Upload
manuel-suarez
View
119
Download
2
Embed Size (px)
DESCRIPTION
PROFESSIONAL CAREER RESUME
Citation preview
MANUEL SUAREZ
INGENIERO INDUSTRIAL
(MEng INDUSTRIAL ENGINEER)
PROFESSIONAL CAREER RESUME
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER RESUME
2
Contents
INTRODUCTION ................................................................................................................. 3
INGENIERO INDUSTRIAL ............................................................................................... 3
INGENIERO INDUSTRIAL STUDIES .............................................................................. 4
MAIN QUALIFICATIONS ..................................................................................................... 5
TRAINING ............................................................................................................................ 5
MAIN WORK EXPERIENCE ................................................................................................ 6
WORK EXPERIENCE DETAILS ...................................................................................... 6
Project Manager ........................................................................................................... 6
MEP Engineer (Building Services Engineer) ................................................................ 6
Health & Safety Engineer ............................................................................................. 7
PROJECT MANAGER ACTIVITIES..................................................................................... 8
MEP ENGINEER ACTIVITIES ........................................................................................... 24
HEALTH & SAFETY ENGINEER ACTIVITIES .................................................................. 39
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER RESUME
3
INTRODUCTION
INGENIERO INDUSTRIAL
Ingeniero Industrial is a six year degree largely multidisciplinary, with an important
theoretical basis and a strong structural, mechanical and electrical background, as well as
an industrial organisation specialization.
The main tasks carried out by an Ingeniero Industrial (Industrial Engineer) can be:
Industrial Organisation
Residential and Civil Constructions
Energy management
Industrial Maintenance
Environmental, Health and Safety management
Electrical, thermal and hydraulic installations
Gas and Compressed air installations
Quality management
Waste management
Expert appraisals, evaluations and reports
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
4
INGENIERO INDUSTRIAL STUDIES
Subject Name Terms
Credits
Theoretical Practical Total
FIR
ST
CO
UR
SE
LINEAR ALGEBRA Annual 9 6 15 CALCULUS I Annual 12 6 18 PHYSICS I Annual 12 6 18
TECHNICAL DRAWING I Annual 6 6 12 CHEMISTRY I Annual 9 3 12
SE
CO
ND
CO
UR
SE
CALCULUS II Annual 9 3 12 DIFFERENTIAL EQUATIONS Annual 9 3 12
CHEMISTRY II Annual 9 6 15 THERMODYNAMICS Annual 7,50 4,50 12
TECHNICAL DRAWING II Annual 4 5 9 MECHANICS Annual 9 6 15
TH
IRD
CO
UR
SE
STATISTICS I Annual 6 6 12 PHYSICS II Annual 9 3 12
STRUCTURAL ANALYSIS Annual 7 8 15 ELECTROTECNIA Annual 9 6 15 METALOTECNIA Annual 4,50 4,50 9
FLUID MECHANICS Annual 3 6 9 COMPUTER PROGRAMMING Annual 6 3 9
TECHNICAL ENGLISH Annual 9 0 9
1credit = 10 hours of teaching or learning
Subject Name Terms
Credits
Theoretical Practical Total
FO
UR
TH
CO
UR
SE
MICROECONOMICS Annual 6 6 12 INDUSTRIAL ORGANIZATION I Annual 6 6 12
MACROECONOMICS Annual 12 0 12 ELECTRONICS Annual 9 6 15
MATHEMATICAL METHODS Annual 7,50 1,50 9 MATERIALS ENGINEERING Annual 4,50 4,50 9 INDUSTRIAL HEAT&COLD Annual 4,50 4,50 9
FIF
TH
CO
UR
SE
INDUSTRIAL ORGANIZATION II Annual 4,50 4,50 9 PRODUCTION MANAGEMENT I Annual 4,50 4,50 9 BUSINESS ADMINISTRATION I Annual 3 3 6
HUMAN RESOURCES ORGANIZATION Annual 4,50 4,50 9 AUTOMATION Annual 6 3 9
MECHANICAL TECHNOLOGY Annual 6 6 12 STATISTICS II Annual 5 1 6
ENVIRONMENTAL ENGINEERING Annual 4,50 1,50 6 ELECTRICAL MACHINES Annual 4,50 4,50 9
SIX
TH
CO
UR
SE
ACCOUNTANCY & FINANCE Annual 6 3 9 PRODUCTION MANAGEMENT II Annual 6 6 12
MARKETING Annual 3 3 6 BUSINESS ADMINISTRATION II Annual 4,50 4,50 9
LOGISTICS Annual 4,50 4,50 9 HYDRAULIC MACHINES Annual 3 6 9
PROJECT DEVELOPMENT Annual 3 6 9 INDUSTRIAL CONSTRUCTION AND ARCHITECTURE Annual 6 3 9
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER RESUME
5
MAIN QUALIFICATIONS
MSc Project Management The Robert Gordon University (2011-2012, Scotland)
http://www.rgu.ac.uk/
Ingeniero Industrial (Industrial Engineer) Universidad de Oviedo (1994-2000, Spain)
www.epsig.uniovi.es
Master en Prevencion de Riesgos Laborales (Master in Health&Safety) EAGE (2001-2002, Spain)
This Degree is the Spanish equivalent to a NEBOSH Diploma. It covers subjects such
as: Construction health & safety plans, health and safety European regulations,
emergency planning, Risks assessments, safe work practices, etc.
