 3/20/2015 SHIV B A5012910A0 12.71106 3/20/2015 SHIV B A5012910B0 12.71107 3/20/2015 SHIV B A5051121A0 101108 3/20/2015 SHIV B A5049715A0 141109 3/20/2015 SHIV B A5049820B0 121110 3/20/2015 SHIV B A5049904A0 121111 3/20/2015 SHIV B A5049820A0 121112 3/20/2015 SHIV B A5049820D0 121113 3/20/2015 SHIV B A5049904D0 121114 3/20/2015 SHIV B A5051211B0 121115 3/20/2015 SHIV B A5051304D0 141116 3/20/2015 SHIV B A5051317A0 141117 3/20/2015 SHIV B A5051317B0 141118 3/20/2015 SHIV B A5056819A0 141119 3/20/2015 SHIV B A5021208A0 40

1120 3/20/2015 SHIV B A5021212B0 32

1121 3/20/2015 SHIV B A5021215B0 40

1122 3/20/2015 SHIV B A5036312A0 40

1123 3/20/2015 SHIV B A5036312B0 40

1124 3/20/2015 SHIV B A5021113A0 18

1125 3/20/2015 SHIV B A5021114D0 18

1126 3/20/2015 SHIV B A5021116D0 16

1127 3/20/2015 SHIV B A5021118A0 25

1128 3/20/2015 SHIV B A5021202B0 18

1129 3/20/2015 SHIV B A5021209D0 18

1130 3/20/2015 SHIV B A5021210A0 18

1131 3/20/2015 SHIV B A5021212A0 32

1132 3/20/2015 SHIV B A5037312A0 16

1133 3/20/2015 SHIV B A5037312B0 16

1134 3/20/2015 SHIV B A5037312E0 16

1135 3/20/2015 SHIV B A5037314A0 16

1136 3/20/2015 SHIV B A5037314B0 16

1137 3/20/2015 SHIV B A5037314D0 16

1138 3/20/2015 SHIV B A5037314E0 16

1139 3/20/2015 SHIV B A5037314F0 16

1140 3/20/2015 SHIV B A5037312D0 16

1141 3/20/2015 GOPAL/ABHISHEK C A4150811A0 28

1142 3/20/2015 GOPAL/ABHISHEK C A4150811B0 28

Page 25: Process Report for Mechanical Engineering

1143 3/20/2015 GOPAL/ABHISHEK C A5026502A0 50

1144 3/20/2015 GOPAL/ABHISHEK C A5057110A0 30.96

1145 3/20/2015 GOPAL/ABHISHEK C A5057110B0 30.96

1146 3/20/2015 GOPAL/ABHISHEK C A5057113A0 30.96

1147 3/20/2015 GOPAL/ABHISHEK C A5057115A0 30.96

1148 3/20/2015 GOPAL/ABHISHEK C A5057115B0 30.96

1149 3/20/2015 GOPAL/ABHISHEK C A5057116B0 30.96

1150 3/20/2015 GOPAL/ABHISHEK C A5057116A0 30.96

1151 3/21/2015 IRFAN/ASHUTOSH A A5045603B0 25

1152 3/21/2015 JASWANT/ABHISHEK C A5064407A0 801153 3/21/2015 JASWANT/ABHISHEK C A5062710A0 801154 3/22/2015 SHIV/IRFAN A A5035309A0 221155 3/22/2015 SHIV/IRFAN A A5035309B0 221156 3/22/2015 SHIV/IRFAN A A5009404B0 201157 3/22/2015 SHIV/IRFAN A A5009404A0 201158 3/22/2015 SHIV/IRFAN A A5009402B0 201159 3/22/2015 SHIV/IRFAN A A5009402A0 201160 3/22/2015 SHIV/IRFAN A A5009323A0 301161 3/22/2015 SHIV/IRFAN A A5009322A0 301162 3/22/2015 SHIV/IRFAN A A5009304A0 301163 3/22/2015 SHIV/IRFAN A A4154001B0 181164 3/22/2015 SHIV/IRFAN A A4154001A0 181165 3/22/2015 SHIV/IRFAN A A4150204B0 181166 3/22/2015 SHIV/IRFAN A A4150204A0 181167 3/22/2015 SHIV/IRFAN A A5051121D0 101168 3/22/2015 SHIV/IRFAN A A5051121B0 101169 3/22/2015 SHIV/IRFAN A A5053308A0 121170 3/22/2015 SHIV/IRFAN A A5053308D0 121171 3/22/2015 SHIV/IRFAN A A5053308B0 121172 3/22/2015 SHIV/IRFAN A A5053306D0 121173 3/22/2015 SHIV/IRFAN A A5053306B0 121174 3/22/2015 SHIV/IRFAN A A5053306A0 121175 3/22/2015 SHIV/IRFAN A A5053302B0 201176 3/22/2015 SHIV/IRFAN A A5053302A0 201177 3/22/2015 GOPAL/TUSHAR B A5053309A0 321178 3/22/2015 GOPAL/TUSHAR B A5053311A0 321179 3/22/2015 GOPAL/TUSHAR B A5053312A0 251180 3/22/2015 GOPAL/TUSHAR B A5053314A0 251181 3/22/2015 GOPAL/TUSHAR B A5066709A0 701182 3/22/2015 GOPAL/TUSHAR B A5066710A0 701183 3/22/2015 GOPAL/TUSHAR B A5066608A0 1001184 3/23/2015 IRFAN/ASHUTOSH A A5062707A0 501185 3/23/2015 IRFAN/ASHUTOSH A A5062705A0 501186 3/23/2015 IRFAN/ASHUTOSH A A5062708A0 501187 3/23/2015 IRFAN/ASHUTOSH A A5064411A0 631188 3/23/2015 IRFAN/ASHUTOSH A A5064405A0 631189 3/23/2015 IRFAN/ASHUTOSH A A5064404A0 701190 3/23/2015 IRFAN/ASHUTOSH A A5064413A0 70

Page 26: Process Report for Mechanical Engineering

1191 3/23/2015 IRFAN/ASHUTOSH A A5035301A0 631192 3/23/2015 IRFAN/ASHUTOSH A A5064401A0 631193 3/23/2015 IRFAN/ASHUTOSH A A5062702A0 631194 3/23/2015 SHIV/TUSHAR B A5035312A0 701195 3/23/2015 SHIV/TUSHAR B A5064403A0 701196 3/23/2015 SHIV/TUSHAR B A5064308A0 751197 3/23/2015 SHIV/TUSHAR B A5014311A0 281198 3/23/2015 SHIV/TUSHAR B A5066707A0 801199 3/24/2015 SHIV/IRFAN A A5061114D0 401200 3/24/2015 SHIV/IRFAN A A5061114B0 401201 3/24/2015 SHIV/IRFAN A A5061114A0 401202 3/24/2015 SHIV/IRFAN A A5061103D0 401203 3/24/2015 SHIV/IRFAN A A5061103B0 401204 3/24/2015 SHIV/IRFAN A A5061103A0 401205 3/24/2015 SHIV/IRFAN A A5061102D0 401206 3/24/2015 SHIV/IRFAN A A5061102B0 401207 3/24/2015 SHIV/IRFAN A A5061115D0 401208 3/24/2015 SHIV/IRFAN A A5061115B0 401209 3/24/2015 SHIV/IRFAN A A5061115A0 401210 3/24/2015 SHIV/IRFAN A A5041311B0 80

Page 27: Process Report for Mechanical Engineering
Page 28: Process Report for Mechanical Engineering

HEAT TREATMENT FURNACE (AF FURNACE )DPR REP0RT MARCH-2015 PLATE DIMENSI0N

Grade Weight CUMULATIVE Width Length2420 10450 IS2041 R260/ASME 3.777 3.7772420 10450 IS2041 R260/ASME 3.777 7.5532000 12000 IS2041 R260/ASME 1.886 9.4402500 12000 IS2041 R260/ASME SA516 GR 70 4.716 14.1562500 12000 IS2041 R260/ASME SA516 GR 70 4.716 18.8722500 12000 IS2041 R260/ASME 5.895 24.7672500 12000 IS2041 R260/ASME 4.716 29.4832500 12000 IS2041 R260/ASME 4.716 34.1992500 12000 IS2041 R260/ASME 4.716 38.9152500 12000 IS2041 R260/ASME 4.716 43.6312500 12000 IS2041 R260/ASME 4.244 47.8752500 12000 IS2041 R260/ASME 4.716 52.5912500 12000 IS2041 R260/ASME 4.244 56.8362500 12000 IS2041 R260/ASME 4.244 61.0802500 12000 IS2041 R260/ASME 4.244 65.3242500 12000 IS2041 R260/ASME 4.244 69.5692500 10000 IS2041 R260/ASME 3.537 73.1062500 12000 IS2041 R260/ASME 4.244 77.3503000 9485 IS2041 R220/ASME 3.910 81.2603000 9485 IS2041 R220/ASME 3.910 85.1692000 12000 IS2041 R260/ASME 1.886 87.0562420 10450 IS2041 R260/ASME 3.777 90.8322500 10000 EN10025-2S355J2 3.930 94.7622000 12000 IS2041 R260/ASME 1.886 96.6492000 12000 IS2041 R260/ASME 1.886 98.5352000 12000 IS2041 R260/ASME 1.886 100.4212500 10000 EN10025-2S355J2 3.537 103.9582300 12000 API5L Gr BN PSL2 7.050 111.0093000 9485 IS2041 R220/ASME 3.910 114.9183000 9485 IS2041 R220/ASME 3.910 118.8283000 9485 IS2041 R220/ASME 3.910 122.7373000 9485 IS2041 R220/ASME 3.910 126.6472500 12000 IS2041 R260/ASME 6.602 133.2491850 8150 IS2062 E250 BO 1.659 134.9081850 8150 IS2062 E250 BO 3.318 138.2272500 12000 IS2041 R260/ASME 8.489 146.7152500 12000 IS2041 R260/ASME 8.489 155.2042950 12665 ASME SA516GR-70 9.691 164.8952500 10000 EN10025 S355J2+N 3.930 168.8252500 10000 EN10025 S355J2+N 3.930 172.7551570 12000 ASME SA516 Gr 65 1.411 174.1661570 12000 ASME SA516 Gr 65 1.411 175.578

Page 29: Process Report for Mechanical Engineering

1570 12000 ASME SA516 Gr 65 1.411 176.9891570 12000 ASME SA516 Gr 65 1.411 178.4001570 12000 ASME SA516 Gr 65 1.411 179.8112850 12000 ASME SA516 Gr 65 2.562 182.3732500 10000 IS2041 R260/ASME 2.358 184.7312500 10000 IS2041 R260/ASME 2.358 187.0892500 10000 IS2041 R260/ASME 2.358 189.4472500 10000 IS2041 R260/ASME 2.358 191.8052500 10000 IS2041 R260/ASME 2.358 194.1632500 10000 IS2041 R260/ASME 2.358 196.5212500 10000 IS2041 R260/ASME 3.537 200.0582500 12000 IS2041 R260/ASME 2.830 202.8882500 12000 IS2041 R260/ASME 2.830 205.7172000 12000 IS2041 R260/ASME 1.886 207.6042500 12000 IS2041 R260/ASME 4.244 211.8482500 12000 IS2041 R260/ASME 4.244 216.0922500 12000 IS2041 R260/ASME 1.886 217.9793000 9485 IS2041 R260/ASME 3.892 221.8702700 9300 IS2041 R260/ASME 3.553 225.4232500 12000 IS2041 R260/ASME 8.489 233.9122500 12000 IS2041 R260/ASME 7.546 241.4572500 12000 IS2041 R260/ASME 7.546 249.0032500 12000 IS2041 R260/ASME 4.716 253.7192500 12000 IS2041 R260/ASME 4.716 258.4352000 12000 IS2041 R260/ASME 3.773 262.2082500 12000 IS2041 R260/ASME 5.895 268.1032500 12000 IS2041 R260/ASME 4.716 272.8192000 12000 IS2041 R260/ASME 3.773 276.5922500 12000 IS2041 R260/ASME 4.716 281.3082500 12000 IS2041 R260/ASME 4.716 286.0242500 12000 IS2041 R260/ASME 5.895 291.9192500 12000 IS2041 R260/ASME 5.895 297.8142500 12000 IS2041 R260/ASME 5.895 303.7092500 12000 IS2041 R260/ASME 5.895 309.6042500 12000 IS2041 R260/ASME 5.895 315.4992500 12000 IS2041 R260/ASME 5.895 321.3942700 12000 IS2041 R260/ASME 6.367 327.7602700 12000 IS2041 R260/ASME 6.367 334.1272700 12000 IS2041 R260/ASME 6.367 340.4932700 12000 IS2041 R260/ASME 6.367 346.8602500 12000 IS2041 R260/ASME 6.602 353.4622500 12000 IS2041 R260/ASME 6.602 360.0652700 12000 IS2041 R260/ASME 8.149 368.2142700 12000 IS2041 R260/ASME 8.149 376.3632700 12000 IS2041 R260/ASME 8.149 384.5132700 12000 IS2041 R260/ASME 8.149 392.662

Page 30: Process Report for Mechanical Engineering

2700 12000 IS2041 R260/ASME 8.149 400.8112700 12000 ASTM A516 Gr.70 8.149 408.9602500 6300 IS2041 R260/ASTM 3.961 412.9222500 6300 IS2041 R260/ASTM 3.095 416.0172500 12000 IS2041 R260/ASME 7.546 423.5622700 12000 ASTM A516 Gr.70 8.149 431.7112500 12000 IS2041 R260/ASME 9.432 441.1432075 8400 IS2041 R260/ASME 3.836 444.9792400 9600 ASME SA516GR-70 5.795 450.7742500 12000 IS2041 R260/ASME 8.489 459.2632500 12000 IS2041 R260/ASME 5.895 465.1582500 12000 IS2041 R260/ASME 5.895 471.0532500 12000 IS2041 R260/ASME 6.602 477.6562500 6300 IS2041 R260/ASTM 3.961 481.6172500 6300 IS2041 R260/ASTM 3.961 485.5792500 6300 IS2041 R260/ASTM 3.961 489.5401850 11650 IS2062 E250 BO 4.743 494.2831850 8150 IS2062 E250 BO 3.318 497.6021850 8150 IS2062 E250 BO 3.318 500.9202500 12000 IS2041 R260/ASME 4.716 505.6362500 12000 IS2041 R260/ASME 4.244 509.8802500 12000 IS2041 R260/ASME 4.244 514.1252500 12000 IS2041 R260/ASME 4.244 518.3693450 6900 ASME SA516GR-70 3.555 521.9241750 7350 IS2041 R260/ASTM 2.831 524.7552420 10450 IS2041 R260/ASME 3.777 528.5312970 10450 IS2041 R260/ASTM 4.635 533.1662970 10450 IS2041 R260/ASTM 4.635 537.8012500 12000 IS2041 R260/ASME 5.895 543.6962500 12000 IS2041 R260/ASME 7.546 551.2422500 6300 IS2041 R260/ASTM A516 GR70 4.085 555.3272500 12000 ASTM A516 Gr.60 3.773 559.1002500 12000 ASTM A516 Gr.60 3.773 562.8733000 10000 ASTM A516 Gr.60 4.716 567.5892500 6300 IS2041 R260/ASTM A516 GR70 3.961 571.5502500 6300 IS2041 R260/ASTM A516 GR70 3.961 575.5122500 6300 IS2041 R260/ASTM A516 GR70 3.961 579.4732500 6300 IS2041 R260/ASTM A516 GR70 3.961 583.4352075 8400 IS2041 R260/ASME SA516 GR70 3.836 587.2712075 8400 IS2041 R260/ASME SA516 GR70 3.836 591.1072500 12000 IS2041 R260/ASME SA516 GR70 4.716 595.8232000 10000 IS2041 R260/ASME SA516 GR70 7.074 602.8972700 12000 ASTM A516 GR.60+N 12.733 615.6302700 12000 ASTM A516 GR.60+N 12.733 628.3632700 12000 ASTM A516 GR.60+N 12.733 641.0962500 12000 IS2041 R260/ASME SA516 GR70 11.790 652.8862500 6300 IS2041 R260/ASTM A516 GR70 3.961 656.8482500 6300 IS2041 R260/ASTM A516 GR70 3.961 660.809

