Holidays Schedule Name Sample Project Revise Date 13/Dec/08 Data Date 25/Jan/09 Friday Only 16 0 S.N Activity ID DESCRIPTION WBS-L1 WBS-L2 WBS-L3 WBS-L4 WBS-L5 WBS-L6 WBS-L7 1 A16140 Precast concrete hollow block Project name XXX Package 6 B Materia Appro General All Floors All Areas Architecture Works 2 A1700 Precast concrete hollow block Project name XXX Package 6 B Material Subm General All Floors All Areas Architecture Works 3 A2770 Site Offices for Consultants Project name XXX Package 6 B Construction General General Requi All Areas General 4 A2780 Site Offices and Stores for Contr Project name XXX Package 6 B Construction General General Requi All Areas General 5 A2790 Insurances Project name XXX Package 6 B Construction General General Requi All Areas General 6 A15860 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing General Basement Floo All Areas Architecture Works 7 A1800 Conduits Project name XXX Package 6 B Material Subm General All Floors All Areas Electrical Works 8 A2660 Access of Site Project name XXX Package 6 B Construction General General Requi All Areas General 9 A2670 Limitations of the Site Project name XXX Package 6 B Construction General General Requi All Areas General 10 A2680 Constructional Plant Project name XXX Package 6 B Construction General General Requi All Areas General 11 A2690 Water for the Works Project name XXX Package 6 B Construction General General Requi All Areas General 12 A2700 Temporary Lighting and Power for Project name XXX Package 6 B Construction General General Requi All Areas General 13 A2720 Site Working Conditions Project name XXX Package 6 B Construction General General Requi All Areas General 14 A2730 Sheds and Storage Facilities Project name XXX Package 6 B Construction General General Requi All Areas General 15 A2800 Progress Photographs Project name XXX Package 6 B Construction General General Requi All Areas General 16 A2840 Program Project name XXX Package 6 B Construction General General Requi All Areas General 17 A16380 Precast concrete hollow block Project name XXX Package 6 B Material Pro General All Floors All Areas Architecture Works 18 A1380 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing General Basement Floo All Areas Architecture Works 19 A16350 Conduits Project name XXX Package 6 B Materia Appro General All Floors All Areas Electrical Works 20 A1930 Ducts Project name XXX Package 6 B Material Subm General All Floors All Areas HVAC Works 21 A1830 UPVC & PVC pipes Project name XXX Package 6 B Material Subm General All Floors All Areas Plumbing Works 22 A15870 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing General Basement Floo All Areas Electrical Works 23 A2710 Block Work Project name XXX Package 6 B Construction Zone 1 Basement Floo All Areas Architecture Works 24 A16310 Ducts Project name XXX Package 6 B Materia Appro General All Floors All Areas HVAC Works 25 A16700 Block Work Project name XXX Package 6 B Construction Zone 2 Basement Floo All Areas Architecture Works 26 A16240 UPVC & PVC pipes Project name XXX Package 6 B Materia Appro General All Floors All Areas Plumbing Works 27 A16590 Conduits Project name XXX Package 6 B Material Pro General All Floors All Areas Electrical Works 28 A15580 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing General Ground Floor All Areas Architecture Works 29 A7490 Block Work Project name XXX Package 6 B Construction Zone 1 Ground Floor All Areas Architecture Works 30 A16180 Porcelain & Ceramic tiles Project name XXX Package 6 B Materia Appro General All Floors All Areas Architecture Works 31 A16190 Marble and black granite Project name XXX Package 6 B Materia Appro General All Floors All Areas Architecture Works 32 A1390 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing General Basement Floo All Areas Electrical Works 33 A2860 Electrical Conduits & Boxes Project name XXX Package 6 B Construction Zone 1 Basement Floo All Areas Electrical Works 34 A19500 Block Work Project name XXX Package 6 B Construction Zone 3 Basement Floo All Areas Architecture Works 35 A15620 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing General First Floor All Areas Architecture Works 36 A15880 Plumbing Shop Drawings Project name XXX Package 6 B Shop Drawing General Basement Floo All Areas Plumbing Works Old QTY Done

Progress Monitoring Sheet Empty

Embed Size (px)

DESCRIPTION

reporting progress

Citation preview

Page 1: Progress Monitoring Sheet Empty

Holidays

Schedule Name Sample Project Revise Date 13/Dec/08

Data Date 25/Jan/09 Friday Only 16 0 372500011 0

S.N Activity ID DESCRIPTION WBS-L1 WBS-L2 WBS-L3 WBS-L4 WBS-L5 WBS-L6 WBS-L7 Old Labour

1 A16140 Precast concrete hollow block Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Architecture Works $0 2 A1700 Precast concrete hollow block Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Architecture Works $0 3 A2770 Site Offices for Consultants Project name XXX Package 6 B Construction WGeneral General Requir All Areas General $460,900 4 A2780 Site Offices and Stores for Contractors Project name XXX Package 6 B Construction WGeneral General Requir All Areas General $115,789 5 A2790 Insurances Project name XXX Package 6 B Construction WGeneral General Requir All Areas General $632,081 6 A15860 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Basement FloorAll Areas Architecture Works $0 7 A1800 Conduits Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Electrical Works $0 8 A2660 Access of Site Project name XXX Package 6 B Construction WGeneral General Requir All Areas General $43,469 9 A2670 Limitations of the Site Project name XXX Package 6 B Construction WGeneral General Requir All Areas General $34,800 10 A2680 Constructional Plant Project name XXX Package 6 B Construction WGeneral General Requir All Areas General $1,205,200 11 A2690 Water for the Works Project name XXX Package 6 B Construction WGeneral General Requir All Areas General $450,000 12 A2700 Temporary Lighting and Power for the WProject name XXX Package 6 B Construction WGeneral General Requir All Areas General $1,686,610 13 A2720 Site Working Conditions Project name XXX Package 6 B Construction WGeneral General Requir All Areas General $388,080 14 A2730 Sheds and Storage Facilities Project name XXX Package 6 B Construction WGeneral General Requir All Areas General $39,285 15 A2800 Progress Photographs Project name XXX Package 6 B Construction WGeneral General Requir All Areas General $14,278 16 A2840 Program Project name XXX Package 6 B Construction WGeneral General Requir All Areas General $427,260 17 A16380 Precast concrete hollow block Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Architecture Works $0 18 A1380 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Basement FloorAll Areas Architecture Works $0 19 A16350 Conduits Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Electrical Works $0 20 A1930 Ducts Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas HVAC Works $0 21 A1830 UPVC & PVC pipes Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Plumbing Works $0 22 A15870 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Basement FloorAll Areas Electrical Works $0 23 A2710 Block Work Project name XXX Package 6 B Construction WZone 1 Basement FloorAll Areas Architecture Works $187,305 24 A16310 Ducts Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas HVAC Works $0 25 A16700 Block Work Project name XXX Package 6 B Construction WZone 2 Basement FloorAll Areas Architecture Works $48,888 26 A16240 UPVC & PVC pipes Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Plumbing Works $0 27 A16590 Conduits Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Electrical Works $0 28 A15580 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Ground Floor All Areas Architecture Works $0 29 A7490 Block Work Project name XXX Package 6 B Construction WZone 1 Ground Floor All Areas Architecture Works $197,053 30 A16180 Porcelain & Ceramic tiles Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Architecture Works $0 31 A16190 Marble and black granite Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Architecture Works $0 32 A1390 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Basement FloorAll Areas Electrical Works $0 33 A2860 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 1 Basement FloorAll Areas Electrical Works $212,184 34 A19500 Block Work Project name XXX Package 6 B Construction WZone 3 Basement FloorAll Areas Architecture Works $309,250 35 A15620 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral First Floor All Areas Architecture Works $0 36 A15880 Plumbing Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Basement FloorAll Areas Plumbing Works $0

Old QTY Done

Total-RemQTY

A6
hanycv: Data From P6 sheet
Page 2: Progress Monitoring Sheet Empty

37 A15890 HVAC Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Basement FloorAll Areas HVAC Works $0 38 A15900 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Ground Floor All Areas Architecture Works $0 39 A17100 Block Work Project name XXX Package 6 B Construction WZone 2 Ground Floor All Areas Architecture Works $127,293 40 A1740 Porcelain & Ceramic tiles Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Architecture Works $0 41 A1750 Marble and black granite Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Architecture Works $0 42 A16550 Ducts Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas HVAC Works $0 43 A16280 CHILLED WATER PUMP Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas HVAC Works $0 44 A1760 ELEVATORS & ESCALATORS Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Electrical Works $0 45 A15660 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Second Floor All Areas Architecture Works $0 46 A15590 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Ground Floor All Areas Electrical Works $0 47 A15940 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral First Floor All Areas Architecture Works $0 48 A15950 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral First Floor All Areas Electrical Works $0 49 A15910 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Ground Floor All Areas Electrical Works $0 50 A15920 Plumbing Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Ground Floor All Areas Plumbing Works $0 51 A15930 HVAC Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Ground Floor All Areas HVAC Works $0 52 A7550 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 1 Ground Floor All Areas Electrical Works $234,661 53 A16480 UPVC & PVC pipes Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Plumbing Works $0 54 A1410 HVAC Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Basement FloorAll Areas HVAC Works $0 55 A23270 Domestic Water Piping Project name XXX Package 6 B Construction WZone 1 Basement FloorAll Areas Plumbing Works $2,611 56 A3160 HVAC Ducting Project name XXX Package 6 B Construction WZone 1 Basement FloorAll Areas HVAC Works $1,386,269 57 A16760 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 2 Basement FloorAll Areas Electrical Works $218,697 58 A15630 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral First Floor All Areas Electrical Works $0 59 A1400 Plumbing Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Basement FloorAll Areas Plumbing Works $0 60 A7860 Block Work Project name XXX Package 6 B Construction WZone 1 First Floor All Areas Architecture Works $958,035 61 A3010 Drainage Piping Project name XXX Package 6 B Construction WZone 1 Basement FloorAll Areas Plumbing Works $64,922 62 A2740 Plaster Work Project name XXX Package 6 B Construction WZone 1 Basement FloorDry Area Architecture Works $127,610 63 A15600 Plumbing Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Ground Floor All Areas Plumbing Works $0 64 A16200 ELEVATORS & ESCALATORS Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Electrical Works $0 65 A15610 HVAC Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Ground Floor All Areas HVAC Works $0 66 A7600 Drainage Piping Project name XXX Package 6 B Construction WZone 1 Ground Floor All Areas Plumbing Works $248,301 67 A15670 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Second Floor All Areas Electrical Works $0 68 A7650 HVAC Ducting Project name XXX Package 6 B Construction WZone 1 Ground Floor All Areas HVAC Works $835,439 69 A15960 Plumbing Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral First Floor All Areas Plumbing Works $0 70 A15970 HVAC Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral First Floor All Areas HVAC Works $0 71 A15980 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Second Floor All Areas Architecture Works $0 72 A15990 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Second Floor All Areas Electrical Works $0 73 A16000 Plumbing Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Second Floor All Areas Plumbing Works $0 74 A16010 HVAC Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Second Floor All Areas HVAC Works $0 75 A15700 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Third Floor All Areas Architecture Works $0 76 A19900 Block Work Project name XXX Package 6 B Construction WZone 3 Ground Floor All Areas Architecture Works $98,227 77 A16710 Plaster Work Project name XXX Package 6 B Construction WZone 2 Basement FloorDry Area Architecture Works $37,450 78 A15690 HVAC Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Second Floor All Areas HVAC Works $0 79 A1360 Elevators & Escalators Shop Drawing Project name XXX Package 6 B Shop Drawing SGeneral Elevators & EscaAll Areas Architecture Works $0 80 A19560 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 3 Basement FloorAll Areas Electrical Works $253,058 81 A15680 Plumbing Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Second Floor All Areas Plumbing Works $0 82 A16420 Porcelain & Ceramic tiles Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Architecture Works $0 83 A16430 Marble and black granite Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Architecture Works $0 84 A23280 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 1 Basement FloorAll Areas Plumbing Works $1,174,039 85 A17470 Block Work Project name XXX Package 6 B Construction WZone 2 First Floor All Areas Architecture Works $384,158 86 A7920 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 1 First Floor All Areas Electrical Works $228,315 87 A7500 Plaster Work Project name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area Architecture Works $47,950

Page 3: Progress Monitoring Sheet Empty

88 A17260 HVAC Ducting Project name XXX Package 6 B Construction WZone 2 Ground Floor All Areas HVAC Works $1,255,871 89 A16400 Aluminum Panel cladding Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Architecture Works $0 90 A16810 Drainage Piping Project name XXX Package 6 B Construction WZone 2 Basement FloorAll Areas Plumbing Works $79,529 91 A23290 Domestic Water Piping Project name XXX Package 6 B Construction WZone 2 Basement FloorAll Areas Plumbing Works $3,489 92 A23300 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 2 Basement FloorAll Areas Plumbing Works $1,620,683 93 A16860 HVAC Ducting Project name XXX Package 6 B Construction WZone 2 Basement FloorAll Areas HVAC Works $1,955,276 94 A15650 HVAC Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral First Floor All Areas HVAC Works $0 95 A22850 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 1 Basement FloorAll Areas Electrical Works $799,759 96 A2910 Ramps Waterproofing Project name XXX Package 6 B Construction WZone 1 Basement FloorDry Area Architecture Works $8,769 97 A16330 Painting Materials Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Architecture Works $0 98 A1790 Cable trays Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Electrical Works $0 99 A1810 Panelboards Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Electrical Works $0 ### A16020 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Third Floor All Areas Architecture Works $0 ### A16030 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Third Floor All Areas Electrical Works $0 ### A16040 Plumbing Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Third Floor All Areas Plumbing Works $0 ### A16050 HVAC Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Third Floor All Areas HVAC Works $0 ### A23370 Domestic Water Piping Project name XXX Package 6 B Construction WZone 1 Ground Floor All Areas Plumbing Works $356,209 ### A1950 Painting Materials Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Architecture Works $0 ### A23100 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 2 Basement FloorAll Areas Electrical Works $906,037 ### A16520 CHILLED WATER PUMP Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas HVAC Works $0 ### A8230 Block Work Project name XXX Package 6 B Construction WZone 1 Second Floor All Areas Architecture Works $908,126 ### A23380 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 1 Ground Floor All Areas Plumbing Works $605,318 ### A17110 Plaster Work Project name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area Architecture Works $42,490 ### A15640 Plumbing Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral First Floor All Areas Plumbing Works $0 ### A19660 HVAC Ducting Project name XXX Package 6 B Construction WZone 3 Basement FloorAll Areas HVAC Works $1,450,366 ### A15710 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Third Floor All Areas Electrical Works $0 ### A15720 Plumbing Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Third Floor All Areas Plumbing Works $0 ### A16790 Ramps Waterproofing Project name XXX Package 6 B Construction WZone 2 Basement FloorDry Area Architecture Works $12,956 ### A15840 Elevators & Escalators Shop Drawing Project name XXX Package 6 B Shop Drawing AGeneral Elevators & EscaAll Areas Architecture Works $0 ### A15850 Elevators & Escalators Shop Drawing Project name XXX Package 6 B Shop Drawing AGeneral Elevators & EscaAll Areas Electrical Works $0 ### A1370 Elevators & Escalators Shop Drawing Project name XXX Package 6 B Shop Drawing SGeneral Elevators & EscaAll Areas Electrical Works $0 ### A19610 Drainage Piping Project name XXX Package 6 B Construction WZone 3 Basement FloorAll Areas Plumbing Works $78,157 ### A17160 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 2 Ground Floor All Areas Electrical Works $224,475 ### A1840 Plumbing Accessories Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Plumbing Works $0 ### A16440 ELEVATORS & ESCALATORS Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Electrical Works $0 ### A1720 Aluminum Panel cladding Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Architecture Works $0 ### A15730 HVAC Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Third Floor All Areas HVAC Works $0 ### A9730 Block Work Project name XXX Package 6 B Construction WZone 1 Package 6A AcceAll Areas Architecture Works $307,395 ### A17210 Drainage Piping Project name XXX Package 6 B Construction WZone 2 Ground Floor All Areas Plumbing Works $319,825 ### A23390 Domestic Water Piping Project name XXX Package 6 B Construction WZone 2 Ground Floor All Areas Plumbing Works $466,938 ### A23520 Domestic Water Piping Project name XXX Package 6 B Construction WZone 1 First Floor All Areas Plumbing Works $40,307 ### A16340 Cable trays Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Electrical Works $0 ### A16360 Panelboards Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Electrical Works $0 ### A19510 Plaster Work Project name XXX Package 6 B Construction WZone 3 Basement FloorDry Area Architecture Works $154,560 ### A19630 Plumbing Works Project name XXX Package 6 B Construction WZone 3 Basement FloorWet Area Plumbing Works $522,667 ### A1770 Generator sets Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Electrical Works $0 ### A8020 HVAC Ducting Project name XXX Package 6 B Construction WZone 1 First Floor All Areas HVAC Works $786,792 ### A2750 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 1 Basement FloorDry Area Architecture Works $7,922 ### A23310 Domestic Water Piping Project name XXX Package 6 B Construction WZone 3 Basement FloorAll Areas Plumbing Works $371,360 ### A16250 Plumbing Accessories Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Plumbing Works $0 ### A17840 Block Work Project name XXX Package 6 B Construction WZone 2 Second Floor All Areas Architecture Works $1,021,084

Page 4: Progress Monitoring Sheet Empty

### A20060 HVAC Ducting Project name XXX Package 6 B Construction WZone 3 Ground Floor All Areas HVAC Works $835,439 ### A8290 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 1 Second Floor All Areas Electrical Works $217,166 ### A7870 Plaster Work Project name XXX Package 6 B Construction WZone 1 First Floor Dry Area Architecture Works $297,430 ### A1920 Fans Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas HVAC Works $0 ### A7580 Waterproofing Project name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area Architecture Works $911,996 ### A16160 Aluminum Panel cladding Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Architecture Works $0 ### A7970 Drainage Piping Project name XXX Package 6 B Construction WZone 1 First Floor All Areas Plumbing Works $50,132 ### A16720 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 2 Basement FloorDry Area Architecture Works $8,584 ### A23050 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 1 First Floor All Areas Electrical Works $134,865 ### A9840 Drainage Piping Project name XXX Package 6 B Construction WZone 1 Package 6A AcceAll Areas Plumbing Works $442 ### A9890 HVAC Ducting Project name XXX Package 6 B Construction WZone 1 Package 6A AcceAll Areas HVAC Works $1,972 ### A20270 Block Work Project name XXX Package 6 B Construction WZone 3 First Floor All Areas Architecture Works $930,836 ### A16570 Painting Materials Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Architecture Works $0 ### A8390 HVAC Ducting Project name XXX Package 6 B Construction WZone 1 Second Floor All Areas HVAC Works $884,346 ### A16300 Fans Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas HVAC Works $0 ### A17630 HVAC Ducting Project name XXX Package 6 B Construction WZone 2 First Floor All Areas HVAC Works $1,035,573 ### A22770 Waterproofing Project name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area Architecture Works $739,312 ### A8340 Drainage Piping Project name XXX Package 6 B Construction WZone 1 Second Floor All Areas Plumbing Works $50,132 ### A23170 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 3 Basement FloorAll Areas Electrical Works $806,162 ### A1940 Suspended gypsum board ceiling Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Architecture Works $0 ### A17530 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 2 First Floor All Areas Electrical Works $214,350 ### A17580 Drainage Piping Project name XXX Package 6 B Construction WZone 2 First Floor All Areas Plumbing Works $105,476 ### A23540 Domestic Water Piping Project name XXX Package 6 B Construction WZone 2 First Floor All Areas Plumbing Works $137,759 ### A19960 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 3 Ground Floor All Areas Electrical Works $261,111 ### A16210 Generator sets Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Electrical Works $0 ### A23320 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 3 Basement FloorAll Areas Plumbing Works $2,081,490 ### A23530 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 1 First Floor All Areas Plumbing Works $511,700 ### A8600 Block Work Project name XXX Package 6 B Construction WZone 1 Third Floor All Areas Architecture Works $984,951 ### A1340 Facade Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Facade All Areas Architecture Works $0 ### A17480 Plaster Work Project name XXX Package 6 B Construction WZone 2 First Floor Dry Area Architecture Works $302,190 ### A16060 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Lower Roof All Areas Architecture Works $0 ### A7510 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area Architecture Works $2,132 ### A16320 Suspended gypsum board ceiling Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Architecture Works $0 ### A19700 Plaster Work Project name XXX Package 6 B Construction WZone 3 Basement FloorWet Area Architecture Works $17,292 ### A19760 Ramps Waterproofing Project name XXX Package 6 B Construction WZone 3 Basement FloorDry Area Architecture Works $59,013 ### A15740 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Lower Roof All Areas Architecture Works $0 ### A19020 Block Work Project name XXX Package 6 B Construction WZone 2 Package 6A AcceAll Areas Architecture Works $261,514 ### A23400 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 2 Ground Floor All Areas Plumbing Works $1,167,112 ### A23910 Block Work Project name XXX Package 6 B Construction WZone 1 Ground Floor SCECO ROOArchitecture Works $99,003 ### A15830 Facade Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Facade All Areas Electrical Works $0 ### A23110 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 2 Ground Floor All Areas Electrical Works $114,877 ### A23240 Electrical Works Project name XXX Package 6 B Construction WZone 1 Ground Floor SCECO ROOElectrical Works $132,590 ### A1850 Pumps Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Plumbing Works $0 ### A16270 WATER CHILLERS Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas HVAC Works $0 ### A23460 Drainage Piping Project name XXX Package 6 B Construction WZone 1 Ground Floor SCECO ROOPlumbing Works $10,477 ### A23470 HVAC Works Project name XXX Package 6 B Construction WZone 1 Ground Floor SCECO ROOHVAC Works $3,222 ### A19910 Plaster Work Project name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area Architecture Works $60,060 ### A1880 WATER CHILLERS Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas HVAC Works $0 ### A1890 CHILLED WATER PUMP Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas HVAC Works $0 ### A16260 Pumps Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Plumbing Works $0 ### A20010 Drainage Piping Project name XXX Package 6 B Construction WZone 3 Ground Floor All Areas Plumbing Works $220,771

Page 5: Progress Monitoring Sheet Empty

### A16580 Cable trays Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Electrical Works $0 ### A16600 Panelboards Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Electrical Works $0 ### A20640 Block Work Project name XXX Package 6 B Construction WZone 3 Second Floor All Areas Architecture Works $1,191,281 ### A1350 Facade Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Facade All Areas Electrical Works $0 ### A17120 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area Architecture Works $4,100 ### A16290 A/C UNITS Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas HVAC Works $0 ### A23610 Domestic Water Piping Project name XXX Package 6 B Construction WZone 1 Second Floor All Areas Plumbing Works $40,307 ### A15780 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Upper Roof All Areas Architecture Works $0 ### A23970 Block Work Project name XXX Package 6 B Construction WZone 2 Ground Floor SCECO ROOArchitecture Works $197,934 ### A23090 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 1 Package 6A AcceAll Areas Electrical Works $596,726 ### A23830 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 1 Package 6A AcceAll Areas Plumbing Works $8,160 ### A18210 Block Work Project name XXX Package 6 B Construction WZone 2 Third Floor All Areas Architecture Works $1,047,052 ### A23480 Drainage Piping Project name XXX Package 6 B Construction WZone 2 Ground Floor SCECO ROOPlumbing Works $10,169 ### A23510 HVAC Works Project name XXX Package 6 B Construction WZone 2 Ground Floor SCECO ROOHVAC Works $6,444 ### A17600 Plumbing Works Project name XXX Package 6 B Construction WZone 2 First Floor Wet Area Plumbing Works $32,970 ### A23420 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 3 Ground Floor All Areas Plumbing Works $1,186,664 ### A9740 Plaster Work Project name XXX Package 6 B Construction WZone 1 Package 6A AcceDry Area Architecture Works $79,730 ### A15770 HVAC Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Lower Roof All Areas HVAC Works $0 ### A19130 Drainage Piping Project name XXX Package 6 B Construction WZone 2 Package 6A AcceAll Areas Plumbing Works $597 ### A19180 HVAC Ducting Project name XXX Package 6 B Construction WZone 2 Package 6A AcceAll Areas HVAC Works $1,260 ### A23550 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 2 First Floor All Areas Plumbing Works $1,022,756 ### A8710 Drainage Piping Project name XXX Package 6 B Construction WZone 1 Third Floor All Areas Plumbing Works $52,123 ### A8660 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 1 Third Floor All Areas Electrical Works $235,650 ### A23920 Plaster Work Project name XXX Package 6 B Construction WZone 1 Ground Floor SCECO ROOArchitecture Works $90,370 ### A15820 Facade Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Facade All Areas Architecture Works $0 ### A18000 HVAC Ducting Project name XXX Package 6 B Construction WZone 2 Second Floor All Areas HVAC Works $1,173,314 ### A17670 Plaster Work Project name XXX Package 6 B Construction WZone 2 First Floor Wet Area Architecture Works $29,304 ### A23250 Electrical Works Project name XXX Package 6 B Construction WZone 2 Ground Floor SCECO ROOElectrical Works $71,111 ### A7880 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 1 First Floor Dry Area Architecture Works $45,100 ### A1910 A/C UNITS Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas HVAC Works $0 ### A8240 Plaster Work Project name XXX Package 6 B Construction WZone 1 Second Floor Dry Area Architecture Works $214,410 ### A19520 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 3 Basement FloorDry Area Architecture Works $7,020 ### A23980 Plaster Work Project name XXX Package 6 B Construction WZone 2 Ground Floor SCECO ROOArchitecture Works $186,620 ### A16070 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Lower Roof All Areas Electrical Works $0 ### A16080 Plumbing Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Lower Roof All Areas Plumbing Works $0 ### A16090 HVAC Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Lower Roof All Areas HVAC Works $0 ### A23180 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 3 Ground Floor All Areas Electrical Works $95,754 ### A8970 Block Work Project name XXX Package 6 B Construction WZone 1 Lower Roof All Areas Architecture Works $234,472 ### A16540 Fans Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas HVAC Works $0 ### A2820 Painting 1st Stage Project name XXX Package 6 B Construction WZone 1 Basement FloorDry Area Architecture Works $1,812,457 ### A8760 HVAC Ducting Project name XXX Package 6 B Construction WZone 1 Third Floor All Areas HVAC Works $1,265,774 ### A23060 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 1 Second Floor All Areas Electrical Works $123,851 ### A17900 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 2 Second Floor All Areas Electrical Works $217,244 ### A1730 Doors & Windows Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Architecture Works $0 ### A7610 Piping Accessories Project name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area Plumbing Works $244,672 ### A23120 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 2 First Floor All Areas Electrical Works $234,063 ### A3620 Facade Plaster & Paint Project name XXX Package 6 B Construction WZone 1 Facade All Areas Architecture Works $290,158 ### A16510 WATER CHILLERS Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas HVAC Works $0 ### A8730 Plumbing Works Project name XXX Package 6 B Construction WZone 1 Third Floor Wet Area Plumbing Works $6,864 ### A23930 Waterproofing Project name XXX Package 6 B Construction WZone 1 Ground Floor SCECO ROOArchitecture Works $58,548 ### A16490 Plumbing Accessories Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Plumbing Works $0

Page 6: Progress Monitoring Sheet Empty

### A17730 Waterproofing Project name XXX Package 6 B Construction WZone 2 First Floor Wet Area Architecture Works $31,312 ### A17490 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 2 First Floor Dry Area Architecture Works $75,850 ### A1860 Lighting Fixtures Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Electrical Works $0 ### A20430 HVAC Ducting Project name XXX Package 6 B Construction WZone 3 First Floor All Areas HVAC Works $878,646 ### A16560 Suspended gypsum board ceiling Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Architecture Works $0 ### A2760 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 1 Basement FloorDry Area Architecture Works $1,327,751 ### A22780 Waterproofing Project name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area Architecture Works $1,080,908 ### A23990 Waterproofing Project name XXX Package 6 B Construction WZone 2 Ground Floor SCECO ROOArchitecture Works $108,834 ### A18580 Block Work Project name XXX Package 6 B Construction WZone 2 Lower Roof All Areas Architecture Works $196,232 ### A16740 Painting 1st Stage Project name XXX Package 6 B Construction WZone 2 Basement FloorDry Area Architecture Works $1,687,773 ### A18270 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 2 Third Floor All Areas Electrical Works $235,683 ### A23490 Drainage Piping Project name XXX Package 6 B Construction WZone 3 Ground Floor SCECO ROOPlumbing Works $10,169 ### A23500 HVAC Works Project name XXX Package 6 B Construction WZone 3 Ground Floor SCECO ROOHVAC Works $3,222 ### A23940 Painting 1st Stage Project name XXX Package 6 B Construction WZone 1 Ground Floor SCECO ROOArchitecture Works $52,487 ### A23040 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 1 Ground Floor All Areas Electrical Works $90,229 ### A9990 Waterproofing Project name XXX Package 6 B Construction WZone 1 Package 6A AcceWet Area Architecture Works $690,262 ### A9720 Roofing System Project name XXX Package 6 B Construction WZone 1 Upper Roof All Areas Architecture Works $850,056 ### A20330 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 3 First Floor All Areas Electrical Works $260,064 ### A20800 HVAC Ducting Project name XXX Package 6 B Construction WZone 3 Second Floor All Areas HVAC Works $976,200 ### A15760 Plumbing Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Lower Roof All Areas Plumbing Works $0 ### A20280 Plaster Work Project name XXX Package 6 B Construction WZone 3 First Floor Dry Area Architecture Works $124,950 ### A23160 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 2 Package 6A AcceAll Areas Electrical Works $827,274 ### A23850 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 2 Package 6A AcceAll Areas Plumbing Works $13,770 ### A19920 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area Architecture Works $3,116 ### A24030 Block Work Project name XXX Package 6 B Construction WZone 3 Ground Floor SCECO ROOArchitecture Works $83,927 ### A23260 Electrical Works Project name XXX Package 6 B Construction WZone 3 Ground Floor SCECO ROOElectrical Works $25,671 ### A16230 Sanitary fixtures Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Plumbing Works $0 ### A18370 HVAC Ducting Project name XXX Package 6 B Construction WZone 2 Third Floor All Areas HVAC Works $1,651,558 ### A17850 Plaster Work Project name XXX Package 6 B Construction WZone 2 Second Floor Dry Area Architecture Works $154,630 ### A9130 HVAC Works Project name XXX Package 6 B Construction WZone 1 Lower Roof All Areas HVAC Works $1,350,747 ### A16170 Doors & Windows Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Architecture Works $0 ### A2890 Wires & Cables Project name XXX Package 6 B Construction WZone 1 Basement FloorDry Area Electrical Works $7,524,987 ### A23700 Domestic Water Piping Project name XXX Package 6 B Construction WZone 1 Third Floor All Areas Plumbing Works $53,567 ### A17950 Drainage Piping Project name XXX Package 6 B Construction WZone 2 Second Floor All Areas Plumbing Works $104,546 ### A23630 Domestic Water Piping Project name XXX Package 6 B Construction WZone 2 Second Floor All Areas Plumbing Works $131,969 ### A16730 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 2 Basement FloorDry Area Architecture Works $2,190,548 ### A16530 A/C UNITS Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas HVAC Works $0 ### A19030 Plaster Work Project name XXX Package 6 B Construction WZone 2 Package 6A AcceDry Area Architecture Works $63,070 ### A8610 Plaster Work Project name XXX Package 6 B Construction WZone 1 Third Floor Dry Area Architecture Works $165,830 ### A8250 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 1 Second Floor Dry Area Architecture Works $57,400 ### A23620 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 1 Second Floor All Areas Plumbing Works $587,936 ### A7530 Painting 1st Stage Project name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area Architecture Works $418,544 ### A15810 HVAC Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Upper Roof All Areas HVAC Works $0 ### A19710 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 3 Basement FloorWet Area Architecture Works $48,867 ### A16640 Generator sets Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Electrical Works $0 ### A24000 Painting 1st Stage Project name XXX Package 6 B Construction WZone 2 Ground Floor SCECO ROOArchitecture Works $111,603 ### A17970 Plumbing Works Project name XXX Package 6 B Construction WZone 2 Second Floor Wet Area Plumbing Works $32,824 ### A15750 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Lower Roof All Areas Electrical Works $0 ### A9340 Block Work Project name XXX Package 6 B Construction WZone 1 Upper Roof All Areas Architecture Works $77,632 ### A21820 Block Work Project name XXX Package 6 B Construction WZone 3 Package 6A AcceAll Areas Architecture Works $621,930 ### A21010 Block Work Project name XXX Package 6 B Construction WZone 3 Third Floor All Areas Architecture Works $926,510

Page 7: Progress Monitoring Sheet Empty

### A18320 Drainage Piping Project name XXX Package 6 B Construction WZone 2 Third Floor All Areas Plumbing Works $79,983 ### A23720 Domestic Water Piping Project name XXX Package 6 B Construction WZone 2 Third Floor All Areas Plumbing Works $118,695 ### A1710 Handrail & Balustrades Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Architecture Works $0 ### A16370 Lighting Fixtures Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Electrical Works $0 ### A20700 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 3 Second Floor All Areas Electrical Works $246,137 ### A9750 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 1 Package 6A AcceDry Area Architecture Works $31,324 ### A24040 Plaster Work Project name XXX Package 6 B Construction WZone 3 Ground Floor SCECO ROOArchitecture Works $90,370 ### A23410 Domestic Water Piping Project name XXX Package 6 B Construction WZone 3 Ground Floor All Areas Plumbing Works $468,385 ### A18640 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 2 Lower Roof All Areas Electrical Works $266,559 ### A18740 HVAC Works Project name XXX Package 6 B Construction WZone 2 Lower Roof All Areas HVAC Works $4,620,066 ### A7520 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area Architecture Works $2,906,735 ### A16770 Wires & Cables Project name XXX Package 6 B Construction WZone 2 Basement FloorDry Area Electrical Works $8,659,006 ### A20380 Drainage Piping Project name XXX Package 6 B Construction WZone 3 First Floor All Areas Plumbing Works $49,855 ### A23560 Domestic Water Piping Project name XXX Package 6 B Construction WZone 3 First Floor All Areas Plumbing Works $45,644 ### A23070 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 1 Third Floor All Areas Electrical Works $104,840 ### A23950 Doors & Windows Project name XXX Package 6 B Construction WZone 1 Ground Floor SCECO ROOArchitecture Works $118,294 ### A17140 Painting 1st Stage Project name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area Architecture Works $439,031 ### A18690 Piping Works Project name XXX Package 6 B Construction WZone 2 Lower Roof All Areas Plumbing Works $81,601 ### A16500 Pumps Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Plumbing Works $0 ### A15790 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Upper Roof All Areas Electrical Works $0 ### A18340 Plumbing Works Project name XXX Package 6 B Construction WZone 2 Third Floor Wet Area Plumbing Works $17,674 ### A16100 Architecture Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Upper Roof All Areas Architecture Works $0 ### A16110 Electrical Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Upper Roof All Areas Electrical Works $0 ### A3500 Aluminum Panel cladding Project name XXX Package 6 B Construction WZone 1 Facade All Areas Architecture Works $8,860,149 ### A24050 Waterproofing Project name XXX Package 6 B Construction WZone 3 Ground Floor SCECO ROOArchitecture Works $58,548 ### A16820 Piping Accessories Project name XXX Package 6 B Construction WZone 2 Basement FloorDry Area Plumbing Works $567,296 ### A3210 HVAC - Air Outlets Project name XXX Package 6 B Construction WZone 1 Basement FloorDry Area HVAC Works $208,775 ### A7560 Wires & Cables Project name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area Electrical Works $1,317,845 ### A23960 Painting Final Stage Project name XXX Package 6 B Construction WZone 1 Ground Floor SCECO ROOArchitecture Works $25,208 ### A20750 Drainage Piping Project name XXX Package 6 B Construction WZone 3 Second Floor All Areas Plumbing Works $49,855 ### A23650 Domestic Water Piping Project name XXX Package 6 B Construction WZone 3 Second Floor All Areas Plumbing Works $45,558 ### A16120 Plumbing Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Upper Roof All Areas Plumbing Works $0 ### A16130 HVAC Shop Drawings Project name XXX Package 6 B Shop Drawing SGeneral Upper Roof All Areas HVAC Works $0 ### A17130 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area Architecture Works $3,389,057 ### A23130 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 2 Second Floor All Areas Electrical Works $135,316 ### A20650 Plaster Work Project name XXX Package 6 B Construction WZone 3 Second Floor Dry Area Architecture Works $296,870 ### A24010 Doors & Windows Project name XXX Package 6 B Construction WZone 2 Ground Floor SCECO ROOArchitecture Works $230,822 ### A24020 Painting Final Stage Project name XXX Package 6 B Construction WZone 2 Ground Floor SCECO ROOArchitecture Works $60,132 ### A24060 Painting 1st Stage Project name XXX Package 6 B Construction WZone 3 Ground Floor SCECO ROOArchitecture Works $53,852 ### A18040 Plaster Work Project name XXX Package 6 B Construction WZone 2 Second Floor Wet Area Architecture Works $29,304 ### A17860 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 2 Second Floor Dry Area Architecture Works $73,472 ### A3710 HVAC Equipments Project name XXX Package 6 B Construction WAll Zones All Floors All Areas HVAC Works $10,965,925 ### A9080 Piping Works Project name XXX Package 6 B Construction WZone 1 Lower Roof All Areas Plumbing Works $73,094 ### A3570 Elevators & Escalators Project name XXX Package 6 B Construction WZone 1 Elevators & EscaAll Areas Architecture Works $8,437,607 ### A22750 Elevators & Escalators Project name XXX Package 6 B Construction WZone 2 Elevators & EscaAll Areas Architecture Works $12,404,477 ### A22760 Elevators & Escalators Project name XXX Package 6 B Construction WZone 3 Elevators & EscaAll Areas Architecture Works $11,132,528 ### A17020 Facade Plaster & Paint Project name XXX Package 6 B Construction WZone 2 Facade All Areas Architecture Works $255,714 ### A23230 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 3 Package 6A AcceAll Areas Electrical Works $388,240 ### A21930 Drainage Piping Project name XXX Package 6 B Construction WZone 3 Package 6A AcceAll Areas Plumbing Works $1,401 ### A21950 Plumbing Works Project name XXX Package 6 B Construction WZone 3 Package 6A AcceWet Area Plumbing Works $567 ### A17680 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 2 First Floor Wet Area Architecture Works $81,982

Page 8: Progress Monitoring Sheet Empty

### A16150 Handrail & Balustrades Project name XXX Package 6 B Materia ApprovGeneral All Floors All Areas Architecture Works $0 ### A19280 Waterproofing Project name XXX Package 6 B Construction WZone 2 Package 6A AcceWet Area Architecture Works $290,758 ### A7900 Painting 1st Stage Project name XXX Package 6 B Construction WZone 1 First Floor Dry Area Architecture Works $145,722 ### A8800 Plaster Work Project name XXX Package 6 B Construction WZone 1 Third Floor Wet Area Architecture Works $16,764 ### A8920 Waterproofing Project name XXX Package 6 B Construction WZone 1 Third Floor Dry Area Architecture Works $88,452 ### A9770 Painting 1st Stage Project name XXX Package 6 B Construction WZone 1 Package 6A AcceDry Area Architecture Works $158,950 ### A3050 Piping Accessories Project name XXX Package 6 B Construction WZone 1 Basement FloorDry Area Plumbing Works $523,093 ### A3530 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 1 Basement FloorDry Area Architecture Works $217,087 ### A19540 Painting 1st Stage Project name XXX Package 6 B Construction WZone 3 Basement FloorDry Area Architecture Works $1,756,632 ### A16870 HVAC - Air Outlets Project name XXX Package 6 B Construction WZone 2 Basement FloorDry Area HVAC Works $280,861 ### A23140 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 2 Third Floor All Areas Electrical Works $133,088 ### A21120 Drainage Piping Project name XXX Package 6 B Construction WZone 3 Third Floor All Areas Plumbing Works $53,769 ### A21070 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 3 Third Floor All Areas Electrical Works $263,121 ### A9030 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 1 Lower Roof All Areas Electrical Works $167,637 ### A24080 Painting Final Stage Project name XXX Package 6 B Construction WZone 3 Ground Floor SCECO ROOArchitecture Works $29,268 ### A8620 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 1 Third Floor Dry Area Architecture Works $22,714 ### A8980 Plaster Work Project name XXX Package 6 B Construction WZone 1 Lower Roof Dry Area Architecture Works $66,990 ### A21380 Block Work Project name XXX Package 6 B Construction WZone 3 Lower Roof All Areas Architecture Works $173,866 ### A19570 Wires & Cables Project name XXX Package 6 B Construction WZone 3 Basement FloorDry Area Electrical Works $7,687,821 ### A20290 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 3 First Floor Dry Area Architecture Works $20,418 ### A7890 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 1 First Floor Dry Area Architecture Works $705,059 ### A17220 Piping Accessories Project name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area Plumbing Works $286,944 ### A23190 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 3 First Floor All Areas Electrical Works $141,021 ### A18100 Waterproofing Project name XXX Package 6 B Construction WZone 2 Second Floor Wet Area Architecture Works $15,656 ### A19530 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 3 Basement FloorDry Area Architecture Works $1,288,408 ### A23860 Domestic Water Piping Project name XXX Package 6 B Construction WZone 3 Package 6A AcceAll Areas Plumbing Works $39,379 ### A21170 HVAC Ducting Project name XXX Package 6 B Construction WZone 3 Third Floor All Areas HVAC Works $1,357,628 ### A17510 Painting 1st Stage Project name XXX Package 6 B Construction WZone 2 First Floor Dry Area Architecture Works $143,978 ### A17000 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 2 Basement FloorDry Area Architecture Works $580,064 ### A19040 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 2 Package 6A AcceDry Area Architecture Works $14,268 ### A8860 Waterproofing Project name XXX Package 6 B Construction WZone 1 Third Floor Wet Area Architecture Works $8,601 ### A8270 Painting 1st Stage Project name XXX Package 6 B Construction WZone 1 Second Floor Dry Area Architecture Works $107,403 ### A23660 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 3 Second Floor All Areas Plumbing Works $1,170,772 ### A16980 Aluminum Panel cladding Project name XXX Package 6 B Construction WZone 2 Facade All Areas Architecture Works $5,425,594 ### A23200 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 3 Second Floor All Areas Electrical Works $122,154 ### A24070 Doors & Windows Project name XXX Package 6 B Construction WZone 3 Ground Floor SCECO ROOArchitecture Works $118,294 ### A7930 Wires & Cables Project name XXX Package 6 B Construction WZone 1 First Floor Dry Area Electrical Works $1,680,187 ### A23710 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 1 Third Floor All Areas Plumbing Works $534,160 ### A9500 HVAC Works Project name XXX Package 6 B Construction WZone 1 Upper Roof All Areas HVAC Works $363,652 ### A19620 Piping Accessories Project name XXX Package 6 B Construction WZone 3 Basement FloorDry Area Plumbing Works $687,982 ### A18220 Plaster Work Project name XXX Package 6 B Construction WZone 2 Third Floor Dry Area Architecture Works $210,210 ### A21140 Plumbing Works Project name XXX Package 6 B Construction WZone 3 Third Floor Wet Area Plumbing Works $20,048 ### A16410 Doors & Windows Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Architecture Works $0 ### A15800 Plumbing Shop Drawings Project name XXX Package 6 B Shop Drawing AGeneral Upper Roof All Areas Plumbing Works $0 ### A9800 Wires & Cables Project name XXX Package 6 B Construction WZone 1 Package 6A AcceDry Area Electrical Works $865,397 ### A23570 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 3 First Floor All Areas Plumbing Works $1,018,301 ### A17500 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 2 First Floor Dry Area Architecture Works $1,355,874 ### A21830 Plaster Work Project name XXX Package 6 B Construction WZone 3 Package 6A AcceDry Area Architecture Works $32,060 ### A20310 Painting 1st Stage Project name XXX Package 6 B Construction WZone 3 First Floor Dry Area Architecture Works $102,590 ### A20660 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 3 Second Floor Dry Area Architecture Works $62,566 ### A19940 Painting 1st Stage Project name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area Architecture Works $423,342

Page 9: Progress Monitoring Sheet Empty

### A9760 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 1 Package 6A AcceDry Area Architecture Works $1,395,494 ### A1820 Sanitary fixtures Project name XXX Package 6 B Material SubmitGeneral All Floors All Areas Plumbing Works $0 ### A23870 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 3 Package 6A AcceAll Areas Plumbing Works $47,389 ### A21020 Plaster Work Project name XXX Package 6 B Construction WZone 3 Third Floor Dry Area Architecture Works $269,850 ### A23740 Domestic Water Piping Project name XXX Package 6 B Construction WZone 3 Third Floor All Areas Plumbing Works $152,061 ### A17640 HVAC - Air Outlets Project name XXX Package 6 B Construction WZone 2 First Floor Dry Area HVAC Works $407,986 ### A17170 Wires & Cables Project name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area Electrical Works $1,379,509 ### A17270 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area HVAC Works $424,947 ### A8640 Painting 1st Stage Project name XXX Package 6 B Construction WZone 1 Third Floor Dry Area Architecture Works $99,857 ### A9060 Waterproofing Project name XXX Package 6 B Construction WZone 1 Lower Roof Dry Area Architecture Works $562,359 ### A21440 Electrical Conduits & Boxes Project name XXX Package 6 B Construction WZone 3 Lower Roof All Areas Electrical Works $198,142 ### A21540 HVAC Works Project name XXX Package 6 B Construction WZone 3 Lower Roof All Areas HVAC Works $1,442,601 ### A16470 Sanitary fixtures Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Plumbing Works $0 ### A19730 Painting 1st Stage Project name XXX Package 6 B Construction WZone 3 Basement FloorWet Area Architecture Works $1,330 ### A7980 Piping Accessories Project name XXX Package 6 B Construction WZone 1 First Floor Dry Area Plumbing Works $202,093 ### A6940 Electrical works Project name XXX Package 6 B Construction WZone 1 Upper Roof All Areas Electrical Works $499,929 ### A23210 Electrical Cable Tray Project name XXX Package 6 B Construction WZone 3 Third Floor All Areas Electrical Works $139,990 ### A19930 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area Architecture Works $3,169,251 ### A22870 Panel Boards Project name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area Electrical Works $125,958 ### A19060 Painting 1st Stage Project name XXX Package 6 B Construction WZone 2 Package 6A AcceDry Area Architecture Works $131,781 ### A8030 HVAC - Air Outlets Project name XXX Package 6 B Construction WZone 1 First Floor Dry Area HVAC Works $350,793 ### A8300 Wires & Cables Project name XXX Package 6 B Construction WZone 1 Second Floor Dry Area Electrical Works $1,555,235 ### A21750 Block Work Project name XXX Package 6 B Construction WZone 3 Upper Roof All Areas Architecture Works $82,240 ### A19590 Wires & Cables Project name XXX Package 6 B Construction WZone 3 Basement FloorWet Area Electrical Works $14,777 ### A17380 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area Architecture Works $621,522 ### A8260 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 1 Second Floor Dry Area Architecture Works $669,015 ### A16610 Lighting Fixtures Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Electrical Works $0 ### A17880 Painting 1st Stage Project name XXX Package 6 B Construction WZone 2 Second Floor Dry Area Architecture Works $106,767 ### A19720 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 3 Basement FloorWet Area Architecture Works $19,920 ### A18410 Plaster Work Project name XXX Package 6 B Construction WZone 2 Third Floor Wet Area Architecture Works $16,764 ### A22860 Panel Boards Project name XXX Package 6 B Construction WZone 1 Basement FloorDry Area Electrical Works $491,139 ### A17540 Wires & Cables Project name XXX Package 6 B Construction WZone 2 First Floor Dry Area Electrical Works $2,153,269 ### A17700 Painting 1st Stage Project name XXX Package 6 B Construction WZone 2 First Floor Wet Area Architecture Works $2,188 ### A16390 Handrail & Balustrades Project name XXX Package 6 B Material ProcuGeneral All Floors All Areas Architecture Works $0 ### A7660 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area HVAC Works $235,625 ### A9900 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 1 Package 6A AcceDry Area HVAC Works $13,443 ### A8140 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 1 First Floor Dry Area Architecture Works $746,088 ### A18960 Plumbing Works Project name XXX Package 6 B Construction WZone 2 Upper Roof All Areas Plumbing Works $16,476 ### A19670 HVAC - Air Outlets Project name XXX Package 6 B Construction WZone 3 Basement FloorDry Area HVAC Works $281,567 ### A20340 Wires & Cables Project name XXX Package 6 B Construction WZone 3 First Floor Dry Area Electrical Works $1,757,041 ### A19970 Wires & Cables Project name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area Electrical Works $1,384,732 ### A21490 Piping Works Project name XXX Package 6 B Construction WZone 3 Lower Roof All Areas Plumbing Works $91,170 ### A9850 Piping Accessories Project name XXX Package 6 B Construction WZone 1 Package 6A AcceDry Area Plumbing Works $46,105 ### A19640 Plumbing Accessories Project name XXX Package 6 B Construction WZone 3 Basement FloorWet Area Plumbing Works $4,409 ### A20020 Piping Accessories Project name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area Plumbing Works $247,120 ### A17590 Piping Accessories Project name XXX Package 6 B Construction WZone 2 First Floor Dry Area Plumbing Works $254,368 ### A23730 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 2 Third Floor All Areas Plumbing Works $1,062,935 ### A22980 Panel Boards Project name XXX Package 6 B Construction WZone 3 Basement FloorDry Area Electrical Works $18,208 ### A7770 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area Architecture Works $274,165 ### A17690 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 2 First Floor Wet Area Architecture Works $30,720 ### A22080 Waterproofing Project name XXX Package 6 B Construction WZone 3 Package 6A AcceWet Area Architecture Works $820,542

Page 10: Progress Monitoring Sheet Empty

### A20680 Painting 1st Stage Project name XXX Package 6 B Construction WZone 3 Second Floor Dry Area Architecture Works $222,327 ### A18050 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 2 Second Floor Wet Area Architecture Works $81,982 ### A8400 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 1 Second Floor Dry Area HVAC Works $189,443 ### A19800 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 3 Basement FloorDry Area Architecture Works $239,656 ### A18230 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 2 Third Floor Dry Area Architecture Works $57,236 ### A18470 Waterproofing Project name XXX Package 6 B Construction WZone 2 Third Floor Wet Area Architecture Works $8,601 ### A18590 Plaster Work Project name XXX Package 6 B Construction WZone 2 Lower Roof Dry Area Architecture Works $114,870 ### A19680 HVAC - Air Outlets Project name XXX Package 6 B Construction WZone 3 Basement FloorWet Area HVAC Works $10,571 ### A21210 Plaster Work Project name XXX Package 6 B Construction WZone 3 Third Floor Wet Area Architecture Works $16,830 ### A3510 As-Built Drawings & Operation & Maint Project name XXX Package 6 B Construction WGeneral General Requir All Areas General $125,136 ### A19090 Wires & Cables Project name XXX Package 6 B Construction WZone 2 Package 6A AcceDry Area Electrical Works $544,579 ### A8810 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 1 Third Floor Wet Area Architecture Works $46,809 ### A8830 Painting 1st Stage Project name XXX Package 6 B Construction WZone 1 Third Floor Wet Area Architecture Works $420 ### A19820 Facade Plaster & Paint Project name XXX Package 6 B Construction WZone 3 Facade All Areas Architecture Works $401,229 ### A17750 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 2 First Floor Dry Area Architecture Works $1,211,670 ### A19050 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 2 Package 6A AcceDry Area Architecture Works $1,285,852 ### A22880 Panel Boards Project name XXX Package 6 B Construction WZone 1 First Floor Dry Area Electrical Works $197,243 ### A8350 Piping Accessories Project name XXX Package 6 B Construction WZone 1 Second Floor Dry Area Plumbing Works $186,861 ### A22920 Panel Boards Project name XXX Package 6 B Construction WZone 2 Basement FloorDry Area Electrical Works $390,436 ### A19000 Electrical works Project name XXX Package 6 B Construction WZone 2 Upper Roof All Areas Electrical Works $701,970 ### A21030 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 3 Third Floor Dry Area Architecture Works $56,826 ### A3360 Doors & Windows Project name XXX Package 6 B Construction WZone 1 Basement FloorDry Area Architecture Works $100,826 ### A17870 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 2 Second Floor Dry Area Architecture Works $1,012,509 ### A8770 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 1 Third Floor Dry Area HVAC Works $240,825 ### A9010 Painting 1st Stage Project name XXX Package 6 B Construction WZone 1 Lower Roof Dry Area Architecture Works $94,141 ### A21840 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 3 Package 6A AcceDry Area Architecture Works $18,040 ### A20440 HVAC - Air Outlets Project name XXX Package 6 B Construction WZone 3 First Floor Dry Area HVAC Works $319,219 ### A20070 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area HVAC Works $236,163 ### A10010 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 1 Package 6A AcceDry Area Architecture Works $949,533 ### A23640 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 2 Second Floor All Areas Plumbing Works $1,175,227 ### A18070 Painting 1st Stage Project name XXX Package 6 B Construction WZone 2 Second Floor Wet Area Architecture Works $1,085 ### A17910 Wires & Cables Project name XXX Package 6 B Construction WZone 2 Second Floor Dry Area Electrical Works $1,661,628 ### A23590 Exhaust Fans Project name XXX Package 6 B Construction WZone 2 First Floor Dry Area HVAC Works $7,174 ### A9450 Plumbing Works Project name XXX Package 6 B Construction WZone 1 Upper Roof All Areas Plumbing Works $44,007 ### A21270 Waterproofing Project name XXX Package 6 B Construction WZone 3 Third Floor Wet Area Architecture Works $9,888 ### A17560 Wires & Cables Project name XXX Package 6 B Construction WZone 2 First Floor Wet Area Electrical Works $22,023 ### A8670 Wires & Cables Project name XXX Package 6 B Construction WZone 1 Third Floor Dry Area Electrical Works $1,427,222 ### A19650 Sanitary Fixtures & Toilet and Bath accesProject name XXX Package 6 B Construction WZone 3 Basement FloorWet Area Plumbing Works $82,103 ### A20710 Wires & Cables Project name XXX Package 6 B Construction WZone 3 Second Floor Dry Area Electrical Works $1,585,508 ### A8630 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 1 Third Floor Dry Area Architecture Works $650,016 ### A16950 Doors & Windows Project name XXX Package 6 B Construction WZone 2 Basement FloorDry Area Architecture Works $75,567 ### A18250 Painting 1st Stage Project name XXX Package 6 B Construction WZone 2 Third Floor Dry Area Architecture Works $154,409 ### A22820 Waterproofing Project name XXX Package 6 B Construction WZone 2 Lower Roof Dry Area Architecture Works $1,365,886 ### A2880 MCC (Motor Control Center) Project name XXX Package 6 B Construction WAll Zones All Floors All Areas Electrical Works $553,356 ### A20300 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 3 First Floor Dry Area Architecture Works $557,232 ### A20180 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area Architecture Works $286,192 ### A22930 Panel Boards Project name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area Electrical Works $86,456 ### A17610 Plumbing Accessories Project name XXX Package 6 B Construction WZone 2 First Floor Wet Area Plumbing Works $57,491 ### A19190 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 2 Package 6A AcceDry Area HVAC Works $16,481 ### A16970 FACADE LIGHTING INSTALLATIONS Project name XXX Package 6 B Construction WZone 2 Facade All Areas Electrical Works $215,049 ### A22890 Panel Boards Project name XXX Package 6 B Construction WZone 1 Second Floor Dry Area Electrical Works $55,086

Page 11: Progress Monitoring Sheet Empty

### A21760 Plumbing Works Project name XXX Package 6 B Construction WZone 3 Upper Roof All Areas Plumbing Works $38,481 ### A3440 FACADE LIGHTING INSTALLATIONS Project name XXX Package 6 B Construction WZone 1 Facade All Areas Electrical Works $221,763 ### A21390 Plaster Work Project name XXX Package 6 B Construction WZone 3 Lower Roof Dry Area Architecture Works $57,400 ### A3380 ATS (Automatic transformer switch) Project name XXX Package 6 B Construction WAll Zones All Floors All Areas Electrical Works $68,123 ### A3400 CCTV System Project name XXX Package 6 B Construction WAll Zones All Floors All Areas Electrical Works $866,178 ### A3390 Public Address System Project name XXX Package 6 B Construction WAll Zones All Floors All Areas Electrical Works $715,254 ### A3420 Telephone System Project name XXX Package 6 B Construction WAll Zones All Floors All Areas Electrical Works $150,773 ### A3410 MATV System Project name XXX Package 6 B Construction WAll Zones All Floors All Areas Electrical Works $236,460 ### A3670 FIRE ALARM SYSTEM Project name XXX Package 6 B Construction WAll Zones All Floors All Areas Electrical Works $1,518,354 ### A3370 Glazing Project name XXX Package 6 B Construction WZone 1 Basement FloorDry Area Architecture Works $291,622 ### A19140 Piping Accessories Project name XXX Package 6 B Construction WZone 2 Package 6A AcceDry Area Plumbing Works $55,391 ### A8690 Wires & Cables Project name XXX Package 6 B Construction WZone 1 Third Floor Wet Area Electrical Works $5,652 ### A8720 Piping Accessories Project name XXX Package 6 B Construction WZone 1 Third Floor Dry Area Plumbing Works $198,161 ### A8510 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 1 Second Floor Dry Area Architecture Works $741,121 ### A22900 Panel Boards Project name XXX Package 6 B Construction WZone 1 Third Floor Dry Area Electrical Works $92,376 ### A18010 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 2 Second Floor Dry Area HVAC Works $240,588 ### A21810 Roofing System Project name XXX Package 6 B Construction WZone 3 Upper Roof All Areas Architecture Works $935,277 ### A19810 Suspended ceiling Project name XXX Package 6 B Construction WZone 3 Basement FloorWet Area Architecture Works $12,844 ### A18420 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 2 Third Floor Wet Area Architecture Works $46,809 ### A18620 Painting 1st Stage Project name XXX Package 6 B Construction WZone 2 Lower Roof Dry Area Architecture Works $176,338 ### A21050 Painting 1st Stage Project name XXX Package 6 B Construction WZone 3 Third Floor Dry Area Architecture Works $223,735 ### A17650 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 2 First Floor Wet Area HVAC Works $59,837 ### A3280 HVAC A/c Units Project name XXX Package 6 B Construction WZone 1 Basement FloorDry Area HVAC Works $119,241 ### A23330 Exhaust Fans Project name XXX Package 6 B Construction WZone 1 Basement FloorDry Area HVAC Works $101,405 ### A2810 Metal Works Project name XXX Package 6 B Construction WZone 1 Basement FloorAll Areas Architecture Works $82,772 ### A2830 Painting Final Stage Project name XXX Package 6 B Construction WZone 1 Basement FloorDry Area Architecture Works $426,958 ### A2900 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 1 Basement FloorDry Area Electrical Works $548,495 ### A19110 Wires & Cables Project name XXX Package 6 B Construction WZone 2 Package 6A AcceWet Area Electrical Works $26,607 ### A17960 Piping Accessories Project name XXX Package 6 B Construction WZone 2 Second Floor Dry Area Plumbing Works $246,468 ### A9040 Wires & Cables Project name XXX Package 6 B Construction WZone 1 Lower Roof Dry Area Electrical Works $322,331 ### A23750 Fire Fighting Piping Project name XXX Package 6 B Construction WZone 3 Third Floor All Areas Plumbing Works $1,069,104 ### A21860 Painting 1st Stage Project name XXX Package 6 B Construction WZone 3 Package 6A AcceDry Area Architecture Works $204,057 ### A23000 Panel Boards Project name XXX Package 6 B Construction WZone 3 First Floor Dry Area Electrical Works $42,312 ### A20810 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 3 Second Floor Dry Area HVAC Works $214,849 ### A22990 Panel Boards Project name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area Electrical Works $40,490 ### A8880 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 1 Third Floor Dry Area Architecture Works $782,634 ### A20670 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 3 Second Floor Dry Area Architecture Works $1,251,086 ### A18120 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 2 Second Floor Dry Area Architecture Works $1,214,439 ### A18060 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 2 Second Floor Wet Area Architecture Works $30,720 ### A17760 Suspended ceiling Project name XXX Package 6 B Construction WZone 2 First Floor Wet Area Architecture Works $21,125 ### A9000 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 1 Lower Roof Dry Area Architecture Works $4,379 ### A16800 Glazing Project name XXX Package 6 B Construction WZone 2 Basement FloorDry Area Architecture Works $1,858,266 ### A19160 Plumbing Accessories Project name XXX Package 6 B Construction WZone 2 Package 6A AcceWet Area Plumbing Works $597 ### A8780 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 1 Third Floor Wet Area HVAC Works $23,152 ### A16890 HVAC A/C Units Project name XXX Package 6 B Construction WZone 2 Basement FloorDry Area HVAC Works $96,260 ### A23340 Exhaust Fans Project name XXX Package 6 B Construction WZone 2 Basement FloorDry Area HVAC Works $128,133 ### A17030 Metal Works Project name XXX Package 6 B Construction WZone 2 Basement FloorAll Areas Architecture Works $69,734 ### A16750 Painting Final Stage Project name XXX Package 6 B Construction WZone 2 Basement FloorDry Area Architecture Works $405,680 ### A18240 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 2 Third Floor Dry Area Architecture Works $1,435,308 ### A20390 Piping Accessories Project name XXX Package 6 B Construction WZone 3 First Floor Dry Area Plumbing Works $253,858 ### A19780 Aluminum Panel cladding Project name XXX Package 6 B Construction WZone 3 Facade All Areas Architecture Works $8,894,739

Page 12: Progress Monitoring Sheet Empty

### A9140 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 1 Lower Roof Dry Area HVAC Works $296,089 ### A22830 Waterproofing Project name XXX Package 6 B Construction WZone 3 Lower Roof Dry Area Architecture Works $437,859 ### A22940 Panel Boards Project name XXX Package 6 B Construction WZone 2 First Floor Dry Area Electrical Works $90,248 ### A19300 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 2 Package 6A AcceDry Area Architecture Works $1,188,449 ### A8820 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 1 Third Floor Wet Area Architecture Works $31,040 ### A17930 Wires & Cables Project name XXX Package 6 B Construction WZone 2 Second Floor Wet Area Electrical Works $22,023 ### A22510 Glazing Project name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area Architecture Works $157,080 ### A18440 Painting 1st Stage Project name XXX Package 6 B Construction WZone 2 Third Floor Wet Area Architecture Works $420 ### A17990 Sanitary Fixtures & Toilet and Bath accesProject name XXX Package 6 B Construction WZone 2 Second Floor Wet Area Plumbing Works $110,671 ### A21040 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 3 Third Floor Dry Area Architecture Works $2,045,761 ### A20550 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 3 First Floor Dry Area Architecture Works $746,243 ### A21770 HVAC Works Project name XXX Package 6 B Construction WZone 3 Upper Roof All Areas HVAC Works $499,856 ### A9980 Doors & Windows Project name XXX Package 6 B Construction WZone 1 Package 6A AcceDry Area Architecture Works $934,189 ### A21220 Wall Covering ( Ceramic / Porcelain/ MarProject name XXX Package 6 B Construction WZone 3 Third Floor Wet Area Architecture Works $47,435 ### A21890 Wires & Cables Project name XXX Package 6 B Construction WZone 3 Package 6A AcceDry Area Electrical Works $606,171 ### A16780 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 2 Basement FloorDry Area Electrical Works $738,181 ### A18020 HVAC - Air Outlets Project name XXX Package 6 B Construction WZone 2 Second Floor Wet Area HVAC Works $55,665 ### A22950 Panel Boards Project name XXX Package 6 B Construction WZone 2 Second Floor Dry Area Electrical Works $54,025 ### A18330 Piping Accessories Project name XXX Package 6 B Construction WZone 2 Third Floor Dry Area Plumbing Works $233,089 ### A18380 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 2 Third Floor Dry Area HVAC Works $292,791 ### A18280 Wires & Cables Project name XXX Package 6 B Construction WZone 2 Third Floor Dry Area Electrical Works $1,689,245 ### A21850 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 3 Package 6A AcceDry Area Architecture Works $1,854,932 ### A21240 Painting 1st Stage Project name XXX Package 6 B Construction WZone 3 Third Floor Wet Area Architecture Works $420 ### A2850 Signage Project name XXX Package 6 B Construction WZone 1 Basement FloorAll Areas Architecture Works $148,044 ### A7740 Doors & Windows Project name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area Architecture Works $843,113 ### A17980 Plumbing Accessories Project name XXX Package 6 B Construction WZone 2 Second Floor Wet Area Plumbing Works $45,107 ### A9090 Piping Accessories Project name XXX Package 6 B Construction WZone 1 Lower Roof Dry Area Plumbing Works $29,017 ### A3640 Plumbing Pumbs Project name XXX Package 6 B Construction WAll Zones All Floors All Areas Plumbing Works $2,609,206 ### A19750 Doors & Windows Project name XXX Package 6 B Construction WZone 3 Basement FloorDry Area Architecture Works $946,016 ### A23010 Panel Boards Project name XXX Package 6 B Construction WZone 3 Second Floor Dry Area Electrical Works $20,332 ### A20760 Piping Accessories Project name XXX Package 6 B Construction WZone 3 Second Floor Dry Area Plumbing Works $260,818 ### A22560 Glazing Project name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area Architecture Works $319,872 ### A8890 Suspended ceiling Project name XXX Package 6 B Construction WZone 1 Third Floor Wet Area Architecture Works $11,830 ### A17350 Doors & Windows Project name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area Architecture Works $1,268,410 ### A18490 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 2 Third Floor Dry Area Architecture Works $1,381,599 ### A18650 Wires & Cables Project name XXX Package 6 B Construction WZone 2 Lower Roof Dry Area Electrical Works $580,254 ### A18750 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 2 Lower Roof Dry Area HVAC Works $786,871 ### A17940 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 2 Second Floor Wet Area Electrical Works $536,123 ### A21160 Sanitary Fixtures & Toilet and Bath accesProject name XXX Package 6 B Construction WZone 3 Third Floor Wet Area Plumbing Works $45,818 ### A20920 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 3 Second Floor Dry Area Architecture Works $999,083 ### A18130 Suspended ceiling Project name XXX Package 6 B Construction WZone 2 Second Floor Wet Area Architecture Works $21,125 ### A9250 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 1 Lower Roof Dry Area Architecture Works $230,895 ### A22660 Wood Cladding Project name XXX Package 6 B Construction WZone 1 First Floor Dry Area Architecture Works $54,675 ### A22520 Glazing Project name XXX Package 6 B Construction WZone 1 First Floor Dry Area Architecture Works $174,216 ### A19580 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 3 Basement FloorDry Area Electrical Works $456,502 ### A8740 Plumbing Accessories Project name XXX Package 6 B Construction WZone 1 Third Floor Wet Area Plumbing Works $1,039 ### A19690 HVAC A/C Units Project name XXX Package 6 B Construction WZone 3 Basement FloorDry Area HVAC Works $255,737 ### A23350 Exhaust Fans Project name XXX Package 6 B Construction WZone 3 Basement FloorDry Area HVAC Works $101,405 ### A17040 Signage Project name XXX Package 6 B Construction WZone 2 Basement FloorAll Areas Architecture Works $148,044 ### A17150 Painting Final Stage Project name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area Architecture Works $303,015 ### A17290 HVAC A/C Units Project name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area HVAC Works $77,738