TRAINING
CAD Training Course
(CETS, 1999-2000; 400 hours).
Environmental Impact Assessment Course
(Asturias Business School, 2002; 62 hours).
Surveying Training Course
(FLC, 2004; 70 hours).
Geographic Information Systems Course
(FLC, 2005; 50 hours).
ISO Quality and Standards Course
(SN, 2006; 50 hours).
Structural Analysis CYPECAD Course
(FLC, 2007; 65 hours).
Structural Analysis Metal 3D Course
(FEMETAL, 2007; 70 hours).
Energetic Efficiency for Buildings Course
(INESEM, 2008; 300 hours).
Renewable Energy for Buildings Course
(FEMETAL, 2009; 420 hours)
Project Management Expert Course
(Elogos, 2010; 260 hours)
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER RESUME
6
Waste Management Course
(Elogos, 2011; 250 hours)
MAIN WORK EXPERIENCE
PROJECT MANAGER
MECHANICAL, ELECTRICAL AND PLUMBING ENGINEER (MEP ENGINEER)
HEALTH & SAFETY ENGINEER
WORK EXPERIENCE DETAILS
Project Manager
The main tasks involved within this position included the following matters:
Create and execute project work plans and revise as appropriate to meet changing
needs and requirements.
Managing the partnering contracts with contractors and material suppliers.
Identify resources needed and assign individual responsibilities.
Manage day-to-day operational aspects of a project and scope.
Prepare for engagement reviews and quality assurance procedures.
Track and report team hours and expenses on a weekly basis.
Determine appropriate revenue recognition, ensure timely and accurate invoicing, and
monitor receivables for project.
Follow up with clients, when necessary, regarding unpaid invoices.
Analyze project profitability, revenue, margins, bill rates and utilization.
MEP Engineer (Building Services Engineer)
The main tasks involved within this position included the design and execution supervision
for electrical, mechanical, plumbing and fire protection installations for residential,
commercial and industrial buildings.
Mechanical:
Heating, Ventilation, and HVAC systems
Piped heating and cooling water generation and distribution systems
Wastewater pumping systems
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER RESUME
7
Electrical:
Electric Power Distribution Systems
Lighting Systems
Fire alarm systems
Lightning-protection systems
Plumbing:
Compressed air systems
Fire protection systems
Natural gas piping systems
Potable cold and hot tap water supply systems
Drainage systems
Health & Safety Engineer
The main tasks involved within this position included the following matters:
Provide guidance & technical expertise to ensure compliance with environmental,
health, and safety regulations and EU Directives
Development of Construction H&S Plans
Changes updating and enlargements of the Construction H&S Plan
Document Control
Risks Assessments
Execution Supervision according to the Construction H&S Plan.
Global Coordination of the different parts involved in the Project.