Page 31: Process Report for Mechanical Engineering

2500 6300 IS2041 R260/ASTM A516 GR70 3.095 663.9042500 6300 IS2041 R260/ASTM A516 GR70 3.095 666.9992500 6300 IS2041 R260/ASTM A516 GR70 3.095 670.0942500 6300 IS2041 R260/ASTM A516 GR70 3.095 673.1892500 6300 IS2041 R260/ASTM A516 GR70 3.095 676.2842500 6300 IS2041 R260/ASTM A516 GR70 3.095 679.3782500 6300 IS2041 R260/ASTM A516 GR70 3.095 682.4732500 12000 IS2041 R260/ASME SA516 GR70 11.790 694.2632500 6300 IS2041 R260/ASTM A516 GR70 3.961 698.2252500 6300 IS2041 R260/ASTM A516 GR70 3.961 702.1862500 6300 IS2041 R260/ASTM A516 GR70 3.095 705.2812500 6300 IS2041 R260/ASTM A516 GR70 3.095 708.3762500 6300 IS2041 R260/ASTM A516 GR70 3.095 711.4712500 8000 IS2041 R260/ASME SA516 GR70 5.030 716.5012000 10500 IS2041 R260/ASME SA516 GR70 9.904 726.4052500 12000 IS2041 R260/ASME SA516 GR70 11.790 738.1952500 12000 IS2041 R260/ASME SA516 GR70 10.611 748.8062500 12000 IS2041 R260/ASME SA516 GR70 9.432 758.2382500 12000 IS2041 R260/ASME SA516 GR70 10.611 768.8492500 12000 IS2041 R260/ASME SA516 GR70 9.432 778.2812500 12000 IS2041 R260/ASME SA516 GR70 9.432 787.7132500 6300 IS2041 R260/ASME SA516 GR70 3.095 790.8082500 6300 IS2041 R260/ASME SA516 GR70 3.095 793.9032500 6300 IS2041 R260/ASME SA516 GR70 3.095 796.9972500 6300 IS2041 R260/ASME SA516 GR70 3.095 800.0922500 6300 IS2041 R260/ASME SA516 GR70 3.095 803.1872500 12000 IS2041 R260/ASME SA516 GR70 2.830 806.0172500 12000 IS2041 R260/ASME SA516 GR70 2.830 808.8462500 12000 IS2041 R260/ASME SA516 GR70 2.830 811.6762900 10650 IS2041 R355/ASME SA537 CL-1 1.942 813.6182900 10650 IS2041 R355/ASME SA537 CL-1 1.942 815.5602900 10650 IS2041 R355/ASME SA537 CL-1 1.942 817.5022900 10650 IS2041 R355/ASME SA537 CL-1 1.942 819.4442900 10650 IS2041 R355/ASME SA537 CL-1 1.942 821.3862900 10650 IS2041 R355/ASME SA537 CL-1 1.942 823.3282900 10650 IS2041 R355/ASME SA537 CL-1 1.942 825.2702900 10650 IS2041 R355/ASME SA537 CL-1 1.942 827.2122900 10650 IS2041 R355/ASME SA537 CL-1 1.942 829.1542500 10000 IS2041 R260/ASME SA516 GR70 2.358 831.5122500 10000 IS2041 R260/ASME SA516 GR70 2.358 833.8702500 12000 IS2041 R260/ASME SA516 GR70 1.886 835.7572500 12000 IS2041 R260/ASME SA516 GR71 1.886 837.6432500 12000 IS2041 R260/ASME SA516 GR72 1.886 839.5302500 12000 IS2041 R260/ASME SA516 GR70 1.886 841.4162500 12000 IS2041 R260/ASME SA516 GR70 1.886 843.3022500 12000 IS2041 R260/ASME SA516 GR70 1.886 845.1892500 12000 IS2041 R260/ASME SA516 GR70 1.886 847.0752500 12000 IS2041 R260/ASME SA516 GR70 1.886 848.962

Page 32: Process Report for Mechanical Engineering

2500 12000 IS2041 R260/ASME SA516 GR70 1.886 850.8482500 12000 IS2041 R260/ASME SA516 GR70 2.358 853.2062500 12000 IS2041 R260/ASME SA516 GR70 2.358 855.5642500 12000 IS2041 R260/ASME SA516 GR70 2.358 857.9222500 10000 IS2041 R260/ASME SA516 GR70 1.572 859.4942500 12000 IS2041 R260/ASME SA516 GR70 2.830 862.3242900 10650 IS2041 R355/ASME SA537 CL-1 1.942 864.2662900 10650 IS2041 R355/ASME SA537 CL-1 1.942 866.2082900 10650 IS2041 R355/ASME SA537 CL-1 1.942 868.1502900 10650 IS2041 R355/ASME SA537 CL-1 1.942 870.0922900 10650 IS2041 R355/ASME SA537 CL-1 1.942 872.0342900 10650 IS2041 R355/ASME SA537 CL-1 1.942 873.9762900 10650 IS2041 R355/ASME SA537 CL-1 1.942 875.9182900 10650 IS2041 R355/ASME SA537 CL-1 1.942 877.8602900 10650 IS2041 R355/ASME SA537 CL-1 1.942 879.8022900 10650 IS2041 R355/ASME SA537 CL-1 1.942 881.7442500 12000 IS2041 R260/ASME SA516 GR70 2.830 884.5742500 12000 IS2041 R260/ASME SA516 GR70 2.830 887.4032500 12000 IS2041 R260/ASME SA516 GR70 2.830 890.2332500 12000 IS2041 R260/ASME SA516 GR70 2.830 893.0622500 10000 TRIAL 1.376 894.4382500 8500 IS2062 E250 BR 12.527 906.9654250 4250 IS2062 E250 BR 15.617 922.5824250 4250 IS2062 E250 BR 15.617 938.1991850 11650 IS2062 E250 BR 2.372 940.5701850 11650 IS2062 E250 BR 2.372 942.9421850 11650 IS2062 E250 BR 2.372 945.3131850 11650 IS2062 E250 BR 2.372 947.6851850 11650 IS2062 E250 BR 2.372 950.0571850 8150 IS2062 E250 BR 1.659 951.7161850 11650 IS2062 E250 BR 2.372 954.0871850 8150 IS2062 E250 BR 1.659 955.7473000 6934 IS2041 R260/ASME SA516 GR70 2.616 958.3633000 9485 IS2041 R260/ASME SA516 GR70 3.910 962.2723000 9485 IS2041 R260/ASME SA516 GR70 3.910 966.1822970 10450 IS2041 R260/ASME SA516 GR70 4.635 970.8172500 6300 IS2041 R260/ASME SA516 GR70 4.952 975.7682500 6300 IS2041 R260/ASME SA516 GR70 4.952 980.7202500 6300 IS2041 R260/ASME SA516 GR70 4.952 985.6722500 6300 IS2041 R260/ASME SA516 GR70 4.952 990.6242500 6300 IS2041 R260/ASME SA516 GR70 4.952 995.5762500 6300 IS2041 R260/ASME SA516 GR70 4.952 1000.5272500 6300 IS2041 R260/ASME SA516 GR70 7.799 1008.3272500 6300 IS2041 R260/ASME SA516 GR70 7.799 1016.1262500 6300 IS2041 R260/ASME SA516 GR70 7.799 1023.9252500 6300 IS2041 R260/ASME SA516 GR70 7.799 1031.7241500 8900 IS2041 R260/ASME SA516 GR70 6.716 1038.4391500 8900 IS2041 R260/ASME SA516 GR70 6.716 1045.155

Page 33: Process Report for Mechanical Engineering

1500 8900 IS2041 R260/ASME SA516 GR70 6.716 1051.8711500 8900 IS2041 R260/ASME SA516 GR70 6.716 1058.5861500 8900 IS2041 R260/ASME SA516 GR70 6.716 1065.3022500 6300 IS2041 R260/ASME SA516 GR70 7.799 1073.1012500 6300 IS2041 R260/ASME SA516 GR70 7.799 1080.9002500 6300 IS2041 R260/ASME SA516 GR70 7.799 1088.6992500 6300 IS2041 R260/ASME SA516 GR70 7.799 1096.4982500 6300 IS2041 R260/ASME SA516 GR70 9.904 1106.4022500 5500 IS2041 R260/ASME SA516 GR70 10.808 1117.2092500 6300 IS2041 R260/ASME SA516 GR70 7.799 1125.0082500 6300 IS2041 R260/ASME SA516 GR70 7.799 1132.8072500 6300 IS2041 R260/ASME SA516 GR70 7.799 1140.6062500 6300 IS2041 R260/ASME SA516 GR70 7.799 1148.4062500 6300 IS2041 R260/ASME SA516 GR70 7.799 1156.2052500 6300 IS2041 R260/ASME SA516 GR70 7.799 1164.0042500 6300 IS2041 R260/ASME SA516 GR70 7.799 1171.8032500 6300 IS2041 R260/ASME SA516 GR70 7.799 1179.6022500 6300 IS2041 R260/ASME SA516 GR70 7.799 1187.4012500 6300 IS2041 R260/ASME SA516 GR70 7.799 1195.2002500 6300 IS2041 R260/ASME SA516 GR70 7.799 1202.9992500 6300 IS2041 R260/ASME SA516 GR70 7.799 1210.7982500 6300 IS2041 R260/ASME SA516 GR70 6.933 1217.7312500 6300 IS2041 R260/ASME SA516 GR70 6.933 1224.6632500 6300 IS2041 R260/ASME SA516 GR70 6.933 1231.5962500 6300 IS2041 R260/ASME SA516 GR70 9.904 1241.4992500 6300 IS2041 R260/ASME SA516 GR70 6.190 1247.6892500 6300 IS2041 R260/ASME SA516 GR70 6.190 1253.8792500 6300 IS2041 R260/ASME SA516 GR70 3.961 1257.8402500 6300 IS2041 R260/ASME SA516 GR70 3.961 1261.8022500 6300 IS2041 R260/ASME SA516 GR70 4.952 1266.7542500 6300 IS2041 R260/ASME SA516 GR70 4.952 1271.7052500 6300 IS2041 R260/ASME SA516 GR70 4.952 1276.6572500 6300 IS2041 R260/ASME SA516 GR70 4.952 1281.6092500 6300 IS2041 R260/ASME SA516 GR70 4.952 1286.5612500 6300 IS2041 R260/ASME SA516 GR70 4.952 1291.5132500 6300 IS2041 R260/ASME SA516 GR70 4.952 1296.4642500 6300 IS2041 R260/ASME SA516 GR70 4.952 1301.4161500 8900 IS2041 R260/ASME SA516 GR70 6.716 1308.1322500 6300 IS2041 R260/ASME SA516 GR70 9.904 1318.0352500 6300 IS2041 R260/ASME SA516 GR70 9.904 1327.9392500 6300 IS2041 R260/ASME SA516 GR70 9.904 1337.8432500 8413 IS2041 R260/ASME SA516 GR70 12.399 1350.2412500 6300 IS2041 R260/ASME SA516 GR70 6.190 1356.4312500 6300 IS2041 R260/ASME SA516 GR70 4.952 1361.3832500 6300 IS2041 R260/ASME SA516 GR70 4.952 1366.3352500 6300 IS2041 R260/ASME SA516 GR70 3.961 1370.2962500 6300 IS2041 R260/ASME SA516 GR70 3.961 1374.2572500 6300 IS2041 R260/ASME SA516 GR70 3.961 1378.219

Page 34: Process Report for Mechanical Engineering

2500 6300 IS2041 R260/ASME SA516 GR70 3.961 1382.1802500 6300 IS2041 R260/ASME SA516 GR70 3.961 1386.1422500 6300 IS2041 R260/ASME SA516 GR70 3.961 1390.1032500 6300 IS2041 R260/ASME SA516 GR70 3.095 1393.1982500 8000 IS2041 R260/ASME SA516 GR70 4.402 1397.6002500 8000 IS2041 R260/ASME SA516 GR70 4.402 1402.0012500 8000 IS2041 R260/ASME SA516 GR70 4.402 1406.4032500 6300 IS2041 R260/ASME SA516 GR70 3.095 1409.4982500 6300 IS2041 R260/ASME SA516 GR70 3.095 1412.5932500 6300 IS2041 R260/ASME SA516 GR70 3.095 1415.6872500 6300 IS2041 R260/ASME SA516 GR70 3.095 1418.7822500 6300 IS2041 R260/ASME SA516 GR70 3.095 1421.8771500 8900 IS2041 R260/ASME SA516 GR70 6.716 1428.5932500 7100 IS2041 R260/ASME SA516 GR70 8.371 1436.9642500 7100 IS2041 R260/ASME SA516 GR70 8.371 1445.3351860 7440 IS2041 R260/ASME SA516 GR70 6.526 1451.8612070 8300 IS2041 R260/ASME SA516 GR70 10.128 1461.9892500 10000 IS2041 R260/ASME SA516 GR70 14.738 1476.7262500 10000 IS2041 R260/ASME SA516 GR70 14.738 1491.4642500 7100 IS2041 R260/ASME SA516 GR70 7.813 1499.2772500 7100 IS2041 R260/ASME SA516 GR70 7.813 1507.0902500 5000 IS2041 R260/ASME SA516 GR70 5.895 1512.9851800 7440 IS2041 R260/ASME SA516 GR70 6.316 1519.3002500 7100 IS2041 R260/ASME SA516 GR70 7.813 1527.1132500 7100 IS2041 R260/ASME SA516 GR70 7.813 1534.9262500 12000 IS2041 R260/ASME SA516 GR70 16.506 1551.4322500 12000 IS2041 R260/ASME SA516 GR70 14.855 1566.2872500 12000 IS2041 R260/ASME SA516 GR70 17.685 1583.9722500 12000 IS2041 R260/ASME SA516 GR70 14.855 1598.8282500 12000 IS2041 R260/ASME SA516 GR70 14.855 1613.6832500 12000 IS2041 R260/ASME SA516 GR70 14.855 1628.5392500 12000 IS2041 R260/ASME SA516 GR70 14.855 1643.3942500 7500 IS2041 R260/ASME SA516 GR70 11.053 1654.4472500 7500 IS2041 R260/ASME SA516 GR70 11.053 1665.5002500 12000 IS2041 R260/ASME SA516 GR70 11.790 1677.2902500 12000 IS2041 R260/ASME SA516 GR70 11.790 1689.0802500 7500 ASME SA516M Grad.485 6.632 1695.7122500 7500 ASME SA516M Grad.485 6.632 1702.3442500 12000 IS2041 R260/ASME SA516 GR70 11.790 1714.1342500 12000 IS2041 R260/ASME SA516 GR70 11.790 1725.9242500 12000 IS2041 R260/ASME SA516 GR70 13.205 1739.1292200 12000 IS2062 E410 C 10.375 1749.5042500 12000 IS2041 R260/ASME SA516 GR70 11.790 1761.2942200 12000 IS2062 E410 C 10.375 1771.6692500 12000 IS2041 R260/ASME SA516 GR70 9.432 1781.1011860 11900 IS2062 E250 BR 4.871 1785.9722500 12000 IS2041 R260/ASME SA516 GR70 11.790 1797.7622700 12000 IS2041 R260/ASME SA516 GR70 12.733 1810.496

