AAAS Engineering &Services
Address: M4 Al Hamd Plaza,Sargodha . Road Sheikhupura
Tel # 0092-3335-4229449 Fax # 0092-56-3031505
Cell # 0092-312-4073944 Email: [email protected]
[email protected] Website : www.aaasengineering.com
Profile
INDEX● Introduction
● Our aims and objectives
● Particulars of the Company
● List of Key Personals
● Services Offered
● Safety Policy
● List of Executed Project
● Pictorial View
● NTN Certificate
INTRODUCTION
● AAAS has been supplying to industrial a wide range of Engineering, Construction(Civil, Mechanical) and Maintenance Services. Our main target is to meet constantly growing demand of the construction and maintenance sector including Oil and gas field, storage facilities and refineries, Pipeline work, Plant piping, power generation, telecommunication sector, fertilizer industry, cement industry, sugar plants, textile industries, oil and edible industry motorways, dams, bridges, chemicals and petrochemical industries.
● AAAS works has been well recognized because of satisfactory completion of whatever task it was entrusted by our clients.
● As you know, nothing succeeds like success, which is being gradual achieved by AAAS with our earnest and dedicated Services
AAAS ESTABLISHED ITSELF IN THE FIELD OF:
Civil infrastructure construction. Mechanical Fabrication, Dismantling and erection. Surface preparation (Abrasive Blasting and other system) Painting (Airless and other system) coating and wrapping. Insulation and cladding, ducting and chiller works. Industrial shutdown jobs and maintenance contracts. Skilled manpower supply. Our emphasis is one employing the most competent staff from management to field operative level enabling us to fulfill a dual aim. Indeed, as each new day sets forth new tasks, for AAAS the challenge never is and never will be over.
● OUR AIMS & OBJECTIVES
● To provide services with quality to move towards our target and execution as per client specification.
● Our vision is to register ourselves in good books of valued client in Pakistan as well as in abroad.
AAAS
HONESTY
QUALITY
SAFETY
PRODUCTIVITY
PARTICULARS OF THE COMPANY● Name: AAAS Engineering & Services
● Year of Establishment : 2003
● Status of the Company: Individual
● Office Address: 2nd Floor, AFC Sheikhupura,Civil Quarters Rd,● Jinnah Park, Sheikhupura,Punjab,Pakistan
● Phone: 0092-335-4229449
● Fax: 0092-56-3031505
● Email: [email protected] [email protected]
● Website www.aaasengineering.com
LIST OF KEY PERSONALS Mr.Asif Shaheen CEO Message
AAAS Engineering & Services business model is evolving. We are enhancing our key internal operations to ensure a consistent and positive experience for our client, partners, and employees. The AAAS Engineering enables the delivery of world-class fabrication and erection services globally across our client’ operations.
We continue to operate in a number of core industries where our clear vision and strategy is trusted by our client. This vertical strategy is underpinned by the strength of our constriction solutions and robust services offerings which we will continue to enhance in 2011
● Our leadership is a result of our employees. They have made AAAS Engineering & Services one of the outstanding companies in our industry. Each of them brings diverse backgrounds and specialized disciplines to deliver the one thing that our client wants most -results. Every member of the company is fully involved in quality improvement efforts by developing necessary skills and attitude essential for Quality Assurance.
● In the end, I am thankful to all my colleagues who are striving hard to establish AAAS Engineering & Services as one of the leading constriction and erection of Pakistan.
ORGANIZATION CHART OFAAAS ENGINEERING & SERVICES
Civil Construction● AAAS involved in various locations civil constructions of equipment
foundations, cooling towers and sheds of various equipments. AAAS consist of well experienced staff for civil construction and they are able to perform civil work as per client specification designed.
Civil Infrastructure Construction MechanicalFabrication, Dismantling & Erection
AAAS has developed the capability in the field of Mechanical Fabrication, Dismantling & Erection Whether in our Workshop Facilities or at the Clients Site, Providing the same high quality workmanship and timely completion of the project. We have a very competent team of Mechanical work including Execution Supervisors, Fabrication, Fitters, Welders, Drillers and Helpers. Our supervisors fully understand the project requirements; the understanding helps every where t set high working standards, utilizing manpower to offer the quality & confidence that quality is looking for.