Page 13: Progress Monitoring Sheet Empty

### A23440 Exhaust Fans Project name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area HVAC Works $134,640 ### A17400 Metal Works Project name XXX Package 6 B Construction WZone 2 Ground Floor All Areas Architecture Works $1,553,562 ### A18430 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 2 Third Floor Wet Area Architecture Works $31,040 ### A21290 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 3 Third Floor Dry Area Architecture Works $1,926,853 ### A21130 Piping Accessories Project name XXX Package 6 B Construction WZone 3 Third Floor Dry Area Plumbing Works $228,834 ### A21180 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 3 Third Floor Dry Area HVAC Works $228,783 ### A21080 Wires & Cables Project name XXX Package 6 B Construction WZone 3 Third Floor Dry Area Electrical Works $1,785,610 ### A22910 Panel Boards Project name XXX Package 6 B Construction WZone 1 Lower Roof Dry Area Electrical Works $148,539 ### A19770 FACADE LIGHTING INSTALLATIONS Project name XXX Package 6 B Construction WZone 3 Facade All Areas Electrical Works $370,878 ### A10030 Metal Works Project name XXX Package 6 B Construction WZone 1 Package 6A AcceAll Areas Architecture Works $426,751 ### A9780 Painting Final Stage Project name XXX Package 6 B Construction WZone 1 Package 6A AcceDry Area Architecture Works $148,173 ### A9810 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 1 Package 6A AcceDry Area Electrical Works $105,117 ### A9920 HVAC A/C Units Project name XXX Package 6 B Construction WZone 1 Package 6A AcceDry Area HVAC Works $28,212 ### A23880 Exhaust Fans Project name XXX Package 6 B Construction WZone 1 Package 6A AcceDry Area HVAC Works $3,591 ### A21990 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 3 Package 6A AcceDry Area HVAC Works $13,505 ### A18860 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 2 Lower Roof Dry Area Architecture Works $970,515 ### A21940 Piping Accessories Project name XXX Package 6 B Construction WZone 3 Package 6A AcceDry Area Plumbing Works $46,530 ### A21230 Floor Covering ( Ceramic / Porcelain/ MaProject name XXX Package 6 B Construction WZone 3 Third Floor Wet Area Architecture Works $44,010 ### A19860 Glazing Project name XXX Package 6 B Construction WZone 3 Basement FloorDry Area Architecture Works $1,041,652 ### A17180 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 2 Ground Floor Dry Area Electrical Works $384,655 ### A8110 Doors & Windows Project name XXX Package 6 B Construction WZone 1 First Floor Dry Area Architecture Works $154,600 ### A7540 Painting Final Stage Project name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area Architecture Works $288,213 ### A7680 HVAC A/C Units Project name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area HVAC Works $77,568 ### A23430 Exhaust Fans Project name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area HVAC Works $89,760 ### A7790 Metal Works Project name XXX Package 6 B Construction WZone 1 Ground Floor All Areas Architecture Works $416,483 ### A22690 Wood Cladding Project name XXX Package 6 B Construction WZone 2 First Floor Dry Area Architecture Works $91,988 ### A22570 Glazing Project name XXX Package 6 B Construction WZone 2 First Floor Dry Area Architecture Works $1,389,562 ### A3760 Generator sets Project name XXX Package 6 B Construction WAll Zones All Floors All Areas Electrical Works $2,475,048 ### A21420 Painting 1st Stage Project name XXX Package 6 B Construction WZone 3 Lower Roof Dry Area Architecture Works $91,023 ### A18700 Piping Accessories Project name XXX Package 6 B Construction WZone 2 Lower Roof Dry Area Plumbing Works $11,021 ### A19830 Metal Works Project name XXX Package 6 B Construction WZone 3 Basement FloorAll Areas Architecture Works $1,074,323 ### A19550 Painting Final Stage Project name XXX Package 6 B Construction WZone 3 Basement FloorDry Area Architecture Works $453,220 ### A7940 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 1 First Floor Dry Area Electrical Works $31,641 ### A20150 Doors & Windows Project name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area Architecture Works $887,137 ### A3460 LANDSCAPING Project name XXX Package 6 B Construction WAll Zones External Works All Areas Architecture Works $5,328,019 ### A18350 Plumbing Accessories Project name XXX Package 6 B Construction WZone 2 Third Floor Wet Area Plumbing Works $19,650 ### A18390 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 2 Third Floor Wet Area HVAC Works $28,848 ### A18300 Wires & Cables Project name XXX Package 6 B Construction WZone 2 Third Floor Wet Area Electrical Works $5,652 ### A3470 Irrigation system Project name XXX Package 6 B Construction WAll Zones External Works All Areas Plumbing Works $963,175 ### A19270 Doors & Windows Project name XXX Package 6 B Construction WZone 2 Package 6A AcceDry Area Architecture Works $1,889,815 ### A8850 Doors & Windows Project name XXX Package 6 B Construction WZone 1 Third Floor Dry Area Architecture Works $154,862 ### A8480 Doors & Windows Project name XXX Package 6 B Construction WZone 1 Second Floor Dry Area Architecture Works $150,136 ### A8790 HVAC A/C Units Project name XXX Package 6 B Construction WZone 1 Third Floor Dry Area HVAC Works $145,513 ### A23760 Exhaust Fans Project name XXX Package 6 B Construction WZone 1 Third Floor Dry Area HVAC Works $136,420 ### A19790 Doors & Windows Project name XXX Package 6 B Construction WZone 3 Basement FloorWet Area Architecture Works $81,453 ### A20090 HVAC A/C Units Project name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area HVAC Works $76,104 ### A23450 Exhaust Fans Project name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area HVAC Works $89,760 ### A19980 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area Electrical Works $438,864 ### A22670 Wood Cladding Project name XXX Package 6 B Construction WZone 1 Second Floor Dry Area Architecture Works $42,861 ### A22530 Glazing Project name XXX Package 6 B Construction WZone 1 Second Floor Dry Area Architecture Works $171,360 ### A17720 Doors & Windows Project name XXX Package 6 B Construction WZone 2 First Floor Dry Area Architecture Works $167,950

Page 14: Progress Monitoring Sheet Empty

### A18500 Suspended ceiling Project name XXX Package 6 B Construction WZone 2 Third Floor Wet Area Architecture Works $11,830 ### A21100 Wires & Cables Project name XXX Package 6 B Construction WZone 3 Third Floor Wet Area Electrical Works $7,536 ### A8160 Metal Works Project name XXX Package 6 B Construction WZone 1 First Floor All Areas Architecture Works $323,186 ### A7910 Painting Final Stage Project name XXX Package 6 B Construction WZone 1 First Floor Dry Area Architecture Works $118,390 ### A8050 HVAC A/C Units Project name XXX Package 6 B Construction WZone 1 First Floor Dry Area HVAC Works $91,038 ### A8280 Painting Final Stage Project name XXX Package 6 B Construction WZone 1 Second Floor Dry Area Architecture Works $96,018 ### A8420 HVAC A/C Units Project name XXX Package 6 B Construction WZone 1 Second Floor Dry Area HVAC Works $21,968 ### A23670 Exhaust Fans Project name XXX Package 6 B Construction WZone 1 Second Floor Dry Area HVAC Works $136,420 ### A8530 Metal Works Project name XXX Package 6 B Construction WZone 1 Second Floor All Areas Architecture Works $643,694 ### A8310 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 1 Second Floor Dry Area Electrical Works $38,444 ### A8650 Painting Final Stage Project name XXX Package 6 B Construction WZone 1 Third Floor Dry Area Architecture Works $80,910 ### A8900 Metal Works Project name XXX Package 6 B Construction WZone 1 Third Floor All Areas Architecture Works $651,980 ### A21450 Wires & Cables Project name XXX Package 6 B Construction WZone 3 Lower Roof Dry Area Electrical Works $370,568 ### A3450 STREET LIGHTING Project name XXX Package 6 B Construction WAll Zones External Works All Areas Electrical Works $10,519,032 ### A22960 Panel Boards Project name XXX Package 6 B Construction WZone 2 Third Floor Dry Area Electrical Works $94,428 ### A19600 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 3 Basement FloorWet Area Electrical Works $207,412 ### A19740 Painting Final Stage Project name XXX Package 6 B Construction WZone 3 Basement FloorWet Area Architecture Works $1,330 ### A3560 Garbage chute Project name XXX Package 6 B Construction WAll Zones All Floors All Areas Architecture Works $544,532 ### A23360 Exhaust Fans Project name XXX Package 6 B Construction WZone 3 Basement FloorWet Area HVAC Works $96,407 ### A7570 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 1 Ground Floor Dry Area Electrical Works $422,554 ### A17550 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 2 First Floor Dry Area Electrical Works $385,113 ### A17770 Metal Works Project name XXX Package 6 B Construction WZone 2 First Floor All Areas Architecture Works $2,062,758 ### A17520 Painting Final Stage Project name XXX Package 6 B Construction WZone 2 First Floor Dry Area Architecture Works $127,550 ### A17660 HVAC A/C Units Project name XXX Package 6 B Construction WZone 2 First Floor Dry Area HVAC Works $202,678 ### A18090 Doors & Windows Project name XXX Package 6 B Construction WZone 2 Second Floor Dry Area Architecture Works $783,044 ### A9220 Doors & Windows Project name XXX Package 6 B Construction WZone 1 Lower Roof Dry Area Architecture Works $55,853 ### A22100 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 3 Package 6A AcceDry Area Architecture Works $922,086 ### A21300 Suspended ceiling Project name XXX Package 6 B Construction WZone 3 Third Floor Wet Area Architecture Works $13,013 ### A21150 Plumbing Accessories Project name XXX Package 6 B Construction WZone 3 Third Floor Wet Area Plumbing Works $7,677 ### A21190 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 3 Third Floor Wet Area HVAC Works $27,256 ### A22610 Glazing Project name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area Architecture Works $157,080 ### A18460 Doors & Windows Project name XXX Package 6 B Construction WZone 2 Third Floor Dry Area Architecture Works $251,446 ### A22700 Wood Cladding Project name XXX Package 6 B Construction WZone 2 Second Floor Dry Area Architecture Works $70,876 ### A22580 Glazing Project name XXX Package 6 B Construction WZone 2 Second Floor Dry Area Architecture Works $342,720 ### A19950 Painting Final Stage Project name XXX Package 6 B Construction WZone 3 Ground Floor Dry Area Architecture Works $265,592 ### A20200 Metal Works Project name XXX Package 6 B Construction WZone 3 Ground Floor All Areas Architecture Works $790,546 ### A20350 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 3 First Floor Dry Area Electrical Works $42,188 ### A20460 HVAC A/C Units Project name XXX Package 6 B Construction WZone 3 First Floor Dry Area HVAC Works $110,986 ### A8680 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 1 Third Floor Dry Area Electrical Works $33,442 ### A22540 Glazing Project name XXX Package 6 B Construction WZone 1 Third Floor Dry Area Architecture Works $185,640 ### A22680 Wood Cladding Project name XXX Package 6 B Construction WZone 1 Third Floor Dry Area Architecture Works $732,681 ### A22970 Panel Boards Project name XXX Package 6 B Construction WZone 2 Lower Roof Dry Area Electrical Works $233,303 ### A21500 Piping Accessories Project name XXX Package 6 B Construction WZone 3 Lower Roof Dry Area Plumbing Works $11,217 ### A17890 Painting Final Stage Project name XXX Package 6 B Construction WZone 2 Second Floor Dry Area Architecture Works $90,108 ### A18030 HVAC A/C Units Project name XXX Package 6 B Construction WZone 2 Second Floor Dry Area HVAC Works $104,159 ### A23680 Exhaust Fans Project name XXX Package 6 B Construction WZone 2 Second Floor Dry Area HVAC Works $181,894 ### A18140 Metal Works Project name XXX Package 6 B Construction WZone 2 Second Floor All Areas Architecture Works $3,300,496 ### A17920 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 2 Second Floor Dry Area Electrical Works $385,419 ### A21970 Sanitary Fixtures & Toilet and Bath accesProject name XXX Package 6 B Construction WZone 3 Package 6A AcceWet Area Plumbing Works $5,790 ### A22720 Wood Cladding Project name XXX Package 6 B Construction WZone 3 First Floor Dry Area Architecture Works $116,458 ### A22620 Glazing Project name XXX Package 6 B Construction WZone 3 First Floor Dry Area Architecture Works $174,216

Page 15: Progress Monitoring Sheet Empty

### A19320 Metal Works Project name XXX Package 6 B Construction WZone 2 Package 6A AcceAll Areas Architecture Works $383,750 ### A19070 Painting Final Stage Project name XXX Package 6 B Construction WZone 2 Package 6A AcceDry Area Architecture Works $129,465 ### A19100 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 2 Package 6A AcceDry Area Electrical Works $1,234,124 ### A19210 HVAC A/C Units Project name XXX Package 6 B Construction WZone 2 Package 6A AcceDry Area HVAC Works $33,122 ### A23890 Exhaust Fans Project name XXX Package 6 B Construction WZone 2 Package 6A AcceDry Area HVAC Works $3,591 ### A22360 Signage Project name XXX Package 6 B Construction WZone 1 Ground Floor All Areas Architecture Works $184,718 ### A20520 Doors & Windows Project name XXX Package 6 B Construction WZone 3 First Floor Dry Area Architecture Works $167,489 ### A22550 Glazing Project name XXX Package 6 B Construction WZone 1 Lower Roof Dry Area Architecture Works $290,852 ### A22600 Glazing Project name XXX Package 6 B Construction WZone 2 Lower Roof Dry Area Architecture Works $1,182,009 ### A22650 Glazing Project name XXX Package 6 B Construction WZone 3 Lower Roof Dry Area Architecture Works $191,083 ### A19850 Signage Project name XXX Package 6 B Construction WZone 3 Basement FloorAll Areas Architecture Works $147,367 ### A19840 Toilet and Bath Accessories Project name XXX Package 6 B Construction WZone 3 Basement FloorWet Area Architecture Works $11,342 ### A21260 Doors & Windows Project name XXX Package 6 B Construction WZone 3 Third Floor Dry Area Architecture Works $218,365 ### A20890 Doors & Windows Project name XXX Package 6 B Construction WZone 3 Second Floor Dry Area Architecture Works $256,462 ### A22400 Signage Project name XXX Package 6 B Construction WZone 2 Ground Floor All Areas Architecture Works $175,423 ### A23020 Panel Boards Project name XXX Package 6 B Construction WZone 3 Third Floor Dry Area Electrical Works $51,451 ### A8870 Doors & Windows Project name XXX Package 6 B Construction WZone 1 Third Floor Wet Area Architecture Works $43,488 ### A8840 Painting Final Stage Project name XXX Package 6 B Construction WZone 1 Third Floor Wet Area Architecture Works $420 ### A21550 HVAC Air Outlets Project name XXX Package 6 B Construction WZone 3 Lower Roof Dry Area HVAC Works $305,424 ### A21660 Suspended ceiling & gypsum board partiProject name XXX Package 6 B Construction WZone 3 Lower Roof Dry Area Architecture Works $110,565 ### A18830 Doors & Windows Project name XXX Package 6 B Construction WZone 2 Lower Roof Dry Area Architecture Works $72,222 ### A20570 Metal Works Project name XXX Package 6 B Construction WZone 3 First Floor All Areas Architecture Works $427,061 ### A20320 Painting Final Stage Project name XXX Package 6 B Construction WZone 3 First Floor Dry Area Architecture Works $77,323 ### A21200 HVAC A/C Units Project name XXX Package 6 B Construction WZone 3 Third Floor Dry Area HVAC Works $77,362 ### A23780 Exhaust Fans Project name XXX Package 6 B Construction WZone 3 Third Floor Dry Area HVAC Works $136,420 ### A20830 HVAC A/C Units Project name XXX Package 6 B Construction WZone 3 Second Floor Dry Area HVAC Works $40,020 ### A23690 Exhaust Fans Project name XXX Package 6 B Construction WZone 3 Second Floor Dry Area HVAC Works $136,420 ### A20720 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 3 Second Floor Dry Area Electrical Works $61,259 ### A9270 Metal Works Project name XXX Package 6 B Construction WZone 1 Lower Roof All Areas Architecture Works $263,772 ### A17780 Toilet and Bath accessories Project name XXX Package 6 B Construction WZone 2 First Floor Wet Area Architecture Works $28,095 ### A17710 Painting Final Stage Project name XXX Package 6 B Construction WZone 2 First Floor Wet Area Architecture Works $2,188 ### A17740 Doors & Windows Project name XXX Package 6 B Construction WZone 2 First Floor Wet Area Architecture Works $99,837 ### A17620 Sanitary Fixtures & Toilet and Bath accesProject name XXX Package 6 B Construction WZone 2 First Floor Wet Area Plumbing Works $113,313 ### A9160 HVAC A/C Units Project name XXX Package 6 B Construction WZone 1 Lower Roof Dry Area HVAC Works $1,851,448 ### A23790 Exhaust Fans Project name XXX Package 6 B Construction WZone 1 Lower Roof Dry Area HVAC Works $392,088 ### A9020 Painting Final Stage Project name XXX Package 6 B Construction WZone 1 Lower Roof Dry Area Architecture Works $34,315 ### A22590 Glazing Project name XXX Package 6 B Construction WZone 2 Third Floor Dry Area Architecture Works $374,136 ### A22710 Wood Cladding Project name XXX Package 6 B Construction WZone 2 Third Floor Dry Area Architecture Works $531,475 ### A19120 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 2 Package 6A AcceWet Area Electrical Works $16,620 ### A22730 Wood Cladding Project name XXX Package 6 B Construction WZone 3 Second Floor Dry Area Architecture Works $61,743 ### A22630 Glazing Project name XXX Package 6 B Construction WZone 3 Second Floor Dry Area Architecture Works $171,360 ### A22370 Signage Project name XXX Package 6 B Construction WZone 1 First Floor All Areas Architecture Works $25,688 ### A22440 Signage Project name XXX Package 6 B Construction WZone 1 Package 6A AcceAll Areas Architecture Works $141,791 ### A22380 Signage Project name XXX Package 6 B Construction WZone 1 Second Floor All Areas Architecture Works $22,477 ### A18260 Painting Final Stage Project name XXX Package 6 B Construction WZone 2 Third Floor Dry Area Architecture Works $139,490 ### A18400 HVAC A/C Units Project name XXX Package 6 B Construction WZone 2 Third Floor Dry Area HVAC Works $106,158 ### A23770 Exhaust Fans Project name XXX Package 6 B Construction WZone 2 Third Floor Dry Area HVAC Works $181,894 ### A18510 Metal Works Project name XXX Package 6 B Construction WZone 2 Third Floor All Areas Architecture Works $3,338,216 ### A22390 Signage Project name XXX Package 6 B Construction WZone 1 Third Floor All Areas Architecture Works $16,055 ### A9050 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 1 Lower Roof Dry Area Electrical Works $51,982 ### A8700 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 1 Third Floor Wet Area Electrical Works $557,533

Page 16: Progress Monitoring Sheet Empty

### A17570 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 2 First Floor Wet Area Electrical Works $646,950 ### A22410 Signage Project name XXX Package 6 B Construction WZone 2 First Floor All Areas Architecture Works $39,040 ### A18110 Doors & Windows Project name XXX Package 6 B Construction WZone 2 Second Floor Wet Area Architecture Works $18,384 ### A8910 Toilet and Bath accessories Project name XXX Package 6 B Construction WZone 1 Third Floor Wet Area Architecture Works $12,911 ### A22640 Glazing Project name XXX Package 6 B Construction WZone 3 Third Floor Dry Area Architecture Works $185,640 ### A22740 Wood Cladding Project name XXX Package 6 B Construction WZone 3 Third Floor Dry Area Architecture Works $463,178 ### A18480 Doors & Windows Project name XXX Package 6 B Construction WZone 2 Third Floor Wet Area Architecture Works $52,342 ### A18290 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 2 Third Floor Dry Area Electrical Works $33,442 ### A21800 Electrical works Project name XXX Package 6 B Construction WZone 3 Upper Roof All Areas Electrical Works $622,068 ### A23030 Panel Boards Project name XXX Package 6 B Construction WZone 3 Lower Roof Dry Area Electrical Works $33,326 ### A21060 Painting Final Stage Project name XXX Package 6 B Construction WZone 3 Third Floor Dry Area Architecture Works $166,768 ### A21310 Metal Works Project name XXX Package 6 B Construction WZone 3 Third Floor All Areas Architecture Works $438,132 ### A20690 Painting Final Stage Project name XXX Package 6 B Construction WZone 3 Second Floor Dry Area Architecture Works $157,970 ### A20940 Metal Works Project name XXX Package 6 B Construction WZone 3 Second Floor All Areas Architecture Works $428,630 ### A18080 Painting Final Stage Project name XXX Package 6 B Construction WZone 2 Second Floor Wet Area Architecture Works $1,085 ### A22450 Signage Project name XXX Package 6 B Construction WZone 2 Package 6A AcceAll Areas Architecture Works $42,588 ### A22420 Signage Project name XXX Package 6 B Construction WZone 2 Second Floor All Areas Architecture Works $39,040 ### A3610 Electrical Works Close Out Project name XXX Package 6 B Construction WProject CloAll Floors Close Out & Electrical Works $170,200 ### A3630 Plumbing Close Out Project name XXX Package 6 B Construction WProject CloAll Floors Close Out & Plumbing Works $425,000 ### A3550 Cleaning equipment Project name XXX Package 6 B Construction WAll Zones All Floors All Areas Architecture Works $1,478,750 ### A22070 Doors & Windows Project name XXX Package 6 B Construction WZone 3 Package 6A AcceDry Area Architecture Works $876,427 ### A18450 Painting Final Stage Project name XXX Package 6 B Construction WZone 2 Third Floor Wet Area Architecture Works $420 ### A18660 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 2 Lower Roof Dry Area Electrical Works $52,165 ### A18880 Metal Works Project name XXX Package 6 B Construction WZone 2 Lower Roof All Areas Architecture Works $719,448 ### A18770 HVAC A/C Units Project name XXX Package 6 B Construction WZone 2 Lower Roof Dry Area HVAC Works $5,524,335 ### A23800 Exhaust Fans Project name XXX Package 6 B Construction WZone 2 Lower Roof Dry Area HVAC Works $1,205,702 ### A18630 Painting Final Stage Project name XXX Package 6 B Construction WZone 2 Lower Roof Dry Area Architecture Works $56,740 ### A21280 Doors & Windows Project name XXX Package 6 B Construction WZone 3 Third Floor Wet Area Architecture Works $56,011 ### A22330 Toilet and Bath accessories Project name XXX Package 6 B Construction WZone 2 Second Floor Wet Area Architecture Works $28,095 ### A21110 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 3 Third Floor Wet Area Electrical Works $1,861,151 ### A18360 Sanitary Fixtures & Toilet and Bath accesProject name XXX Package 6 B Construction WZone 2 Third Floor Wet Area Plumbing Works $109,496 ### A3600 Doors & Windows Close Out Project name XXX Package 6 B Construction WProject CloAll Floors Close Out & Architecture Works $0 ### A22470 Signage Project name XXX Package 6 B Construction WZone 3 First Floor All Areas Architecture Works $48,165 ### A22460 Signage Project name XXX Package 6 B Construction WZone 3 Ground Floor All Areas Architecture Works $197,731 ### A22430 Signage Project name XXX Package 6 B Construction WZone 2 Third Floor All Areas Architecture Works $0 ### A21250 Painting Final Stage Project name XXX Package 6 B Construction WZone 3 Third Floor Wet Area Architecture Works $420 ### A21630 Doors & Windows Project name XXX Package 6 B Construction WZone 3 Lower Roof Dry Area Architecture Works $56,405 ### A22340 Toilet and Bath accessories Project name XXX Package 6 B Construction WZone 2 Third Floor Wet Area Architecture Works $17,111 ### A21090 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 3 Third Floor Dry Area Electrical Works $44,590 ### A22320 Facade Works Close Out Project name XXX Package 6 B Construction WProject CloFacade Close Out & General $0 ### A18310 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 2 Third Floor Wet Area Electrical Works $903,128 ### A21460 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 3 Lower Roof Dry Area Electrical Works $96,456 ### A21570 HVAC A/C Units Project name XXX Package 6 B Construction WZone 3 Lower Roof Dry Area HVAC Works $1,701,370 ### A23810 Exhaust Fans Project name XXX Package 6 B Construction WZone 3 Lower Roof Dry Area HVAC Works $398,702 ### A22120 Metal Works Project name XXX Package 6 B Construction WZone 3 Package 6A AcceAll Areas Architecture Works $36,900 ### A21870 Painting Final Stage Project name XXX Package 6 B Construction WZone 3 Package 6A AcceDry Area Architecture Works $190,225 ### A21900 Electrical Wiring Devices & Lighting FixtuProject name XXX Package 6 B Construction WZone 3 Package 6A AcceDry Area Electrical Works $120,653 ### A22010 HVAC A/C Units Project name XXX Package 6 B Construction WZone 3 Package 6A AcceDry Area HVAC Works $56,680 ### A23900 Exhaust Fans Project name XXX Package 6 B Construction WZone 3 Package 6A AcceDry Area HVAC Works $26,031 ### A22350 Toilet and Bath Accessories Project name XXX Package 6 B Construction WZone 3 Third Floor Wet Area Architecture Works $11,081 ### A22500 Signage Project name XXX Package 6 B Construction WZone 3 Package 6A AcceAll Areas Architecture Works $113,230

Page 17: Progress Monitoring Sheet Empty

### A22490 Signage Project name XXX Package 6 B Construction WZone 3 Third Floor All Areas Architecture Works $43,197 ### A22480 Signage Project name XXX Package 6 B Construction WZone 3 Second Floor All Areas Architecture Works $63,882 ### A21680 Metal Works Project name XXX Package 6 B Construction WZone 3 Lower Roof All Areas Architecture Works $193,662 ### A21430 Painting Final Stage Project name XXX Package 6 B Construction WZone 3 Lower Roof Dry Area Architecture Works $34,278 ### A3690 External Works Close Out Project name XXX Package 6 B Construction WProject CloExternal Works Close Out & General $0 ### A3580 Painting Touch Up & Close Out Project name XXX Package 6 B Construction WProject CloAll Floors Close Out & Architecture Works $0 ### A22840 Elevators & Escalators Project name XXX Package 6 B Construction WProject CloAll Floors Close Out & Architecture Works $1,682,874 ### A3590 Metal Works Close Out Project name XXX Package 6 B Construction WProject CloAll Floors Close Out & Architecture Works $0

Page 18: Progress Monitoring Sheet Empty

0 Materials

Old Skilled Tech Productivity Materials duration Materials Elapsed days Materials Rem. Days

1 0.5 6/Dec/08 8/Jan/09 33.0 33.0 0.0 0.01 0.5 6/Dec/08 8/Jan/09 33.0 33.0 0.0 0.01 0.5 15/Dec/08 9/Mar/10 449.0 36.0 413.0 36,954.11 0.5 15/Dec/08 9/Mar/10 449.0 36.0 413.0 9,283.81 0.5 15/Dec/08 2/Feb/09 49.0 36.0 13.0 464,386.01 0.5 27/Dec/08 17/May/09 141.0 26.0 115.0 0.01 0.5 4/Jan/09 8/Feb/09 35.0 19.0 16.0 0.01 0.5 6/Jan/09 12/Oct/09 279.0 17.0 262.0 2,648.61 0.5 6/Jan/09 12/Oct/09 279.0 17.0 262.0 2,120.41 0.5 6/Jan/09 7/Mar/10 425.0 17.0 408.0 48,208.01 0.5 6/Jan/09 7/Mar/10 425.0 17.0 408.0 18,000.01 0.5 6/Jan/09 7/Mar/10 425.0 17.0 408.0 67,464.41 0.5 6/Jan/09 7/Mar/10 425.0 17.0 408.0 15,523.21 0.5 6/Jan/09 7/Mar/10 425.0 17.0 408.0 1,571.41 0.5 6/Jan/09 7/Mar/10 425.0 17.0 408.0 571.11 0.5 6/Jan/09 7/Mar/10 425.0 17.0 408.0 17,090.41 0.5 10/Jan/09 1/Nov/09 295.0 14.0 281.0 0.01 0.5 19/Jan/09 9/Jun/09 141.0 6.0 135.0 0.01 0.5 21/Jan/09 25/Feb/09 35.0 4.0 31.0 0.01 0.5 28/Jan/09 4/Mar/09 35.0 0.0 35.0 0.01 0.5 3/Feb/09 10/Mar/09 35.0 0.0 35.0 0.01 0.5 11/Feb/09 2/Jul/09 141.0 0.0 141.0 0.01 0.5 14/Feb/09 9/Jun/09 115.0 0.0 115.0 0.01 0.5 15/Feb/09 22/Mar/09 35.0 0.0 35.0 0.01 0.5 21/Feb/09 16/Jun/09 115.0 0.0 115.0 0.01 0.5 21/Feb/09 28/Mar/09 35.0 0.0 35.0 0.01 0.5 25/Feb/09 20/Oct/09 237.0 0.0 237.0 0.01 0.5 1/Mar/09 20/Jul/09 141.0 0.0 141.0 0.01 0.5 3/Mar/09 27/Jun/09 116.0 0.0 116.0 0.01 0.5 5/Mar/09 25/Apr/09 51.0 0.0 51.0 0.01 0.5 5/Mar/09 25/Apr/09 51.0 0.0 51.0 0.01 0.5 7/Mar/09 26/Jul/09 141.0 0.0 141.0 0.01 0.5 9/Mar/09 27/Jun/09 110.0 0.0 110.0 0.01 0.5 10/Mar/09 4/Jul/09 116.0 0.0 116.0 0.01 0.5 12/Mar/09 1/Aug/09 142.0 0.0 142.0 0.01 0.5 14/Mar/09 3/Aug/09 142.0 0.0 142.0 0.0

LaborProductivity

Materials Delivery QTY

Materials Start of Delivery

Materials End of Delivery

materials Planned delivery Qty as of Data

date

Page 19: Progress Monitoring Sheet Empty

1 0.5 14/Mar/09 3/Aug/09 142.0 0.0 142.0 0.01 0.5 14/Mar/09 3/Aug/09 142.0 0.0 142.0 0.01 0.5 18/Mar/09 12/Jul/09 116.0 0.0 116.0 0.01 0.5 21/Mar/09 9/May/09 49.0 0.0 49.0 0.01 0.5 21/Mar/09 9/May/09 49.0 0.0 49.0 0.01 0.5 22/Mar/09 20/Oct/09 212.0 0.0 212.0 0.01 0.5 22/Mar/09 11/May/09 50.0 0.0 50.0 0.01 0.5 23/Mar/09 26/Apr/09 34.0 0.0 34.0 0.01 0.5 24/Mar/09 12/Aug/09 141.0 0.0 141.0 0.01 0.5 24/Mar/09 12/Aug/09 141.0 0.0 141.0 0.01 0.5 25/Mar/09 15/Aug/09 143.0 0.0 143.0 0.01 0.5 25/Mar/09 15/Aug/09 143.0 0.0 143.0 0.01 0.5 25/Mar/09 15/Aug/09 143.0 0.0 143.0 0.01 0.5 25/Mar/09 15/Aug/09 143.0 0.0 143.0 0.01 0.5 25/Mar/09 15/Aug/09 143.0 0.0 143.0 0.01 0.5 26/Mar/09 25/Jun/09 91.0 0.0 91.0 0.01 0.5 28/Mar/09 24/Nov/09 241.0 0.0 241.0 0.01 0.5 31/Mar/09 20/Aug/09 142.0 0.0 142.0 0.01 0.5 1/Apr/09 23/Jun/09 83.0 0.0 83.0 0.01 0.5 2/Apr/09 20/Jul/09 109.0 0.0 109.0 0.01 0.5 5/Apr/09 13/Aug/09 130.0 0.0 130.0 0.01 0.5 5/Apr/09 24/Aug/09 141.0 0.0 141.0 0.01 0.5 6/Apr/09 26/Aug/09 142.0 0.0 142.0 0.01 0.5 7/Apr/09 1/Aug/09 116.0 0.0 116.0 0.01 0.5 8/Apr/09 13/Jun/09 66.0 0.0 66.0 0.01 0.5 13/Apr/09 6/Aug/09 115.0 0.0 115.0 0.01 0.5 14/Apr/09 2/Sep/09 141.0 0.0 141.0 0.01 0.5 15/Apr/09 19/May/09 34.0 0.0 34.0 0.01 0.5 15/Apr/09 3/Sep/09 141.0 0.0 141.0 0.01 0.5 15/Apr/09 27/Jun/09 73.0 0.0 73.0 0.01 0.5 16/Apr/09 5/Sep/09 142.0 0.0 142.0 0.01 0.5 16/Apr/09 28/Jul/09 103.0 0.0 103.0 0.01 0.5 20/Apr/09 8/Sep/09 141.0 0.0 141.0 0.01 0.5 20/Apr/09 8/Sep/09 141.0 0.0 141.0 0.01 0.5 20/Apr/09 8/Sep/09 141.0 0.0 141.0 0.01 0.5 20/Apr/09 8/Sep/09 141.0 0.0 141.0 0.01 0.5 20/Apr/09 8/Sep/09 141.0 0.0 141.0 0.01 0.5 20/Apr/09 8/Sep/09 141.0 0.0 141.0 0.01 0.5 21/Apr/09 24/Aug/09 125.0 0.0 125.0 0.01 0.5 22/Apr/09 16/Aug/09 116.0 0.0 116.0 0.01 0.5 22/Apr/09 17/Aug/09 117.0 0.0 117.0 0.01 0.5 22/Apr/09 10/Sep/09 141.0 0.0 141.0 0.01 0.5 22/Apr/09 15/Jul/09 84.0 0.0 84.0 0.01 0.5 23/Apr/09 2/Sep/09 132.0 0.0 132.0 0.01 0.5 23/Apr/09 17/Sep/09 147.0 0.0 147.0 0.01 0.5 25/Apr/09 24/Jan/10 274.0 0.0 274.0 0.01 0.5 25/Apr/09 24/Jan/10 274.0 0.0 274.0 0.01 0.5 25/Apr/09 9/Sep/09 137.0 0.0 137.0 0.01 0.5 29/Apr/09 23/Aug/09 116.0 0.0 116.0 0.01 0.5 30/Apr/09 30/Jul/09 91.0 0.0 91.0 0.01 0.5 2/May/09 26/Aug/09 116.0 0.0 116.0 0.0

Page 20: Progress Monitoring Sheet Empty

1 0.5 2/May/09 19/Aug/09 109.0 0.0 109.0 0.01 0.5 3/May/09 6/Sep/09 126.0 0.0 126.0 0.01 0.5 4/May/09 1/Jul/09 58.0 0.0 58.0 0.01 0.5 4/May/09 23/Jul/09 80.0 0.0 80.0 0.01 0.5 4/May/09 31/Oct/09 180.0 0.0 180.0 0.01 0.5 4/May/09 13/Aug/09 101.0 0.0 101.0 0.01 0.5 4/May/09 27/Sep/09 146.0 0.0 146.0 0.01 0.5 6/May/09 6/Aug/09 92.0 0.0 92.0 0.01 0.5 6/May/09 8/Jun/09 33.0 0.0 33.0 0.01 0.5 6/May/09 10/Jun/09 35.0 0.0 35.0 0.01 0.5 6/May/09 10/Jun/09 35.0 0.0 35.0 0.01 0.5 6/May/09 10/Jun/09 35.0 0.0 35.0 0.01 0.5 6/May/09 8/Sep/09 125.0 0.0 125.0 0.01 0.5 6/May/09 8/Sep/09 125.0 0.0 125.0 0.01 0.5 6/May/09 8/Sep/09 125.0 0.0 125.0 0.01 0.5 6/May/09 8/Sep/09 125.0 0.0 125.0 0.01 0.5 9/May/09 30/Jul/09 82.0 0.0 82.0 0.01 0.5 9/May/09 13/Jun/09 35.0 0.0 35.0 0.01 0.5 10/May/09 10/Aug/09 92.0 0.0 92.0 0.01 0.5 11/May/09 29/Oct/09 171.0 0.0 171.0 0.01 0.5 12/May/09 5/Sep/09 116.0 0.0 116.0 0.01 0.5 12/May/09 5/Oct/09 146.0 0.0 146.0 0.01 0.5 12/May/09 6/Sep/09 117.0 0.0 117.0 0.01 0.5 13/May/09 6/Oct/09 146.0 0.0 146.0 0.01 0.5 14/May/09 31/Aug/09 109.0 0.0 109.0 0.01 0.5 14/May/09 21/Sep/09 130.0 0.0 130.0 0.01 0.5 14/May/09 21/Sep/09 130.0 0.0 130.0 0.01 0.5 16/May/09 18/Jun/09 33.0 0.0 33.0 0.01 0.5 16/May/09 8/Aug/09 84.0 0.0 84.0 0.01 0.5 16/May/09 8/Aug/09 84.0 0.0 84.0 0.01 0.5 16/May/09 8/Aug/09 84.0 0.0 84.0 0.01 0.5 17/May/09 21/Jul/09 65.0 0.0 65.0 0.01 0.5 18/May/09 18/Aug/09 92.0 0.0 92.0 0.01 0.5 19/May/09 8/Jul/09 50.0 0.0 50.0 0.01 0.5 20/May/09 30/Nov/09 194.0 0.0 194.0 0.01 0.5 20/May/09 9/Jul/09 50.0 0.0 50.0 0.01 0.5 20/May/09 27/Sep/09 130.0 0.0 130.0 0.01 0.5 23/May/09 28/Jul/09 66.0 0.0 66.0 0.01 0.5 23/May/09 13/Aug/09 82.0 0.0 82.0 0.01 0.5 23/May/09 13/Aug/09 82.0 0.0 82.0 0.01 0.5 24/May/09 24/Aug/09 92.0 0.0 92.0 0.01 0.5 24/May/09 28/Jun/09 35.0 0.0 35.0 0.01 0.5 24/May/09 28/Jun/09 35.0 0.0 35.0 0.01 0.5 26/May/09 24/Sep/09 121.0 0.0 121.0 0.01 0.5 27/May/09 16/Aug/09 81.0 0.0 81.0 0.01 0.5 28/May/09 18/Jul/09 51.0 0.0 51.0 0.01 0.5 30/May/09 24/Aug/09 86.0 0.0 86.0 0.01 0.5 30/May/09 19/Sep/09 112.0 0.0 112.0 0.01 0.5 1/Jun/09 12/Aug/09 72.0 0.0 72.0 0.01 0.5 1/Jun/09 21/Jul/09 50.0 0.0 50.0 0.01 0.5 3/Jun/09 1/Oct/09 120.0 0.0 120.0 0.0

Page 21: Progress Monitoring Sheet Empty

1 0.5 3/Jun/09 21/Sep/09 110.0 0.0 110.0 0.01 0.5 4/Jun/09 3/Sep/09 91.0 0.0 91.0 0.01 0.5 6/Jun/09 5/Oct/09 121.0 0.0 121.0 0.01 0.5 6/Jun/09 11/Jul/09 35.0 0.0 35.0 0.01 0.5 6/Jun/09 8/Jul/09 32.0 0.0 32.0 0.01 0.5 7/Jun/09 27/Jul/09 50.0 0.0 50.0 0.01 0.5 7/Jun/09 18/Aug/09 72.0 0.0 72.0 0.01 0.5 8/Jun/09 29/Sep/09 113.0 0.0 113.0 0.01 0.5 8/Jun/09 3/Sep/09 87.0 0.0 87.0 0.01 0.5 9/Jun/09 28/Jul/09 49.0 0.0 49.0 0.01 0.5 9/Jun/09 15/Aug/09 67.0 0.0 67.0 0.01 0.5 10/Jun/09 8/Oct/09 120.0 0.0 120.0 0.01 0.5 10/Jun/09 3/Mar/10 266.0 0.0 266.0 0.01 0.5 10/Jun/09 8/Oct/09 120.0 0.0 120.0 0.01 0.5 10/Jun/09 15/Jul/09 35.0 0.0 35.0 0.01 0.5 10/Jun/09 24/Sep/09 106.0 0.0 106.0 0.01 0.5 10/Jun/09 14/Jul/09 34.0 0.0 34.0 0.01 0.5 11/Jun/09 16/Aug/09 66.0 0.0 66.0 0.01 0.5 13/Jun/09 8/Sep/09 87.0 0.0 87.0 0.01 0.5 13/Jun/09 18/Jul/09 35.0 0.0 35.0 0.01 0.5 15/Jun/09 11/Aug/09 57.0 0.0 57.0 0.01 0.5 15/Jun/09 19/Aug/09 65.0 0.0 65.0 0.01 0.5 15/Jun/09 26/Aug/09 72.0 0.0 72.0 0.01 0.5 15/Jun/09 10/Sep/09 87.0 0.0 87.0 0.01 0.5 15/Jun/09 4/Aug/09 50.0 0.0 50.0 0.01 0.5 15/Jun/09 7/Nov/09 145.0 0.0 145.0 0.01 0.5 16/Jun/09 20/Oct/09 126.0 0.0 126.0 0.01 0.5 16/Jun/09 14/Oct/09 120.0 0.0 120.0 0.01 0.5 16/Jun/09 7/Sep/09 83.0 0.0 83.0 0.01 0.5 16/Jun/09 15/Oct/09 121.0 0.0 121.0 0.01 0.5 17/Jun/09 8/Sep/09 83.0 0.0 83.0 0.01 0.5 17/Jun/09 8/Oct/09 113.0 0.0 113.0 0.01 0.5 18/Jun/09 23/Jul/09 35.0 0.0 35.0 0.01 0.5 18/Jun/09 30/Sep/09 104.0 0.0 104.0 0.01 0.5 18/Jun/09 21/Jul/09 33.0 0.0 33.0 0.01 0.5 18/Jun/09 10/Sep/09 84.0 0.0 84.0 0.01 0.5 20/Jun/09 25/Aug/09 66.0 0.0 66.0 0.01 0.5 20/Jun/09 9/Nov/09 142.0 0.0 142.0 0.01 0.5 22/Jun/09 2/Aug/09 41.0 0.0 41.0 0.01 0.5 22/Jun/09 17/Sep/09 87.0 0.0 87.0 0.01 0.5 22/Jun/09 27/Sep/09 97.0 0.0 97.0 0.01 0.5 22/Jun/09 19/Aug/09 58.0 0.0 58.0 0.01 0.5 23/Jun/09 12/Aug/09 50.0 0.0 50.0 0.01 0.5 23/Jun/09 12/Aug/09 50.0 0.0 50.0 0.01 0.5 24/Jun/09 6/Aug/09 43.0 0.0 43.0 0.01 0.5 24/Jun/09 5/Oct/09 103.0 0.0 103.0 0.01 0.5 25/Jun/09 24/Oct/09 121.0 0.0 121.0 0.01 0.5 25/Jun/09 15/Aug/09 51.0 0.0 51.0 0.01 0.5 25/Jun/09 15/Aug/09 51.0 0.0 51.0 0.01 0.5 25/Jun/09 15/Aug/09 51.0 0.0 51.0 0.01 0.5 27/Jun/09 31/Aug/09 65.0 0.0 65.0 0.0

Page 22: Progress Monitoring Sheet Empty

1 0.5 28/Jun/09 30/Jan/10 216.0 0.0 216.0 0.01 0.5 28/Jun/09 30/Jan/10 216.0 0.0 216.0 0.01 0.5 28/Jun/09 26/Oct/09 120.0 0.0 120.0 0.01 0.5 28/Jun/09 23/Sep/09 87.0 0.0 87.0 0.01 0.5 28/Jun/09 19/Oct/09 113.0 0.0 113.0 0.01 0.5 28/Jun/09 2/Aug/09 35.0 0.0 35.0 0.01 0.5 29/Jun/09 24/Sep/09 87.0 0.0 87.0 0.01 0.5 29/Jun/09 18/Aug/09 50.0 0.0 50.0 0.01 0.5 1/Jul/09 10/Aug/09 40.0 0.0 40.0 0.01 0.5 2/Jul/09 29/Aug/09 58.0 0.0 58.0 0.01 0.5 2/Jul/09 9/Sep/09 69.0 0.0 69.0 0.01 0.5 2/Jul/09 31/Oct/09 121.0 0.0 121.0 0.01 0.5 2/Jul/09 4/Oct/09 94.0 0.0 94.0 0.01 0.5 2/Jul/09 4/Oct/09 94.0 0.0 94.0 0.01 0.5 4/Jul/09 26/Sep/09 84.0 0.0 84.0 0.01 0.5 5/Jul/09 29/Nov/09 147.0 0.0 147.0 0.01 0.5 5/Jul/09 9/Sep/09 66.0 0.0 66.0 0.01 0.5 6/Jul/09 3/Oct/09 89.0 0.0 89.0 0.01 0.5 7/Jul/09 25/Aug/09 49.0 0.0 49.0 0.01 0.5 7/Jul/09 12/Sep/09 67.0 0.0 67.0 0.01 0.5 8/Jul/09 19/Oct/09 103.0 0.0 103.0 0.01 0.5 9/Jul/09 27/Sep/09 80.0 0.0 80.0 0.01 0.5 9/Jul/09 5/Oct/09 88.0 0.0 88.0 0.01 0.5 9/Jul/09 19/Aug/09 41.0 0.0 41.0 0.01 0.5 9/Jul/09 5/Oct/09 88.0 0.0 88.0 0.01 0.5 9/Jul/09 31/Oct/09 114.0 0.0 114.0 0.01 0.5 9/Jul/09 22/Oct/09 105.0 0.0 105.0 0.01 0.5 9/Jul/09 6/Sep/09 59.0 0.0 59.0 0.01 0.5 11/Jul/09 1/Nov/09 113.0 0.0 113.0 0.01 0.5 11/Jul/09 15/Aug/09 35.0 0.0 35.0 0.01 0.5 11/Jul/09 9/Nov/09 121.0 0.0 121.0 0.01 0.5 12/Jul/09 2/Nov/09 113.0 0.0 113.0 0.01 0.5 13/Jul/09 22/Aug/09 40.0 0.0 40.0 0.01 0.5 14/Jul/09 10/Oct/09 88.0 0.0 88.0 0.01 0.5 14/Jul/09 10/Oct/09 88.0 0.0 88.0 0.01 0.5 14/Jul/09 10/Oct/09 88.0 0.0 88.0 0.01 0.5 14/Jul/09 6/Oct/09 84.0 0.0 84.0 0.01 0.5 14/Jul/09 26/Oct/09 104.0 0.0 104.0 0.01 0.5 15/Jul/09 23/Jan/10 192.0 0.0 192.0 0.01 0.5 15/Jul/09 27/Oct/09 104.0 0.0 104.0 0.01 0.5 15/Jul/09 4/Nov/09 112.0 0.0 112.0 0.01 0.5 18/Jul/09 22/Oct/09 96.0 0.0 96.0 0.01 0.5 18/Jul/09 4/Oct/09 78.0 0.0 78.0 0.01 0.5 18/Jul/09 29/Aug/09 42.0 0.0 42.0 0.01 0.5 19/Jul/09 15/Oct/09 88.0 0.0 88.0 0.01 0.5 20/Jul/09 28/Sep/09 70.0 0.0 70.0 0.01 0.5 20/Jul/09 15/Oct/09 87.0 0.0 87.0 0.01 0.5 20/Jul/09 30/Nov/09 133.0 0.0 133.0 0.01 0.5 21/Jul/09 18/Nov/09 120.0 0.0 120.0 0.01 0.5 21/Jul/09 23/Aug/09 33.0 0.0 33.0 0.01 0.5 21/Jul/09 20/Mar/10 242.0 0.0 242.0 0.0

Page 23: Progress Monitoring Sheet Empty

1 0.5 21/Jul/09 3/Nov/09 105.0 0.0 105.0 0.01 0.5 21/Jul/09 11/Nov/09 113.0 0.0 113.0 0.01 0.5 21/Jul/09 9/Sep/09 50.0 0.0 50.0 0.01 0.5 22/Jul/09 3/Nov/09 104.0 0.0 104.0 0.01 0.5 23/Jul/09 24/Feb/10 216.0 0.0 216.0 0.01 0.5 23/Jul/09 4/Nov/09 104.0 0.0 104.0 0.01 0.5 25/Jul/09 26/Aug/09 32.0 0.0 32.0 0.01 0.5 25/Jul/09 26/Aug/09 32.0 0.0 32.0 0.01 0.5 25/Jul/09 5/Nov/09 103.0 0.0 103.0 0.01 0.5 25/Jul/09 7/Nov/09 105.0 0.0 105.0 0.01 0.5 26/Jul/09 21/Oct/09 87.0 0.0 87.0 0.01 0.5 26/Jul/09 8/Oct/09 74.0 0.0 74.0 0.01 0.5 26/Jul/09 8/Oct/09 74.0 0.0 74.0 0.01 0.5 27/Jul/09 6/Sep/09 41.0 0.0 41.0 0.01 0.5 27/Jul/09 12/Oct/09 77.0 0.0 77.0 0.01 0.5 28/Jul/09 21/Sep/09 55.0 0.0 55.0 0.01 0.5 29/Jul/09 8/Oct/09 71.0 0.0 71.0 0.01 0.5 29/Jul/09 22/Oct/09 85.0 0.0 85.0 0.01 0.5 29/Jul/09 24/Nov/09 118.0 0.0 118.0 0.01 0.5 29/Jul/09 26/Oct/09 89.0 0.0 89.0 0.01 0.5 30/Jul/09 1/Dec/09 124.0 0.0 124.0 0.01 0.5 30/Jul/09 22/Sep/09 54.0 0.0 54.0 0.01 0.5 30/Jul/09 12/Oct/09 74.0 0.0 74.0 0.01 0.5 30/Jul/09 19/Nov/09 112.0 0.0 112.0 0.01 0.5 30/Jul/09 1/Sep/09 33.0 0.0 33.0 0.01 0.5 30/Jul/09 9/Sep/09 41.0 0.0 41.0 0.01 0.5 30/Jul/09 23/Sep/09 55.0 0.0 55.0 0.01 0.5 1/Aug/09 24/Nov/09 115.0 0.0 115.0 0.01 0.5 1/Aug/09 3/Dec/09 124.0 0.0 124.0 0.01 0.5 1/Aug/09 12/Nov/09 103.0 0.0 103.0 0.01 0.5 1/Aug/09 12/Sep/09 42.0 0.0 42.0 0.01 0.5 2/Aug/09 12/Nov/09 102.0 0.0 102.0 0.01 0.5 2/Aug/09 20/Oct/09 79.0 0.0 79.0 0.01 0.5 2/Aug/09 11/Oct/09 70.0 0.0 70.0 0.01 0.5 2/Aug/09 25/Oct/09 84.0 0.0 84.0 0.01 0.5 2/Aug/09 15/Nov/09 105.0 0.0 105.0 0.01 0.5 2/Aug/09 24/Jan/10 175.0 0.0 175.0 0.01 0.5 2/Aug/09 12/Oct/09 71.0 0.0 71.0 0.01 0.5 3/Aug/09 6/Dec/09 125.0 0.0 125.0 0.01 0.5 3/Aug/09 28/Nov/09 117.0 0.0 117.0 0.01 0.5 3/Aug/09 28/Nov/09 117.0 0.0 117.0 0.01 0.5 3/Aug/09 15/Nov/09 104.0 0.0 104.0 0.01 0.5 3/Aug/09 27/Sep/09 55.0 0.0 55.0 0.01 0.5 4/Aug/09 8/Nov/09 96.0 0.0 96.0 0.01 0.5 4/Aug/09 23/Dec/09 141.0 0.0 141.0 0.01 0.5 5/Aug/09 19/Sep/09 45.0 0.0 45.0 0.01 0.5 6/Aug/09 5/Nov/09 91.0 0.0 91.0 0.01 0.5 6/Aug/09 2/Nov/09 88.0 0.0 88.0 0.01 0.5 6/Aug/09 30/Sep/09 55.0 0.0 55.0 0.01 0.5 8/Aug/09 18/Oct/09 71.0 0.0 71.0 0.01 0.5 8/Aug/09 9/Dec/09 123.0 0.0 123.0 0.0

Page 24: Progress Monitoring Sheet Empty

1 0.5 8/Aug/09 17/Oct/09 70.0 0.0 70.0 0.01 0.5 8/Aug/09 19/Oct/09 72.0 0.0 72.0 0.01 0.5 8/Aug/09 12/Sep/09 35.0 0.0 35.0 0.01 0.5 8/Aug/09 1/Oct/09 54.0 0.0 54.0 0.01 0.5 9/Aug/09 9/Nov/09 92.0 0.0 92.0 0.01 0.5 9/Aug/09 11/Oct/09 63.0 0.0 63.0 0.01 0.5 11/Aug/09 17/Sep/09 37.0 0.0 37.0 0.01 0.5 11/Aug/09 7/Nov/09 88.0 0.0 88.0 0.01 0.5 11/Aug/09 20/Dec/09 131.0 0.0 131.0 0.01 0.5 11/Aug/09 26/Nov/09 107.0 0.0 107.0 0.01 0.5 11/Aug/09 28/Nov/09 109.0 0.0 109.0 0.01 0.5 11/Aug/09 26/Nov/09 107.0 0.0 107.0 0.01 0.5 13/Aug/09 22/Oct/09 70.0 0.0 70.0 0.01 0.5 13/Aug/09 29/Oct/09 77.0 0.0 77.0 0.01 0.5 13/Aug/09 9/Nov/09 88.0 0.0 88.0 0.01 0.5 13/Aug/09 21/Sep/09 39.0 0.0 39.0 0.01 0.5 13/Aug/09 30/Nov/09 109.0 0.0 109.0 0.01 0.5 13/Aug/09 9/Dec/09 118.0 0.0 118.0 0.01 0.5 15/Aug/09 6/Feb/10 175.0 0.0 175.0 0.01 0.5 15/Aug/09 8/Oct/09 54.0 0.0 54.0 0.01 0.5 15/Aug/09 15/Nov/09 92.0 0.0 92.0 0.01 0.5 16/Aug/09 10/Oct/09 55.0 0.0 55.0 0.01 0.5 16/Aug/09 10/Oct/09 55.0 0.0 55.0 0.01 0.5 16/Aug/09 9/Feb/10 177.0 0.0 177.0 0.01 0.5 17/Aug/09 24/Sep/09 38.0 0.0 38.0 0.01 0.5 18/Aug/09 15/Nov/09 89.0 0.0 89.0 0.01 0.5 19/Aug/09 15/Nov/09 88.0 0.0 88.0 0.01 0.5 19/Aug/09 15/Nov/09 88.0 0.0 88.0 0.01 0.5 20/Aug/09 5/Oct/09 46.0 0.0 46.0 0.01 0.5 20/Aug/09 29/Oct/09 70.0 0.0 70.0 0.01 0.5 20/Aug/09 5/Nov/09 77.0 0.0 77.0 0.01 0.5 20/Aug/09 14/Oct/09 55.0 0.0 55.0 0.01 0.5 20/Aug/09 14/Oct/09 55.0 0.0 55.0 0.01 0.5 22/Aug/09 8/Dec/09 108.0 0.0 108.0 0.01 0.5 22/Aug/09 8/Nov/09 78.0 0.0 78.0 0.01 0.5 23/Aug/09 24/Dec/09 123.0 0.0 123.0 0.01 0.5 23/Aug/09 30/Sep/09 38.0 0.0 38.0 0.01 0.5 23/Aug/09 6/Oct/09 44.0 0.0 44.0 0.01 0.5 23/Aug/09 30/Sep/09 38.0 0.0 38.0 0.01 0.5 24/Aug/09 9/Dec/09 107.0 0.0 107.0 0.01 0.5 24/Aug/09 17/Dec/09 115.0 0.0 115.0 0.01 0.5 24/Aug/09 15/Feb/10 175.0 0.0 175.0 0.01 0.5 24/Aug/09 17/Dec/09 115.0 0.0 115.0 0.01 0.5 25/Aug/09 30/Mar/10 217.0 0.0 217.0 0.01 0.5 25/Aug/09 30/Mar/10 217.0 0.0 217.0 0.01 0.5 25/Aug/09 30/Mar/10 217.0 0.0 217.0 0.01 0.5 25/Aug/09 24/Nov/09 91.0 0.0 91.0 0.01 0.5 25/Aug/09 26/Oct/09 62.0 0.0 62.0 0.01 0.5 25/Aug/09 18/Oct/09 54.0 0.0 54.0 0.01 0.5 25/Aug/09 10/Oct/09 46.0 0.0 46.0 0.01 0.5 25/Aug/09 3/Dec/09 100.0 0.0 100.0 0.0

Page 25: Progress Monitoring Sheet Empty

1 0.5 25/Aug/09 4/Oct/09 40.0 0.0 40.0 0.01 0.5 25/Aug/09 19/Oct/09 55.0 0.0 55.0 0.01 0.5 26/Aug/09 12/Dec/09 108.0 0.0 108.0 0.01 0.5 26/Aug/09 12/Dec/09 108.0 0.0 108.0 0.01 0.5 26/Aug/09 20/Oct/09 55.0 0.0 55.0 0.01 0.5 26/Aug/09 20/Oct/09 55.0 0.0 55.0 0.01 0.5 27/Aug/09 14/Oct/09 48.0 0.0 48.0 0.01 0.5 27/Aug/09 13/Dec/09 108.0 0.0 108.0 0.01 0.5 27/Aug/09 13/Dec/09 108.0 0.0 108.0 0.01 0.5 29/Aug/09 28/Nov/09 91.0 0.0 91.0 0.01 0.5 30/Aug/09 28/Nov/09 90.0 0.0 90.0 0.01 0.5 31/Aug/09 18/Nov/09 79.0 0.0 79.0 0.01 0.5 31/Aug/09 30/Nov/09 91.0 0.0 91.0 0.01 0.5 31/Aug/09 20/Dec/09 111.0 0.0 111.0 0.01 0.5 1/Sep/09 10/Oct/09 39.0 0.0 39.0 0.01 0.5 1/Sep/09 27/Dec/09 117.0 0.0 117.0 0.01 0.5 1/Sep/09 17/Dec/09 107.0 0.0 107.0 0.01 0.5 1/Sep/09 9/Dec/09 99.0 0.0 99.0 0.01 0.5 2/Sep/09 2/Dec/09 91.0 0.0 91.0 0.01 0.5 3/Sep/09 28/Dec/09 116.0 0.0 116.0 0.01 0.5 3/Sep/09 21/Dec/09 109.0 0.0 109.0 0.01 0.5 3/Sep/09 5/Dec/09 93.0 0.0 93.0 0.01 0.5 3/Sep/09 1/Dec/09 89.0 0.0 89.0 0.01 0.5 5/Sep/09 21/Dec/09 107.0 0.0 107.0 0.01 0.5 5/Sep/09 22/Dec/09 108.0 0.0 108.0 0.01 0.5 6/Sep/09 29/Oct/09 53.0 0.0 53.0 0.01 0.5 6/Sep/09 30/Dec/09 115.0 0.0 115.0 0.01 0.5 6/Sep/09 23/Dec/09 108.0 0.0 108.0 0.01 0.5 6/Sep/09 23/Dec/09 108.0 0.0 108.0 0.01 0.5 6/Sep/09 8/Nov/09 63.0 0.0 63.0 0.01 0.5 7/Sep/09 23/Dec/09 107.0 0.0 107.0 0.01 0.5 7/Sep/09 23/Dec/09 107.0 0.0 107.0 0.01 0.5 7/Sep/09 17/Dec/09 101.0 0.0 101.0 0.01 0.5 8/Sep/09 9/Feb/10 154.0 0.0 154.0 0.01 0.5 8/Sep/09 6/Dec/09 89.0 0.0 89.0 0.01 0.5 9/Sep/09 6/Oct/09 27.0 0.0 27.0 0.01 0.5 9/Sep/09 9/Dec/09 91.0 0.0 91.0 0.01 0.5 9/Sep/09 10/Feb/10 154.0 0.0 154.0 0.01 0.5 10/Sep/09 19/Nov/09 70.0 0.0 70.0 0.01 0.5 10/Sep/09 10/Dec/09 91.0 0.0 91.0 0.01 0.5 10/Sep/09 13/Jan/10 125.0 0.0 125.0 0.01 0.5 12/Sep/09 13/Jan/10 123.0 0.0 123.0 0.01 0.5 12/Sep/09 14/Mar/10 183.0 0.0 183.0 0.01 0.5 17/Sep/09 7/Nov/09 51.0 0.0 51.0 0.01 0.5 17/Sep/09 21/Oct/09 34.0 0.0 34.0 0.01 0.5 19/Sep/09 26/Dec/09 98.0 0.0 98.0 0.01 0.5 19/Sep/09 31/Dec/09 103.0 0.0 103.0 0.01 0.5 19/Sep/09 28/Nov/09 70.0 0.0 70.0 0.01 0.5 20/Sep/09 31/Dec/09 102.0 0.0 102.0 0.01 0.5 20/Sep/09 9/Jan/10 111.0 0.0 111.0 0.01 0.5 20/Sep/09 31/Dec/09 102.0 0.0 102.0 0.0

Page 26: Progress Monitoring Sheet Empty

1 0.5 21/Sep/09 9/Nov/09 49.0 0.0 49.0 0.01 0.5 21/Sep/09 9/Nov/09 49.0 0.0 49.0 0.01 0.5 22/Sep/09 28/Nov/09 67.0 0.0 67.0 0.01 0.5 22/Sep/09 19/Jan/10 119.0 0.0 119.0 0.01 0.5 22/Sep/09 9/Dec/09 78.0 0.0 78.0 0.01 0.5 22/Sep/09 17/Dec/09 86.0 0.0 86.0 0.01 0.5 22/Sep/09 22/Dec/09 91.0 0.0 91.0 0.01 0.5 22/Sep/09 19/Dec/09 88.0 0.0 88.0 0.01 0.5 23/Sep/09 4/Jan/10 103.0 0.0 103.0 0.01 0.5 23/Sep/09 12/Nov/09 50.0 0.0 50.0 0.01 0.5 23/Sep/09 23/Dec/09 91.0 0.0 91.0 0.01 0.5 23/Sep/09 27/Dec/09 95.0 0.0 95.0 0.01 0.5 23/Sep/09 30/Jan/10 129.0 0.0 129.0 0.01 0.5 24/Sep/09 20/Dec/09 87.0 0.0 87.0 0.01 0.5 26/Sep/09 21/Dec/09 86.0 0.0 86.0 0.01 0.5 27/Sep/09 22/Dec/09 86.0 0.0 86.0 0.01 0.5 28/Sep/09 23/Dec/09 86.0 0.0 86.0 0.01 0.5 28/Sep/09 9/Jan/10 103.0 0.0 103.0 0.01 0.5 28/Sep/09 29/Nov/09 62.0 0.0 62.0 0.01 0.5 28/Sep/09 17/Nov/09 50.0 0.0 50.0 0.01 0.5 29/Sep/09 24/Dec/09 86.0 0.0 86.0 0.01 0.5 29/Sep/09 24/Dec/09 86.0 0.0 86.0 0.01 0.5 29/Sep/09 18/Nov/09 50.0 0.0 50.0 0.01 0.5 30/Sep/09 9/Dec/09 70.0 0.0 70.0 0.01 0.5 30/Sep/09 12/Jan/10 104.0 0.0 104.0 0.01 0.5 1/Oct/09 13/Jan/10 104.0 0.0 104.0 0.01 0.5 1/Oct/09 21/Mar/10 171.0 0.0 171.0 0.01 0.5 3/Oct/09 13/Jan/10 102.0 0.0 102.0 0.01 0.5 3/Oct/09 28/Dec/09 86.0 0.0 86.0 0.01 0.5 3/Oct/09 14/Jan/10 103.0 0.0 103.0 0.01 0.5 4/Oct/09 3/Dec/09 60.0 0.0 60.0 0.01 0.5 4/Oct/09 29/Dec/09 86.0 0.0 86.0 0.01 0.5 4/Oct/09 29/Dec/09 86.0 0.0 86.0 0.01 0.5 4/Oct/09 31/Mar/10 178.0 0.0 178.0 0.01 0.5 5/Oct/09 31/Dec/09 87.0 0.0 87.0 0.01 0.5 5/Oct/09 8/Nov/09 34.0 0.0 34.0 0.01 0.5 5/Oct/09 17/Jan/10 104.0 0.0 104.0 0.01 0.5 6/Oct/09 19/Jan/10 105.0 0.0 105.0 0.01 0.5 6/Oct/09 31/Dec/09 86.0 0.0 86.0 0.01 0.5 7/Oct/09 2/Jan/10 87.0 0.0 87.0 0.01 0.5 7/Oct/09 2/Jan/10 87.0 0.0 87.0 0.01 0.5 7/Oct/09 28/Jan/10 113.0 0.0 113.0 0.01 0.5 8/Oct/09 10/Nov/09 33.0 0.0 33.0 0.01 0.5 8/Oct/09 17/Dec/09 70.0 0.0 70.0 0.01 0.5 10/Oct/09 4/Jan/10 86.0 0.0 86.0 0.01 0.5 10/Oct/09 5/Jan/10 87.0 0.0 87.0 0.01 0.5 11/Oct/09 21/Jan/10 102.0 0.0 102.0 0.01 0.5 12/Oct/09 13/Dec/09 62.0 0.0 62.0 0.01 0.5 12/Oct/09 24/Jan/10 104.0 0.0 104.0 0.01 0.5 12/Oct/09 7/Jan/10 87.0 0.0 87.0 0.01 0.5 12/Oct/09 5/Dec/09 54.0 0.0 54.0 0.0

Page 27: Progress Monitoring Sheet Empty

1 0.5 13/Oct/09 24/Jan/10 103.0 0.0 103.0 0.01 0.5 14/Oct/09 17/Jan/10 95.0 0.0 95.0 0.01 0.5 14/Oct/09 9/Jan/10 87.0 0.0 87.0 0.01 0.5 14/Oct/09 26/Jan/10 104.0 0.0 104.0 0.01 0.5 14/Oct/09 3/Feb/10 112.0 0.0 112.0 0.01 0.5 14/Oct/09 26/Jan/10 104.0 0.0 104.0 0.01 0.5 14/Oct/09 26/Jan/10 104.0 0.0 104.0 0.01 0.5 14/Oct/09 23/Dec/09 70.0 0.0 70.0 0.01 0.5 15/Oct/09 26/Jan/10 103.0 0.0 103.0 0.01 0.5 15/Oct/09 10/Mar/10 146.0 0.0 146.0 0.01 0.5 15/Oct/09 18/Nov/09 34.0 0.0 34.0 0.01 0.5 17/Oct/09 19/Jan/10 94.0 0.0 94.0 0.01 0.5 17/Oct/09 11/Jan/10 86.0 0.0 86.0 0.01 0.5 17/Oct/09 11/Jan/10 86.0 0.0 86.0 0.01 0.5 17/Oct/09 28/Jan/10 103.0 0.0 103.0 0.01 0.5 19/Oct/09 10/Dec/09 52.0 0.0 52.0 0.01 0.5 19/Oct/09 20/Dec/09 62.0 0.0 62.0 0.01 0.5 19/Oct/09 11/Jan/10 84.0 0.0 84.0 0.01 0.5 19/Oct/09 20/Dec/09 62.0 0.0 62.0 0.01 0.5 20/Oct/09 16/Jan/10 88.0 0.0 88.0 0.01 0.5 21/Oct/09 9/Feb/10 111.0 0.0 111.0 0.01 0.5 21/Oct/09 30/Dec/09 70.0 0.0 70.0 0.01 0.5 22/Oct/09 2/Feb/10 103.0 0.0 103.0 0.01 0.5 22/Oct/09 17/Jan/10 87.0 0.0 87.0 0.01 0.5 22/Oct/09 17/Jan/10 87.0 0.0 87.0 0.01 0.5 24/Oct/09 24/Dec/09 61.0 0.0 61.0 0.01 0.5 25/Oct/09 19/Jan/10 86.0 0.0 86.0 0.01 0.5 25/Oct/09 19/Jan/10 86.0 0.0 86.0 0.01 0.5 26/Oct/09 17/Dec/09 52.0 0.0 52.0 0.01 0.5 26/Oct/09 10/Feb/10 107.0 0.0 107.0 0.01 0.5 26/Oct/09 20/Jan/10 86.0 0.0 86.0 0.01 0.5 26/Oct/09 20/Jan/10 86.0 0.0 86.0 0.01 0.5 26/Oct/09 4/Jan/10 70.0 0.0 70.0 0.01 0.5 26/Oct/09 14/Dec/09 49.0 0.0 49.0 0.01 0.5 27/Oct/09 7/Feb/10 103.0 0.0 103.0 0.01 0.5 27/Oct/09 5/Jan/10 70.0 0.0 70.0 0.01 0.5 28/Oct/09 29/Dec/09 62.0 0.0 62.0 0.01 0.5 28/Oct/09 21/Dec/09 54.0 0.0 54.0 0.01 0.5 31/Oct/09 25/Jan/10 86.0 0.0 86.0 0.01 0.5 31/Oct/09 11/Feb/10 103.0 0.0 103.0 0.01 0.5 1/Nov/09 10/Jan/10 70.0 0.0 70.0 0.01 0.5 1/Nov/09 13/Feb/10 104.0 0.0 104.0 0.01 0.5 1/Nov/09 24/Dec/09 53.0 0.0 53.0 0.01 0.5 2/Nov/09 30/Mar/10 148.0 0.0 148.0 0.01 0.5 2/Nov/09 13/Feb/10 103.0 0.0 103.0 0.01 0.5 2/Nov/09 13/Feb/10 103.0 0.0 103.0 0.01 0.5 2/Nov/09 3/Jan/10 62.0 0.0 62.0 0.01 0.5 2/Nov/09 11/Jan/10 70.0 0.0 70.0 0.01 0.5 2/Nov/09 9/Dec/09 37.0 0.0 37.0 0.01 0.5 3/Nov/09 9/Feb/10 98.0 0.0 98.0 0.01 0.5 3/Nov/09 4/Jan/10 62.0 0.0 62.0 0.0