Periodic Meetings and Reports
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER RESUME
8
PROJECT MANAGER ACTIVITIES
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
9
CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 41 FLATS, AND UNDERGROUND PARKING FOR 45 CAR PLACES (ARRIONDAS-SPAIN)
CLIENT: DICAR SCOPE OF THE WORK: Concrete Structure Construction POSITION: Project Manager COMPLETION PERIOD: March 2008 – December 2008 KEY INFORMATION: 5,700 m2 built up area INVESTMENT BUDGET: € 576,880.00 LOCATION: Arriondas, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
10
CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 48 FLATS AND UNDERGROUND PARKING FOR 52 CAR PLACES (MIERES-SPAIN)
CLIENT: ALVAREZ Y CUERVO SCOPE OF THE WORK: Concrete Structure Construction POSITION: Project Manager COMPLETION PERIOD: April 2008 – December 2008 KEY INFORMATION: 8.600 m2 built up area. INVESTMENT BUDGET: € 712,546.25 LOCATION: Mieres, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
11
CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 52 FLATS AND UNDERGROUND PARKING FOR 54 CAR PLACES (VILLAVICIOSA-SPAIN)
CLIENT: Asturcontinental de Edificacion SCOPE OF THE WORK: Concrete Structure Construction POSITION: Project Manager COMPLETION PERIOD: May 2007 – March 2008 KEY INFORMATION: 8.200 m2 built up area. INVESTMENT BUDGET: € 834,145.21 LOCATION: Villaviciosa, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
12
CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 68 FLATS, AND UNDERGROUND PARKING FOR 70 CAR PLACES (SIERO-SPAIN)
CLIENT: IROCA SCOPE OF THE WORK: Concrete Structure Construction POSITION: Project Manager COMPLETION PERIOD: January 2008 – October 2008 KEY INFORMATION: 11,900 m2 built up area INVESTMENT BUDGET: € 892,110.20 LOCATION: Pola de Siero, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
13
CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 40 FLATS AND UNDERGROUND PARKING FOR 52 CAR PLACES (OVIEDO-SPAIN)
CLIENT: EDIMARCA SCOPE OF THE WORK: Concrete Structure Construction POSITION: Project Manager COMPLETION PERIOD: September 2007 – June 2008 KEY INFORMATION: 5,700 m2 built up area INVESTMENT BUDGET: € 876,580.00 LOCATION: Oviedo, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
14
CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 35 FLATS AND UNDERGROUND PARKING FOR 40 CAR PLACES (GIJON-SPAIN)
CLIENT: GARMORE SCOPE OF THE WORKS: Concrete Structure Construction POSITION: Project Manager COMPLETION PERIOD: March 2007– December 2007 KEY INFORMATION: 5.900 m2 built up area INVESTMENT BUDGET: € 650,969.53 LOCATION: Gijón, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
15
CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 38 FLATS, AND UNDERGROUND PARKING FOR 40 CAR PLACES (MIERES - SPAIN)
CLIENT: Inmobiliaria ATTA SCOPE OF THE WORK: Concrete Structure Construction POSITION: Project Manager COMPLETION PERIOD: March 2007 – December 2007 KEY INFORMATION: 5,100 m2 built up area INVESTMENT BUDGET: € 561,200.00 LOCATION: Mieres, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
16
CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 36 FLATS AND UNDERGROUND PARKING FOR 40 CAR PLACES (GIJON - SPAIN)
CLIENT: Residencial Maya SCOPE OF THE WORK: Concrete Structure Construction POSITION: Project Manager COMPLETION PERIOD: February 2007 – October 2007 KEY INFORMATION: 4.200 m2 built up area INVESTMENT BUDGET: € 569,452.76 LOCATION: Gijón, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
17
CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 42 FLATS, AND UNDERGROUND PARKING FOR 50 CAR PLACES (CABAÑAQUINTA - SPAIN)
CLIENT: INYCO SCOPE OF THE WORK: Concrete Structure Construction POSITION: Project Manager COMPLETION PERIOD: March 2007 – January 2008 KEY INFORMATION: 8,900 m2 built up area INVESTMENT BUDGET: € 806,140.12 LOCATION: Cabañaquinta, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
18
CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 34 FLATS, AND UNDERGROUND PARKING FOR 38 CAR PLACES (CIAÑO – SPAIN)
CLIENT: INMOBILIARIA ATTA SCOPE OF THE WORK: Concrete Structure Construction POSITION: Project Manager COMPLETION PERIOD: January 2007 – August 2007 KEY INFORMATION: 4,300 m2 built up area INVESTMENT BUDGET: € 562,390.00 LOCATION: Ciaño, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