SERVICES OFFERED
AAAS HAS INVOLVED IN FIELD:● Fabrication of All types of Steel Formwork, Shuttering Plates, Column Beam
Shuttering,
● Scaffolding Pipe etc. Fabrication & dismantling & erection of all types steel structural works up to standard or proposed size like pipe rack, walk way following sheds like compressors, Boiler, Toll Plaza, Petrol Pumps etc.Fabrication & dismantling of all types of Equipments & tanks. Large Capacity Storage Tanks, Big Die pipes and allied works. Fabrication, Installation & laying of water and High Pressure oil and gas pipeline works, upgrading existing pipelines, installation and supervision of Catholic Protection System. Plate & Pipe bending, cutting and rolling services. Cooking Oil & Ghee Mills Refinery Specialist Power Plants
SURFACE OPERATION● Corrosion is the basic problem every industry has to contend with. By
providing innovative solutions, AAAPS is committed to providing industrial
commercial customers with the highest standard of surface preparation (Abrasive Blasting & other system). The performance of any protective coating is influenced by Surface Preparation before Application, it is essential to remove rust, dust and all mill scale as well as other contaminants, if expensive coating are to be of full value. Painting,
● Coating and Wrapping Application:Plaint Coating will depend upon number of factors including the size, type of
area, environment of the area, the type of system specified, the surface preparation specified.
WE OFFER VARIOUS PAINTING METHODS SUCH AS :● Airless Spray Conventional Spray● Brush Application Roller Application● The paint application of above methods need necessary skill and craft.
Whether in our Workshop Facilities or at Clients job site, we have the personal who are trained and qualified.
● Insulation and Cladding, Ducting and Chiller Works
● One of our major service is insulation, while fuel is the principal advantages of insulation in industrial plants, some other advantages which is many cases, are considered as important as fuel saving. Protection of plant from thermal socks. Improvement in distribution of heat and more accurate temperature control.
● Reducing heart radiation from the heated equipments and sound emission from the noisy machines, thereby increasing their working capacity. Fire protection of plant and piping. Absorption of vibration. Painting, Coating and Wrapping Applications / Inspection and Corrosion Survey, Insulation and Cladding Ducting and Chiller works, Scaffolding Erection, Dismantling and Inspection, Rigging / Slinging, Lifting & Inspection.
● The Policy of AAAS is of continuous education and orientation of workers on quality standards and working norms, our Admin. Managers and Supervisory staff to oversea, monitor and inspect the performance and the output of the workers, both in terms of quality and quantity.
SAFETY POLICY● OBJECTIVE● The purpose of the booklet is to promote the Safety of Employees ad by
setting out the General Requirements whilst working at any site specific requirements to avoid danger from specific hazards incident. These hazards are not considered to be exhaustive but are those frequently met and which are common causes of accidents.
● SAFETY● GENERAL SAFETY● SECURITY, VEHICLES AND PARKING● We give the awareness to our staff about Safety Plan Rules in this inane. Off site
parking and station security is the first stage of safety. Only essential vehicles will be allowed on site.
● All site visitors must report to the gatehouse where they will be issued with a security pass, which be worn at all times. All vehicles on site are limited to maximum speed to 15 kilometers per hours.
● SAFETY TALKS● Before start the job Safety Talks must be conducted to his team, and also
discusses about working are place in clean and safe.
● SAFE SYSTEM OF WORK● All work must be carried out in accordance with a safe system of work on all
plant and apparatus must follow the Safety Rules. All work must be discussed with a Safety Authorized Person before work can begin, the Safety Authorized Person will then decide what measures need to be taken to ensure your safety from the system, he also decides if a safety documents is required.
● Usually a safety document will be required; Senior then arranges for the plant to be taken from service, isolated and prepares a Safety Document. The Safety Document must then be issued to a Competent Person by an Senior. The senior is responsible for ensuring that you understand the Safety Documents. Safety Isolations are secured by locks and caution tags. These are for your safety under no circumstances should they be interfered with.
● TOOLS AND EQUIPMENT● All tools used shall be in good condition and fit for purpose. Electrical tools,
equipment, lighting, extension lads etc. shall be free of defect, with fully insulated power supply leads and shall be fitted with a suitable plug.
● Lifting equipment shall be in good condition and marked with the safety working limit, lifting operations may only be carried out with the permission of the Engineer. All equipment with rotating elements must be suitably guarded.
● HAZARDS AND EMERGENCIES● All emergency situations are dealt with by the control room.
● FIRE● A fire is potentially a most dangerous situation any small outbreak must be
dealt with immediately. Fire extinguisher are to be found around site at clearly marked locations. Do not attempt to use the extinguisher unless it is safe to do so. Ensure that the correct type is used. Do not attempt to extinguish a Gas Fire unless you had training.