Page 28: Progress Monitoring Sheet Empty

1 0.5 3/Nov/09 28/Jan/10 86.0 0.0 86.0 0.01 0.5 3/Nov/09 9/Feb/10 98.0 0.0 98.0 0.01 0.5 3/Nov/09 15/Feb/10 104.0 0.0 104.0 0.01 0.5 4/Nov/09 3/Apr/10 150.0 0.0 150.0 0.01 0.5 4/Nov/09 3/Apr/10 150.0 0.0 150.0 0.01 0.5 4/Nov/09 3/Apr/10 150.0 0.0 150.0 0.01 0.5 4/Nov/09 3/Apr/10 150.0 0.0 150.0 0.01 0.5 4/Nov/09 3/Apr/10 150.0 0.0 150.0 0.01 0.5 4/Nov/09 3/Apr/10 150.0 0.0 150.0 0.01 0.5 4/Nov/09 28/Dec/09 54.0 0.0 54.0 0.01 0.5 5/Nov/09 12/Dec/09 37.0 0.0 37.0 0.01 0.5 5/Nov/09 14/Jan/10 70.0 0.0 70.0 0.01 0.5 5/Nov/09 28/Jan/10 84.0 0.0 84.0 0.01 0.5 5/Nov/09 17/Feb/10 104.0 0.0 104.0 0.01 0.5 5/Nov/09 24/Jan/10 80.0 0.0 80.0 0.01 0.5 7/Nov/09 1/Feb/10 86.0 0.0 86.0 0.01 0.5 7/Nov/09 16/Jan/10 70.0 0.0 70.0 0.01 0.5 7/Nov/09 1/Feb/10 86.0 0.0 86.0 0.01 0.5 7/Nov/09 10/Feb/10 95.0 0.0 95.0 0.01 0.5 7/Nov/09 2/Feb/10 87.0 0.0 87.0 0.01 0.5 8/Nov/09 18/Feb/10 102.0 0.0 102.0 0.01 0.5 8/Nov/09 17/Jan/10 70.0 0.0 70.0 0.01 0.5 8/Nov/09 17/Jan/10 70.0 0.0 70.0 0.01 0.5 8/Nov/09 17/Jan/10 70.0 0.0 70.0 0.01 0.5 8/Nov/09 9/Jan/10 62.0 0.0 62.0 0.01 0.5 8/Nov/09 17/Jan/10 70.0 0.0 70.0 0.01 0.5 8/Nov/09 17/Jan/10 70.0 0.0 70.0 0.01 0.5 8/Nov/09 16/Dec/09 38.0 0.0 38.0 0.01 0.5 9/Nov/09 3/Feb/10 86.0 0.0 86.0 0.01 0.5 9/Nov/09 18/Jan/10 70.0 0.0 70.0 0.01 0.5 10/Nov/09 11/Mar/10 121.0 0.0 121.0 0.01 0.5 10/Nov/09 3/Jan/10 54.0 0.0 54.0 0.01 0.5 11/Nov/09 11/Jan/10 61.0 0.0 61.0 0.01 0.5 11/Nov/09 6/Feb/10 87.0 0.0 87.0 0.01 0.5 11/Nov/09 11/Jan/10 61.0 0.0 61.0 0.01 0.5 11/Nov/09 23/Feb/10 104.0 0.0 104.0 0.01 0.5 14/Nov/09 24/Feb/10 102.0 0.0 102.0 0.01 0.5 15/Nov/09 25/Feb/10 102.0 0.0 102.0 0.01 0.5 15/Nov/09 9/Feb/10 86.0 0.0 86.0 0.01 0.5 15/Nov/09 9/Feb/10 86.0 0.0 86.0 0.01 0.5 15/Nov/09 9/Feb/10 86.0 0.0 86.0 0.01 0.5 15/Nov/09 7/Jan/10 53.0 0.0 53.0 0.01 0.5 17/Nov/09 23/Dec/09 36.0 0.0 36.0 0.01 0.5 17/Nov/09 26/Jan/10 70.0 0.0 70.0 0.01 0.5 18/Nov/09 27/Jan/10 70.0 0.0 70.0 0.01 0.5 18/Nov/09 27/Jan/10 70.0 0.0 70.0 0.01 0.5 18/Nov/09 19/Jan/10 62.0 0.0 62.0 0.01 0.5 18/Nov/09 27/Jan/10 70.0 0.0 70.0 0.01 0.5 18/Nov/09 2/Mar/10 104.0 0.0 104.0 0.01 0.5 19/Nov/09 14/Feb/10 87.0 0.0 87.0 0.01 0.5 19/Nov/09 25/Feb/10 98.0 0.0 98.0 0.0

Page 29: Progress Monitoring Sheet Empty

1 0.5 24/Nov/09 30/Jan/10 67.0 0.0 67.0 0.01 0.5 24/Nov/09 13/Jan/10 50.0 0.0 50.0 0.01 0.5 26/Nov/09 23/Jan/10 58.0 0.0 58.0 0.01 0.5 26/Nov/09 14/Jan/10 49.0 0.0 49.0 0.01 0.5 26/Nov/09 17/Feb/10 83.0 0.0 83.0 0.01 0.5 28/Nov/09 2/Feb/10 66.0 0.0 66.0 0.01 0.5 28/Nov/09 16/Jan/10 49.0 0.0 49.0 0.01 0.5 28/Nov/09 20/Feb/10 84.0 0.0 84.0 0.01 0.5 28/Nov/09 17/Jan/10 50.0 0.0 50.0 0.01 0.5 29/Nov/09 8/Mar/10 99.0 0.0 99.0 0.01 0.5 29/Nov/09 8/Mar/10 99.0 0.0 99.0 0.01 0.5 30/Nov/09 18/Feb/10 80.0 0.0 80.0 0.01 0.5 30/Nov/09 4/Jan/10 35.0 0.0 35.0 0.01 0.5 1/Dec/09 2/Mar/10 91.0 0.0 91.0 0.01 0.5 1/Dec/09 4/Jan/10 34.0 0.0 34.0 0.01 0.5 2/Dec/09 7/Feb/10 67.0 0.0 67.0 0.01 0.5 3/Dec/09 8/Feb/10 67.0 0.0 67.0 0.01 0.5 3/Dec/09 31/Jan/10 59.0 0.0 59.0 0.01 0.5 3/Dec/09 25/Feb/10 84.0 0.0 84.0 0.01 0.5 3/Dec/09 25/Feb/10 84.0 0.0 84.0 0.01 0.5 3/Dec/09 25/Feb/10 84.0 0.0 84.0 0.01 0.5 5/Dec/09 23/Jan/10 49.0 0.0 49.0 0.01 0.5 5/Dec/09 25/Feb/10 82.0 0.0 82.0 0.01 0.5 5/Dec/09 9/Jan/10 35.0 0.0 35.0 0.01 0.5 6/Dec/09 10/Feb/10 66.0 0.0 66.0 0.01 0.5 6/Dec/09 10/Feb/10 66.0 0.0 66.0 0.01 0.5 6/Dec/09 10/Feb/10 66.0 0.0 66.0 0.01 0.5 6/Dec/09 10/Apr/10 125.0 0.0 125.0 0.01 0.5 7/Dec/09 13/Feb/10 68.0 0.0 68.0 0.01 0.5 8/Dec/09 3/Feb/10 57.0 0.0 57.0 0.01 0.5 8/Dec/09 1/Mar/10 83.0 0.0 83.0 0.01 0.5 8/Dec/09 27/Jan/10 50.0 0.0 50.0 0.01 0.5 8/Dec/09 1/Mar/10 83.0 0.0 83.0 0.01 0.5 9/Dec/09 14/Feb/10 67.0 0.0 67.0 0.01 0.5 9/Dec/09 20/Mar/10 101.0 0.0 101.0 0.01 0.5 9/Dec/09 14/Feb/10 67.0 0.0 67.0 0.01 0.5 9/Dec/09 14/Feb/10 67.0 0.0 67.0 0.01 0.5 9/Dec/09 28/Jan/10 50.0 0.0 50.0 0.01 0.5 9/Dec/09 28/Jan/10 50.0 0.0 50.0 0.01 0.5 10/Dec/09 20/Mar/10 100.0 0.0 100.0 0.01 0.5 12/Dec/09 4/Mar/10 82.0 0.0 82.0 0.01 0.5 12/Dec/09 4/Mar/10 82.0 0.0 82.0 0.01 0.5 13/Dec/09 31/Jan/10 49.0 0.0 49.0 0.01 0.5 13/Dec/09 31/Jan/10 49.0 0.0 49.0 0.01 0.5 13/Dec/09 18/Feb/10 67.0 0.0 67.0 0.01 0.5 14/Dec/09 18/Feb/10 66.0 0.0 66.0 0.01 0.5 14/Dec/09 20/Feb/10 68.0 0.0 68.0 0.01 0.5 14/Dec/09 20/Feb/10 68.0 0.0 68.0 0.01 0.5 15/Dec/09 19/Jan/10 35.0 0.0 35.0 0.01 0.5 15/Dec/09 20/Feb/10 67.0 0.0 67.0 0.01 0.5 15/Dec/09 20/Feb/10 67.0 0.0 67.0 0.0

Page 30: Progress Monitoring Sheet Empty

1 0.5 15/Dec/09 20/Feb/10 67.0 0.0 67.0 0.01 0.5 15/Dec/09 11/Feb/10 58.0 0.0 58.0 0.01 0.5 15/Dec/09 9/Mar/10 84.0 0.0 84.0 0.01 0.5 16/Dec/09 25/Mar/10 99.0 0.0 99.0 0.01 0.5 16/Dec/09 9/Mar/10 83.0 0.0 83.0 0.01 0.5 16/Dec/09 9/Mar/10 83.0 0.0 83.0 0.01 0.5 16/Dec/09 11/Feb/10 57.0 0.0 57.0 0.01 0.5 17/Dec/09 27/Jan/10 41.0 0.0 41.0 0.01 0.5 17/Dec/09 25/Feb/10 70.0 0.0 70.0 0.01 0.5 17/Dec/09 20/Jan/10 34.0 0.0 34.0 0.01 0.5 17/Dec/09 21/Jan/10 35.0 0.0 35.0 0.01 0.5 17/Dec/09 16/Jan/10 30.0 0.0 30.0 0.01 0.5 17/Dec/09 16/Jan/10 30.0 0.0 30.0 0.01 0.5 17/Dec/09 16/Jan/10 30.0 0.0 30.0 0.01 0.5 19/Dec/09 21/Jan/10 33.0 0.0 33.0 0.01 0.5 20/Dec/09 14/Mar/10 84.0 0.0 84.0 0.01 0.5 22/Dec/09 24/Jan/10 33.0 0.0 33.0 0.01 0.5 22/Dec/09 15/Mar/10 83.0 0.0 83.0 0.01 0.5 22/Dec/09 9/Feb/10 49.0 0.0 49.0 0.01 0.5 22/Dec/09 27/Feb/10 67.0 0.0 67.0 0.01 0.5 23/Dec/09 28/Feb/10 67.0 0.0 67.0 0.01 0.5 23/Dec/09 28/Feb/10 67.0 0.0 67.0 0.01 0.5 23/Dec/09 28/Feb/10 67.0 0.0 67.0 0.01 0.5 23/Dec/09 28/Feb/10 67.0 0.0 67.0 0.01 0.5 23/Dec/09 20/Feb/10 59.0 0.0 59.0 0.01 0.5 23/Dec/09 11/Feb/10 50.0 0.0 50.0 0.01 0.5 23/Dec/09 11/Feb/10 50.0 0.0 50.0 0.01 0.5 23/Dec/09 3/Apr/10 101.0 0.0 101.0 0.01 0.5 23/Dec/09 17/Mar/10 84.0 0.0 84.0 0.01 0.5 24/Dec/09 24/Feb/10 62.0 0.0 62.0 0.01 0.5 24/Dec/09 21/Feb/10 59.0 0.0 59.0 0.01 0.5 24/Dec/09 2/Mar/10 68.0 0.0 68.0 0.01 0.5 26/Dec/09 2/Mar/10 66.0 0.0 66.0 0.01 0.5 26/Dec/09 2/Mar/10 66.0 0.0 66.0 0.01 0.5 26/Dec/09 2/Mar/10 66.0 0.0 66.0 0.01 0.5 27/Dec/09 3/Mar/10 66.0 0.0 66.0 0.01 0.5 27/Dec/09 3/Mar/10 66.0 0.0 66.0 0.01 0.5 27/Dec/09 3/Mar/10 66.0 0.0 66.0 0.01 0.5 27/Dec/09 4/Mar/10 67.0 0.0 67.0 0.01 0.5 28/Dec/09 1/Feb/10 35.0 0.0 35.0 0.01 0.5 29/Dec/09 6/Mar/10 67.0 0.0 67.0 0.01 0.5 29/Dec/09 6/Mar/10 67.0 0.0 67.0 0.01 0.5 29/Dec/09 7/Mar/10 68.0 0.0 68.0 0.01 0.5 29/Dec/09 7/Mar/10 68.0 0.0 68.0 0.01 0.5 30/Dec/09 18/Feb/10 50.0 0.0 50.0 0.01 0.5 31/Dec/09 8/Mar/10 67.0 0.0 67.0 0.01 0.5 31/Dec/09 8/Mar/10 67.0 0.0 67.0 0.01 0.5 31/Dec/09 8/Mar/10 67.0 0.0 67.0 0.01 0.5 2/Jan/10 20/Feb/10 49.0 0.0 49.0 0.01 0.5 2/Jan/10 20/Feb/10 49.0 0.0 49.0 0.01 0.5 2/Jan/10 9/Mar/10 66.0 0.0 66.0 0.0

Page 31: Progress Monitoring Sheet Empty

1 0.5 2/Jan/10 27/Mar/10 84.0 0.0 84.0 0.01 0.5 3/Jan/10 16/Feb/10 44.0 0.0 44.0 0.01 0.5 4/Jan/10 3/Mar/10 58.0 0.0 58.0 0.01 0.5 4/Jan/10 11/Mar/10 66.0 0.0 66.0 0.01 0.5 4/Jan/10 11/Mar/10 66.0 0.0 66.0 0.01 0.5 4/Jan/10 11/Mar/10 66.0 0.0 66.0 0.01 0.5 4/Jan/10 11/Mar/10 66.0 0.0 66.0 0.01 0.5 4/Jan/10 11/Mar/10 66.0 0.0 66.0 0.01 0.5 4/Jan/10 3/Mar/10 58.0 0.0 58.0 0.01 0.5 4/Jan/10 11/Mar/10 66.0 0.0 66.0 0.01 0.5 4/Jan/10 13/Mar/10 68.0 0.0 68.0 0.01 0.5 4/Jan/10 3/Mar/10 58.0 0.0 58.0 0.01 0.5 4/Jan/10 13/Mar/10 68.0 0.0 68.0 0.01 0.5 5/Jan/10 18/Mar/10 72.0 0.0 72.0 0.01 0.5 5/Jan/10 4/Mar/10 58.0 0.0 58.0 0.01 0.5 5/Jan/10 24/Feb/10 50.0 0.0 50.0 0.01 0.5 5/Jan/10 24/Feb/10 50.0 0.0 50.0 0.01 0.5 6/Jan/10 30/Mar/10 83.0 0.0 83.0 0.01 0.5 6/Jan/10 25/Feb/10 50.0 0.0 50.0 0.01 0.5 7/Jan/10 15/Mar/10 67.0 0.0 67.0 0.01 0.5 7/Jan/10 15/Mar/10 67.0 0.0 67.0 0.01 0.5 7/Jan/10 7/Mar/10 59.0 0.0 59.0 0.01 0.5 7/Jan/10 15/Mar/10 67.0 0.0 67.0 0.01 0.5 7/Jan/10 15/Mar/10 67.0 0.0 67.0 0.01 0.5 7/Jan/10 15/Mar/10 67.0 0.0 67.0 0.01 0.5 7/Jan/10 27/Feb/10 51.0 0.0 51.0 0.01 0.5 9/Jan/10 27/Feb/10 49.0 0.0 49.0 0.01 0.5 9/Jan/10 1/Apr/10 82.0 0.0 82.0 0.01 0.5 9/Jan/10 16/Mar/10 66.0 0.0 66.0 0.01 0.5 9/Jan/10 16/Mar/10 66.0 0.0 66.0 0.01 0.5 9/Jan/10 28/Feb/10 50.0 0.0 50.0 0.01 0.5 10/Jan/10 17/Mar/10 66.0 0.0 66.0 0.01 0.5 10/Jan/10 1/Mar/10 50.0 0.0 50.0 0.01 0.5 10/Jan/10 1/Mar/10 50.0 0.0 50.0 0.01 0.5 12/Jan/10 20/Mar/10 67.0 0.0 67.0 0.01 0.5 12/Jan/10 11/Mar/10 58.0 0.0 58.0 0.01 0.5 12/Jan/10 20/Mar/10 67.0 0.0 67.0 0.01 0.5 12/Jan/10 20/Mar/10 67.0 0.0 67.0 0.01 0.5 12/Jan/10 20/Mar/10 67.0 0.0 67.0 0.01 0.5 13/Jan/10 3/Mar/10 49.0 0.0 49.0 0.01 0.5 13/Jan/10 3/Mar/10 49.0 0.0 49.0 0.01 0.5 13/Jan/10 24/Feb/10 42.0 0.0 42.0 0.01 0.5 13/Jan/10 21/Mar/10 67.0 0.0 67.0 0.01 0.5 13/Jan/10 22/Mar/10 68.0 0.0 68.0 0.01 0.5 13/Jan/10 22/Mar/10 68.0 0.0 68.0 0.01 0.5 13/Jan/10 22/Mar/10 68.0 0.0 68.0 0.01 0.5 13/Jan/10 13/Mar/10 59.0 0.0 59.0 0.01 0.5 13/Jan/10 22/Mar/10 68.0 0.0 68.0 0.01 0.5 14/Jan/10 6/Feb/10 23.0 0.0 23.0 0.01 0.5 14/Jan/10 6/Mar/10 51.0 0.0 51.0 0.01 0.5 14/Jan/10 6/Mar/10 51.0 0.0 51.0 0.0

Page 32: Progress Monitoring Sheet Empty

1 0.5 14/Jan/10 17/Feb/10 34.0 0.0 34.0 0.01 0.5 14/Jan/10 18/Feb/10 35.0 0.0 35.0 0.01 0.5 14/Jan/10 13/Feb/10 30.0 0.0 30.0 0.01 0.5 14/Jan/10 13/Feb/10 30.0 0.0 30.0 0.01 0.5 14/Jan/10 13/Feb/10 30.0 0.0 30.0 0.01 0.5 16/Jan/10 20/Feb/10 35.0 0.0 35.0 0.01 0.5 17/Jan/10 24/Mar/10 66.0 0.0 66.0 0.01 0.5 17/Jan/10 8/Mar/10 50.0 0.0 50.0 0.01 0.5 17/Jan/10 8/Mar/10 50.0 0.0 50.0 0.01 0.5 17/Jan/10 8/Mar/10 50.0 0.0 50.0 0.01 0.5 17/Jan/10 21/Feb/10 35.0 0.0 35.0 0.01 0.5 17/Jan/10 28/Feb/10 42.0 0.0 42.0 0.01 0.5 18/Jan/10 25/Mar/10 66.0 0.0 66.0 0.01 0.5 18/Jan/10 25/Mar/10 66.0 0.0 66.0 0.01 0.5 19/Jan/10 23/Feb/10 35.0 0.0 35.0 0.01 0.5 20/Jan/10 25/Feb/10 36.0 0.0 36.0 0.01 0.5 21/Jan/10 11/Mar/10 49.0 0.0 49.0 0.01 0.5 21/Jan/10 13/Mar/10 51.0 0.0 51.0 0.01 0.5 21/Jan/10 30/Mar/10 68.0 0.0 68.0 0.01 0.5 21/Jan/10 15/Apr/10 84.0 0.0 84.0 0.01 0.5 24/Jan/10 15/Mar/10 50.0 0.0 50.0 0.01 0.5 24/Jan/10 23/Mar/10 58.0 0.0 58.0 0.01 0.5 24/Jan/10 31/Mar/10 66.0 0.0 66.0 0.01 0.5 24/Jan/10 31/Mar/10 66.0 0.0 66.0 0.01 0.5 24/Jan/10 31/Mar/10 66.0 0.0 66.0 0.01 0.5 24/Jan/10 31/Mar/10 66.0 0.0 66.0 0.01 0.5 24/Jan/10 31/Mar/10 66.0 0.0 66.0 0.01 0.5 24/Jan/10 31/Mar/10 66.0 0.0 66.0 0.01 0.5 24/Jan/10 15/Mar/10 50.0 0.0 50.0 0.01 0.5 25/Jan/10 7/Mar/10 41.0 0.0 41.0 0.01 0.5 25/Jan/10 16/Mar/10 50.0 0.0 50.0 0.01 0.5 25/Jan/10 16/Mar/10 50.0 0.0 50.0 0.01 0.5 25/Jan/10 16/Mar/10 50.0 0.0 50.0 0.01 0.5 25/Jan/10 16/Mar/10 50.0 0.0 50.0 0.01 0.5 25/Jan/10 16/Mar/10 50.0 0.0 50.0 0.01 0.5 25/Jan/10 16/Mar/10 50.0 0.0 50.0 0.01 0.5 26/Jan/10 17/Mar/10 50.0 0.0 50.0 0.01 0.5 26/Jan/10 17/Mar/10 50.0 0.0 50.0 0.01 0.5 26/Jan/10 18/Feb/10 23.0 0.0 23.0 0.01 0.5 26/Jan/10 17/Mar/10 50.0 0.0 50.0 0.01 0.5 26/Jan/10 17/Mar/10 50.0 0.0 50.0 0.01 0.5 27/Jan/10 3/Mar/10 35.0 0.0 35.0 0.01 0.5 27/Jan/10 3/Mar/10 35.0 0.0 35.0 0.01 0.5 27/Jan/10 3/Mar/10 35.0 0.0 35.0 0.01 0.5 27/Jan/10 4/Apr/10 67.0 0.0 67.0 0.01 0.5 27/Jan/10 4/Apr/10 67.0 0.0 67.0 0.01 0.5 27/Jan/10 4/Apr/10 67.0 0.0 67.0 0.01 0.5 27/Jan/10 27/Mar/10 59.0 0.0 59.0 0.01 0.5 27/Jan/10 3/Mar/10 35.0 0.0 35.0 0.01 0.5 27/Jan/10 18/Mar/10 50.0 0.0 50.0 0.01 0.5 30/Jan/10 21/Mar/10 50.0 0.0 50.0 0.0

Page 33: Progress Monitoring Sheet Empty

1 0.5 31/Jan/10 22/Mar/10 50.0 0.0 50.0 0.01 0.5 31/Jan/10 7/Mar/10 35.0 0.0 35.0 0.01 0.5 31/Jan/10 22/Mar/10 50.0 0.0 50.0 0.01 0.5 31/Jan/10 14/Mar/10 42.0 0.0 42.0 0.01 0.5 1/Feb/10 23/Mar/10 50.0 0.0 50.0 0.01 0.5 1/Feb/10 23/Mar/10 50.0 0.0 50.0 0.01 0.5 2/Feb/10 24/Mar/10 50.0 0.0 50.0 0.01 0.5 2/Feb/10 10/Apr/10 67.0 0.0 67.0 0.01 0.5 2/Feb/10 1/Apr/10 58.0 0.0 58.0 0.01 0.5 2/Feb/10 16/Mar/10 42.0 0.0 42.0 0.01 0.5 4/Feb/10 12/Apr/10 67.0 0.0 67.0 0.01 0.5 4/Feb/10 4/Apr/10 59.0 0.0 59.0 0.01 0.5 4/Feb/10 12/Apr/10 67.0 0.0 67.0 0.01 0.5 4/Feb/10 4/Apr/10 59.0 0.0 59.0 0.01 0.5 4/Feb/10 27/Mar/10 51.0 0.0 51.0 0.01 0.5 6/Feb/10 13/Mar/10 35.0 0.0 35.0 0.01 0.5 6/Feb/10 13/Mar/10 35.0 0.0 35.0 0.01 0.5 8/Feb/10 13/May/10 94.0 0.0 94.0 0.01 0.5 8/Feb/10 13/May/10 94.0 0.0 94.0 0.01 0.5 9/Feb/10 30/Mar/10 49.0 0.0 49.0 0.01 0.5 9/Feb/10 16/Mar/10 35.0 0.0 35.0 0.01 0.5 10/Feb/10 1/Apr/10 50.0 0.0 50.0 0.01 0.5 10/Feb/10 1/Apr/10 50.0 0.0 50.0 0.01 0.5 10/Feb/10 1/Apr/10 50.0 0.0 50.0 0.01 0.5 10/Feb/10 1/Apr/10 50.0 0.0 50.0 0.01 0.5 10/Feb/10 1/Apr/10 50.0 0.0 50.0 0.01 0.5 10/Feb/10 1/Apr/10 50.0 0.0 50.0 0.01 0.5 10/Feb/10 1/Apr/10 50.0 0.0 50.0 0.01 0.5 13/Feb/10 27/Mar/10 42.0 0.0 42.0 0.01 0.5 14/Feb/10 5/Apr/10 50.0 0.0 50.0 0.01 0.5 15/Feb/10 6/Apr/10 50.0 0.0 50.0 0.01 0.5 18/Feb/10 13/May/10 84.0 0.0 84.0 0.01 0.5 18/Feb/10 25/Mar/10 35.0 0.0 35.0 0.01 0.5 18/Feb/10 25/Mar/10 35.0 0.0 35.0 0.01 0.5 20/Feb/10 27/Mar/10 35.0 0.0 35.0 0.01 0.5 20/Feb/10 11/Apr/10 50.0 0.0 50.0 0.01 0.5 20/Feb/10 11/Apr/10 50.0 0.0 50.0 0.01 0.5 22/Feb/10 5/Apr/10 42.0 0.0 42.0 0.01 0.5 22/Feb/10 3/Apr/10 40.0 0.0 40.0 0.01 0.5 25/Feb/10 25/Apr/10 59.0 0.0 59.0 0.01 0.5 25/Feb/10 17/Apr/10 51.0 0.0 51.0 0.01 0.5 25/Feb/10 17/Apr/10 51.0 0.0 51.0 0.01 0.5 25/Feb/10 17/Apr/10 51.0 0.0 51.0 0.01 0.5 25/Feb/10 17/Apr/10 51.0 0.0 51.0 0.01 0.5 27/Feb/10 1/Apr/10 33.0 0.0 33.0 0.01 0.5 27/Feb/10 3/Apr/10 35.0 0.0 35.0 0.01 0.5 27/Feb/10 28/Mar/10 29.0 0.0 29.0 0.01 0.5 27/Feb/10 28/Mar/10 29.0 0.0 29.0 0.01 0.5 27/Feb/10 28/Mar/10 29.0 0.0 29.0 0.01 0.5 28/Feb/10 11/Apr/10 42.0 0.0 42.0 0.01 0.5 28/Feb/10 4/Apr/10 35.0 0.0 35.0 0.0

Page 34: Progress Monitoring Sheet Empty

1 0.5 28/Feb/10 4/Apr/10 35.0 0.0 35.0 0.01 0.5 28/Feb/10 4/Apr/10 35.0 0.0 35.0 0.01 0.5 9/Mar/10 28/Apr/10 50.0 0.0 50.0 0.01 0.5 9/Mar/10 28/Apr/10 50.0 0.0 50.0 0.01 0.5 18/Mar/10 22/Apr/10 35.0 0.0 35.0 0.01 0.5 23/Mar/10 12/May/10 50.0 0.0 50.0 0.01 0.5 24/Mar/10 12/May/10 49.0 0.0 49.0 0.01 0.5 5/Apr/10 12/May/10 37.0 0.0 37.0 0.0

Page 35: Progress Monitoring Sheet Empty

Unit Planned Start Planned Finish Start Date Finish Date Total Tech Planned %

13/Dec/08 15/Jan/09 15/Jan/09 0 0 0 33 30 0 0 - - - 1.00 13/Dec/08 15/Jan/09 15/Jan/09 0 0 0 33 30 0 0 - - - 1.00 22/Dec/08 16/Mar/10 19/Apr/10 460900 460900 921800 449 386 35821.244 35821.2435 1,194.04 2,388.08 1,194.04 0.08 22/Dec/08 16/Mar/10 19/Apr/10 115789 115789 231578 449 386 8999.1451 8999.14508 299.97 599.94 299.97 0.08 22/Dec/08 9/Feb/09 15/Mar/09 632081 632081 1264162 49 43 440986.74 440986.744 14,699.56 29,399.12 14,699.56 0.70 3/Jan/09 24/May/09 24/May/09 0 0 0 141 122 0 0 - - - 0.16

11/Jan/09 15/Feb/09 15/Feb/09 0 0 0 35 31 0 0 - - - 0.42 13/Jan/09 19/Oct/09 31/Oct/09 43469 43469 86938 279 240 1992.3292 1992.32917 181.12 362.24 181.12 0.05 13/Jan/09 19/Oct/09 31/Oct/09 34800 34800 69600 279 240 1595 1595 145.00 290.00 145.00 0.05 13/Jan/09 14/Mar/10 26/Mar/10 1205200 1205200 2410400 425 365 36321.096 36321.0959 3,301.92 6,603.84 3,301.92 0.03 13/Jan/09 14/Mar/10 26/Mar/10 450000 450000 900000 425 365 13561.644 13561.6438 1,232.88 2,465.75 1,232.88 0.03 13/Jan/09 14/Mar/10 26/Mar/10 1686610 1686610 3373220 425 365 50829.342 50829.3425 4,620.85 9,241.70 4,620.85 0.03 13/Jan/09 14/Mar/10 26/Mar/10 388080 388080 776160 425 365 11695.562 11695.5616 1,063.23 2,126.47 1,063.23 0.03 13/Jan/09 14/Mar/10 26/Mar/10 39285 39285 78570 425 365 1183.9315 1183.93151 107.63 215.26 107.63 0.03 13/Jan/09 14/Mar/10 26/Mar/10 14278 14278 28556 425 365 430.29589 430.29589 39.12 78.24 39.12 0.03 13/Jan/09 14/Mar/10 26/Mar/10 427260 427260 854520 425 365 12876.329 12876.3288 1,170.58 2,341.15 1,170.58 0.03 17/Jan/09 8/Nov/09 8/Nov/09 0 0 0 295 254 0 0 - - - 0.03 26/Jan/09 16/Jun/09 16/Jun/09 0 0 0 141 122 0 0 - - - - 28/Jan/09 4/Mar/09 4/Mar/09 0 0 0 35 31 0 0 - - - - 4/Feb/09 11/Mar/09 11/Mar/09 0 0 0 35 31 0 0 - - - -

10/Feb/09 17/Mar/09 17/Mar/09 0 0 0 35 31 0 0 - - - - 18/Feb/09 9/Jul/09 9/Jul/09 0 0 0 141 122 0 0 - - - - 21/Feb/09 16/Jun/09 16/Jun/09 187305 187305 374610 115 100 0 0 1,873.05 3,746.10 1,873.05 - 22/Feb/09 29/Mar/09 29/Mar/09 0 0 0 35 31 0 0 - - - - 28/Feb/09 23/Jun/09 23/Jun/09 48888 48888 97776 115 100 0 0 488.88 977.76 488.88 - 28/Feb/09 4/Apr/09 4/Apr/09 0 0 0 35 31 0 0 - - - - 4/Mar/09 27/Oct/09 27/Oct/09 0 0 0 237 204 0 0 - - - - 8/Mar/09 27/Jul/09 27/Jul/09 0 0 0 141 122 0 0 - - - -

10/Mar/09 4/Jul/09 4/Jul/09 197053 197053 394106 116 100 0 0 1,970.53 3,941.06 1,970.53 - 12/Mar/09 2/May/09 2/May/09 0 0 0 51 44 0 0 - - - - 12/Mar/09 2/May/09 2/May/09 0 0 0 51 44 0 0 - - - - 14/Mar/09 2/Aug/09 2/Aug/09 0 0 0 141 122 0 0 - - - - 16/Mar/09 4/Jul/09 4/Jul/09 212184 212184 424368 110 95 0 0 2,233.52 4,467.03 2,233.52 - 17/Mar/09 11/Jul/09 11/Jul/09 309250 309250 618500 116 100 0 0 3,092.50 6,185.00 3,092.50 - 19/Mar/09 8/Aug/09 8/Aug/09 0 0 0 142 122 0 0 - - - - 21/Mar/09 10/Aug/09 10/Aug/09 0 0 0 142 123 0 0 - - - -

TotalQty

Total Labor

Calendar Dur.

DurationWorking

DaysPlanned

QTYPlannedQTY Rem

Planned Lobor Daily

Planned Skilled Daily

Planned Daily QTY

Page 36: Progress Monitoring Sheet Empty

21/Mar/09 10/Aug/09 10/Aug/09 0 0 0 142 123 0 0 - - - - 21/Mar/09 10/Aug/09 10/Aug/09 0 0 0 142 123 0 0 - - - - 25/Mar/09 19/Jul/09 19/Jul/09 127293 127293 254586 116 100 0 0 1,272.93 2,545.86 1,272.93 - 28/Mar/09 16/May/09 16/May/09 0 0 0 49 43 0 0 - - - - 28/Mar/09 16/May/09 16/May/09 0 0 0 49 43 0 0 - - - - 29/Mar/09 27/Oct/09 27/Oct/09 0 0 0 212 183 0 0 - - - - 29/Mar/09 18/May/09 18/May/09 0 0 0 50 44 0 0 - - - - 30/Mar/09 3/May/09 3/May/09 0 0 0 34 30 0 0 - - - - 31/Mar/09 19/Aug/09 19/Aug/09 0 0 0 141 122 0 0 - - - - 31/Mar/09 19/Aug/09 19/Aug/09 0 0 0 141 122 0 0 - - - - 1/Apr/09 22/Aug/09 22/Aug/09 0 0 0 143 123 0 0 - - - - 1/Apr/09 22/Aug/09 22/Aug/09 0 0 0 143 123 0 0 - - - - 1/Apr/09 22/Aug/09 22/Aug/09 0 0 0 143 123 0 0 - - - - 1/Apr/09 22/Aug/09 22/Aug/09 0 0 0 143 123 0 0 - - - - 1/Apr/09 22/Aug/09 22/Aug/09 0 0 0 143 123 0 0 - - - - 2/Apr/09 2/Jul/09 2/Jul/09 234661 234661 469322 91 79 0 0 2,970.39 5,940.78 2,970.39 - 4/Apr/09 1/Dec/09 1/Dec/09 0 0 0 241 208 0 0 - - - - 7/Apr/09 27/Aug/09 27/Aug/09 0 0 0 142 123 0 0 - - - - 8/Apr/09 30/Jun/09 30/Jun/09 2611 2611 5222 83 72 0 0 36.26 72.53 36.26 - 9/Apr/09 27/Jul/09 27/Jul/09 1386269 1386269 2772538 109 94 0 0 14,747.54 29,495.09 14,747.54 -

12/Apr/09 20/Aug/09 20/Aug/09 218697 218697 437394 130 113 0 0 1,935.37 3,870.74 1,935.37 - 12/Apr/09 31/Aug/09 31/Aug/09 0 0 0 141 122 0 0 - - - - 13/Apr/09 2/Sep/09 2/Sep/09 0 0 0 142 123 0 0 - - - - 14/Apr/09 8/Aug/09 8/Aug/09 958035 958035 1916070 116 100 0 0 9,580.35 19,160.70 9,580.35 - 15/Apr/09 20/Jun/09 20/Jun/09 64922 64922 129844 66 57 0 0 1,138.98 2,277.96 1,138.98 - 20/Apr/09 13/Aug/09 13/Aug/09 127610 127610 255220 115 100 0 0 1,276.10 2,552.20 1,276.10 - 21/Apr/09 9/Sep/09 9/Sep/09 0 0 0 141 122 0 0 - - - - 22/Apr/09 26/May/09 26/May/09 0 0 0 34 30 0 0 - - - - 22/Apr/09 10/Sep/09 10/Sep/09 0 0 0 141 122 0 0 - - - - 22/Apr/09 4/Jul/09 4/Jul/09 248301 248301 496602 73 63 0 0 3,941.29 7,882.57 3,941.29 - 23/Apr/09 12/Sep/09 12/Sep/09 0 0 0 142 122 0 0 - - - - 23/Apr/09 4/Aug/09 4/Aug/09 835439 835439 1670878 103 89 0 0 9,386.96 18,773.91 9,386.96 - 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 141 122 0 0 - - - - 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 141 122 0 0 - - - - 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 141 122 0 0 - - - - 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 141 122 0 0 - - - - 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 141 122 0 0 - - - - 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 141 122 0 0 - - - - 28/Apr/09 31/Aug/09 31/Aug/09 0 0 0 125 108 0 0 - - - - 29/Apr/09 23/Aug/09 23/Aug/09 98227 98227 196454 116 100 0 0 982.27 1,964.54 982.27 - 29/Apr/09 24/Aug/09 24/Aug/09 37450 37450 74900 117 101 0 0 370.79 741.58 370.79 - 29/Apr/09 17/Sep/09 17/Sep/09 0 0 0 141 122 0 0 - - - - 29/Apr/09 22/Jul/09 22/Jul/09 0 0 0 84 73 0 0 - - - - 30/Apr/09 9/Sep/09 9/Sep/09 253058 253058 506116 132 114 0 0 2,219.81 4,439.61 2,219.81 - 30/Apr/09 24/Sep/09 24/Sep/09 0 0 0 147 127 0 0 - - - - 2/May/09 31/Jan/10 31/Jan/10 0 0 0 274 236 0 0 - - - - 2/May/09 31/Jan/10 31/Jan/10 0 0 0 274 236 0 0 - - - - 2/May/09 16/Sep/09 16/Sep/09 1174039 1174039 2348078 137 119 0 0 9,865.87 19,731.75 9,865.87 - 6/May/09 30/Aug/09 30/Aug/09 384158 384158 768316 116 100 0 0 3,841.58 7,683.16 3,841.58 - 7/May/09 6/Aug/09 6/Aug/09 228315 228315 456630 91 79 0 0 2,890.06 5,780.13 2,890.06 - 9/May/09 2/Sep/09 2/Sep/09 47950 47950 95900 116 101 0 0 474.75 949.50 474.75 -

Page 37: Progress Monitoring Sheet Empty

9/May/09 26/Aug/09 26/Aug/09 1255871 1255871 2511742 109 95 0 0 13,219.69 26,439.39 13,219.69 - 10/May/09 13/Sep/09 13/Sep/09 0 0 0 126 109 0 0 - - - - 11/May/09 8/Jul/09 8/Jul/09 79529 79529 159058 58 51 0 0 1,559.39 3,118.78 1,559.39 - 11/May/09 30/Jul/09 30/Jul/09 3489 3489 6978 80 70 0 0 49.84 99.69 49.84 - 11/May/09 7/Nov/09 7/Nov/09 1620683 1620683 3241366 180 155 0 0 10,456.02 20,912.04 10,456.02 - 11/May/09 20/Aug/09 20/Aug/09 1955276 1955276 3910552 101 88 0 0 22,219.05 44,438.09 22,219.05 - 11/May/09 4/Oct/09 4/Oct/09 0 0 0 146 126 0 0 - - - - 13/May/09 13/Aug/09 13/Aug/09 799759 799759 1599518 92 80 0 0 9,996.99 19,993.98 9,996.99 - 13/May/09 15/Jun/09 15/Jun/09 8769 8769 17538 33 29 0 0 302.38 604.76 302.38 - 13/May/09 17/Jun/09 17/Jun/09 0 0 0 35 31 0 0 - - - - 13/May/09 17/Jun/09 17/Jun/09 0 0 0 35 31 0 0 - - - - 13/May/09 17/Jun/09 17/Jun/09 0 0 0 35 31 0 0 - - - - 13/May/09 15/Sep/09 15/Sep/09 0 0 0 125 108 0 0 - - - - 13/May/09 15/Sep/09 15/Sep/09 0 0 0 125 108 0 0 - - - - 13/May/09 15/Sep/09 15/Sep/09 0 0 0 125 108 0 0 - - - - 13/May/09 15/Sep/09 15/Sep/09 0 0 0 125 108 0 0 - - - - 16/May/09 6/Aug/09 6/Aug/09 356209 356209 712418 82 72 0 0 4,947.35 9,894.69 4,947.35 - 16/May/09 20/Jun/09 20/Jun/09 0 0 0 35 31 0 0 - - - - 17/May/09 17/Aug/09 17/Aug/09 906037 906037 1812074 92 80 0 0 11,325.46 22,650.93 11,325.46 - 18/May/09 5/Nov/09 5/Nov/09 0 0 0 171 148 0 0 - - - - 19/May/09 12/Sep/09 12/Sep/09 908126 908126 1816252 116 100 0 0 9,081.26 18,162.52 9,081.26 - 19/May/09 12/Oct/09 12/Oct/09 605318 605318 1210636 146 126 0 0 4,804.11 9,608.22 4,804.11 - 19/May/09 13/Sep/09 13/Sep/09 42490 42490 84980 117 101 0 0 420.69 841.39 420.69 - 20/May/09 13/Oct/09 13/Oct/09 0 0 0 146 126 0 0 - - - - 21/May/09 7/Sep/09 7/Sep/09 1450366 1450366 2900732 109 94 0 0 15,429.43 30,858.85 15,429.43 - 21/May/09 28/Sep/09 28/Sep/09 0 0 0 130 112 0 0 - - - - 21/May/09 28/Sep/09 28/Sep/09 0 0 0 130 112 0 0 - - - - 23/May/09 25/Jun/09 25/Jun/09 12956 12956 25912 33 30 0 0 431.87 863.73 431.87 - 23/May/09 15/Aug/09 15/Aug/09 0 0 0 84 73 0 0 - - - - 23/May/09 15/Aug/09 15/Aug/09 0 0 0 84 73 0 0 - - - - 23/May/09 15/Aug/09 15/Aug/09 0 0 0 84 73 0 0 - - - - 24/May/09 28/Jul/09 28/Jul/09 78157 78157 156314 65 57 0 0 1,371.18 2,742.35 1,371.18 - 25/May/09 25/Aug/09 25/Aug/09 224475 224475 448950 92 80 0 0 2,805.94 5,611.88 2,805.94 - 26/May/09 15/Jul/09 15/Jul/09 0 0 0 50 44 0 0 - - - - 27/May/09 7/Dec/09 7/Dec/09 0 0 0 194 167 0 0 - - - - 27/May/09 16/Jul/09 16/Jul/09 0 0 0 50 44 0 0 - - - - 27/May/09 4/Oct/09 4/Oct/09 0 0 0 130 112 0 0 - - - - 30/May/09 4/Aug/09 4/Aug/09 307395 307395 614790 66 58 0 0 5,299.91 10,599.83 5,299.91 - 30/May/09 20/Aug/09 20/Aug/09 319825 319825 639650 82 72 0 0 4,442.01 8,884.03 4,442.01 - 30/May/09 20/Aug/09 20/Aug/09 466938 466938 933876 82 72 0 0 6,485.25 12,970.50 6,485.25 - 31/May/09 31/Aug/09 31/Aug/09 40307 40307 80614 92 80 0 0 503.84 1,007.68 503.84 - 31/May/09 5/Jul/09 5/Jul/09 0 0 0 35 31 0 0 - - - - 31/May/09 5/Jul/09 5/Jul/09 0 0 0 35 31 0 0 - - - -

2/Jun/09 1/Oct/09 1/Oct/09 154560 154560 309120 121 105 0 0 1,472.00 2,944.00 1,472.00 - 3/Jun/09 23/Aug/09 23/Aug/09 522667 522667 1045334 81 70 0 0 7,466.67 14,933.34 7,466.67 - 4/Jun/09 25/Jul/09 25/Jul/09 0 0 0 51 44 0 0 - - - - 6/Jun/09 31/Aug/09 31/Aug/09 786792 786792 1573584 86 75 0 0 10,490.56 20,981.12 10,490.56 - 6/Jun/09 26/Sep/09 26/Sep/09 7922 7922 15844 112 97 0 0 81.67 163.34 81.67 - 8/Jun/09 19/Aug/09 19/Aug/09 371360 371360 742720 72 63 0 0 5,894.60 11,789.21 5,894.60 - 8/Jun/09 28/Jul/09 28/Jul/09 0 0 0 50 44 0 0 - - - -

10/Jun/09 8/Oct/09 8/Oct/09 1021084 1021084 2042168 120 104 0 0 9,818.12 19,636.23 9,818.12 -

Page 38: Progress Monitoring Sheet Empty

10/Jun/09 28/Sep/09 28/Sep/09 835439 835439 1670878 110 95 0 0 8,794.09 17,588.19 8,794.09 - 11/Jun/09 10/Sep/09 10/Sep/09 217166 217166 434332 91 79 0 0 2,748.94 5,497.87 2,748.94 - 13/Jun/09 12/Oct/09 12/Oct/09 297430 297430 594860 121 105 0 0 2,832.67 5,665.33 2,832.67 - 13/Jun/09 18/Jul/09 18/Jul/09 0 0 0 35 31 0 0 - - - - 13/Jun/09 15/Jul/09 15/Jul/09 911996 911996 1823992 32 29 0 0 31,448.14 62,896.28 31,448.14 - 14/Jun/09 3/Aug/09 3/Aug/09 0 0 0 50 44 0 0 - - - - 14/Jun/09 25/Aug/09 25/Aug/09 50132 50132 100264 72 63 0 0 795.75 1,591.49 795.75 - 15/Jun/09 6/Oct/09 6/Oct/09 8584 8584 17168 113 98 0 0 87.59 175.18 87.59 - 15/Jun/09 10/Sep/09 10/Sep/09 134865 134865 269730 87 76 0 0 1,774.54 3,549.08 1,774.54 - 16/Jun/09 4/Aug/09 4/Aug/09 442 442 884 49 43 0 0 10.28 20.56 10.28 - 16/Jun/09 22/Aug/09 22/Aug/09 1972 1972 3944 67 58 0 0 34.00 68.00 34.00 - 17/Jun/09 15/Oct/09 15/Oct/09 930836 930836 1861672 120 104 0 0 8,950.35 17,900.69 8,950.35 - 17/Jun/09 10/Mar/10 10/Mar/10 0 0 0 266 229 0 0 - - - - 17/Jun/09 15/Oct/09 15/Oct/09 884346 884346 1768692 120 104 0 0 8,503.33 17,006.65 8,503.33 - 17/Jun/09 22/Jul/09 22/Jul/09 0 0 0 35 31 0 0 - - - - 17/Jun/09 1/Oct/09 1/Oct/09 1035573 1035573 2071146 106 92 0 0 11,256.23 22,512.46 11,256.23 - 17/Jun/09 21/Jul/09 21/Jul/09 739312 739312 1478624 34 30 0 0 24,643.73 49,287.47 24,643.73 - 18/Jun/09 23/Aug/09 23/Aug/09 50132 50132 100264 66 57 0 0 879.51 1,759.02 879.51 - 20/Jun/09 15/Sep/09 15/Sep/09 806162 806162 1612324 87 76 0 0 10,607.39 21,214.79 10,607.39 - 20/Jun/09 25/Jul/09 25/Jul/09 0 0 0 35 31 0 0 - - - - 22/Jun/09 18/Aug/09 18/Aug/09 214350 214350 428700 57 50 0 0 4,287.00 8,574.00 4,287.00 - 22/Jun/09 26/Aug/09 26/Aug/09 105476 105476 210952 65 57 0 0 1,850.46 3,700.91 1,850.46 - 22/Jun/09 2/Sep/09 2/Sep/09 137759 137759 275518 72 63 0 0 2,186.65 4,373.30 2,186.65 - 22/Jun/09 17/Sep/09 17/Sep/09 261111 261111 522222 87 76 0 0 3,435.67 6,871.34 3,435.67 - 22/Jun/09 11/Aug/09 11/Aug/09 0 0 0 50 44 0 0 - - - - 22/Jun/09 14/Nov/09 14/Nov/09 2081490 2081490 4162980 145 125 0 0 16,651.92 33,303.84 16,651.92 - 23/Jun/09 27/Oct/09 27/Oct/09 511700 511700 1023400 126 109 0 0 4,694.50 9,388.99 4,694.50 - 23/Jun/09 21/Oct/09 21/Oct/09 984951 984951 1969902 120 104 0 0 9,470.68 18,941.37 9,470.68 - 23/Jun/09 14/Sep/09 14/Sep/09 0 0 0 83 72 0 0 - - - - 23/Jun/09 22/Oct/09 22/Oct/09 302190 302190 604380 121 105 0 0 2,878.00 5,756.00 2,878.00 - 24/Jun/09 15/Sep/09 15/Sep/09 0 0 0 83 72 0 0 - - - - 24/Jun/09 15/Oct/09 15/Oct/09 2132 2132 4264 113 98 0 0 21.76 43.51 21.76 - 25/Jun/09 30/Jul/09 30/Jul/09 0 0 0 35 31 0 0 - - - - 25/Jun/09 7/Oct/09 7/Oct/09 17292 17292 34584 104 90 0 0 192.13 384.27 192.13 - 25/Jun/09 28/Jul/09 28/Jul/09 59013 59013 118026 33 29 0 0 2,034.93 4,069.86 2,034.93 - 25/Jun/09 17/Sep/09 17/Sep/09 0 0 0 84 73 0 0 - - - - 27/Jun/09 1/Sep/09 1/Sep/09 261514 261514 523028 66 58 0 0 4,508.86 9,017.72 4,508.86 - 27/Jun/09 16/Nov/09 16/Nov/09 1167112 1167112 2334224 142 123 0 0 9,488.72 18,977.43 9,488.72 - 29/Jun/09 9/Aug/09 9/Aug/09 99003 99003 198006 41 36 0 0 2,750.08 5,500.17 2,750.08 - 29/Jun/09 24/Sep/09 24/Sep/09 0 0 0 87 76 0 0 - - - - 29/Jun/09 4/Oct/09 4/Oct/09 114877 114877 229754 97 84 0 0 1,367.58 2,735.17 1,367.58 - 29/Jun/09 26/Aug/09 26/Aug/09 132590 132590 265180 58 51 0 0 2,599.80 5,199.61 2,599.80 - 30/Jun/09 19/Aug/09 19/Aug/09 0 0 0 50 44 0 0 - - - - 30/Jun/09 19/Aug/09 19/Aug/09 0 0 0 50 44 0 0 - - - - 1/Jul/09 13/Aug/09 13/Aug/09 10477 10477 20954 43 38 0 0 275.71 551.42 275.71 - 1/Jul/09 12/Oct/09 12/Oct/09 3222 3222 6444 103 89 0 0 36.20 72.40 36.20 - 2/Jul/09 31/Oct/09 31/Oct/09 60060 60060 120120 121 104 0 0 577.50 1,155.00 577.50 - 2/Jul/09 22/Aug/09 22/Aug/09 0 0 0 51 44 0 0 - - - - 2/Jul/09 22/Aug/09 22/Aug/09 0 0 0 51 44 0 0 - - - - 2/Jul/09 22/Aug/09 22/Aug/09 0 0 0 51 44 0 0 - - - - 4/Jul/09 7/Sep/09 7/Sep/09 220771 220771 441542 65 57 0 0 3,873.18 7,746.35 3,873.18 -

Page 39: Progress Monitoring Sheet Empty

5/Jul/09 6/Feb/10 6/Feb/10 0 0 0 216 186 0 0 - - - - 5/Jul/09 6/Feb/10 6/Feb/10 0 0 0 216 186 0 0 - - - - 5/Jul/09 2/Nov/09 2/Nov/09 1191281 1191281 2382562 120 104 0 0 11,454.63 22,909.25 11,454.63 - 5/Jul/09 30/Sep/09 30/Sep/09 0 0 0 87 76 0 0 - - - - 5/Jul/09 26/Oct/09 26/Oct/09 4100 4100 8200 113 98 0 0 41.84 83.67 41.84 - 5/Jul/09 9/Aug/09 9/Aug/09 0 0 0 35 31 0 0 - - - - 6/Jul/09 1/Oct/09 1/Oct/09 40307 40307 80614 87 76 0 0 530.36 1,060.71 530.36 - 6/Jul/09 25/Aug/09 25/Aug/09 0 0 0 50 44 0 0 - - - - 8/Jul/09 17/Aug/09 17/Aug/09 197934 197934 395868 40 35 0 0 5,655.26 11,310.51 5,655.26 - 9/Jul/09 5/Sep/09 5/Sep/09 596726 596726 1193452 58 50 0 0 11,934.52 23,869.04 11,934.52 - 9/Jul/09 16/Sep/09 16/Sep/09 8160 8160 16320 69 60 0 0 136.00 272.00 136.00 - 9/Jul/09 7/Nov/09 7/Nov/09 1047052 1047052 2094104 121 104 0 0 10,067.81 20,135.62 10,067.81 - 9/Jul/09 11/Oct/09 11/Oct/09 10169 10169 20338 94 81 0 0 125.54 251.09 125.54 - 9/Jul/09 11/Oct/09 11/Oct/09 6444 6444 12888 94 81 0 0 79.56 159.11 79.56 -

11/Jul/09 3/Oct/09 3/Oct/09 32970 32970 65940 84 73 0 0 451.64 903.29 451.64 - 12/Jul/09 6/Dec/09 6/Dec/09 1186664 1186664 2373328 147 127 0 0 9,343.81 18,687.62 9,343.81 - 12/Jul/09 16/Sep/09 16/Sep/09 79730 79730 159460 66 58 0 0 1,374.66 2,749.31 1,374.66 - 13/Jul/09 10/Oct/09 10/Oct/09 0 0 0 89 77 0 0 - - - - 14/Jul/09 1/Sep/09 1/Sep/09 597 597 1194 49 43 0 0 13.88 27.77 13.88 - 14/Jul/09 19/Sep/09 19/Sep/09 1260 1260 2520 67 58 0 0 21.72 43.45 21.72 - 15/Jul/09 26/Oct/09 26/Oct/09 1022756 1022756 2045512 103 89 0 0 11,491.64 22,983.28 11,491.64 - 16/Jul/09 4/Oct/09 4/Oct/09 52123 52123 104246 80 69 0 0 755.41 1,510.81 755.41 - 16/Jul/09 12/Oct/09 12/Oct/09 235650 235650 471300 88 76 0 0 3,100.66 6,201.32 3,100.66 - 16/Jul/09 26/Aug/09 26/Aug/09 90370 90370 180740 41 36 0 0 2,510.28 5,020.56 2,510.28 - 16/Jul/09 12/Oct/09 12/Oct/09 0 0 0 88 76 0 0 - - - - 16/Jul/09 7/Nov/09 7/Nov/09 1173314 1173314 2346628 114 98 0 0 11,972.59 23,945.18 11,972.59 - 16/Jul/09 29/Oct/09 29/Oct/09 29304 29304 58608 105 91 0 0 322.02 644.04 322.02 - 16/Jul/09 13/Sep/09 13/Sep/09 71111 71111 142222 59 51 0 0 1,394.33 2,788.67 1,394.33 - 18/Jul/09 8/Nov/09 8/Nov/09 45100 45100 90200 113 98 0 0 460.20 920.41 460.20 - 18/Jul/09 22/Aug/09 22/Aug/09 0 0 0 35 31 0 0 - - - - 18/Jul/09 16/Nov/09 16/Nov/09 214410 214410 428820 121 105 0 0 2,042.00 4,084.00 2,042.00 - 19/Jul/09 9/Nov/09 9/Nov/09 7020 7020 14040 113 98 0 0 71.63 143.27 71.63 - 20/Jul/09 29/Aug/09 29/Aug/09 186620 186620 373240 40 35 0 0 5,332.00 10,664.00 5,332.00 - 21/Jul/09 17/Oct/09 17/Oct/09 0 0 0 88 76 0 0 - - - - 21/Jul/09 17/Oct/09 17/Oct/09 0 0 0 88 76 0 0 - - - - 21/Jul/09 17/Oct/09 17/Oct/09 0 0 0 88 76 0 0 - - - - 21/Jul/09 13/Oct/09 13/Oct/09 95754 95754 191508 84 73 0 0 1,311.70 2,623.40 1,311.70 - 21/Jul/09 2/Nov/09 2/Nov/09 234472 234472 468944 104 90 0 0 2,605.24 5,210.49 2,605.24 - 22/Jul/09 30/Jan/10 30/Jan/10 0 0 0 192 165 0 0 - - - - 22/Jul/09 3/Nov/09 3/Nov/09 1812457 1812457 3624914 104 90 0 0 20,138.41 40,276.82 20,138.41 - 22/Jul/09 11/Nov/09 11/Nov/09 1265774 1265774 2531548 112 97 0 0 13,049.22 26,098.43 13,049.22 - 25/Jul/09 29/Oct/09 29/Oct/09 123851 123851 247702 96 84 0 0 1,474.42 2,948.83 1,474.42 - 25/Jul/09 11/Oct/09 11/Oct/09 217244 217244 434488 78 68 0 0 3,194.76 6,389.53 3,194.76 - 25/Jul/09 5/Sep/09 5/Sep/09 0 0 0 42 37 0 0 - - - - 26/Jul/09 22/Oct/09 22/Oct/09 244672 244672 489344 88 77 0 0 3,177.56 6,355.12 3,177.56 - 27/Jul/09 5/Oct/09 5/Oct/09 234063 234063 468126 70 61 0 0 3,837.10 7,674.20 3,837.10 - 27/Jul/09 22/Oct/09 22/Oct/09 290158 290158 580316 87 76 0 0 3,817.87 7,635.74 3,817.87 - 27/Jul/09 7/Dec/09 7/Dec/09 0 0 0 133 115 0 0 - - - - 28/Jul/09 25/Nov/09 25/Nov/09 6864 6864 13728 120 104 0 0 66.00 132.00 66.00 - 28/Jul/09 30/Aug/09 30/Aug/09 58548 58548 117096 33 29 0 0 2,018.90 4,037.79 2,018.90 - 28/Jul/09 27/Mar/10 27/Mar/10 0 0 0 242 208 0 0 - - - -

Page 40: Progress Monitoring Sheet Empty

28/Jul/09 10/Nov/09 10/Nov/09 31312 31312 62624 105 91 0 0 344.09 688.18 344.09 - 28/Jul/09 18/Nov/09 18/Nov/09 75850 75850 151700 113 98 0 0 773.98 1,547.96 773.98 - 28/Jul/09 16/Sep/09 16/Sep/09 0 0 0 50 44 0 0 - - - - 29/Jul/09 10/Nov/09 10/Nov/09 878646 878646 1757292 104 90 0 0 9,762.73 19,525.47 9,762.73 - 30/Jul/09 3/Mar/10 3/Mar/10 0 0 0 216 186 0 0 - - - - 30/Jul/09 11/Nov/09 11/Nov/09 1327751 1327751 2655502 104 90 0 0 14,752.79 29,505.58 14,752.79 - 1/Aug/09 2/Sep/09 2/Sep/09 1080908 1080908 2161816 32 29 0 0 37,272.69 74,545.38 37,272.69 - 1/Aug/09 2/Sep/09 2/Sep/09 108834 108834 217668 32 29 0 0 3,752.90 7,505.79 3,752.90 - 1/Aug/09 12/Nov/09 12/Nov/09 196232 196232 392464 103 90 0 0 2,180.36 4,360.71 2,180.36 - 1/Aug/09 14/Nov/09 14/Nov/09 1687773 1687773 3375546 105 91 0 0 18,546.96 37,093.91 18,546.96 - 2/Aug/09 28/Oct/09 28/Oct/09 235683 235683 471366 87 76 0 0 3,101.09 6,202.18 3,101.09 - 2/Aug/09 15/Oct/09 15/Oct/09 10169 10169 20338 74 65 0 0 156.45 312.89 156.45 - 2/Aug/09 15/Oct/09 15/Oct/09 3222 3222 6444 74 65 0 0 49.57 99.14 49.57 - 3/Aug/09 13/Sep/09 13/Sep/09 52487 52487 104974 41 36 0 0 1,457.97 2,915.94 1,457.97 - 3/Aug/09 19/Oct/09 19/Oct/09 90229 90229 180458 77 67 0 0 1,346.70 2,693.40 1,346.70 - 4/Aug/09 28/Sep/09 28/Sep/09 690262 690262 1380524 55 48 0 0 14,380.46 28,760.92 14,380.46 - 5/Aug/09 15/Oct/09 15/Oct/09 850056 850056 1700112 71 62 0 0 13,710.58 27,421.16 13,710.58 - 5/Aug/09 29/Oct/09 29/Oct/09 260064 260064 520128 85 74 0 0 3,514.38 7,028.76 3,514.38 - 5/Aug/09 1/Dec/09 1/Dec/09 976200 976200 1952400 118 102 0 0 9,570.59 19,141.18 9,570.59 - 5/Aug/09 2/Nov/09 2/Nov/09 0 0 0 89 77 0 0 - - - - 6/Aug/09 8/Dec/09 8/Dec/09 124950 124950 249900 124 107 0 0 1,167.76 2,335.51 1,167.76 - 6/Aug/09 29/Sep/09 29/Sep/09 827274 827274 1654548 54 47 0 0 17,601.57 35,203.15 17,601.57 - 6/Aug/09 19/Oct/09 19/Oct/09 13770 13770 27540 74 64 0 0 215.16 430.31 215.16 - 6/Aug/09 26/Nov/09 26/Nov/09 3116 3116 6232 112 97 0 0 32.12 64.25 32.12 - 6/Aug/09 8/Sep/09 8/Sep/09 83927 83927 167854 33 29 0 0 2,894.03 5,788.07 2,894.03 - 6/Aug/09 16/Sep/09 16/Sep/09 25671 25671 51342 41 36 0 0 713.08 1,426.17 713.08 - 6/Aug/09 30/Sep/09 30/Sep/09 0 0 0 55 48 0 0 - - - - 8/Aug/09 1/Dec/09 1/Dec/09 1651558 1651558 3303116 115 100 0 0 16,515.58 33,031.16 16,515.58 - 8/Aug/09 10/Dec/09 10/Dec/09 154630 154630 309260 124 108 0 0 1,431.76 2,863.52 1,431.76 - 8/Aug/09 19/Nov/09 19/Nov/09 1350747 1350747 2701494 103 90 0 0 15,008.30 30,016.60 15,008.30 - 8/Aug/09 19/Sep/09 19/Sep/09 0 0 0 42 37 0 0 - - - - 9/Aug/09 19/Nov/09 19/Nov/09 7524987 7524987 15049974 102 89 0 0 84,550.42 169,100.83 84,550.42 - 9/Aug/09 27/Oct/09 27/Oct/09 53567 53567 107134 79 69 0 0 776.33 1,552.67 776.33 - 9/Aug/09 18/Oct/09 18/Oct/09 104546 104546 209092 70 61 0 0 1,713.87 3,427.74 1,713.87 - 9/Aug/09 1/Nov/09 1/Nov/09 131969 131969 263938 84 73 0 0 1,807.79 3,615.59 1,807.79 - 9/Aug/09 22/Nov/09 22/Nov/09 2190548 2190548 4381096 105 91 0 0 24,071.96 48,143.91 24,071.96 - 9/Aug/09 31/Jan/10 31/Jan/10 0 0 0 175 151 0 0 - - - - 9/Aug/09 19/Oct/09 19/Oct/09 63070 63070 126140 71 62 0 0 1,017.26 2,034.52 1,017.26 -

10/Aug/09 13/Dec/09 13/Dec/09 165830 165830 331660 125 108 0 0 1,535.46 3,070.93 1,535.46 - 10/Aug/09 5/Dec/09 5/Dec/09 57400 57400 114800 117 101 0 0 568.32 1,136.63 568.32 - 10/Aug/09 5/Dec/09 5/Dec/09 587936 587936 1175872 117 101 0 0 5,821.15 11,642.30 5,821.15 - 10/Aug/09 22/Nov/09 22/Nov/09 418544 418544 837088 104 90 0 0 4,650.49 9,300.98 4,650.49 - 10/Aug/09 4/Oct/09 4/Oct/09 0 0 0 55 48 0 0 - - - - 11/Aug/09 15/Nov/09 15/Nov/09 48867 48867 97734 96 83 0 0 588.76 1,177.52 588.76 - 11/Aug/09 30/Dec/09 30/Dec/09 0 0 0 141 122 0 0 - - - - 12/Aug/09 26/Sep/09 26/Sep/09 111603 111603 223206 45 39 0 0 2,861.62 5,723.23 2,861.62 - 13/Aug/09 12/Nov/09 12/Nov/09 32824 32824 65648 91 79 0 0 415.49 830.99 415.49 - 13/Aug/09 9/Nov/09 9/Nov/09 0 0 0 88 76 0 0 - - - - 13/Aug/09 7/Oct/09 7/Oct/09 77632 77632 155264 55 48 0 0 1,617.33 3,234.67 1,617.33 - 15/Aug/09 25/Oct/09 25/Oct/09 621930 621930 1243860 71 62 0 0 10,031.13 20,062.26 10,031.13 - 15/Aug/09 16/Dec/09 16/Dec/09 926510 926510 1853020 123 107 0 0 8,658.97 17,317.94 8,658.97 -

Page 41: Progress Monitoring Sheet Empty

15/Aug/09 24/Oct/09 24/Oct/09 79983 79983 159966 70 61 0 0 1,311.20 2,622.39 1,311.20 - 15/Aug/09 26/Oct/09 26/Oct/09 118695 118695 237390 72 63 0 0 1,884.05 3,768.10 1,884.05 - 15/Aug/09 19/Sep/09 19/Sep/09 0 0 0 35 31 0 0 - - - - 15/Aug/09 8/Oct/09 8/Oct/09 0 0 0 54 48 0 0 - - - - 16/Aug/09 16/Nov/09 16/Nov/09 246137 246137 492274 92 80 0 0 3,076.71 6,153.43 3,076.71 - 16/Aug/09 18/Oct/09 18/Oct/09 31324 31324 62648 63 55 0 0 569.53 1,139.05 569.53 - 18/Aug/09 24/Sep/09 24/Sep/09 90370 90370 180740 37 33 0 0 2,738.48 5,476.97 2,738.48 - 18/Aug/09 14/Nov/09 14/Nov/09 468385 468385 936770 88 76 0 0 6,162.96 12,325.92 6,162.96 - 18/Aug/09 27/Dec/09 27/Dec/09 266559 266559 533118 131 113 0 0 2,358.93 4,717.86 2,358.93 - 18/Aug/09 3/Dec/09 3/Dec/09 4620066 4620066 9240132 107 93 0 0 49,678.13 99,356.26 49,678.13 - 18/Aug/09 5/Dec/09 5/Dec/09 2906735 2906735 5813470 109 94 0 0 30,922.71 61,845.43 30,922.71 - 18/Aug/09 3/Dec/09 3/Dec/09 8659006 8659006 17318012 107 93 0 0 93,107.59 186,215.18 93,107.59 - 20/Aug/09 29/Oct/09 29/Oct/09 49855 49855 99710 70 61 0 0 817.30 1,634.59 817.30 - 20/Aug/09 5/Nov/09 5/Nov/09 45644 45644 91288 77 67 0 0 681.25 1,362.51 681.25 - 20/Aug/09 16/Nov/09 16/Nov/09 104840 104840 209680 88 76 0 0 1,379.47 2,758.95 1,379.47 - 20/Aug/09 28/Sep/09 28/Sep/09 118294 118294 236588 39 34 0 0 3,479.24 6,958.47 3,479.24 - 20/Aug/09 7/Dec/09 7/Dec/09 439031 439031 878062 109 94 0 0 4,670.54 9,341.09 4,670.54 - 20/Aug/09 16/Dec/09 16/Dec/09 81601 81601 163202 118 102 0 0 800.01 1,600.02 800.01 - 22/Aug/09 13/Feb/10 13/Feb/10 0 0 0 175 151 0 0 - - - - 22/Aug/09 15/Oct/09 15/Oct/09 0 0 0 54 48 0 0 - - - - 22/Aug/09 22/Nov/09 22/Nov/09 17674 17674 35348 92 80 0 0 220.93 441.85 220.93 - 23/Aug/09 17/Oct/09 17/Oct/09 0 0 0 55 48 0 0 - - - - 23/Aug/09 17/Oct/09 17/Oct/09 0 0 0 55 48 0 0 - - - - 23/Aug/09 16/Feb/10 16/Feb/10 8860149 8860149 17720298 177 153 0 0 57,909.47 115,818.94 57,909.47 - 24/Aug/09 1/Oct/09 1/Oct/09 58548 58548 117096 38 34 0 0 1,722.00 3,444.00 1,722.00 - 25/Aug/09 22/Nov/09 22/Nov/09 567296 567296 1134592 89 77 0 0 7,367.48 14,734.96 7,367.48 - 26/Aug/09 22/Nov/09 22/Nov/09 208775 208775 417550 88 76 0 0 2,747.04 5,494.08 2,747.04 - 26/Aug/09 22/Nov/09 22/Nov/09 1317845 1317845 2635690 88 76 0 0 17,340.07 34,680.13 17,340.07 - 27/Aug/09 12/Oct/09 12/Oct/09 25208 25208 50416 46 40 0 0 630.20 1,260.40 630.20 - 27/Aug/09 5/Nov/09 5/Nov/09 49855 49855 99710 70 61 0 0 817.30 1,634.59 817.30 - 27/Aug/09 12/Nov/09 12/Nov/09 45558 45558 91116 77 67 0 0 679.97 1,359.94 679.97 - 27/Aug/09 21/Oct/09 21/Oct/09 0 0 0 55 48 0 0 - - - - 27/Aug/09 21/Oct/09 21/Oct/09 0 0 0 55 48 0 0 - - - - 29/Aug/09 15/Dec/09 15/Dec/09 3389057 3389057 6778114 108 94 0 0 36,053.80 72,107.60 36,053.80 - 29/Aug/09 15/Nov/09 15/Nov/09 135316 135316 270632 78 68 0 0 1,989.94 3,979.88 1,989.94 - 30/Aug/09 31/Dec/09 31/Dec/09 296870 296870 593740 123 107 0 0 2,774.49 5,548.97 2,774.49 - 30/Aug/09 7/Oct/09 7/Oct/09 230822 230822 461644 38 34 0 0 6,788.88 13,577.76 6,788.88 - 30/Aug/09 13/Oct/09 13/Oct/09 60132 60132 120264 44 39 0 0 1,541.85 3,083.69 1,541.85 - 30/Aug/09 7/Oct/09 7/Oct/09 53852 53852 107704 38 34 0 0 1,583.88 3,167.76 1,583.88 - 31/Aug/09 16/Dec/09 16/Dec/09 29304 29304 58608 107 93 0 0 315.10 630.19 315.10 - 31/Aug/09 24/Dec/09 24/Dec/09 73472 73472 146944 115 100 0 0 734.72 1,469.44 734.72 - 31/Aug/09 22/Feb/10 22/Feb/10 10965925 10965925 21931850 175 151 0 0 72,622.02 145,244.04 72,622.02 - 31/Aug/09 24/Dec/09 24/Dec/09 73094 73094 146188 115 100 0 0 730.94 1,461.88 730.94 - 1/Sep/09 6/Apr/10 6/Apr/10 8437607 8437607 16875214 217 187 0 0 45,120.89 90,241.79 45,120.89 - 1/Sep/09 6/Apr/10 6/Apr/10 12404477 12404477 24808954 217 187 0 0 66,334.10 132,668.20 66,334.10 - 1/Sep/09 6/Apr/10 6/Apr/10 11132528 11132528 22265056 217 187 0 0 59,532.24 119,064.47 59,532.24 - 1/Sep/09 1/Dec/09 1/Dec/09 255714 255714 511428 91 79 0 0 3,236.89 6,473.77 3,236.89 - 1/Sep/09 2/Nov/09 2/Nov/09 388240 388240 776480 62 54 0 0 7,189.63 14,379.26 7,189.63 - 1/Sep/09 25/Oct/09 25/Oct/09 1401 1401 2802 54 47 0 0 29.81 59.62 29.81 - 1/Sep/09 17/Oct/09 17/Oct/09 567 567 1134 46 40 0 0 14.18 28.35 14.18 - 1/Sep/09 10/Dec/09 10/Dec/09 81982 81982 163964 100 87 0 0 942.32 1,884.64 942.32 -