19
CONCRETE STRUCTURE FOR THE CONGRESS PALACE IN OVIEDO (OVIEDO – SPAIN)
CLIENT: FIAGA SCOPE OF THE WORK: Concrete Structure Construction POSITION: Project Manager COMPLETION PERIOD: January 2005 – December 2006 KEY INFORMATION: 59,700 m2 built up area INVESTMENT BUDGET: € 14.2 Mill. LOCATION: Oviedo, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
20
CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 38 FLATS, AND UNDERGROUND PARKING FOR 42 CAR PLACES (VILLAVICIOSA - SPAIN)
CLIENT: ASTURCONTINENTAL SCOPE OF THE WORK: Concrete Structure Construction POSITION: Project Manager COMPLETION PERIOD: May 2004 – February 2005 KEY INFORMATION: 5,100 m2 built up area INVESTMENT BUDGET: € 575,260.00 LOCATION: Villaviciosa, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
21
CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 14 FLATS AND UNDERGROUND PARKING (CANGAS DE ONIS - SPAIN)
CLIENT: COTO DE LOS FERRANES SCOPE OF THE WORKS: Concrete Structure Construction POSITION: Project Manager COMPLETION PERIOD: April 2004 – December 2004 KEY INFORMATION: 2,600 m2 built up area INVESTMENT BUDGET: € 315,781.64 LOCATION: Cangas de Onis, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
22
CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 30 FLATS, AND UNDERGROUND PARKING FOR 32 CAR PLACES (C. ONIS - SPAIN)
CLIENT: URBANIA EPRONOR SCOPE OF THE WORK: Concrete Structure Construction POSITION: Project Manager COMPLETION PERIOD: March 2004 – October 2004 KEY INFORMATION: 4,500 m2 built up area INVESTMENT BUDGET: € 486,750.24 LOCATION: Cangas de Onis, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
23
CONCRETE STRUCTURE IN RESIDENTIAL BUILDING FOR 32 FLATS, AND UNDERGROUND PARKING FOR 40 CAR PLACES (VILLAVICIOSA - SPAIN)
CLIENT: ASTURCONTINENTAL SCOPE OF THE WORKS: Concrete Structure Construction POSITION: Project Manager COMPLETION PERIOD: January 2004 – August 2004 KEY INFORMATION: 4,200 m2 built up area INVESTMENT BUDGET: € 462,580.00 LOCATION: Villaviciosa, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
24
MEP ENGINEER ACTIVITIES
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
25
FORTIM MINDELO RESORT. SAO VICENTE ISLAND CAPE VERDE
CLIENT: Cape Verde Development SCOPE OF THE WORK: Project and Construction Management POSITION: MEP Engineer COMPLETION PERIOD: December 2009 – July 2011 KEY INFORMATION: Hotel, casino and 74 residential units 5-star , 51 room hotel and resort to be managed by luxury operator Nikki Beach INVESTMENT BUDGET: € 31,000,000 LOCATION: Mindelo, Sao Vicente Island, Cape Verde
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
26
DRAFT IMPLEMENTATION FOR THE NEW PARKING/COMMERCIAL BUILDING IN LA SABINA PORT (FORMENTERA-SPAIN)
CLIENT: MARINA DE FORMENTERA SCOPE OF THE WORK: Project Design POSITION: MEP Engineer COMPLETION PERIOD: January 2011 – April 2011 KEY INFORMATION: 57,900 m2 built up area INVESTMENT BUDGET: € 7,2 Mill LOCATION: Formentera, Spain GENERAL INFORMATION: Design of new electrical, mechanical, plumbing and fire protection installations.
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
27
DRAFT IMPLEMENTATION FOR THE NEW INDUSTRIAL BUILDINGS FOR STORAGE AND DISTRIBUTION OF CEMENT IN THE PORT OF ALCUDIA (MALLORCA-SPAIN)
CLIENT: CIMENTS BALEARS SCOPE OF THE WORKS: Project Design POSITION: MEP Engineer COMPLETION PERIOD: March 2010 – December 2010 KEY INFORMATION: 9,900 m2 built up area. INVESTMENT BUDGET: € 8.6 Mill. LOCATION: Puerto de Alcudia, Spain GENERAL INFORMATION. Includes design for electrical, mechanical, plumbing and fire protection installations.
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
28
ENLARGEMENT OF THE SCHOOL OF SOLLER (MALLORCA-SPAIN) CLIENT: IBISEC SCOPE OF THE WORKS: Construction Management Project Design POSITION: MEP Engineer COMPLETION PERIOD: January 2010 – December 2010 KEY INFORMATION: 3,750 m2 built up area INVESTMENT BUDGET: € 1.2 Mill. LOCATION: Soller, Spain GENERAL INFORMATION: Design and execution supervision for the electrical, mechanical, plumbing and fire protection installations.