EXCAVATION
● Excavation on site requires a Safety Document and written instruction from a “Selected Person” by client Safety Rules to ensure safety is achieved.
● FIRST AID:● First Aid box must avail at site every time and trained person like dispenser. A
qualified first aid person is a call 24 hours a day or in any emergency shift to hospital.
● ALL ACCIDENT MUST BE REPORTED● Accident shall be reported site to Incharge. Such reports shall include details of
any injuries to person along with their names.
GOOD HOSUEKEEPING● Most accidents within the workplace are due to slips, trips and falls, many of
these are caused by basic faults which can be easily remedied, such as material left lying around, inadequate lighting or slippery floors. In this way Good Housekeeping and tidy working also contribute to safety. You must remove all waste you create in the course of your work, and dispose of it in the correct area or container.
● Hazardous waste must be dealt with in accordance with the correct procedures.
LIST OF SOME EXECUTED PROJECTS
S.NO PROJECT NAME MAIN CLIENT LOCATION
01 Premier Alcohol Plant Premier Group Lahore Road Sheikhupura
02 Nimer Chemical Nimer Chemical Faisalabad Road Sheikhpura
03 Bikhi Power House PPR Faisalabad Road Sheikhpura
04 Total Parco Oil Depot Total Parco Machikay Sheikhupura
05 Bosicor Oil Refinery BYCO Hubchoki Boluchistan
06 JJVL Gas Plant Al Tariq Constructors Jamshoro Hyderabad
07 FWQ Enterprises Pvt Ltd FWQ Group Port Qasim Karachi
08 Byco Oil Refinery Byco Hubchoki Baluchistan
09 FFBL Flash Vassal DESCON Engineering DEW Works. Lahore
10 OGDCL Qadirpur Gas Field
OGDCL Ghotki . Sindh
S.NO PROJECT NAME MAIN CLIENT LOCATION
11 S.S Product Pipeline FWQ Port Qasim
12 Korangi Power House ORINT ENERGY Billal Choragi Khi
13 HSB Cross Country Pipe Line BYCO Hubco Boluchistan
14 PSM Ltd Fabrication of Compressor Piping at PSM Workshop
PSM Ltd Mangoper Karachi
15 IRAN LPG Bouzer IRAN LPG Fathe Jang
16 National Refinery Ltd NRL Ltd Korangi Karachi
17 Wasa Water Treatment Plant Tobishima Japan Fasilabad
18 Kuasar Ghee Mill Pvt Ltd Mehrooz ENG Port Qasim
19 EPRF II Project To Date ENAR Mangoper Khi
S.NO PROJECT NAME MAIN CLIENT LOCATION
20 Biyco Oil Refinery IMJ Hub Balochistan
21 PPL (Sui Gas Field) Ptrocon Pvt. LTd Sui Balochistan
23 Premier Bio Gas Plant Premier Group Sheikhupura
24 Esp Eraction Engro Mureed ke
25 ICI Polistor IKAN Sheikhupura
26 ICI Soda Ash Project IKAN Khewra
27 Angro Polimar Karachi Al-Tariq Construction Port Qasim Karachi
28
29
30
31
Biyco Oil Refinery
Attock OIl Refinery
Olico Oil Termenal
Pineer Cement Plant(CFB)
Al-Tariq Construction
Al-Tariq Construction
Ptrocon Pvt. LTd
EKL Eng Pvt. LTd
Hub Balochistan
Rawalpindi
Machiky Sheikhupura
Joharabad
S.NO PROJECT NAME MAIN CLIENT LOCATION
32 New Age Power House New Age Cable Pvt Ltd
18 Km Lahore Road Sheikhupura
33 87” Wire Reel New Age New Age Cable Pvt Ltd
18 Km Lahore Road Sheikhupura
34 Synergy Fire Coal Boiler Synergy Board & Paper Mills
Kharianwala Sheikhupura Road
35 Parco - Pak Arab Refinery LTD. Al-TariqMachikey, Sheikhupura
ASIF SHAHEEN (C.E.O)
Project Picture
90 MWPakistan Power Resource (Bikhi)
90 MWKorangi Power House
EPRF II Oil Refinery (Karachi)
Wasa Water Treatment Plant Faisalabad & OGDCL Qadirpur Gas Field Ghotki
Kuasar Ghee Mill Pvt Ltd Port Qasim & FWQ
NTN Certificate
Thank You
M.Asif Shaheen(C.E.O) AtAAAS Engineering & Services
AAAS Engineering &Services www.aaasengineering.comAAAS Engineering &Services