Page 42: Progress Monitoring Sheet Empty

1/Sep/09 11/Oct/09 11/Oct/09 0 0 0 40 35 0 0 - - - - 1/Sep/09 26/Oct/09 26/Oct/09 290758 290758 581516 55 48 0 0 6,057.46 12,114.92 6,057.46 - 2/Sep/09 19/Dec/09 19/Dec/09 145722 145722 291444 108 93 0 0 1,566.90 3,133.81 1,566.90 - 2/Sep/09 19/Dec/09 19/Dec/09 16764 16764 33528 108 93 0 0 180.26 360.52 180.26 - 2/Sep/09 27/Oct/09 27/Oct/09 88452 88452 176904 55 48 0 0 1,842.75 3,685.50 1,842.75 - 2/Sep/09 27/Oct/09 27/Oct/09 158950 158950 317900 55 48 0 0 3,311.46 6,622.92 3,311.46 - 3/Sep/09 21/Oct/09 21/Oct/09 523093 523093 1046186 48 42 0 0 12,454.60 24,909.19 12,454.60 - 3/Sep/09 20/Dec/09 20/Dec/09 217087 217087 434174 108 93 0 0 2,334.27 4,668.54 2,334.27 - 3/Sep/09 20/Dec/09 20/Dec/09 1756632 1756632 3513264 108 93 0 0 18,888.52 37,777.03 18,888.52 - 5/Sep/09 5/Dec/09 5/Dec/09 280861 280861 561722 91 79 0 0 3,555.20 7,110.41 3,555.20 - 6/Sep/09 5/Dec/09 5/Dec/09 133088 133088 266176 90 78 0 0 1,706.26 3,412.51 1,706.26 - 7/Sep/09 25/Nov/09 25/Nov/09 53769 53769 107538 79 69 0 0 779.26 1,558.52 779.26 - 7/Sep/09 7/Dec/09 7/Dec/09 263121 263121 526242 91 79 0 0 3,330.65 6,661.29 3,330.65 - 7/Sep/09 27/Dec/09 27/Dec/09 167637 167637 335274 111 96 0 0 1,746.22 3,492.44 1,746.22 - 8/Sep/09 17/Oct/09 17/Oct/09 29268 29268 58536 39 34 0 0 860.82 1,721.65 860.82 - 8/Sep/09 3/Jan/10 3/Jan/10 22714 22714 45428 117 101 0 0 224.89 449.78 224.89 - 8/Sep/09 24/Dec/09 24/Dec/09 66990 66990 133980 107 93 0 0 720.32 1,440.65 720.32 - 8/Sep/09 16/Dec/09 16/Dec/09 173866 173866 347732 99 86 0 0 2,021.70 4,043.40 2,021.70 - 9/Sep/09 9/Dec/09 9/Dec/09 7687821 7687821 15375642 91 79 0 0 97,314.19 194,628.38 97,314.19 -

10/Sep/09 4/Jan/10 4/Jan/10 20418 20418 40836 116 100 0 0 204.18 408.36 204.18 - 10/Sep/09 28/Dec/09 28/Dec/09 705059 705059 1410118 109 94 0 0 7,500.63 15,001.26 7,500.63 - 10/Sep/09 12/Dec/09 12/Dec/09 286944 286944 573888 93 80 0 0 3,586.80 7,173.60 3,586.80 - 10/Sep/09 8/Dec/09 8/Dec/09 141021 141021 282042 89 77 0 0 1,831.44 3,662.88 1,831.44 - 12/Sep/09 28/Dec/09 28/Dec/09 15656 15656 31312 107 93 0 0 168.34 336.69 168.34 - 12/Sep/09 29/Dec/09 29/Dec/09 1288408 1288408 2576816 108 94 0 0 13,706.47 27,412.94 13,706.47 - 13/Sep/09 5/Nov/09 5/Nov/09 39379 39379 78758 53 47 0 0 837.85 1,675.70 837.85 - 13/Sep/09 6/Jan/10 6/Jan/10 1357628 1357628 2715256 115 100 0 0 13,576.28 27,152.56 13,576.28 - 13/Sep/09 30/Dec/09 30/Dec/09 143978 143978 287956 108 94 0 0 1,531.68 3,063.36 1,531.68 - 13/Sep/09 30/Dec/09 30/Dec/09 580064 580064 1160128 108 94 0 0 6,170.89 12,341.79 6,170.89 - 13/Sep/09 15/Nov/09 15/Nov/09 14268 14268 28536 63 55 0 0 259.42 518.84 259.42 - 14/Sep/09 30/Dec/09 30/Dec/09 8601 8601 17202 107 93 0 0 92.48 184.97 92.48 - 14/Sep/09 30/Dec/09 30/Dec/09 107403 107403 214806 107 93 0 0 1,154.87 2,309.74 1,154.87 - 14/Sep/09 24/Dec/09 24/Dec/09 1170772 1170772 2341544 101 88 0 0 13,304.23 26,608.45 13,304.23 - 15/Sep/09 16/Feb/10 16/Feb/10 5425594 5425594 10851188 154 133 0 0 40,793.94 81,587.88 40,793.94 - 15/Sep/09 13/Dec/09 13/Dec/09 122154 122154 244308 89 77 0 0 1,586.42 3,172.83 1,586.42 - 16/Sep/09 13/Oct/09 13/Oct/09 118294 118294 236588 27 24 0 0 4,928.92 9,857.83 4,928.92 - 16/Sep/09 16/Dec/09 16/Dec/09 1680187 1680187 3360374 91 79 0 0 21,268.19 42,536.38 21,268.19 - 16/Sep/09 17/Feb/10 17/Feb/10 534160 534160 1068320 154 133 0 0 4,016.24 8,032.48 4,016.24 - 17/Sep/09 26/Nov/09 26/Nov/09 363652 363652 727304 70 61 0 0 5,961.51 11,923.02 5,961.51 - 17/Sep/09 17/Dec/09 17/Dec/09 687982 687982 1375964 91 79 0 0 8,708.63 17,417.27 8,708.63 - 17/Sep/09 20/Jan/10 20/Jan/10 210210 210210 420420 125 108 0 0 1,946.39 3,892.78 1,946.39 - 19/Sep/09 20/Jan/10 20/Jan/10 20048 20048 40096 123 107 0 0 187.36 374.73 187.36 - 19/Sep/09 21/Mar/10 21/Mar/10 0 0 0 183 158 0 0 - - - - 24/Sep/09 14/Nov/09 14/Nov/09 0 0 0 51 44 0 0 - - - - 24/Sep/09 28/Oct/09 28/Oct/09 865397 865397 1730794 34 30 0 0 28,846.57 57,693.13 28,846.57 - 26/Sep/09 2/Jan/10 2/Jan/10 1018301 1018301 2036602 98 85 0 0 11,980.01 23,960.02 11,980.01 - 26/Sep/09 7/Jan/10 7/Jan/10 1355874 1355874 2711748 103 90 0 0 15,065.27 30,130.53 15,065.27 - 26/Sep/09 5/Dec/09 5/Dec/09 32060 32060 64120 70 61 0 0 525.57 1,051.15 525.57 - 27/Sep/09 7/Jan/10 7/Jan/10 102590 102590 205180 102 89 0 0 1,152.70 2,305.39 1,152.70 - 27/Sep/09 16/Jan/10 16/Jan/10 62566 62566 125132 111 96 0 0 651.73 1,303.46 651.73 - 27/Sep/09 7/Jan/10 7/Jan/10 423342 423342 846684 102 89 0 0 4,756.65 9,513.30 4,756.65 -

Page 43: Progress Monitoring Sheet Empty

28/Sep/09 16/Nov/09 16/Nov/09 1395494 1395494 2790988 49 43 0 0 32,453.35 64,906.70 32,453.35 - 28/Sep/09 16/Nov/09 16/Nov/09 0 0 0 49 43 0 0 - - - - 29/Sep/09 5/Dec/09 5/Dec/09 47389 47389 94778 67 58 0 0 817.05 1,634.10 817.05 - 29/Sep/09 26/Jan/10 26/Jan/10 269850 269850 539700 119 103 0 0 2,619.90 5,239.81 2,619.90 - 29/Sep/09 16/Dec/09 16/Dec/09 152061 152061 304122 78 68 0 0 2,236.19 4,472.38 2,236.19 - 29/Sep/09 24/Dec/09 24/Dec/09 407986 407986 815972 86 75 0 0 5,439.81 10,879.63 5,439.81 - 29/Sep/09 29/Dec/09 29/Dec/09 1379509 1379509 2759018 91 79 0 0 17,462.14 34,924.28 17,462.14 - 29/Sep/09 26/Dec/09 26/Dec/09 424947 424947 849894 88 76 0 0 5,591.41 11,182.82 5,591.41 - 30/Sep/09 11/Jan/10 11/Jan/10 99857 99857 199714 103 89 0 0 1,121.99 2,243.98 1,121.99 - 30/Sep/09 19/Nov/09 19/Nov/09 562359 562359 1124718 50 44 0 0 12,780.89 25,561.77 12,780.89 - 30/Sep/09 30/Dec/09 30/Dec/09 198142 198142 396284 91 79 0 0 2,508.13 5,016.25 2,508.13 - 30/Sep/09 3/Jan/10 3/Jan/10 1442601 1442601 2885202 95 82 0 0 17,592.70 35,185.39 17,592.70 - 30/Sep/09 6/Feb/10 6/Feb/10 0 0 0 129 111 0 0 - - - - 1/Oct/09 27/Dec/09 27/Dec/09 1330 1330 2660 87 75 0 0 17.73 35.47 17.73 - 3/Oct/09 28/Dec/09 28/Dec/09 202093 202093 404186 86 75 0 0 2,694.57 5,389.15 2,694.57 - 4/Oct/09 29/Dec/09 29/Dec/09 499929 499929 999858 86 75 0 0 6,665.72 13,331.44 6,665.72 - 5/Oct/09 30/Dec/09 30/Dec/09 139990 139990 279980 86 75 0 0 1,866.53 3,733.07 1,866.53 - 5/Oct/09 16/Jan/10 16/Jan/10 3169251 3169251 6338502 103 89 0 0 35,609.56 71,219.12 35,609.56 - 5/Oct/09 6/Dec/09 6/Dec/09 125958 125958 251916 62 54 0 0 2,332.56 4,665.11 2,332.56 - 5/Oct/09 24/Nov/09 24/Nov/09 131781 131781 263562 50 44 0 0 2,995.02 5,990.05 2,995.02 - 6/Oct/09 31/Dec/09 31/Dec/09 350793 350793 701586 86 75 0 0 4,677.24 9,354.48 4,677.24 - 6/Oct/09 31/Dec/09 31/Dec/09 1555235 1555235 3110470 86 75 0 0 20,736.47 41,472.93 20,736.47 - 6/Oct/09 25/Nov/09 25/Nov/09 82240 82240 164480 50 44 0 0 1,869.09 3,738.18 1,869.09 - 7/Oct/09 16/Dec/09 16/Dec/09 14777 14777 29554 70 61 0 0 242.25 484.49 242.25 - 7/Oct/09 19/Jan/10 19/Jan/10 621522 621522 1243044 104 90 0 0 6,905.80 13,811.60 6,905.80 - 8/Oct/09 20/Jan/10 20/Jan/10 669015 669015 1338030 104 90 0 0 7,433.50 14,867.00 7,433.50 - 8/Oct/09 28/Mar/10 28/Mar/10 0 0 0 171 147 0 0 - - - -

10/Oct/09 20/Jan/10 20/Jan/10 106767 106767 213534 102 89 0 0 1,199.63 2,399.26 1,199.63 - 10/Oct/09 4/Jan/10 4/Jan/10 19920 19920 39840 86 75 0 0 265.60 531.20 265.60 - 10/Oct/09 21/Jan/10 21/Jan/10 16764 16764 33528 103 90 0 0 186.27 372.53 186.27 - 11/Oct/09 10/Dec/09 10/Dec/09 491139 491139 982278 60 53 0 0 9,266.77 18,533.55 9,266.77 - 11/Oct/09 5/Jan/10 5/Jan/10 2153269 2153269 4306538 86 75 0 0 28,710.25 57,420.51 28,710.25 - 11/Oct/09 5/Jan/10 5/Jan/10 2188 2188 4376 86 75 0 0 29.17 58.35 29.17 - 11/Oct/09 7/Apr/10 7/Apr/10 0 0 0 178 154 0 0 - - - - 12/Oct/09 7/Jan/10 7/Jan/10 235625 235625 471250 87 76 0 0 3,100.33 6,200.66 3,100.33 - 12/Oct/09 15/Nov/09 15/Nov/09 13443 13443 26886 34 30 0 0 448.10 896.20 448.10 - 12/Oct/09 24/Jan/10 24/Jan/10 746088 746088 1492176 104 90 0 0 8,289.87 16,579.73 8,289.87 - 13/Oct/09 26/Jan/10 26/Jan/10 16476 16476 32952 105 91 0 0 181.05 362.11 181.05 - 13/Oct/09 7/Jan/10 7/Jan/10 281567 281567 563134 86 75 0 0 3,754.23 7,508.45 3,754.23 - 14/Oct/09 9/Jan/10 9/Jan/10 1757041 1757041 3514082 87 75 0 0 23,427.21 46,854.43 23,427.21 - 14/Oct/09 9/Jan/10 9/Jan/10 1384732 1384732 2769464 87 75 0 0 18,463.09 36,926.19 18,463.09 - 14/Oct/09 4/Feb/10 4/Feb/10 91170 91170 182340 113 98 0 0 930.31 1,860.61 930.31 - 15/Oct/09 17/Nov/09 17/Nov/09 46105 46105 92210 33 29 0 0 1,589.83 3,179.66 1,589.83 - 15/Oct/09 24/Dec/09 24/Dec/09 4409 4409 8818 70 61 0 0 72.28 144.56 72.28 - 17/Oct/09 11/Jan/10 11/Jan/10 247120 247120 494240 86 75 0 0 3,294.93 6,589.87 3,294.93 - 17/Oct/09 12/Jan/10 12/Jan/10 254368 254368 508736 87 76 0 0 3,346.95 6,693.89 3,346.95 - 18/Oct/09 28/Jan/10 28/Jan/10 1062935 1062935 2125870 102 89 0 0 11,943.09 23,886.18 11,943.09 - 19/Oct/09 20/Dec/09 20/Dec/09 18208 18208 36416 62 54 0 0 337.19 674.37 337.19 - 19/Oct/09 31/Jan/10 31/Jan/10 274165 274165 548330 104 90 0 0 3,046.28 6,092.56 3,046.28 - 19/Oct/09 14/Jan/10 14/Jan/10 30720 30720 61440 87 76 0 0 404.21 808.42 404.21 - 19/Oct/09 12/Dec/09 12/Dec/09 820542 820542 1641084 54 47 0 0 17,458.34 34,916.68 17,458.34 -

Page 44: Progress Monitoring Sheet Empty

20/Oct/09 31/Jan/10 31/Jan/10 222327 222327 444654 103 89 0 0 2,498.06 4,996.11 2,498.06 - 21/Oct/09 24/Jan/10 24/Jan/10 81982 81982 163964 95 82 0 0 999.78 1,999.56 999.78 - 21/Oct/09 16/Jan/10 16/Jan/10 189443 189443 378886 87 75 0 0 2,525.91 5,051.81 2,525.91 - 21/Oct/09 2/Feb/10 2/Feb/10 239656 239656 479312 104 90 0 0 2,662.84 5,325.69 2,662.84 - 21/Oct/09 10/Feb/10 10/Feb/10 57236 57236 114472 112 97 0 0 590.06 1,180.12 590.06 - 21/Oct/09 2/Feb/10 2/Feb/10 8601 8601 17202 104 90 0 0 95.57 191.13 95.57 - 21/Oct/09 2/Feb/10 2/Feb/10 114870 114870 229740 104 90 0 0 1,276.33 2,552.67 1,276.33 - 21/Oct/09 30/Dec/09 30/Dec/09 10571 10571 21142 70 61 0 0 173.30 346.59 173.30 - 22/Oct/09 2/Feb/10 2/Feb/10 16830 16830 33660 103 89 0 0 189.10 378.20 189.10 - 22/Oct/09 17/Mar/10 17/Mar/10 125136 125136 250272 146 126 0 0 993.14 1,986.29 993.14 - 22/Oct/09 25/Nov/09 25/Nov/09 544579 544579 1089158 34 30 0 0 18,152.63 36,305.27 18,152.63 - 24/Oct/09 26/Jan/10 26/Jan/10 46809 46809 93618 94 82 0 0 570.84 1,141.68 570.84 - 24/Oct/09 18/Jan/10 18/Jan/10 420 420 840 86 75 0 0 5.60 11.20 5.60 - 24/Oct/09 18/Jan/10 18/Jan/10 401229 401229 802458 86 75 0 0 5,349.72 10,699.44 5,349.72 - 24/Oct/09 4/Feb/10 4/Feb/10 1211670 1211670 2423340 103 90 0 0 13,463.00 26,926.00 13,463.00 - 26/Oct/09 17/Dec/09 17/Dec/09 1285852 1285852 2571704 52 46 0 0 27,953.30 55,906.61 27,953.30 - 26/Oct/09 27/Dec/09 27/Dec/09 197243 197243 394486 62 54 0 0 3,652.65 7,305.30 3,652.65 - 26/Oct/09 18/Jan/10 18/Jan/10 186861 186861 373722 84 73 0 0 2,559.74 5,119.48 2,559.74 - 26/Oct/09 27/Dec/09 27/Dec/09 390436 390436 780872 62 54 0 0 7,230.30 14,460.59 7,230.30 - 27/Oct/09 23/Jan/10 23/Jan/10 701970 701970 1403940 88 76 0 0 9,236.45 18,472.89 9,236.45 - 28/Oct/09 16/Feb/10 16/Feb/10 56826 56826 113652 111 96 0 0 591.94 1,183.88 591.94 - 28/Oct/09 6/Jan/10 6/Jan/10 100826 100826 201652 70 61 0 0 1,652.89 3,305.77 1,652.89 - 29/Oct/09 9/Feb/10 9/Feb/10 1012509 1012509 2025018 103 89 0 0 11,376.51 22,753.01 11,376.51 - 29/Oct/09 24/Jan/10 24/Jan/10 240825 240825 481650 87 75 0 0 3,211.00 6,422.00 3,211.00 - 29/Oct/09 24/Jan/10 24/Jan/10 94141 94141 188282 87 75 0 0 1,255.21 2,510.43 1,255.21 - 31/Oct/09 31/Dec/09 31/Dec/09 18040 18040 36080 61 54 0 0 334.07 668.15 334.07 - 1/Nov/09 26/Jan/10 26/Jan/10 319219 319219 638438 86 75 0 0 4,256.25 8,512.51 4,256.25 - 1/Nov/09 26/Jan/10 26/Jan/10 236163 236163 472326 86 75 0 0 3,148.84 6,297.68 3,148.84 - 2/Nov/09 24/Dec/09 24/Dec/09 949533 949533 1899066 52 46 0 0 20,642.02 41,284.04 20,642.02 - 2/Nov/09 17/Feb/10 17/Feb/10 1175227 1175227 2350454 107 93 0 0 12,636.85 25,273.70 12,636.85 - 2/Nov/09 27/Jan/10 27/Jan/10 1085 1085 2170 86 75 0 0 14.47 28.93 14.47 - 2/Nov/09 27/Jan/10 27/Jan/10 1661628 1661628 3323256 86 75 0 0 22,155.04 44,310.08 22,155.04 - 2/Nov/09 11/Jan/10 11/Jan/10 7174 7174 14348 70 61 0 0 117.61 235.21 117.61 - 2/Nov/09 21/Dec/09 21/Dec/09 44007 44007 88014 49 43 0 0 1,023.42 2,046.84 1,023.42 - 3/Nov/09 14/Feb/10 14/Feb/10 9888 9888 19776 103 89 0 0 111.10 222.20 111.10 - 3/Nov/09 12/Jan/10 12/Jan/10 22023 22023 44046 70 61 0 0 361.03 722.07 361.03 - 4/Nov/09 5/Jan/10 5/Jan/10 1427222 1427222 2854444 62 54 0 0 26,430.04 52,860.07 26,430.04 - 4/Nov/09 28/Dec/09 28/Dec/09 82103 82103 164206 54 47 0 0 1,746.87 3,493.74 1,746.87 - 7/Nov/09 1/Feb/10 1/Feb/10 1585508 1585508 3171016 86 75 0 0 21,140.11 42,280.21 21,140.11 - 7/Nov/09 18/Feb/10 18/Feb/10 650016 650016 1300032 103 90 0 0 7,222.40 14,444.80 7,222.40 - 8/Nov/09 17/Jan/10 17/Jan/10 75567 75567 151134 70 61 0 0 1,238.80 2,477.61 1,238.80 - 8/Nov/09 20/Feb/10 20/Feb/10 154409 154409 308818 104 90 0 0 1,715.66 3,431.31 1,715.66 - 8/Nov/09 31/Dec/09 31/Dec/09 1365886 1365886 2731772 53 47 0 0 29,061.40 58,122.81 29,061.40 - 9/Nov/09 6/Apr/10 6/Apr/10 553356 553356 1106712 148 128 0 0 4,323.09 8,646.19 4,323.09 - 9/Nov/09 20/Feb/10 20/Feb/10 557232 557232 1114464 103 89 0 0 6,261.03 12,522.07 6,261.03 - 9/Nov/09 20/Feb/10 20/Feb/10 286192 286192 572384 103 89 0 0 3,215.64 6,431.28 3,215.64 - 9/Nov/09 10/Jan/10 10/Jan/10 86456 86456 172912 62 54 0 0 1,601.04 3,202.07 1,601.04 - 9/Nov/09 18/Jan/10 18/Jan/10 57491 57491 114982 70 61 0 0 942.48 1,884.95 942.48 - 9/Nov/09 16/Dec/09 16/Dec/09 16481 16481 32962 37 33 0 0 499.42 998.85 499.42 -

10/Nov/09 16/Feb/10 16/Feb/10 215049 215049 430098 98 85 0 0 2,529.99 5,059.98 2,529.99 - 10/Nov/09 11/Jan/10 11/Jan/10 55086 55086 110172 62 54 0 0 1,020.11 2,040.22 1,020.11 -

Page 45: Progress Monitoring Sheet Empty

10/Nov/09 4/Feb/10 4/Feb/10 38481 38481 76962 86 75 0 0 513.08 1,026.16 513.08 - 10/Nov/09 16/Feb/10 16/Feb/10 221763 221763 443526 98 85 0 0 2,608.98 5,217.95 2,608.98 - 10/Nov/09 22/Feb/10 22/Feb/10 57400 57400 114800 104 90 0 0 637.78 1,275.56 637.78 - 11/Nov/09 10/Apr/10 10/Apr/10 68123 68123 136246 150 129 0 0 528.09 1,056.17 528.09 - 11/Nov/09 10/Apr/10 10/Apr/10 866178 866178 1732356 150 129 0 0 6,714.56 13,429.12 6,714.56 - 11/Nov/09 10/Apr/10 10/Apr/10 715254 715254 1430508 150 129 0 0 5,544.60 11,089.21 5,544.60 - 11/Nov/09 10/Apr/10 10/Apr/10 150773 150773 301546 150 129 0 0 1,168.78 2,337.57 1,168.78 - 11/Nov/09 10/Apr/10 10/Apr/10 236460 236460 472920 150 129 0 0 1,833.02 3,666.05 1,833.02 - 11/Nov/09 10/Apr/10 10/Apr/10 1518354 1518354 3036708 150 129 0 0 11,770.19 23,540.37 11,770.19 - 11/Nov/09 4/Jan/10 4/Jan/10 291622 291622 583244 54 47 0 0 6,204.72 12,409.45 6,204.72 - 12/Nov/09 19/Dec/09 19/Dec/09 55391 55391 110782 37 32 0 0 1,730.97 3,461.94 1,730.97 - 12/Nov/09 21/Jan/10 21/Jan/10 5652 5652 11304 70 61 0 0 92.66 185.31 92.66 - 12/Nov/09 4/Feb/10 4/Feb/10 198161 198161 396322 84 73 0 0 2,714.53 5,429.07 2,714.53 - 12/Nov/09 24/Feb/10 24/Feb/10 741121 741121 1482242 104 90 0 0 8,234.68 16,469.36 8,234.68 - 12/Nov/09 31/Jan/10 31/Jan/10 92376 92376 184752 80 69 0 0 1,338.78 2,677.57 1,338.78 - 14/Nov/09 8/Feb/10 8/Feb/10 240588 240588 481176 86 75 0 0 3,207.84 6,415.68 3,207.84 - 14/Nov/09 23/Jan/10 23/Jan/10 935277 935277 1870554 70 61 0 0 15,332.41 30,664.82 15,332.41 - 14/Nov/09 8/Feb/10 8/Feb/10 12844 12844 25688 86 75 0 0 171.25 342.51 171.25 - 14/Nov/09 17/Feb/10 17/Feb/10 46809 46809 93618 95 83 0 0 563.96 1,127.93 563.96 - 14/Nov/09 9/Feb/10 9/Feb/10 176338 176338 352676 87 76 0 0 2,320.24 4,640.47 2,320.24 - 15/Nov/09 25/Feb/10 25/Feb/10 223735 223735 447470 102 89 0 0 2,513.88 5,027.75 2,513.88 - 15/Nov/09 24/Jan/10 24/Jan/10 59837 59837 119674 70 61 0 0 980.93 1,961.87 980.93 - 15/Nov/09 24/Jan/10 24/Jan/10 119241 119241 238482 70 61 0 0 1,954.77 3,909.54 1,954.77 - 15/Nov/09 24/Jan/10 24/Jan/10 101405 101405 202810 70 61 0 0 1,662.38 3,324.75 1,662.38 - 15/Nov/09 16/Jan/10 16/Jan/10 82772 82772 165544 62 54 0 0 1,532.81 3,065.63 1,532.81 - 15/Nov/09 24/Jan/10 24/Jan/10 426958 426958 853916 70 61 0 0 6,999.31 13,998.62 6,999.31 - 15/Nov/09 24/Jan/10 24/Jan/10 548495 548495 1096990 70 61 0 0 8,991.72 17,983.44 8,991.72 - 15/Nov/09 23/Dec/09 23/Dec/09 26607 26607 53214 38 34 0 0 782.56 1,565.12 782.56 - 16/Nov/09 10/Feb/10 10/Feb/10 246468 246468 492936 86 75 0 0 3,286.24 6,572.48 3,286.24 - 16/Nov/09 25/Jan/10 25/Jan/10 322331 322331 644662 70 61 0 0 5,284.11 10,568.23 5,284.11 - 17/Nov/09 18/Mar/10 18/Mar/10 1069104 1069104 2138208 121 105 0 0 10,181.94 20,363.89 10,181.94 - 17/Nov/09 10/Jan/10 10/Jan/10 204057 204057 408114 54 47 0 0 4,341.64 8,683.28 4,341.64 - 18/Nov/09 18/Jan/10 18/Jan/10 42312 42312 84624 61 53 0 0 798.34 1,596.68 798.34 - 18/Nov/09 13/Feb/10 13/Feb/10 214849 214849 429698 87 75 0 0 2,864.65 5,729.31 2,864.65 - 18/Nov/09 18/Jan/10 18/Jan/10 40490 40490 80980 61 53 0 0 763.96 1,527.92 763.96 - 18/Nov/09 2/Mar/10 2/Mar/10 782634 782634 1565268 104 90 0 0 8,695.93 17,391.87 8,695.93 - 21/Nov/09 3/Mar/10 3/Mar/10 1251086 1251086 2502172 102 89 0 0 14,057.15 28,114.29 14,057.15 - 22/Nov/09 4/Mar/10 4/Mar/10 1214439 1214439 2428878 102 89 0 0 13,645.38 27,290.76 13,645.38 - 22/Nov/09 16/Feb/10 16/Feb/10 30720 30720 61440 86 75 0 0 409.60 819.20 409.60 - 22/Nov/09 16/Feb/10 16/Feb/10 21125 21125 42250 86 75 0 0 281.67 563.33 281.67 - 22/Nov/09 16/Feb/10 16/Feb/10 4379 4379 8758 86 75 0 0 58.39 116.77 58.39 - 22/Nov/09 14/Jan/10 14/Jan/10 1858266 1858266 3716532 53 47 0 0 39,537.57 79,075.15 39,537.57 - 24/Nov/09 30/Dec/09 30/Dec/09 597 597 1194 36 32 0 0 18.66 37.31 18.66 - 24/Nov/09 2/Feb/10 2/Feb/10 23152 23152 46304 70 61 0 0 379.54 759.08 379.54 - 25/Nov/09 3/Feb/10 3/Feb/10 96260 96260 192520 70 61 0 0 1,578.03 3,156.07 1,578.03 - 25/Nov/09 3/Feb/10 3/Feb/10 128133 128133 256266 70 61 0 0 2,100.54 4,201.08 2,100.54 - 25/Nov/09 26/Jan/10 26/Jan/10 69734 69734 139468 62 54 0 0 1,291.37 2,582.74 1,291.37 - 25/Nov/09 3/Feb/10 3/Feb/10 405680 405680 811360 70 61 0 0 6,650.49 13,300.98 6,650.49 - 25/Nov/09 9/Mar/10 9/Mar/10 1435308 1435308 2870616 104 90 0 0 15,947.87 31,895.73 15,947.87 - 26/Nov/09 21/Feb/10 21/Feb/10 253858 253858 507716 87 75 0 0 3,384.77 6,769.55 3,384.77 - 26/Nov/09 4/Mar/10 4/Mar/10 8894739 8894739 17789478 98 85 0 0 104,643.99 209,287.98 104,643.99 -

Page 46: Progress Monitoring Sheet Empty

1/Dec/09 6/Feb/10 6/Feb/10 296089 296089 592178 67 58 0 0 5,104.98 10,209.97 5,104.98 - 1/Dec/09 20/Jan/10 20/Jan/10 437859 437859 875718 50 44 0 0 9,951.34 19,902.68 9,951.34 - 3/Dec/09 30/Jan/10 30/Jan/10 90248 90248 180496 58 50 0 0 1,804.96 3,609.92 1,804.96 - 3/Dec/09 21/Jan/10 21/Jan/10 1188449 1188449 2376898 49 43 0 0 27,638.35 55,276.70 27,638.35 - 3/Dec/09 24/Feb/10 24/Feb/10 31040 31040 62080 83 72 0 0 431.11 862.22 431.11 - 5/Dec/09 9/Feb/10 9/Feb/10 22023 22023 44046 66 58 0 0 379.71 759.41 379.71 - 5/Dec/09 23/Jan/10 23/Jan/10 157080 157080 314160 49 43 0 0 3,653.02 7,306.05 3,653.02 - 5/Dec/09 27/Feb/10 27/Feb/10 420 420 840 84 73 0 0 5.75 11.51 5.75 - 5/Dec/09 24/Jan/10 24/Jan/10 110671 110671 221342 50 44 0 0 2,515.25 5,030.50 2,515.25 - 6/Dec/09 15/Mar/10 15/Mar/10 2045761 2045761 4091522 99 86 0 0 23,787.92 47,575.84 23,787.92 - 6/Dec/09 15/Mar/10 15/Mar/10 746243 746243 1492486 99 86 0 0 8,677.24 17,354.49 8,677.24 - 7/Dec/09 25/Feb/10 25/Feb/10 499856 499856 999712 80 70 0 0 7,140.80 14,281.60 7,140.80 - 7/Dec/09 11/Jan/10 11/Jan/10 934189 934189 1868378 35 31 0 0 30,135.13 60,270.26 30,135.13 - 8/Dec/09 9/Mar/10 9/Mar/10 47435 47435 94870 91 79 0 0 600.44 1,200.89 600.44 - 8/Dec/09 11/Jan/10 11/Jan/10 606171 606171 1212342 34 30 0 0 20,205.70 40,411.40 20,205.70 - 9/Dec/09 14/Feb/10 14/Feb/10 738181 738181 1476362 67 58 0 0 12,727.26 25,454.52 12,727.26 -

10/Dec/09 15/Feb/10 15/Feb/10 55665 55665 111330 67 58 0 0 959.74 1,919.48 959.74 - 10/Dec/09 7/Feb/10 7/Feb/10 54025 54025 108050 59 51 0 0 1,059.31 2,118.63 1,059.31 - 10/Dec/09 4/Mar/10 4/Mar/10 233089 233089 466178 84 73 0 0 3,193.00 6,386.00 3,193.00 - 10/Dec/09 4/Mar/10 4/Mar/10 292791 292791 585582 84 73 0 0 4,010.84 8,021.67 4,010.84 - 10/Dec/09 4/Mar/10 4/Mar/10 1689245 1689245 3378490 84 73 0 0 23,140.34 46,280.68 23,140.34 - 12/Dec/09 30/Jan/10 30/Jan/10 1854932 1854932 3709864 49 43 0 0 43,137.95 86,275.91 43,137.95 - 12/Dec/09 4/Mar/10 4/Mar/10 420 420 840 82 72 0 0 5.83 11.67 5.83 - 12/Dec/09 16/Jan/10 16/Jan/10 148044 148044 296088 35 31 0 0 4,775.61 9,551.23 4,775.61 - 13/Dec/09 17/Feb/10 17/Feb/10 843113 843113 1686226 66 58 0 0 14,536.43 29,072.86 14,536.43 - 13/Dec/09 17/Feb/10 17/Feb/10 45107 45107 90214 66 58 0 0 777.71 1,555.41 777.71 - 13/Dec/09 17/Feb/10 17/Feb/10 29017 29017 58034 66 58 0 0 500.29 1,000.59 500.29 - 13/Dec/09 17/Apr/10 17/Apr/10 2609206 2609206 5218412 125 108 0 0 24,159.31 48,318.63 24,159.31 - 14/Dec/09 20/Feb/10 20/Feb/10 946016 946016 1892032 68 59 0 0 16,034.17 32,068.34 16,034.17 - 15/Dec/09 10/Feb/10 10/Feb/10 20332 20332 40664 57 50 0 0 406.64 813.28 406.64 - 15/Dec/09 8/Mar/10 8/Mar/10 260818 260818 521636 83 72 0 0 3,622.47 7,244.94 3,622.47 - 15/Dec/09 3/Feb/10 3/Feb/10 319872 319872 639744 50 44 0 0 7,269.82 14,539.64 7,269.82 - 15/Dec/09 8/Mar/10 8/Mar/10 11830 11830 23660 83 72 0 0 164.31 328.61 164.31 - 16/Dec/09 21/Feb/10 21/Feb/10 1268410 1268410 2536820 67 58 0 0 21,869.14 43,738.28 21,869.14 - 16/Dec/09 27/Mar/10 27/Mar/10 1381599 1381599 2763198 101 87 0 0 15,880.45 31,760.90 15,880.45 - 16/Dec/09 21/Feb/10 21/Feb/10 580254 580254 1160508 67 58 0 0 10,004.38 20,008.76 10,004.38 - 16/Dec/09 21/Feb/10 21/Feb/10 786871 786871 1573742 67 58 0 0 13,566.74 27,133.48 13,566.74 - 16/Dec/09 4/Feb/10 4/Feb/10 536123 536123 1072246 50 44 0 0 12,184.61 24,369.23 12,184.61 - 16/Dec/09 4/Feb/10 4/Feb/10 45818 45818 91636 50 44 0 0 1,041.32 2,082.64 1,041.32 - 17/Dec/09 27/Mar/10 27/Mar/10 999083 999083 1998166 100 86 0 0 11,617.24 23,234.49 11,617.24 - 19/Dec/09 11/Mar/10 11/Mar/10 21125 21125 42250 82 72 0 0 293.40 586.81 293.40 - 19/Dec/09 11/Mar/10 11/Mar/10 230895 230895 461790 82 72 0 0 3,206.88 6,413.75 3,206.88 - 20/Dec/09 7/Feb/10 7/Feb/10 54675 54675 109350 49 43 0 0 1,271.51 2,543.02 1,271.51 - 20/Dec/09 7/Feb/10 7/Feb/10 174216 174216 348432 49 43 0 0 4,051.53 8,103.07 4,051.53 - 20/Dec/09 25/Feb/10 25/Feb/10 456502 456502 913004 67 59 0 0 7,737.32 15,474.64 7,737.32 - 21/Dec/09 25/Feb/10 25/Feb/10 1039 1039 2078 66 58 0 0 17.91 35.83 17.91 - 21/Dec/09 27/Feb/10 27/Feb/10 255737 255737 511474 68 59 0 0 4,334.53 8,669.05 4,334.53 - 21/Dec/09 27/Feb/10 27/Feb/10 101405 101405 202810 68 59 0 0 1,718.73 3,437.46 1,718.73 - 22/Dec/09 26/Jan/10 26/Jan/10 148044 148044 296088 35 31 0 0 4,775.61 9,551.23 4,775.61 - 22/Dec/09 27/Feb/10 27/Feb/10 303015 303015 606030 67 58 0 0 5,224.40 10,448.79 5,224.40 - 22/Dec/09 27/Feb/10 27/Feb/10 77738 77738 155476 67 58 0 0 1,340.31 2,680.62 1,340.31 -

Page 47: Progress Monitoring Sheet Empty

22/Dec/09 27/Feb/10 27/Feb/10 134640 134640 269280 67 58 0 0 2,321.38 4,642.76 2,321.38 - 22/Dec/09 18/Feb/10 18/Feb/10 1553562 1553562 3107124 58 51 0 0 30,462.00 60,924.00 30,462.00 - 22/Dec/09 16/Mar/10 16/Mar/10 31040 31040 62080 84 73 0 0 425.21 850.41 425.21 - 23/Dec/09 1/Apr/10 1/Apr/10 1926853 1926853 3853706 99 86 0 0 22,405.27 44,810.53 22,405.27 - 23/Dec/09 16/Mar/10 16/Mar/10 228834 228834 457668 83 72 0 0 3,178.25 6,356.50 3,178.25 - 23/Dec/09 16/Mar/10 16/Mar/10 228783 228783 457566 83 72 0 0 3,177.54 6,355.08 3,177.54 - 23/Dec/09 18/Feb/10 18/Feb/10 1785610 1785610 3571220 57 50 0 0 35,712.20 71,424.40 35,712.20 - 24/Dec/09 3/Feb/10 3/Feb/10 148539 148539 297078 41 36 0 0 4,126.08 8,252.17 4,126.08 - 24/Dec/09 4/Mar/10 4/Mar/10 370878 370878 741756 70 61 0 0 6,079.97 12,159.93 6,079.97 - 24/Dec/09 27/Jan/10 27/Jan/10 426751 426751 853502 34 30 0 0 14,225.03 28,450.07 14,225.03 - 24/Dec/09 28/Jan/10 28/Jan/10 148173 148173 296346 35 31 0 0 4,779.77 9,559.55 4,779.77 - 24/Dec/09 23/Jan/10 23/Jan/10 105117 105117 210234 30 26 0 0 4,042.96 8,085.92 4,042.96 - 24/Dec/09 23/Jan/10 23/Jan/10 28212 28212 56424 30 26 0 0 1,085.08 2,170.15 1,085.08 - 24/Dec/09 23/Jan/10 23/Jan/10 3591 3591 7182 30 26 0 0 138.12 276.23 138.12 - 26/Dec/09 28/Jan/10 28/Jan/10 13505 13505 27010 33 30 0 0 450.17 900.33 450.17 - 27/Dec/09 21/Mar/10 21/Mar/10 970515 970515 1941030 84 73 0 0 13,294.73 26,589.45 13,294.73 - 29/Dec/09 31/Jan/10 31/Jan/10 46530 46530 93060 33 29 0 0 1,604.48 3,208.97 1,604.48 - 29/Dec/09 22/Mar/10 22/Mar/10 44010 44010 88020 83 72 0 0 611.25 1,222.50 611.25 - 29/Dec/09 16/Feb/10 16/Feb/10 1041652 1041652 2083304 49 43 0 0 24,224.47 48,448.93 24,224.47 - 29/Dec/09 6/Mar/10 6/Mar/10 384655 384655 769310 67 58 0 0 6,631.98 13,263.97 6,631.98 - 30/Dec/09 7/Mar/10 7/Mar/10 154600 154600 309200 67 58 0 0 2,665.52 5,331.03 2,665.52 - 30/Dec/09 7/Mar/10 7/Mar/10 288213 288213 576426 67 58 0 0 4,969.19 9,938.38 4,969.19 - 30/Dec/09 7/Mar/10 7/Mar/10 77568 77568 155136 67 58 0 0 1,337.38 2,674.76 1,337.38 - 30/Dec/09 7/Mar/10 7/Mar/10 89760 89760 179520 67 58 0 0 1,547.59 3,095.17 1,547.59 - 30/Dec/09 27/Feb/10 27/Feb/10 416483 416483 832966 59 51 0 0 8,166.33 16,332.67 8,166.33 - 30/Dec/09 18/Feb/10 18/Feb/10 91988 91988 183976 50 44 0 0 2,090.64 4,181.27 2,090.64 - 30/Dec/09 18/Feb/10 18/Feb/10 1389562 1389562 2779124 50 44 0 0 31,580.95 63,161.91 31,580.95 - 30/Dec/09 10/Apr/10 10/Apr/10 2475048 2475048 4950096 101 87 0 0 28,448.83 56,897.66 28,448.83 - 30/Dec/09 24/Mar/10 24/Mar/10 91023 91023 182046 84 73 0 0 1,246.89 2,493.78 1,246.89 - 31/Dec/09 3/Mar/10 3/Mar/10 11021 11021 22042 62 54 0 0 204.09 408.19 204.09 - 31/Dec/09 28/Feb/10 28/Feb/10 1074323 1074323 2148646 59 51 0 0 21,065.16 42,130.31 21,065.16 - 31/Dec/09 9/Mar/10 9/Mar/10 453220 453220 906440 68 59 0 0 7,681.69 15,363.39 7,681.69 - 2/Jan/10 9/Mar/10 9/Mar/10 31641 31641 63282 66 58 0 0 545.53 1,091.07 545.53 - 2/Jan/10 9/Mar/10 9/Mar/10 887137 887137 1774274 66 58 0 0 15,295.47 30,590.93 15,295.47 - 2/Jan/10 9/Mar/10 9/Mar/10 5328019 5328019 10656038 66 58 0 0 91,862.40 183,724.79 91,862.40 - 3/Jan/10 10/Mar/10 10/Mar/10 19650 19650 39300 66 58 0 0 338.79 677.59 338.79 - 3/Jan/10 10/Mar/10 10/Mar/10 28848 28848 57696 66 58 0 0 497.38 994.76 497.38 - 3/Jan/10 10/Mar/10 10/Mar/10 5652 5652 11304 66 58 0 0 97.45 194.90 97.45 - 3/Jan/10 11/Mar/10 11/Mar/10 963175 963175 1926350 67 59 0 0 16,325.00 32,650.00 16,325.00 - 4/Jan/10 8/Feb/10 8/Feb/10 1889815 1889815 3779630 35 31 0 0 60,961.77 121,923.55 60,961.77 - 5/Jan/10 13/Mar/10 13/Mar/10 154862 154862 309724 67 58 0 0 2,670.03 5,340.07 2,670.03 - 5/Jan/10 13/Mar/10 13/Mar/10 150136 150136 300272 67 58 0 0 2,588.55 5,177.10 2,588.55 - 5/Jan/10 14/Mar/10 14/Mar/10 145513 145513 291026 68 59 0 0 2,466.32 4,932.64 2,466.32 - 5/Jan/10 14/Mar/10 14/Mar/10 136420 136420 272840 68 59 0 0 2,312.20 4,624.41 2,312.20 - 6/Jan/10 25/Feb/10 25/Feb/10 81453 81453 162906 50 44 0 0 1,851.20 3,702.41 1,851.20 - 7/Jan/10 15/Mar/10 15/Mar/10 76104 76104 152208 67 58 0 0 1,312.14 2,624.28 1,312.14 - 7/Jan/10 15/Mar/10 15/Mar/10 89760 89760 179520 67 58 0 0 1,547.59 3,095.17 1,547.59 - 7/Jan/10 15/Mar/10 15/Mar/10 438864 438864 877728 67 58 0 0 7,566.62 15,133.24 7,566.62 - 9/Jan/10 27/Feb/10 27/Feb/10 42861 42861 85722 49 43 0 0 996.77 1,993.53 996.77 - 9/Jan/10 27/Feb/10 27/Feb/10 171360 171360 342720 49 43 0 0 3,985.12 7,970.23 3,985.12 - 9/Jan/10 16/Mar/10 16/Mar/10 167950 167950 335900 66 58 0 0 2,895.69 5,791.38 2,895.69 -

Page 48: Progress Monitoring Sheet Empty

9/Jan/10 3/Apr/10 3/Apr/10 11830 11830 23660 84 73 0 0 162.05 324.11 162.05 - 10/Jan/10 23/Feb/10 23/Feb/10 7536 7536 15072 44 39 0 0 193.23 386.46 193.23 - 11/Jan/10 10/Mar/10 10/Mar/10 323186 323186 646372 58 51 0 0 6,336.98 12,673.96 6,336.98 - 11/Jan/10 18/Mar/10 18/Mar/10 118390 118390 236780 66 58 0 0 2,041.21 4,082.41 2,041.21 - 11/Jan/10 18/Mar/10 18/Mar/10 91038 91038 182076 66 58 0 0 1,569.62 3,139.24 1,569.62 - 11/Jan/10 18/Mar/10 18/Mar/10 96018 96018 192036 66 58 0 0 1,655.48 3,310.97 1,655.48 - 11/Jan/10 18/Mar/10 18/Mar/10 21968 21968 43936 66 58 0 0 378.76 757.52 378.76 - 11/Jan/10 18/Mar/10 18/Mar/10 136420 136420 272840 66 58 0 0 2,352.07 4,704.14 2,352.07 - 11/Jan/10 10/Mar/10 10/Mar/10 643694 643694 1287388 58 51 0 0 12,621.45 25,242.90 12,621.45 - 11/Jan/10 18/Mar/10 18/Mar/10 38444 38444 76888 66 58 0 0 662.83 1,325.66 662.83 - 11/Jan/10 20/Mar/10 20/Mar/10 80910 80910 161820 68 59 0 0 1,371.36 2,742.71 1,371.36 - 11/Jan/10 10/Mar/10 10/Mar/10 651980 651980 1303960 58 51 0 0 12,783.92 25,567.84 12,783.92 - 11/Jan/10 20/Mar/10 20/Mar/10 370568 370568 741136 68 59 0 0 6,280.81 12,561.63 6,280.81 - 12/Jan/10 25/Mar/10 25/Mar/10 10519032 10519032 21038064 72 63 0 0 166,968.76 333,937.52 166,968.76 - 12/Jan/10 11/Mar/10 11/Mar/10 94428 94428 188856 58 51 0 0 1,851.53 3,703.06 1,851.53 - 12/Jan/10 3/Mar/10 3/Mar/10 207412 207412 414824 50 44 0 0 4,713.91 9,427.82 4,713.91 - 12/Jan/10 3/Mar/10 3/Mar/10 1330 1330 2660 50 44 0 0 30.23 60.45 30.23 - 13/Jan/10 6/Apr/10 6/Apr/10 544532 544532 1089064 83 72 0 0 7,562.94 15,125.89 7,562.94 - 13/Jan/10 4/Mar/10 4/Mar/10 96407 96407 192814 50 44 0 0 2,191.07 4,382.14 2,191.07 - 14/Jan/10 22/Mar/10 22/Mar/10 422554 422554 845108 67 58 0 0 7,285.41 14,570.83 7,285.41 - 14/Jan/10 22/Mar/10 22/Mar/10 385113 385113 770226 67 58 0 0 6,639.88 13,279.76 6,639.88 - 14/Jan/10 14/Mar/10 14/Mar/10 2062758 2062758 4125516 59 51 0 0 40,446.24 80,892.47 40,446.24 - 14/Jan/10 22/Mar/10 22/Mar/10 127550 127550 255100 67 58 0 0 2,199.14 4,398.28 2,199.14 - 14/Jan/10 22/Mar/10 22/Mar/10 202678 202678 405356 67 58 0 0 3,494.45 6,988.90 3,494.45 - 14/Jan/10 22/Mar/10 22/Mar/10 783044 783044 1566088 67 58 0 0 13,500.76 27,001.52 13,500.76 - 14/Jan/10 6/Mar/10 6/Mar/10 55853 55853 111706 51 44 0 0 1,269.39 2,538.77 1,269.39 - 16/Jan/10 6/Mar/10 6/Mar/10 922086 922086 1844172 49 43 0 0 21,443.86 42,887.72 21,443.86 - 16/Jan/10 8/Apr/10 8/Apr/10 13013 13013 26026 82 72 0 0 180.74 361.47 180.74 - 16/Jan/10 23/Mar/10 23/Mar/10 7677 7677 15354 66 58 0 0 132.36 264.72 132.36 - 16/Jan/10 23/Mar/10 23/Mar/10 27256 27256 54512 66 58 0 0 469.93 939.86 469.93 - 16/Jan/10 7/Mar/10 7/Mar/10 157080 157080 314160 50 44 0 0 3,570.00 7,140.00 3,570.00 - 17/Jan/10 24/Mar/10 24/Mar/10 251446 251446 502892 66 58 0 0 4,335.28 8,670.55 4,335.28 - 17/Jan/10 8/Mar/10 8/Mar/10 70876 70876 141752 50 44 0 0 1,610.82 3,221.64 1,610.82 - 17/Jan/10 8/Mar/10 8/Mar/10 342720 342720 685440 50 44 0 0 7,789.09 15,578.18 7,789.09 - 19/Jan/10 27/Mar/10 27/Mar/10 265592 265592 531184 67 58 0 0 4,579.17 9,158.34 4,579.17 - 19/Jan/10 18/Mar/10 18/Mar/10 790546 790546 1581092 58 51 0 0 15,500.90 31,001.80 15,500.90 - 19/Jan/10 27/Mar/10 27/Mar/10 42188 42188 84376 67 58 0 0 727.38 1,454.76 727.38 - 19/Jan/10 27/Mar/10 27/Mar/10 110986 110986 221972 67 58 0 0 1,913.55 3,827.10 1,913.55 - 19/Jan/10 27/Mar/10 27/Mar/10 33442 33442 66884 67 58 0 0 576.59 1,153.17 576.59 - 20/Jan/10 10/Mar/10 10/Mar/10 185640 185640 371280 49 43 0 0 4,317.21 8,634.42 4,317.21 - 20/Jan/10 10/Mar/10 10/Mar/10 732681 732681 1465362 49 43 0 0 17,039.09 34,078.19 17,039.09 - 20/Jan/10 3/Mar/10 3/Mar/10 233303 233303 466606 42 37 0 0 6,305.49 12,610.97 6,305.49 - 20/Jan/10 28/Mar/10 28/Mar/10 11217 11217 22434 67 58 0 0 193.40 386.79 193.40 - 20/Jan/10 29/Mar/10 29/Mar/10 90108 90108 180216 68 59 0 0 1,527.25 3,054.51 1,527.25 - 20/Jan/10 29/Mar/10 29/Mar/10 104159 104159 208318 68 59 0 0 1,765.41 3,530.81 1,765.41 - 20/Jan/10 29/Mar/10 29/Mar/10 181894 181894 363788 68 59 0 0 3,082.95 6,165.90 3,082.95 - 20/Jan/10 20/Mar/10 20/Mar/10 3300496 3300496 6600992 59 51 0 0 64,715.61 129,431.22 64,715.61 - 20/Jan/10 29/Mar/10 29/Mar/10 385419 385419 770838 68 59 0 0 6,532.53 13,065.05 6,532.53 - 21/Jan/10 13/Feb/10 13/Feb/10 5790 5790 11580 23 20 0 0 289.50 579.00 289.50 - 21/Jan/10 13/Mar/10 13/Mar/10 116458 116458 232916 51 44 0 0 2,646.77 5,293.55 2,646.77 - 21/Jan/10 13/Mar/10 13/Mar/10 174216 174216 348432 51 44 0 0 3,959.45 7,918.91 3,959.45 -

Page 49: Progress Monitoring Sheet Empty

21/Jan/10 24/Feb/10 24/Feb/10 383750 383750 767500 34 30 0 0 12,791.67 25,583.33 12,791.67 - 21/Jan/10 25/Feb/10 25/Feb/10 129465 129465 258930 35 31 0 0 4,176.29 8,352.58 4,176.29 - 21/Jan/10 20/Feb/10 20/Feb/10 1234124 1234124 2468248 30 26 0 0 47,466.31 94,932.62 47,466.31 - 21/Jan/10 20/Feb/10 20/Feb/10 33122 33122 66244 30 26 0 0 1,273.92 2,547.85 1,273.92 - 21/Jan/10 20/Feb/10 20/Feb/10 3591 3591 7182 30 26 0 0 138.12 276.23 138.12 - 23/Jan/10 27/Feb/10 27/Feb/10 184718 184718 369436 35 31 0 0 5,958.65 11,917.29 5,958.65 - 24/Jan/10 31/Mar/10 31/Mar/10 167489 167489 334978 66 58 0 0 2,887.74 5,775.48 2,887.74 - 24/Jan/10 15/Mar/10 15/Mar/10 290852 290852 581704 50 44 0 0 6,610.27 13,220.55 6,610.27 - 24/Jan/10 15/Mar/10 15/Mar/10 1182009 1182009 2364018 50 44 0 0 26,863.84 53,727.68 26,863.84 - 24/Jan/10 15/Mar/10 15/Mar/10 191083 191083 382166 50 44 0 0 4,342.80 8,685.59 4,342.80 - 24/Jan/10 28/Feb/10 28/Feb/10 147367 147367 294734 35 31 0 0 4,753.77 9,507.55 4,753.77 - 24/Jan/10 7/Mar/10 7/Mar/10 11342 11342 22684 42 37 0 0 306.54 613.08 306.54 - 25/Jan/10 1/Apr/10 1/Apr/10 218365 218365 436730 66 58 0 0 3,764.91 7,529.83 3,764.91 - 25/Jan/10 1/Apr/10 1/Apr/10 256462 256462 512924 66 58 0 0 4,421.76 8,843.52 4,421.76 - 26/Jan/10 2/Mar/10 2/Mar/10 175423 175423 350846 35 31 0 0 5,658.81 11,317.61 5,658.81 - 27/Jan/10 4/Mar/10 4/Mar/10 51451 51451 102902 36 32 0 0 1,607.84 3,215.69 1,607.84 - 28/Jan/10 18/Mar/10 18/Mar/10 43488 43488 86976 49 43 0 0 1,011.35 2,022.70 1,011.35 - 28/Jan/10 20/Mar/10 20/Mar/10 420 420 840 51 44 0 0 9.55 19.09 9.55 - 28/Jan/10 6/Apr/10 6/Apr/10 305424 305424 610848 68 59 0 0 5,176.68 10,353.36 5,176.68 - 28/Jan/10 22/Apr/10 22/Apr/10 110565 110565 221130 84 73 0 0 1,514.59 3,029.18 1,514.59 - 31/Jan/10 22/Mar/10 22/Mar/10 72222 72222 144444 50 44 0 0 1,641.41 3,282.82 1,641.41 - 31/Jan/10 30/Mar/10 30/Mar/10 427061 427061 854122 58 51 0 0 8,373.75 16,747.49 8,373.75 - 31/Jan/10 7/Apr/10 7/Apr/10 77323 77323 154646 66 58 0 0 1,333.16 2,666.31 1,333.16 - 31/Jan/10 7/Apr/10 7/Apr/10 77362 77362 154724 66 58 0 0 1,333.83 2,667.66 1,333.83 - 31/Jan/10 7/Apr/10 7/Apr/10 136420 136420 272840 66 58 0 0 2,352.07 4,704.14 2,352.07 - 31/Jan/10 7/Apr/10 7/Apr/10 40020 40020 80040 66 58 0 0 690.00 1,380.00 690.00 - 31/Jan/10 7/Apr/10 7/Apr/10 136420 136420 272840 66 58 0 0 2,352.07 4,704.14 2,352.07 - 31/Jan/10 7/Apr/10 7/Apr/10 61259 61259 122518 66 58 0 0 1,056.19 2,112.38 1,056.19 - 31/Jan/10 22/Mar/10 22/Mar/10 263772 263772 527544 50 44 0 0 5,994.82 11,989.64 5,994.82 - 1/Feb/10 14/Mar/10 14/Mar/10 28095 28095 56190 41 36 0 0 780.42 1,560.83 780.42 - 1/Feb/10 23/Mar/10 23/Mar/10 2188 2188 4376 50 44 0 0 49.73 99.45 49.73 - 1/Feb/10 23/Mar/10 23/Mar/10 99837 99837 199674 50 44 0 0 2,269.02 4,538.05 2,269.02 - 1/Feb/10 23/Mar/10 23/Mar/10 113313 113313 226626 50 44 0 0 2,575.30 5,150.59 2,575.30 - 1/Feb/10 23/Mar/10 23/Mar/10 1851448 1851448 3702896 50 44 0 0 42,078.36 84,156.73 42,078.36 - 1/Feb/10 23/Mar/10 23/Mar/10 392088 392088 784176 50 44 0 0 8,911.09 17,822.18 8,911.09 - 1/Feb/10 23/Mar/10 23/Mar/10 34315 34315 68630 50 44 0 0 779.89 1,559.77 779.89 - 2/Feb/10 24/Mar/10 24/Mar/10 374136 374136 748272 50 44 0 0 8,503.09 17,006.18 8,503.09 - 2/Feb/10 24/Mar/10 24/Mar/10 531475 531475 1062950 50 44 0 0 12,078.98 24,157.95 12,078.98 - 2/Feb/10 25/Feb/10 25/Feb/10 16620 16620 33240 23 21 0 0 791.43 1,582.86 791.43 - 2/Feb/10 24/Mar/10 24/Mar/10 61743 61743 123486 50 44 0 0 1,403.25 2,806.50 1,403.25 - 2/Feb/10 24/Mar/10 24/Mar/10 171360 171360 342720 50 44 0 0 3,894.55 7,789.09 3,894.55 - 3/Feb/10 10/Mar/10 10/Mar/10 25688 25688 51376 35 31 0 0 828.65 1,657.29 828.65 - 3/Feb/10 10/Mar/10 10/Mar/10 141791 141791 283582 35 31 0 0 4,573.90 9,147.81 4,573.90 - 3/Feb/10 10/Mar/10 10/Mar/10 22477 22477 44954 35 31 0 0 725.06 1,450.13 725.06 - 3/Feb/10 11/Apr/10 11/Apr/10 139490 139490 278980 67 58 0 0 2,405.00 4,810.00 2,405.00 - 3/Feb/10 11/Apr/10 11/Apr/10 106158 106158 212316 67 58 0 0 1,830.31 3,660.62 1,830.31 - 3/Feb/10 11/Apr/10 11/Apr/10 181894 181894 363788 67 58 0 0 3,136.10 6,272.21 3,136.10 - 3/Feb/10 3/Apr/10 3/Apr/10 3338216 3338216 6676432 59 51 0 0 65,455.22 130,910.43 65,455.22 - 3/Feb/10 10/Mar/10 10/Mar/10 16055 16055 32110 35 31 0 0 517.90 1,035.81 517.90 - 3/Feb/10 25/Mar/10 25/Mar/10 51982 51982 103964 50 44 0 0 1,181.41 2,362.82 1,181.41 - 6/Feb/10 28/Mar/10 28/Mar/10 557533 557533 1115066 50 44 0 0 12,671.20 25,342.41 12,671.20 -

Page 50: Progress Monitoring Sheet Empty

7/Feb/10 29/Mar/10 29/Mar/10 646950 646950 1293900 50 44 0 0 14,703.41 29,406.82 14,703.41 - 7/Feb/10 14/Mar/10 14/Mar/10 39040 39040 78080 35 31 0 0 1,259.35 2,518.71 1,259.35 - 7/Feb/10 29/Mar/10 29/Mar/10 18384 18384 36768 50 44 0 0 417.82 835.64 417.82 - 7/Feb/10 21/Mar/10 21/Mar/10 12911 12911 25822 42 37 0 0 348.95 697.89 348.95 - 8/Feb/10 30/Mar/10 30/Mar/10 185640 185640 371280 50 44 0 0 4,219.09 8,438.18 4,219.09 - 8/Feb/10 30/Mar/10 30/Mar/10 463178 463178 926356 50 44 0 0 10,526.77 21,053.55 10,526.77 - 9/Feb/10 31/Mar/10 31/Mar/10 52342 52342 104684 50 44 0 0 1,189.59 2,379.18 1,189.59 - 9/Feb/10 17/Apr/10 17/Apr/10 33442 33442 66884 67 58 0 0 576.59 1,153.17 576.59 - 9/Feb/10 8/Apr/10 8/Apr/10 622068 622068 1244136 58 51 0 0 12,197.41 24,394.82 12,197.41 - 9/Feb/10 23/Mar/10 23/Mar/10 33326 33326 66652 42 37 0 0 900.70 1,801.41 900.70 -

11/Feb/10 19/Apr/10 19/Apr/10 166768 166768 333536 67 58 0 0 2,875.31 5,750.62 2,875.31 - 11/Feb/10 11/Apr/10 11/Apr/10 438132 438132 876264 59 51 0 0 8,590.82 17,181.65 8,590.82 - 11/Feb/10 19/Apr/10 19/Apr/10 157970 157970 315940 67 58 0 0 2,723.62 5,447.24 2,723.62 - 11/Feb/10 11/Apr/10 11/Apr/10 428630 428630 857260 59 51 0 0 8,404.51 16,809.02 8,404.51 - 11/Feb/10 3/Apr/10 3/Apr/10 1085 1085 2170 51 44 0 0 24.66 49.32 24.66 - 13/Feb/10 20/Mar/10 20/Mar/10 42588 42588 85176 35 31 0 0 1,373.81 2,747.61 1,373.81 - 13/Feb/10 20/Mar/10 20/Mar/10 39040 39040 78080 35 31 0 0 1,259.35 2,518.71 1,259.35 - 15/Feb/10 20/May/10 20/May/10 170200 170200 340400 94 82 0 0 2,075.61 4,151.22 2,075.61 - 15/Feb/10 20/May/10 20/May/10 425000 425000 850000 94 82 0 0 5,182.93 10,365.85 5,182.93 - 16/Feb/10 6/Apr/10 6/Apr/10 1478750 1478750 2957500 49 43 0 0 34,389.53 68,779.07 34,389.53 - 16/Feb/10 23/Mar/10 23/Mar/10 876427 876427 1752854 35 31 0 0 28,271.84 56,543.68 28,271.84 - 17/Feb/10 8/Apr/10 8/Apr/10 420 420 840 50 44 0 0 9.55 19.09 9.55 - 17/Feb/10 8/Apr/10 8/Apr/10 52165 52165 104330 50 44 0 0 1,185.57 2,371.14 1,185.57 - 17/Feb/10 8/Apr/10 8/Apr/10 719448 719448 1438896 50 44 0 0 16,351.09 32,702.18 16,351.09 - 17/Feb/10 8/Apr/10 8/Apr/10 5524335 5524335 11048670 50 44 0 0 125,553.07 251,106.14 125,553.07 - 17/Feb/10 8/Apr/10 8/Apr/10 1205702 1205702 2411404 50 44 0 0 27,402.32 54,804.64 27,402.32 - 17/Feb/10 8/Apr/10 8/Apr/10 56740 56740 113480 50 44 0 0 1,289.55 2,579.09 1,289.55 - 17/Feb/10 8/Apr/10 8/Apr/10 56011 56011 112022 50 44 0 0 1,272.98 2,545.95 1,272.98 - 20/Feb/10 3/Apr/10 3/Apr/10 28095 28095 56190 42 37 0 0 759.32 1,518.65 759.32 - 21/Feb/10 12/Apr/10 12/Apr/10 1861151 1861151 3722302 50 44 0 0 42,298.89 84,597.77 42,298.89 - 22/Feb/10 13/Apr/10 13/Apr/10 109496 109496 218992 50 44 0 0 2,488.55 4,977.09 2,488.55 - 25/Feb/10 20/May/10 20/May/10 0 0 0 84 73 0 0 - - - - 25/Feb/10 1/Apr/10 1/Apr/10 48165 48165 96330 35 31 0 0 1,553.71 3,107.42 1,553.71 - 25/Feb/10 1/Apr/10 1/Apr/10 197731 197731 395462 35 31 0 0 6,378.42 12,756.84 6,378.42 - 27/Feb/10 3/Apr/10 3/Apr/10 0 0 0 35 31 0 0 - - - - 27/Feb/10 18/Apr/10 18/Apr/10 420 420 840 50 44 0 0 9.55 19.09 9.55 - 27/Feb/10 18/Apr/10 18/Apr/10 56405 56405 112810 50 44 0 0 1,281.93 2,563.86 1,281.93 - 1/Mar/10 12/Apr/10 12/Apr/10 17111 17111 34222 42 37 0 0 462.46 924.92 462.46 - 1/Mar/10 10/Apr/10 10/Apr/10 44590 44590 89180 40 35 0 0 1,274.00 2,548.00 1,274.00 - 4/Mar/10 2/May/10 2/May/10 0 0 0 59 51 0 0 - - - - 4/Mar/10 24/Apr/10 24/Apr/10 903128 903128 1806256 51 44 0 0 20,525.64 41,051.27 20,525.64 - 4/Mar/10 24/Apr/10 24/Apr/10 96456 96456 192912 51 44 0 0 2,192.18 4,384.36 2,192.18 - 4/Mar/10 24/Apr/10 24/Apr/10 1701370 1701370 3402740 51 44 0 0 38,667.50 77,335.00 38,667.50 - 4/Mar/10 24/Apr/10 24/Apr/10 398702 398702 797404 51 44 0 0 9,061.41 18,122.82 9,061.41 - 6/Mar/10 8/Apr/10 8/Apr/10 36900 36900 73800 33 30 0 0 1,230.00 2,460.00 1,230.00 - 6/Mar/10 10/Apr/10 10/Apr/10 190225 190225 380450 35 31 0 0 6,136.29 12,272.58 6,136.29 - 6/Mar/10 4/Apr/10 4/Apr/10 120653 120653 241306 29 26 0 0 4,640.50 9,281.00 4,640.50 - 6/Mar/10 4/Apr/10 4/Apr/10 56680 56680 113360 29 26 0 0 2,180.00 4,360.00 2,180.00 - 6/Mar/10 4/Apr/10 4/Apr/10 26031 26031 52062 29 26 0 0 1,001.19 2,002.38 1,001.19 - 7/Mar/10 18/Apr/10 18/Apr/10 11081 11081 22162 42 37 0 0 299.49 598.97 299.49 - 7/Mar/10 11/Apr/10 11/Apr/10 113230 113230 226460 35 31 0 0 3,652.58 7,305.16 3,652.58 -

Page 51: Progress Monitoring Sheet Empty

7/Mar/10 11/Apr/10 11/Apr/10 43197 43197 86394 35 31 0 0 1,393.45 2,786.90 1,393.45 - 7/Mar/10 11/Apr/10 11/Apr/10 63882 63882 127764 35 31 0 0 2,060.71 4,121.42 2,060.71 -

16/Mar/10 5/May/10 5/May/10 193662 193662 387324 50 44 0 0 4,401.41 8,802.82 4,401.41 - 16/Mar/10 5/May/10 5/May/10 34278 34278 68556 50 44 0 0 779.05 1,558.09 779.05 - 25/Mar/10 29/Apr/10 29/Apr/10 0 0 0 35 31 0 0 - - - - 30/Mar/10 19/May/10 19/May/10 0 0 0 50 44 0 0 - - - - 31/Mar/10 19/May/10 19/May/10 1682874 1682874 3365748 49 43 0 0 39,136.60 78,273.21 39,136.60 - 12/Apr/10 19/May/10 19/May/10 0 0 0 37 33 0 0 - - - -

Page 52: Progress Monitoring Sheet Empty

39,788.0

13/D

ec/0

8

WK1

Variance

Pl-Q

TY

Pl-L

B

Pl-S

K

Actual Labor Actual Skilled Actual % Days QTY %

WK1

-Pl-Q

TY

WK1

-Pl-L

B

WK1

-Pl-S

K

1 30 0 0 0 0 0 0 0 0 0% 100.00% 0 0 0 0.0 0.0 0.01 30 0 0 0 0 0 0 0 0 0% 100.00% 0 0 0 0.0 0.0 0.0