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
29
FACILITIES ASSESSMENT REPORT AT PALMA DE MALLORCA PORT CLIENT : APB (Porth Authority) SCOPE OF THE WORKS: Technical Consultancy POSITION: MEP Engineer COMPLETION PERIOD: Sept 2009 – June 2010 KEY INFORMATION: 11,000 m docks 4,000 m dykes INVESTMENT BUDGET: € 197,890 LOCATION: Palma de Mallorca
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
30
DRAFT IMPLEMENTATION FOR REFURBISHMENT AND ENLARGEMENT OF BUILDINGS AT IBIZA AIRPORT (IBIZA-SPAIN)
CLIENT: AENA SCOPE OF THE WORKS: Project Design POSITION: MEP Engineer COMPLETION PERIOD: March 2010 – November 2010 KEY INFORMATION: 1,200 m2 built up area INVESTMENT BUDGET: € 112,356.00 LOCATION: Ibiza, Spain GENERAL INFORMATION. Includes design of the electrical and heating installations.
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
31
DRAFT IMPLEMENTATION FOR REFURBISHMENT AND ENLARGEMENT OF THE PORT OF FORNELLS (MENORCA-SPAIN)
CLIENT: PORTS ILLES BALEARS SCOPE OF THE WORK: Project Design POSITION: MEP Engineer COMPLETION PERIOD: February 2010 – April 2010 INVESTMENT BUDGET: € 357,596.54 LOCATION: Puerto Fornells, Menorca, Spain GENERAL INFORMATION: Design of electrical, mechanical and plumbing installations.
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
32
DRAFT IMPLEMENTATION FOR CONSTRUCTION OF GOLDCAR RENTAL SERVICES AREA IN PALMA AIRPORT (MALLORCA-SPAIN)
CLIENT: GOLDCAR RENTAL SCOPE OF THE WORKS: Construction Management Project Design POSITION: MEP Engineer COMPLETION PERIOD: March 2009 – December 2009 KEY INFORMATION: 7,900 m2 built up area INVESTMENT BUDGET: €372,147.54 LOCATION: Palma de Mallorca, Spain. GENERAL INFORMATION: Design and execution supervision for the electrical, mechanical, plumbing and fire protection installations.
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
33
DRAFT IMPLEMENTATION FOR CONSTRUCTION OF TWO INDUSTRIAL BUILDINGS FOR CHEMICHAL PRODUCTS STORAGE (MALLORCA-SPAIN)
CLIENT: TIRME SCOPE OF THE WORKS: Project Design POSITION: MEP Engineer COMPLETION PERIOD: February 2009 – June 2009 KEY INFORMATION: 475 m2 built up area INVESTMENT BUDGET: € 576,200.00 LOCATION: Mallorca, Spain. GENERAL INFORMATION: Design of electrical, mechanical, plumbing and fire protection installations.
UNDERGROUND PARKING FOR 15 CAR PLACES
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
34
(MALLORCA-SPAIN) CLIENT: VENT DE PROA SCOPE OF THE WORKS: Construction Management Project Design POSITION: MEP Engineer COMPLETION PERIOD: January 2009 – July 2009 KEY INFORMATION: 1,300 m2 built up area INVESTMENT BUDGET: € 292,320.00 LOCATION: Cala San Vicente, Mallorca, Spain. GENERAL INFORMATION: Includes design and execution supervision for electrical, mechanical, plumbing and fire protection installations.
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
35
FIRE PROTECTION INSTALLATION FOR THE PORT OF FORNELLS CLIENT: PORTS ILLES BALEARS SCOPE OF THE WORKS: Project Design POSITION: MEP Engineer COMPLETION PERIOD: January 2009 – March 2009 INVESTMENT BUDGET: € 26,480.00 LOCATION: Puerto Fornells, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
36
GESA-ENDESA HEADQUARTERS – PHASE 2 PALMA DE MALLORCA
CLIENT : Endesa SCOPE OF THE WORKS: Construction Management POSITION MEP Engineer COMPLETION PERIOD: October 2008 – June 2009 KEY INFORMATION: Building 4: 1.089 m2. Building 5: 1.785 m2 Surface parking and urban area: 14.489 m2 INVESTMENT BUDGET: 4.2 Mill € LOCATION: Palma de Mallorca, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
37
DRAFT IMPLEMENTATION FOR REFURBISHMENT AND ENLARGEMENT OF INDUSTRIAL BUILDING FOR MECHANICAL CONSTRUCTIONS (SIERO - SPAIN)
CLIENT : ROTULA 2007 SCOPE OF THE WORK: Construction Management Project Design POSITION Project Manager/ MEP Engineer (Freelance) COMPLETION PERIOD: January 2008 – May 2008 KEY INFORMATION: 3,700 m2 built up area INVESTMENT BUDGET: € 188,263.71 LOCATION: Siero, Spain
ELECTRICAL PROJECT FOR THE ENLARGEMENT OF THE FERTIBERIA
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
38
PLANT IN AVILES (AVILES – SPAIN) CLIENT: FERTIBERIA SCOPE OF THE WORKS: Construction Management Project Design POSITION: MEP Engineer COMPLETION PERIOD: March 2007 – December 2007 KEY INFORMATION: 3,200 m2 built up area INVESTMENT BUDGET: € 415,962.18 LOCATION: Avilés, Spain GENERAL INFORMATION: Includes design and execution supervision for the electrical installation.