Page 35: Process Report for Mechanical Engineering

2700 12000 IS2041 R260/ASME SA516 GR70 12.733 1823.2292500 8000 IS2041 R260/ASME SA516 GR70 11.790 1835.0192500 12000 IS2041 R260/ASME SA516 GR70 16.506 1851.5252500 12000 IS2041 R260/ASME SA516 GR70 17.685 1869.2102500 12000 IS2041 R260/ASME SA516 GR70 14.855 1884.0652500 6300 IS2041 R260/ASME SA516 GR70 5.571 1889.6362000 8000 IS2041 R260/ASME SA516 GR70 5.030 1894.6662000 8000 IS2041 R260/ASME SA516 GR70 5.030 1899.6972075 8400 IS2041 R260/ASME SA516 GR70 3.836 1903.5332500 12000 IS2041 R260/ASME SA516 GR70 2.830 1906.3622500 12000 IS2041 R260/ASME SA516 GR70 2.830 1909.1922500 12000 IS2041 R260/ASME SA516 GR70 3.301 1912.4932000 5250 IS2041 R260/ASME SA516 GR70 1.073 1913.5662000 5250 IS2041 R260/ASME SA516 GR70 1.073 1914.6392000 5250 IS2041 R260/ASME SA516 GR70 1.073 1915.7122000 5250 IS2041 R260/ASME SA516 GR70 1.073 1916.7852500 8000 IS2041 R260/ASME SA516 GR70 1.886 1918.6712500 8000 IS2041 R260/ASME SA516 GR70 1.886 1920.5582500 8000 IS2041 R260/ASME SA516 GR70 1.886 1922.4442850 12000 IS2041 R260/ASME SA516 GR70 2.562 1925.0061650 10200 IS2041 R260/ASME SA516 GR70 5.556 1930.5622700 12000 IS2041 R260/ASME SA516 GR70 12.733 1943.2952500 8000 IS2041 R260/ASME SA516 GR70 1.886 1945.1812500 8000 IS2041 R260/ASME SA516 GR70 1.886 1947.0682500 8000 IS2041 R260/ASME SA516 GR70 1.886 1948.9542500 8000 IS2041 R260/ASME SA516 GR70 1.886 1950.8402500 8000 IS2041 R260/ASME SA516 GR70 1.886 1952.7272500 10000 IS2041 R260/ASME SA516 GR70 2.358 1955.0852500 8000 IS2041 R260/ASME SA516 GR70 1.886 1956.9712500 10000 IS2041 R260/ASME SA516 GR70 2.358 1959.3292500 8000 IS2041 R260/ASME SA516 GR70 1.886 1961.2162500 8000 IS2041 R260/ASME SA516 GR70 1.886 1963.1022500 8000 IS2041 R260/ASME SA516 GR70 1.886 1964.9882500 8000 IS2041 R260/ASME SA516 GR70 1.886 1966.8753000 12000 IS2041 R260/ASME SA516 GR70 3.396 1970.2702500 12000 IS2041 R260/ASME SA516 GR70 2.830 1973.1003800 7600 IS2041 R260/ASME SA516 GR70 3.859 1976.9592500 12000 IS2041 R260/ASME SA516 GR70 2.830 1979.7892500 12000 IS2041 R260/ASME SA516 GR70 2.830 1982.6182600 8350 IS2041 R260/ASME SA516 GR70 2.730 1985.3482600 8350 IS2041 R260/ASME SA516 GR70 2.730 1988.0792600 8350 IS2041 R260/ASME SA516 GR70 2.730 1990.8091570 12000 IS2041 R260/ASME SA516 GR70 2.369 1993.1781570 12000 IS2041 R260/ASME SA516 GR70 2.369 1995.5482500 12000 IS2041 R260/ASME SA516 GR70 1.886 1997.4342000 12000 IS2041 R260/ASME SA516 GR70 1.886 1999.3202000 12000 IS2041 R260/ASME SA516 GR70 1.886 2001.2072000 12000 IS2041 R260/ASME SA516 GR70 1.886 2003.093

Page 36: Process Report for Mechanical Engineering

2000 12000 IS2041 R260/ASME SA516 GR70 1.886 2004.9802000 12000 IS2041 R260/ASME SA516 GR70 1.886 2006.8662000 12000 IS2041 R260/ASME SA516 GR70 1.886 2008.7522000 12000 IS2041 R260/ASME SA516 GR70 1.886 2010.6392000 12000 IS2041 R260/ASME SA516 GR70 1.886 2012.5252000 12000 IS2041 R260/ASME SA516 GR70 1.886 2014.4122000 12000 IS2041 R260/ASME SA516 GR70 1.886 2016.2982000 12000 IS2041 R260/ASME SA516 GR70 1.886 2018.1842000 12000 IS2041 R260/ASME SA516 GR70 1.886 2020.0712000 12000 IS2041 R260/ASME SA516 GR70 1.886 2021.9572000 12000 IS2041 R260/ASME SA516 GR70 1.886 2023.8442000 12000 IS2041 R260/ASME SA516 GR70 1.886 2025.7302500 10000 IS2041 R260/ASME SA516 GR70 1.965 2027.6952500 10000 IS2041 R260/ASME SA516 GR70 1.965 2029.6602500 10000 IS2041 R260/ASME SA516 GR70 1.965 2031.6252500 12000 IS2041 R260/ASME SA516 GR70 7.546 2039.1712500 12000 IS2041 R260/ASME SA516 GR70 7.546 2046.7162075 8405 IS2041 R260/ASME SA516 GR70 3.838 2050.5542500 12000 IS2041 R260/ASME SA516 GR70 1.886 2052.4413000 9485 IS2041 R220/ASME 3.910 2056.3503000 10000 ASTM A516 Gr.60 4.716 2061.0662500 12000 IS2041 R260/ASME 7.546 2068.6122500 12000 IS2041 R260/ASME 5.895 2074.5072000 12000 IS2041 R260/ASME 2.641 2077.1482000 12000 IS2041 R260/ASME 2.641 2079.7892500 12000 IS2041 R260/ASME 7.546 2087.3342850 12000 ASME SA516 Gr 65 2.562 2089.8962500 12000 IS2041 R260/ASME 1.886 2091.7832000 12000 IS2041 R260/ASME 1.886 2093.6692500 12000 IS2041 R260/ASME 1.886 2095.5552500 12000 IS2041 R260/ASME 10.611 2106.1662420 10450 IS2041 R260/ASME 3.777 2109.9431850 8150 IS2062 E250 BO 1.659 2111.6022500 12500 ASME SA516 Gr.70 7.860 2119.4622500 12500 ASME SA516 Gr.70 7.860 2127.3222500 12000 IS2041 R260/ASME 1.886 2129.2092500 12000 IS2041 R260/ASME 1.886 2131.0952500 10000 IS2041 R260/ASME 1.572 2132.6672500 10000 IS2041 R260/ASME 1.572 2134.2392500 10000 IS2041 R260/ASME 1.572 2135.8112500 10000 IS2041 R260/ASME 1.572 2137.3832000 12000 IS2041 R260/ASME 2.641 2140.0242500 12000 IS2041 R260/ASME 2.830 2142.8542500 12000 IS2041 R260/ASME 2.830 2145.6832500 12000 IS2041 R260/ASME 2.830 2148.5132500 10000 IS2041 R260/ASME 2.358 2150.8712500 10000 IS2041 R260/ASME 2.358 2153.2292500 10000 IS2041 R260/ASME 2.358 2155.587

Page 37: Process Report for Mechanical Engineering

2500 12000 IS2041 R260/ASME 2.830 2158.4161850 8150 IS2041 R260/ASME 1.659 2160.0752500 12000 IS2041 R260/ASME 8.489 2168.5642500 12000 IS2041 R260/ASME 8.489 2177.0532500 12000 IS2041 R260/ASME 8.489 2185.5423300 12600 IS2041 R260/ASME 11.765 2197.3072500 8000 IS 2062 E410 C 4.716 2202.0232500 8000 IS 2062 E410 C 4.716 2206.7392500 8000 IS 2062 E410 C 4.716 2211.4552500 8000 IS 2062 E410 C 4.716 2216.1711750 12000 IS 2062 E410 C 5.282 2221.4531750 12000 IS 2062 E410 C 5.282 2226.7351750 12000 IS 2062 E410 C 5.282 2232.0172000 12000 IS 2062 E410 C 4.716 2236.7332000 12000 IS 2062 E410 C 4.716 2241.4492000 12000 IS 2062 E410 C 4.716 2246.1652000 12000 IS 2062 E410 C 4.716 2250.8812500 12000 IS 2062 E410 C 4.716 2255.5972500 12000 IS 2062 E410 C 4.716 2260.3132500 12000 IS 2062 E410 C 4.716 2265.0292500 12000 IS 2062 E410 C 4.716 2269.7452500 12000 IS 2062 E410 C 4.716 2274.4612500 12000 IS 2062 E410 C 4.716 2279.1772500 12000 IS 2062 E410 C 4.716 2283.8932500 12000 IS 2062 E410 C 4.716 2288.6092500 12000 IS 2062 E410 C 4.716 2293.3252500 12000 IS 2062 E410 C 4.716 2298.0412500 12000 IS 2062 E410 C 4.716 2302.7572500 10000 IS 2062 E410 C 2.751 2305.5082500 12000 IS2062 E410 C 2.358 2307.8662500 12000 IS2062 E410 C 2.358 2310.2242500 12000 IS2062 E410 C 2.358 2312.5822500 12000 IS2062 E410 C 2.358 2314.9402500 12000 IS2062 E410 C 2.358 2317.2982500 12000 IS2062 E410 C 2.358 2319.6562500 12000 IS2062 E410 C 2.358 2322.0142500 12000 IS2062 E410 C 2.358 2324.3722500 12000 IS2062 E410 C 2.358 2326.7302500 12000 IS2062 E410 C 2.358 2329.0882500 12000 IS2062 E410 C 2.358 2331.4462500 12000 IS2062 E410 C 2.358 2333.8042500 12000 IS2062 E410 C 2.358 2336.1622500 12000 IS2062 E410 C 2.358 2338.5202500 12000 IS2062 E410 C 2.358 2340.8782500 12000 IS2062 E410 C 2.358 2343.2362500 12000 IS2062 E410 C 2.358 2345.5942500 12000 IS2062 E410 C 2.358 2347.9522500 12000 IS2062 E410 C 2.358 2350.310

Page 38: Process Report for Mechanical Engineering

2500 12000 IS2062 E410 C 4.716 2355.0262500 12000 IS2062 E410 C 5.188 2360.2142000 12000 IS2062 E410 C 7.546 2367.7592000 12000 IS2062 E410 C 7.546 2375.3052000 12000 IS2062 E410 C 7.546 2382.8512000 12000 IS2062 E410 C 7.546 2390.3962500 12000 IS2062 E410 C 2.830 2393.2262500 12000 IS2062 E410 C 2.830 2396.0552500 12000 IS2062 E410 C 2.830 2398.8852500 10000 IS2062 E410 C 2.751 2401.6362500 10000 IS2062 E410 C 2.751 2404.3872500 8600 IS2062 E410 C 2.704 2407.0912500 8600 IS2062 E410 C 2.704 2409.7952500 8600 IS2062 E410 C 2.704 2412.4982200 8500 IS2062 E410 C 7.349 2419.8482200 8500 IS2062 E410 C 7.349 2427.1972000 12000 IS2062 E410 C 7.546 2434.7423700 10100 IS2041 R260/ASME SA516 GR70 9.399 2444.1422500 12000 IS2041 R260/ASME SA516 GR70 7.546 2451.6872400 6500 IS2041 R260/ASME SA516 GR70 3.924 2455.6112400 6500 IS2041 R260/ASME SA516 GR70 3.924 2459.5352500 10000 IS2041 R260/ASME SA516 GR70 1.965 2461.5002500 10000 IS2041 R260/ASME SA516 GR70 1.965 2463.4652500 12000 IS2041 R260/ASME SA516 GR70 1.886 2465.3512500 12000 IS2041 R260/ASME SA516 GR70 1.886 2467.2372500 12000 IS2041 R260/ASME SA516 GR70 1.886 2469.1242500 10000 IS2041 R260/ASME SA516 GR70 1.965 2471.0892500 10000 IS2041 R260/ASME SA516 GR70 1.572 2472.6612500 10000 IS2041 R260/ASME SA516 GR70 1.572 2474.2331750 12000 IS2062 E410 C 5.282 2479.5151750 12000 IS2062 E410 C 5.282 2484.7971750 12000 IS2062 E410 C 5.282 2490.0792000 12000 IS2062 E410 C 7.546 2497.6242000 12000 IS2062 E410 C 7.546 2505.1702500 8000 IS2062 E410 C 4.716 2509.8862000 5300 IS2041 R260/ASME SA516 GR70 8.332 2518.2172000 5300 IS2041 R260/ASME SA516 GR70 8.332 2526.5492500 10000 IS2041 R260/ASME SA516 GR70 14.738 2541.2862500 6000 IS2041 R260/ASME SA516 GR70 9.432 2550.7182500 8000 IS2041 R260/ASME SA516 GR70 12.576 2563.2942200 8000 IS2062 E410 C 10.375 2573.6702500 12000 IS2041 R260/ASME SA516 GR70 13.205 2586.8742500 6300 IS2062E250BR 6.190 2593.0642500 12000 IS2041 R260/ASME SA516 GR70 14.855 2607.9202500 6300 IS2062E250BR 6.190 2614.1092000 12000 IS2062 E410 C 7.546 2621.6552000 12000 IS2062 E410 C 7.546 2629.2012500 6300 IS2041 R260/ASTM 3.961 2633.162