0.077720207 30 356 0 460900 0 0 0 0 0 0% 0.00% -34 -35821 -0.0777 0.0 0.0 0.00.077720207 30 356 0 115789 0 0 0 0 0 0% 0.00% -34 -8999 -0.0777 0.0 0.0 0.00.697674419 30 13 0 632081 0 0 0 0 0 0% 0.00% -34 -4E+05 -0.6977 0.0 0.0 0.00.163934426 20 102 0 0 0 0 0 0 0 0% 100.00% 0 0 0.8361 0.0 0.0 0.00.419354839 13 18 0 0 0 0 0 0 0 0% 100.00% 0 0 0.5806 0.0 0.0 0.00.045833333 11 229 0 43469 0 0 0 0 0 0% 0.00% -12 -1992 -0.0458 0.0 0.0 0.00.045833333 11 229 0 34800 0 0 0 0 0 0.00% 0.00% -12 -1595 -0.0458 0.0 0.0 0.00.030136986 11 354 0 1205200 0 0 0 0 0 0% 0.00% -12 -36321 -0.0301 0.0 0.0 0.00.030136986 11 354 0 450000 0 0 0 0 0 0% 0.00% -12 -13562 -0.0301 0.0 0.0 0.00.030136986 11 354 0 1686610 0 0 0 0 0 0% 0.00% -12 -50829 -0.0301 0.0 0.0 0.00.030136986 11 354 0 388080 0 0 0 0 0 0% 0.00% -12 -11696 -0.0301 0.0 0.0 0.00.030136986 11 354 0 39285 0 0 0 0 0 0% 0.00% -12 -1184 -0.0301 0.0 0.0 0.00.030136986 11 354 0 14278 0 0 0 0 0 0% 0.00% -12 -430.3 -0.0301 0.0 0.0 0.00.030136986 11 354 0 427260 0 0 0 0 0 0% 0.00% -12 -12876 -0.0301 0.0 0.0 0.00.031496063 8 246 0 0 0 0 0 0 0 0% 100.00% 0 0 0.9685 0.0 0.0 0.0

0 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 100 0 187305 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 100 0 48888 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 204 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 100 0 197053 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 95 0 212184 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 100 0 309250 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 123 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.0

Planned rem %

Elapsed Working Days

Remaining Working

DaysFinished

QTYRemainin

g QTY

Total Labor old-new

Toatal skilled old-new

Finished QTY rem

Actual rem %

Page 53: Progress Monitoring Sheet Empty

0 0 123 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 123 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 100 0 127293 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 43 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 183 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 30 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 123 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 123 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 123 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 123 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 123 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 79 0 234661 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 208 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 123 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 72 0 2611 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 94 0 1386269 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 113 0 218697 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 123 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 100 0 958035 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 57 0 64922 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 100 0 127610 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 30 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 63 0 248301 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 89 0 835439 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 108 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 100 0 98227 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 101 0 37450 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 73 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 114 0 253058 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 127 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 236 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 236 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 119 0 1174039 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 100 0 384158 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 79 0 228315 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 101 0 47950 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.0

Page 54: Progress Monitoring Sheet Empty

0 0 95 0 1255871 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 109 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 51 0 79529 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 70 0 3489 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 155 0 1620683 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 88 0 1955276 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 126 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 80 0 799759 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 29 0 8769 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 108 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 108 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 108 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 108 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 72 0 356209 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 80 0 906037 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 148 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 100 0 908126 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 126 0 605318 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 101 0 42490 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 126 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 94 0 1450366 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 112 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 112 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 30 0 12956 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 73 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 73 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 73 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 57 0 78157 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 80 0 224475 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 167 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 112 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 58 0 307395 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 72 0 319825 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 72 0 466938 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 80 0 40307 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 105 0 154560 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 70 0 522667 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 75 0 786792 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 97 0 7922 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 63 0 371360 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 104 0 1021084 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.0

Page 55: Progress Monitoring Sheet Empty

0 0 95 0 835439 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 79 0 217166 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 105 0 297430 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 29 0 911996 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 63 0 50132 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 98 0 8584 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 134865 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 442 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 1972 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 104 0 930836 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 229 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 104 0 884346 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 92 0 1035573 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 30 0 739312 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 57 0 50132 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 806162 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 50 0 214350 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 57 0 105476 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 63 0 137759 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 261111 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 125 0 2081490 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 109 0 511700 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 104 0 984951 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 72 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 105 0 302190 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 72 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 98 0 2132 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 90 0 17292 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 29 0 59013 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 73 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 58 0 261514 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 123 0 1167112 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 36 0 99003 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 84 0 114877 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 132590 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 38 0 10477 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 89 0 3222 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 104 0 60060 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 57 0 220771 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.0

Page 56: Progress Monitoring Sheet Empty

0 0 186 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 186 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 104 0 1191281 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 98 0 4100 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 76 0 40307 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 35 0 197934 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 50 0 596726 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 60 0 8160 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 104 0 1047052 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 81 0 10169 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 81 0 6444 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 73 0 32970 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 127 0 1186664 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 79730 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 77 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 43 0 597 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 1260 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 89 0 1022756 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 69 0 52123 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 235650 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 36 0 90370 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 98 0 1173314 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 91 0 29304 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 71111 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 98 0 45100 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 105 0 214410 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 98 0 7020 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 35 0 186620 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 76 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 76 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 73 0 95754 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 234472 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 165 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 90 0 1812457 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 97 0 1265774 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 84 0 123851 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 68 0 217244 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 37 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 77 0 244672 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 234063 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 290158 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 115 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 104 0 6864 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 29 0 58548 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 208 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.0

Page 57: Progress Monitoring Sheet Empty

0 0 91 0 31312 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 98 0 75850 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 90 0 878646 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 186 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 90 0 1327751 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 29 0 1080908 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 29 0 108834 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 196232 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 91 0 1687773 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 235683 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 65 0 10169 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 65 0 3222 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 36 0 52487 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 67 0 90229 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 48 0 690262 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 62 0 850056 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 74 0 260064 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 102 0 976200 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 77 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 107 0 124950 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 47 0 827274 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 64 0 13770 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 97 0 3116 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 29 0 83927 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 36 0 25671 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 48 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 100 0 1651558 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 108 0 154630 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 1350747 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 37 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 89 0 7524987 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 69 0 53567 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 104546 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 73 0 131969 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 91 0 2190548 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 151 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 62 0 63070 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 108 0 165830 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 101 0 57400 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 101 0 587936 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 418544 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 48 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 83 0 48867 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 122 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 39 0 111603 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 79 0 32824 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 48 0 77632 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 62 0 621930 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 107 0 926510 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.0

Page 58: Progress Monitoring Sheet Empty

0 0 61 0 79983 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 63 0 118695 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 48 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 80 0 246137 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 55 0 31324 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 33 0 90370 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 468385 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 113 0 266559 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 93 0 4620066 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 94 0 2906735 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 93 0 8659006 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 49855 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 67 0 45644 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 104840 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 34 0 118294 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 94 0 439031 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 102 0 81601 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 151 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 48 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 80 0 17674 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 48 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 48 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 153 0 8860149 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 34 0 58548 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 77 0 567296 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 208775 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 1317845 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 40 0 25208 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 49855 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 67 0 45558 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 48 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 48 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 94 0 3389057 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 68 0 135316 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 107 0 296870 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 34 0 230822 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 39 0 60132 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 34 0 53852 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 93 0 29304 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 100 0 73472 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 151 0 10965925 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 100 0 73094 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 187 0 8437607 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 187 0 12404477 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 187 0 11132528 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 79 0 255714 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 54 0 388240 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 47 0 1401 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 40 0 567 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 87 0 81982 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.0

Page 59: Progress Monitoring Sheet Empty

0 0 35 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 48 0 290758 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 93 0 145722 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 93 0 16764 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 48 0 88452 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 48 0 158950 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 42 0 523093 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 93 0 217087 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 93 0 1756632 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 79 0 280861 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 78 0 133088 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 69 0 53769 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 79 0 263121 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 96 0 167637 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 34 0 29268 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 101 0 22714 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 93 0 66990 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 86 0 173866 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 79 0 7687821 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 100 0 20418 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 94 0 705059 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 80 0 286944 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 77 0 141021 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 93 0 15656 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 94 0 1288408 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 47 0 39379 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 100 0 1357628 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 94 0 143978 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 94 0 580064 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 55 0 14268 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 93 0 8601 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 93 0 107403 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 88 0 1170772 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 133 0 5425594 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 77 0 122154 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 24 0 118294 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 79 0 1680187 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 133 0 534160 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 363652 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 79 0 687982 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 108 0 210210 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 107 0 20048 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 158 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 30 0 865397 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 85 0 1018301 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 1355874 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 32060 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 89 0 102590 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 96 0 62566 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 89 0 423342 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.0

Page 60: Progress Monitoring Sheet Empty

0 0 43 0 1395494 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 58 0 47389 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 103 0 269850 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 68 0 152061 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 407986 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 79 0 1379509 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 424947 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 89 0 99857 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 562359 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 79 0 198142 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 82 0 1442601 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 111 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 75 0 1330 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 202093 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 499929 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 139990 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 89 0 3169251 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 54 0 125958 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 131781 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 350793 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 1555235 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 82240 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 14777 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 621522 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 669015 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 147 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 89 0 106767 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 19920 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 16764 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 53 0 491139 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 2153269 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 2188 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 154 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 76 0 235625 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 30 0 13443 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 746088 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 91 0 16476 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 281567 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 1757041 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 1384732 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 98 0 91170 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 29 0 46105 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 4409 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 247120 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 254368 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 89 0 1062935 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 54 0 18208 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 274165 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 30720 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 47 0 820542 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.0

Page 61: Progress Monitoring Sheet Empty

0 0 89 0 222327 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 82 0 81982 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 189443 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 239656 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 97 0 57236 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 8601 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 114870 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 10571 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 89 0 16830 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 126 0 125136 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 30 0 544579 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 82 0 46809 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 420 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 401229 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 1211670 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 46 0 1285852 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 54 0 197243 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 73 0 186861 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 54 0 390436 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 701970 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 96 0 56826 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 100826 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 89 0 1012509 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 240825 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 94141 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 54 0 18040 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 319219 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 236163 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 46 0 949533 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 93 0 1175227 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 1085 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 1661628 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 7174 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 44007 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 89 0 9888 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 22023 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 54 0 1427222 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 47 0 82103 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 1585508 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 650016 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 75567 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 154409 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 47 0 1365886 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 128 0 553356 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 89 0 557232 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 89 0 286192 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 54 0 86456 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 57491 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 33 0 16481 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 85 0 215049 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 54 0 55086 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.0

Page 62: Progress Monitoring Sheet Empty

0 0 75 0 38481 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 85 0 221763 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 57400 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 129 0 68123 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 129 0 866178 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 129 0 715254 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 129 0 150773 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 129 0 236460 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 129 0 1518354 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 47 0 291622 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 32 0 55391 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 5652 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 73 0 198161 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 741121 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 69 0 92376 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 240588 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 935277 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 12844 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 83 0 46809 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 76 0 176338 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 89 0 223735 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 59837 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 119241 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 101405 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 54 0 82772 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 426958 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 548495 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 34 0 26607 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 246468 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 322331 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 105 0 1069104 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 47 0 204057 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 53 0 42312 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 214849 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 53 0 40490 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 782634 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 89 0 1251086 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 89 0 1214439 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 30720 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 21125 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 4379 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 47 0 1858266 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 32 0 597 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 23152 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 96260 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 128133 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 54 0 69734 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 405680 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 90 0 1435308 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 75 0 253858 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 85 0 8894739 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.0

Page 63: Progress Monitoring Sheet Empty

0 0 58 0 296089 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 437859 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 50 0 90248 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 1188449 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 72 0 31040 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 22023 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 157080 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 73 0 420 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 110671 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 86 0 2045761 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 86 0 746243 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 70 0 499856 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 934189 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 79 0 47435 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 30 0 606171 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 738181 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 55665 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 54025 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 73 0 233089 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 73 0 292791 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 73 0 1689245 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 1854932 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 72 0 420 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 148044 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 843113 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 45107 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 29017 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 108 0 2609206 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 59 0 946016 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 50 0 20332 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 72 0 260818 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 319872 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 72 0 11830 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 1268410 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 87 0 1381599 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 580254 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 786871 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 536123 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 45818 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 86 0 999083 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 72 0 21125 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 72 0 230895 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 54675 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 174216 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 59 0 456502 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 1039 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 59 0 255737 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 59 0 101405 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 148044 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 303015 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 77738 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.0

Page 64: Progress Monitoring Sheet Empty

0 0 58 0 134640 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 1553562 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 73 0 31040 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 86 0 1926853 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 72 0 228834 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 72 0 228783 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 50 0 1785610 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 36 0 148539 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 61 0 370878 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 30 0 426751 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 148173 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 26 0 105117 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 26 0 28212 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 26 0 3591 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 30 0 13505 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 73 0 970515 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 29 0 46530 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 72 0 44010 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 1041652 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 384655 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 154600 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 288213 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 77568 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 89760 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 416483 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 91988 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 1389562 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 87 0 2475048 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 73 0 91023 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 54 0 11021 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 1074323 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 59 0 453220 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 31641 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 887137 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 5328019 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 19650 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 28848 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 5652 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 59 0 963175 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 1889815 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 154862 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 150136 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 59 0 145513 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 59 0 136420 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 81453 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 76104 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 89760 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 438864 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 42861 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 171360 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 167950 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.0

Page 65: Progress Monitoring Sheet Empty

0 0 73 0 11830 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 39 0 7536 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 323186 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 118390 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 91038 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 96018 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 21968 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 136420 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 643694 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 38444 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 59 0 80910 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 651980 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 59 0 370568 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 63 0 10519032 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 94428 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 207412 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 1330 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 72 0 544532 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 96407 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 422554 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 385113 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 2062758 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 127550 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 202678 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 783044 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 55853 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 922086 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 72 0 13013 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 7677 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 27256 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 157080 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 251446 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 70876 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 342720 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 265592 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 790546 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 42188 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 110986 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 33442 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 185640 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 732681 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 37 0 233303 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 11217 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 59 0 90108 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 59 0 104159 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 59 0 181894 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 3300496 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 59 0 385419 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 20 0 5790 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 116458 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 174216 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.0

Page 66: Progress Monitoring Sheet Empty

0 0 30 0 383750 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 129465 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 26 0 1234124 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 26 0 33122 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 26 0 3591 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 184718 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 167489 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 290852 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 1182009 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 191083 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 147367 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 37 0 11342 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 218365 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 256462 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 175423 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 32 0 51451 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 43488 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 420 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 59 0 305424 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 73 0 110565 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 72222 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 427061 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 77323 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 77362 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 136420 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 40020 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 136420 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 61259 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 263772 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 36 0 28095 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 2188 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 99837 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 113313 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 1851448 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 392088 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 34315 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 374136 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 531475 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 21 0 16620 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 61743 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 171360 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 25688 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 141791 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 22477 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 139490 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 106158 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 181894 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 3338216 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 16055 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 51982 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 557533 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.0

Page 67: Progress Monitoring Sheet Empty

0 0 44 0 646950 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 39040 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 18384 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 37 0 12911 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 185640 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 463178 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 52342 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 33442 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 622068 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 37 0 33326 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 166768 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 438132 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 58 0 157970 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 428630 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 1085 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 42588 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 39040 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 82 0 170200 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 82 0 425000 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 43 0 1478750 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 876427 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 420 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 52165 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 719448 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 5524335 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 1205702 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 56740 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 56011 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 37 0 28095 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 1861151 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 109496 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 73 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 31 0 48165 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 197731 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 44 0 420 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 56405 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 37 0 17111 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 35 0 44590 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 51 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 44 0 903128 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 96456 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 1701370 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 398702 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 30 0 36900 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 190225 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 26 0 120653 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 26 0 56680 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 26 0 26031 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 37 0 11081 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 113230 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.0

Page 68: Progress Monitoring Sheet Empty

0 0 31 0 43197 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 63882 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 193662 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 44 0 34278 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 31 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 44 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.00 0 43 0 1682874 0 0 0 0 0 0% 0.00% 0 0 0 0.0 0.0 0.00 0 33 0 0 0 0 0 0 0 0% 100.00% 0 0 1 0.0 0.0 0.0

Page 69: Progress Monitoring Sheet Empty

7

WK1

19/D

ec/0

8

20/D

ec/0

8

WK2

26/D

ec/0

8

27/D

ec/0

8

WK3

2/Ja

n/09

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

WK1

-Pl-M

P

WK1

-AC-

QTY

WK1

-AC-

LB

WK1

-AC-

SK

WK1

-AC-

MP

WK2

-Pl-Q

TY

WK2

-Pl-L

B

WK2

-Pl-S

K

WK2

-Pl-M

P

WK2

-AC-

QTY

WK2

-AC-

LB

WK2

-AC-

SK

WK2

-AC-

MP

WK3

-Pl-Q

TY

WK3

-Pl-L

B

WK3

-Pl-S

K

WK3

-Pl-M

P

WK3

-AC-

QTY

WK3

-AC-

LB

WK3

-AC-

SK

WK3

-AC-

MP

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 4,776.2 4,776.2 9,552.3 14,328.5 0 7,164.2 7,164.2 14,328.5 21,492.7 00.0 0 1,199.9 1,199.9 2,399.8 3,599.7 0 1,799.8 1,799.8 3,599.7 5,399.5 00.0 0 58,798.2 58,798.2 117,596.5 176,394.7 0 88,197.3 88,197.3 ### ### 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 70: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 71: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 72: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 73: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 74: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 75: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 76: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 77: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 78: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 79: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 80: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 81: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 82: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 83: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 84: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 85: Progress Monitoring Sheet Empty

0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 00.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0

Page 86: Progress Monitoring Sheet Empty

3/Ja

n/09

WK4

9/Ja

n/09

10/J

an/0

9

WK5

16/J

an/0

9

17/J

an/0

9

WK6

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

WK4

-Pl-Q

TY

WK4

-Pl-L

B

WK4

-Pl-S

K

WK4

-Pl-M

P

WK4

-AC-

QTY

WK4

-AC-

LB

WK4

-AC-

SK

WK4

-AC-

MP

WK5

-Pl-Q

TY

WK5

-Pl-L

B

WK5

-Pl-S

K

WK5

-Pl-M

P

WK5

-AC-

QTY

WK5

-AC-

LB

WK5

-AC-

SK

WK5

-AC-

MP

WK6

-Pl-Q

TY

WK6

-Pl-L

B

WK6

-Pl-S

K

WK6

-Pl-M

P

WK6

-AC-

QTY

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

7,164.2 7,164.2 14,328.5 21,492.7 0 7,164.2 7,164.2 14,328.5 21,492.7 0 7,164.2 7,164.2 14,328.5 21,492.71,799.8 1,799.8 3,599.7 5,399.5 0 1,799.8 1,799.8 3,599.7 5,399.5 0 1,799.8 1,799.8 3,599.7 5,399.5

88,197.3 88,197.3 ### ### 0 88,197.3 88,197.3 176,394.7 264,592.0 0 88,197.3 88,197.3 176,394.7 264,592.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 543.4 543.4 1,086.7 1,630.1 0 1,086.7 1,086.7 2,173.5 3,260.20.0 0.0 0.0 0.0 0 435.0 435.0 870.0 1,305.0 0 870.0 870.0 1,740.0 2,610.00.0 0.0 0.0 0.0 0 9,905.8 9,905.8 19,811.5 29,717.3 0 19,811.5 19,811.5 39,623.0 59,434.50.0 0.0 0.0 0.0 0 3,698.6 3,698.6 7,397.3 11,095.9 0 7,397.3 7,397.3 14,794.5 22,191.80.0 0.0 0.0 0.0 0 13,862.5 13,862.5 27,725.1 41,587.6 0 27,725.1 27,725.1 55,450.2 83,175.30.0 0.0 0.0 0.0 0 3,189.7 3,189.7 6,379.4 9,569.1 0 6,379.4 6,379.4 12,758.8 19,138.20.0 0.0 0.0 0.0 0 322.9 322.9 645.8 968.7 0 645.8 645.8 1,291.6 1,937.30.0 0.0 0.0 0.0 0 117.4 117.4 234.7 352.1 0 234.7 234.7 469.4 704.10.0 0.0 0.0 0.0 0 3,511.7 3,511.7 7,023.5 10,535.2 0 7,023.5 7,023.5 14,046.9 21,070.40.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 87: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 88: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 89: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 90: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 91: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 92: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 93: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 94: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 95: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 96: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 97: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 98: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 99: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 100: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 101: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 102: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 103: Progress Monitoring Sheet Empty

WK6

23/J

an/0

9

24/J

an/0

9

WK7

30/J

an/0

9

31/J

an/0

9

WK8

6/Fe

b/09

7/Fe

b/09

WK9

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

WK6

-AC-

LB

WK6

-AC-

SK

WK6

-AC-

MP

WK7

-Pl-Q

TY

WK7

-Pl-L

B

WK7

-Pl-S

K

WK7

-Pl-M

P

WK7

-AC-

QTY

WK7

-AC-

LB

WK7

-AC-

SK

WK7

-AC-

MP

WK8

-Pl-Q

TY

WK8

-Pl-L

B

WK8

-Pl-S

K

WK8

-Pl-M

P

WK8

-AC-

QTY

WK8

-AC-

LB

WK8

-AC-

SK

WK8

-AC-

MP

WK9

-Pl-Q

TY

WK9

-Pl-L

B

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 7,164.2 7,164.2 14,328.5 21,492.7 0 7,164.2 7,164.2 14,328.5 21,492.7 0 7,164.2 7,164.20 1,799.8 1,799.8 3,599.7 5,399.5 0 1,799.8 1,799.8 3,599.7 5,399.5 0 1,799.8 1,799.80 88,197.3 88,197.3 176,394.7 264,592.0 0 88,197.3 88,197.3 176,394.7 264,592.0 0 44,098.7 44,098.70 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 1,086.7 1,086.7 2,173.5 3,260.2 0 1,086.7 1,086.7 2,173.5 3,260.2 0 1,086.7 1,086.70 870.0 870.0 1,740.0 2,610.0 0 870.0 870.0 1,740.0 2,610.0 0 870.0 870.00 19,811.5 19,811.5 39,623.0 59,434.5 0 19,811.5 19,811.5 39,623.0 59,434.5 0 19,811.5 19,811.50 7,397.3 7,397.3 14,794.5 22,191.8 0 7,397.3 7,397.3 14,794.5 22,191.8 0 7,397.3 7,397.30 27,725.1 27,725.1 55,450.2 83,175.3 0 27,725.1 27,725.1 55,450.2 83,175.3 0 27,725.1 27,725.10 6,379.4 6,379.4 12,758.8 19,138.2 0 6,379.4 6,379.4 12,758.8 19,138.2 0 6,379.4 6,379.40 645.8 645.8 1,291.6 1,937.3 0 645.8 645.8 1,291.6 1,937.3 0 645.8 645.80 234.7 234.7 469.4 704.1 0 234.7 234.7 469.4 704.1 0 234.7 234.70 7,023.5 7,023.5 14,046.9 21,070.4 0 7,023.5 7,023.5 14,046.9 21,070.4 0 7,023.5 7,023.50 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 104: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 105: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 106: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 107: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 108: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 109: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 110: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 111: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 112: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 113: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 114: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 115: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 116: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 117: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 118: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 119: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0

Page 120: Progress Monitoring Sheet Empty

WK9

13/F

eb/0

9

14/F

eb/0

9

WK10

20/F

eb/0

9

21/F

eb/0

9

WK11

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

WK9

-Pl-S

K

WK9

-Pl-M

P

WK9

-AC-

QTY

WK9

-AC-

LB

WK9

-AC-

SK

WK9

-AC-

MP

WK1

0-Pl

-QTY

WK1

0-Pl

-LB

WK1

0-Pl

-SK

WK1

0-Pl

-MP

WK1

0-AC

-QTY

WK1

0-AC

-LB

WK1

0-AC

-SK

WK1

0-AC

-MP

WK1

1-Pl

-QTY

WK1

1-Pl

-LB

WK1

1-Pl

-SK

WK1

1-Pl

-MP

WK1

1-AC

-QTY

WK1

1-AC

-LB

WK1

1-AC

-SK

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

14,328.5 21,492.7 0 7,164.2 7,164.2 14,328.5 21,492.7 0 7,164.2 7,164.2 14,328.5 21,492.73,599.7 5,399.5 0 1,799.8 1,799.8 3,599.7 5,399.5 0 1,799.8 1,799.8 3,599.7 5,399.5

88,197.3 132,296.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

2,173.5 3,260.2 0 1,086.7 1,086.7 2,173.5 3,260.2 0 1,086.7 1,086.7 2,173.5 3,260.21,740.0 2,610.0 0 870.0 870.0 1,740.0 2,610.0 0 870.0 870.0 1,740.0 2,610.0

39,623.0 59,434.5 0 19,811.5 19,811.5 39,623.0 59,434.5 0 19,811.5 19,811.5 39,623.0 59,434.514,794.5 22,191.8 0 7,397.3 7,397.3 14,794.5 22,191.8 0 7,397.3 7,397.3 14,794.5 22,191.855,450.2 83,175.3 0 27,725.1 27,725.1 55,450.2 83,175.3 0 27,725.1 27,725.1 55,450.2 83,175.312,758.8 19,138.2 0 6,379.4 6,379.4 12,758.8 19,138.2 0 6,379.4 6,379.4 12,758.8 19,138.21,291.6 1,937.3 0 645.8 645.8 1,291.6 1,937.3 0 645.8 645.8 1,291.6 1,937.3469.4 704.1 0 234.7 234.7 469.4 704.1 0 234.7 234.7 469.4 704.1

14,046.9 21,070.4 0 7,023.5 7,023.5 14,046.9 21,070.4 0 7,023.5 7,023.5 14,046.9 21,070.40.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 11,238.3 11,238.3 22,476.6 33,714.90.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 121: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 122: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 123: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 124: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 125: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 126: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 127: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 128: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 129: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 130: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 131: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 132: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 133: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 134: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 135: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 136: Progress Monitoring Sheet Empty

0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 137: Progress Monitoring Sheet Empty

27/F

eb/0

9

28/F

eb/0

9WK12

6/M

ar/0

9

7/M

ar/0

9

WK13

13/M

ar/0

9

14/M

ar/0

9

WK14

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

WK1

1-AC

-MP

WK1

2-Pl

-QTY

WK1

2-Pl

-LB

WK1

2-Pl

-SK

WK1

2-Pl

-MP

WK1

2-AC

-QTY

WK1

2-AC

-LB

WK1

2-AC

-SK

WK1

2-AC

-MP

WK1

3-Pl

-QTY

WK1

3-Pl

-LB

WK1

3-Pl

-SK

WK1

3-Pl

-MP

WK1

3-AC

-QTY

WK1

3-AC

-LB

WK1

3-AC

-SK

WK1

3-AC

-MP

WK1

4-Pl

-QTY

WK1

4-Pl

-LB

WK1

4-Pl

-SK

WK1

4-Pl

-MP

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 7,164.2 7,164.2 14,328.5 21,492.7 0 7,164.2 7,164.2 14,328.5 21,492.7 0 7,164.2 7,164.2 14,328.5 21,492.70 1,799.8 1,799.8 3,599.7 5,399.5 0 1,799.8 1,799.8 3,599.7 5,399.5 0 1,799.8 1,799.8 3,599.7 5,399.50 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 1,086.7 1,086.7 2,173.5 3,260.2 0 1,086.7 1,086.7 2,173.5 3,260.2 0 1,086.7 1,086.7 2,173.5 3,260.20 870.0 870.0 1,740.0 2,610.0 0 870.0 870.0 1,740.0 2,610.0 0 870.0 870.0 1,740.0 2,610.00 19,811.5 19,811.5 39,623.0 59,434.5 0 19,811.5 19,811.5 39,623.0 59,434.5 0 19,811.5 19,811.5 39,623.0 59,434.50 7,397.3 7,397.3 14,794.5 22,191.8 0 7,397.3 7,397.3 14,794.5 22,191.8 0 7,397.3 7,397.3 14,794.5 22,191.80 27,725.1 27,725.1 55,450.2 83,175.3 0 27,725.1 27,725.1 55,450.2 83,175.3 0 27,725.1 27,725.1 55,450.2 83,175.30 6,379.4 6,379.4 12,758.8 19,138.2 0 6,379.4 6,379.4 12,758.8 19,138.2 0 6,379.4 6,379.4 12,758.8 19,138.20 645.8 645.8 1,291.6 1,937.3 0 645.8 645.8 1,291.6 1,937.3 0 645.8 645.8 1,291.6 1,937.30 234.7 234.7 469.4 704.1 0 234.7 234.7 469.4 704.1 0 234.7 234.7 469.4 704.10 7,023.5 7,023.5 14,046.9 21,070.4 0 7,023.5 7,023.5 14,046.9 21,070.4 0 7,023.5 7,023.5 14,046.9 21,070.40 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 11,238.3 11,238.3 22,476.6 33,714.9 0 11,238.3 11,238.3 22,476.6 33,714.9 0 11,238.3 11,238.3 22,476.6 33,714.90 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 2,933.3 2,933.3 5,866.6 8,799.8 0 2,933.3 2,933.3 5,866.6 8,799.8 0 2,933.3 2,933.3 5,866.6 8,799.80 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 5,911.6 5,911.6 11,823.2 17,734.8 0 11,823.2 11,823.2 23,646.4 35,469.50 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 8,934.1 8,934.1 17,868.1 26,802.20 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 9,277.5 9,277.5 18,555.0 27,832.50 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 138: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 139: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 140: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 141: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 142: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 143: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 144: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 145: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 146: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 147: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 148: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 149: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 150: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 151: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 152: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 153: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 154: Progress Monitoring Sheet Empty

WK14

20/M

ar/0

9

21/M

ar/0

9

WK15

27/M

ar/0

9

28/M

ar/0

9

WK16

3/Ap

r/09

4/Ap

r/09

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

WK1

4-AC

-QTY

WK1

4-AC

-LB

WK1

4-AC

-SK

WK1

4-AC

-MP

WK1

5-Pl

-QTY

WK1

5-Pl

-LB

WK1

5-Pl

-SK

WK1

5-Pl

-MP

WK1

5-AC

-QTY

WK1

5-AC

-LB

WK1

5-AC

-SK

WK1

5-AC

-MP

WK1

6-Pl

-QTY

WK1

6-Pl

-LB

WK1

6-Pl

-SK

WK1

6-Pl

-MP

WK1

6-AC

-QTY

WK1

6-AC

-LB

WK1

6-AC

-SK

WK1

6-AC

-MP

WK1

7-Pl

-QTY

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 7,164.2 7,164.2 14,328.5 21,492.7 0 7,164.2 7,164.2 14,328.5 21,492.7 0 7,164.20 1,799.8 1,799.8 3,599.7 5,399.5 0 1,799.8 1,799.8 3,599.7 5,399.5 0 1,799.80 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 1,086.7 1,086.7 2,173.5 3,260.2 0 1,086.7 1,086.7 2,173.5 3,260.2 0 1,086.70 870.0 870.0 1,740.0 2,610.0 0 870.0 870.0 1,740.0 2,610.0 0 870.00 19,811.5 19,811.5 39,623.0 59,434.5 0 19,811.5 19,811.5 39,623.0 59,434.5 0 19,811.50 7,397.3 7,397.3 14,794.5 22,191.8 0 7,397.3 7,397.3 14,794.5 22,191.8 0 7,397.30 27,725.1 27,725.1 55,450.2 83,175.3 0 27,725.1 27,725.1 55,450.2 83,175.3 0 27,725.10 6,379.4 6,379.4 12,758.8 19,138.2 0 6,379.4 6,379.4 12,758.8 19,138.2 0 6,379.40 645.8 645.8 1,291.6 1,937.3 0 645.8 645.8 1,291.6 1,937.3 0 645.80 234.7 234.7 469.4 704.1 0 234.7 234.7 469.4 704.1 0 234.70 7,023.5 7,023.5 14,046.9 21,070.4 0 7,023.5 7,023.5 14,046.9 21,070.4 0 7,023.50 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 11,238.3 11,238.3 22,476.6 33,714.9 0 11,238.3 11,238.3 22,476.6 33,714.9 0 11,238.30 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 2,933.3 2,933.3 5,866.6 8,799.8 0 2,933.3 2,933.3 5,866.6 8,799.8 0 2,933.30 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 11,823.2 11,823.2 23,646.4 35,469.5 0 11,823.2 11,823.2 23,646.4 35,469.5 0 11,823.20 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 13,401.1 13,401.1 26,802.2 40,203.3 0 13,401.1 13,401.1 26,802.2 40,203.3 0 13,401.10 18,555.0 18,555.0 37,110.0 55,665.0 0 18,555.0 18,555.0 37,110.0 55,665.0 0 18,555.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 155: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 2,545.9 2,545.9 5,091.7 7,637.6 0 7,637.6 7,637.6 15,275.2 22,912.7 0 7,637.60 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 2,970.4 2,970.4 5,940.8 8,911.2 0 17,822.40 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 72.50 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 14,747.50 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 156: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 157: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 158: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 159: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 160: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 161: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 162: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 163: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 164: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 165: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 166: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 167: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 168: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 169: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 170: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.00 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0

Page 171: Progress Monitoring Sheet Empty

WK17

10/A

pr/0

9

11/A

pr/0

9

WK18

17/A

pr/0

9

18/A

pr/0

9

WK19

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

WK1

7-Pl

-LB

WK1

7-Pl

-SK

WK1

7-Pl

-MP

WK1

7-AC

-QTY

WK1

7-AC

-LB

WK1

7-AC

-SK

WK1

7-AC

-MP

WK1

8-Pl

-QTY

WK1

8-Pl

-LB

WK1

8-Pl

-SK

WK1

8-Pl

-MP

WK1

8-AC

-QTY

WK1

8-AC

-LB

WK1

8-AC

-SK

WK1

8-AC

-MP

WK1

9-Pl

-QTY

WK1

9-Pl

-LB

WK1

9-Pl

-SK

WK1

9-Pl

-MP

WK1

9-AC

-QTY

WK1

9-AC

-LB

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

7,164.2 14,328.5 21,492.7 0 7,164.2 7,164.2 14,328.5 21,492.7 0 7,164.2 7,164.2 14,328.5 21,492.71,799.8 3,599.7 5,399.5 0 1,799.8 1,799.8 3,599.7 5,399.5 0 1,799.8 1,799.8 3,599.7 5,399.5

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

1,086.7 2,173.5 3,260.2 0 1,086.7 1,086.7 2,173.5 3,260.2 0 1,086.7 1,086.7 2,173.5 3,260.2870.0 1,740.0 2,610.0 0 870.0 870.0 1,740.0 2,610.0 0 870.0 870.0 1,740.0 2,610.0

19,811.5 39,623.0 59,434.5 0 19,811.5 19,811.5 39,623.0 59,434.5 0 19,811.5 19,811.5 39,623.0 59,434.57,397.3 14,794.5 22,191.8 0 7,397.3 7,397.3 14,794.5 22,191.8 0 7,397.3 7,397.3 14,794.5 22,191.8

27,725.1 55,450.2 83,175.3 0 27,725.1 27,725.1 55,450.2 83,175.3 0 27,725.1 27,725.1 55,450.2 83,175.36,379.4 12,758.8 19,138.2 0 6,379.4 6,379.4 12,758.8 19,138.2 0 6,379.4 6,379.4 12,758.8 19,138.2645.8 1,291.6 1,937.3 0 645.8 645.8 1,291.6 1,937.3 0 645.8 645.8 1,291.6 1,937.3234.7 469.4 704.1 0 234.7 234.7 469.4 704.1 0 234.7 234.7 469.4 704.1

7,023.5 14,046.9 21,070.4 0 7,023.5 7,023.5 14,046.9 21,070.4 0 7,023.5 7,023.5 14,046.9 21,070.40.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

11,238.3 22,476.6 33,714.9 0 11,238.3 11,238.3 22,476.6 33,714.9 0 11,238.3 11,238.3 22,476.6 33,714.90.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

2,933.3 5,866.6 8,799.8 0 2,933.3 2,933.3 5,866.6 8,799.8 0 2,933.3 2,933.3 5,866.6 8,799.80.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

11,823.2 23,646.4 35,469.5 0 11,823.2 11,823.2 23,646.4 35,469.5 0 11,823.2 11,823.2 23,646.4 35,469.50.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

13,401.1 26,802.2 40,203.3 0 13,401.1 13,401.1 26,802.2 40,203.3 0 13,401.1 13,401.1 26,802.2 40,203.318,555.0 37,110.0 55,665.0 0 18,555.0 18,555.0 37,110.0 55,665.0 0 18,555.0 18,555.0 37,110.0 55,665.0

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 172: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

7,637.6 15,275.2 22,912.7 0 7,637.6 7,637.6 15,275.2 22,912.7 0 7,637.6 7,637.6 15,275.2 22,912.70.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

17,822.4 35,644.7 53,467.1 0 17,822.4 17,822.4 35,644.7 53,467.1 0 17,822.4 17,822.4 35,644.7 53,467.10.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

72.5 145.1 217.6 0 217.6 217.6 435.2 652.8 0 217.6 217.6 435.2 652.814,747.5 29,495.1 44,242.6 0 88,485.3 88,485.3 176,970.5 265,455.8 0 88,485.3 88,485.3 176,970.5 265,455.8

0.0 0.0 0.0 0 9,676.9 9,676.9 19,353.7 29,030.6 0 11,612.2 11,612.2 23,224.5 34,836.70.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 28,741.1 28,741.1 57,482.1 86,223.2 0 57,482.1 57,482.1 114,964.2 172,446.30.0 0.0 0.0 0 2,278.0 2,278.0 4,555.9 6,833.9 0 6,833.9 6,833.9 13,667.8 20,501.70.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 5,104.4 5,104.4 10,208.8 15,313.20.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 7,882.6 7,882.6 15,765.1 23,647.70.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 9,387.0 9,387.0 18,773.9 28,160.90.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 173: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 174: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 175: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 176: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 177: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 178: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 179: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 180: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 181: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 182: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 183: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 184: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 185: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 186: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 187: Progress Monitoring Sheet Empty

0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.00.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0

Page 188: Progress Monitoring Sheet Empty

WK1924

/Apr

/09

25/A

pr/0

9

WK20

1/M

ay/0

9

2/M

ay/0

9

WK21

8/M

ay/0

9

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

Pl-Q

TY

Pl-L

B

Pl-S

K

Pl-M

P

AC-Q

TY

AC-L

B

AC-S

K

AC-M

P

WK1

9-AC

-SK

WK1

9-AC

-MP

WK2

0-Pl

-QTY

WK2

0-Pl

-LB

WK2

0-Pl

-SK

WK2

0-Pl

-MP

WK2

0-AC

-QTY

WK2

0-AC

-LB

WK2

0-AC

-SK

WK2

0-AC

-MP

WK2

1-Pl

-QTY

WK2

1-Pl

-LB

WK2

1-Pl

-SK

WK2

1-Pl

-MP

WK2

1-AC

-QTY

WK2

1-AC

-LB

WK2

1-AC

-SK

WK2

1-AC

-MP

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 7,164.2 7,164.2 14,328.5 21,492.7 0 7164.2487 7164.2487 14328.497 21492.746 00 1,799.8 1,799.8 3,599.7 5,399.5 0 1799.829 1799.829 3599.658 5399.487 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 1,086.7 1,086.7 2,173.5 3,260.2 0 1086.725 1086.725 2173.45 3260.175 00 870.0 870.0 1,740.0 2,610.0 0 870 870 1740 2610 00 19,811.5 19,811.5 39,623.0 59,434.5 0 19811.507 19811.507 39623.014 59434.521 00 7,397.3 7,397.3 14,794.5 22,191.8 0 7397.2603 7397.2603 14794.521 22191.781 00 27,725.1 27,725.1 55,450.2 83,175.3 0 27725.096 27725.096 55450.192 83175.288 00 6,379.4 6,379.4 12,758.8 19,138.2 0 6379.3973 6379.3973 12758.795 19138.192 00 645.8 645.8 1,291.6 1,937.3 0 645.78082 645.78082 1291.5616 1937.3425 00 234.7 234.7 469.4 704.1 0 234.70685 234.70685 469.4137 704.12055 00 7,023.5 7,023.5 14,046.9 21,070.4 0 7023.4521 7023.4521 14046.904 21070.356 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 11,238.3 11,238.3 22,476.6 33,714.9 0 11238.3 11238.3 22476.6 33714.9 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 2,933.3 2,933.3 5,866.6 8,799.8 0 2933.28 2933.28 5866.56 8799.84 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 11,823.2 11,823.2 23,646.4 35,469.5 0 11823.18 11823.18 23646.36 35469.54 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 13,401.1 13,401.1 26,802.2 40,203.3 0 13401.095 13401.095 26802.189 40203.284 00 18,555.0 18,555.0 37,110.0 55,665.0 0 18555 18555 37110 55665 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 189: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 7,637.6 7,637.6 15,275.2 22,912.7 0 7637.58 7637.58 15275.16 22912.74 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 17,822.4 17,822.4 35,644.7 53,467.1 0 17822.354 17822.354 35644.709 53467.063 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 217.6 217.6 435.2 652.8 0 217.58333 217.58333 435.16667 652.75 00 88,485.3 88,485.3 176,970.5 265,455.8 0 88485.255 88485.255 176970.51 265455.77 00 11,612.2 11,612.2 23,224.5 34,836.7 0 11612.23 11612.23 23224.46 34836.69 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 57,482.1 57,482.1 114,964.2 172,446.3 0 57482.1 57482.1 114964.2 172446.3 00 6,833.9 6,833.9 13,667.8 20,501.7 0 6833.8947 6833.8947 13667.789 20501.684 00 7,656.6 7,656.6 15,313.2 22,969.8 0 7656.6 7656.6 15313.2 22969.8 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 23,647.7 23,647.7 47,295.4 70,943.1 0 23647.714 23647.714 47295.429 70943.143 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 56,321.7 56,321.7 112,643.5 168,965.2 0 56321.73 56321.73 112643.46 168965.19 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 1,964.5 1,964.5 3,929.1 5,893.6 0 5893.62 5893.62 11787.24 17680.86 00 741.6 741.6 1,483.2 2,224.8 0 2224.7525 2224.7525 4449.505 6674.2574 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 2,219.8 2,219.8 4,439.6 6,659.4 0 13318.842 13318.842 26637.684 39956.526 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 59195.244 59195.244 118390.49 177585.73 00 0.0 0.0 0.0 0.0 0 7683.16 7683.16 15366.32 23049.48 00 0.0 0.0 0.0 0.0 0 2890.0633 2890.0633 5780.1266 8670.1899 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 190: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 191: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 192: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 193: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 194: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 195: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 196: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 197: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 198: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 199: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 200: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 201: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 202: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 203: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 204: Progress Monitoring Sheet Empty

0 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 00 0.0 0.0 0.0 0.0 0 0 0 0 0 0

Page 205: Progress Monitoring Sheet Empty

Activity ID Activity Name Start Finish Budgeted TA16140 Precast concrete hollow block 13-Dec-08 15-Jan-09 $0 A1700 Precast concrete hollow block 13-Dec-08 15-Jan-09 $0 A2770 Site Offices for Consultants 22-Dec-08 16-Mar-10 $460,900 A2780 Site Offices and Stores for Contractors 22-Dec-08 16-Mar-10 $115,789 A2790 Insurances 22-Dec-08 9-Feb-09 $632,081 A15860 Architecture Shop Drawings 3-Jan-09 24-May-09 $0 A1800 Conduits 11-Jan-09 15-Feb-09 $0 A2660 Access of Site 13-Jan-09 19-Oct-09 $43,469 A2670 Limitations of the Site 13-Jan-09 19-Oct-09 $34,800 A2680 Constructional Plant 13-Jan-09 14-Mar-10 ###A2690 Water for the Works 13-Jan-09 14-Mar-10 $450,000 A2700 Temporary Lighting and Power for the Works 13-Jan-09 14-Mar-10 ###A2720 Site Working Conditions 13-Jan-09 14-Mar-10 $388,080 A2730 Sheds and Storage Facilities 13-Jan-09 14-Mar-10 $39,285 A2800 Progress Photographs 13-Jan-09 14-Mar-10 $14,278 A2840 Program 13-Jan-09 14-Mar-10 $427,260 A16380 Precast concrete hollow block 17-Jan-09 8-Nov-09 $0 A1380 Architecture Shop Drawings 26-Jan-09 16-Jun-09 $0 A16350 Conduits 28-Jan-09 4-Mar-09 $0 A1930 Ducts 4-Feb-09 11-Mar-09 $0 A1830 UPVC & PVC pipes 10-Feb-09 17-Mar-09 $0 A15870 Electrical Shop Drawings 18-Feb-09 9-Jul-09 $0 A2710 Block Work 21-Feb-09 16-Jun-09 $187,305 A16310 Ducts 22-Feb-09 29-Mar-09 $0 A16700 Block Work 28-Feb-09 23-Jun-09 $48,888 A16240 UPVC & PVC pipes 28-Feb-09 4-Apr-09 $0 A16590 Conduits 4-Mar-09 27-Oct-09 $0 A15580 Architecture Shop Drawings 8-Mar-09 27-Jul-09 $0 A7490 Block Work 10-Mar-09 4-Jul-09 $197,053 A16180 Porcelain & Ceramic tiles 12-Mar-09 2-May-09 $0 A16190 Marble and black granite 12-Mar-09 2-May-09 $0 A1390 Electrical Shop Drawings 14-Mar-09 2-Aug-09 $0 A2860 Electrical Conduits & Boxes 16-Mar-09 4-Jul-09 $212,184 A19500 Block Work 17-Mar-09 11-Jul-09 $309,250 A15620 Architecture Shop Drawings 19-Mar-09 8-Aug-09 $0 A15880 Plumbing Shop Drawings 21-Mar-09 10-Aug-09 $0 A15890 HVAC Shop Drawings 21-Mar-09 10-Aug-09 $0 A15900 Architecture Shop Drawings 21-Mar-09 10-Aug-09 $0 A17100 Block Work 25-Mar-09 19-Jul-09 $127,293 A1740 Porcelain & Ceramic tiles 28-Mar-09 16-May-09 $0 A1750 Marble and black granite 28-Mar-09 16-May-09 $0 A16550 Ducts 29-Mar-09 27-Oct-09 $0 A16280 CHILLED WATER PUMP 29-Mar-09 18-May-09 $0 A1760 ELEVATORS & ESCALATORS 30-Mar-09 3-May-09 $0 A15660 Architecture Shop Drawings 31-Mar-09 19-Aug-09 $0 A15590 Electrical Shop Drawings 31-Mar-09 19-Aug-09 $0 A15940 Architecture Shop Drawings 1-Apr-09 22-Aug-09 $0 A15950 Electrical Shop Drawings 1-Apr-09 22-Aug-09 $0 A15910 Electrical Shop Drawings 1-Apr-09 22-Aug-09 $0 A15920 Plumbing Shop Drawings 1-Apr-09 22-Aug-09 $0

Page 206: Progress Monitoring Sheet Empty

A15930 HVAC Shop Drawings 1-Apr-09 22-Aug-09 $0 A7550 Electrical Conduits & Boxes 2-Apr-09 2-Jul-09 $234,661 A16480 UPVC & PVC pipes 4-Apr-09 1-Dec-09 $0 A1410 HVAC Shop Drawings 7-Apr-09 27-Aug-09 $0 A23270 Domestic Water Piping 8-Apr-09 30-Jun-09 $2,611 A3160 HVAC Ducting 9-Apr-09 27-Jul-09 ###A16760 Electrical Conduits & Boxes 12-Apr-09 20-Aug-09 $218,697 A15630 Electrical Shop Drawings 12-Apr-09 31-Aug-09 $0 A1400 Plumbing Shop Drawings 13-Apr-09 2-Sep-09 $0 A7860 Block Work 14-Apr-09 8-Aug-09 $958,035 A3010 Drainage Piping 15-Apr-09 20-Jun-09 $64,922 A2740 Plaster Work 20-Apr-09 13-Aug-09 $127,610 A15600 Plumbing Shop Drawings 21-Apr-09 9-Sep-09 $0 A16200 ELEVATORS & ESCALATORS 22-Apr-09 26-May-09 $0 A15610 HVAC Shop Drawings 22-Apr-09 10-Sep-09 $0 A7600 Drainage Piping 22-Apr-09 4-Jul-09 $248,301 A15670 Electrical Shop Drawings 23-Apr-09 12-Sep-09 $0 A7650 HVAC Ducting 23-Apr-09 4-Aug-09 $835,439 A15960 Plumbing Shop Drawings 27-Apr-09 15-Sep-09 $0 A15970 HVAC Shop Drawings 27-Apr-09 15-Sep-09 $0 A15980 Architecture Shop Drawings 27-Apr-09 15-Sep-09 $0 A15990 Electrical Shop Drawings 27-Apr-09 15-Sep-09 $0 A16000 Plumbing Shop Drawings 27-Apr-09 15-Sep-09 $0 A16010 HVAC Shop Drawings 27-Apr-09 15-Sep-09 $0 A15700 Architecture Shop Drawings 28-Apr-09 31-Aug-09 $0 A19900 Block Work 29-Apr-09 23-Aug-09 $98,227 A16710 Plaster Work 29-Apr-09 24-Aug-09 $37,450 A15690 HVAC Shop Drawings 29-Apr-09 17-Sep-09 $0 A1360 Elevators & Escalators Shop Drawing 29-Apr-09 22-Jul-09 $0 A19560 Electrical Conduits & Boxes 30-Apr-09 9-Sep-09 $253,058 A15680 Plumbing Shop Drawings 30-Apr-09 24-Sep-09 $0 A16420 Porcelain & Ceramic tiles 2-May-09 31-Jan-10 $0 A16430 Marble and black granite 2-May-09 31-Jan-10 $0 A23280 Fire Fighting Piping 2-May-09 16-Sep-09 ###A17470 Block Work 6-May-09 30-Aug-09 $384,158 A7920 Electrical Conduits & Boxes 7-May-09 6-Aug-09 $228,315 A7500 Plaster Work 9-May-09 2-Sep-09 $47,950 A17260 HVAC Ducting 9-May-09 26-Aug-09 ###A16400 Aluminum Panel cladding 10-May-09 13-Sep-09 $0 A16810 Drainage Piping 11-May-09 8-Jul-09 $79,529 A23290 Domestic Water Piping 11-May-09 30-Jul-09 $3,489 A23300 Fire Fighting Piping 11-May-09 7-Nov-09 ###A16860 HVAC Ducting 11-May-09 20-Aug-09 ###A15650 HVAC Shop Drawings 11-May-09 4-Oct-09 $0 A22850 Electrical Cable Tray 13-May-09 13-Aug-09 $799,759 A2910 Ramps Waterproofing 13-May-09 15-Jun-09 $8,769 A16330 Painting Materials 13-May-09 17-Jun-09 $0 A1790 Cable trays 13-May-09 17-Jun-09 $0 A1810 Panelboards 13-May-09 17-Jun-09 $0 A16020 Architecture Shop Drawings 13-May-09 15-Sep-09 $0 A16030 Electrical Shop Drawings 13-May-09 15-Sep-09 $0

Page 207: Progress Monitoring Sheet Empty

A16040 Plumbing Shop Drawings 13-May-09 15-Sep-09 $0 A16050 HVAC Shop Drawings 13-May-09 15-Sep-09 $0 A23370 Domestic Water Piping 16-May-09 6-Aug-09 $356,209 A1950 Painting Materials 16-May-09 20-Jun-09 $0 A23100 Electrical Cable Tray 17-May-09 17-Aug-09 $906,037 A16520 CHILLED WATER PUMP 18-May-09 5-Nov-09 $0 A8230 Block Work 19-May-09 12-Sep-09 $908,126 A23380 Fire Fighting Piping 19-May-09 12-Oct-09 $605,318 A17110 Plaster Work 19-May-09 13-Sep-09 $42,490 A15640 Plumbing Shop Drawings 20-May-09 13-Oct-09 $0 A19660 HVAC Ducting 21-May-09 7-Sep-09 ###A15710 Electrical Shop Drawings 21-May-09 28-Sep-09 $0 A15720 Plumbing Shop Drawings 21-May-09 28-Sep-09 $0 A16790 Ramps Waterproofing 23-May-09 25-Jun-09 $12,956 A15840 Elevators & Escalators Shop Drawing 23-May-09 15-Aug-09 $0 A15850 Elevators & Escalators Shop Drawing 23-May-09 15-Aug-09 $0 A1370 Elevators & Escalators Shop Drawing 23-May-09 15-Aug-09 $0 A19610 Drainage Piping 24-May-09 28-Jul-09 $78,157 A17160 Electrical Conduits & Boxes 25-May-09 25-Aug-09 $224,475 A1840 Plumbing Accessories 26-May-09 15-Jul-09 $0 A16440 ELEVATORS & ESCALATORS 27-May-09 7-Dec-09 $0 A1720 Aluminum Panel cladding 27-May-09 16-Jul-09 $0 A15730 HVAC Shop Drawings 27-May-09 4-Oct-09 $0 A9730 Block Work 30-May-09 4-Aug-09 $307,395 A17210 Drainage Piping 30-May-09 20-Aug-09 $319,825 A23390 Domestic Water Piping 30-May-09 20-Aug-09 $466,938 A23520 Domestic Water Piping 31-May-09 31-Aug-09 $40,307 A16340 Cable trays 31-May-09 5-Jul-09 $0 A16360 Panelboards 31-May-09 5-Jul-09 $0 A19510 Plaster Work 2-Jun-09 1-Oct-09 $154,560 A19630 Plumbing Works 3-Jun-09 23-Aug-09 $522,667 A1770 Generator sets 4-Jun-09 25-Jul-09 $0 A8020 HVAC Ducting 6-Jun-09 31-Aug-09 $786,792 A2750 Wall Covering ( Ceramic / Porcelain/ Marble ) 6-Jun-09 26-Sep-09 $7,922 A23310 Domestic Water Piping 8-Jun-09 19-Aug-09 $371,360 A16250 Plumbing Accessories 8-Jun-09 28-Jul-09 $0 A17840 Block Work 10-Jun-09 8-Oct-09 ###A20060 HVAC Ducting 10-Jun-09 28-Sep-09 $835,439 A8290 Electrical Conduits & Boxes 11-Jun-09 10-Sep-09 $217,166 A7870 Plaster Work 13-Jun-09 12-Oct-09 $297,430 A1920 Fans 13-Jun-09 18-Jul-09 $0 A7580 Waterproofing 13-Jun-09 15-Jul-09 $911,996 A16160 Aluminum Panel cladding 14-Jun-09 3-Aug-09 $0 A7970 Drainage Piping 14-Jun-09 25-Aug-09 $50,132 A16720 Wall Covering ( Ceramic / Porcelain/ Marble ) 15-Jun-09 6-Oct-09 $8,584 A23050 Electrical Cable Tray 15-Jun-09 10-Sep-09 $134,865 A9840 Drainage Piping 16-Jun-09 4-Aug-09 $442 A9890 HVAC Ducting 16-Jun-09 22-Aug-09 $1,972 A20270 Block Work 17-Jun-09 15-Oct-09 $930,836 A16570 Painting Materials 17-Jun-09 10-Mar-10 $0 A8390 HVAC Ducting 17-Jun-09 15-Oct-09 $884,346

Page 208: Progress Monitoring Sheet Empty

A16300 Fans 17-Jun-09 22-Jul-09 $0 A17630 HVAC Ducting 17-Jun-09 1-Oct-09 ###A22770 Waterproofing 17-Jun-09 21-Jul-09 $739,312 A8340 Drainage Piping 18-Jun-09 23-Aug-09 $50,132 A23170 Electrical Cable Tray 20-Jun-09 15-Sep-09 $806,162 A1940 Suspended gypsum board ceiling 20-Jun-09 25-Jul-09 $0 A17530 Electrical Conduits & Boxes 22-Jun-09 18-Aug-09 $214,350 A17580 Drainage Piping 22-Jun-09 26-Aug-09 $105,476 A23540 Domestic Water Piping 22-Jun-09 2-Sep-09 $137,759 A19960 Electrical Conduits & Boxes 22-Jun-09 17-Sep-09 $261,111 A16210 Generator sets 22-Jun-09 11-Aug-09 $0 A23320 Fire Fighting Piping 22-Jun-09 14-Nov-09 ###A23530 Fire Fighting Piping 23-Jun-09 27-Oct-09 $511,700 A8600 Block Work 23-Jun-09 21-Oct-09 $984,951 A1340 Facade Shop Drawings 23-Jun-09 14-Sep-09 $0 A17480 Plaster Work 23-Jun-09 22-Oct-09 $302,190 A16060 Architecture Shop Drawings 24-Jun-09 15-Sep-09 $0 A7510 Wall Covering ( Ceramic / Porcelain/ Marble ) 24-Jun-09 15-Oct-09 $2,132 A16320 Suspended gypsum board ceiling 25-Jun-09 30-Jul-09 $0 A19700 Plaster Work 25-Jun-09 7-Oct-09 $17,292 A19760 Ramps Waterproofing 25-Jun-09 28-Jul-09 $59,013 A15740 Architecture Shop Drawings 25-Jun-09 17-Sep-09 $0 A19020 Block Work 27-Jun-09 1-Sep-09 $261,514 A23400 Fire Fighting Piping 27-Jun-09 16-Nov-09 ###A23910 Block Work 29-Jun-09 9-Aug-09 $99,003 A15830 Facade Electrical Shop Drawings 29-Jun-09 24-Sep-09 $0 A23110 Electrical Cable Tray 29-Jun-09 4-Oct-09 $114,877 A23240 Electrical Works 29-Jun-09 26-Aug-09 $132,590 A1850 Pumps 30-Jun-09 19-Aug-09 $0 A16270 WATER CHILLERS 30-Jun-09 19-Aug-09 $0 A23460 Drainage Piping 1-Jul-09 13-Aug-09 $10,477 A23470 HVAC Works 1-Jul-09 12-Oct-09 $3,222 A19910 Plaster Work 2-Jul-09 31-Oct-09 $60,060 A1880 WATER CHILLERS 2-Jul-09 22-Aug-09 $0 A1890 CHILLED WATER PUMP 2-Jul-09 22-Aug-09 $0 A16260 Pumps 2-Jul-09 22-Aug-09 $0 A20010 Drainage Piping 4-Jul-09 7-Sep-09 $220,771 A16580 Cable trays 5-Jul-09 6-Feb-10 $0 A16600 Panelboards 5-Jul-09 6-Feb-10 $0 A20640 Block Work 5-Jul-09 2-Nov-09 ###A1350 Facade Electrical Shop Drawings 5-Jul-09 30-Sep-09 $0 A17120 Wall Covering ( Ceramic / Porcelain/ Marble ) 5-Jul-09 26-Oct-09 $4,100 A16290 A/C UNITS 5-Jul-09 9-Aug-09 $0 A23610 Domestic Water Piping 6-Jul-09 1-Oct-09 $40,307 A15780 Architecture Shop Drawings 6-Jul-09 25-Aug-09 $0 A23970 Block Work 8-Jul-09 17-Aug-09 $197,934 A23090 Electrical Cable Tray 9-Jul-09 5-Sep-09 $596,726 A23830 Fire Fighting Piping 9-Jul-09 16-Sep-09 $8,160 A18210 Block Work 9-Jul-09 7-Nov-09 ###A23480 Drainage Piping 9-Jul-09 11-Oct-09 $10,169 A23510 HVAC Works 9-Jul-09 11-Oct-09 $6,444

Page 209: Progress Monitoring Sheet Empty

A17600 Plumbing Works 11-Jul-09 3-Oct-09 $32,970 A23420 Fire Fighting Piping 12-Jul-09 6-Dec-09 ###A9740 Plaster Work 12-Jul-09 16-Sep-09 $79,730 A15770 HVAC Shop Drawings 13-Jul-09 10-Oct-09 $0 A19130 Drainage Piping 14-Jul-09 1-Sep-09 $597 A19180 HVAC Ducting 14-Jul-09 19-Sep-09 $1,260 A23550 Fire Fighting Piping 15-Jul-09 26-Oct-09 ###A8710 Drainage Piping 16-Jul-09 4-Oct-09 $52,123 A8660 Electrical Conduits & Boxes 16-Jul-09 12-Oct-09 $235,650 A23920 Plaster Work 16-Jul-09 26-Aug-09 $90,370 A15820 Facade Shop Drawings 16-Jul-09 12-Oct-09 $0 A18000 HVAC Ducting 16-Jul-09 7-Nov-09 ###A17670 Plaster Work 16-Jul-09 29-Oct-09 $29,304 A23250 Electrical Works 16-Jul-09 13-Sep-09 $71,111 A7880 Wall Covering ( Ceramic / Porcelain/ Marble ) 18-Jul-09 8-Nov-09 $45,100 A1910 A/C UNITS 18-Jul-09 22-Aug-09 $0 A8240 Plaster Work 18-Jul-09 16-Nov-09 $214,410 A19520 Wall Covering ( Ceramic / Porcelain/ Marble ) 19-Jul-09 9-Nov-09 $7,020 A23980 Plaster Work 20-Jul-09 29-Aug-09 $186,620 A16070 Electrical Shop Drawings 21-Jul-09 17-Oct-09 $0 A16080 Plumbing Shop Drawings 21-Jul-09 17-Oct-09 $0 A16090 HVAC Shop Drawings 21-Jul-09 17-Oct-09 $0 A23180 Electrical Cable Tray 21-Jul-09 13-Oct-09 $95,754 A8970 Block Work 21-Jul-09 2-Nov-09 $234,472 A16540 Fans 22-Jul-09 30-Jan-10 $0 A2820 Painting 1st Stage 22-Jul-09 3-Nov-09 ###A8760 HVAC Ducting 22-Jul-09 11-Nov-09 ###A23060 Electrical Cable Tray 25-Jul-09 29-Oct-09 $123,851 A17900 Electrical Conduits & Boxes 25-Jul-09 11-Oct-09 $217,244 A1730 Doors & Windows 25-Jul-09 5-Sep-09 $0 A7610 Piping Accessories 26-Jul-09 22-Oct-09 $244,672 A23120 Electrical Cable Tray 27-Jul-09 5-Oct-09 $234,063 A3620 Facade Plaster & Paint 27-Jul-09 22-Oct-09 $290,158 A16510 WATER CHILLERS 27-Jul-09 7-Dec-09 $0 A8730 Plumbing Works 28-Jul-09 25-Nov-09 $6,864 A23930 Waterproofing 28-Jul-09 30-Aug-09 $58,548 A16490 Plumbing Accessories 28-Jul-09 27-Mar-10 $0 A17730 Waterproofing 28-Jul-09 10-Nov-09 $31,312 A17490 Wall Covering ( Ceramic / Porcelain/ Marble ) 28-Jul-09 18-Nov-09 $75,850 A1860 Lighting Fixtures 28-Jul-09 16-Sep-09 $0 A20430 HVAC Ducting 29-Jul-09 10-Nov-09 $878,646 A16560 Suspended gypsum board ceiling 30-Jul-09 3-Mar-10 $0 A2760 Floor Covering ( Ceramic / Porcelain/ Marble ) 30-Jul-09 11-Nov-09 ###A22780 Waterproofing 1-Aug-09 2-Sep-09 ###A23990 Waterproofing 1-Aug-09 2-Sep-09 $108,834 A18580 Block Work 1-Aug-09 12-Nov-09 $196,232 A16740 Painting 1st Stage 1-Aug-09 14-Nov-09 ###A18270 Electrical Conduits & Boxes 2-Aug-09 28-Oct-09 $235,683 A23490 Drainage Piping 2-Aug-09 15-Oct-09 $10,169 A23500 HVAC Works 2-Aug-09 15-Oct-09 $3,222 A23940 Painting 1st Stage 3-Aug-09 13-Sep-09 $52,487

Page 210: Progress Monitoring Sheet Empty

A23040 Electrical Cable Tray 3-Aug-09 19-Oct-09 $90,229 A9990 Waterproofing 4-Aug-09 28-Sep-09 $690,262 A9720 Roofing System 5-Aug-09 15-Oct-09 $850,056 A20330 Electrical Conduits & Boxes 5-Aug-09 29-Oct-09 $260,064 A20800 HVAC Ducting 5-Aug-09 1-Dec-09 $976,200 A15760 Plumbing Shop Drawings 5-Aug-09 2-Nov-09 $0 A20280 Plaster Work 6-Aug-09 8-Dec-09 $124,950 A23160 Electrical Cable Tray 6-Aug-09 29-Sep-09 $827,274 A23850 Fire Fighting Piping 6-Aug-09 19-Oct-09 $13,770 A19920 Wall Covering ( Ceramic / Porcelain/ Marble ) 6-Aug-09 26-Nov-09 $3,116 A24030 Block Work 6-Aug-09 8-Sep-09 $83,927 A23260 Electrical Works 6-Aug-09 16-Sep-09 $25,671 A16230 Sanitary fixtures 6-Aug-09 30-Sep-09 $0 A18370 HVAC Ducting 8-Aug-09 1-Dec-09 ###A17850 Plaster Work 8-Aug-09 10-Dec-09 $154,630 A9130 HVAC Works 8-Aug-09 19-Nov-09 ###A16170 Doors & Windows 8-Aug-09 19-Sep-09 $0 A2890 Wires & Cables 9-Aug-09 19-Nov-09 ###A23700 Domestic Water Piping 9-Aug-09 27-Oct-09 $53,567 A17950 Drainage Piping 9-Aug-09 18-Oct-09 $104,546 A23630 Domestic Water Piping 9-Aug-09 1-Nov-09 $131,969 A16730 Floor Covering ( Ceramic / Porcelain/ Marble ) 9-Aug-09 22-Nov-09 ###A16530 A/C UNITS 9-Aug-09 31-Jan-10 $0 A19030 Plaster Work 9-Aug-09 19-Oct-09 $63,070 A8610 Plaster Work 10-Aug-09 13-Dec-09 $165,830 A8250 Wall Covering ( Ceramic / Porcelain/ Marble ) 10-Aug-09 5-Dec-09 $57,400 A23620 Fire Fighting Piping 10-Aug-09 5-Dec-09 $587,936 A7530 Painting 1st Stage 10-Aug-09 22-Nov-09 $418,544 A15810 HVAC Shop Drawings 10-Aug-09 4-Oct-09 $0 A19710 Wall Covering ( Ceramic / Porcelain/ Marble ) 11-Aug-09 15-Nov-09 $48,867 A16640 Generator sets 11-Aug-09 30-Dec-09 $0 A24000 Painting 1st Stage 12-Aug-09 26-Sep-09 $111,603 A17970 Plumbing Works 13-Aug-09 12-Nov-09 $32,824 A15750 Electrical Shop Drawings 13-Aug-09 9-Nov-09 $0 A9340 Block Work 13-Aug-09 7-Oct-09 $77,632 A21820 Block Work 15-Aug-09 25-Oct-09 $621,930 A21010 Block Work 15-Aug-09 16-Dec-09 $926,510 A18320 Drainage Piping 15-Aug-09 24-Oct-09 $79,983 A23720 Domestic Water Piping 15-Aug-09 26-Oct-09 $118,695 A1710 Handrail & Balustrades 15-Aug-09 19-Sep-09 $0 A16370 Lighting Fixtures 15-Aug-09 8-Oct-09 $0 A20700 Electrical Conduits & Boxes 16-Aug-09 16-Nov-09 $246,137 A9750 Wall Covering ( Ceramic / Porcelain/ Marble ) 16-Aug-09 18-Oct-09 $31,324 A24040 Plaster Work 18-Aug-09 24-Sep-09 $90,370 A23410 Domestic Water Piping 18-Aug-09 14-Nov-09 $468,385 A18640 Electrical Conduits & Boxes 18-Aug-09 27-Dec-09 $266,559 A18740 HVAC Works 18-Aug-09 3-Dec-09 ###A7520 Floor Covering ( Ceramic / Porcelain/ Marble ) 18-Aug-09 5-Dec-09 ###A16770 Wires & Cables 18-Aug-09 3-Dec-09 ###A20380 Drainage Piping 20-Aug-09 29-Oct-09 $49,855 A23560 Domestic Water Piping 20-Aug-09 5-Nov-09 $45,644

Page 211: Progress Monitoring Sheet Empty

A23070 Electrical Cable Tray 20-Aug-09 16-Nov-09 $104,840 A23950 Doors & Windows 20-Aug-09 28-Sep-09 $118,294 A17140 Painting 1st Stage 20-Aug-09 7-Dec-09 $439,031 A18690 Piping Works 20-Aug-09 16-Dec-09 $81,601 A16500 Pumps 22-Aug-09 13-Feb-10 $0 A15790 Electrical Shop Drawings 22-Aug-09 15-Oct-09 $0 A18340 Plumbing Works 22-Aug-09 22-Nov-09 $17,674 A16100 Architecture Shop Drawings 23-Aug-09 17-Oct-09 $0 A16110 Electrical Shop Drawings 23-Aug-09 17-Oct-09 $0 A3500 Aluminum Panel cladding 23-Aug-09 16-Feb-10 ###A24050 Waterproofing 24-Aug-09 1-Oct-09 $58,548 A16820 Piping Accessories 25-Aug-09 22-Nov-09 $567,296 A3210 HVAC - Air Outlets 26-Aug-09 22-Nov-09 $208,775 A7560 Wires & Cables 26-Aug-09 22-Nov-09 ###A23960 Painting Final Stage 27-Aug-09 12-Oct-09 $25,208 A20750 Drainage Piping 27-Aug-09 5-Nov-09 $49,855 A23650 Domestic Water Piping 27-Aug-09 12-Nov-09 $45,558 A16120 Plumbing Shop Drawings 27-Aug-09 21-Oct-09 $0 A16130 HVAC Shop Drawings 27-Aug-09 21-Oct-09 $0 A17130 Floor Covering ( Ceramic / Porcelain/ Marble ) 29-Aug-09 15-Dec-09 ###A23130 Electrical Cable Tray 29-Aug-09 15-Nov-09 $135,316 A20650 Plaster Work 30-Aug-09 31-Dec-09 $296,870 A24010 Doors & Windows 30-Aug-09 7-Oct-09 $230,822 A24020 Painting Final Stage 30-Aug-09 13-Oct-09 $60,132 A24060 Painting 1st Stage 30-Aug-09 7-Oct-09 $53,852 A18040 Plaster Work 31-Aug-09 16-Dec-09 $29,304 A17860 Wall Covering ( Ceramic / Porcelain/ Marble ) 31-Aug-09 24-Dec-09 $73,472 A3710 HVAC Equipments 31-Aug-09 22-Feb-10 ###A9080 Piping Works 31-Aug-09 24-Dec-09 $73,094 A3570 Elevators & Escalators 1-Sep-09 6-Apr-10 ###A22750 Elevators & Escalators 1-Sep-09 6-Apr-10 ###A22760 Elevators & Escalators 1-Sep-09 6-Apr-10 ###A17020 Facade Plaster & Paint 1-Sep-09 1-Dec-09 $255,714 A23230 Electrical Cable Tray 1-Sep-09 2-Nov-09 $388,240 A21930 Drainage Piping 1-Sep-09 25-Oct-09 $1,401 A21950 Plumbing Works 1-Sep-09 17-Oct-09 $567 A17680 Wall Covering ( Ceramic / Porcelain/ Marble ) 1-Sep-09 10-Dec-09 $81,982 A16150 Handrail & Balustrades 1-Sep-09 11-Oct-09 $0 A19280 Waterproofing 1-Sep-09 26-Oct-09 $290,758 A7900 Painting 1st Stage 2-Sep-09 19-Dec-09 $145,722 A8800 Plaster Work 2-Sep-09 19-Dec-09 $16,764 A8920 Waterproofing 2-Sep-09 27-Oct-09 $88,452 A9770 Painting 1st Stage 2-Sep-09 27-Oct-09 $158,950 A3050 Piping Accessories 3-Sep-09 21-Oct-09 $523,093 A3530 Suspended ceiling & gypsum board partition 3-Sep-09 20-Dec-09 $217,087 A19540 Painting 1st Stage 3-Sep-09 20-Dec-09 ###A16870 HVAC - Air Outlets 5-Sep-09 5-Dec-09 $280,861 A23140 Electrical Cable Tray 6-Sep-09 5-Dec-09 $133,088 A21120 Drainage Piping 7-Sep-09 25-Nov-09 $53,769 A21070 Electrical Conduits & Boxes 7-Sep-09 7-Dec-09 $263,121 A9030 Electrical Conduits & Boxes 7-Sep-09 27-Dec-09 $167,637

