fessional Project Management Service essional Project Management Service Bringing It All Together” Bringing It All Together” The Project Manager is responsible for the overall planning and installation of Qwest products and services. The Project Manager’s goal is to make a valued difference for the customer. Single Point of Contact Focal Point within Qwest Manage all Project Tasks and Resources Monitor Progress Provide a Clear Picture of Project Status

Professional Project Management Service “Bringing It All Together”

  • Upload
    velvet

  • View
    29

  • Download
    0

Embed Size (px)

DESCRIPTION

Professional Project Management Service “Bringing It All Together”. The Project Manager is responsible for the overall planning and installation of Qwest products and services. The Project Manager’s goal is to make a valued difference for the customer. Single Point of Contact - PowerPoint PPT Presentation

Citation preview

Page 1: Professional Project Management Service “Bringing It All Together”

Professional Project Management ServiceProfessional Project Management Service““Bringing It All Together”Bringing It All Together”

The Project Manager is responsible for the overall planning and installation of Qwest products and services.

The Project Manager’s goal is to make a valued difference for the customer.

Single Point of Contact

Focal Point within Qwest

Manage all Project Tasks and Resources

Monitor Progress

Provide a Clear Picture of Project Status

Page 2: Professional Project Management Service “Bringing It All Together”

SS7 Conversion

E9-1-1 Network Build Out

Wireless E9-1-1 Launch

North DakotaNorth DakotaAssociation of Counties ProjectAssociation of Counties Project

Page 3: Professional Project Management Service “Bringing It All Together”

SS7 Conversion

Install SS7 Software at Fargo and Bismarck Tandem Switching Centers

Redesign Approximately 260 Circuits for SS7 Operation (convert from MF Signaling)

Cutover and Test During Maintenance Window

Local Exchange Company (LEC) Qwest30% requiring component changes, scheduled for cut over in mid April

Independent Local Exchange Company (ILEC)

Competitive Local Exchange Carrier (CLEC)

Page 4: Professional Project Management Service “Bringing It All Together”

9-1-1

Wireless E9-1-1 Network

ESRK

PublicSafetyAnsweringPosition

Data Links. Data Connection from PSAP Controller to ALI data base ( 2 per PSAP).

Qwest9-1-1

SelectiveRouterCAMA Trunks.

Trunks assigned to a DS1 Facility.

ESRK + MIN

ESRK + Voice

Cell Site + MIN

ESRK

ALI

ESRK + Voice

EM Trunks. PSAP Voice Trunks.

LEGEND MSC - Mobile Switching CenterSCP - Service Control PointALI - Automatic Location IdentifierANI - Automatic Number IdentificationMIN - Mobile Identification NumberESRK - Routing ANI (AKA) pANI

IntradoALI Host

MSC

SCP

Call Sequence 1) Cell phone dials 9-1-12) MSC sends cell site,

sector, and MIN to SCP

3) SCP assigns an ESRK and sends to MSC

4) MSC sends voice and ESRK to Selective Router

5) Selective Router determines PSAP and sends ESRK and voice; at the same time, SCP delivers MIN, cell site, sector, and ESRK to ALI host

6) PSAP controller requests ALI bid with ESRK received from Selective Router

7) ALI record delivered to PSAP

Page 5: Professional Project Management Service “Bringing It All Together”

E9-1-1 Network Build Out

New Data15%

Current Data20%

New EM25%

Current EM 40%

Page 6: Professional Project Management Service “Bringing It All Together”

Wireless E9-1-1 Introduction

Cell Site Coverage Information Provided to Intrado (Wireless Carriers)

Phase I Location Information Display Determined (PSAP’s)

Routing Recommendations Made (PSAP’s)

Network Recommendations Made (Intrado)

MSC CAMA Trunk Service Orders Placed and Provisioned

E9-1-1 Database Created with Routing Instructions and “Shell” Records

Operational Testing and “Live” Call Handling