Page 39: Process Report for Mechanical Engineering

2500 6300 IS2041 R260/ASTM 3.095 2636.2572500 6300 IS2041 R260/ASTM 3.095 2639.3522500 11000 IS2062 E410 C 4.755 2644.1073450 6900 ASME SA516GR-70 3.555 2647.6622500 11000 IS2062 E410 C 4.755 2652.4171500 9100 STOCKYARD FARIDABAD, 3.433 2655.8511500 9100 STOCKYARD FARIDABAD, 3.433 2659.2842000 12000 IS2062 E410 C 4.716 2664.0002000 12000 IS2062 E410 C 4.716 2668.7162000 12000 IS2062 E410 C 4.716 2673.4322000 12000 IS2062 E410 C 4.716 2678.1482000 12000 IS2062 E410 C 4.716 2682.8642000 12000 IS2062 E410 C 4.716 2687.5802500 11000 IS2062 E410 C 4.755 2692.3352000 12000 IS2062 E410 C 4.716 2697.0512000 12000 IS2062 E410 C 4.716 2701.7672150 9200 IS2041 R260/ASTM 1.974 2703.7422500 10000 EN10025 S355J2+N 2.358 2706.1002500 12000 IS2041 R260/ASME 6.602 2712.7022500 8000 IS2041 R220/ASTM 1.886 2714.5882000 12000 IS2041 R260/ASME 1.886 2716.4752500 12000 EN10025 S355J2+N 2.358 2718.8332500 12000 EN10025 S355J2+N 2.358 2721.1912500 12000 EN10025 S355J2+N 2.358 2723.5492500 12000 EN10025 S355J2+N 2.358 2725.9072500 12000 IS2041 R260/ASME 1.886 2727.7932500 12000 IS2041 R260/ASME 1.886 2729.6802500 11000 IS2062 E410 C 4.755 2734.4352000 12000 IS2041 R260/ASME 3.773 2738.2082500 12000 IS2041 R260/ASME 4.244 2742.4522000 12000 IS2041 R260/ASME 3.773 2746.2252000 12000 IS2062 E410 C 7.546 2753.7712500 11000 IS2062 E410 C 4.755 2758.5262500 12000 IS2041 R260/ASME 1.886 2760.4122500 12000 IS2041 R260/ASME 1.886 2762.2992850 12000 ASME SA516 Gr 65 2.562 2764.8602500 12000 IS2041 R260/ASME 1.886 2766.7472000 12000 IS2041 R260/ASME 1.886 2768.6332500 12000 IS2041 R260/ASME 1.886 2770.5202500 12000 IS2041 R260/ASME 1.886 2772.4062500 10000 IS2041 R260/ASME 1.572 2773.9782000 12000 IS2041 R260/ASME 1.886 2775.8642000 12000 IS2041 R260/ASME 1.886 2777.7512500 12000 ASME SA516GR70 1.886 2779.6372000 12000 ASME SA516GR70 1.886 2781.5242500 12000 ASME SA516GR70 2.830 2784.3533450 6300 ASME SA516GR70 2.392 2786.7453100 8100 ASTM A516 Gr.70 3.947 2790.692

Page 40: Process Report for Mechanical Engineering

2200 7900 ASTM A516 Gr.70 2.732 2793.4242500 12000 IS2041 R260/ASME 2.358 2795.7821570 12000 ASME SA516 Gr 65 1.411 2797.1942500 10000 IS2041 R260/ASME 1.572 2798.7662500 12000 IS2041 R260/ASME 1.886 2800.6522000 12000 IS2041 R260/ASME 1.886 2802.5382500 12000 IS2041 R260/ASME 1.886 2804.4252500 12000 IS2041 R260/ASME 1.886 2806.3112500 12000 IS2041 R260/ASME 1.886 2808.1982500 12000 IS2041 R260/ASME 1.886 2810.0842500 12000 IS2041 R260/ASME 1.886 2811.9702500 12000 IS2041 R260/ASME 1.886 2813.8572500 12000 IS2041 R260/ASME 1.886 2815.7432500 12000 IS2041 R260/ASME 1.886 2817.6302500 12000 IS2041 R260/ASME 1.886 2819.5162500 8500 ASTM A517 GR F 6.347 2825.8632500 8500 ASTM A517 GR F 6.347 2832.2102000 12000 ASTM A517 GR F 7.168 2839.3782200 7000 ASTM A517 GR F 4.600 2843.9782200 7000 ASTM A517 GR F 4.600 2848.5782200 7000 ASTM A517 GR F 4.600 2853.1772000 12000 ASTM A517 GR F 7.168 2860.3462500 12000 ASTM A517 GR F 14.148 2874.4942500 8700 ASTM A517 GR F 10.257 2884.7512500 10000 IS2062 E410 C 2.751 2887.5022500 12000 IS2062 E410 C 2.830 2890.3312500 12000 IS2062 E410 C 2.830 2893.1612500 6800 IS2062 E410 C 2.138 2895.2992000 12000 IS2062 E410 C 3.773 2899.0722500 12000 IS2062 E410 C 2.830 2901.9012500 10000 IS2062 E410 C 2.751 2904.6522500 10000 IS2062 E410 C 2.751 2907.4032500 10000 IS2062 E410 C 2.751 2910.1542500 12000 IS2062 E410 C 2.358 2912.5122500 12000 IS2062 E410 C 2.358 2914.8702000 12000 IS2062 E410 C 3.396 2918.2662000 12000 IS2062 E410 C 3.396 2921.6612500 12000 IS2062 E410 C 2.830 2924.4912500 12000 IS2062 E410 C 2.830 2927.3212500 12000 IS2062 E410 C 2.830 2930.1502500 12000 IS2062 E410 C 3.773 2933.9232500 12000 IS2062 E410 C 3.773 2937.6962500 12000 IS2062 E410 C 3.773 2941.4692500 11000 IS2062 E410 C 4.755 2946.2242500 11000 IS2062 E410 C 4.755 2950.9792500 11000 IS2062 E410 C 4.755 2955.7352000 12000 IS2062 E410 C 4.716 2960.4512000 12000 IS2062 E410 C 4.716 2965.167

Page 41: Process Report for Mechanical Engineering

2000 12000 IS2062 E410 C 4.716 2969.8832000 12000 IS2062 E410 C 4.716 2974.5992500 8000 IS2062 E410 C 4.716 2979.3152000 12000 IS2062 E410 C 7.546 2986.8602000 12000 IS2062 E410 C 7.546 2994.4062500 10000 IS2062 E410 C 2.751 2997.1572500 10000 IS2062 E410 C 2.751 2999.9082300 11450 IS2041 R260/ASME 3.312 3003.2202300 11450 IS2041 R260/ASME 3.312 3006.5312300 11450 IS2041 R260/ASME 3.312 3009.8432300 11450 IS2041 R260/ASME 3.312 3013.1552300 11450 IS2041 R260/ASME 3.312 3016.4672300 11450 IS2041 R260/ASME 3.312 3019.7792500 12000 IS2041 R260/ASME 4.244 3024.0232500 12000 IS2041 R260/ASME 4.244 3028.2682500 12000 IS2041 R260/ASME 4.244 3032.5122500 12000 IS2041 R260/ASME 3.773 3036.2852500 12000 IS2041 R260/ASME 3.773 3040.0582500 12000 IS2041 R260/ASME 3.773 3043.8312500 8600 IS2062 E410 C 2.704 3046.5342500 8600 IS2062 E410 C 2.704 3049.2382000 8600 IS2062 E410 C 2.433 3051.6723100 8100 IS2041 R260/ASTM 3.553 3055.2243100 8100 IS2041 R260/ASTM 3.553 3058.7773700 10100 IS2041 R260/ASTM 10.574 3069.3512500 10000 IS2062E350BR 7.860 3077.2113800 10200 IS2041 R260/ASTM 7.616 3084.8273200 4400 IS2041 R260/ASTM 2.213 3087.0413200 4400 IS2041 R260/ASTM 2.213 3089.2543200 4400 IS2041 R260/ASTM 2.213 3091.4682850 12000 ASME SA516 GR65 2.562 3094.0292850 12000 ASME SA516 GR65 2.562 3096.5912000 5250 IS2041/ASME 1.073 3097.6643500 9300 IS2041 R260/ASTM 3.070 3100.7343400 9800 IS2041 R260/ASTM 4.190 3104.9242800 9800 IS2041 R260/ASTM 4.314 3109.2382800 9800 IS2041 R260/ASTM 4.314 3113.5522500 12000 IS2062 E410 C 2.358 3115.9102500 12000 IS2062 E410 C 2.358 3118.2682500 12000 IS2062 E410 C 2.358 3120.6262500 12000 IS2062 E410 C 2.358 3122.9842900 10650 IS2041 R355/ASME 1.942 3124.9262900 10650 IS2041 R355/ASME 1.942 3126.8683500 8200 IS2041 R260/ASME 2.933 3129.8003500 8200 IS2041 R260/ASME 2.933 3132.7333500 8200 IS2041 R260/ASME 2.933 3135.6653550 12000 IS2041 R260/ASME 5.357 3141.0233550 12000 IS2041 R260/ASME 5.357 3146.380

Page 42: Process Report for Mechanical Engineering

3550 12000 IS2041 R260/ASME 5.357 3151.7383550 12000 IS2041 R260/ASME 5.357 3157.0952300 11450 IS2041 R260/ASME 3.312 3160.4072300 11450 IS2041 R260/ASME 3.312 3163.7192300 11450 IS2041 R260/ASME 3.312 3167.0312000 12000 IS2062 E410 C 3.396 3170.4262000 12000 IS2062 E410 C 3.396 3173.8222000 12000 IS2062 E410 C 3.396 3177.2172000 12000 IS2062 E410 C 3.396 3180.6132000 12000 IS2062 E410 C 3.396 3184.0082900 10650 IS2041 R260/ASME 1.942 3185.9502500 12000 IS2041 R260/ASME 2.830 3188.7802500 12000 IS2041 R260/ASME 1.886 3190.6662500 12000 IS2041 R260/ASME 2.358 3193.0242500 12000 IS2041 R260/ASME 2.358 3195.3822500 12000 IS2041 R260/ASME 2.358 3197.7402500 12000 IS2041 R260/ASME 2.830 3200.5702500 12000 IS2041 R260/ASME 2.830 3203.3992500 10000 IS2041 R260/ASME 7.860 3211.2592500 12000 IS2041 R260/ASME 2.358 3213.6172500 12000 IS2041 R260/ASME 2.358 3215.9752500 12000 IS2041 R260/ASME 2.358 3218.3332500 12000 IS2041 R260/ASME 2.358 3220.6912500 12000 IS2041 R260/ASME 2.358 3223.0492500 12000 IS2041 R260/ASME 2.358 3225.4072500 12000 IS2041 R260/ASME 2.358 3227.7652500 12000 IS2041 R260/ASME 2.358 3230.1232500 12000 IS2041 R260/ASME 2.358 3232.4812500 12000 IS2041 R260/ASME 2.358 3234.8392500 12000 IS2041 R260/ASME 2.358 3237.1972500 12000 IS2041 R260/ASME 2.358 3239.5553000 12000 IS2041 R260/ASME 3.961 3243.5173000 12000 IS2041 R260/ASME 4.527 3248.0442800 12000 IS2041 R260/ASME 3.697 3251.7422800 12000 IS2041 R260/ASME 3.697 3255.4393000 12000 IS2041 R260/ASME 3.961 3259.4003000 12000 IS2041 R260/ASME 3.961 3263.3622200 7900 IS2041 R260/ASME 2.732 3266.0942500 12000 IS2041 R260/ASME 1.886 3267.9802500 12000 IS2041 R260/ASME 1.886 3269.8672500 12000 ASME SA516 GR70 1.886 3271.7532500 12000 ASME SA516 GR70 1.886 3273.6402500 11800 ASME SA516 GR70 9.275 3282.9142500 12000 ASME SA516 GR70 13.205 3296.1192300 12000 API 5L GR BN PSL2 7.050 3303.1702300 12000 API 5L GR BN PSL2 7.050 3310.2202300 12000 API 5L GR BN PSL2 7.050 3317.2702300 12000 API 5L GR BN PSL2 7.050 3324.321

Page 43: Process Report for Mechanical Engineering

2000 12000 IS2062 E410 C 3.396 3327.7161770 11250 IS2041 R260/ASTM 3.756 3331.4731770 11250 IS2041 R260/ASTM 3.756 3335.2291770 11250 IS2041 R260/ASTM 3.756 3338.9851770 11250 IS2041 R260/ASTM 3.756 3342.7422420 10450 IS2041 R260/ASTM 3.777 3346.5182420 10450 IS2041 R260/ASTM 3.777 3350.2952500 12000 IS2041 R260/ASTM 4.716 3355.0111850 9500 ASTM A516 GR 70+N 2.210 3357.2212500 12000 IS2041 R260/ASME 2.830 3360.0512500 12000 IS2041 R260/ASME 2.830 3362.8802500 12000 IS2041 R260/ASME 2.830 3365.7104100 7020 ASTMA516GR70 5.656 3371.3664100 7020 ASTMA516GR70 5.656 3377.0214100 7020 ASTMA516GR70 5.656 3382.6774100 7020 ASTMA516GR70 5.656 3388.3332500 9000 ASTMA516GR70 3.891 3392.2233500 8200 ASTMA516GR70 2.933 3391.2653500 8200 ASTMA516GR70 2.933 3395.1563500 8200 ASTMA516GR70 2.933 3398.0883500 8200 ASTMA516GR70 2.933 3401.0213500 8200 ASTMA516GR70 2.933 3403.9533500 8200 ASTMA516GR70 2.933 3406.8862500 12000 ASTMA516GR70 2.830 3409.7162500 12000 ASTMA516GR70 2.830 3412.5453500 8200 ASTMA516GR70 2.933 3415.4783500 8200 ASTMA516GR70 2.933 3418.4103500 8200 ASTMA516GR70 2.933 3421.3432500 9000 ASTMA516GR70 3.891 3425.2343800 7600 ASTMA516GR70 3.859 3429.0932500 7500 ASTMA516GR70 3.684 3432.7772500 7500 ASTMA516GR70 3.684 3436.4612500 7500 ASTMA516GR70 3.684 3440.1462500 12500 ASTMA516GR70 5.404 3445.5492500 12500 ASTMA516GR70 5.404 3450.9532500 10000 ASTMA516GR70 4.323 3455.2762500 10000 ASTMA516GR70 4.323 3459.5992500 10000 IS2041 R260/ASME 3.930 3463.5292500 10000 IS2041 R260/ASME 3.930 3467.4592500 10000 IS2041 R260/ASME 3.930 3471.3892500 12500 IS2041 R260/ASME 4.913 3476.3022500 12500 IS2041 R260/ASME 4.913 3481.2142500 10000 IS2041 R260/ASME 3.930 3485.1442500 10000 IS2041 R260/ASME 3.930 3489.0742500 12000 IS2041 R260/ASME 3.773 3492.8473000 6600 ASTM A516 GR 65 2.965 3495.8123000 6600 ASTM A516 GR 65 2.965 3498.7762500 12000 IS2041 R260/ASME 3.773 3502.549