Page 212: Progress Monitoring Sheet Empty

A24080 Painting Final Stage 8-Sep-09 17-Oct-09 $29,268 A8620 Wall Covering ( Ceramic / Porcelain/ Marble ) 8-Sep-09 3-Jan-10 $22,714 A8980 Plaster Work 8-Sep-09 24-Dec-09 $66,990 A21380 Block Work 8-Sep-09 16-Dec-09 $173,866 A19570 Wires & Cables 9-Sep-09 9-Dec-09 ###A20290 Wall Covering ( Ceramic / Porcelain/ Marble ) 10-Sep-09 4-Jan-10 $20,418 A7890 Floor Covering ( Ceramic / Porcelain/ Marble ) 10-Sep-09 28-Dec-09 $705,059 A17220 Piping Accessories 10-Sep-09 12-Dec-09 $286,944 A23190 Electrical Cable Tray 10-Sep-09 8-Dec-09 $141,021 A18100 Waterproofing 12-Sep-09 28-Dec-09 $15,656 A19530 Floor Covering ( Ceramic / Porcelain/ Marble ) 12-Sep-09 29-Dec-09 ###A23860 Domestic Water Piping 13-Sep-09 5-Nov-09 $39,379 A21170 HVAC Ducting 13-Sep-09 6-Jan-10 ###A17510 Painting 1st Stage 13-Sep-09 30-Dec-09 $143,978 A17000 Suspended ceiling & gypsum board partition 13-Sep-09 30-Dec-09 $580,064 A19040 Wall Covering ( Ceramic / Porcelain/ Marble ) 13-Sep-09 15-Nov-09 $14,268 A8860 Waterproofing 14-Sep-09 30-Dec-09 $8,601 A8270 Painting 1st Stage 14-Sep-09 30-Dec-09 $107,403 A23660 Fire Fighting Piping 14-Sep-09 24-Dec-09 ###A16980 Aluminum Panel cladding 15-Sep-09 16-Feb-10 ###A23200 Electrical Cable Tray 15-Sep-09 13-Dec-09 $122,154 A24070 Doors & Windows 16-Sep-09 13-Oct-09 $118,294 A7930 Wires & Cables 16-Sep-09 16-Dec-09 ###A23710 Fire Fighting Piping 16-Sep-09 17-Feb-10 $534,160 A9500 HVAC Works 17-Sep-09 26-Nov-09 $363,652 A19620 Piping Accessories 17-Sep-09 17-Dec-09 $687,982 A18220 Plaster Work 17-Sep-09 20-Jan-10 $210,210 A21140 Plumbing Works 19-Sep-09 20-Jan-10 $20,048 A16410 Doors & Windows 19-Sep-09 21-Mar-10 $0 A15800 Plumbing Shop Drawings 24-Sep-09 14-Nov-09 $0 A9800 Wires & Cables 24-Sep-09 28-Oct-09 $865,397 A23570 Fire Fighting Piping 26-Sep-09 2-Jan-10 ###A17500 Floor Covering ( Ceramic / Porcelain/ Marble ) 26-Sep-09 7-Jan-10 ###A21830 Plaster Work 26-Sep-09 5-Dec-09 $32,060 A20310 Painting 1st Stage 27-Sep-09 7-Jan-10 $102,590 A20660 Wall Covering ( Ceramic / Porcelain/ Marble ) 27-Sep-09 16-Jan-10 $62,566 A19940 Painting 1st Stage 27-Sep-09 7-Jan-10 $423,342 A9760 Floor Covering ( Ceramic / Porcelain/ Marble ) 28-Sep-09 16-Nov-09 ###A1820 Sanitary fixtures 28-Sep-09 16-Nov-09 $0 A23870 Fire Fighting Piping 29-Sep-09 5-Dec-09 $47,389 A21020 Plaster Work 29-Sep-09 26-Jan-10 $269,850 A23740 Domestic Water Piping 29-Sep-09 16-Dec-09 $152,061 A17640 HVAC - Air Outlets 29-Sep-09 24-Dec-09 $407,986 A17170 Wires & Cables 29-Sep-09 29-Dec-09 ###A17270 HVAC Air Outlets 29-Sep-09 26-Dec-09 $424,947 A8640 Painting 1st Stage 30-Sep-09 11-Jan-10 $99,857 A9060 Waterproofing 30-Sep-09 19-Nov-09 $562,359 A21440 Electrical Conduits & Boxes 30-Sep-09 30-Dec-09 $198,142 A21540 HVAC Works 30-Sep-09 3-Jan-10 ###A16470 Sanitary fixtures 30-Sep-09 6-Feb-10 $0 A19730 Painting 1st Stage 1-Oct-09 27-Dec-09 $1,330

Page 213: Progress Monitoring Sheet Empty

A7980 Piping Accessories 3-Oct-09 28-Dec-09 $202,093 A6940 Electrical works 4-Oct-09 29-Dec-09 $499,929 A23210 Electrical Cable Tray 5-Oct-09 30-Dec-09 $139,990 A19930 Floor Covering ( Ceramic / Porcelain/ Marble ) 5-Oct-09 16-Jan-10 ###A22870 Panel Boards 5-Oct-09 6-Dec-09 $125,958 A19060 Painting 1st Stage 5-Oct-09 24-Nov-09 $131,781 A8030 HVAC - Air Outlets 6-Oct-09 31-Dec-09 $350,793 A8300 Wires & Cables 6-Oct-09 31-Dec-09 ###A21750 Block Work 6-Oct-09 25-Nov-09 $82,240 A19590 Wires & Cables 7-Oct-09 16-Dec-09 $14,777 A17380 Suspended ceiling & gypsum board partition 7-Oct-09 19-Jan-10 $621,522 A8260 Floor Covering ( Ceramic / Porcelain/ Marble ) 8-Oct-09 20-Jan-10 $669,015 A16610 Lighting Fixtures 8-Oct-09 28-Mar-10 $0 A17880 Painting 1st Stage 10-Oct-09 20-Jan-10 $106,767 A19720 Floor Covering ( Ceramic / Porcelain/ Marble ) 10-Oct-09 4-Jan-10 $19,920 A18410 Plaster Work 10-Oct-09 21-Jan-10 $16,764 A22860 Panel Boards 11-Oct-09 10-Dec-09 $491,139 A17540 Wires & Cables 11-Oct-09 5-Jan-10 ###A17700 Painting 1st Stage 11-Oct-09 5-Jan-10 $2,188 A16390 Handrail & Balustrades 11-Oct-09 7-Apr-10 $0 A7660 HVAC Air Outlets 12-Oct-09 7-Jan-10 $235,625 A9900 HVAC Air Outlets 12-Oct-09 15-Nov-09 $13,443 A8140 Suspended ceiling & gypsum board partition 12-Oct-09 24-Jan-10 $746,088 A18960 Plumbing Works 13-Oct-09 26-Jan-10 $16,476 A19670 HVAC - Air Outlets 13-Oct-09 7-Jan-10 $281,567 A20340 Wires & Cables 14-Oct-09 9-Jan-10 ###A19970 Wires & Cables 14-Oct-09 9-Jan-10 ###A21490 Piping Works 14-Oct-09 4-Feb-10 $91,170 A9850 Piping Accessories 15-Oct-09 17-Nov-09 $46,105 A19640 Plumbing Accessories 15-Oct-09 24-Dec-09 $4,409 A20020 Piping Accessories 17-Oct-09 11-Jan-10 $247,120 A17590 Piping Accessories 17-Oct-09 12-Jan-10 $254,368 A23730 Fire Fighting Piping 18-Oct-09 28-Jan-10 ###A22980 Panel Boards 19-Oct-09 20-Dec-09 $18,208 A7770 Suspended ceiling & gypsum board partition 19-Oct-09 31-Jan-10 $274,165 A17690 Floor Covering ( Ceramic / Porcelain/ Marble ) 19-Oct-09 14-Jan-10 $30,720 A22080 Waterproofing 19-Oct-09 12-Dec-09 $820,542 A20680 Painting 1st Stage 20-Oct-09 31-Jan-10 $222,327 A18050 Wall Covering ( Ceramic / Porcelain/ Marble ) 21-Oct-09 24-Jan-10 $81,982 A8400 HVAC Air Outlets 21-Oct-09 16-Jan-10 $189,443 A19800 Suspended ceiling & gypsum board partition 21-Oct-09 2-Feb-10 $239,656 A18230 Wall Covering ( Ceramic / Porcelain/ Marble ) 21-Oct-09 10-Feb-10 $57,236 A18470 Waterproofing 21-Oct-09 2-Feb-10 $8,601 A18590 Plaster Work 21-Oct-09 2-Feb-10 $114,870 A19680 HVAC - Air Outlets 21-Oct-09 30-Dec-09 $10,571 A21210 Plaster Work 22-Oct-09 2-Feb-10 $16,830 A3510 As-Built Drawings & Operation & Maintenance Manual 22-Oct-09 17-Mar-10 $125,136 A19090 Wires & Cables 22-Oct-09 25-Nov-09 $544,579 A8810 Wall Covering ( Ceramic / Porcelain/ Marble ) 24-Oct-09 26-Jan-10 $46,809 A8830 Painting 1st Stage 24-Oct-09 18-Jan-10 $420 A19820 Facade Plaster & Paint 24-Oct-09 18-Jan-10 $401,229

Page 214: Progress Monitoring Sheet Empty

A17750 Suspended ceiling & gypsum board partition 24-Oct-09 4-Feb-10 ###A19050 Floor Covering ( Ceramic / Porcelain/ Marble ) 26-Oct-09 17-Dec-09 ###A22880 Panel Boards 26-Oct-09 27-Dec-09 $197,243 A8350 Piping Accessories 26-Oct-09 18-Jan-10 $186,861 A22920 Panel Boards 26-Oct-09 27-Dec-09 $390,436 A19000 Electrical works 27-Oct-09 23-Jan-10 $701,970 A21030 Wall Covering ( Ceramic / Porcelain/ Marble ) 28-Oct-09 16-Feb-10 $56,826 A3360 Doors & Windows 28-Oct-09 6-Jan-10 $100,826 A17870 Floor Covering ( Ceramic / Porcelain/ Marble ) 29-Oct-09 9-Feb-10 ###A8770 HVAC Air Outlets 29-Oct-09 24-Jan-10 $240,825 A9010 Painting 1st Stage 29-Oct-09 24-Jan-10 $94,141 A21840 Wall Covering ( Ceramic / Porcelain/ Marble ) 31-Oct-09 31-Dec-09 $18,040 A20440 HVAC - Air Outlets 1-Nov-09 26-Jan-10 $319,219 A20070 HVAC Air Outlets 1-Nov-09 26-Jan-10 $236,163 A10010 Suspended ceiling & gypsum board partition 2-Nov-09 24-Dec-09 $949,533 A23640 Fire Fighting Piping 2-Nov-09 17-Feb-10 ###A18070 Painting 1st Stage 2-Nov-09 27-Jan-10 $1,085 A17910 Wires & Cables 2-Nov-09 27-Jan-10 ###A23590 Exhaust Fans 2-Nov-09 11-Jan-10 $7,174 A9450 Plumbing Works 2-Nov-09 21-Dec-09 $44,007 A21270 Waterproofing 3-Nov-09 14-Feb-10 $9,888 A17560 Wires & Cables 3-Nov-09 12-Jan-10 $22,023 A8670 Wires & Cables 4-Nov-09 5-Jan-10 ###A19650 Sanitary Fixtures & Toilet and Bath accessories 4-Nov-09 28-Dec-09 $82,103 A20710 Wires & Cables 7-Nov-09 1-Feb-10 ###A8630 Floor Covering ( Ceramic / Porcelain/ Marble ) 7-Nov-09 18-Feb-10 $650,016 A16950 Doors & Windows 8-Nov-09 17-Jan-10 $75,567 A18250 Painting 1st Stage 8-Nov-09 20-Feb-10 $154,409 A22820 Waterproofing 8-Nov-09 31-Dec-09 ###A2880 MCC (Motor Control Center) 9-Nov-09 6-Apr-10 $553,356 A20300 Floor Covering ( Ceramic / Porcelain/ Marble ) 9-Nov-09 20-Feb-10 $557,232 A20180 Suspended ceiling & gypsum board partition 9-Nov-09 20-Feb-10 $286,192 A22930 Panel Boards 9-Nov-09 10-Jan-10 $86,456 A17610 Plumbing Accessories 9-Nov-09 18-Jan-10 $57,491 A19190 HVAC Air Outlets 9-Nov-09 16-Dec-09 $16,481 A16970 FACADE LIGHTING INSTALLATIONS 10-Nov-09 16-Feb-10 $215,049 A22890 Panel Boards 10-Nov-09 11-Jan-10 $55,086 A21760 Plumbing Works 10-Nov-09 4-Feb-10 $38,481 A3440 FACADE LIGHTING INSTALLATIONS 10-Nov-09 16-Feb-10 $221,763 A21390 Plaster Work 10-Nov-09 22-Feb-10 $57,400 A3380 ATS (Automatic transformer switch) 11-Nov-09 10-Apr-10 $68,123 A3400 CCTV System 11-Nov-09 10-Apr-10 $866,178 A3390 Public Address System 11-Nov-09 10-Apr-10 $715,254 A3420 Telephone System 11-Nov-09 10-Apr-10 $150,773 A3410 MATV System 11-Nov-09 10-Apr-10 $236,460 A3670 FIRE ALARM SYSTEM 11-Nov-09 10-Apr-10 ###A3370 Glazing 11-Nov-09 4-Jan-10 $291,622 A19140 Piping Accessories 12-Nov-09 19-Dec-09 $55,391 A8690 Wires & Cables 12-Nov-09 21-Jan-10 $5,652 A8720 Piping Accessories 12-Nov-09 4-Feb-10 $198,161 A8510 Suspended ceiling & gypsum board partition 12-Nov-09 24-Feb-10 $741,121

Page 215: Progress Monitoring Sheet Empty

A22900 Panel Boards 12-Nov-09 31-Jan-10 $92,376 A18010 HVAC Air Outlets 14-Nov-09 8-Feb-10 $240,588 A21810 Roofing System 14-Nov-09 23-Jan-10 $935,277 A19810 Suspended ceiling 14-Nov-09 8-Feb-10 $12,844 A18420 Wall Covering ( Ceramic / Porcelain/ Marble ) 14-Nov-09 17-Feb-10 $46,809 A18620 Painting 1st Stage 14-Nov-09 9-Feb-10 $176,338 A21050 Painting 1st Stage 15-Nov-09 25-Feb-10 $223,735 A17650 HVAC Air Outlets 15-Nov-09 24-Jan-10 $59,837 A3280 HVAC A/c Units 15-Nov-09 24-Jan-10 $119,241 A23330 Exhaust Fans 15-Nov-09 24-Jan-10 $101,405 A2810 Metal Works 15-Nov-09 16-Jan-10 $82,772 A2830 Painting Final Stage 15-Nov-09 24-Jan-10 $426,958 A2900 Electrical Wiring Devices & Lighting Fixtures 15-Nov-09 24-Jan-10 $548,495 A19110 Wires & Cables 15-Nov-09 23-Dec-09 $26,607 A17960 Piping Accessories 16-Nov-09 10-Feb-10 $246,468 A9040 Wires & Cables 16-Nov-09 25-Jan-10 $322,331 A23750 Fire Fighting Piping 17-Nov-09 18-Mar-10 ###A21860 Painting 1st Stage 17-Nov-09 10-Jan-10 $204,057 A23000 Panel Boards 18-Nov-09 18-Jan-10 $42,312 A20810 HVAC Air Outlets 18-Nov-09 13-Feb-10 $214,849 A22990 Panel Boards 18-Nov-09 18-Jan-10 $40,490 A8880 Suspended ceiling & gypsum board partition 18-Nov-09 2-Mar-10 $782,634 A20670 Floor Covering ( Ceramic / Porcelain/ Marble ) 21-Nov-09 3-Mar-10 ###A18120 Suspended ceiling & gypsum board partition 22-Nov-09 4-Mar-10 ###A18060 Floor Covering ( Ceramic / Porcelain/ Marble ) 22-Nov-09 16-Feb-10 $30,720 A17760 Suspended ceiling 22-Nov-09 16-Feb-10 $21,125 A9000 Floor Covering ( Ceramic / Porcelain/ Marble ) 22-Nov-09 16-Feb-10 $4,379 A16800 Glazing 22-Nov-09 14-Jan-10 ###A19160 Plumbing Accessories 24-Nov-09 30-Dec-09 $597 A8780 HVAC Air Outlets 24-Nov-09 2-Feb-10 $23,152 A16890 HVAC A/C Units 25-Nov-09 3-Feb-10 $96,260 A23340 Exhaust Fans 25-Nov-09 3-Feb-10 $128,133 A17030 Metal Works 25-Nov-09 26-Jan-10 $69,734 A16750 Painting Final Stage 25-Nov-09 3-Feb-10 $405,680 A18240 Floor Covering ( Ceramic / Porcelain/ Marble ) 25-Nov-09 9-Mar-10 ###A20390 Piping Accessories 26-Nov-09 21-Feb-10 $253,858 A19780 Aluminum Panel cladding 26-Nov-09 4-Mar-10 ###A9140 HVAC Air Outlets 1-Dec-09 6-Feb-10 $296,089 A22830 Waterproofing 1-Dec-09 20-Jan-10 $437,859 A22940 Panel Boards 3-Dec-09 30-Jan-10 $90,248 A19300 Suspended ceiling & gypsum board partition 3-Dec-09 21-Jan-10 ###A8820 Floor Covering ( Ceramic / Porcelain/ Marble ) 3-Dec-09 24-Feb-10 $31,040 A17930 Wires & Cables 5-Dec-09 9-Feb-10 $22,023 A22510 Glazing 5-Dec-09 23-Jan-10 $157,080 A18440 Painting 1st Stage 5-Dec-09 27-Feb-10 $420 A17990 Sanitary Fixtures & Toilet and Bath accessories 5-Dec-09 24-Jan-10 $110,671 A21040 Floor Covering ( Ceramic / Porcelain/ Marble ) 6-Dec-09 15-Mar-10 ###A20550 Suspended ceiling & gypsum board partition 6-Dec-09 15-Mar-10 $746,243 A21770 HVAC Works 7-Dec-09 25-Feb-10 $499,856 A9980 Doors & Windows 7-Dec-09 11-Jan-10 $934,189 A21220 Wall Covering ( Ceramic / Porcelain/ Marble ) 8-Dec-09 9-Mar-10 $47,435

Page 216: Progress Monitoring Sheet Empty

A21890 Wires & Cables 8-Dec-09 11-Jan-10 $606,171 A16780 Electrical Wiring Devices & Lighting Fixtures 9-Dec-09 14-Feb-10 $738,181 A18020 HVAC - Air Outlets 10-Dec-09 15-Feb-10 $55,665 A22950 Panel Boards 10-Dec-09 7-Feb-10 $54,025 A18330 Piping Accessories 10-Dec-09 4-Mar-10 $233,089 A18380 HVAC Air Outlets 10-Dec-09 4-Mar-10 $292,791 A18280 Wires & Cables 10-Dec-09 4-Mar-10 ###A21850 Floor Covering ( Ceramic / Porcelain/ Marble ) 12-Dec-09 30-Jan-10 ###A21240 Painting 1st Stage 12-Dec-09 4-Mar-10 $420 A2850 Signage 12-Dec-09 16-Jan-10 $148,044 A7740 Doors & Windows 13-Dec-09 17-Feb-10 $843,113 A17980 Plumbing Accessories 13-Dec-09 17-Feb-10 $45,107 A9090 Piping Accessories 13-Dec-09 17-Feb-10 $29,017 A3640 Plumbing Pumbs 13-Dec-09 17-Apr-10 ###A19750 Doors & Windows 14-Dec-09 20-Feb-10 $946,016 A23010 Panel Boards 15-Dec-09 10-Feb-10 $20,332 A20760 Piping Accessories 15-Dec-09 8-Mar-10 $260,818 A22560 Glazing 15-Dec-09 3-Feb-10 $319,872 A8890 Suspended ceiling 15-Dec-09 8-Mar-10 $11,830 A17350 Doors & Windows 16-Dec-09 21-Feb-10 ###A18490 Suspended ceiling & gypsum board partition 16-Dec-09 27-Mar-10 ###A18650 Wires & Cables 16-Dec-09 21-Feb-10 $580,254 A18750 HVAC Air Outlets 16-Dec-09 21-Feb-10 $786,871 A17940 Electrical Wiring Devices & Lighting Fixtures 16-Dec-09 4-Feb-10 $536,123 A21160 Sanitary Fixtures & Toilet and Bath accessories 16-Dec-09 4-Feb-10 $45,818 A20920 Suspended ceiling & gypsum board partition 17-Dec-09 27-Mar-10 $999,083 A18130 Suspended ceiling 19-Dec-09 11-Mar-10 $21,125 A9250 Suspended ceiling & gypsum board partition 19-Dec-09 11-Mar-10 $230,895 A22660 Wood Cladding 20-Dec-09 7-Feb-10 $54,675 A22520 Glazing 20-Dec-09 7-Feb-10 $174,216 A19580 Electrical Wiring Devices & Lighting Fixtures 20-Dec-09 25-Feb-10 $456,502 A8740 Plumbing Accessories 21-Dec-09 25-Feb-10 $1,039 A19690 HVAC A/C Units 21-Dec-09 27-Feb-10 $255,737 A23350 Exhaust Fans 21-Dec-09 27-Feb-10 $101,405 A17040 Signage 22-Dec-09 26-Jan-10 $148,044 A17150 Painting Final Stage 22-Dec-09 27-Feb-10 $303,015 A17290 HVAC A/C Units 22-Dec-09 27-Feb-10 $77,738 A23440 Exhaust Fans 22-Dec-09 27-Feb-10 $134,640 A17400 Metal Works 22-Dec-09 18-Feb-10 ###A18430 Floor Covering ( Ceramic / Porcelain/ Marble ) 22-Dec-09 16-Mar-10 $31,040 A21290 Suspended ceiling & gypsum board partition 23-Dec-09 1-Apr-10 ###A21130 Piping Accessories 23-Dec-09 16-Mar-10 $228,834 A21180 HVAC Air Outlets 23-Dec-09 16-Mar-10 $228,783 A21080 Wires & Cables 23-Dec-09 18-Feb-10 ###A22910 Panel Boards 24-Dec-09 3-Feb-10 $148,539 A19770 FACADE LIGHTING INSTALLATIONS 24-Dec-09 4-Mar-10 $370,878 A10030 Metal Works 24-Dec-09 27-Jan-10 $426,751 A9780 Painting Final Stage 24-Dec-09 28-Jan-10 $148,173 A9810 Electrical Wiring Devices & Lighting Fixtures 24-Dec-09 23-Jan-10 $105,117 A9920 HVAC A/C Units 24-Dec-09 23-Jan-10 $28,212 A23880 Exhaust Fans 24-Dec-09 23-Jan-10 $3,591

Page 217: Progress Monitoring Sheet Empty

A21990 HVAC Air Outlets 26-Dec-09 28-Jan-10 $13,505 A18860 Suspended ceiling & gypsum board partition 27-Dec-09 21-Mar-10 $970,515 A21940 Piping Accessories 29-Dec-09 31-Jan-10 $46,530 A21230 Floor Covering ( Ceramic / Porcelain/ Marble ) 29-Dec-09 22-Mar-10 $44,010 A19860 Glazing 29-Dec-09 16-Feb-10 ###A17180 Electrical Wiring Devices & Lighting Fixtures 29-Dec-09 6-Mar-10 $384,655 A8110 Doors & Windows 30-Dec-09 7-Mar-10 $154,600 A7540 Painting Final Stage 30-Dec-09 7-Mar-10 $288,213 A7680 HVAC A/C Units 30-Dec-09 7-Mar-10 $77,568 A23430 Exhaust Fans 30-Dec-09 7-Mar-10 $89,760 A7790 Metal Works 30-Dec-09 27-Feb-10 $416,483 A22690 Wood Cladding 30-Dec-09 18-Feb-10 $91,988 A22570 Glazing 30-Dec-09 18-Feb-10 ###A3760 Generator sets 30-Dec-09 10-Apr-10 ###A21420 Painting 1st Stage 30-Dec-09 24-Mar-10 $91,023 A18700 Piping Accessories 31-Dec-09 3-Mar-10 $11,021 A19830 Metal Works 31-Dec-09 28-Feb-10 ###A19550 Painting Final Stage 31-Dec-09 9-Mar-10 $453,220 A7940 Electrical Wiring Devices & Lighting Fixtures 2-Jan-10 9-Mar-10 $31,641 A20150 Doors & Windows 2-Jan-10 9-Mar-10 $887,137 A3460 LANDSCAPING 2-Jan-10 9-Mar-10 ###A18350 Plumbing Accessories 3-Jan-10 10-Mar-10 $19,650 A18390 HVAC Air Outlets 3-Jan-10 10-Mar-10 $28,848 A18300 Wires & Cables 3-Jan-10 10-Mar-10 $5,652 A3470 Irrigation system 3-Jan-10 11-Mar-10 $963,175 A19270 Doors & Windows 4-Jan-10 8-Feb-10 ###A8850 Doors & Windows 5-Jan-10 13-Mar-10 $154,862 A8480 Doors & Windows 5-Jan-10 13-Mar-10 $150,136 A8790 HVAC A/C Units 5-Jan-10 14-Mar-10 $145,513 A23760 Exhaust Fans 5-Jan-10 14-Mar-10 $136,420 A19790 Doors & Windows 6-Jan-10 25-Feb-10 $81,453 A20090 HVAC A/C Units 7-Jan-10 15-Mar-10 $76,104 A23450 Exhaust Fans 7-Jan-10 15-Mar-10 $89,760 A19980 Electrical Wiring Devices & Lighting Fixtures 7-Jan-10 15-Mar-10 $438,864 A22670 Wood Cladding 9-Jan-10 27-Feb-10 $42,861 A22530 Glazing 9-Jan-10 27-Feb-10 $171,360 A17720 Doors & Windows 9-Jan-10 16-Mar-10 $167,950 A18500 Suspended ceiling 9-Jan-10 3-Apr-10 $11,830 A21100 Wires & Cables 10-Jan-10 23-Feb-10 $7,536 A8160 Metal Works 11-Jan-10 10-Mar-10 $323,186 A7910 Painting Final Stage 11-Jan-10 18-Mar-10 $118,390 A8050 HVAC A/C Units 11-Jan-10 18-Mar-10 $91,038 A8280 Painting Final Stage 11-Jan-10 18-Mar-10 $96,018 A8420 HVAC A/C Units 11-Jan-10 18-Mar-10 $21,968 A23670 Exhaust Fans 11-Jan-10 18-Mar-10 $136,420 A8530 Metal Works 11-Jan-10 10-Mar-10 $643,694 A8310 Electrical Wiring Devices & Lighting Fixtures 11-Jan-10 18-Mar-10 $38,444 A8650 Painting Final Stage 11-Jan-10 20-Mar-10 $80,910 A8900 Metal Works 11-Jan-10 10-Mar-10 $651,980 A21450 Wires & Cables 11-Jan-10 20-Mar-10 $370,568 A3450 STREET LIGHTING 12-Jan-10 25-Mar-10 ###

Page 218: Progress Monitoring Sheet Empty

A22960 Panel Boards 12-Jan-10 11-Mar-10 $94,428 A19600 Electrical Wiring Devices & Lighting Fixtures 12-Jan-10 3-Mar-10 $207,412 A19740 Painting Final Stage 12-Jan-10 3-Mar-10 $1,330 A3560 Garbage chute 13-Jan-10 6-Apr-10 $544,532 A23360 Exhaust Fans 13-Jan-10 4-Mar-10 $96,407 A7570 Electrical Wiring Devices & Lighting Fixtures 14-Jan-10 22-Mar-10 $422,554 A17550 Electrical Wiring Devices & Lighting Fixtures 14-Jan-10 22-Mar-10 $385,113 A17770 Metal Works 14-Jan-10 14-Mar-10 ###A17520 Painting Final Stage 14-Jan-10 22-Mar-10 $127,550 A17660 HVAC A/C Units 14-Jan-10 22-Mar-10 $202,678 A18090 Doors & Windows 14-Jan-10 22-Mar-10 $783,044 A9220 Doors & Windows 14-Jan-10 6-Mar-10 $55,853 A22100 Suspended ceiling & gypsum board partition 16-Jan-10 6-Mar-10 $922,086 A21300 Suspended ceiling 16-Jan-10 8-Apr-10 $13,013 A21150 Plumbing Accessories 16-Jan-10 23-Mar-10 $7,677 A21190 HVAC Air Outlets 16-Jan-10 23-Mar-10 $27,256 A22610 Glazing 16-Jan-10 7-Mar-10 $157,080 A18460 Doors & Windows 17-Jan-10 24-Mar-10 $251,446 A22700 Wood Cladding 17-Jan-10 8-Mar-10 $70,876 A22580 Glazing 17-Jan-10 8-Mar-10 $342,720 A19950 Painting Final Stage 19-Jan-10 27-Mar-10 $265,592 A20200 Metal Works 19-Jan-10 18-Mar-10 $790,546 A20350 Electrical Wiring Devices & Lighting Fixtures 19-Jan-10 27-Mar-10 $42,188 A20460 HVAC A/C Units 19-Jan-10 27-Mar-10 $110,986 A8680 Electrical Wiring Devices & Lighting Fixtures 19-Jan-10 27-Mar-10 $33,442 A22540 Glazing 20-Jan-10 10-Mar-10 $185,640 A22680 Wood Cladding 20-Jan-10 10-Mar-10 $732,681 A22970 Panel Boards 20-Jan-10 3-Mar-10 $233,303 A21500 Piping Accessories 20-Jan-10 28-Mar-10 $11,217 A17890 Painting Final Stage 20-Jan-10 29-Mar-10 $90,108 A18030 HVAC A/C Units 20-Jan-10 29-Mar-10 $104,159 A23680 Exhaust Fans 20-Jan-10 29-Mar-10 $181,894 A18140 Metal Works 20-Jan-10 20-Mar-10 ###A17920 Electrical Wiring Devices & Lighting Fixtures 20-Jan-10 29-Mar-10 $385,419 A21970 Sanitary Fixtures & Toilet and Bath accessories 21-Jan-10 13-Feb-10 $5,790 A22720 Wood Cladding 21-Jan-10 13-Mar-10 $116,458 A22620 Glazing 21-Jan-10 13-Mar-10 $174,216 A19320 Metal Works 21-Jan-10 24-Feb-10 $383,750 A19070 Painting Final Stage 21-Jan-10 25-Feb-10 $129,465 A19100 Electrical Wiring Devices & Lighting Fixtures 21-Jan-10 20-Feb-10 ###A19210 HVAC A/C Units 21-Jan-10 20-Feb-10 $33,122 A23890 Exhaust Fans 21-Jan-10 20-Feb-10 $3,591 A22360 Signage 23-Jan-10 27-Feb-10 $184,718 A20520 Doors & Windows 24-Jan-10 31-Mar-10 $167,489 A22550 Glazing 24-Jan-10 15-Mar-10 $290,852 A22600 Glazing 24-Jan-10 15-Mar-10 ###A22650 Glazing 24-Jan-10 15-Mar-10 $191,083 A19850 Signage 24-Jan-10 28-Feb-10 $147,367 A19840 Toilet and Bath Accessories 24-Jan-10 7-Mar-10 $11,342 A21260 Doors & Windows 25-Jan-10 1-Apr-10 $218,365 A20890 Doors & Windows 25-Jan-10 1-Apr-10 $256,462

Page 219: Progress Monitoring Sheet Empty

A22400 Signage 26-Jan-10 2-Mar-10 $175,423 A23020 Panel Boards 27-Jan-10 4-Mar-10 $51,451 A8870 Doors & Windows 28-Jan-10 18-Mar-10 $43,488 A8840 Painting Final Stage 28-Jan-10 20-Mar-10 $420 A21550 HVAC Air Outlets 28-Jan-10 6-Apr-10 $305,424 A21660 Suspended ceiling & gypsum board partition 28-Jan-10 22-Apr-10 $110,565 A18830 Doors & Windows 31-Jan-10 22-Mar-10 $72,222 A20570 Metal Works 31-Jan-10 30-Mar-10 $427,061 A20320 Painting Final Stage 31-Jan-10 7-Apr-10 $77,323 A21200 HVAC A/C Units 31-Jan-10 7-Apr-10 $77,362 A23780 Exhaust Fans 31-Jan-10 7-Apr-10 $136,420 A20830 HVAC A/C Units 31-Jan-10 7-Apr-10 $40,020 A23690 Exhaust Fans 31-Jan-10 7-Apr-10 $136,420 A20720 Electrical Wiring Devices & Lighting Fixtures 31-Jan-10 7-Apr-10 $61,259 A9270 Metal Works 31-Jan-10 22-Mar-10 $263,772 A17780 Toilet and Bath accessories 1-Feb-10 14-Mar-10 $28,095 A17710 Painting Final Stage 1-Feb-10 23-Mar-10 $2,188 A17740 Doors & Windows 1-Feb-10 23-Mar-10 $99,837 A17620 Sanitary Fixtures & Toilet and Bath accessories 1-Feb-10 23-Mar-10 $113,313 A9160 HVAC A/C Units 1-Feb-10 23-Mar-10 ###A23790 Exhaust Fans 1-Feb-10 23-Mar-10 $392,088 A9020 Painting Final Stage 1-Feb-10 23-Mar-10 $34,315 A22590 Glazing 2-Feb-10 24-Mar-10 $374,136 A22710 Wood Cladding 2-Feb-10 24-Mar-10 $531,475 A19120 Electrical Wiring Devices & Lighting Fixtures 2-Feb-10 25-Feb-10 $16,620 A22730 Wood Cladding 2-Feb-10 24-Mar-10 $61,743 A22630 Glazing 2-Feb-10 24-Mar-10 $171,360 A22370 Signage 3-Feb-10 10-Mar-10 $25,688 A22440 Signage 3-Feb-10 10-Mar-10 $141,791 A22380 Signage 3-Feb-10 10-Mar-10 $22,477 A18260 Painting Final Stage 3-Feb-10 11-Apr-10 $139,490 A18400 HVAC A/C Units 3-Feb-10 11-Apr-10 $106,158 A23770 Exhaust Fans 3-Feb-10 11-Apr-10 $181,894 A18510 Metal Works 3-Feb-10 3-Apr-10 ###A22390 Signage 3-Feb-10 10-Mar-10 $16,055 A9050 Electrical Wiring Devices & Lighting Fixtures 3-Feb-10 25-Mar-10 $51,982 A8700 Electrical Wiring Devices & Lighting Fixtures 6-Feb-10 28-Mar-10 $557,533 A17570 Electrical Wiring Devices & Lighting Fixtures 7-Feb-10 29-Mar-10 $646,950 A22410 Signage 7-Feb-10 14-Mar-10 $39,040 A18110 Doors & Windows 7-Feb-10 29-Mar-10 $18,384 A8910 Toilet and Bath accessories 7-Feb-10 21-Mar-10 $12,911 A22640 Glazing 8-Feb-10 30-Mar-10 $185,640 A22740 Wood Cladding 8-Feb-10 30-Mar-10 $463,178 A18480 Doors & Windows 9-Feb-10 31-Mar-10 $52,342 A18290 Electrical Wiring Devices & Lighting Fixtures 9-Feb-10 17-Apr-10 $33,442 A21800 Electrical works 9-Feb-10 8-Apr-10 $622,068 A23030 Panel Boards 9-Feb-10 23-Mar-10 $33,326 A21060 Painting Final Stage 11-Feb-10 19-Apr-10 $166,768 A21310 Metal Works 11-Feb-10 11-Apr-10 $438,132 A20690 Painting Final Stage 11-Feb-10 19-Apr-10 $157,970 A20940 Metal Works 11-Feb-10 11-Apr-10 $428,630

Page 220: Progress Monitoring Sheet Empty

A18080 Painting Final Stage 11-Feb-10 3-Apr-10 $1,085 A22450 Signage 13-Feb-10 20-Mar-10 $42,588 A22420 Signage 13-Feb-10 20-Mar-10 $39,040 A3610 Electrical Works Close Out 15-Feb-10 20-May-10 $170,200 A3630 Plumbing Close Out 15-Feb-10 20-May-10 $425,000 A3550 Cleaning equipment 16-Feb-10 6-Apr-10 ###A22070 Doors & Windows 16-Feb-10 23-Mar-10 $876,427 A18450 Painting Final Stage 17-Feb-10 8-Apr-10 $420 A18660 Electrical Wiring Devices & Lighting Fixtures 17-Feb-10 8-Apr-10 $52,165 A18880 Metal Works 17-Feb-10 8-Apr-10 $719,448 A18770 HVAC A/C Units 17-Feb-10 8-Apr-10 ###A23800 Exhaust Fans 17-Feb-10 8-Apr-10 ###A18630 Painting Final Stage 17-Feb-10 8-Apr-10 $56,740 A21280 Doors & Windows 17-Feb-10 8-Apr-10 $56,011 A22330 Toilet and Bath accessories 20-Feb-10 3-Apr-10 $28,095 A21110 Electrical Wiring Devices & Lighting Fixtures 21-Feb-10 12-Apr-10 ###A18360 Sanitary Fixtures & Toilet and Bath accessories 22-Feb-10 13-Apr-10 $109,496 A3600 Doors & Windows Close Out 25-Feb-10 20-May-10 $0 A22470 Signage 25-Feb-10 1-Apr-10 $48,165 A22460 Signage 25-Feb-10 1-Apr-10 $197,731 A22430 Signage 27-Feb-10 3-Apr-10 $0 A21250 Painting Final Stage 27-Feb-10 18-Apr-10 $420 A21630 Doors & Windows 27-Feb-10 18-Apr-10 $56,405 A22340 Toilet and Bath accessories 1-Mar-10 12-Apr-10 $17,111 A21090 Electrical Wiring Devices & Lighting Fixtures 1-Mar-10 10-Apr-10 $44,590 A22320 Facade Works Close Out 4-Mar-10 2-May-10 $0 A18310 Electrical Wiring Devices & Lighting Fixtures 4-Mar-10 24-Apr-10 $903,128 A21460 Electrical Wiring Devices & Lighting Fixtures 4-Mar-10 24-Apr-10 $96,456 A21570 HVAC A/C Units 4-Mar-10 24-Apr-10 ###A23810 Exhaust Fans 4-Mar-10 24-Apr-10 $398,702 A22120 Metal Works 6-Mar-10 8-Apr-10 $36,900 A21870 Painting Final Stage 6-Mar-10 10-Apr-10 $190,225 A21900 Electrical Wiring Devices & Lighting Fixtures 6-Mar-10 4-Apr-10 $120,653 A22010 HVAC A/C Units 6-Mar-10 4-Apr-10 $56,680 A23900 Exhaust Fans 6-Mar-10 4-Apr-10 $26,031 A22350 Toilet and Bath Accessories 7-Mar-10 18-Apr-10 $11,081 A22500 Signage 7-Mar-10 11-Apr-10 $113,230 A22490 Signage 7-Mar-10 11-Apr-10 $43,197 A22480 Signage 7-Mar-10 11-Apr-10 $63,882 A21680 Metal Works 16-Mar-10 5-May-10 $193,662 A21430 Painting Final Stage 16-Mar-10 5-May-10 $34,278 A3690 External Works Close Out 25-Mar-10 29-Apr-10 $0 A3580 Painting Touch Up & Close Out 30-Mar-10 19-May-10 $0 A22840 Elevators & Escalators 31-Mar-10 19-May-10 ###A3590 Metal Works Close Out 12-Apr-10 19-May-10 $0

Page 221: Progress Monitoring Sheet Empty

1Project 3Package 4Type Of Work 5zone 6Floor 7Area Of Work 8Division Of WorkOSR6B PCK MAA GEN AF ALL AWOSR6B PCK MAS GEN AF ALL AWOSR6B PCK CON GEN GR ALL GNOSR6B PCK CON GEN GR ALL GNOSR6B PCK CON GEN GR ALL GNOSR6B PCK SDS GEN BF ALL AWOSR6B PCK MAS GEN AF ALL EWOSR6B PCK CON GEN GR ALL GNOSR6B PCK CON GEN GR ALL GNOSR6B PCK CON GEN GR ALL GNOSR6B PCK CON GEN GR ALL GNOSR6B PCK CON GEN GR ALL GNOSR6B PCK CON GEN GR ALL GNOSR6B PCK CON GEN GR ALL GNOSR6B PCK CON GEN GR ALL GNOSR6B PCK CON GEN GR ALL GNOSR6B PCK MAP GEN AF ALL AWOSR6B PCK SDA GEN BF ALL AWOSR6B PCK MAA GEN AF ALL EWOSR6B PCK MAS GEN AF ALL HWOSR6B PCK MAS GEN AF ALL PWOSR6B PCK SDS GEN BF ALL EWOSR6B PCK CON Z1 BF ALL AWOSR6B PCK MAA GEN AF ALL HWOSR6B PCK CON Z2 BF ALL AWOSR6B PCK MAA GEN AF ALL PWOSR6B PCK MAP GEN AF ALL EWOSR6B PCK SDA GEN GF ALL AWOSR6B PCK CON Z1 GF ALL AWOSR6B PCK MAA GEN AF ALL AWOSR6B PCK MAA GEN AF ALL AWOSR6B PCK SDA GEN BF ALL EWOSR6B PCK CON Z1 BF ALL EWOSR6B PCK CON Z3 BF ALL AWOSR6B PCK SDA GEN FF ALL AWOSR6B PCK SDS GEN BF ALL PWOSR6B PCK SDS GEN BF ALL HWOSR6B PCK SDS GEN GF ALL AWOSR6B PCK CON Z2 GF ALL AWOSR6B PCK MAS GEN AF ALL AWOSR6B PCK MAS GEN AF ALL AWOSR6B PCK MAP GEN AF ALL HWOSR6B PCK MAA GEN AF ALL HWOSR6B PCK MAS GEN AF ALL EWOSR6B PCK SDA GEN SF ALL AWOSR6B PCK SDA GEN GF ALL EWOSR6B PCK SDS GEN FF ALL AWOSR6B PCK SDS GEN FF ALL EWOSR6B PCK SDS GEN GF ALL EWOSR6B PCK SDS GEN GF ALL PW

Page 222: Progress Monitoring Sheet Empty

OSR6B PCK SDS GEN GF ALL HWOSR6B PCK CON Z1 GF ALL EWOSR6B PCK MAP GEN AF ALL PWOSR6B PCK SDA GEN BF ALL HWOSR6B PCK CON Z1 BF ALL PWOSR6B PCK CON Z1 BF ALL HWOSR6B PCK CON Z2 BF ALL EWOSR6B PCK SDA GEN FF ALL EWOSR6B PCK SDA GEN BF ALL PWOSR6B PCK CON Z1 FF ALL AWOSR6B PCK CON Z1 BF ALL PWOSR6B PCK CON Z1 BF DRY AWOSR6B PCK SDA GEN GF ALL PWOSR6B PCK MAA GEN AF ALL EWOSR6B PCK SDA GEN GF ALL HWOSR6B PCK CON Z1 GF ALL PWOSR6B PCK SDA GEN SF ALL EWOSR6B PCK CON Z1 GF ALL HWOSR6B PCK SDS GEN FF ALL PWOSR6B PCK SDS GEN FF ALL HWOSR6B PCK SDS GEN SF ALL AWOSR6B PCK SDS GEN SF ALL EWOSR6B PCK SDS GEN SF ALL PWOSR6B PCK SDS GEN SF ALL HWOSR6B PCK SDA GEN TF ALL AWOSR6B PCK CON Z3 GF ALL AWOSR6B PCK CON Z2 BF DRY AWOSR6B PCK SDA GEN SF ALL HWOSR6B PCK SDS GEN CS ALL AWOSR6B PCK CON Z3 BF ALL EWOSR6B PCK SDA GEN SF ALL PWOSR6B PCK MAP GEN AF ALL AWOSR6B PCK MAP GEN AF ALL AWOSR6B PCK CON Z1 BF ALL PWOSR6B PCK CON Z2 FF ALL AWOSR6B PCK CON Z1 FF ALL EWOSR6B PCK CON Z1 GF DRY AWOSR6B PCK CON Z2 GF ALL HWOSR6B PCK MAP GEN AF ALL AWOSR6B PCK CON Z2 BF ALL PWOSR6B PCK CON Z2 BF ALL PWOSR6B PCK CON Z2 BF ALL PWOSR6B PCK CON Z2 BF ALL HWOSR6B PCK SDA GEN FF ALL HWOSR6B PCK CON Z1 BF ALL EWOSR6B PCK CON Z1 BF DRY AWOSR6B PCK MAA GEN AF ALL AWOSR6B PCK MAS GEN AF ALL EWOSR6B PCK MAS GEN AF ALL EWOSR6B PCK SDS GEN TF ALL AWOSR6B PCK SDS GEN TF ALL EW

Page 223: Progress Monitoring Sheet Empty

OSR6B PCK SDS GEN TF ALL PWOSR6B PCK SDS GEN TF ALL HWOSR6B PCK CON Z1 GF ALL PWOSR6B PCK MAS GEN AF ALL AWOSR6B PCK CON Z2 BF ALL EWOSR6B PCK MAP GEN AF ALL HWOSR6B PCK CON Z1 SF ALL AWOSR6B PCK CON Z1 GF ALL PWOSR6B PCK CON Z2 GF DRY AWOSR6B PCK SDA GEN FF ALL PWOSR6B PCK CON Z3 BF ALL HWOSR6B PCK SDA GEN TF ALL EWOSR6B PCK SDA GEN TF ALL PWOSR6B PCK CON Z2 BF DRY AWOSR6B PCK SDA GEN CS ALL AWOSR6B PCK SDA GEN CS ALL EWOSR6B PCK SDS GEN CS ALL EWOSR6B PCK CON Z3 BF ALL PWOSR6B PCK CON Z2 GF ALL EWOSR6B PCK MAS GEN AF ALL PWOSR6B PCK MAP GEN AF ALL EWOSR6B PCK MAS GEN AF ALL AWOSR6B PCK SDA GEN TF ALL HWOSR6B PCK CON Z1 AA ALL AWOSR6B PCK CON Z2 GF ALL PWOSR6B PCK CON Z2 GF ALL PWOSR6B PCK CON Z1 FF ALL PWOSR6B PCK MAA GEN AF ALL EWOSR6B PCK MAA GEN AF ALL EWOSR6B PCK CON Z3 BF DRY AWOSR6B PCK CON Z3 BF WET PWOSR6B PCK MAS GEN AF ALL EWOSR6B PCK CON Z1 FF ALL HWOSR6B PCK CON Z1 BF DRY AWOSR6B PCK CON Z3 BF ALL PWOSR6B PCK MAA GEN AF ALL PWOSR6B PCK CON Z2 SF ALL AWOSR6B PCK CON Z3 GF ALL HWOSR6B PCK CON Z1 SF ALL EWOSR6B PCK CON Z1 FF DRY AWOSR6B PCK MAS GEN AF ALL HWOSR6B PCK CON Z1 GF DRY AWOSR6B PCK MAA GEN AF ALL AWOSR6B PCK CON Z1 FF ALL PWOSR6B PCK CON Z2 BF DRY AWOSR6B PCK CON Z1 FF ALL EWOSR6B PCK CON Z1 AA ALL PWOSR6B PCK CON Z1 AA ALL HWOSR6B PCK CON Z3 FF ALL AWOSR6B PCK MAP GEN AF ALL AWOSR6B PCK CON Z1 SF ALL HW

Page 224: Progress Monitoring Sheet Empty

OSR6B PCK MAA GEN AF ALL HWOSR6B PCK CON Z2 FF ALL HWOSR6B PCK CON Z2 GF DRY AWOSR6B PCK CON Z1 SF ALL PWOSR6B PCK CON Z3 BF ALL EWOSR6B PCK MAS GEN AF ALL AWOSR6B PCK CON Z2 FF ALL EWOSR6B PCK CON Z2 FF ALL PWOSR6B PCK CON Z2 FF ALL PWOSR6B PCK CON Z3 GF ALL EWOSR6B PCK MAA GEN AF ALL EWOSR6B PCK CON Z3 BF ALL PWOSR6B PCK CON Z1 FF ALL PWOSR6B PCK CON Z1 TF ALL AWOSR6B PCK SDS GEN FC ALL AWOSR6B PCK CON Z2 FF DRY AWOSR6B PCK SDS GEN LR ALL AWOSR6B PCK CON Z1 GF DRY AWOSR6B PCK MAA GEN AF ALL AWOSR6B PCK CON Z3 BF WET AWOSR6B PCK CON Z3 BF DRY AWOSR6B PCK SDA GEN LR ALL AWOSR6B PCK CON Z2 AA ALL AWOSR6B PCK CON Z2 GF ALL PWOSR6B PCK CON Z1 GF SCC AWOSR6B PCK SDA GEN FC ALL EWOSR6B PCK CON Z2 GF ALL EWOSR6B PCK CON Z1 GF SCC EWOSR6B PCK MAS GEN AF ALL PWOSR6B PCK MAA GEN AF ALL HWOSR6B PCK CON Z1 GF SCC PWOSR6B PCK CON Z1 GF SCC HWOSR6B PCK CON Z3 GF DRY AWOSR6B PCK MAS GEN AF ALL HWOSR6B PCK MAS GEN AF ALL HWOSR6B PCK MAA GEN AF ALL PWOSR6B PCK CON Z3 GF ALL PWOSR6B PCK MAP GEN AF ALL EWOSR6B PCK MAP GEN AF ALL EWOSR6B PCK CON Z3 SF ALL AWOSR6B PCK SDS GEN FC ALL EWOSR6B PCK CON Z2 GF DRY AWOSR6B PCK MAA GEN AF ALL HWOSR6B PCK CON Z1 SF ALL PWOSR6B PCK SDA GEN UR ALL AWOSR6B PCK CON Z2 GF SCC AWOSR6B PCK CON Z1 AA ALL EWOSR6B PCK CON Z1 AA ALL PWOSR6B PCK CON Z2 TF ALL AWOSR6B PCK CON Z2 GF SCC PWOSR6B PCK CON Z2 GF SCC HW

Page 225: Progress Monitoring Sheet Empty

OSR6B PCK CON Z2 FF WET PWOSR6B PCK CON Z3 GF ALL PWOSR6B PCK CON Z1 AA DRY AWOSR6B PCK SDA GEN LR ALL HWOSR6B PCK CON Z2 AA ALL PWOSR6B PCK CON Z2 AA ALL HWOSR6B PCK CON Z2 FF ALL PWOSR6B PCK CON Z1 TF ALL PWOSR6B PCK CON Z1 TF ALL EWOSR6B PCK CON Z1 GF SCC AWOSR6B PCK SDA GEN FC ALL AWOSR6B PCK CON Z2 SF ALL HWOSR6B PCK CON Z2 FF WET AWOSR6B PCK CON Z2 GF SCC EWOSR6B PCK CON Z1 FF DRY AWOSR6B PCK MAS GEN AF ALL HWOSR6B PCK CON Z1 SF DRY AWOSR6B PCK CON Z3 BF DRY AWOSR6B PCK CON Z2 GF SCC AWOSR6B PCK SDS GEN LR ALL EWOSR6B PCK SDS GEN LR ALL PWOSR6B PCK SDS GEN LR ALL HWOSR6B PCK CON Z3 GF ALL EWOSR6B PCK CON Z1 LR ALL AWOSR6B PCK MAP GEN AF ALL HWOSR6B PCK CON Z1 BF DRY AWOSR6B PCK CON Z1 TF ALL HWOSR6B PCK CON Z1 SF ALL EWOSR6B PCK CON Z2 SF ALL EWOSR6B PCK MAS GEN AF ALL AWOSR6B PCK CON Z1 GF DRY PWOSR6B PCK CON Z2 FF ALL EWOSR6B PCK CON Z1 FC ALL AWOSR6B PCK MAP GEN AF ALL HWOSR6B PCK CON Z1 TF WET PWOSR6B PCK CON Z1 GF SCC AWOSR6B PCK MAP GEN AF ALL PWOSR6B PCK CON Z2 FF WET AWOSR6B PCK CON Z2 FF DRY AWOSR6B PCK MAS GEN AF ALL EWOSR6B PCK CON Z3 FF ALL HWOSR6B PCK MAP GEN AF ALL AWOSR6B PCK CON Z1 BF DRY AWOSR6B PCK CON Z3 GF DRY AWOSR6B PCK CON Z2 GF SCC AWOSR6B PCK CON Z2 LR ALL AWOSR6B PCK CON Z2 BF DRY AWOSR6B PCK CON Z2 TF ALL EWOSR6B PCK CON Z3 GF SCC PWOSR6B PCK CON Z3 GF SCC HWOSR6B PCK CON Z1 GF SCC AW

Page 226: Progress Monitoring Sheet Empty

OSR6B PCK CON Z1 GF ALL EWOSR6B PCK CON Z1 AA WET AWOSR6B PCK CON Z1 UR ALL AWOSR6B PCK CON Z3 FF ALL EWOSR6B PCK CON Z3 SF ALL HWOSR6B PCK SDA GEN LR ALL PWOSR6B PCK CON Z3 FF DRY AWOSR6B PCK CON Z2 AA ALL EWOSR6B PCK CON Z2 AA ALL PWOSR6B PCK CON Z3 GF DRY AWOSR6B PCK CON Z3 GF SCC AWOSR6B PCK CON Z3 GF SCC EWOSR6B PCK MAA GEN AF ALL PWOSR6B PCK CON Z2 TF ALL HWOSR6B PCK CON Z2 SF DRY AWOSR6B PCK CON Z1 LR ALL HWOSR6B PCK MAA GEN AF ALL AWOSR6B PCK CON Z1 BF DRY EWOSR6B PCK CON Z1 TF ALL PWOSR6B PCK CON Z2 SF ALL PWOSR6B PCK CON Z2 SF ALL PWOSR6B PCK CON Z2 BF DRY AWOSR6B PCK MAP GEN AF ALL HWOSR6B PCK CON Z2 AA DRY AWOSR6B PCK CON Z1 TF DRY AWOSR6B PCK CON Z1 SF DRY AWOSR6B PCK CON Z1 SF ALL PWOSR6B PCK CON Z1 GF DRY AWOSR6B PCK SDA GEN UR ALL HWOSR6B PCK CON Z3 BF WET AWOSR6B PCK MAP GEN AF ALL EWOSR6B PCK CON Z2 GF SCC AWOSR6B PCK CON Z2 SF WET PWOSR6B PCK SDA GEN LR ALL EWOSR6B PCK CON Z1 UR ALL AWOSR6B PCK CON Z3 AA ALL AWOSR6B PCK CON Z3 TF ALL AWOSR6B PCK CON Z2 TF ALL PWOSR6B PCK CON Z2 TF ALL PWOSR6B PCK MAS GEN AF ALL AWOSR6B PCK MAA GEN AF ALL EWOSR6B PCK CON Z3 SF ALL EWOSR6B PCK CON Z1 AA DRY AWOSR6B PCK CON Z3 GF SCC AWOSR6B PCK CON Z3 GF ALL PWOSR6B PCK CON Z2 LR ALL EWOSR6B PCK CON Z2 LR ALL HWOSR6B PCK CON Z1 GF DRY AWOSR6B PCK CON Z2 BF DRY EWOSR6B PCK CON Z3 FF ALL PWOSR6B PCK CON Z3 FF ALL PW

Page 227: Progress Monitoring Sheet Empty

OSR6B PCK CON Z1 TF ALL EWOSR6B PCK CON Z1 GF SCC AWOSR6B PCK CON Z2 GF DRY AWOSR6B PCK CON Z2 LR ALL PWOSR6B PCK MAP GEN AF ALL PWOSR6B PCK SDA GEN UR ALL EWOSR6B PCK CON Z2 TF WET PWOSR6B PCK SDS GEN UR ALL AWOSR6B PCK SDS GEN UR ALL EWOSR6B PCK CON Z1 FC ALL AWOSR6B PCK CON Z3 GF SCC AWOSR6B PCK CON Z2 BF DRY PWOSR6B PCK CON Z1 BF DRY HWOSR6B PCK CON Z1 GF DRY EWOSR6B PCK CON Z1 GF SCC AWOSR6B PCK CON Z3 SF ALL PWOSR6B PCK CON Z3 SF ALL PWOSR6B PCK SDS GEN UR ALL PWOSR6B PCK SDS GEN UR ALL HWOSR6B PCK CON Z2 GF DRY AWOSR6B PCK CON Z2 SF ALL EWOSR6B PCK CON Z3 SF DRY AWOSR6B PCK CON Z2 GF SCC AWOSR6B PCK CON Z2 GF SCC AWOSR6B PCK CON Z3 GF SCC AWOSR6B PCK CON Z2 SF WET AWOSR6B PCK CON Z2 SF DRY AWOSR6B PCK CON AZ AF ALL HWOSR6B PCK CON Z1 LR ALL PWOSR6B PCK CON Z1 CS ALL AWOSR6B PCK CON Z2 CS ALL AWOSR6B PCK CON Z3 CS ALL AWOSR6B PCK CON Z2 FC ALL AWOSR6B PCK CON Z3 AA ALL EWOSR6B PCK CON Z3 AA ALL PWOSR6B PCK CON Z3 AA WET PWOSR6B PCK CON Z2 FF WET AWOSR6B PCK MAA GEN AF ALL AWOSR6B PCK CON Z2 AA WET AWOSR6B PCK CON Z1 FF DRY AWOSR6B PCK CON Z1 TF WET AWOSR6B PCK CON Z1 TF DRY AWOSR6B PCK CON Z1 AA DRY AWOSR6B PCK CON Z1 BF DRY PWOSR6B PCK CON Z1 BF DRY AWOSR6B PCK CON Z3 BF DRY AWOSR6B PCK CON Z2 BF DRY HWOSR6B PCK CON Z2 TF ALL EWOSR6B PCK CON Z3 TF ALL PWOSR6B PCK CON Z3 TF ALL EWOSR6B PCK CON Z1 LR ALL EW

Page 228: Progress Monitoring Sheet Empty

OSR6B PCK CON Z3 GF SCC AWOSR6B PCK CON Z1 TF DRY AWOSR6B PCK CON Z1 LR DRY AWOSR6B PCK CON Z3 LR ALL AWOSR6B PCK CON Z3 BF DRY EWOSR6B PCK CON Z3 FF DRY AWOSR6B PCK CON Z1 FF DRY AWOSR6B PCK CON Z2 GF DRY PWOSR6B PCK CON Z3 FF ALL EWOSR6B PCK CON Z2 SF WET AWOSR6B PCK CON Z3 BF DRY AWOSR6B PCK CON Z3 AA ALL PWOSR6B PCK CON Z3 TF ALL HWOSR6B PCK CON Z2 FF DRY AWOSR6B PCK CON Z2 BF DRY AWOSR6B PCK CON Z2 AA DRY AWOSR6B PCK CON Z1 TF WET AWOSR6B PCK CON Z1 SF DRY AWOSR6B PCK CON Z3 SF ALL PWOSR6B PCK CON Z2 FC ALL AWOSR6B PCK CON Z3 SF ALL EWOSR6B PCK CON Z3 GF SCC AWOSR6B PCK CON Z1 FF DRY EWOSR6B PCK CON Z1 TF ALL PWOSR6B PCK CON Z1 UR ALL HWOSR6B PCK CON Z3 BF DRY PWOSR6B PCK CON Z2 TF DRY AWOSR6B PCK CON Z3 TF WET PWOSR6B PCK MAP GEN AF ALL AWOSR6B PCK SDA GEN UR ALL PWOSR6B PCK CON Z1 AA DRY EWOSR6B PCK CON Z3 FF ALL PWOSR6B PCK CON Z2 FF DRY AWOSR6B PCK CON Z3 AA DRY AWOSR6B PCK CON Z3 FF DRY AWOSR6B PCK CON Z3 SF DRY AWOSR6B PCK CON Z3 GF DRY AWOSR6B PCK CON Z1 AA DRY AWOSR6B PCK MAS GEN AF ALL PWOSR6B PCK CON Z3 AA ALL PWOSR6B PCK CON Z3 TF DRY AWOSR6B PCK CON Z3 TF ALL PWOSR6B PCK CON Z2 FF DRY HWOSR6B PCK CON Z2 GF DRY EWOSR6B PCK CON Z2 GF DRY HWOSR6B PCK CON Z1 TF DRY AWOSR6B PCK CON Z1 LR DRY AWOSR6B PCK CON Z3 LR ALL EWOSR6B PCK CON Z3 LR ALL HWOSR6B PCK MAP GEN AF ALL PWOSR6B PCK CON Z3 BF WET AW

Page 229: Progress Monitoring Sheet Empty

OSR6B PCK CON Z1 FF DRY PWOSR6B PCK CON Z1 UR ALL EWOSR6B PCK CON Z3 TF ALL EWOSR6B PCK CON Z3 GF DRY AWOSR6B PCK CON Z1 GF DRY EWOSR6B PCK CON Z2 AA DRY AWOSR6B PCK CON Z1 FF DRY HWOSR6B PCK CON Z1 SF DRY EWOSR6B PCK CON Z3 UR ALL AWOSR6B PCK CON Z3 BF WET EWOSR6B PCK CON Z2 GF DRY AWOSR6B PCK CON Z1 SF DRY AWOSR6B PCK MAP GEN AF ALL EWOSR6B PCK CON Z2 SF DRY AWOSR6B PCK CON Z3 BF WET AWOSR6B PCK CON Z2 TF WET AWOSR6B PCK CON Z1 BF DRY EWOSR6B PCK CON Z2 FF DRY EWOSR6B PCK CON Z2 FF WET AWOSR6B PCK MAP GEN AF ALL AWOSR6B PCK CON Z1 GF DRY HWOSR6B PCK CON Z1 AA DRY HWOSR6B PCK CON Z1 FF DRY AWOSR6B PCK CON Z2 UR ALL PWOSR6B PCK CON Z3 BF DRY HWOSR6B PCK CON Z3 FF DRY EWOSR6B PCK CON Z3 GF DRY EWOSR6B PCK CON Z3 LR ALL PWOSR6B PCK CON Z1 AA DRY PWOSR6B PCK CON Z3 BF WET PWOSR6B PCK CON Z3 GF DRY PWOSR6B PCK CON Z2 FF DRY PWOSR6B PCK CON Z2 TF ALL PWOSR6B PCK CON Z3 BF DRY EWOSR6B PCK CON Z1 GF DRY AWOSR6B PCK CON Z2 FF WET AWOSR6B PCK CON Z3 AA WET AWOSR6B PCK CON Z3 SF DRY AWOSR6B PCK CON Z2 SF WET AWOSR6B PCK CON Z1 SF DRY HWOSR6B PCK CON Z3 BF DRY AWOSR6B PCK CON Z2 TF DRY AWOSR6B PCK CON Z2 TF WET AWOSR6B PCK CON Z2 LR DRY AWOSR6B PCK CON Z3 BF WET HWOSR6B PCK CON Z3 TF WET AWOSR6B PCK CON GEN GR ALL GNOSR6B PCK CON Z2 AA DRY EWOSR6B PCK CON Z1 TF WET AWOSR6B PCK CON Z1 TF WET AWOSR6B PCK CON Z3 FC ALL AW

Page 230: Progress Monitoring Sheet Empty

OSR6B PCK CON Z2 FF DRY AWOSR6B PCK CON Z2 AA DRY AWOSR6B PCK CON Z1 FF DRY EWOSR6B PCK CON Z1 SF DRY PWOSR6B PCK CON Z2 BF DRY EWOSR6B PCK CON Z2 UR ALL EWOSR6B PCK CON Z3 TF DRY AWOSR6B PCK CON Z1 BF DRY AWOSR6B PCK CON Z2 SF DRY AWOSR6B PCK CON Z1 TF DRY HWOSR6B PCK CON Z1 LR DRY AWOSR6B PCK CON Z3 AA DRY AWOSR6B PCK CON Z3 FF DRY HWOSR6B PCK CON Z3 GF DRY HWOSR6B PCK CON Z1 AA DRY AWOSR6B PCK CON Z2 SF ALL PWOSR6B PCK CON Z2 SF WET AWOSR6B PCK CON Z2 SF DRY EWOSR6B PCK CON Z2 FF DRY HWOSR6B PCK CON Z1 UR ALL PWOSR6B PCK CON Z3 TF WET AWOSR6B PCK CON Z2 FF WET EWOSR6B PCK CON Z1 TF DRY EWOSR6B PCK CON Z3 BF WET PWOSR6B PCK CON Z3 SF DRY EWOSR6B PCK CON Z1 TF DRY AWOSR6B PCK CON Z2 BF DRY AWOSR6B PCK CON Z2 TF DRY AWOSR6B PCK CON Z2 LR DRY AWOSR6B PCK CON AZ AF ALL EWOSR6B PCK CON Z3 FF DRY AWOSR6B PCK CON Z3 GF DRY AWOSR6B PCK CON Z2 GF DRY EWOSR6B PCK CON Z2 FF WET PWOSR6B PCK CON Z2 AA DRY HWOSR6B PCK CON Z2 FC ALL EWOSR6B PCK CON Z1 SF DRY EWOSR6B PCK CON Z3 UR ALL PWOSR6B PCK CON Z1 FC ALL EWOSR6B PCK CON Z3 LR DRY AWOSR6B PCK CON AZ AF ALL EWOSR6B PCK CON AZ AF ALL EWOSR6B PCK CON AZ AF ALL EWOSR6B PCK CON AZ AF ALL EWOSR6B PCK CON AZ AF ALL EWOSR6B PCK CON AZ AF ALL EWOSR6B PCK CON Z1 BF DRY AWOSR6B PCK CON Z2 AA DRY PWOSR6B PCK CON Z1 TF WET EWOSR6B PCK CON Z1 TF DRY PWOSR6B PCK CON Z1 SF DRY AW

Page 231: Progress Monitoring Sheet Empty

OSR6B PCK CON Z1 TF DRY EWOSR6B PCK CON Z2 SF DRY HWOSR6B PCK CON Z3 UR ALL AWOSR6B PCK CON Z3 BF WET AWOSR6B PCK CON Z2 TF WET AWOSR6B PCK CON Z2 LR DRY AWOSR6B PCK CON Z3 TF DRY AWOSR6B PCK CON Z2 FF WET HWOSR6B PCK CON Z1 BF DRY HWOSR6B PCK CON Z1 BF DRY HWOSR6B PCK CON Z1 BF ALL AWOSR6B PCK CON Z1 BF DRY AWOSR6B PCK CON Z1 BF DRY EWOSR6B PCK CON Z2 AA WET EWOSR6B PCK CON Z2 SF DRY PWOSR6B PCK CON Z1 LR DRY EWOSR6B PCK CON Z3 TF ALL PWOSR6B PCK CON Z3 AA DRY AWOSR6B PCK CON Z3 FF DRY EWOSR6B PCK CON Z3 SF DRY HWOSR6B PCK CON Z3 GF DRY EWOSR6B PCK CON Z1 TF DRY AWOSR6B PCK CON Z3 SF DRY AWOSR6B PCK CON Z2 SF DRY AWOSR6B PCK CON Z2 SF WET AWOSR6B PCK CON Z2 FF WET AWOSR6B PCK CON Z1 LR DRY AWOSR6B PCK CON Z2 BF DRY AWOSR6B PCK CON Z2 AA WET PWOSR6B PCK CON Z1 TF WET HWOSR6B PCK CON Z2 BF DRY HWOSR6B PCK CON Z2 BF DRY HWOSR6B PCK CON Z2 BF ALL AWOSR6B PCK CON Z2 BF DRY AWOSR6B PCK CON Z2 TF DRY AWOSR6B PCK CON Z3 FF DRY PWOSR6B PCK CON Z3 FC ALL AWOSR6B PCK CON Z1 LR DRY HWOSR6B PCK CON Z3 LR DRY AWOSR6B PCK CON Z2 FF DRY EWOSR6B PCK CON Z2 AA DRY AWOSR6B PCK CON Z1 TF WET AWOSR6B PCK CON Z2 SF WET EWOSR6B PCK CON Z1 GF DRY AWOSR6B PCK CON Z2 TF WET AWOSR6B PCK CON Z2 SF WET PWOSR6B PCK CON Z3 TF DRY AWOSR6B PCK CON Z3 FF DRY AWOSR6B PCK CON Z3 UR ALL HWOSR6B PCK CON Z1 AA DRY AWOSR6B PCK CON Z3 TF WET AW