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
39
HEALTH & SAFETY ENGINEER ACTIVITIES
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
40
CONSTRUCTION HEALTH&SAFETY PLAN FOR A 36 FLATS RESIDENTIAL BUILDING AND UNDERGROUND PARKING FOR 40 CAR PLACES (OVIEDO-SPAIN)
CLIENT: HONA HOGAR Y NATURALEZA SCOPE OF THE WORKS: Construction H&S Plan Design POSITION: H&S Engineer (Freelance) COMPLETION PERIOD: February 2004 – April 2004 KEY INFORMATION: 4,100 m2 built up area LOCATION: Oviedo, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
41
CONSTRUCTION HEALTH&SAFETY PLAN FOR A 82 FLATS RESIDENTIAL BUILDING AND UNDERGROUND PARKING FOR 90 CAR PLACES (COLLOTO-SPAIN)
CLIENT: HONA HOGAR Y NATURALEZA SCOPE OF THE WORKS: Construction H&S Plan Design POSITION: H&S Engineer (Freelance) COMPLETION PERIOD: January 2004 – March 2004 KEY INFORMATION: 6,900 m2 built up area LOCATION: Colloto, Spain.
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
42
CONSTRUCTION HEALTH&SAFETY PLAN FOR A 110 FLATS RESIDENTIAL BUILDING AND UNDERGROUND PARKING FOR 120 CAR PLACES (LUANCO-SPAIN)
CLIENT: HONA HOGAR Y NATURALEZA SCOPE OF THE WORK: Construction H&S Plan Design POSITION: H&S Engineer (Freelance) COMPLETION PERIOD: March 2003 – May 2003 KEY INFORMATION: 8,800 m2 built up area LOCATION: Luanco, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
43
HEALTH & SAFETY CONSTRUCTION MANAGEMENT DURING THE CONSTRUCTION OF THE ALAS ALUMINIUM PLANT IN CIAÑO (CIAÑO – SPAIN)
CLIENT: ALAS ALUMINIUM SCOPE OF THE WORKS: Health & Safety Construction Management POSITION: Health & Safety Engineer COMPLETION PERIOD: January 2003 – December 2003 KEY INFORMATION: 9,500 m2 built up area INVESTMENT BUDGET: € 3.6 Mill. LOCATION: Ciaño, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
44
HEALTH & SAFETY CONSTRUCTION MANAGEMENT DURING THE CONSTRUCTION OF THE RAILFORJA PLANT IN GIJON (GIJON – SPAIN)
CLIENT: Railforja Asturiana SCOPE OF THE WORK: Health & Safety Construction Management POSITION: Health & Safety Engineer COMPLETION PERIOD: January 2003 – October 2003 KEY INFORMATION: 4,100 m2 built up area INVESTMENT BUDGET: € 1.3 Mill. LOCATION: Puerto del Musel, Gijon (Spain)
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
45
HEALTH & SAFETY CONSTRUCTION MANAGEMENT DURING THE ENLARGEMENT OF THE ARCELOR PLANT IN GIJON (GIJON – SPAIN)
CLIENT: ARCELOR-MITTAL SCOPE OF THE WORKS: Health & Safety Construction Management POSITION: Health & Safety Engineer COMPLETION PERIOD: February 2002 – November 2002 KEY INFORMATION: 1,900 m2 built up area INVESTMENT BUDGET: € 946,280.00 LOCATION: Gijón, Spain
MANUEL SUAREZ INDUSTRIAL ENGINEER
PROFESSIONAL CAREER
RESUME
46
RISK ASSESSMENT OF WORKING CONDITIONS FOR A MECHANICAL CONSTRUCTION INDUSTRY (CORVERA-SPAIN)
CLIENT: METUVISA SCOPE OF THE WORK: Health & Safety Assessment POSITION: Health & Safety Engineer (Freelance) COMPLETION PERIOD: March 2001 – June 2001 LOCATION: Corvera, Spain