Page 44: Process Report for Mechanical Engineering

2500 9000 IS2041 R260/ASME 2.476 3505.0252500 9000 IS2041 R260/ASME 2.476 3507.5012500 9000 IS2041 R260/ASME 2.476 3509.9773200 8200 ASTM A516 Gr.70 3.300 3513.2773300 6000 IS2041 R260/ASME 16.341 3529.6182500 12500 IS2062 E350 BO 12.281 3541.8991570 12000 ASME SA516 Gr 65 1.411 3543.3101570 12000 ASME SA516 Gr 65 1.411 3544.7221570 12000 ASME SA516 Gr 65 1.411 3546.1331570 12000 ASME SA516 Gr 65 1.411 3547.5441570 12000 ASME SA516 Gr 65 1.411 3548.9551570 12000 ASME SA516 Gr 65 1.411 3550.3662500 9000 IS2041 R260/ASME 3.891 3554.2572500 9000 IS2041 R260/ASME 3.891 3558.1482500 12500 IS2041 R260/ASME 4.913 3563.0602500 12500 IS2041 R260/ASME 4.913 3567.9732500 12500 IS2041 R260/ASME 4.913 3572.8852500 12500 IS2041 R260/ASME 4.913 3577.7982500 12500 IS2041 R260/ASME 4.913 3582.7102500 12500 IS2041 R260/ASME 4.913 3587.6232500 12500 IS2041 R260/ASME 4.913 3592.5352500 12500 ASME SA516 Gr.70 7.860 3600.3952500 12500 ASME SA516 Gr.70 7.860 3608.2553000 12000 ASME SA516GR-70 3.396 3611.6511570 12000 ASME SA516 Gr 65 1.411 3613.0621570 12000 ASME SA516 Gr 65 1.411 3614.4733500 8200 IS2041 R260/ASME 2.933 3617.4063500 8200 IS2041 R260/ASME 2.933 3620.3383000 12500 IS2041 R260/ASME 4.127 3624.4652500 12000 IS2041 R260/ASME 3.773 3628.2382500 12000 IS2041 R260/ASME 3.773 3632.0112500 9000 IS2041 R260/ASME 1.769 3633.7793500 8200 IS2041 R260/ASME 2.933 3636.7123500 8200 IS2041 R260/ASME 2.933 3639.6443500 8200 IS2041 R260/ASME 2.933 3642.5773500 8200 IS2041 R260/ASME 2.933 3645.5093500 8200 IS2041 R260/ASME 2.933 3648.4423500 8200 IS2041 R260/ASME 2.933 3651.3743500 8200 IS2041 R260/ASME 2.933 3654.3073500 8200 IS2041 R260/ASME 2.933 3657.2403500 8200 IS2041 R260/ASME 2.933 3660.1722835 11700 IS2041 R260/ASME 3.650 3663.8222835 11700 IS2041 R260/ASME 3.650 3667.4722500 10000 IS2041 R260/ASME 4.323 3671.7952500 10000 IS2041 R260/ASME 4.323 3676.1182500 10000 IS2041 R260/ASME 4.323 3680.4412500 10000 IS2041 R260/ASME 4.323 3684.7642500 10000 IS2041 R260/ASME 3.930 3688.694

Page 45: Process Report for Mechanical Engineering

2500 10000 IS2041 R260/ASME 3.930 3692.6242500 12500 IS2041 R260/ASME 4.913 3697.5373000 12000 ASME SA516GR-70 6.225 3703.7622200 7000 ASME SA516GR-70 3.147 3706.9092200 7000 ASME SA516GR-70 3.147 3710.0562200 11500 ASME SA516GR-70 5.170 3715.2263000 8000 ASME SA516GR-70 5.659 3720.8853000 10000 ASME SA516GR-70 7.074 3727.9593000 10000 ASME SA516GR-70 5.188 3733.1473000 12000 ASME SA516GR-70 6.225 3739.3723000 12000 ASME SA516GR-70 6.225 3745.5973000 12000 ASME SA516GR-70 6.225 3751.8223000 12000 ASME SA516GR-70 6.225 3758.0483050 13500 ASME SA516GR-70 7.120 3765.1683050 13500 ASME SA516GR-70 7.120 3772.2882200 11500 ASME SA516GR-70 5.170 3777.4583200 4400 IS2041 R260/ASTM 2.213 3779.6712500 12000 IS2041 R260/ASME 2.830 3782.5013200 4400 IS2041 R260/ASTM 2.213 3784.7143200 4400 IS2041 R260/ASTM 2.213 3786.9283200 4400 IS2041 R260/ASTM 2.213 3789.1413000 8000 ASME SA516GR-70 5.659 3794.8002500 12000 IS2041 R260/ASME 3.773 3798.5732500 12000 IS2041 R260/ASME 3.773 3802.3462500 12000 IS2041 R260/ASME 3.773 3806.1192500 12000 IS2041 R260/ASME 2.830 3808.9482500 12000 IS2041 R260/ASME 1.886 3810.8352500 9000 IS2041 R260/ASME 1.769 3812.6032500 9000 IS2041 R260/ASME 1.769 3814.3722500 9000 IS2041 R260/ASME 1.769 3816.1402500 12000 IS2041 R260/ASME 3.773 3819.9132500 12000 IS2041 R260/ASME 3.773 3823.6862500 12000 IS2041 R260/ASME 3.773 3827.4582500 9000 IS2041 R260/ASME 1.769 3829.2272500 9000 IS2041 R260/ASME 1.769 3830.9952500 9000 IS2041 R260/ASME 1.769 3832.7642500 9000 IS2041 R260/ASME 1.769 3834.5322500 9000 IS2041 R260/ASME 1.769 3836.3012500 9000 IS2041 R260/ASME 1.769 3838.0693800 11500 IS2041 R260/ASME 5.496 3843.5653800 11500 IS2041 R260/ASME 5.496 3849.0613000 12000 IS2041 R260/ASME 4.527 3853.5883000 12000 IS2041 R260/ASME 4.527 3858.1163000 12000 IS2041 R260/ASME 4.527 3862.6433000 12000 IS2041 R260/ASME 4.527 3867.1702500 9000 IS2041 R260/ASME 3.891 3871.0612500 7800 IS2041 R260/ASME 2.452 3873.5133800 11500 IS2041 R260/ASME 5.496 3879.009

Page 46: Process Report for Mechanical Engineering

3800 11500 IS2041 R260/ASME 5.496 3884.5053000 9000 IS2041 R260/ASME 10.611 3895.1163000 9000 IS2041 R260/ASME 10.611 3905.7273000 9000 IS2041 R260/ASME 10.611 3916.3382500 9000 IS2041 R260/ASME 3.891 3920.2282500 9000 IS2041 R260/ASME 3.891 3924.1192500 7020 IS2041 R260/ASME 3.449 3927.5683000 12000 ASME SA516GR-70 6.225 3933.7933000 10000 ASME SA516GR-70 5.188 3938.9803100 8100 ASTM A516 Gr.70 3.947 3942.9282500 8300 ASTM A516 Gr.70 4.893 3947.8212500 12500 IS2041 R260/ASME 4.913 3952.7332500 11000 IS2041 R260/ASME 3.026 3955.7592500 11000 IS2041 R260/ASME 3.026 3958.7852500 11000 IS2041 R260/ASME 3.026 3961.8112500 7020 IS2041 R260/ASME 3.449 3965.2602500 7020 IS2041 R260/ASME 3.449 3968.7092500 7020 IS2041 R260/ASME 3.449 3972.1573500 8200 IS2041 R260/ASME 2.933 3975.0903500 8200 IS2041 R260/ASME 2.933 3978.0222500 12000 IS2041 R260/ASME 3.773 3981.7952500 7800 IS2041 R260/ASME 2.452 3984.2472500 6500 IS2041 R260/ASME 2.044 3986.2912500 12000 IS2041 R260/ASME 4.716 3991.0072500 12000 IS2041 R260/ASME 4.716 3995.7233000 12000 IS2041 R260/ASME 4.527 4000.2503000 12000 IS2041 R260/ASME 4.527 4004.7783000 12000 IS2041 R260/ASME 4.527 4009.3053500 8200 IS2041 R260/ASME 2.933 4012.2383500 8200 IS2041 R260/ASME 2.933 4015.1703500 8200 IS2041 R260/ASME 2.933 4018.1033500 8200 IS2041 R260/ASME 2.933 4021.0353500 8200 IS2041 R260/ASME 2.933 4023.9683500 8200 IS2041 R260/ASME 2.933 4026.9003000 12000 IS2041 R260/ASME 4.527 4031.4283100 8100 IS2041 R260/ASME 3.947 4035.3752200 7000 IS2041 R260/ASME 2.421 4037.7962500 8300 IS2041 R260/ASME 4.893 4042.6893000 12000 IS2041 R260/ASME 4.527 4047.2162500 12500 IS2041 R260/ASME 4.913 4052.1292500 12500 IS2041 R260/ASME 4.913 4057.0412500 12000 IS2041 R260/ASME 2.358 4059.3992000 12000 IS2041 R260/ASME 2.264 4061.6632000 12000 IS2041 R260/ASME 2.264 4063.9273000 10000 ASME SA516GR-70 4.244 4068.1713000 12000 ASME SA516GR-70 6.225 4074.3963000 10000 ASME SA516GR-70 5.895 4080.2913000 12000 ASME SA516GR-70 6.225 4086.516

Page 47: Process Report for Mechanical Engineering

2500 10000 IS2041 R260/ASME 3.537 4090.0532500 10000 IS2041 R260/ASME 3.537 4093.5903000 6000 ASME SA516GR-70 2.547 4096.1373000 6000 ASME SA516GR-70 2.547 4098.6831700 11500 IS2041 R260/ASME 2.459 4101.1421700 11500 IS2041 R260/ASME 2.459 4103.6013000 12000 IS2041 R260/ASME 4.527 4108.1283000 12000 ASME SA516GR-70 6.225 4114.3532500 12000 IS2041 R260/ASME 2.358 4116.7112500 12000 IS2041 R260/ASME 2.358 4119.0693000 12000 IS2041 R260/ASME 3.961 4123.0313000 12000 IS2041 R260/ASME 4.527 4127.5582100 4400 IS2041 R260/ASME 1.453 4129.0103000 12000 IS2041 R260/ASME 3.961 4132.9722000 12000 IS2041 R260/ASME 2.264 4135.2362000 12000 IS2041 R260/ASME 2.264 4137.4993000 12000 IS2041 R260/ASME 3.961 4141.4612500 10000 IS2041 R260/ASME 2.751 4144.2122500 10000 IS2041 R260/ASME 2.751 4146.9632500 12000 IS2041 R260/ASME 3.773 4150.7362500 12000 IS2041 R260/ASME 3.773 4154.5083000 12000 IS2041 R260/ASME 6.225 4160.7333000 12000 IS2041 R260/ASME 6.225 4166.9592500 12000 IS2041 R260/ASME 2.830 4169.7883000 12000 IS2041 R260/ASME 4.527 4174.3162815 12000 IS2041 R260/ASME 3.717 4178.0333500 8200 IS2041 R260/ASME 2.933 4180.9653500 8200 IS2041 R260/ASME 2.933 4183.8983000 13500 IS2041 R260/ASME 4.457 4188.3543000 13500 IS2041 R260/ASME 4.457 4192.8113000 12000 IS2041 R260/ASME 6.225 4199.0362500 12000 IS2041 R260/ASME 3.773 4202.8092500 12000 IS2041 R260/ASME 3.773 4206.5822500 8300 IS2041 R260/ASME 22.833 4229.4152300 8500 IS2062 E250 BR 12.293 4241.7082300 8500 IS2062 E250 BR 12.293 4254.0012300 8500 IS2062 E250 BR 12.293 4266.2942500 12000 IS2062 E250 BR 11.790 4278.0842500 12000 IS2062 E250 BR 11.790 4289.8742500 12000 IS2062 E250 BR 11.790 4301.6642500 12830 IS2062 E250 BR 10.084 4311.7492500 12500 IS2062 E250 BR 9.825 4321.5742500 12500 IS2062 E250 BR 9.825 4331.3993100 10700 ASME SA516GR-70 10.429 4341.8271830 12000 API 5L GR BM 5.344 4347.1711830 12000 API 5L GR BM 5.344 4352.5151830 12000 API 5L GR BN PSL2 5.344 4357.8592300 12000 API 5L GR BM 7.050 4364.909

Page 48: Process Report for Mechanical Engineering

2300 12000 API 5L GR BN PSL2 7.050 4371.9602300 12000 API 5L GR BM 7.050 4379.0102300 12000 API 5L GR BM 7.050 4386.0612300 12000 API 5L GR BN PSL2 7.050 4393.1111830 12000 API 5L GR BN PSL2 5.344 4398.4551830 12000 API 5L GR BN PSL2 5.344 4403.7992700 12100 ASME SA516GR-70 5.136 4408.9342700 12100 ASME SA516GR-70 5.136 4414.0703200 4400 ASME SA516GR-70 2.213 4416.2833200 4400 ASME SA516GR-70 2.213 4418.4973200 4400 ASME SA516GR-70 2.213 4420.7103200 4400 ASME SA516GR-70 2.213 4422.9243200 4400 ASME SA516GR-70 2.213 4425.1373200 4400 ASME SA516GR-70 2.213 4427.3503200 4400 ASME SA516GR-70 2.213 4429.5643200 4400 ASME SA516GR-70 2.213 4431.7772000 4800 ASME SA516GR-70 2.113 4433.8903200 4400 ASME SA516GR-70 2.213 4436.1033200 4400 ASME SA516GR-70 2.213 4438.3172000 4800 ASME SA516GR-70 2.113 4440.4293400 9800 ASME SA516GR-70 4.190 4444.6203200 4400 ASME SA516GR-70 2.213 4446.8333000 6000 ASME SA516GR-70 1.981 4448.8142500 12000 ASME SA516GR-70 1.886 4450.7002500 9000 ASME SA516GR-70 2.476 4453.1762500 12000 ASME SA516GR-70 1.886 4455.0632500 12000 ASME SA516GR-70 3.773 4458.8352500 10000 ASME SA516GR-70 2.751 4461.5862500 7000 ASME SA516GR-70 2.201 4463.7872200 7900 ASME SA516GR-70 2.732 4466.5193400 9800 ASME SA516GR-70 4.190 4470.7102500 12000 ASME SA516GR-70 2.830 4473.5392200 7900 ASME SA516GR-70 2.732 4476.2712200 7900 ASME SA516GR-70 2.732 4479.0033000 10000 ASME SA516GR-70 8.489 4487.4923000 10000 ASME SA516GR-70 8.489 4495.9813000 7500 ASME SA516GR-70 6.720 4502.7013000 7500 ASME SA516GR-70 6.720 4509.4223000 7500 ASME SA516GR-70 6.720 4516.1422000 6620 ASME SA516GR-70 4.163 4520.3052000 6620 ASME SA516GR-70 4.163 4524.4672000 6620 ASME SA516GR-70 4.163 4528.6302000 6620 ASME SA516GR-70 4.163 4532.7933300 8600 ASME SA516GR-70 6.692 4539.4852000 4800 ASME SA516GR-70 2.113 4541.5972300 9000 ASME SA516GR-70 2.603 4544.2012500 7000 ASME SA516GR-70 2.201 4546.4012500 7000 ASME SA516GR-70 2.201 4548.602