Page 232: Progress Monitoring Sheet Empty

OSR6B PCK CON Z3 AA DRY EWOSR6B PCK CON Z2 BF DRY EWOSR6B PCK CON Z2 SF WET HWOSR6B PCK CON Z2 SF DRY EWOSR6B PCK CON Z2 TF DRY PWOSR6B PCK CON Z2 TF DRY HWOSR6B PCK CON Z2 TF DRY EWOSR6B PCK CON Z3 AA DRY AWOSR6B PCK CON Z3 TF WET AWOSR6B PCK CON Z1 BF ALL AWOSR6B PCK CON Z1 GF DRY AWOSR6B PCK CON Z2 SF WET PWOSR6B PCK CON Z1 LR DRY PWOSR6B PCK CON AZ AF ALL PWOSR6B PCK CON Z3 BF DRY AWOSR6B PCK CON Z3 SF DRY EWOSR6B PCK CON Z3 SF DRY PWOSR6B PCK CON Z2 GF DRY AWOSR6B PCK CON Z1 TF WET AWOSR6B PCK CON Z2 GF DRY AWOSR6B PCK CON Z2 TF DRY AWOSR6B PCK CON Z2 LR DRY EWOSR6B PCK CON Z2 LR DRY HWOSR6B PCK CON Z2 SF WET EWOSR6B PCK CON Z3 TF WET PWOSR6B PCK CON Z3 SF DRY AWOSR6B PCK CON Z2 SF WET AWOSR6B PCK CON Z1 LR DRY AWOSR6B PCK CON Z1 FF DRY AWOSR6B PCK CON Z1 FF DRY AWOSR6B PCK CON Z3 BF DRY EWOSR6B PCK CON Z1 TF WET PWOSR6B PCK CON Z3 BF DRY HWOSR6B PCK CON Z3 BF DRY HWOSR6B PCK CON Z2 BF ALL AWOSR6B PCK CON Z2 GF DRY AWOSR6B PCK CON Z2 GF DRY HWOSR6B PCK CON Z2 GF DRY HWOSR6B PCK CON Z2 GF ALL AWOSR6B PCK CON Z2 TF WET AWOSR6B PCK CON Z3 TF DRY AWOSR6B PCK CON Z3 TF DRY PWOSR6B PCK CON Z3 TF DRY HWOSR6B PCK CON Z3 TF DRY EWOSR6B PCK CON Z1 LR DRY EWOSR6B PCK CON Z3 FC ALL EWOSR6B PCK CON Z1 AA ALL AWOSR6B PCK CON Z1 AA DRY AWOSR6B PCK CON Z1 AA DRY EWOSR6B PCK CON Z1 AA DRY HWOSR6B PCK CON Z1 AA DRY HW

Page 233: Progress Monitoring Sheet Empty

OSR6B PCK CON Z3 AA DRY HWOSR6B PCK CON Z2 LR DRY AWOSR6B PCK CON Z3 AA DRY PWOSR6B PCK CON Z3 TF WET AWOSR6B PCK CON Z3 BF DRY AWOSR6B PCK CON Z2 GF DRY EWOSR6B PCK CON Z1 FF DRY AWOSR6B PCK CON Z1 GF DRY AWOSR6B PCK CON Z1 GF DRY HWOSR6B PCK CON Z1 GF DRY HWOSR6B PCK CON Z1 GF ALL AWOSR6B PCK CON Z2 FF DRY AWOSR6B PCK CON Z2 FF DRY AWOSR6B PCK CON AZ AF ALL EWOSR6B PCK CON Z3 LR DRY AWOSR6B PCK CON Z2 LR DRY PWOSR6B PCK CON Z3 BF ALL AWOSR6B PCK CON Z3 BF DRY AWOSR6B PCK CON Z1 FF DRY EWOSR6B PCK CON Z3 GF DRY AWOSR6B PCK CON AZ EW ALL AWOSR6B PCK CON Z2 TF WET PWOSR6B PCK CON Z2 TF WET HWOSR6B PCK CON Z2 TF WET EWOSR6B PCK CON AZ EW ALL PWOSR6B PCK CON Z2 AA DRY AWOSR6B PCK CON Z1 TF DRY AWOSR6B PCK CON Z1 SF DRY AWOSR6B PCK CON Z1 TF DRY HWOSR6B PCK CON Z1 TF DRY HWOSR6B PCK CON Z3 BF WET AWOSR6B PCK CON Z3 GF DRY HWOSR6B PCK CON Z3 GF DRY HWOSR6B PCK CON Z3 GF DRY EWOSR6B PCK CON Z1 SF DRY AWOSR6B PCK CON Z1 SF DRY AWOSR6B PCK CON Z2 FF DRY AWOSR6B PCK CON Z2 TF WET AWOSR6B PCK CON Z3 TF WET EWOSR6B PCK CON Z1 FF ALL AWOSR6B PCK CON Z1 FF DRY AWOSR6B PCK CON Z1 FF DRY HWOSR6B PCK CON Z1 SF DRY AWOSR6B PCK CON Z1 SF DRY HWOSR6B PCK CON Z1 SF DRY HWOSR6B PCK CON Z1 SF ALL AWOSR6B PCK CON Z1 SF DRY EWOSR6B PCK CON Z1 TF DRY AWOSR6B PCK CON Z1 TF ALL AWOSR6B PCK CON Z3 LR DRY EWOSR6B PCK CON AZ EW ALL EW

Page 234: Progress Monitoring Sheet Empty

OSR6B PCK CON Z2 TF DRY EWOSR6B PCK CON Z3 BF WET EWOSR6B PCK CON Z3 BF WET AWOSR6B PCK CON AZ AF ALL AWOSR6B PCK CON Z3 BF WET HWOSR6B PCK CON Z1 GF DRY EWOSR6B PCK CON Z2 FF DRY EWOSR6B PCK CON Z2 FF ALL AWOSR6B PCK CON Z2 FF DRY AWOSR6B PCK CON Z2 FF DRY HWOSR6B PCK CON Z2 SF DRY AWOSR6B PCK CON Z1 LR DRY AWOSR6B PCK CON Z3 AA DRY AWOSR6B PCK CON Z3 TF WET AWOSR6B PCK CON Z3 TF WET PWOSR6B PCK CON Z3 TF WET HWOSR6B PCK CON Z3 GF DRY AWOSR6B PCK CON Z2 TF DRY AWOSR6B PCK CON Z2 SF DRY AWOSR6B PCK CON Z2 SF DRY AWOSR6B PCK CON Z3 GF DRY AWOSR6B PCK CON Z3 GF ALL AWOSR6B PCK CON Z3 FF DRY EWOSR6B PCK CON Z3 FF DRY HWOSR6B PCK CON Z1 TF DRY EWOSR6B PCK CON Z1 TF DRY AWOSR6B PCK CON Z1 TF DRY AWOSR6B PCK CON Z2 LR DRY EWOSR6B PCK CON Z3 LR DRY PWOSR6B PCK CON Z2 SF DRY AWOSR6B PCK CON Z2 SF DRY HWOSR6B PCK CON Z2 SF DRY HWOSR6B PCK CON Z2 SF ALL AWOSR6B PCK CON Z2 SF DRY EWOSR6B PCK CON Z3 AA WET PWOSR6B PCK CON Z3 FF DRY AWOSR6B PCK CON Z3 FF DRY AWOSR6B PCK CON Z2 AA ALL AWOSR6B PCK CON Z2 AA DRY AWOSR6B PCK CON Z2 AA DRY EWOSR6B PCK CON Z2 AA DRY HWOSR6B PCK CON Z2 AA DRY HWOSR6B PCK CON Z1 GF ALL AWOSR6B PCK CON Z3 FF DRY AWOSR6B PCK CON Z1 LR DRY AWOSR6B PCK CON Z2 LR DRY AWOSR6B PCK CON Z3 LR DRY AWOSR6B PCK CON Z3 BF ALL AWOSR6B PCK CON Z3 BF WET AWOSR6B PCK CON Z3 TF DRY AWOSR6B PCK CON Z3 SF DRY AW

Page 235: Progress Monitoring Sheet Empty

OSR6B PCK CON Z2 GF ALL AWOSR6B PCK CON Z3 TF DRY EWOSR6B PCK CON Z1 TF WET AWOSR6B PCK CON Z1 TF WET AWOSR6B PCK CON Z3 LR DRY HWOSR6B PCK CON Z3 LR DRY AWOSR6B PCK CON Z2 LR DRY AWOSR6B PCK CON Z3 FF ALL AWOSR6B PCK CON Z3 FF DRY AWOSR6B PCK CON Z3 TF DRY HWOSR6B PCK CON Z3 TF DRY HWOSR6B PCK CON Z3 SF DRY HWOSR6B PCK CON Z3 SF DRY HWOSR6B PCK CON Z3 SF DRY EWOSR6B PCK CON Z1 LR ALL AWOSR6B PCK CON Z2 FF WET AWOSR6B PCK CON Z2 FF WET AWOSR6B PCK CON Z2 FF WET AWOSR6B PCK CON Z2 FF WET PWOSR6B PCK CON Z1 LR DRY HWOSR6B PCK CON Z1 LR DRY HWOSR6B PCK CON Z1 LR DRY AWOSR6B PCK CON Z2 TF DRY AWOSR6B PCK CON Z2 TF DRY AWOSR6B PCK CON Z2 AA WET EWOSR6B PCK CON Z3 SF DRY AWOSR6B PCK CON Z3 SF DRY AWOSR6B PCK CON Z1 FF ALL AWOSR6B PCK CON Z1 AA ALL AWOSR6B PCK CON Z1 SF ALL AWOSR6B PCK CON Z2 TF DRY AWOSR6B PCK CON Z2 TF DRY HWOSR6B PCK CON Z2 TF DRY HWOSR6B PCK CON Z2 TF ALL AWOSR6B PCK CON Z1 TF ALL AWOSR6B PCK CON Z1 LR DRY EWOSR6B PCK CON Z1 TF WET EWOSR6B PCK CON Z2 FF WET EWOSR6B PCK CON Z2 FF ALL AWOSR6B PCK CON Z2 SF WET AWOSR6B PCK CON Z1 TF WET AWOSR6B PCK CON Z3 TF DRY AWOSR6B PCK CON Z3 TF DRY AWOSR6B PCK CON Z2 TF WET AWOSR6B PCK CON Z2 TF DRY EWOSR6B PCK CON Z3 UR ALL EWOSR6B PCK CON Z3 LR DRY EWOSR6B PCK CON Z3 TF DRY AWOSR6B PCK CON Z3 TF ALL AWOSR6B PCK CON Z3 SF DRY AWOSR6B PCK CON Z3 SF ALL AW

Page 236: Progress Monitoring Sheet Empty

OSR6B PCK CON Z2 SF WET AWOSR6B PCK CON Z2 AA ALL AWOSR6B PCK CON Z2 SF ALL AWOSR6B PCK CON CO AF CLO EWOSR6B PCK CON CO AF CLO PWOSR6B PCK CON AZ AF ALL AWOSR6B PCK CON Z3 AA DRY AWOSR6B PCK CON Z2 TF WET AWOSR6B PCK CON Z2 LR DRY EWOSR6B PCK CON Z2 LR ALL AWOSR6B PCK CON Z2 LR DRY HWOSR6B PCK CON Z2 LR DRY HWOSR6B PCK CON Z2 LR DRY AWOSR6B PCK CON Z3 TF WET AWOSR6B PCK CON Z2 SF WET AWOSR6B PCK CON Z3 TF WET EWOSR6B PCK CON Z2 TF WET PWOSR6B PCK CON CO AF CLO AWOSR6B PCK CON Z3 FF ALL AWOSR6B PCK CON Z3 GF ALL AWOSR6B PCK CON Z2 TF ALL AWOSR6B PCK CON Z3 TF WET AWOSR6B PCK CON Z3 LR DRY AWOSR6B PCK CON Z2 TF WET AWOSR6B PCK CON Z3 TF DRY EWOSR6B PCK CON CO FC CLO GNOSR6B PCK CON Z2 TF WET EWOSR6B PCK CON Z3 LR DRY EWOSR6B PCK CON Z3 LR DRY HWOSR6B PCK CON Z3 LR DRY HWOSR6B PCK CON Z3 AA ALL AWOSR6B PCK CON Z3 AA DRY AWOSR6B PCK CON Z3 AA DRY EWOSR6B PCK CON Z3 AA DRY HWOSR6B PCK CON Z3 AA DRY HWOSR6B PCK CON Z3 TF WET AWOSR6B PCK CON Z3 AA ALL AWOSR6B PCK CON Z3 TF ALL AWOSR6B PCK CON Z3 SF ALL AWOSR6B PCK CON Z3 LR ALL AWOSR6B PCK CON Z3 LR DRY AWOSR6B PCK CON CO EW CLO GNOSR6B PCK CON CO AF CLO AWOSR6B PCK CON CO AF CLO AWOSR6B PCK CON CO AF CLO AW

Page 237: Progress Monitoring Sheet Empty

WBS 1 Code Name WBS 2 Code NameProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

Page 238: Progress Monitoring Sheet Empty

Project name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

Page 239: Progress Monitoring Sheet Empty

Project name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

Page 240: Progress Monitoring Sheet Empty

Project name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

Page 241: Progress Monitoring Sheet Empty

Project name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

Page 242: Progress Monitoring Sheet Empty

Project name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

Page 243: Progress Monitoring Sheet Empty

Project name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

Page 244: Progress Monitoring Sheet Empty

Project name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

Page 245: Progress Monitoring Sheet Empty

Project name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

Page 246: Progress Monitoring Sheet Empty

Project name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

Page 247: Progress Monitoring Sheet Empty

Project name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

Page 248: Progress Monitoring Sheet Empty

Project name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

Page 249: Progress Monitoring Sheet Empty

Project name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

Page 250: Progress Monitoring Sheet Empty

Project name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

Page 251: Progress Monitoring Sheet Empty

Project name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

Page 252: Progress Monitoring Sheet Empty

Project name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 BProject name XXX Package 6 B

#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A

Page 253: Progress Monitoring Sheet Empty

#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A#N/A #N/A

Page 254: Progress Monitoring Sheet Empty

WBS 3 Code Name WBS 4 Code Name WBS 5 Code Name WBS 6 Code NameMateria Approval General All Floors All AreasMaterial Submittals General All Floors All AreasConstruction Works General General Requirements All AreasConstruction Works General General Requirements All AreasConstruction Works General General Requirements All AreasShop Drawing Submittals General Basement Floor All AreasMaterial Submittals General All Floors All AreasConstruction Works General General Requirements All AreasConstruction Works General General Requirements All AreasConstruction Works General General Requirements All AreasConstruction Works General General Requirements All AreasConstruction Works General General Requirements All AreasConstruction Works General General Requirements All AreasConstruction Works General General Requirements All AreasConstruction Works General General Requirements All AreasConstruction Works General General Requirements All AreasMaterial Procurement & Deliver on Site General All Floors All AreasShop Drawing Approval General Basement Floor All AreasMateria Approval General All Floors All AreasMaterial Submittals General All Floors All AreasMaterial Submittals General All Floors All AreasShop Drawing Submittals General Basement Floor All AreasConstruction Works Zone 1 Basement Floor All AreasMateria Approval General All Floors All AreasConstruction Works Zone 2 Basement Floor All AreasMateria Approval General All Floors All AreasMaterial Procurement & Deliver on Site General All Floors All AreasShop Drawing Approval General Ground Floor All AreasConstruction Works Zone 1 Ground Floor All AreasMateria Approval General All Floors All AreasMateria Approval General All Floors All AreasShop Drawing Approval General Basement Floor All AreasConstruction Works Zone 1 Basement Floor All AreasConstruction Works Zone 3 Basement Floor All AreasShop Drawing Approval General First Floor All AreasShop Drawing Submittals General Basement Floor All AreasShop Drawing Submittals General Basement Floor All AreasShop Drawing Submittals General Ground Floor All AreasConstruction Works Zone 2 Ground Floor All AreasMaterial Submittals General All Floors All AreasMaterial Submittals General All Floors All AreasMaterial Procurement & Deliver on Site General All Floors All AreasMateria Approval General All Floors All AreasMaterial Submittals General All Floors All AreasShop Drawing Approval General Second Floor All AreasShop Drawing Approval General Ground Floor All AreasShop Drawing Submittals General First Floor All AreasShop Drawing Submittals General First Floor All AreasShop Drawing Submittals General Ground Floor All AreasShop Drawing Submittals General Ground Floor All Areas

Page 255: Progress Monitoring Sheet Empty

Shop Drawing Submittals General Ground Floor All AreasConstruction Works Zone 1 Ground Floor All AreasMaterial Procurement & Deliver on Site General All Floors All AreasShop Drawing Approval General Basement Floor All AreasConstruction Works Zone 1 Basement Floor All AreasConstruction Works Zone 1 Basement Floor All AreasConstruction Works Zone 2 Basement Floor All AreasShop Drawing Approval General First Floor All AreasShop Drawing Approval General Basement Floor All AreasConstruction Works Zone 1 First Floor All AreasConstruction Works Zone 1 Basement Floor All AreasConstruction Works Zone 1 Basement Floor Dry AreaShop Drawing Approval General Ground Floor All AreasMateria Approval General All Floors All AreasShop Drawing Approval General Ground Floor All AreasConstruction Works Zone 1 Ground Floor All AreasShop Drawing Approval General Second Floor All AreasConstruction Works Zone 1 Ground Floor All AreasShop Drawing Submittals General First Floor All AreasShop Drawing Submittals General First Floor All AreasShop Drawing Submittals General Second Floor All AreasShop Drawing Submittals General Second Floor All AreasShop Drawing Submittals General Second Floor All AreasShop Drawing Submittals General Second Floor All AreasShop Drawing Approval General Third Floor All AreasConstruction Works Zone 3 Ground Floor All AreasConstruction Works Zone 2 Basement Floor Dry AreaShop Drawing Approval General Second Floor All AreasShop Drawing Submittals General Elevators & Escalators All AreasConstruction Works Zone 3 Basement Floor All AreasShop Drawing Approval General Second Floor All AreasMaterial Procurement & Deliver on Site General All Floors All AreasMaterial Procurement & Deliver on Site General All Floors All AreasConstruction Works Zone 1 Basement Floor All AreasConstruction Works Zone 2 First Floor All AreasConstruction Works Zone 1 First Floor All AreasConstruction Works Zone 1 Ground Floor Dry AreaConstruction Works Zone 2 Ground Floor All AreasMaterial Procurement & Deliver on Site General All Floors All AreasConstruction Works Zone 2 Basement Floor All AreasConstruction Works Zone 2 Basement Floor All AreasConstruction Works Zone 2 Basement Floor All AreasConstruction Works Zone 2 Basement Floor All AreasShop Drawing Approval General First Floor All AreasConstruction Works Zone 1 Basement Floor All AreasConstruction Works Zone 1 Basement Floor Dry AreaMateria Approval General All Floors All AreasMaterial Submittals General All Floors All AreasMaterial Submittals General All Floors All AreasShop Drawing Submittals General Third Floor All AreasShop Drawing Submittals General Third Floor All Areas

Page 256: Progress Monitoring Sheet Empty

Shop Drawing Submittals General Third Floor All AreasShop Drawing Submittals General Third Floor All AreasConstruction Works Zone 1 Ground Floor All AreasMaterial Submittals General All Floors All AreasConstruction Works Zone 2 Basement Floor All AreasMaterial Procurement & Deliver on Site General All Floors All AreasConstruction Works Zone 1 Second Floor All AreasConstruction Works Zone 1 Ground Floor All AreasConstruction Works Zone 2 Ground Floor Dry AreaShop Drawing Approval General First Floor All AreasConstruction Works Zone 3 Basement Floor All AreasShop Drawing Approval General Third Floor All AreasShop Drawing Approval General Third Floor All AreasConstruction Works Zone 2 Basement Floor Dry AreaShop Drawing Approval General Elevators & Escalators All AreasShop Drawing Approval General Elevators & Escalators All AreasShop Drawing Submittals General Elevators & Escalators All AreasConstruction Works Zone 3 Basement Floor All AreasConstruction Works Zone 2 Ground Floor All AreasMaterial Submittals General All Floors All AreasMaterial Procurement & Deliver on Site General All Floors All AreasMaterial Submittals General All Floors All AreasShop Drawing Approval General Third Floor All AreasConstruction Works Zone 1 Package 6A Access Area All AreasConstruction Works Zone 2 Ground Floor All AreasConstruction Works Zone 2 Ground Floor All AreasConstruction Works Zone 1 First Floor All AreasMateria Approval General All Floors All AreasMateria Approval General All Floors All AreasConstruction Works Zone 3 Basement Floor Dry AreaConstruction Works Zone 3 Basement Floor Wet AreaMaterial Submittals General All Floors All AreasConstruction Works Zone 1 First Floor All AreasConstruction Works Zone 1 Basement Floor Dry AreaConstruction Works Zone 3 Basement Floor All AreasMateria Approval General All Floors All AreasConstruction Works Zone 2 Second Floor All AreasConstruction Works Zone 3 Ground Floor All AreasConstruction Works Zone 1 Second Floor All AreasConstruction Works Zone 1 First Floor Dry AreaMaterial Submittals General All Floors All AreasConstruction Works Zone 1 Ground Floor Dry AreaMateria Approval General All Floors All AreasConstruction Works Zone 1 First Floor All AreasConstruction Works Zone 2 Basement Floor Dry AreaConstruction Works Zone 1 First Floor All AreasConstruction Works Zone 1 Package 6A Access Area All AreasConstruction Works Zone 1 Package 6A Access Area All AreasConstruction Works Zone 3 First Floor All AreasMaterial Procurement & Deliver on Site General All Floors All AreasConstruction Works Zone 1 Second Floor All Areas

Page 257: Progress Monitoring Sheet Empty

Materia Approval General All Floors All AreasConstruction Works Zone 2 First Floor All AreasConstruction Works Zone 2 Ground Floor Dry AreaConstruction Works Zone 1 Second Floor All AreasConstruction Works Zone 3 Basement Floor All AreasMaterial Submittals General All Floors All AreasConstruction Works Zone 2 First Floor All AreasConstruction Works Zone 2 First Floor All AreasConstruction Works Zone 2 First Floor All AreasConstruction Works Zone 3 Ground Floor All AreasMateria Approval General All Floors All AreasConstruction Works Zone 3 Basement Floor All AreasConstruction Works Zone 1 First Floor All AreasConstruction Works Zone 1 Third Floor All AreasShop Drawing Submittals General Facade All AreasConstruction Works Zone 2 First Floor Dry AreaShop Drawing Submittals General Lower Roof All AreasConstruction Works Zone 1 Ground Floor Dry AreaMateria Approval General All Floors All AreasConstruction Works Zone 3 Basement Floor Wet AreaConstruction Works Zone 3 Basement Floor Dry AreaShop Drawing Approval General Lower Roof All AreasConstruction Works Zone 2 Package 6A Access Area All AreasConstruction Works Zone 2 Ground Floor All AreasConstruction Works Zone 1 Ground Floor SCECO ROOMShop Drawing Approval General Facade All AreasConstruction Works Zone 2 Ground Floor All AreasConstruction Works Zone 1 Ground Floor SCECO ROOMMaterial Submittals General All Floors All AreasMateria Approval General All Floors All AreasConstruction Works Zone 1 Ground Floor SCECO ROOMConstruction Works Zone 1 Ground Floor SCECO ROOMConstruction Works Zone 3 Ground Floor Dry AreaMaterial Submittals General All Floors All AreasMaterial Submittals General All Floors All AreasMateria Approval General All Floors All AreasConstruction Works Zone 3 Ground Floor All AreasMaterial Procurement & Deliver on Site General All Floors All AreasMaterial Procurement & Deliver on Site General All Floors All AreasConstruction Works Zone 3 Second Floor All AreasShop Drawing Submittals General Facade All AreasConstruction Works Zone 2 Ground Floor Dry AreaMateria Approval General All Floors All AreasConstruction Works Zone 1 Second Floor All AreasShop Drawing Approval General Upper Roof All AreasConstruction Works Zone 2 Ground Floor SCECO ROOMConstruction Works Zone 1 Package 6A Access Area All AreasConstruction Works Zone 1 Package 6A Access Area All AreasConstruction Works Zone 2 Third Floor All AreasConstruction Works Zone 2 Ground Floor SCECO ROOMConstruction Works Zone 2 Ground Floor SCECO ROOM

Page 258: Progress Monitoring Sheet Empty

Construction Works Zone 2 First Floor Wet AreaConstruction Works Zone 3 Ground Floor All AreasConstruction Works Zone 1 Package 6A Access Area Dry AreaShop Drawing Approval General Lower Roof All AreasConstruction Works Zone 2 Package 6A Access Area All AreasConstruction Works Zone 2 Package 6A Access Area All AreasConstruction Works Zone 2 First Floor All AreasConstruction Works Zone 1 Third Floor All AreasConstruction Works Zone 1 Third Floor All AreasConstruction Works Zone 1 Ground Floor SCECO ROOMShop Drawing Approval General Facade All AreasConstruction Works Zone 2 Second Floor All AreasConstruction Works Zone 2 First Floor Wet AreaConstruction Works Zone 2 Ground Floor SCECO ROOMConstruction Works Zone 1 First Floor Dry AreaMaterial Submittals General All Floors All AreasConstruction Works Zone 1 Second Floor Dry AreaConstruction Works Zone 3 Basement Floor Dry AreaConstruction Works Zone 2 Ground Floor SCECO ROOMShop Drawing Submittals General Lower Roof All AreasShop Drawing Submittals General Lower Roof All AreasShop Drawing Submittals General Lower Roof All AreasConstruction Works Zone 3 Ground Floor All AreasConstruction Works Zone 1 Lower Roof All AreasMaterial Procurement & Deliver on Site General All Floors All AreasConstruction Works Zone 1 Basement Floor Dry AreaConstruction Works Zone 1 Third Floor All AreasConstruction Works Zone 1 Second Floor All AreasConstruction Works Zone 2 Second Floor All AreasMaterial Submittals General All Floors All AreasConstruction Works Zone 1 Ground Floor Dry AreaConstruction Works Zone 2 First Floor All AreasConstruction Works Zone 1 Facade All AreasMaterial Procurement & Deliver on Site General All Floors All AreasConstruction Works Zone 1 Third Floor Wet AreaConstruction Works Zone 1 Ground Floor SCECO ROOMMaterial Procurement & Deliver on Site General All Floors All AreasConstruction Works Zone 2 First Floor Wet AreaConstruction Works Zone 2 First Floor Dry AreaMaterial Submittals General All Floors All AreasConstruction Works Zone 3 First Floor All AreasMaterial Procurement & Deliver on Site General All Floors All AreasConstruction Works Zone 1 Basement Floor Dry AreaConstruction Works Zone 3 Ground Floor Dry AreaConstruction Works Zone 2 Ground Floor SCECO ROOMConstruction Works Zone 2 Lower Roof All AreasConstruction Works Zone 2 Basement Floor Dry AreaConstruction Works Zone 2 Third Floor All AreasConstruction Works Zone 3 Ground Floor SCECO ROOMConstruction Works Zone 3 Ground Floor SCECO ROOMConstruction Works Zone 1 Ground Floor SCECO ROOM

Page 259: Progress Monitoring Sheet Empty

Construction Works Zone 1 Ground Floor All AreasConstruction Works Zone 1 Package 6A Access Area Wet AreaConstruction Works Zone 1 Upper Roof All AreasConstruction Works Zone 3 First Floor All AreasConstruction Works Zone 3 Second Floor All AreasShop Drawing Approval General Lower Roof All AreasConstruction Works Zone 3 First Floor Dry AreaConstruction Works Zone 2 Package 6A Access Area All AreasConstruction Works Zone 2 Package 6A Access Area All AreasConstruction Works Zone 3 Ground Floor Dry AreaConstruction Works Zone 3 Ground Floor SCECO ROOMConstruction Works Zone 3 Ground Floor SCECO ROOMMateria Approval General All Floors All AreasConstruction Works Zone 2 Third Floor All AreasConstruction Works Zone 2 Second Floor Dry AreaConstruction Works Zone 1 Lower Roof All AreasMateria Approval General All Floors All AreasConstruction Works Zone 1 Basement Floor Dry AreaConstruction Works Zone 1 Third Floor All AreasConstruction Works Zone 2 Second Floor All AreasConstruction Works Zone 2 Second Floor All AreasConstruction Works Zone 2 Basement Floor Dry AreaMaterial Procurement & Deliver on Site General All Floors All AreasConstruction Works Zone 2 Package 6A Access Area Dry AreaConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 1 Second Floor Dry AreaConstruction Works Zone 1 Second Floor All AreasConstruction Works Zone 1 Ground Floor Dry AreaShop Drawing Approval General Upper Roof All AreasConstruction Works Zone 3 Basement Floor Wet AreaMaterial Procurement & Deliver on Site General All Floors All AreasConstruction Works Zone 2 Ground Floor SCECO ROOMConstruction Works Zone 2 Second Floor Wet AreaShop Drawing Approval General Lower Roof All AreasConstruction Works Zone 1 Upper Roof All AreasConstruction Works Zone 3 Package 6A Access Area All AreasConstruction Works Zone 3 Third Floor All AreasConstruction Works Zone 2 Third Floor All AreasConstruction Works Zone 2 Third Floor All AreasMaterial Submittals General All Floors All AreasMateria Approval General All Floors All AreasConstruction Works Zone 3 Second Floor All AreasConstruction Works Zone 1 Package 6A Access Area Dry AreaConstruction Works Zone 3 Ground Floor SCECO ROOMConstruction Works Zone 3 Ground Floor All AreasConstruction Works Zone 2 Lower Roof All AreasConstruction Works Zone 2 Lower Roof All AreasConstruction Works Zone 1 Ground Floor Dry AreaConstruction Works Zone 2 Basement Floor Dry AreaConstruction Works Zone 3 First Floor All AreasConstruction Works Zone 3 First Floor All Areas

Page 260: Progress Monitoring Sheet Empty

Construction Works Zone 1 Third Floor All AreasConstruction Works Zone 1 Ground Floor SCECO ROOMConstruction Works Zone 2 Ground Floor Dry AreaConstruction Works Zone 2 Lower Roof All AreasMaterial Procurement & Deliver on Site General All Floors All AreasShop Drawing Approval General Upper Roof All AreasConstruction Works Zone 2 Third Floor Wet AreaShop Drawing Submittals General Upper Roof All AreasShop Drawing Submittals General Upper Roof All AreasConstruction Works Zone 1 Facade All AreasConstruction Works Zone 3 Ground Floor SCECO ROOMConstruction Works Zone 2 Basement Floor Dry AreaConstruction Works Zone 1 Basement Floor Dry AreaConstruction Works Zone 1 Ground Floor Dry AreaConstruction Works Zone 1 Ground Floor SCECO ROOMConstruction Works Zone 3 Second Floor All AreasConstruction Works Zone 3 Second Floor All AreasShop Drawing Submittals General Upper Roof All AreasShop Drawing Submittals General Upper Roof All AreasConstruction Works Zone 2 Ground Floor Dry AreaConstruction Works Zone 2 Second Floor All AreasConstruction Works Zone 3 Second Floor Dry AreaConstruction Works Zone 2 Ground Floor SCECO ROOMConstruction Works Zone 2 Ground Floor SCECO ROOMConstruction Works Zone 3 Ground Floor SCECO ROOMConstruction Works Zone 2 Second Floor Wet AreaConstruction Works Zone 2 Second Floor Dry AreaConstruction Works All Zones All Floors All AreasConstruction Works Zone 1 Lower Roof All AreasConstruction Works Zone 1 Elevators & Escalators All AreasConstruction Works Zone 2 Elevators & Escalators All AreasConstruction Works Zone 3 Elevators & Escalators All AreasConstruction Works Zone 2 Facade All AreasConstruction Works Zone 3 Package 6A Access Area All AreasConstruction Works Zone 3 Package 6A Access Area All AreasConstruction Works Zone 3 Package 6A Access Area Wet AreaConstruction Works Zone 2 First Floor Wet AreaMateria Approval General All Floors All AreasConstruction Works Zone 2 Package 6A Access Area Wet AreaConstruction Works Zone 1 First Floor Dry AreaConstruction Works Zone 1 Third Floor Wet AreaConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 1 Package 6A Access Area Dry AreaConstruction Works Zone 1 Basement Floor Dry AreaConstruction Works Zone 1 Basement Floor Dry AreaConstruction Works Zone 3 Basement Floor Dry AreaConstruction Works Zone 2 Basement Floor Dry AreaConstruction Works Zone 2 Third Floor All AreasConstruction Works Zone 3 Third Floor All AreasConstruction Works Zone 3 Third Floor All AreasConstruction Works Zone 1 Lower Roof All Areas

Page 261: Progress Monitoring Sheet Empty

Construction Works Zone 3 Ground Floor SCECO ROOMConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 1 Lower Roof Dry AreaConstruction Works Zone 3 Lower Roof All AreasConstruction Works Zone 3 Basement Floor Dry AreaConstruction Works Zone 3 First Floor Dry AreaConstruction Works Zone 1 First Floor Dry AreaConstruction Works Zone 2 Ground Floor Dry AreaConstruction Works Zone 3 First Floor All AreasConstruction Works Zone 2 Second Floor Wet AreaConstruction Works Zone 3 Basement Floor Dry AreaConstruction Works Zone 3 Package 6A Access Area All AreasConstruction Works Zone 3 Third Floor All AreasConstruction Works Zone 2 First Floor Dry AreaConstruction Works Zone 2 Basement Floor Dry AreaConstruction Works Zone 2 Package 6A Access Area Dry AreaConstruction Works Zone 1 Third Floor Wet AreaConstruction Works Zone 1 Second Floor Dry AreaConstruction Works Zone 3 Second Floor All AreasConstruction Works Zone 2 Facade All AreasConstruction Works Zone 3 Second Floor All AreasConstruction Works Zone 3 Ground Floor SCECO ROOMConstruction Works Zone 1 First Floor Dry AreaConstruction Works Zone 1 Third Floor All AreasConstruction Works Zone 1 Upper Roof All AreasConstruction Works Zone 3 Basement Floor Dry AreaConstruction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 3 Third Floor Wet AreaMaterial Procurement & Deliver on Site General All Floors All AreasShop Drawing Approval General Upper Roof All AreasConstruction Works Zone 1 Package 6A Access Area Dry AreaConstruction Works Zone 3 First Floor All AreasConstruction Works Zone 2 First Floor Dry AreaConstruction Works Zone 3 Package 6A Access Area Dry AreaConstruction Works Zone 3 First Floor Dry AreaConstruction Works Zone 3 Second Floor Dry AreaConstruction Works Zone 3 Ground Floor Dry AreaConstruction Works Zone 1 Package 6A Access Area Dry AreaMaterial Submittals General All Floors All AreasConstruction Works Zone 3 Package 6A Access Area All AreasConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Zone 3 Third Floor All AreasConstruction Works Zone 2 First Floor Dry AreaConstruction Works Zone 2 Ground Floor Dry AreaConstruction Works Zone 2 Ground Floor Dry AreaConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 1 Lower Roof Dry AreaConstruction Works Zone 3 Lower Roof All AreasConstruction Works Zone 3 Lower Roof All AreasMaterial Procurement & Deliver on Site General All Floors All AreasConstruction Works Zone 3 Basement Floor Wet Area

Page 262: Progress Monitoring Sheet Empty

Construction Works Zone 1 First Floor Dry AreaConstruction Works Zone 1 Upper Roof All AreasConstruction Works Zone 3 Third Floor All AreasConstruction Works Zone 3 Ground Floor Dry AreaConstruction Works Zone 1 Ground Floor Dry AreaConstruction Works Zone 2 Package 6A Access Area Dry AreaConstruction Works Zone 1 First Floor Dry AreaConstruction Works Zone 1 Second Floor Dry AreaConstruction Works Zone 3 Upper Roof All AreasConstruction Works Zone 3 Basement Floor Wet AreaConstruction Works Zone 2 Ground Floor Dry AreaConstruction Works Zone 1 Second Floor Dry AreaMaterial Procurement & Deliver on Site General All Floors All AreasConstruction Works Zone 2 Second Floor Dry AreaConstruction Works Zone 3 Basement Floor Wet AreaConstruction Works Zone 2 Third Floor Wet AreaConstruction Works Zone 1 Basement Floor Dry AreaConstruction Works Zone 2 First Floor Dry AreaConstruction Works Zone 2 First Floor Wet AreaMaterial Procurement & Deliver on Site General All Floors All AreasConstruction Works Zone 1 Ground Floor Dry AreaConstruction Works Zone 1 Package 6A Access Area Dry AreaConstruction Works Zone 1 First Floor Dry AreaConstruction Works Zone 2 Upper Roof All AreasConstruction Works Zone 3 Basement Floor Dry AreaConstruction Works Zone 3 First Floor Dry AreaConstruction Works Zone 3 Ground Floor Dry AreaConstruction Works Zone 3 Lower Roof All AreasConstruction Works Zone 1 Package 6A Access Area Dry AreaConstruction Works Zone 3 Basement Floor Wet AreaConstruction Works Zone 3 Ground Floor Dry AreaConstruction Works Zone 2 First Floor Dry AreaConstruction Works Zone 2 Third Floor All AreasConstruction Works Zone 3 Basement Floor Dry AreaConstruction Works Zone 1 Ground Floor Dry AreaConstruction Works Zone 2 First Floor Wet AreaConstruction Works Zone 3 Package 6A Access Area Wet AreaConstruction Works Zone 3 Second Floor Dry AreaConstruction Works Zone 2 Second Floor Wet AreaConstruction Works Zone 1 Second Floor Dry AreaConstruction Works Zone 3 Basement Floor Dry AreaConstruction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 2 Third Floor Wet AreaConstruction Works Zone 2 Lower Roof Dry AreaConstruction Works Zone 3 Basement Floor Wet AreaConstruction Works Zone 3 Third Floor Wet AreaConstruction Works General General Requirements All AreasConstruction Works Zone 2 Package 6A Access Area Dry AreaConstruction Works Zone 1 Third Floor Wet AreaConstruction Works Zone 1 Third Floor Wet AreaConstruction Works Zone 3 Facade All Areas

Page 263: Progress Monitoring Sheet Empty

Construction Works Zone 2 First Floor Dry AreaConstruction Works Zone 2 Package 6A Access Area Dry AreaConstruction Works Zone 1 First Floor Dry AreaConstruction Works Zone 1 Second Floor Dry AreaConstruction Works Zone 2 Basement Floor Dry AreaConstruction Works Zone 2 Upper Roof All AreasConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Zone 1 Basement Floor Dry AreaConstruction Works Zone 2 Second Floor Dry AreaConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 1 Lower Roof Dry AreaConstruction Works Zone 3 Package 6A Access Area Dry AreaConstruction Works Zone 3 First Floor Dry AreaConstruction Works Zone 3 Ground Floor Dry AreaConstruction Works Zone 1 Package 6A Access Area Dry AreaConstruction Works Zone 2 Second Floor All AreasConstruction Works Zone 2 Second Floor Wet AreaConstruction Works Zone 2 Second Floor Dry AreaConstruction Works Zone 2 First Floor Dry AreaConstruction Works Zone 1 Upper Roof All AreasConstruction Works Zone 3 Third Floor Wet AreaConstruction Works Zone 2 First Floor Wet AreaConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 3 Basement Floor Wet AreaConstruction Works Zone 3 Second Floor Dry AreaConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 2 Basement Floor Dry AreaConstruction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 2 Lower Roof Dry AreaConstruction Works All Zones All Floors All AreasConstruction Works Zone 3 First Floor Dry AreaConstruction Works Zone 3 Ground Floor Dry AreaConstruction Works Zone 2 Ground Floor Dry AreaConstruction Works Zone 2 First Floor Wet AreaConstruction Works Zone 2 Package 6A Access Area Dry AreaConstruction Works Zone 2 Facade All AreasConstruction Works Zone 1 Second Floor Dry AreaConstruction Works Zone 3 Upper Roof All AreasConstruction Works Zone 1 Facade All AreasConstruction Works Zone 3 Lower Roof Dry AreaConstruction Works All Zones All Floors All AreasConstruction Works All Zones All Floors All AreasConstruction Works All Zones All Floors All AreasConstruction Works All Zones All Floors All AreasConstruction Works All Zones All Floors All AreasConstruction Works All Zones All Floors All AreasConstruction Works Zone 1 Basement Floor Dry AreaConstruction Works Zone 2 Package 6A Access Area Dry AreaConstruction Works Zone 1 Third Floor Wet AreaConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 1 Second Floor Dry Area

Page 264: Progress Monitoring Sheet Empty

Construction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 2 Second Floor Dry AreaConstruction Works Zone 3 Upper Roof All AreasConstruction Works Zone 3 Basement Floor Wet AreaConstruction Works Zone 2 Third Floor Wet AreaConstruction Works Zone 2 Lower Roof Dry AreaConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Zone 2 First Floor Wet AreaConstruction Works Zone 1 Basement Floor Dry AreaConstruction Works Zone 1 Basement Floor Dry AreaConstruction Works Zone 1 Basement Floor All AreasConstruction Works Zone 1 Basement Floor Dry AreaConstruction Works Zone 1 Basement Floor Dry AreaConstruction Works Zone 2 Package 6A Access Area Wet AreaConstruction Works Zone 2 Second Floor Dry AreaConstruction Works Zone 1 Lower Roof Dry AreaConstruction Works Zone 3 Third Floor All AreasConstruction Works Zone 3 Package 6A Access Area Dry AreaConstruction Works Zone 3 First Floor Dry AreaConstruction Works Zone 3 Second Floor Dry AreaConstruction Works Zone 3 Ground Floor Dry AreaConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 3 Second Floor Dry AreaConstruction Works Zone 2 Second Floor Dry AreaConstruction Works Zone 2 Second Floor Wet AreaConstruction Works Zone 2 First Floor Wet AreaConstruction Works Zone 1 Lower Roof Dry AreaConstruction Works Zone 2 Basement Floor Dry AreaConstruction Works Zone 2 Package 6A Access Area Wet AreaConstruction Works Zone 1 Third Floor Wet AreaConstruction Works Zone 2 Basement Floor Dry AreaConstruction Works Zone 2 Basement Floor Dry AreaConstruction Works Zone 2 Basement Floor All AreasConstruction Works Zone 2 Basement Floor Dry AreaConstruction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 3 First Floor Dry AreaConstruction Works Zone 3 Facade All AreasConstruction Works Zone 1 Lower Roof Dry AreaConstruction Works Zone 3 Lower Roof Dry AreaConstruction Works Zone 2 First Floor Dry AreaConstruction Works Zone 2 Package 6A Access Area Dry AreaConstruction Works Zone 1 Third Floor Wet AreaConstruction Works Zone 2 Second Floor Wet AreaConstruction Works Zone 1 Ground Floor Dry AreaConstruction Works Zone 2 Third Floor Wet AreaConstruction Works Zone 2 Second Floor Wet AreaConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Zone 3 First Floor Dry AreaConstruction Works Zone 3 Upper Roof All AreasConstruction Works Zone 1 Package 6A Access Area Dry AreaConstruction Works Zone 3 Third Floor Wet Area

Page 265: Progress Monitoring Sheet Empty

Construction Works Zone 3 Package 6A Access Area Dry AreaConstruction Works Zone 2 Basement Floor Dry AreaConstruction Works Zone 2 Second Floor Wet AreaConstruction Works Zone 2 Second Floor Dry AreaConstruction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 3 Package 6A Access Area Dry AreaConstruction Works Zone 3 Third Floor Wet AreaConstruction Works Zone 1 Basement Floor All AreasConstruction Works Zone 1 Ground Floor Dry AreaConstruction Works Zone 2 Second Floor Wet AreaConstruction Works Zone 1 Lower Roof Dry AreaConstruction Works All Zones All Floors All AreasConstruction Works Zone 3 Basement Floor Dry AreaConstruction Works Zone 3 Second Floor Dry AreaConstruction Works Zone 3 Second Floor Dry AreaConstruction Works Zone 2 Ground Floor Dry AreaConstruction Works Zone 1 Third Floor Wet AreaConstruction Works Zone 2 Ground Floor Dry AreaConstruction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 2 Lower Roof Dry AreaConstruction Works Zone 2 Lower Roof Dry AreaConstruction Works Zone 2 Second Floor Wet AreaConstruction Works Zone 3 Third Floor Wet AreaConstruction Works Zone 3 Second Floor Dry AreaConstruction Works Zone 2 Second Floor Wet AreaConstruction Works Zone 1 Lower Roof Dry AreaConstruction Works Zone 1 First Floor Dry AreaConstruction Works Zone 1 First Floor Dry AreaConstruction Works Zone 3 Basement Floor Dry AreaConstruction Works Zone 1 Third Floor Wet AreaConstruction Works Zone 3 Basement Floor Dry AreaConstruction Works Zone 3 Basement Floor Dry AreaConstruction Works Zone 2 Basement Floor All AreasConstruction Works Zone 2 Ground Floor Dry AreaConstruction Works Zone 2 Ground Floor Dry AreaConstruction Works Zone 2 Ground Floor Dry AreaConstruction Works Zone 2 Ground Floor All AreasConstruction Works Zone 2 Third Floor Wet AreaConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Zone 1 Lower Roof Dry AreaConstruction Works Zone 3 Facade All AreasConstruction Works Zone 1 Package 6A Access Area All AreasConstruction Works Zone 1 Package 6A Access Area Dry AreaConstruction Works Zone 1 Package 6A Access Area Dry AreaConstruction Works Zone 1 Package 6A Access Area Dry AreaConstruction Works Zone 1 Package 6A Access Area Dry Area

Page 266: Progress Monitoring Sheet Empty

Construction Works Zone 3 Package 6A Access Area Dry AreaConstruction Works Zone 2 Lower Roof Dry AreaConstruction Works Zone 3 Package 6A Access Area Dry AreaConstruction Works Zone 3 Third Floor Wet AreaConstruction Works Zone 3 Basement Floor Dry AreaConstruction Works Zone 2 Ground Floor Dry AreaConstruction Works Zone 1 First Floor Dry AreaConstruction Works Zone 1 Ground Floor Dry AreaConstruction Works Zone 1 Ground Floor Dry AreaConstruction Works Zone 1 Ground Floor Dry AreaConstruction Works Zone 1 Ground Floor All AreasConstruction Works Zone 2 First Floor Dry AreaConstruction Works Zone 2 First Floor Dry AreaConstruction Works All Zones All Floors All AreasConstruction Works Zone 3 Lower Roof Dry AreaConstruction Works Zone 2 Lower Roof Dry AreaConstruction Works Zone 3 Basement Floor All AreasConstruction Works Zone 3 Basement Floor Dry AreaConstruction Works Zone 1 First Floor Dry AreaConstruction Works Zone 3 Ground Floor Dry AreaConstruction Works All Zones External Works All AreasConstruction Works Zone 2 Third Floor Wet AreaConstruction Works Zone 2 Third Floor Wet AreaConstruction Works Zone 2 Third Floor Wet AreaConstruction Works All Zones External Works All AreasConstruction Works Zone 2 Package 6A Access Area Dry AreaConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 1 Second Floor Dry AreaConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 3 Basement Floor Wet AreaConstruction Works Zone 3 Ground Floor Dry AreaConstruction Works Zone 3 Ground Floor Dry AreaConstruction Works Zone 3 Ground Floor Dry AreaConstruction Works Zone 1 Second Floor Dry AreaConstruction Works Zone 1 Second Floor Dry AreaConstruction Works Zone 2 First Floor Dry AreaConstruction Works Zone 2 Third Floor Wet AreaConstruction Works Zone 3 Third Floor Wet AreaConstruction Works Zone 1 First Floor All AreasConstruction Works Zone 1 First Floor Dry AreaConstruction Works Zone 1 First Floor Dry AreaConstruction Works Zone 1 Second Floor Dry AreaConstruction Works Zone 1 Second Floor Dry AreaConstruction Works Zone 1 Second Floor Dry AreaConstruction Works Zone 1 Second Floor All AreasConstruction Works Zone 1 Second Floor Dry AreaConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 1 Third Floor All AreasConstruction Works Zone 3 Lower Roof Dry AreaConstruction Works All Zones External Works All Areas

Page 267: Progress Monitoring Sheet Empty

Construction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 3 Basement Floor Wet AreaConstruction Works Zone 3 Basement Floor Wet AreaConstruction Works All Zones All Floors All AreasConstruction Works Zone 3 Basement Floor Wet AreaConstruction Works Zone 1 Ground Floor Dry AreaConstruction Works Zone 2 First Floor Dry AreaConstruction Works Zone 2 First Floor All AreasConstruction Works Zone 2 First Floor Dry AreaConstruction Works Zone 2 First Floor Dry AreaConstruction Works Zone 2 Second Floor Dry AreaConstruction Works Zone 1 Lower Roof Dry AreaConstruction Works Zone 3 Package 6A Access Area Dry AreaConstruction Works Zone 3 Third Floor Wet AreaConstruction Works Zone 3 Third Floor Wet AreaConstruction Works Zone 3 Third Floor Wet AreaConstruction Works Zone 3 Ground Floor Dry AreaConstruction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 2 Second Floor Dry AreaConstruction Works Zone 2 Second Floor Dry AreaConstruction Works Zone 3 Ground Floor Dry AreaConstruction Works Zone 3 Ground Floor All AreasConstruction Works Zone 3 First Floor Dry AreaConstruction Works Zone 3 First Floor Dry AreaConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 1 Third Floor Dry AreaConstruction Works Zone 2 Lower Roof Dry AreaConstruction Works Zone 3 Lower Roof Dry AreaConstruction Works Zone 2 Second Floor Dry AreaConstruction Works Zone 2 Second Floor Dry AreaConstruction Works Zone 2 Second Floor Dry AreaConstruction Works Zone 2 Second Floor All AreasConstruction Works Zone 2 Second Floor Dry AreaConstruction Works Zone 3 Package 6A Access Area Wet AreaConstruction Works Zone 3 First Floor Dry AreaConstruction Works Zone 3 First Floor Dry AreaConstruction Works Zone 2 Package 6A Access Area All AreasConstruction Works Zone 2 Package 6A Access Area Dry AreaConstruction Works Zone 2 Package 6A Access Area Dry AreaConstruction Works Zone 2 Package 6A Access Area Dry AreaConstruction Works Zone 2 Package 6A Access Area Dry AreaConstruction Works Zone 1 Ground Floor All AreasConstruction Works Zone 3 First Floor Dry AreaConstruction Works Zone 1 Lower Roof Dry AreaConstruction Works Zone 2 Lower Roof Dry AreaConstruction Works Zone 3 Lower Roof Dry AreaConstruction Works Zone 3 Basement Floor All AreasConstruction Works Zone 3 Basement Floor Wet AreaConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Zone 3 Second Floor Dry Area

Page 268: Progress Monitoring Sheet Empty

Construction Works Zone 2 Ground Floor All AreasConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Zone 1 Third Floor Wet AreaConstruction Works Zone 1 Third Floor Wet AreaConstruction Works Zone 3 Lower Roof Dry AreaConstruction Works Zone 3 Lower Roof Dry AreaConstruction Works Zone 2 Lower Roof Dry AreaConstruction Works Zone 3 First Floor All AreasConstruction Works Zone 3 First Floor Dry AreaConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Zone 3 Second Floor Dry AreaConstruction Works Zone 3 Second Floor Dry AreaConstruction Works Zone 3 Second Floor Dry AreaConstruction Works Zone 1 Lower Roof All AreasConstruction Works Zone 2 First Floor Wet AreaConstruction Works Zone 2 First Floor Wet AreaConstruction Works Zone 2 First Floor Wet AreaConstruction Works Zone 2 First Floor Wet AreaConstruction Works Zone 1 Lower Roof Dry AreaConstruction Works Zone 1 Lower Roof Dry AreaConstruction Works Zone 1 Lower Roof Dry AreaConstruction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 2 Package 6A Access Area Wet AreaConstruction Works Zone 3 Second Floor Dry AreaConstruction Works Zone 3 Second Floor Dry AreaConstruction Works Zone 1 First Floor All AreasConstruction Works Zone 1 Package 6A Access Area All AreasConstruction Works Zone 1 Second Floor All AreasConstruction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 2 Third Floor All AreasConstruction Works Zone 1 Third Floor All AreasConstruction Works Zone 1 Lower Roof Dry AreaConstruction Works Zone 1 Third Floor Wet AreaConstruction Works Zone 2 First Floor Wet AreaConstruction Works Zone 2 First Floor All AreasConstruction Works Zone 2 Second Floor Wet AreaConstruction Works Zone 1 Third Floor Wet AreaConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Zone 2 Third Floor Wet AreaConstruction Works Zone 2 Third Floor Dry AreaConstruction Works Zone 3 Upper Roof All AreasConstruction Works Zone 3 Lower Roof Dry AreaConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Zone 3 Third Floor All AreasConstruction Works Zone 3 Second Floor Dry AreaConstruction Works Zone 3 Second Floor All Areas

Page 269: Progress Monitoring Sheet Empty

Construction Works Zone 2 Second Floor Wet AreaConstruction Works Zone 2 Package 6A Access Area All AreasConstruction Works Zone 2 Second Floor All AreasConstruction Works Project Close Out All Floors Close Out & TestingConstruction Works Project Close Out All Floors Close Out & TestingConstruction Works All Zones All Floors All AreasConstruction Works Zone 3 Package 6A Access Area Dry AreaConstruction Works Zone 2 Third Floor Wet AreaConstruction Works Zone 2 Lower Roof Dry AreaConstruction Works Zone 2 Lower Roof All AreasConstruction Works Zone 2 Lower Roof Dry AreaConstruction Works Zone 2 Lower Roof Dry AreaConstruction Works Zone 2 Lower Roof Dry AreaConstruction Works Zone 3 Third Floor Wet AreaConstruction Works Zone 2 Second Floor Wet AreaConstruction Works Zone 3 Third Floor Wet AreaConstruction Works Zone 2 Third Floor Wet AreaConstruction Works Project Close Out All Floors Close Out & TestingConstruction Works Zone 3 First Floor All AreasConstruction Works Zone 3 Ground Floor All AreasConstruction Works Zone 2 Third Floor All AreasConstruction Works Zone 3 Third Floor Wet AreaConstruction Works Zone 3 Lower Roof Dry AreaConstruction Works Zone 2 Third Floor Wet AreaConstruction Works Zone 3 Third Floor Dry AreaConstruction Works Project Close Out Facade Close Out & TestingConstruction Works Zone 2 Third Floor Wet AreaConstruction Works Zone 3 Lower Roof Dry AreaConstruction Works Zone 3 Lower Roof Dry AreaConstruction Works Zone 3 Lower Roof Dry AreaConstruction Works Zone 3 Package 6A Access Area All AreasConstruction Works Zone 3 Package 6A Access Area Dry AreaConstruction Works Zone 3 Package 6A Access Area Dry AreaConstruction Works Zone 3 Package 6A Access Area Dry AreaConstruction Works Zone 3 Package 6A Access Area Dry AreaConstruction Works Zone 3 Third Floor Wet AreaConstruction Works Zone 3 Package 6A Access Area All AreasConstruction Works Zone 3 Third Floor All AreasConstruction Works Zone 3 Second Floor All AreasConstruction Works Zone 3 Lower Roof All AreasConstruction Works Zone 3 Lower Roof Dry AreaConstruction Works Project Close Out External Works Close Out & TestingConstruction Works Project Close Out All Floors Close Out & TestingConstruction Works Project Close Out All Floors Close Out & TestingConstruction Works Project Close Out All Floors Close Out & Testing

#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A

Page 270: Progress Monitoring Sheet Empty

#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A#N/A #N/A #N/A #N/A

Page 271: Progress Monitoring Sheet Empty

WBS 7 Code NameArchitecture WorksArchitecture WorksGeneralGeneralGeneralArchitecture WorksElectrical WorksGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralGeneralArchitecture WorksArchitecture WorksElectrical WorksHVAC WorksPlumbing WorksElectrical WorksArchitecture WorksHVAC WorksArchitecture WorksPlumbing WorksElectrical WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksElectrical WorksArchitecture WorksArchitecture WorksPlumbing WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksHVAC WorksHVAC WorksElectrical WorksArchitecture WorksElectrical WorksArchitecture WorksElectrical WorksElectrical WorksPlumbing Works

Page 272: Progress Monitoring Sheet Empty

HVAC WorksElectrical WorksPlumbing WorksHVAC WorksPlumbing WorksHVAC WorksElectrical WorksElectrical WorksPlumbing WorksArchitecture WorksPlumbing WorksArchitecture WorksPlumbing WorksElectrical WorksHVAC WorksPlumbing WorksElectrical WorksHVAC WorksPlumbing WorksHVAC WorksArchitecture WorksElectrical WorksPlumbing WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksHVAC WorksArchitecture WorksElectrical WorksPlumbing WorksArchitecture WorksArchitecture WorksPlumbing WorksArchitecture WorksElectrical WorksArchitecture WorksHVAC WorksArchitecture WorksPlumbing WorksPlumbing WorksPlumbing WorksHVAC WorksHVAC WorksElectrical WorksArchitecture WorksArchitecture WorksElectrical WorksElectrical WorksArchitecture WorksElectrical Works

Page 273: Progress Monitoring Sheet Empty

Plumbing WorksHVAC WorksPlumbing WorksArchitecture WorksElectrical WorksHVAC WorksArchitecture WorksPlumbing WorksArchitecture WorksPlumbing WorksHVAC WorksElectrical WorksPlumbing WorksArchitecture WorksArchitecture WorksElectrical WorksElectrical WorksPlumbing WorksElectrical WorksPlumbing WorksElectrical WorksArchitecture WorksHVAC WorksArchitecture WorksPlumbing WorksPlumbing WorksPlumbing WorksElectrical WorksElectrical WorksArchitecture WorksPlumbing WorksElectrical WorksHVAC WorksArchitecture WorksPlumbing WorksPlumbing WorksArchitecture WorksHVAC WorksElectrical WorksArchitecture WorksHVAC WorksArchitecture WorksArchitecture WorksPlumbing WorksArchitecture WorksElectrical WorksPlumbing WorksHVAC WorksArchitecture WorksArchitecture WorksHVAC Works

Page 274: Progress Monitoring Sheet Empty

HVAC WorksHVAC WorksArchitecture WorksPlumbing WorksElectrical WorksArchitecture WorksElectrical WorksPlumbing WorksPlumbing WorksElectrical WorksElectrical WorksPlumbing WorksPlumbing WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksPlumbing WorksArchitecture WorksElectrical WorksElectrical WorksElectrical WorksPlumbing WorksHVAC WorksPlumbing WorksHVAC WorksArchitecture WorksHVAC WorksHVAC WorksPlumbing WorksPlumbing WorksElectrical WorksElectrical WorksArchitecture WorksElectrical WorksArchitecture WorksHVAC WorksPlumbing WorksArchitecture WorksArchitecture WorksElectrical WorksPlumbing WorksArchitecture WorksPlumbing WorksHVAC Works

Page 275: Progress Monitoring Sheet Empty

Plumbing WorksPlumbing WorksArchitecture WorksHVAC WorksPlumbing WorksHVAC WorksPlumbing WorksPlumbing WorksElectrical WorksArchitecture WorksArchitecture WorksHVAC WorksArchitecture WorksElectrical WorksArchitecture WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksPlumbing WorksHVAC WorksElectrical WorksArchitecture WorksHVAC WorksArchitecture WorksHVAC WorksElectrical WorksElectrical WorksArchitecture WorksPlumbing WorksElectrical WorksArchitecture WorksHVAC WorksPlumbing WorksArchitecture WorksPlumbing WorksArchitecture WorksArchitecture WorksElectrical WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksPlumbing WorksHVAC WorksArchitecture Works

Page 276: Progress Monitoring Sheet Empty

Electrical WorksArchitecture WorksArchitecture WorksElectrical WorksHVAC WorksPlumbing WorksArchitecture WorksElectrical WorksPlumbing WorksArchitecture WorksArchitecture WorksElectrical WorksPlumbing WorksHVAC WorksArchitecture WorksHVAC WorksArchitecture WorksElectrical WorksPlumbing WorksPlumbing WorksPlumbing WorksArchitecture WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksPlumbing WorksArchitecture WorksHVAC WorksArchitecture WorksElectrical WorksArchitecture WorksPlumbing WorksElectrical WorksArchitecture WorksArchitecture WorksArchitecture WorksPlumbing WorksPlumbing WorksArchitecture WorksElectrical WorksElectrical WorksArchitecture WorksArchitecture WorksPlumbing WorksElectrical WorksHVAC WorksArchitecture WorksElectrical WorksPlumbing WorksPlumbing Works

Page 277: Progress Monitoring Sheet Empty

Electrical WorksArchitecture WorksArchitecture WorksPlumbing WorksPlumbing WorksElectrical WorksPlumbing WorksArchitecture WorksElectrical WorksArchitecture WorksArchitecture WorksPlumbing WorksHVAC WorksElectrical WorksArchitecture WorksPlumbing WorksPlumbing WorksPlumbing WorksHVAC WorksArchitecture WorksElectrical WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksHVAC WorksPlumbing WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksPlumbing WorksPlumbing WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksPlumbing WorksArchitecture WorksArchitecture WorksHVAC WorksElectrical WorksPlumbing WorksElectrical WorksElectrical Works

Page 278: Progress Monitoring Sheet Empty

Architecture WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksArchitecture WorksArchitecture WorksPlumbing WorksElectrical WorksArchitecture WorksArchitecture WorksPlumbing WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksPlumbing WorksArchitecture WorksElectrical WorksArchitecture WorksElectrical WorksPlumbing WorksHVAC WorksPlumbing WorksArchitecture WorksPlumbing WorksArchitecture WorksPlumbing WorksElectrical WorksPlumbing WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksPlumbing WorksPlumbing WorksArchitecture WorksPlumbing WorksHVAC WorksElectrical WorksHVAC WorksArchitecture WorksArchitecture WorksElectrical WorksHVAC WorksPlumbing WorksArchitecture Works

Page 279: Progress Monitoring Sheet Empty

Plumbing WorksElectrical WorksElectrical WorksArchitecture WorksElectrical WorksArchitecture WorksHVAC WorksElectrical WorksArchitecture WorksElectrical WorksArchitecture WorksArchitecture WorksElectrical WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksElectrical WorksArchitecture WorksArchitecture WorksHVAC WorksHVAC WorksArchitecture WorksPlumbing WorksHVAC WorksElectrical WorksElectrical WorksPlumbing WorksPlumbing WorksPlumbing WorksPlumbing WorksPlumbing WorksPlumbing WorksElectrical WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksHVAC WorksArchitecture WorksGeneralElectrical WorksArchitecture WorksArchitecture WorksArchitecture Works

Page 280: Progress Monitoring Sheet Empty

Architecture WorksArchitecture WorksElectrical WorksPlumbing WorksElectrical WorksElectrical WorksArchitecture WorksArchitecture WorksArchitecture WorksHVAC WorksArchitecture WorksArchitecture WorksHVAC WorksHVAC WorksArchitecture WorksPlumbing WorksArchitecture WorksElectrical WorksHVAC WorksPlumbing WorksArchitecture WorksElectrical WorksElectrical WorksPlumbing WorksElectrical WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksArchitecture WorksArchitecture WorksElectrical WorksPlumbing WorksHVAC WorksElectrical WorksElectrical WorksPlumbing WorksElectrical WorksArchitecture WorksElectrical WorksElectrical WorksElectrical WorksElectrical WorksElectrical WorksElectrical WorksArchitecture WorksPlumbing WorksElectrical WorksPlumbing WorksArchitecture Works

Page 281: Progress Monitoring Sheet Empty

Electrical WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksHVAC WorksHVAC WorksHVAC WorksArchitecture WorksArchitecture WorksElectrical WorksElectrical WorksPlumbing WorksElectrical WorksPlumbing WorksArchitecture WorksElectrical WorksHVAC WorksElectrical WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksPlumbing WorksHVAC WorksHVAC WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksPlumbing WorksArchitecture WorksHVAC WorksArchitecture WorksElectrical WorksArchitecture WorksArchitecture WorksElectrical WorksArchitecture WorksArchitecture WorksPlumbing WorksArchitecture WorksArchitecture WorksHVAC WorksArchitecture WorksArchitecture Works

Page 282: Progress Monitoring Sheet Empty

Electrical WorksElectrical WorksHVAC WorksElectrical WorksPlumbing WorksHVAC WorksElectrical WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksPlumbing WorksPlumbing WorksPlumbing WorksArchitecture WorksElectrical WorksPlumbing WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksHVAC WorksElectrical WorksPlumbing WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksPlumbing WorksHVAC WorksHVAC WorksArchitecture WorksArchitecture WorksHVAC WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksPlumbing WorksHVAC WorksElectrical WorksElectrical WorksElectrical WorksArchitecture WorksArchitecture WorksElectrical WorksHVAC WorksHVAC Works

Page 283: Progress Monitoring Sheet Empty

HVAC WorksArchitecture WorksPlumbing WorksArchitecture WorksArchitecture WorksElectrical WorksArchitecture WorksArchitecture WorksHVAC WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksArchitecture WorksPlumbing WorksArchitecture WorksArchitecture WorksElectrical WorksArchitecture WorksArchitecture WorksPlumbing WorksHVAC WorksElectrical WorksPlumbing WorksArchitecture WorksArchitecture WorksArchitecture WorksHVAC WorksHVAC WorksArchitecture WorksHVAC WorksHVAC WorksElectrical WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksArchitecture WorksArchitecture WorksHVAC WorksArchitecture WorksHVAC WorksHVAC WorksArchitecture WorksElectrical WorksArchitecture WorksArchitecture WorksElectrical WorksElectrical Works

Page 284: Progress Monitoring Sheet Empty

Electrical WorksElectrical WorksArchitecture WorksArchitecture WorksHVAC WorksElectrical WorksElectrical WorksArchitecture WorksArchitecture WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksPlumbing WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksHVAC WorksElectrical WorksArchitecture WorksArchitecture WorksElectrical WorksPlumbing WorksArchitecture WorksHVAC WorksHVAC WorksArchitecture WorksElectrical WorksPlumbing WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksHVAC WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture Works

Page 285: Progress Monitoring Sheet Empty

Architecture WorksElectrical WorksArchitecture WorksArchitecture WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksHVAC WorksHVAC WorksHVAC WorksHVAC WorksElectrical WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksPlumbing WorksHVAC WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksHVAC WorksHVAC WorksArchitecture WorksArchitecture WorksElectrical WorksElectrical WorksElectrical WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksElectrical WorksElectrical WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture Works

Page 286: Progress Monitoring Sheet Empty

Architecture WorksArchitecture WorksArchitecture WorksElectrical WorksPlumbing WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksArchitecture WorksHVAC WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksPlumbing WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksElectrical WorksGeneralElectrical WorksElectrical WorksHVAC WorksHVAC WorksArchitecture WorksArchitecture WorksElectrical WorksHVAC WorksHVAC WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksArchitecture WorksGeneralArchitecture WorksArchitecture WorksArchitecture Works

#N/A#N/A#N/A#N/A#N/A#N/A

Page 287: Progress Monitoring Sheet Empty

#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A#N/A

Page 288: Progress Monitoring Sheet Empty

WBS-1 WBS-2 WBS-3Code Value Description Code Value Description Code ValueOSR6B Project name XXX PCK Package 6 B Mil

SDSSDAMASMAAMAP

4CON

Page 289: Progress Monitoring Sheet Empty

WBS-3 WBS-4 WBS-5Description Code Value Description Code ValueGeneral Mile Stones GEN General GMShop Drawing Submittals Z1 Zone 1 SDSShop Drawing Approval Z2 Zone 2 SDAMaterial Submittals Z3 Zone 3 MASMateria Approval AZ All Zones MAAMaterial Procurement & Deliver on Site CO Project Close Out MAPMateria Deliver on Site MADConstruction Works GR

BFGFFFSFTFLRURAAAFFCCSEWCO

Page 290: Progress Monitoring Sheet Empty

WBS-5 WBS-6 WBS-7Description Code Value Description Code Value DescriptionGeneral Mile Stones ALL All Areas GN GeneralShop Drawing Submittals DRY Dry Area FM Package 6A Finish MilestonesShop Drawing Approval WET Wet Area AW Architecture WorksMaterial Submittals SCC SCECO ROOM EW Electrical WorksMateria Approval CLO Close Out & Testing PW Plumbing WorksMateria Procurement HW HVAC WorksMateria Deliver on SiteGeneral RequirementsBasement FloorGround FloorFirst FloorSecond FloorThird FloorLower RoofUpper RoofPackage 6A Access AreaAll FloorsFacadeElevators & EscalatorsExternal WorksClose Out & Testing