Page 49: Process Report for Mechanical Engineering

3500 9300 ASME SA516GR-70 3.070 4551.6723500 9300 ASME SA516GR-70 3.070 4554.7423000 12500 ASME SA516GR-70 4.127 4558.8692500 9000 ASME SA516GR-70 2.476 4561.3453000 12000 ASME SA516GR-70 3.961 4565.3063000 12000 ASME SA516GR-70 3.961 4569.2682500 7000 ASME SA516GR-70 2.201 4571.4682500 12000 ASME SA516GR-70 2.358 4573.8262500 12000 ASME SA516GR-70 2.358 4576.1842500 9000 ASME SA516GR-70 1.769 4577.9532500 9000 ASME SA516GR-70 1.769 4579.7212500 12000 ASME SA516GR-70 4.244 4583.9662500 12000 ASME SA516GR-70 4.244 4588.2102000 12000 ASME SA516GR-70 3.773 4591.9832500 12000 ASME SA516GR-70 2.830 4594.8132500 12000 ASME SA516GR-70 3.773 4598.5852500 12000 ASME SA516GR-70 3.773 4602.3583700 7400 ASME SA516GR-70 4.304 4606.6622500 12000 ASME SA516GR-70 1.886 4608.5492000 12000 ASME SA516GR-70 3.773 4612.3222500 12000 ASME SA516GR-70 2.830 4615.1513100 8100 ASME SA516GR-70 3.947 4619.0992500 12000 ASME SA516GR-70 2.830 4621.9282500 12000 ASME SA516GR-70 4.244 4626.1732500 12000 ASME SA516GR-70 4.244 4630.4171600 6450 ASME SA516GR-70 1.460 4631.8771600 6450 ASME SA516GR-70 1.460 4633.3371600 6450 ASME SA516GR-70 1.460 4634.7972500 9000 ASME SA516GR-70 3.891 4638.6882500 9000 ASME SA516GR-70 3.891 4642.5792500 9000 ASME SA516GR-70 3.891 4646.4692500 9000 ASME SA516GR-70 3.891 4650.3602500 12500 ASME SA516GR-70 4.913 4655.2722500 12500 ASME SA516GR-70 4.913 4660.1852000 4800 ASME SA516GR-70 2.113 4662.2982500 10000 ASME SA516GR-70 1.572 4663.8702100 4400 ASME SA516GR-70 1.453 4665.3222100 4400 ASME SA516GR-70 1.453 4666.7752100 4400 ASME SA516GR-70 1.453 4668.2273200 4400 ASME SA516GR-70 2.213 4670.4413200 4400 ASME SA516GR-70 2.213 4672.6543200 4400 ASME SA516GR-70 2.213 4674.8672500 11000 ASME SA516GR-70 3.026 4677.8942500 12000 ASME SA516GR-70 2.830 4680.7233600 12680 ASME SA516GR-70 12.917 4693.6402500 11000 ASME SA516GR-70 3.026 4696.6662500 12000 ASME SA516GR-70 2.995 4699.6602500 12000 ASME SA516GR-70 2.995 4702.655

Page 50: Process Report for Mechanical Engineering

2500 12000 ASME SA516GR-70 2.995 4705.6502500 12000 ASME SA516GR-70 3.773 4709.4232500 12000 ASME SA516GR-70 4.244 4713.6672500 12000 ASME SA516GR-70 3.773 4717.4402500 12000 ASME SA516GR-70 4.716 4722.1562500 12000 ASME SA516GR-70 4.716 4726.8722500 12000 ASME SA516GR-70 3.773 4730.6452500 12000 ASME SA516GR-70 3.773 4734.4172500 12000 ASME SA516GR-70 3.773 4738.1902500 12000 ASME SA516GR-70 3.773 4741.9632500 12000 ASME SA516GR-70 3.773 4745.7362500 12000 ASME SA516GR-70 4.244 4749.9802500 12000 ASME SA516GR-70 3.773 4753.7532500 12000 ASME SA516GR-70 4.244 4757.9972500 12000 ASME SA516GR-70 4.244 4762.2422500 12000 ASME SA516GR-70 4.244 4766.4862500 12000 ASME SA516GR-70 3.773 4770.2592500 12000 ASME SA516GR-70 3.773 4774.0322500 12000 ASME SA516GR-70 4.244 4778.2762500 12000 ASME SA516GR-70 4.244 4782.5212500 12000 ASME SA516GR-70 4.244 4786.7652500 12000 ASME SA516GR-70 4.244 4791.0092500 12000 ASME SA516GR-70 4.244 4795.2542500 12000 ASME SA516GR-70 2.830 4798.0832500 12000 ASME SA516GR-70 2.830 4800.9132500 12000 ASME SA516GR-70 2.830 4803.7432500 12000 ASME SA516GR-70 2.830 4806.5722500 12000 ASME SA516GR-70 2.830 4809.4022500 12000 ASME SA516GR-70 2.995 4812.3962500 12000 ASME SA516GR-70 2.830 4815.2262500 12000 ASME SA516GR-70 2.830 4818.0562500 12000 ASME SA516GR-70 2.830 4820.8852500 12000 ASME SA516GR-70 2.830 4823.7152500 12000 ASME SA516GR-70 2.830 4826.5442500 12000 ASME SA516GR-70 2.830 4829.3742500 12000 ASME SA516GR-70 2.995 4832.3692000 12000 ASME SA516GR-70 3.396 4835.7642000 12000 ASME SA516GR-70 3.396 4839.1602000 12000 ASME SA516GR-70 3.396 4842.5552500 12000 ASME SA516GR-70 2.830 4845.3852500 12000 ASME SA516GR-70 2.830 4848.2142500 12000 ASME SA516GR-70 2.830 4851.0442000 12000 ASME SA516GR-70 3.396 4854.4402000 12000 ASME SA516GR-70 3.396 4857.8352000 12000 ASME SA516GR-70 3.396 4861.2312000 12000 ASME SA516GR-70 3.018 4864.2492000 12000 ASME SA516GR-70 3.018 4867.2672000 12000 ASME SA516GR-70 3.018 4870.285

Page 51: Process Report for Mechanical Engineering

2000 12000 ASME SA516GR-70 3.018 4873.3042000 12000 ASME SA516GR-70 3.018 4876.3222000 12000 ASME SA516GR-70 3.018 4879.3402500 12000 ASME SA516GR-70 2.830 4882.1702500 12000 ASME SA516GR-70 2.830 4884.9992500 12000 ASME SA516GR-70 2.830 4887.8292500 12000 ASME SA516GR-70 2.830 4890.6582500 12000 ASME SA516GR-70 2.830 4893.4882500 12000 ASME SA516GR-70 2.830 4896.3182500 12000 ASME SA516GR-70 2.830 4899.1473000 10470 IS2041 R220/ASME 3.135 4902.2833000 10470 IS2041 R220/ASME 3.135 4905.4182500 9000 IS2041 R260/ASME 1.769 4907.1872835 11700 IS2041 R260/ASME 3.650 4910.8372500 12000 ASME SA516GR-70 2.830 4913.6662500 12000 ASME SA516GR-70 2.830 4916.4962500 12000 ASME SA516GR-70 2.830 4919.3252500 12000 ASME SA516GR-70 2.830 4922.1552500 12000 ASME SA516GR-70 2.830 4924.9852500 12000 IS2041 R260/ASME 2.830 4927.8142500 9000 IS2041 R260/ASME 2.476 4930.2902815 12000 IS2041 R260/ASME 3.717 4934.0072815 12000 IS2041 R260/ASME 3.717 4937.7242500 11000 IS2041 R260/ASME 3.026 4940.7502000 6000 IS2041 R260/ASME 3.773 4944.5232580 8190 IS2041 R260/ASTM 5.315 4949.8382000 9080 IS2041 R260/ASME 5.710 4955.5472000 9080 IS2041 R260/ASME 5.710 4961.2572000 9080 IS2041 R260/ASME 5.710 4966.9663000 9300 IS2041 R260/ASME 3.947 4970.9143000 5735 IS2041 R260/ASME 2.434 4973.3483000 6935 IS2041 R260/ASTM 2.616 4975.9642500 12000 IS2041 R260/ASTM 5.895 4981.8593000 9600 ASME SA516GR-70 4.075 4985.9342720 9300 IS2041 R260/ASME 3.579 4989.5133000 11500 IS2041 R260/ASME 4.881 4994.3942580 8190 IS2041 R260/ASTM 5.315 4999.7093000 6934 IS2041 R260/ASTM 2.616 5002.3253000 6934 IS2041 R260/ASTM 2.616 5004.9413000 6934 IS2041 R260/ASTM 2.616 5007.5572500 6334 IS2041 R260/ASTM 1.991 5009.5482500 6334 IS2041 R260/ASTM 1.991 5011.5402500 6334 IS2041 R260/ASTM 1.991 5013.5312500 6334 IS2041 R260/ASTM 1.991 5015.5222500 6334 IS2041 R260/ASTM 1.991 5017.5143000 6334 IS2041 R260/ASTM 2.390 5019.9031850 11650 ASTM A516GR70 4.743 5024.6471850 8150 ASTM A516GR70 3.318 5027.965

Page 52: Process Report for Mechanical Engineering

2310 4690 ASTM A516GR70 4.258 5032.2231830 12000 API5L Gr BN PSL2 5.344 5037.5671830 12000 API5L Gr BN PSL2 5.344 5042.9101830 12000 API5L Gr BN PSL2 5.344 5048.2541830 12000 API5L Gr BN PSL2 5.344 5053.5981830 12000 API5L Gr BN PSL2 5.344 5058.9421830 12000 API5L Gr BN PSL2 5.344 5064.2861830 12000 API5L Gr BN PSL2 5.344 5069.6303000 10000 IS2041 R260/ASTM 5.895 5075.5252500 8000 IS2041 R260/ASTM 12.576 5088.1012500 8000 IS2041 R260/ASTM 12.576 5100.6773000 10000 IS2041 R260/ASTM 5.1876 5105.8643000 8200 IS2041 R260/ASTM 4.253832 5110.1183000 12500 IS2041 R260/ASME 5.895 5116.0133000 12500 IS2041 R260/ASME 5.895 5121.9083000 12500 IS2041 R260/ASME 5.895 5127.8033000 12500 IS2041 R260/ASME 5.895 5133.6982500 12000 IS2041 R260/ASME 7.074 5140.7722500 12000 IS2041 R260/ASME 7.074 5147.8462500 12000 IS2041 R260/ASME 7.074 5154.9203000 12000 IS2041 R260/ASME 5.09328 5160.0143000 12000 IS2041 R260/ASME 5.09328 5165.1073000 12000 IS2041 R260/ASME 5.09328 5170.2003000 12000 IS2041 R260/ASME 5.09328 5175.2932500 12000 IS2041 R260/ASME 2.358 5177.6512500 12000 IS2041 R260/ASME 2.358 5180.0092500 12000 ASME SA387 Gr.11 2.8296 5182.8392500 12000 ASME SA387 Gr.11 2.8296 5185.6692500 12000 ASME SA387 Gr.11 2.8296 5188.4982500 12000 ASME SA387 Gr.11 2.8296 5191.3282500 12000 ASME SA387 Gr.11 2.8296 5194.1572500 12000 ASME SA387 Gr.11 2.8296 5196.9872500 12000 ASME SA387 Gr.11 4.716 5201.7032500 12000 ASME SA387 Gr.11 4.716 5206.4192500 12000 ASME SA387 Gr.11 7.5456 5213.9652500 12000 ASME SA387 Gr.11 7.5456 5221.5102500 12000 ASME SA387 Gr.11 5.895 5227.4052500 12000 ASME SA387 Gr.11 5.895 5233.3003000 7000 IS2062 E250 BR 11.5542 5244.8543000 7000 IS2062 E250 BR 11.5542 5256.4093000 4000 IS2062 E250 BR 9.432 5265.8412500 12000 ASME SA516M Grad 11.79 5277.6312500 12000 ASME SA516M Grad 11.79 5289.4212500 12000 ASME SA516M Grad 11.79 5301.2112500 12000 ASME SA516M Grad 14.8554 5316.0662500 12000 ASME SA516M Grad 14.8554 5330.9212500 10500 ASME SA516M Grad 14.44275 5345.3642500 10500 ASME SA516M Grad 14.44275 5359.807

Page 53: Process Report for Mechanical Engineering

2500 12000 ASME SA516M Grad 14.8554 5374.6622500 12000 ASME SA516M Grad 14.8554 5389.5182500 12000 ASME SA516M Grad 14.8554 5404.3732500 10500 ASME SA516M Grad 14.44275 5418.8162500 10500 ASME SA516M Grad 14.44275 5433.2592500 12000 ASME SA516M Grad 17.685 5450.9442500 12000 ASME SA516M Grad 6.6024 5457.5462300 8500 ASME SA516M Grad 12.29304 5469.8392000 6620 IS2041 R260/ASME 4.162656 5474.0022000 6620 IS2041 R260/ASME 4.162656 5478.1642000 6620 IS2041 R260/ASME 4.162656 5482.3272000 6620 IS2041 R260/ASME 4.162656 5486.4902000 6620 IS2041 R260/ASME 4.162656 5490.6522000 6620 IS2041 R260/ASME 4.162656 5494.8152000 6620 IS2041 R260/ASME 4.162656 5498.9782000 6620 IS2041 R260/ASME 4.162656 5503.1402000 6620 IS2041 R260/ASME 4.162656 5507.3032000 6620 IS2041 R260/ASME 4.162656 5511.4662000 6620 IS2041 R260/ASME 4.162656 5515.6282500 6000 IS2041 R260/ASME 9.432 5525.060

Page 54: Process Report for Mechanical Engineering
Page 55: Process Report for Mechanical Engineering

HEAT TREATMENT FURNACE (AF FURNACE )DPR REP0RT MARCH-2015Customer Process

SUDHIR BROTHERS NormalisingSUDHIR BROTHERS Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD CHENNAI Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD CHENNAI NormalisingSTOCKYARD CHENNAI NormalisingSTOCKYARD CHENNAI Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

SUDHIR BROTHERS NormalisingTHYSSENKRUPP Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

THYSSENKRUPP NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

JSPL THANE NormalisingV.R. GLOBAL PVT LTD. NormalisingV.R. GLOBAL PVT LTD. Normalising

JSPL THANE NormalisingJSPL THANE Normalising

BILFAL HEAVY INDUSTRIES LIMITED, NormalisingTHYSSENKRUPP INDUSTRIES INDIA PVT L NormalisingTHYSSENKRUPP INDUSTRIES INDIA PVT L Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

Page 56: Process Report for Mechanical Engineering

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

THYSSENKRUPP NormalisingTHYSSENKRUPP Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

STK CHENNAI NormalisingSTK CHENNAI Normalising

STK AHMEDABAD NormalisingKARBON STEEL NormalisingKARBON STEEL Normalising

STK AHMEDABAD NormalisingKARBON STEEL NormalisingKARBON STEEL Normalising

INDUSTRIAL METAL NormalisingINDUSTRIAL METAL NormalisingINDUSTRIAL METAL NormalisingINDUSTRIAL METAL Normalising

KARBON STEEL NormalisingKARBON STEEL Normalising

L&T HYDROCARBON ENGINEERING LIMITED NormalisingL&T HYDROCARBON ENGINEERING LIMITED NormalisingL&T HYDROCARBON ENGINEERING LIMITED NormalisingL&T HYDROCARBON ENGINEERING LIMITED Normalising

INDUSTRIAL METAL NormalisingINDUSTRIAL METAL Normalising

L&T HYDROCARBON ENGINEERING LIMITED NormalisingL&T HYDROCARBON ENGINEERING LIMITED NormalisingL&T HYDROCARBON ENGINEERING LIMITED NormalisingL&T HYDROCARBON ENGINEERING LIMITED Normalising

Page 57: Process Report for Mechanical Engineering

L&T HYDROCARBON ENGINEERING LIMITED NormalisingL&T HYDROCARBON ENGINEERING LIMITED Normalising

STK BHOPAL NormalisingSTK BHOPAL Normalising

INDUSTRIAL METALS, NormalisingL&T HYDROCARBON ENGINEERING LIMITED Normalising

INDUSTRIAL METALS, NormalisingSTOCKYARD FARIDABAD, Normalising

BILFAL HEAVY INDUSTRIES LIMITED, NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingSTK BHOPAL NormalisingSTK BHOPAL NormalisingSTK BHOPAL Normalising

V.R. GLOBAL PVT LTD. NormalisingV.R. GLOBAL PVT LTD. NormalisingV.R. GLOBAL PVT LTD. NormalisingSTOCKYARD CHENNAI, Normalising

STOCKYARD AHMEDABAD, NormalisingJSPL THANE NormalisingJSPL THANE Normalising

BILFAL HEAVY INDUSTRIES LIMITED, NormalisingSTOCKYARD FARIDABAD, Normalising

SUDHIR BROTHERS NormalisingSUDHIR BROTHERS NormalisingSUDHIR BROTHERS Normalising

JSPL THANE NormalisingJSPL THANE Normalising

STOCKYARD BHOPAL, NormalisingQUALITY INTERNATIONAL CO. LTD. FZE. NormalisingQUALITY INTERNATIONAL CO. LTD. FZE. NormalisingQUALITY INTERNATIONAL CO. LTD. FZE. Normalising

STOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, Normalising

STOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, Normalising

KARBON STEELMART PRIVATE LIMITED, NormalisingSTOCKYARD FARIDABAD, Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

STOCKYARD CHENNAI, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, Normalising

Page 58: Process Report for Mechanical Engineering

STOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingINDUSTRIAL METALS, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, Normalising

STOCKYARD FARIDABAD, NormalisingBRIDGECON INDIA Normalising

INDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, Normalising

KARBON STEELMART PRIVATE LIMITED, NormalisingKARBON STEELMART PRIVATE LIMITED, Normalising

STOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, Normalising

D M SONS NormalisingD M SONS NormalisingD M SONS NormalisingD M SONS NormalisingD M SONS NormalisingD M SONS NormalisingD M SONS NormalisingD M SONS NormalisingD M SONS Normalising

THYSENKRUPP NormalisingTHYSENKRUPP Normalising

STOCKYARD AHMEDABAD NormalisingSTOCKYARD AHMEDABAD NormalisingSTOCKYARD AHMEDABAD NormalisingSTOCKYARD AHMEDABAD NormalisingSTOCKYARD AHMEDABAD NormalisingSTOCKYARD AHMEDABAD NormalisingSTOCKYARD AHMEDABAD NormalisingSTOCKYARD AHMEDABAD Normalising

Page 59: Process Report for Mechanical Engineering

STOCKYARD AHMEDABAD NormalisingSTOCKYARD THANE NormalisingSTOCKYARD THANE NormalisingSTOCKYARD THANE NormalisingSTOCKYARD THANE NormalisingSTOCKYARD THANE Normalising

DM SONS METAL PVT LTD, NormalisingDM SONS METAL PVT LTD, NormalisingDM SONS METAL PVT LTD, NormalisingDM SONS METAL PVT LTD, NormalisingDM SONS METAL PVT LTD, NormalisingDM SONS METAL PVT LTD, NormalisingDM SONS METAL PVT LTD, NormalisingDM SONS METAL PVT LTD, NormalisingDM SONS METAL PVT LTD, NormalisingDM SONS METAL PVT LTD, Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

DMR HARDENINGTOSHIBA NormalisingTOSHIBA NormalisingTOSHIBA Normalising

V.R. GLOBAL PVT LTD. NormalisingV.R. GLOBAL PVT LTD. NormalisingV.R. GLOBAL PVT LTD. NormalisingV.R. GLOBAL PVT LTD. Normalising

V R GLOBAL NormalisingV R GLOBAL NormalisingV R GLOBAL NormalisingV R GLOBAL Normalising

STK FARIDABAD NormalisingSTK AHMEDABAD NormalisingSTK AHMEDABAD Normalising

SUDHIR BROTHERS NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, Normalising

JSPL THANE NormalisingJSPL THANE Normalising

Page 60: Process Report for Mechanical Engineering

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

STOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, Normalising

JSPL THANE NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingINDUSTRIAL METAL Normalising

STOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, Normalising

Page 61: Process Report for Mechanical Engineering

STOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, Normalising

STOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, Normalising

STOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, Normalising

JSPL THANE NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, Normalising

STOCKYARD CHENNAI NormalisingSTOCKYARD THANE Normalising

STOCKYARD FARIDABAD, NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

KARBON STEELMART PRIVATE LIMITED NormalisingKARBON STEELMART PRIVATE LIMITED Normalising

JSPL RAIPUR NormalisingJSPL RAIPUR Normalising

STOCKYARD CHENNAI NormalisingSTOCKYARD CHENNAI Normalising

JSPL THANE NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, Normalising

STOCKYARD THANE NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, Normalising

INDUSTRIAL METAL NormalisingV R GLOBAL NormalisingJSPL THANE Normalising

STOCKYARD AHMEDABAD, Normalising

Page 62: Process Report for Mechanical Engineering

STOCKYARD AHMEDABAD, NormalisingINDUSTRIAL METALS, Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

JSPL RAMGARH NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, Normalising

STOCKYARD CHENNAI NormalisingSTOCKYARD CHENNAI NormalisingSTOCKYARD CHENNAI Normalising

STOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, Normalising

AMARDEEP STEELS NormalisingAMARDEEP STEELS NormalisingAMARDEEP STEELS Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD FARIDABAD, Normalising

STOCKYARD AHMEDABAD, NormalisingAMARDEEP STEELS NormalisingAMARDEEP STEELS NormalisingAMARDEEP STEELS NormalisingAMARDEEP STEELS NormalisingAMARDEEP STEELS NormalisingAMARDEEP STEELS NormalisingAMARDEEP STEELS NormalisingAMARDEEP STEELS NormalisingAMARDEEP STEELS NormalisingAMARDEEP STEELS NormalisingAMARDEEP STEELS NormalisingAMARDEEP STEELS Normalising

BILFAL HEAVY INDUSTRIES LIMITED, NormalisingJSPL THANE Normalising

BILFAL HEAVY INDUSTRIES LIMITED, NormalisingJSPL THANE NormalisingJSPL THANE Normalising

STOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

INDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, Normalising

Page 63: Process Report for Mechanical Engineering

INDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

KARBON STEELMART PRIVATE LIMITED NormalisingKARBON STEELMART PRIVATE LIMITED Normalising

STOCKYARD FARIDABAD, NormalisingJSPL THANE Normalising

STOCKYARD AHMEDABAD, NormalisingQUALITY INTERNATIONAL CO. LTD. FZE. Normalising

INDUSTRIAL METALS, NormalisingJINDAL STEEL & POWER LIMITED, Normalising

INDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, Normalising

JINDAL STEEL & POWER LIMITED, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

INDUSTRIAL METALS, NormalisingSUDHIR BROTHERS, Normalising

V.R. GLOBAL PVT LTD. NormalisingLEXUS TRADELINK PRIVATE LIMITED, NormalisingLEXUS TRADELINK PRIVATE LIMITED, Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

INDUSTRIAL METALS, NormalisingJSPL THANE Normalising

STOCKYARD CHENNAI, NormalisingSTOCKYARD CHENNAI, Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

Page 64: Process Report for Mechanical Engineering

JSPL THANE NormalisingV.R. GLOBAL PVT LTD. NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, Normalising

BILFAL HEAVY INDUSTRIES LIMITED, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, Normalising

Page 65: Process Report for Mechanical Engineering

CHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

CHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, Normalising

JSPL THANE NormalisingJSPL THANE Normalising

STOCKYARD FARIDABAD, NormalisingJSPL THANE Normalising

INDUSTRIAL METALS, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, Normalising

JSPL THANE NormalisingJSPL RAMGARH Normalising

KARBON STEELMART PRIVATE LIMITED, NormalisingJSPL RAMGARH Normalising

CHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, Normalising

STOCKYARD BHOPAL, Normalising

Page 66: Process Report for Mechanical Engineering

STOCKYARD BHOPAL, NormalisingSTOCKYARD BHOPAL, Normalising

CHENAB BRIDGE PROJECT UNDERTAKING, NormalisingBILFAL HEAVY INDUSTRIES LIMITED Normalising

CHENAB BRIDGE PROJECT UNDERTAKING, NormalisingSTOCKYARD FARIDABAD NormalisingSTOCKYARD FARIDABAD Normalising

CHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, Normalising

L&T HYDROCARBON ENGINEERING LIMITED NormalisingTHYSSENKRUPP INDUSTRIES INDIA PVT L Normalising

JSPL THANE NormalisingAMARDEEP STEEL CENTRE NormalisingSTOCKYARD AHMEDABAD, Normalising

THYSSENKRUPP INDUSTRIES INDIA PVT L NormalisingTHYSSENKRUPP INDUSTRIES INDIA PVT L NormalisingTHYSSENKRUPP INDUSTRIES INDIA PVT L NormalisingTHYSSENKRUPP INDUSTRIES INDIA PVT L Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

CHENAB BRIDGE PROJECT UNDERTAKING, NormalisingSTOCKYARD AHMEDABAD, Normalising

JSPL THANE NormalisingSTOCKYARD AHMEDABAD, Normalising

CHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

JSPL THANE NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

INDUSTRIAL METALS, NormalisingBILFAL HEAVY INDUSTRIES LIMITED Normalising

STK THANE Normalising

Page 67: Process Report for Mechanical Engineering

STK THANE NormalisingINDUSTRIAL METALS, Normalising

STOCKYARD AHMEDABAD, NormalisingJINDAL STEEL & POWER LIMITED, Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

OM METALS HARDENINGOM METALS HARDENINGOM METALS HARDENINGOM METALS HARDENINGOM METALS HARDENINGOM METALS HARDENINGOM METALS HARDENINGOM METALS HARDENINGOM METALS HARDENING

CHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, Normalising

Page 68: Process Report for Mechanical Engineering

CHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

STOCKYARD BHOPAL, NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

STK AHMEDABAD NormalisingSTK AHMEDABAD NormalisingSTK FARIDABAD Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

CHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, Normalising

DM SONS NormalisingDM SONS Normalising

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

Page 69: Process Report for Mechanical Engineering

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, NormalisingCHENAB BRIDGE PROJECT UNDERTAKING, Normalising

DM SONS METAL PVT LTD, NormalisingSTOCKYARD CHENNAI, NormalisingSTOCKYARD CHENNAI, NormalisingSTOCKYARD CHENNAI, NormalisingSTOCKYARD CHENNAI, NormalisingSTOCKYARD CHENNAI, NormalisingSTOCKYARD CHENNAI, NormalisingSTOCKYARD CHENNAI, NormalisingSTOCKYARD BHOPAL, Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

STK AHMEDABAD NormalisingSTK AHMEDABAD NormalisingSTK AHMEDABAD NormalisingSTK AHMEDABAD Normalising

Page 70: Process Report for Mechanical Engineering

CHENAB BRIDGE PROJECT UNDERTAKING, NormalisingSUDHIR BROTHERS, NormalisingSUDHIR BROTHERS, NormalisingSUDHIR BROTHERS, NormalisingSUDHIR BROTHERS, NormalisingSUDHIR BROTHERS, NormalisingSUDHIR BROTHERS, Normalising

INDUSTRIAL METALS, NormalisingL&T HYDROCARBON ENGINEERING LIMITED Normalising

STOCKYARD CHENNAI NormalisingSTOCKYARD CHENNAI NormalisingSTOCKYARD CHENNAI Normalising

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

BILFAL HEAVY INDUSTRIES LIMITED NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

JSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL THANE Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

JSPL THANE Normalising

Page 71: Process Report for Mechanical Engineering

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

LARSEN & TOUBRO LIMITED, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

JSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR Normalising

LEXUS TRADELINK PRIVATE LIMITED, NormalisingLEXUS TRADELINK PRIVATE LIMITED, NormalisingBILFAL HEAVY INDUSTRIES LIMITED Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

JSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR Normalising

Page 72: Process Report for Mechanical Engineering

JSPL JAIPUR NormalisingJSPL JAIPUR Normalising

MARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

MARITIME INDUSTRIAL SERVICES ARABIA NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

STOCKYARD CHENNAI, NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

Page 73: Process Report for Mechanical Engineering

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL JAIPUR NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL JAIPUR NormalisingJSPL JAIPUR Normalising

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA Normalising

Page 74: Process Report for Mechanical Engineering

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

JINDAL STEEL & POWER LIMITED, NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

MARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA Normalising

STK CHENNAI NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingMARITIME INDUSTRIAL SERVICES ARABIA Normalising

MARITIME INDUSTRIAL SERVICES ARABIA NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL RAIPUR Normalising

LARSEN & TOUBRO LIMITED, NormalisingLARSEN & TOUBRO LIMITED, NormalisingLARSEN & TOUBRO LIMITED, NormalisingLARSEN & TOUBRO LIMITED, NormalisingLARSEN & TOUBRO LIMITED, NormalisingLARSEN & TOUBRO LIMITED, NormalisingLARSEN & TOUBRO LIMITED, NormalisingLARSEN & TOUBRO LIMITED, NormalisingLARSEN & TOUBRO LIMITED, Normalising

JSPL THANE NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

Page 75: Process Report for Mechanical Engineering

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

LARSEN & TOUBRO LIMITED, NormalisingL&T HYDROCARBON ENGINEERING LIMITED Normalising

JSPL,THANE NormalisingJSPL,THANE NormalisingJSPL,THANE NormalisingJSPL,THANE NormalisingJSPL,THANE NormalisingJSPL,THANE NormalisingJSPL,THANE NormalisingJSPL,THANE NormalisingJSPL,THANE NormalisingJSPL,THANE NormalisingJSPL,THANE NormalisingJSPL,THANE NormalisingJSPL,THANE NormalisingJSPL,THANE Normalising

MARITIME INDUSTRIAL SERVICES ARABIA NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

MARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

Page 76: Process Report for Mechanical Engineering

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

INDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, Normalising

JSPL THANE NormalisingJSPL THANE Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

JSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

STOCKYARD AHMEDABAD, NormalisingSTOCKYARD CHENNAI, Normalising

JSPL THANE NormalisingSTOCKYARD CHENNAI, Normalising

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

JSPL JAIPUR NormalisingJSPL JAIPUR NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

BILFAL HEAVY INDUSTRIES LIMITED NormalisingJSPL THANE Normalising

MADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD Normalising

Page 77: Process Report for Mechanical Engineering

MADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD Normalising

Page 78: Process Report for Mechanical Engineering

MADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingSTOCKYARD AHMEDABAD, NormalisingSTOCKYARD AHMEDABAD, Normalising

JSPL THANE NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

MADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD NormalisingMADHUVAN IRON PVT LTD Normalising

STOCKYARD CHENNAI, NormalisingJSPL THANE Normalising

GODREJ & BOYCE MFG INDUSTRIES LIMIT NormalisingGODREJ & BOYCE MFG INDUSTRIES LIMIT Normalising

JSPL THANE NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, NormalisingSTOCKYARD FARIDABAD, Normalising

VR GLOBAL NormalisingVR GLOBAL Normalising

Page 79: Process Report for Mechanical Engineering

STK FARIDABAD NormalisingSTK AHMEDABAD NormalisingSTK AHMEDABAD NormalisingSTK AHMEDABAD NormalisingSTK AHMEDABAD NormalisingSTK AHMEDABAD NormalisingSTK AHMEDABAD NormalisingSTK AHMEDABAD Normalising

MARITIME INDUSTRIAL SERVICES ARABIA NormalisingINDUSTRIAL METALS, NormalisingINDUSTRIAL METALS, Normalising

MARITIME INDUSTRIAL SERVICES ARABIA NormalisingMARITIME INDUSTRIAL SERVICES ARABIA Normalising

PRESSURE VESSELS (INDIA) NormalisingPRESSURE VESSELS (INDIA) NormalisingPRESSURE VESSELS (INDIA) NormalisingPRESSURE VESSELS (INDIA) NormalisingPRESSURE VESSELS (INDIA) NormalisingPRESSURE VESSELS (INDIA) NormalisingPRESSURE VESSELS (INDIA) NormalisingPRESSURE VESSELS (INDIA) NormalisingPRESSURE VESSELS (INDIA) NormalisingPRESSURE VESSELS (INDIA) NormalisingPRESSURE VESSELS (INDIA) NormalisingPRESSURE VESSELS (INDIA) NormalisingPRESSURE VESSELS (INDIA) Normalising

BHARAT STEELS, NormalisingBHARAT STEELS, NormalisingBHARAT STEELS, NormalisingBHARAT STEELS, NormalisingBHARAT STEELS, NormalisingBHARAT STEELS, NormalisingBHARAT STEELS, NormalisingBHARAT STEELS, NormalisingBHARAT STEELS, NormalisingBHARAT STEELS, NormalisingBHARAT STEELS, NormalisingBHARAT STEELS, Normalising

TOSHIBA JSW POWER SYSTEMS PRIVATE NormalisingTOSHIBA JSW POWER SYSTEMS PRIVATE NormalisingTOSHIBA JSW POWER SYSTEMS PRIVATE Normalising

THERMAX LIMITED, NormalisingTHERMAX LIMITED, NormalisingTHERMAX LIMITED, NormalisingTHERMAX LIMITED, NormalisingTHERMAX LIMITED, NormalisingTHERMAX LIMITED, NormalisingTHERMAX LIMITED, Normalising

Page 80: Process Report for Mechanical Engineering

THERMAX LIMITED, NormalisingTHERMAX LIMITED, NormalisingTHERMAX LIMITED, NormalisingTHERMAX LIMITED, NormalisingTHERMAX LIMITED, Normalising

JSPL THANE NormalisingINDUSTRIAL METALS, Normalising

L&T HYDROCARBON ENGINEERING LIMITED NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE NormalisingJSPL THANE Normalising

Page 81: Process Report for Mechanical Engineering
Page 82: Process Report for Mechanical Engineering

Remarks

Page 83: Process Report for Mechanical Engineering

Confirmation pending in SAP as it is showing in WIPConfirmation pending in SAP as it is showing in WIPConfirmation pending in SAP as it is showing in WIP

Confirmation pending in SAP as it is showing in WIP

Confirmation pending in SAP as it is showing in WIPConfirmation pending in SAP as it is showing in WIPConfirmation pending in SAP as it is showing in WIPConfirmation pending in SAP as it is showing in WIP

Page 84: Process Report for Mechanical Engineering

. HEAT TREATMENT FURNACE (TF FURNACE )DPR REP0RT MARCH-2015SR. No Date SHIFT ENGG Shift Plate ID PLATE DIMENSI0N

21 3/12/2015 JASWANT/ASHUTOSH B A5011202A0 20 240029 3/12/2015 JASWANT/ASHUTOSH B A5011202B0 20 240025 3/12/2015 JASWANT/ASHUTOSH B A5011202D0 20 240024 3/12/2015 JASWANT/ASHUTOSH B A5011203A0 20 240032 3/12/2015 JASWANT/ASHUTOSH B A5011203B0 20 240045 3/12/2015 JASWANT/ASHUTOSH B A5011203D0 20 240081 3/12/2015 SHIV C A5011204A0 20 240020 3/12/2015 JASWANT/ASHUTOSH B A5011204B0 20 240038 3/12/2015 JASWANT/ASHUTOSH B A5011204D0 20 240030 3/12/2015 JASWANT/ASHUTOSH B A5011205A0 18 240019 3/12/2015 JASWANT/ASHUTOSH B A5011205B0 18 240062 3/12/2015 SHIV C A5011205D0 18 240095 3/13/2015 GOPAL/PRAKASH A A5011205EO 18 240041 3/12/2015 JASWANT/ASHUTOSH B A5011206A0 18 240028 3/12/2015 JASWANT/ASHUTOSH B A5011206D0 18 240096 3/13/2015 GOPAL/PRAKASH A A5011206DO 18 240031 3/12/2015 JASWANT/ASHUTOSH B A5011206E0 18 240015 3/12/2015 GOPAL/ABHISHEK A A5011207B0 16 240084 3/13/2015 GOPAL/PRAKASH A A5011208B0 16 250017 3/12/2015 JASWANT/ASHUTOSH B A5011209A0 16 240086 3/13/2015 GOPAL/PRAKASH A A5011209B0 16 2500

101 3/13/2015 GOPAL/PRAKASH A A5011209BO 16 240082 3/12/2015 SHIV C A5011209E0 16 250079 3/12/2015 SHIV C A5011210D0 16 250035 3/12/2015 JASWANT/ASHUTOSH B A5011210E0 16 240012 3/12/2015 GOPAL/ABHISHEK A A5011211D0 15 240013 3/12/2015 GOPAL/ABHISHEK A A5011211F0 15 2400

100 3/13/2015 GOPAL/PRAKASH A A5011212BO 15 240037 3/12/2015 JASWANT/ASHUTOSH B A5011212D0 15 240014 3/12/2015 GOPAL/ABHISHEK A A5011212E0 15 240018 3/12/2015 JASWANT/ASHUTOSH B A5011212F0 15 240058 3/12/2015 SHIV C A5011213A0 13 240050 3/12/2015 SHIV C A5011213B0 13 240054 3/12/2015 SHIV C A5011213D0 13 240099 3/13/2015 GOPAL/PRAKASH A A5011213EO 13 240044 3/12/2015 JASWANT/ASHUTOSH B A5011213F0 13 240097 3/13/2015 GOPAL/PRAKASH A A5011213G0 13 240092 3/13/2015 GOPAL/PRAKASH A A5011214AO 13 240052 3/12/2015 SHIV C A5011214B0 13 240053 3/12/2015 SHIV C A5011214D0 13 240098 3/13/2015 GOPAL/PRAKASH A A5011214EO 13 240046 3/12/2015 JASWANT/ASHUTOSH B A5011214F0 13 240048 3/12/2015 SHIV C A5011214G0 13 240055 3/12/2015 SHIV C A5011215A0 12 2400

102 3/13/2015 GOPAL/PRAKASH A A5011215BO 12 240016 3/12/2015 JASWANT/ASHUTOSH B A5011215D0 12 2400

Page 85: Process Report for Mechanical Engineering

47 3/12/2015 JASWANT/ASHUTOSH B A5011215F0 12 240088 3/13/2015 GOPAL/PRAKASH A A5011215G0 12 240093 3/13/2015 GOPAL/PRAKASH A A5011216AO 12 240057 3/12/2015 SHIV C A5011216B0 12 240078 3/12/2015 SHIV C A5011216D0 12 240042 3/12/2015 JASWANT/ASHUTOSH B A5011216E0 12 240049 3/12/2015 SHIV C A5011216F0 12 240056 3/12/2015 SHIV C A5011217A0 12 240089 3/13/2015 GOPAL/PRAKASH A A5011217B0 12 240094 3/13/2015 GOPAL/PRAKASH A A5011217DO 12 240059 3/12/2015 SHIV C A5011217E0 12 240060 3/12/2015 SHIV C A5011218A0 12 240075 3/12/2015 SHIV C A5011218B0 12 240051 3/12/2015 SHIV C A5011218D0 12 240027 3/12/2015 JASWANT/ASHUTOSH B A5011218E0 12 240043 3/12/2015 JASWANT/ASHUTOSH B A5011218F0 12 240091 3/13/2015 GOPAL/PRAKASH A A5011219A0 12 240022 3/12/2015 JASWANT/ASHUTOSH B A5011219B0 12 240026 3/12/2015 JASWANT/ASHUTOSH B A5011219D0 12 240023 3/12/2015 JASWANT/ASHUTOSH B A5011219E0 12 240090 3/13/2015 GOPAL/PRAKASH A A5011220A0 12 240063 3/12/2015 SHIV C A5011220B0 12 240039 3/12/2015 JASWANT/ASHUTOSH B A5011220D0 12 240040 3/12/2015 JASWANT/ASHUTOSH B A5011220E0 12 240077 3/12/2015 SHIV C A5011221A0 12 240066 3/12/2015 SHIV C A5011221B0 12 240064 3/12/2015 SHIV C A5011221D0 12 240067 3/12/2015 SHIV C A5011221E0 12 240065 3/12/2015 SHIV C A5011221F0 12 240085 3/13/2015 GOPAL/PRAKASH A A5011222BO 10 250036 3/12/2015 JASWANT/ASHUTOSH B A5011222D0 10 240072 3/12/2015 SHIV C A5011222G0 10 240061 3/12/2015 SHIV C A5011223A0 10 240076 3/12/2015 SHIV C A5011223B0 10 240087 3/13/2015 GOPAL/PRAKASH A A5011223F0 10 240073 3/12/2015 SHIV C A5011223E0 10 240070 3/12/2015 SHIV C A5011223G0 10 240074 3/12/2015 SHIV C A5011224A0 10 240033 3/12/2015 JASWANT/ASHUTOSH B A5011224E0 10 240083 3/12/2015 SHIV C A5011224F0 10 250071 3/12/2015 SHIV C A5011225A0 10 240068 3/12/2015 SHIV C A5011225E0 10 240069 3/12/2015 SHIV C A5011225F0 10 240080 3/12/2015 SHIV C A5011226F0 10 250034 3/12/2015 JASWANT/ASHUTOSH B A5011226G0 10 2400

Page 86: Process Report for Mechanical Engineering
Page 87: Process Report for Mechanical Engineering
Page 88: Process Report for Mechanical Engineering

HEAT TREATMENT FURNACE (TF FURNACE )DPR REP0RT MARCH-2015 PLATE DIMENSI0N Grade Weight CUMULATIVE Customer

6000 EN19 2.26 70.250 INDO CHAIN6000 EN19 2.26 72.513 INDO CHAIN6000 EN19 2.26 74.777 INDO CHAIN6000 EN19 2.26 77.041 INDO CHAIN6000 EN19 2.26 79.304 INDO CHAIN6000 EN19 2.26 81.568 INDO CHAIN6000 EN19 2.26 83.832 INDO CHAIN6000 EN19 2.26 86.095 INDO CHAIN6000 EN19 2.26 88.359 INDO CHAIN6000 EN19 2.04 90.396 INDO CHAIN6000 EN19 2.04 92.434 INDO CHAIN6000 EN19 2.04 94.471 INDO CHAIN6000 EN19 2.04 96.508 INDO CHAIN6000 EN19 2.04 98.546 INDO CHAIN6000 EN19 2.04 100.583 INDO CHAIN6000 EN19 2.04 102.620 INDO CHAIN6000 EN19 2.04 104.657 INDO CHAIN6000 EN19 1.81 106.468 INDO CHAIN6000 EN19 1.89 108.355 INDO CHAIN6000 EN19 1.81 110.166 INDO CHAIN6000 EN19 1.89 112.052 INDO CHAIN6000 EN19 1.81 113.863 INDO CHAIN6000 EN19 1.89 115.750 INDO CHAIN6000 EN19 1.89 117.636 INDO CHAIN6000 EN19 1.81 119.447 INDO CHAIN6000 EN19 1.70 121.145 INDO CHAIN6000 EN19 1.70 122.842 INDO CHAIN6000 EN19 1.70 124.540 INDO CHAIN6000 EN19 1.70 126.238 INDO CHAIN6000 EN19 1.70 127.936 INDO CHAIN6000 EN19 1.70 129.633 INDO CHAIN6000 EN19 1.47 131.105 INDO CHAIN6000 EN19 1.47 132.576 INDO CHAIN6000 EN19 1.47 134.048 INDO CHAIN6000 EN19 1.47 135.519 INDO CHAIN6000 EN19 1.47 136.990 INDO CHAIN6000 EN19 1.47 138.462 INDO CHAIN6000 EN19 1.47 139.933 INDO CHAIN6000 EN19 1.47 141.405 INDO CHAIN6000 EN19 1.47 142.876 INDO CHAIN6000 EN19 1.47 144.347 INDO CHAIN6000 EN19 1.47 145.819 INDO CHAIN6000 EN19 1.47 147.290 INDO CHAIN6000 EN19 1.36 148.648 INDO CHAIN6000 EN19 1.36 150.007 INDO CHAIN6000 EN19 1.36 151.365 INDO CHAIN

Page 89: Process Report for Mechanical Engineering

6000 EN19 1.36 152.723 INDO CHAIN6000 EN19 1.36 154.081 INDO CHAIN6000 EN19 1.36 155.439 INDO CHAIN6000 EN19 1.36 156.798 INDO CHAIN6000 EN19 1.36 158.156 INDO CHAIN6000 EN19 1.36 159.514 INDO CHAIN6000 EN19 1.36 160.872 INDO CHAIN6000 EN19 1.36 162.230 INDO CHAIN6000 EN19 1.36 163.589 INDO CHAIN6000 EN19 1.36 164.947 INDO CHAIN6000 EN19 1.36 166.305 INDO CHAIN6000 EN19 1.36 167.663 INDO CHAIN6000 EN19 1.36 169.021 INDO CHAIN6000 EN19 1.36 170.380 INDO CHAIN6000 EN19 1.36 171.738 INDO CHAIN6000 EN19 1.36 173.096 INDO CHAIN6000 EN19 1.36 174.454 INDO CHAIN6000 EN19 1.36 175.812 INDO CHAIN6000 EN19 1.36 177.171 INDO CHAIN6000 EN19 1.36 178.529 INDO CHAIN6000 EN19 1.36 179.887 INDO CHAIN6000 EN19 1.36 181.245 INDO CHAIN6000 EN19 1.36 182.604 INDO CHAIN6000 EN19 1.36 183.962 INDO CHAIN6000 EN19 1.36 185.320 INDO CHAIN6000 EN19 1.36 186.678 INDO CHAIN6000 EN19 1.36 188.036 INDO CHAIN6000 EN19 1.36 189.395 INDO CHAIN6000 EN19 1.36 190.753 INDO CHAIN6000 EN19 1.18 191.932 INDO CHAIN6000 EN19 1.13 193.064 INDO CHAIN6000 EN19 1.13 194.195 INDO CHAIN6000 EN19 1.13 195.327 INDO CHAIN6000 EN19 1.13 196.459 INDO CHAIN6000 EN19 1.13 197.591 INDO CHAIN6000 EN19 1.13 198.723 INDO CHAIN6000 EN19 1.13 199.855 INDO CHAIN6000 EN19 1.13 200.986 INDO CHAIN6000 EN19 1.13 202.118 INDO CHAIN6000 EN19 1.18 203.297 INDO CHAIN6000 EN19 1.13 204.429 INDO CHAIN6000 EN19 1.13 205.561 INDO CHAIN6000 EN19 1.13 206.693 INDO CHAIN6000 EN19 1.18 207.872 INDO CHAIN6000 EN19 1.13 209.004 INDO CHAIN

Page 90: Process Report for Mechanical Engineering
Page 91: Process Report for Mechanical Engineering
Page 92: Process Report for Mechanical Engineering

HEAT TREATMENT FURNACE (TF FURNACE )DPR REP0RT MARCH-2015Process

SOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALING

Page 93: Process Report for Mechanical Engineering

SOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALINGSOFT ANNEALING

Page 94: Process Report for Mechanical Engineering
Page 95: Process Report for Mechanical Engineering
Page 96: Process Report for Mechanical Engineering

A5051004B0 8 2900 10650A5051003D0 8 2900 10650A5051006A0 8 2900 10650A5051004D0 8 2900 10650A5051002A0 8 2900 10650A5051003A0 8 2900 10650A5051002B0 8 2900 10650A5051002D0 8 2900 10650A5051006D0 8 2900 10650