Page 291: Progress Monitoring Sheet Empty

Page 291 of 353

Sample Project

Dates Percentages % Quantities Data Date 25/Jan/09

Description % Var. Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14 Wk15

S.N Activity Name 13/Dec/08 20/May/10 30/Dec/99 20/May/10 -34 0.2% 0.00% -0.2% 372,500,011 372,500,011.0 616,292.7 0.0 -616,293

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

Data

WBS-L1 WBS-L2 WBS-L4 WBS-L5 WBS-L6 WBS-L7 S.N DESCRIPTIO Sum of MaterMin of PlanneMax of Planned FinMin of Start Date Max of FinishMin of DaysSum of TotaSum of RemaiSum of Plan Sum of Finis Sum of QTY Sum of WK1-Sum of WK2-Sum of WK3-Sum of WK4-Sum of WK5-Sum of WK6-Sum of WK7-Sum of WK8-Sum of WK9-Sum of WK10Sum of WK11

Project name XXX 13/Dec/08 20/May/10 20/May/10 -34372500011 372500011 616292.662 0 -616292.66 0.0 64,774.3 97,161.4 97,161.4 132,748.4 168,335.4 168,335.4 168,335.4 124,236.7 80,138.0 91,376.3

Package 6 B 13/Dec/08 20/May/10 20/May/10 -34372500011 372500011 616292.662 0 -616292.66 0.0 64,774.3 97,161.4 97,161.4 132,748.4 168,335.4 168,335.4 168,335.4 124,236.7 80,138.0 91,376.3

22/Dec/08 20/May/10 20/May/10 -34372500011 372500011 616292.662 0 -616292.66 0.0 64,774.3 97,161.4 97,161.4 132,748.4 168,335.4 168,335.4 168,335.4 124,236.7 80,138.0 91,376.3

All Zones 31/Aug/09 17/Apr/10 17/Apr/10 0 38992185 38992185 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Floors 31/Aug/09 17/Apr/10 17/Apr/10 0 22181959 22181959 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 31/Aug/09 17/Apr/10 17/Apr/10 0 22181959 22181959 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 13/Jan/10 6/Apr/10 6/Apr/10 0 2023282 2023282 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

666 Garbage chute 13/Jan/10 6/Apr/10 6/Apr/10 0 544532 544532 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0770 Cleaning equipment 16/Feb/10 6/Apr/10 6/Apr/10 0 1478750 1478750 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 9/Nov/09 10/Apr/10 10/Apr/10 0 6583546 6583546 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0488 MCC (Motor Control Cent 9/Nov/09 6/Apr/10 6/Apr/10 0 553356 553356 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0499 ATS (Automatic transform 11/Nov/09 10/Apr/10 10/Apr/10 0 68123 68123 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0500 CCTV System 11/Nov/09 10/Apr/10 10/Apr/10 0 866178 866178 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0501 Public Address System 11/Nov/09 10/Apr/10 10/Apr/10 0 715254 715254 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0502 Telephone System 11/Nov/09 10/Apr/10 10/Apr/10 0 150773 150773 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0503 MATV System 11/Nov/09 10/Apr/10 10/Apr/10 0 236460 236460 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0504 FIRE ALARM SYSTEM 11/Nov/09 10/Apr/10 10/Apr/10 0 1518354 1518354 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0625 Generator sets 30/Dec/09 10/Apr/10 10/Apr/10 0 2475048 2475048 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 31/Aug/09 22/Feb/10 22/Feb/10 0 10965925 10965925 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0333 HVAC Equipments 31/Aug/09 22/Feb/10 22/Feb/10 0 10965925 10965925 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 13/Dec/09 17/Apr/10 17/Apr/10 0 2609206 2609206 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0574 Plumbing Pumbs 13/Dec/09 17/Apr/10 17/Apr/10 0 2609206 2609206 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

External Works 2/Jan/10 25/Mar/10 25/Mar/10 0 16810226 16810226 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 2/Jan/10 25/Mar/10 25/Mar/10 0 16810226 16810226 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 2/Jan/10 9/Mar/10 9/Mar/10 0 5328019 5328019 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0632 LANDSCAPING 2/Jan/10 9/Mar/10 9/Mar/10 0 5328019 5328019 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 12/Jan/10 25/Mar/10 25/Mar/10 0 10519032 10519032 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0662 STREET LIGHTING 12/Jan/10 25/Mar/10 25/Mar/10 0 10519032 10519032 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 3/Jan/10 11/Mar/10 11/Mar/10 0 963175 963175 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0636 Irrigation system 3/Jan/10 11/Mar/10 11/Mar/10 0 963175 963175 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

General 22/Dec/08 17/Mar/10 19/Apr/10 -34 5622888 5622888 616292.662 0 -616292.66 0.0 64,774.3 97,161.4 97,161.4 132,748.4 168,335.4 168,335.4 168,335.4 124,236.7 80,138.0 80,138.0General Requirements 22/Dec/08 17/Mar/10 19/Apr/10 -34 5622888 5622888 616292.662 0 -616292.66 0.0 64,774.3 97,161.4 97,161.4 132,748.4 168,335.4 168,335.4 168,335.4 124,236.7 80,138.0 80,138.0

All Areas 22/Dec/08 17/Mar/10 19/Apr/10 -34 5622888 5622888 616292.662 0 -616292.66 0.0 64,774.3 97,161.4 97,161.4 132,748.4 168,335.4 168,335.4 168,335.4 124,236.7 80,138.0 80,138.0General 22/Dec/08 17/Mar/10 19/Apr/10 -34 5622888 5622888 616292.662 0 -616292.66 0.0 64,774.3 97,161.4 97,161.4 132,748.4 168,335.4 168,335.4 168,335.4 124,236.7 80,138.0 80,138.0

3 Site Offices for Consultan 22/Dec/08 16/Mar/10 19/Apr/10 -34 460900 460900 35821.2435 0 -35821.244 0.0 4,776.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.24 Site Offices and Stores fo 22/Dec/08 16/Mar/10 19/Apr/10 -34 115789 115789 8999.14508 0 -8999.1451 0.0 1,199.9 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.85 Insurances 22/Dec/08 9/Feb/09 15/Mar/09 -34 632081 632081 440986.744 0 -440986.74 0.0 58,798.2 88,197.3 88,197.3 88,197.3 88,197.3 88,197.3 88,197.3 44,098.7 0.0 0.08 Access of Site 13/Jan/09 19/Oct/09 31/Oct/09 -12 43469 43469 1992.32917 0 -1992.3292 0.0 0.0 0.0 0.0 543.4 1,086.7 1,086.7 1,086.7 1,086.7 1,086.7 1,086.79 Limitations of the Site 13/Jan/09 19/Oct/09 31/Oct/09 -12 34800 34800 1595 0 -1595 0.0 0.0 0.0 0.0 435.0 870.0 870.0 870.0 870.0 870.0 870.010 Constructional Plant 13/Jan/09 14/Mar/10 26/Mar/10 -12 1205200 1205200 36321.0959 0 -36321.096 0.0 0.0 0.0 0.0 9,905.8 19,811.5 19,811.5 19,811.5 19,811.5 19,811.5 19,811.511 Water for the Works 13/Jan/09 14/Mar/10 26/Mar/10 -12 450000 450000 13561.6438 0 -13561.644 0.0 0.0 0.0 0.0 3,698.6 7,397.3 7,397.3 7,397.3 7,397.3 7,397.3 7,397.312 Temporary Lighting and P 13/Jan/09 14/Mar/10 26/Mar/10 -12 1686610 1686610 50829.3425 0 -50829.342 0.0 0.0 0.0 0.0 13,862.5 27,725.1 27,725.1 27,725.1 27,725.1 27,725.1 27,725.113 Site Working Conditions 13/Jan/09 14/Mar/10 26/Mar/10 -12 388080 388080 11695.5616 0 -11695.562 0.0 0.0 0.0 0.0 3,189.7 6,379.4 6,379.4 6,379.4 6,379.4 6,379.4 6,379.414 Sheds and Storage Faciliti 13/Jan/09 14/Mar/10 26/Mar/10 -12 39285 39285 1183.93151 0 -1183.9315 0.0 0.0 0.0 0.0 322.9 645.8 645.8 645.8 645.8 645.8 645.815 Progress Photographs 13/Jan/09 14/Mar/10 26/Mar/10 -12 14278 14278 430.29589 0 -430.29589 0.0 0.0 0.0 0.0 117.4 234.7 234.7 234.7 234.7 234.7 234.716 Program 13/Jan/09 14/Mar/10 26/Mar/10 -12 427260 427260 12876.3288 0 -12876.329 0.0 0.0 0.0 0.0 3,511.7 7,023.5 7,023.5 7,023.5 7,023.5 7,023.5 7,023.5454 As-Built Drawings & Ope 22/Oct/09 17/Mar/10 17/Mar/10 0 125136 125136 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Project Close Out 15/Feb/10 20/May/10 20/May/10 0 2278074 2278074 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Floors 15/Feb/10 20/May/10 20/May/10 0 2278074 2278074 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Close Out & Testing 15/Feb/10 20/May/10 20/May/10 0 2278074 2278074 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 25/Feb/10 20/May/10 20/May/10 0 1682874 1682874 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

782 Doors & Windows Close 25/Feb/10 20/May/10 20/May/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0807 Painting Touch Up & Clos 30/Mar/10 19/May/10 19/May/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0808 Elevators & Escalators 31/Mar/10 19/May/10 19/May/10 0 1682874 1682874 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0809 Metal Works Close Out 12/Apr/10 19/May/10 19/May/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 15/Feb/10 20/May/10 20/May/10 0 170200 170200 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0768 Electrical Works Close Ou 15/Feb/10 20/May/10 20/May/10 0 170200 170200 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 15/Feb/10 20/May/10 20/May/10 0 425000 425000 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0769 Plumbing Close Out 15/Feb/10 20/May/10 20/May/10 0 425000 425000 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

External Works 25/Mar/10 29/Apr/10 29/Apr/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Close Out & Testing 25/Mar/10 29/Apr/10 29/Apr/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

General 25/Mar/10 29/Apr/10 29/Apr/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0806 External Works Close Out 25/Mar/10 29/Apr/10 29/Apr/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade 4/Mar/10 2/May/10 2/May/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Close Out & Testing 4/Mar/10 2/May/10 2/May/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

General 4/Mar/10 2/May/10 2/May/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0790 Facade Works Close Out 4/Mar/10 2/May/10 2/May/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Zone 1 21/Feb/09 6/Apr/10 6/Apr/10 0 88984961 88984961 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11,238.3Basement Floor 21/Feb/09 24/Jan/10 24/Jan/10 0 17896042 17896042 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11,238.3

All Areas 21/Feb/09 16/Jan/10 16/Jan/10 0 4057905 4057905 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11,238.3Architecture Works 21/Feb/09 16/Jan/10 16/Jan/10 0 418121 418121 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11,238.3

23 Block Work 21/Feb/09 16/Jun/09 16/Jun/09 0 187305 187305 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11,238.3520 Metal Works 15/Nov/09 16/Jan/10 16/Jan/10 0 82772 82772 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0570 Signage 12/Dec/09 16/Jan/10 16/Jan/10 0 148044 148044 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 16/Mar/09 13/Aug/09 13/Aug/09 0 1011943 1011943 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.033 Electrical Conduits & Box 16/Mar/09 4/Jul/09 4/Jul/09 0 212184 212184 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.095 Electrical Cable Tray 13/May/09 13/Aug/09 13/Aug/09 0 799759 799759 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 9/Apr/09 27/Jul/09 27/Jul/09 0 1386269 1386269 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.056 HVAC Ducting 9/Apr/09 27/Jul/09 27/Jul/09 0 1386269 1386269 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 8/Apr/09 16/Sep/09 16/Sep/09 0 1241572 1241572 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.055 Domestic Water Piping 8/Apr/09 30/Jun/09 30/Jun/09 0 2611 2611 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.061 Drainage Piping 15/Apr/09 20/Jun/09 20/Jun/09 0 64922 64922 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.084 Fire Fighting Piping 2/May/09 16/Sep/09 16/Sep/09 0 1174039 1174039 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 20/Apr/09 24/Jan/10 24/Jan/10 0 13838137 13838137 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Planned Start

Planned Finish

Actual Start

Actual Finish

Days Var.

Planned %

Actual %

Total. QTY

Rem. QTY

Planned QTY

Actual QTY

QTY Var.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

Page 292: Progress Monitoring Sheet Empty

Page 292 of 353

Sample Project

Dates Percentages % Quantities Data Date 25/Jan/09

Description % Var. Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14 Wk15

S.N Activity Name 13/Dec/08 20/May/10 30/Dec/99 20/May/10 -34 0.2% 0.00% -0.2% 372,500,011 372,500,011.0 616,292.7 0.0 -616,293

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

Planned Start

Planned Finish

Actual Start

Actual Finish

Days Var.

Planned %

Actual %

Total. QTY

Rem. QTY

Planned QTY

Actual QTY

QTY Var.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

Architecture Works 20/Apr/09 24/Jan/10 24/Jan/10 0 4321002 4321002 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.062 Plaster Work 20/Apr/09 13/Aug/09 13/Aug/09 0 127610 127610 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.096 Ramps Waterproofing 13/May/09 15/Jun/09 15/Jun/09 0 8769 8769 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0135 Wall Covering ( Ceramic / 6/Jun/09 26/Sep/09 26/Sep/09 0 7922 7922 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0229 Painting 1st Stage 22/Jul/09 3/Nov/09 3/Nov/09 0 1812457 1812457 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0246 Floor Covering ( Ceramic 30/Jul/09 11/Nov/09 11/Nov/09 0 1327751 1327751 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0350 Suspended ceiling & gyps 3/Sep/09 20/Dec/09 20/Dec/09 0 217087 217087 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0466 Doors & Windows 28/Oct/09 6/Jan/10 6/Jan/10 0 100826 100826 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0505 Glazing 11/Nov/09 4/Jan/10 4/Jan/10 0 291622 291622 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0521 Painting Final Stage 15/Nov/09 24/Jan/10 24/Jan/10 0 426958 426958 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 9/Aug/09 24/Jan/10 24/Jan/10 0 8564621 8564621 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0272 Wires & Cables 9/Aug/09 19/Nov/09 19/Nov/09 0 7524987 7524987 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0424 Panel Boards 11/Oct/09 10/Dec/09 10/Dec/09 0 491139 491139 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0522 Electrical Wiring Devices 15/Nov/09 24/Jan/10 24/Jan/10 0 548495 548495 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 26/Aug/09 24/Jan/10 24/Jan/10 0 429421 429421 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0318 HVAC - Air Outlets 26/Aug/09 22/Nov/09 22/Nov/09 0 208775 208775 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0518 HVAC A/C Units 15/Nov/09 24/Jan/10 24/Jan/10 0 119241 119241 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0519 Exhaust Fans 15/Nov/09 24/Jan/10 24/Jan/10 0 101405 101405 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 3/Sep/09 21/Oct/09 21/Oct/09 0 523093 523093 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0349 Piping Accessories 3/Sep/09 21/Oct/09 21/Oct/09 0 523093 523093 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators & Escalators 1/Sep/09 6/Apr/10 6/Apr/10 0 8437607 8437607 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 1/Sep/09 6/Apr/10 6/Apr/10 0 8437607 8437607 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 1/Sep/09 6/Apr/10 6/Apr/10 0 8437607 8437607 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0335 Elevators & Escalators 1/Sep/09 6/Apr/10 6/Apr/10 0 8437607 8437607 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade 27/Jul/09 16/Feb/10 16/Feb/10 0 9372070 9372070 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 27/Jul/09 16/Feb/10 16/Feb/10 0 9372070 9372070 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 27/Jul/09 16/Feb/10 16/Feb/10 0 9150307 9150307 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0236 Facade Plaster & Paint 27/Jul/09 22/Oct/09 22/Oct/09 0 290158 290158 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0315 Aluminum Panel cladding 23/Aug/09 16/Feb/10 16/Feb/10 0 8860149 8860149 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 10/Nov/09 16/Feb/10 16/Feb/10 0 221763 221763 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0497 FACADE LIGHTING INSTA 10/Nov/09 16/Feb/10 16/Feb/10 0 221763 221763 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

First Floor 14/Apr/09 18/Mar/10 18/Mar/10 0 8053295 8053295 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 14/Apr/09 10/Mar/10 10/Mar/10 0 3059020 3059020 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 14/Apr/09 10/Mar/10 10/Mar/10 0 1306909 1306909 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.060 Block Work 14/Apr/09 8/Aug/09 8/Aug/09 0 958035 958035 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0651 Metal Works 11/Jan/10 10/Mar/10 10/Mar/10 0 323186 323186 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0741 Signage 3/Feb/10 10/Mar/10 10/Mar/10 0 25688 25688 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 7/May/09 10/Sep/09 10/Sep/09 0 363180 363180 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.086 Electrical Conduits & Box 7/May/09 6/Aug/09 6/Aug/09 0 228315 228315 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0147 Electrical Cable Tray 15/Jun/09 10/Sep/09 10/Sep/09 0 134865 134865 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 6/Jun/09 31/Aug/09 31/Aug/09 0 786792 786792 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0134 HVAC Ducting 6/Jun/09 31/Aug/09 31/Aug/09 0 786792 786792 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 31/May/09 27/Oct/09 27/Oct/09 0 602139 602139 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0128 Domestic Water Piping 31/May/09 31/Aug/09 31/Aug/09 0 40307 40307 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0145 Drainage Piping 14/Jun/09 25/Aug/09 25/Aug/09 0 50132 50132 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0165 Fire Fighting Piping 23/Jun/09 27/Oct/09 27/Oct/09 0 511700 511700 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 13/Jun/09 18/Mar/10 18/Mar/10 0 4994275 4994275 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 13/Jun/09 18/Mar/10 18/Mar/10 0 2441280 2441280 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

141 Plaster Work 13/Jun/09 12/Oct/09 12/Oct/09 0 297430 297430 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0218 Wall Covering ( Ceramic / 18/Jul/09 8/Nov/09 8/Nov/09 0 45100 45100 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0345 Painting 1st Stage 2/Sep/09 19/Dec/09 19/Dec/09 0 145722 145722 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0363 Floor Covering ( Ceramic 10/Sep/09 28/Dec/09 28/Dec/09 0 705059 705059 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0430 Suspended ceiling & gyps 12/Oct/09 24/Jan/10 24/Jan/10 0 746088 746088 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0589 Wood Cladding 20/Dec/09 7/Feb/10 7/Feb/10 0 54675 54675 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0590 Glazing 20/Dec/09 7/Feb/10 7/Feb/10 0 174216 174216 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0618 Doors & Windows 30/Dec/09 7/Mar/10 7/Mar/10 0 154600 154600 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0652 Painting Final Stage 11/Jan/10 18/Mar/10 18/Mar/10 0 118390 118390 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 16/Sep/09 9/Mar/10 9/Mar/10 0 1909071 1909071 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0379 Wires & Cables 16/Sep/09 16/Dec/09 16/Dec/09 0 1680187 1680187 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0461 Panel Boards 26/Oct/09 27/Dec/09 27/Dec/09 0 197243 197243 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0630 Electrical Wiring Devices 2/Jan/10 9/Mar/10 9/Mar/10 0 31641 31641 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 6/Oct/09 18/Mar/10 18/Mar/10 0 441831 441831 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0414 HVAC - Air Outlets 6/Oct/09 31/Dec/09 31/Dec/09 0 350793 350793 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0653 HVAC A/C Units 11/Jan/10 18/Mar/10 18/Mar/10 0 91038 91038 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 3/Oct/09 28/Dec/09 28/Dec/09 0 202093 202093 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0408 Piping Accessories 3/Oct/09 28/Dec/09 28/Dec/09 0 202093 202093 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ground Floor 10/Mar/09 22/Mar/10 22/Mar/10 0 12122520 12122520 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 10/Mar/09 27/Feb/10 27/Feb/10 0 3168411 3168411 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 10/Mar/09 27/Feb/10 27/Feb/10 0 798254 798254 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.029 Block Work 10/Mar/09 4/Jul/09 4/Jul/09 0 197053 197053 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0622 Metal Works 30/Dec/09 27/Feb/10 27/Feb/10 0 416483 416483 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0705 Signage 23/Jan/10 27/Feb/10 27/Feb/10 0 184718 184718 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 2/Apr/09 19/Oct/09 19/Oct/09 0 324890 324890 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.052 Electrical Conduits & Box 2/Apr/09 2/Jul/09 2/Jul/09 0 234661 234661 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0255 Electrical Cable Tray 3/Aug/09 19/Oct/09 19/Oct/09 0 90229 90229 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 23/Apr/09 4/Aug/09 4/Aug/09 0 835439 835439 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.068 HVAC Ducting 23/Apr/09 4/Aug/09 4/Aug/09 0 835439 835439 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 22/Apr/09 12/Oct/09 12/Oct/09 0 1209828 1209828 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.066 Drainage Piping 22/Apr/09 4/Jul/09 4/Jul/09 0 248301 248301 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0104 Domestic Water Piping 16/May/09 6/Aug/09 6/Aug/09 0 356209 356209 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0109 Fire Fighting Piping 19/May/09 12/Oct/09 12/Oct/09 0 605318 605318 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 9/May/09 22/Mar/10 22/Mar/10 0 8363910 8363910 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 9/May/09 7/Mar/10 7/Mar/10 0 5849928 5849928 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

87 Plaster Work 9/May/09 2/Sep/09 2/Sep/09 0 47950 47950 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0143 Waterproofing 13/Jun/09 15/Jul/09 15/Jul/09 0 911996 911996 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0170 Wall Covering ( Ceramic / 24/Jun/09 15/Oct/09 15/Oct/09 0 2132 2132 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0282 Painting 1st Stage 10/Aug/09 22/Nov/09 22/Nov/09 0 418544 418544 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0302 Floor Covering ( Ceramic 18/Aug/09 5/Dec/09 5/Dec/09 0 2906735 2906735 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 293: Progress Monitoring Sheet Empty

Page 293 of 353

Sample Project

Dates Percentages % Quantities Data Date 25/Jan/09

Description % Var. Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14 Wk15

S.N Activity Name 13/Dec/08 20/May/10 30/Dec/99 20/May/10 -34 0.2% 0.00% -0.2% 372,500,011 372,500,011.0 616,292.7 0.0 -616,293

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

Planned Start

Planned Finish

Actual Start

Actual Finish

Days Var.

Planned %

Actual %

Total. QTY

Rem. QTY

Planned QTY

Actual QTY

QTY Var.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

442 Suspended ceiling & gyps 19/Oct/09 31/Jan/10 31/Jan/10 0 274165 274165 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0553 Glazing 5/Dec/09 23/Jan/10 23/Jan/10 0 157080 157080 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0571 Doors & Windows 13/Dec/09 17/Feb/10 17/Feb/10 0 843113 843113 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0619 Painting Final Stage 30/Dec/09 7/Mar/10 7/Mar/10 0 288213 288213 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 26/Aug/09 22/Mar/10 22/Mar/10 0 1866357 1866357 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0319 Wires & Cables 26/Aug/09 22/Nov/09 22/Nov/09 0 1317845 1317845 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0412 Panel Boards 5/Oct/09 6/Dec/09 6/Dec/09 0 125958 125958 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0668 Electrical Wiring Devices 14/Jan/10 22/Mar/10 22/Mar/10 0 422554 422554 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 12/Oct/09 7/Mar/10 7/Mar/10 0 402953 402953 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0428 HVAC Air Outlets 12/Oct/09 7/Jan/10 7/Jan/10 0 235625 235625 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0620 HVAC A/C Units 30/Dec/09 7/Mar/10 7/Mar/10 0 77568 77568 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0621 Exhaust Fans 30/Dec/09 7/Mar/10 7/Mar/10 0 89760 89760 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 26/Jul/09 22/Oct/09 22/Oct/09 0 244672 244672 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0234 Piping Accessories 26/Jul/09 22/Oct/09 22/Oct/09 0 244672 244672 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

SCECO ROOM 29/Jun/09 12/Oct/09 12/Oct/09 0 590199 590199 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 29/Jun/09 12/Oct/09 12/Oct/09 0 443910 443910 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

177 Block Work 29/Jun/09 9/Aug/09 9/Aug/09 0 99003 99003 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0213 Plaster Work 16/Jul/09 26/Aug/09 26/Aug/09 0 90370 90370 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0239 Waterproofing 28/Jul/09 30/Aug/09 30/Aug/09 0 58548 58548 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0254 Painting 1st Stage 3/Aug/09 13/Sep/09 13/Sep/09 0 52487 52487 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0307 Doors & Windows 20/Aug/09 28/Sep/09 28/Sep/09 0 118294 118294 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0320 Painting Final Stage 27/Aug/09 12/Oct/09 12/Oct/09 0 25208 25208 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 29/Jun/09 26/Aug/09 26/Aug/09 0 132590 132590 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0180 Electrical Works 29/Jun/09 26/Aug/09 26/Aug/09 0 132590 132590 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1/Jul/09 12/Oct/09 12/Oct/09 0 3222 3222 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0184 HVAC Works 1/Jul/09 12/Oct/09 12/Oct/09 0 3222 3222 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 1/Jul/09 13/Aug/09 13/Aug/09 0 10477 10477 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0183 Drainage Piping 1/Jul/09 13/Aug/09 13/Aug/09 0 10477 10477 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Lower Roof 21/Jul/09 25/Mar/10 25/Mar/10 0 6521000 6521000 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 21/Jul/09 22/Mar/10 22/Mar/10 0 2089722 2089722 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 21/Jul/09 22/Mar/10 22/Mar/10 0 498244 498244 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0227 Block Work 21/Jul/09 2/Nov/09 2/Nov/09 0 234472 234472 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0728 Metal Works 31/Jan/10 22/Mar/10 22/Mar/10 0 263772 263772 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 7/Sep/09 27/Dec/09 27/Dec/09 0 167637 167637 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0356 Electrical Conduits & Box 7/Sep/09 27/Dec/09 27/Dec/09 0 167637 167637 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 8/Aug/09 19/Nov/09 19/Nov/09 0 1350747 1350747 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0270 HVAC Works 8/Aug/09 19/Nov/09 19/Nov/09 0 1350747 1350747 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 31/Aug/09 24/Dec/09 24/Dec/09 0 73094 73094 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0334 Piping Works 31/Aug/09 24/Dec/09 24/Dec/09 0 73094 73094 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 8/Sep/09 25/Mar/10 25/Mar/10 0 4431278 4431278 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 8/Sep/09 23/Mar/10 23/Mar/10 0 1339784 1339784 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

359 Plaster Work 8/Sep/09 24/Dec/09 24/Dec/09 0 66990 66990 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0403 Waterproofing 30/Sep/09 19/Nov/09 19/Nov/09 0 562359 562359 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0469 Painting 1st Stage 29/Oct/09 24/Jan/10 24/Jan/10 0 94141 94141 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0536 Floor Covering ( Ceramic 22/Nov/09 16/Feb/10 16/Feb/10 0 4379 4379 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0588 Suspended ceiling & gyps 19/Dec/09 11/Mar/10 11/Mar/10 0 230895 230895 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0674 Doors & Windows 14/Jan/10 6/Mar/10 6/Mar/10 0 55853 55853 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0707 Glazing 24/Jan/10 15/Mar/10 15/Mar/10 0 290852 290852 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0735 Painting Final Stage 1/Feb/10 23/Mar/10 23/Mar/10 0 34315 34315 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 16/Nov/09 25/Mar/10 25/Mar/10 0 522852 522852 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0525 Wires & Cables 16/Nov/09 25/Jan/10 25/Jan/10 0 322331 322331 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0605 Panel Boards 24/Dec/09 3/Feb/10 3/Feb/10 0 148539 148539 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0749 Electrical Wiring Devices 3/Feb/10 25/Mar/10 25/Mar/10 0 51982 51982 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1/Dec/09 23/Mar/10 23/Mar/10 0 2539625 2539625 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0547 HVAC Air Outlets 1/Dec/09 6/Feb/10 6/Feb/10 0 296089 296089 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0733 HVAC A/C Units 1/Feb/10 23/Mar/10 23/Mar/10 0 1851448 1851448 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0734 Exhaust Fans 1/Feb/10 23/Mar/10 23/Mar/10 0 392088 392088 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 13/Dec/09 17/Feb/10 17/Feb/10 0 29017 29017 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0573 Piping Accessories 13/Dec/09 17/Feb/10 17/Feb/10 0 29017 29017 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Package 6A Access Area 30/May/09 10/Mar/10 10/Mar/10 0 6932757 6932757 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 30/May/09 10/Mar/10 10/Mar/10 0 1483237 1483237 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 30/May/09 10/Mar/10 10/Mar/10 0 875937 875937 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0125 Block Work 30/May/09 4/Aug/09 4/Aug/09 0 307395 307395 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0607 Metal Works 24/Dec/09 27/Jan/10 27/Jan/10 0 426751 426751 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0742 Signage 3/Feb/10 10/Mar/10 10/Mar/10 0 141791 141791 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 9/Jul/09 5/Sep/09 5/Sep/09 0 596726 596726 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0199 Electrical Cable Tray 9/Jul/09 5/Sep/09 5/Sep/09 0 596726 596726 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 16/Jun/09 22/Aug/09 22/Aug/09 0 1972 1972 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0149 HVAC Ducting 16/Jun/09 22/Aug/09 22/Aug/09 0 1972 1972 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 16/Jun/09 16/Sep/09 16/Sep/09 0 8602 8602 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0148 Drainage Piping 16/Jun/09 4/Aug/09 4/Aug/09 0 442 442 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0200 Fire Fighting Piping 9/Jul/09 16/Sep/09 16/Sep/09 0 8160 8160 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 12/Jul/09 28/Jan/10 28/Jan/10 0 4759258 4759258 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 12/Jul/09 28/Jan/10 28/Jan/10 0 3697393 3697393 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

206 Plaster Work 12/Jul/09 16/Sep/09 16/Sep/09 0 79730 79730 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0297 Wall Covering ( Ceramic / 16/Aug/09 18/Oct/09 18/Oct/09 0 31324 31324 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0348 Painting 1st Stage 2/Sep/09 27/Oct/09 27/Oct/09 0 158950 158950 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0394 Floor Covering ( Ceramic 28/Sep/09 16/Nov/09 16/Nov/09 0 1395494 1395494 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0473 Suspended ceiling & gyps 2/Nov/09 24/Dec/09 24/Dec/09 0 949533 949533 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0559 Doors & Windows 7/Dec/09 11/Jan/10 11/Jan/10 0 934189 934189 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0608 Painting Final Stage 24/Dec/09 28/Jan/10 28/Jan/10 0 148173 148173 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 24/Sep/09 23/Jan/10 23/Jan/10 0 970514 970514 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0387 Wires & Cables 24/Sep/09 28/Oct/09 28/Oct/09 0 865397 865397 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0609 Electrical Wiring Devices 24/Dec/09 23/Jan/10 23/Jan/10 0 105117 105117 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 12/Oct/09 23/Jan/10 23/Jan/10 0 45246 45246 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0429 HVAC Air Outlets 12/Oct/09 15/Nov/09 15/Nov/09 0 13443 13443 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0610 HVAC A/C Units 24/Dec/09 23/Jan/10 23/Jan/10 0 28212 28212 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0611 Exhaust Fans 24/Dec/09 23/Jan/10 23/Jan/10 0 3591 3591 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 294: Progress Monitoring Sheet Empty

Page 294 of 353

Sample Project

Dates Percentages % Quantities Data Date 25/Jan/09

Description % Var. Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14 Wk15

S.N Activity Name 13/Dec/08 20/May/10 30/Dec/99 20/May/10 -34 0.2% 0.00% -0.2% 372,500,011 372,500,011.0 616,292.7 0.0 -616,293

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

Planned Start

Planned Finish

Actual Start

Actual Finish

Days Var.

Planned %

Actual %

Total. QTY

Rem. QTY

Planned QTY

Actual QTY

QTY Var.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

Plumbing Works 15/Oct/09 17/Nov/09 17/Nov/09 0 46105 46105 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0436 Piping Accessories 15/Oct/09 17/Nov/09 17/Nov/09 0 46105 46105 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 4/Aug/09 28/Sep/09 28/Sep/09 0 690262 690262 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 4/Aug/09 28/Sep/09 28/Sep/09 0 690262 690262 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

256 Waterproofing 4/Aug/09 28/Sep/09 28/Sep/09 0 690262 690262 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Second Floor 19/May/09 18/Mar/10 18/Mar/10 0 7911216 7911216 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 19/May/09 10/Mar/10 10/Mar/10 0 3478035 3478035 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 19/May/09 10/Mar/10 10/Mar/10 0 1574297 1574297 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

108 Block Work 19/May/09 12/Sep/09 12/Sep/09 0 908126 908126 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0657 Metal Works 11/Jan/10 10/Mar/10 10/Mar/10 0 643694 643694 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0743 Signage 3/Feb/10 10/Mar/10 10/Mar/10 0 22477 22477 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 11/Jun/09 29/Oct/09 29/Oct/09 0 341017 341017 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0140 Electrical Conduits & Box 11/Jun/09 10/Sep/09 10/Sep/09 0 217166 217166 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0231 Electrical Cable Tray 25/Jul/09 29/Oct/09 29/Oct/09 0 123851 123851 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 17/Jun/09 15/Oct/09 15/Oct/09 0 884346 884346 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0152 HVAC Ducting 17/Jun/09 15/Oct/09 15/Oct/09 0 884346 884346 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 18/Jun/09 5/Dec/09 5/Dec/09 0 678375 678375 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0156 Drainage Piping 18/Jun/09 23/Aug/09 23/Aug/09 0 50132 50132 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0196 Domestic Water Piping 6/Jul/09 1/Oct/09 1/Oct/09 0 40307 40307 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0281 Fire Fighting Piping 10/Aug/09 5/Dec/09 5/Dec/09 0 587936 587936 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 18/Jul/09 18/Mar/10 18/Mar/10 0 4433181 4433181 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 18/Jul/09 18/Mar/10 18/Mar/10 0 2249724 2249724 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

220 Plaster Work 18/Jul/09 16/Nov/09 16/Nov/09 0 214410 214410 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0280 Wall Covering ( Ceramic / 10/Aug/09 5/Dec/09 5/Dec/09 0 57400 57400 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0374 Painting 1st Stage 14/Sep/09 30/Dec/09 30/Dec/09 0 107403 107403 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0419 Floor Covering ( Ceramic 8/Oct/09 20/Jan/10 20/Jan/10 0 669015 669015 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0509 Suspended ceiling & gyps 12/Nov/09 24/Feb/10 24/Feb/10 0 741121 741121 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0639 Doors & Windows 5/Jan/10 13/Mar/10 13/Mar/10 0 150136 150136 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0646 Wood Cladding 9/Jan/10 27/Feb/10 27/Feb/10 0 42861 42861 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0647 Glazing 9/Jan/10 27/Feb/10 27/Feb/10 0 171360 171360 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0654 Painting Final Stage 11/Jan/10 18/Mar/10 18/Mar/10 0 96018 96018 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 6/Oct/09 18/Mar/10 18/Mar/10 0 1648765 1648765 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0415 Wires & Cables 6/Oct/09 31/Dec/09 31/Dec/09 0 1555235 1555235 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0495 Panel Boards 10/Nov/09 11/Jan/10 11/Jan/10 0 55086 55086 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0658 Electrical Wiring Devices 11/Jan/10 18/Mar/10 18/Mar/10 0 38444 38444 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 21/Oct/09 18/Mar/10 18/Mar/10 0 347831 347831 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0447 HVAC Air Outlets 21/Oct/09 16/Jan/10 16/Jan/10 0 189443 189443 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0655 HVAC A/C Units 11/Jan/10 18/Mar/10 18/Mar/10 0 21968 21968 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0656 Exhaust Fans 11/Jan/10 18/Mar/10 18/Mar/10 0 136420 136420 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 26/Oct/09 18/Jan/10 18/Jan/10 0 186861 186861 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0462 Piping Accessories 26/Oct/09 18/Jan/10 18/Jan/10 0 186861 186861 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Third Floor 23/Jun/09 28/Mar/10 28/Mar/10 0 9903178 9903178 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 23/Jun/09 10/Mar/10 10/Mar/10 0 3899100 3899100 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 23/Jun/09 10/Mar/10 10/Mar/10 0 1652986 1652986 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0166 Block Work 23/Jun/09 21/Oct/09 21/Oct/09 0 984951 984951 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0660 Metal Works 11/Jan/10 10/Mar/10 10/Mar/10 0 651980 651980 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0748 Signage 3/Feb/10 10/Mar/10 10/Mar/10 0 16055 16055 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 16/Jul/09 16/Nov/09 16/Nov/09 0 340490 340490 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0212 Electrical Conduits & Box 16/Jul/09 12/Oct/09 12/Oct/09 0 235650 235650 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0306 Electrical Cable Tray 20/Aug/09 16/Nov/09 16/Nov/09 0 104840 104840 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 22/Jul/09 11/Nov/09 11/Nov/09 0 1265774 1265774 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0230 HVAC Ducting 22/Jul/09 11/Nov/09 11/Nov/09 0 1265774 1265774 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 16/Jul/09 17/Feb/10 17/Feb/10 0 639850 639850 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0211 Drainage Piping 16/Jul/09 4/Oct/09 4/Oct/09 0 52123 52123 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0273 Domestic Water Piping 9/Aug/09 27/Oct/09 27/Oct/09 0 53567 53567 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0380 Fire Fighting Piping 16/Sep/09 17/Feb/10 17/Feb/10 0 534160 534160 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 10/Aug/09 27/Mar/10 27/Mar/10 0 5237555 5237555 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 10/Aug/09 20/Mar/10 20/Mar/10 0 2963596 2963596 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

279 Plaster Work 10/Aug/09 13/Dec/09 13/Dec/09 0 165830 165830 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0347 Waterproofing 2/Sep/09 27/Oct/09 27/Oct/09 0 88452 88452 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0358 Wall Covering ( Ceramic / 8/Sep/09 3/Jan/10 3/Jan/10 0 22714 22714 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0402 Painting 1st Stage 30/Sep/09 11/Jan/10 11/Jan/10 0 99857 99857 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0484 Floor Covering ( Ceramic 7/Nov/09 18/Feb/10 18/Feb/10 0 650016 650016 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0531 Suspended ceiling & gyps 18/Nov/09 2/Mar/10 2/Mar/10 0 782634 782634 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0638 Doors & Windows 5/Jan/10 13/Mar/10 13/Mar/10 0 154862 154862 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0659 Painting Final Stage 11/Jan/10 20/Mar/10 20/Mar/10 0 80910 80910 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0688 Glazing 20/Jan/10 10/Mar/10 10/Mar/10 0 185640 185640 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0689 Wood Cladding 20/Jan/10 10/Mar/10 10/Mar/10 0 732681 732681 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 4/Nov/09 27/Mar/10 27/Mar/10 0 1553040 1553040 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0481 Wires & Cables 4/Nov/09 5/Jan/10 5/Jan/10 0 1427222 1427222 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0510 Panel Boards 12/Nov/09 31/Jan/10 31/Jan/10 0 92376 92376 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0687 Electrical Wiring Devices 19/Jan/10 27/Mar/10 27/Mar/10 0 33442 33442 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 29/Oct/09 14/Mar/10 14/Mar/10 0 522758 522758 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0468 HVAC Air Outlets 29/Oct/09 24/Jan/10 24/Jan/10 0 240825 240825 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0640 HVAC A/C Units 5/Jan/10 14/Mar/10 14/Mar/10 0 145513 145513 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0641 Exhaust Fans 5/Jan/10 14/Mar/10 14/Mar/10 0 136420 136420 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 12/Nov/09 4/Feb/10 4/Feb/10 0 198161 198161 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0508 Piping Accessories 12/Nov/09 4/Feb/10 4/Feb/10 0 198161 198161 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 28/Jul/09 28/Mar/10 28/Mar/10 0 766523 766523 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 2/Sep/09 21/Mar/10 21/Mar/10 0 172283 172283 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

346 Plaster Work 2/Sep/09 19/Dec/09 19/Dec/09 0 16764 16764 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0373 Waterproofing 14/Sep/09 30/Dec/09 30/Dec/09 0 8601 8601 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0456 Wall Covering ( Ceramic / 24/Oct/09 26/Jan/10 26/Jan/10 0 46809 46809 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0457 Painting 1st Stage 24/Oct/09 18/Jan/10 18/Jan/10 0 420 420 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0551 Floor Covering ( Ceramic 3/Dec/09 24/Feb/10 24/Feb/10 0 31040 31040 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0579 Suspended ceiling 15/Dec/09 8/Mar/10 8/Mar/10 0 11830 11830 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0716 Doors & Windows 28/Jan/10 18/Mar/10 18/Mar/10 0 43488 43488 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0717 Painting Final Stage 28/Jan/10 20/Mar/10 20/Mar/10 0 420 420 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 295: Progress Monitoring Sheet Empty

Page 295 of 353

Sample Project

Dates Percentages % Quantities Data Date 25/Jan/09

Description % Var. Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14 Wk15

S.N Activity Name 13/Dec/08 20/May/10 30/Dec/99 20/May/10 -34 0.2% 0.00% -0.2% 372,500,011 372,500,011.0 616,292.7 0.0 -616,293

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

Planned Start

Planned Finish

Actual Start

Actual Finish

Days Var.

Planned %

Actual %

Total. QTY

Rem. QTY

Planned QTY

Actual QTY

QTY Var.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

754 Toilet and Bath Accessori 7/Feb/10 21/Mar/10 21/Mar/10 0 12911 12911 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Electrical Works 12/Nov/09 28/Mar/10 28/Mar/10 0 563185 563185 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

507 Wires & Cables 12/Nov/09 21/Jan/10 21/Jan/10 0 5652 5652 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0750 Electrical Wiring Devices 6/Feb/10 28/Mar/10 28/Mar/10 0 557533 557533 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 24/Nov/09 2/Feb/10 2/Feb/10 0 23152 23152 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0539 HVAC Air Outlets 24/Nov/09 2/Feb/10 2/Feb/10 0 23152 23152 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 28/Jul/09 25/Feb/10 25/Feb/10 0 7903 7903 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

238 Plumbing Works 28/Jul/09 25/Nov/09 25/Nov/09 0 6864 6864 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0592 Plumbing Accessories 21/Dec/09 25/Feb/10 25/Feb/10 0 1039 1039 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Upper Roof 5/Aug/09 29/Dec/09 29/Dec/09 0 1835276 1835276 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 5/Aug/09 29/Dec/09 29/Dec/09 0 1835276 1835276 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 5/Aug/09 15/Oct/09 15/Oct/09 0 927688 927688 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0257 Roofing System 5/Aug/09 15/Oct/09 15/Oct/09 0 850056 850056 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0289 Block Work 13/Aug/09 7/Oct/09 7/Oct/09 0 77632 77632 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 4/Oct/09 29/Dec/09 29/Dec/09 0 499929 499929 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0409 Electrical Works 4/Oct/09 29/Dec/09 29/Dec/09 0 499929 499929 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 17/Sep/09 26/Nov/09 26/Nov/09 0 363652 363652 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0381 HVAC Works 17/Sep/09 26/Nov/09 26/Nov/09 0 363652 363652 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 2/Nov/09 21/Dec/09 21/Dec/09 0 44007 44007 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0478 Plumbing Works 2/Nov/09 21/Dec/09 21/Dec/09 0 44007 44007 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Zone 2 28/Feb/09 24/Apr/10 24/Apr/10 0130765819 130765819 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Basement Floor 28/Feb/09 14/Feb/10 14/Feb/10 0 22767438 22767438 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 28/Feb/09 26/Jan/10 26/Jan/10 0 5050377 5050377 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 28/Feb/09 26/Jan/10 26/Jan/10 0 266666 266666 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

25 Block Work 28/Feb/09 23/Jun/09 23/Jun/09 0 48888 48888 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0542 Metal Works 25/Nov/09 26/Jan/10 26/Jan/10 0 69734 69734 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0595 Signage 22/Dec/09 26/Jan/10 26/Jan/10 0 148044 148044 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 12/Apr/09 20/Aug/09 20/Aug/09 0 1124734 1124734 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.057 Electrical Conduits & Box 12/Apr/09 20/Aug/09 20/Aug/09 0 218697 218697 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0106 Electrical Cable Tray 17/May/09 17/Aug/09 17/Aug/09 0 906037 906037 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 11/May/09 20/Aug/09 20/Aug/09 0 1955276 1955276 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.093 HVAC Ducting 11/May/09 20/Aug/09 20/Aug/09 0 1955276 1955276 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 11/May/09 7/Nov/09 7/Nov/09 0 1703701 1703701 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.090 Drainage Piping 11/May/09 8/Jul/09 8/Jul/09 0 79529 79529 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.091 Domestic Water Piping 11/May/09 30/Jul/09 30/Jul/09 0 3489 3489 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.092 Fire Fighting Piping 11/May/09 7/Nov/09 7/Nov/09 0 1620683 1620683 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 29/Apr/09 14/Feb/10 14/Feb/10 0 17717061 17717061 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 29/Apr/09 3/Feb/10 3/Feb/10 0 6856888 6856888 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

77 Plaster Work 29/Apr/09 24/Aug/09 24/Aug/09 0 37450 37450 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0115 Ramps Waterproofing 23/May/09 25/Jun/09 25/Jun/09 0 12956 12956 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0146 Wall Covering ( Ceramic / 15/Jun/09 6/Oct/09 6/Oct/09 0 8584 8584 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0250 Painting 1st Stage 1/Aug/09 14/Nov/09 14/Nov/09 0 1687773 1687773 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0276 Floor Covering ( Ceramic 9/Aug/09 22/Nov/09 22/Nov/09 0 2190548 2190548 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0371 Suspended ceiling & gyps 13/Sep/09 30/Dec/09 30/Dec/09 0 580064 580064 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0485 Doors & Windows 8/Nov/09 17/Jan/10 17/Jan/10 0 75567 75567 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0537 Glazing 22/Nov/09 14/Jan/10 14/Jan/10 0 1858266 1858266 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0543 Painting Final Stage 25/Nov/09 3/Feb/10 3/Feb/10 0 405680 405680 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 18/Aug/09 14/Feb/10 14/Feb/10 0 9787623 9787623 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0303 Wires & Cables 18/Aug/09 3/Dec/09 3/Dec/09 0 8659006 8659006 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0463 Panel Boards 26/Oct/09 27/Dec/09 27/Dec/09 0 390436 390436 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0562 Electrical Wiring Devices 9/Dec/09 14/Feb/10 14/Feb/10 0 738181 738181 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 5/Sep/09 3/Feb/10 3/Feb/10 0 505254 505254 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0352 HVAC - Air Outlets 5/Sep/09 5/Dec/09 5/Dec/09 0 280861 280861 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0540 HVAC A/C Units 25/Nov/09 3/Feb/10 3/Feb/10 0 96260 96260 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0541 Exhaust Fans 25/Nov/09 3/Feb/10 3/Feb/10 0 128133 128133 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 25/Aug/09 22/Nov/09 22/Nov/09 0 567296 567296 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0317 Piping Accessories 25/Aug/09 22/Nov/09 22/Nov/09 0 567296 567296 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators & Escalators 1/Sep/09 6/Apr/10 6/Apr/10 0 12404477 12404477 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 1/Sep/09 6/Apr/10 6/Apr/10 0 12404477 12404477 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 1/Sep/09 6/Apr/10 6/Apr/10 0 12404477 12404477 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0336 Elevators & Escalators 1/Sep/09 6/Apr/10 6/Apr/10 0 12404477 12404477 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade 1/Sep/09 16/Feb/10 16/Feb/10 0 5896357 5896357 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 1/Sep/09 16/Feb/10 16/Feb/10 0 5896357 5896357 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 1/Sep/09 16/Feb/10 16/Feb/10 0 5681308 5681308 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0338 Facade Plaster & Paint 1/Sep/09 1/Dec/09 1/Dec/09 0 255714 255714 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0376 Aluminum Panel cladding 15/Sep/09 16/Feb/10 16/Feb/10 0 5425594 5425594 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 10/Nov/09 16/Feb/10 16/Feb/10 0 215049 215049 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0494 FACADE LIGHTING INSTA 10/Nov/09 16/Feb/10 16/Feb/10 0 215049 215049 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

First Floor 6/May/09 29/Mar/10 29/Mar/10 0 14862716 14862716 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 6/May/09 14/Mar/10 14/Mar/10 0 5235933 5235933 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 6/May/09 14/Mar/10 14/Mar/10 0 2485956 2485956 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.085 Block Work 6/May/09 30/Aug/09 30/Aug/09 0 384158 384158 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0670 Metal Works 14/Jan/10 14/Mar/10 14/Mar/10 0 2062758 2062758 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0752 Signage 7/Feb/10 14/Mar/10 14/Mar/10 0 39040 39040 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 22/Jun/09 5/Oct/09 5/Oct/09 0 448413 448413 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0159 Electrical Conduits & Box 22/Jun/09 18/Aug/09 18/Aug/09 0 214350 214350 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0235 Electrical Cable Tray 27/Jul/09 5/Oct/09 5/Oct/09 0 234063 234063 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 17/Jun/09 1/Oct/09 1/Oct/09 0 1035573 1035573 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0154 HVAC Ducting 17/Jun/09 1/Oct/09 1/Oct/09 0 1035573 1035573 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 22/Jun/09 26/Oct/09 26/Oct/09 0 1265991 1265991 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0160 Drainage Piping 22/Jun/09 26/Aug/09 26/Aug/09 0 105476 105476 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0161 Domestic Water Piping 22/Jun/09 2/Sep/09 2/Sep/09 0 137759 137759 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0210 Fire Fighting Piping 15/Jul/09 26/Oct/09 26/Oct/09 0 1022756 1022756 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 23/Jun/09 22/Mar/10 22/Mar/10 0 8367448 8367448 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 23/Jun/09 22/Mar/10 22/Mar/10 0 4866612 4866612 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

168 Plaster Work 23/Jun/09 22/Oct/09 22/Oct/09 0 302190 302190 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0242 Wall Covering ( Ceramic / 28/Jul/09 18/Nov/09 18/Nov/09 0 75850 75850 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 296: Progress Monitoring Sheet Empty

Page 296 of 353

Sample Project

Dates Percentages % Quantities Data Date 25/Jan/09

Description % Var. Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14 Wk15

S.N Activity Name 13/Dec/08 20/May/10 30/Dec/99 20/May/10 -34 0.2% 0.00% -0.2% 372,500,011 372,500,011.0 616,292.7 0.0 -616,293

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

Planned Start

Planned Finish

Actual Start

Actual Finish

Days Var.

Planned %

Actual %

Total. QTY

Rem. QTY

Planned QTY

Actual QTY

QTY Var.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

370 Painting 1st Stage 13/Sep/09 30/Dec/09 30/Dec/09 0 143978 143978 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0389 Floor Covering ( Ceramic 26/Sep/09 7/Jan/10 7/Jan/10 0 1355874 1355874 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0459 Suspended ceiling & gyps 24/Oct/09 4/Feb/10 4/Feb/10 0 1211670 1211670 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0623 Wood Cladding 30/Dec/09 18/Feb/10 18/Feb/10 0 91988 91988 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0624 Glazing 30/Dec/09 18/Feb/10 18/Feb/10 0 1389562 1389562 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0648 Doors & Windows 9/Jan/10 16/Mar/10 16/Mar/10 0 167950 167950 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0671 Painting Final Stage 14/Jan/10 22/Mar/10 22/Mar/10 0 127550 127550 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 11/Oct/09 22/Mar/10 22/Mar/10 0 2628630 2628630 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0425 Wires & Cables 11/Oct/09 5/Jan/10 5/Jan/10 0 2153269 2153269 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0549 Panel Boards 3/Dec/09 30/Jan/10 30/Jan/10 0 90248 90248 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0669 Electrical Wiring Devices 14/Jan/10 22/Mar/10 22/Mar/10 0 385113 385113 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 29/Sep/09 22/Mar/10 22/Mar/10 0 617838 617838 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0399 HVAC - Air Outlets 29/Sep/09 24/Dec/09 24/Dec/09 0 407986 407986 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0477 Exhaust Fans 2/Nov/09 11/Jan/10 11/Jan/10 0 7174 7174 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0672 HVAC A/C Units 14/Jan/10 22/Mar/10 22/Mar/10 0 202678 202678 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 17/Oct/09 12/Jan/10 12/Jan/10 0 254368 254368 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0439 Piping Accessories 17/Oct/09 12/Jan/10 12/Jan/10 0 254368 254368 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 11/Jul/09 29/Mar/10 29/Mar/10 0 1259335 1259335 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 16/Jul/09 23/Mar/10 23/Mar/10 0 326751 326751 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

216 Plaster Work 16/Jul/09 29/Oct/09 29/Oct/09 0 29304 29304 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0241 Waterproofing 28/Jul/09 10/Nov/09 10/Nov/09 0 31312 31312 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0342 Wall Covering ( Ceramic / 1/Sep/09 10/Dec/09 10/Dec/09 0 81982 81982 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0426 Painting 1st Stage 11/Oct/09 5/Jan/10 5/Jan/10 0 2188 2188 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

443 Floor Covering ( Ceramic 19/Oct/09 14/Jan/10 14/Jan/10 0 30720 30720 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0535 Suspended ceiling 22/Nov/09 16/Feb/10 16/Feb/10 0 21125 21125 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0729 Toilet and Bath Accessori 1/Feb/10 14/Mar/10 14/Mar/10 0 28095 28095 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0730 Painting Final Stage 1/Feb/10 23/Mar/10 23/Mar/10 0 2188 2188 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0731 Doors & Windows 1/Feb/10 23/Mar/10 23/Mar/10 0 99837 99837 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 3/Nov/09 29/Mar/10 29/Mar/10 0 668973 668973 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0480 Wires & Cables 3/Nov/09 12/Jan/10 12/Jan/10 0 22023 22023 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0751 Electrical Wiring Devices 7/Feb/10 29/Mar/10 29/Mar/10 0 646950 646950 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 15/Nov/09 24/Jan/10 24/Jan/10 0 59837 59837 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0517 HVAC Air Outlets 15/Nov/09 24/Jan/10 24/Jan/10 0 59837 59837 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 11/Jul/09 23/Mar/10 23/Mar/10 0 203774 203774 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0204 Plumbing Works 11/Jul/09 3/Oct/09 3/Oct/09 0 32970 32970 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0492 Plumbing Accessories 9/Nov/09 18/Jan/10 18/Jan/10 0 57491 57491 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0732 Sanitary Fixtures & Toilet 1/Feb/10 23/Mar/10 23/Mar/10 0 113313 113313 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ground Floor 25/Mar/09 6/Mar/10 6/Mar/10 0 16290743 16290743 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 25/Mar/09 2/Mar/10 2/Mar/10 0 5405376 5405376 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 25/Mar/09 2/Mar/10 2/Mar/10 0 1856278 1856278 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.039 Block Work 25/Mar/09 19/Jul/09 19/Jul/09 0 127293 127293 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

599 Metal Works 22/Dec/09 18/Feb/10 18/Feb/10 0 1553562 1553562 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0714 Signage 26/Jan/10 2/Mar/10 2/Mar/10 0 175423 175423 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 25/May/09 4/Oct/09 4/Oct/09 0 339352 339352 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0120 Electrical Conduits & Box 25/May/09 25/Aug/09 25/Aug/09 0 224475 224475 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0179 Electrical Cable Tray 29/Jun/09 4/Oct/09 4/Oct/09 0 114877 114877 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 9/May/09 26/Aug/09 26/Aug/09 0 1255871 1255871 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.088 HVAC Ducting 9/May/09 26/Aug/09 26/Aug/09 0 1255871 1255871 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 30/May/09 16/Nov/09 16/Nov/09 0 1953875 1953875 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0126 Drainage Piping 30/May/09 20/Aug/09 20/Aug/09 0 319825 319825 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0127 Domestic Water Piping 30/May/09 20/Aug/09 20/Aug/09 0 466938 466938 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0176 Fire Fighting Piping 27/Jun/09 16/Nov/09 16/Nov/09 0 1167112 1167112 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 19/May/09 6/Mar/10 6/Mar/10 0 9901698 9901698 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 19/May/09 27/Feb/10 27/Feb/10 0 7126809 7126809 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

110 Plaster Work 19/May/09 13/Sep/09 13/Sep/09 0 42490 42490 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0155 Waterproofing 17/Jun/09 21/Jul/09 21/Jul/09 0 739312 739312 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0194 Wall Covering ( Ceramic / 5/Jul/09 26/Oct/09 26/Oct/09 0 4100 4100 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0308 Painting 1st Stage 20/Aug/09 7/Dec/09 7/Dec/09 0 439031 439031 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0325 Floor Covering ( Ceramic 29/Aug/09 15/Dec/09 15/Dec/09 0 3389057 3389057 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

418 Suspended ceiling & gyps 7/Oct/09 19/Jan/10 19/Jan/10 0 621522 621522 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0578 Glazing 15/Dec/09 3/Feb/10 3/Feb/10 0 319872 319872 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0580 Doors & Windows 16/Dec/09 21/Feb/10 21/Feb/10 0 1268410 1268410 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0596 Painting Final Stage 22/Dec/09 27/Feb/10 27/Feb/10 0 303015 303015 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 29/Sep/09 6/Mar/10 6/Mar/10 0 1850620 1850620 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0400 Wires & Cables 29/Sep/09 29/Dec/09 29/Dec/09 0 1379509 1379509 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0491 Panel Boards 9/Nov/09 10/Jan/10 10/Jan/10 0 86456 86456 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0617 Electrical Wiring Devices 29/Dec/09 6/Mar/10 6/Mar/10 0 384655 384655 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 29/Sep/09 27/Feb/10 27/Feb/10 0 637325 637325 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0401 HVAC Air Outlets 29/Sep/09 26/Dec/09 26/Dec/09 0 424947 424947 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0597 HVAC A/C Units 22/Dec/09 27/Feb/10 27/Feb/10 0 77738 77738 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0598 Exhaust Fans 22/Dec/09 27/Feb/10 27/Feb/10 0 134640 134640 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 10/Sep/09 12/Dec/09 12/Dec/09 0 286944 286944 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0364 Piping Accessories 10/Sep/09 12/Dec/09 12/Dec/09 0 286944 286944 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

SCECO ROOM 8/Jul/09 13/Oct/09 13/Oct/09 0 983669 983669 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 8/Jul/09 13/Oct/09 13/Oct/09 0 895945 895945 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0198 Block Work 8/Jul/09 17/Aug/09 17/Aug/09 0 197934 197934 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0222 Plaster Work 20/Jul/09 29/Aug/09 29/Aug/09 0 186620 186620 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0248 Waterproofing 1/Aug/09 2/Sep/09 2/Sep/09 0 108834 108834 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

286 Painting 1st Stage 12/Aug/09 26/Sep/09 26/Sep/09 0 111603 111603 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0328 Doors & Windows 30/Aug/09 7/Oct/09 7/Oct/09 0 230822 230822 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0329 Painting Final Stage 30/Aug/09 13/Oct/09 13/Oct/09 0 60132 60132 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 16/Jul/09 13/Sep/09 13/Sep/09 0 71111 71111 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0217 Electrical Works 16/Jul/09 13/Sep/09 13/Sep/09 0 71111 71111 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 9/Jul/09 11/Oct/09 11/Oct/09 0 6444 6444 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0203 HVAC Works 9/Jul/09 11/Oct/09 11/Oct/09 0 6444 6444 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 9/Jul/09 11/Oct/09 11/Oct/09 0 10169 10169 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 297: Progress Monitoring Sheet Empty

Page 297 of 353

Sample Project

Dates Percentages % Quantities Data Date 25/Jan/09

Description % Var. Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14 Wk15

S.N Activity Name 13/Dec/08 20/May/10 30/Dec/99 20/May/10 -34 0.2% 0.00% -0.2% 372,500,011 372,500,011.0 616,292.7 0.0 -616,293

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

Planned Start

Planned Finish

Actual Start

Actual Finish

Days Var.

Planned %

Actual %

Total. QTY

Rem. QTY

Planned QTY

Actual QTY

QTY Var.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

202 Drainage Piping 9/Jul/09 11/Oct/09 11/Oct/09 0 10169 10169 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Lower Roof 1/Aug/09 8/Apr/10 8/Apr/10 0 18216137 18216137 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 1/Aug/09 8/Apr/10 8/Apr/10 0 5883906 5883906 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 1/Aug/09 8/Apr/10 8/Apr/10 0 915680 915680 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

249 Block Work 1/Aug/09 12/Nov/09 12/Nov/09 0 196232 196232 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0774 Metal Works 17/Feb/10 8/Apr/10 8/Apr/10 0 719448 719448 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 18/Aug/09 27/Dec/09 27/Dec/09 0 266559 266559 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0300 Electrical Conduits & Box 18/Aug/09 27/Dec/09 27/Dec/09 0 266559 266559 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 18/Aug/09 3/Dec/09 3/Dec/09 0 4620066 4620066 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0301 HVAC Works 18/Aug/09 3/Dec/09 3/Dec/09 0 4620066 4620066 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 20/Aug/09 16/Dec/09 16/Dec/09 0 81601 81601 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0309 Piping Works 20/Aug/09 16/Dec/09 16/Dec/09 0 81601 81601 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 21/Oct/09 8/Apr/10 8/Apr/10 0 12332231 12332231 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 21/Oct/09 8/Apr/10 8/Apr/10 0 3938580 3938580 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

451 Plaster Work 21/Oct/09 2/Feb/10 2/Feb/10 0 114870 114870 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0487 Waterproofing 8/Nov/09 31/Dec/09 31/Dec/09 0 1365886 1365886 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0515 Painting 1st Stage 14/Nov/09 9/Feb/10 9/Feb/10 0 176338 176338 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0613 Suspended ceiling & gyps 27/Dec/09 21/Mar/10 21/Mar/10 0 970515 970515 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0708 Glazing 24/Jan/10 15/Mar/10 15/Mar/10 0 1182009 1182009 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0720 Doors & Windows 31/Jan/10 22/Mar/10 22/Mar/10 0 72222 72222 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0777 Painting Final Stage 17/Feb/10 8/Apr/10 8/Apr/10 0 56740 56740 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 16/Dec/09 8/Apr/10 8/Apr/10 0 865722 865722 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0582 Wires & Cables 16/Dec/09 21/Feb/10 21/Feb/10 0 580254 580254 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

690 Panel Boards 20/Jan/10 3/Mar/10 3/Mar/10 0 233303 233303 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0773 Electrical Wiring Devices 17/Feb/10 8/Apr/10 8/Apr/10 0 52165 52165 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 16/Dec/09 8/Apr/10 8/Apr/10 0 7516908 7516908 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0583 HVAC Air Outlets 16/Dec/09 21/Feb/10 21/Feb/10 0 786871 786871 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0775 HVAC A/C Units 17/Feb/10 8/Apr/10 8/Apr/10 0 5524335 5524335 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0776 Exhaust Fans 17/Feb/10 8/Apr/10 8/Apr/10 0 1205702 1205702 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 31/Dec/09 3/Mar/10 3/Mar/10 0 11021 11021 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0627 Piping Accessories 31/Dec/09 3/Mar/10 3/Mar/10 0 11021 11021 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Package 6A Access Area 27/Jun/09 20/Mar/10 20/Mar/10 0 8455323 8455323 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 27/Jun/09 20/Mar/10 20/Mar/10 0 1530753 1530753 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 27/Jun/09 20/Mar/10 20/Mar/10 0 687852 687852 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0175 Block Work 27/Jun/09 1/Sep/09 1/Sep/09 0 261514 261514 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0700 Metal Works 21/Jan/10 24/Feb/10 24/Feb/10 0 383750 383750 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0766 Signage 13/Feb/10 20/Mar/10 20/Mar/10 0 42588 42588 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 6/Aug/09 29/Sep/09 29/Sep/09 0 827274 827274 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0262 Electrical Cable Tray 6/Aug/09 29/Sep/09 29/Sep/09 0 827274 827274 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 14/Jul/09 19/Sep/09 19/Sep/09 0 1260 1260 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0209 HVAC Ducting 14/Jul/09 19/Sep/09 19/Sep/09 0 1260 1260 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 14/Jul/09 19/Oct/09 19/Oct/09 0 14367 14367 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0208 Drainage Piping 14/Jul/09 1/Sep/09 1/Sep/09 0 597 597 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0263 Fire Fighting Piping 6/Aug/09 19/Oct/09 19/Oct/09 0 13770 13770 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 9/Aug/09 25/Feb/10 25/Feb/10 0 6589988 6589988 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 9/Aug/09 25/Feb/10 25/Feb/10 0 4702700 4702700 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

278 Plaster Work 9/Aug/09 19/Oct/09 19/Oct/09 0 63070 63070 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0372 Wall Covering ( Ceramic / 13/Sep/09 15/Nov/09 15/Nov/09 0 14268 14268 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0413 Painting 1st Stage 5/Oct/09 24/Nov/09 24/Nov/09 0 131781 131781 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0460 Floor Covering ( Ceramic 26/Oct/09 17/Dec/09 17/Dec/09 0 1285852 1285852 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

550 Suspended ceiling & gyps 3/Dec/09 21/Jan/10 21/Jan/10 0 1188449 1188449 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0637 Doors & Windows 4/Jan/10 8/Feb/10 8/Feb/10 0 1889815 1889815 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0701 Painting Final Stage 21/Jan/10 25/Feb/10 25/Feb/10 0 129465 129465 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 22/Oct/09 20/Feb/10 20/Feb/10 0 1778703 1778703 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0455 Wires & Cables 22/Oct/09 25/Nov/09 25/Nov/09 0 544579 544579 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0702 Electrical Wiring Devices 21/Jan/10 20/Feb/10 20/Feb/10 0 1234124 1234124 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 9/Nov/09 20/Feb/10 20/Feb/10 0 53194 53194 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0493 HVAC Air Outlets 9/Nov/09 16/Dec/09 16/Dec/09 0 16481 16481 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0703 HVAC A/C Units 21/Jan/10 20/Feb/10 20/Feb/10 0 33122 33122 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0704 Exhaust Fans 21/Jan/10 20/Feb/10 20/Feb/10 0 3591 3591 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 12/Nov/09 19/Dec/09 19/Dec/09 0 55391 55391 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0506 Piping Accessories 12/Nov/09 19/Dec/09 19/Dec/09 0 55391 55391 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 1/Sep/09 25/Feb/10 25/Feb/10 0 334582 334582 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 1/Sep/09 26/Oct/09 26/Oct/09 0 290758 290758 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

344 Waterproofing 1/Sep/09 26/Oct/09 26/Oct/09 0 290758 290758 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 15/Nov/09 25/Feb/10 25/Feb/10 0 43227 43227 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0523 Wires & Cables 15/Nov/09 23/Dec/09 23/Dec/09 0 26607 26607 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0738 Electrical Wiring Devices 2/Feb/10 25/Feb/10 25/Feb/10 0 16620 16620 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 24/Nov/09 30/Dec/09 30/Dec/09 0 597 597 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0538 Plumbing Accessories 24/Nov/09 30/Dec/09 30/Dec/09 0 597 597 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Second Floor 10/Jun/09 3/Apr/10 3/Apr/10 0 15050831 15050831 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 10/Jun/09 20/Mar/10 20/Mar/10 0 7298236 7298236 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 10/Jun/09 20/Mar/10 20/Mar/10 0 4360620 4360620 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0138 Block Work 10/Jun/09 8/Oct/09 8/Oct/09 0 1021084 1021084 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0695 Metal Works 20/Jan/10 20/Mar/10 20/Mar/10 0 3300496 3300496 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0767 Signage 13/Feb/10 20/Mar/10 20/Mar/10 0 39040 39040 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 25/Jul/09 15/Nov/09 15/Nov/09 0 352560 352560 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0232 Electrical Conduits & Box 25/Jul/09 11/Oct/09 11/Oct/09 0 217244 217244 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0326 Electrical Cable Tray 29/Aug/09 15/Nov/09 15/Nov/09 0 135316 135316 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 16/Jul/09 7/Nov/09 7/Nov/09 0 1173314 1173314 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0215 HVAC Ducting 16/Jul/09 7/Nov/09 7/Nov/09 0 1173314 1173314 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 9/Aug/09 17/Feb/10 17/Feb/10 0 1411742 1411742 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0274 Drainage Piping 9/Aug/09 18/Oct/09 18/Oct/09 0 104546 104546 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

275 Domestic Water Piping 9/Aug/09 1/Nov/09 1/Nov/09 0 131969 131969 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 298: Progress Monitoring Sheet Empty

Page 298 of 353

Sample Project

Dates Percentages % Quantities Data Date 25/Jan/09

Description % Var. Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14 Wk15

S.N Activity Name 13/Dec/08 20/May/10 30/Dec/99 20/May/10 -34 0.2% 0.00% -0.2% 372,500,011 372,500,011.0 616,292.7 0.0 -616,293

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

Planned Start

Planned Finish

Actual Start

Actual Finish

Days Var.

Planned %

Actual %

Total. QTY

Rem. QTY

Planned QTY

Actual QTY

QTY Var.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

474 Fire Fighting Piping 2/Nov/09 17/Feb/10 17/Feb/10 0 1175227 1175227 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Dry Area 8/Aug/09 29/Mar/10 29/Mar/10 0 6722746 6722746 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 8/Aug/09 29/Mar/10 29/Mar/10 0 3848565 3848565 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

269 Plaster Work 8/Aug/09 10/Dec/09 10/Dec/09 0 154630 154630 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

332 Wall Covering ( Ceramic / 31/Aug/09 24/Dec/09 24/Dec/09 0 73472 73472 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0421 Painting 1st Stage 10/Oct/09 20/Jan/10 20/Jan/10 0 106767 106767 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0467 Floor Covering ( Ceramic 29/Oct/09 9/Feb/10 9/Feb/10 0 1012509 1012509 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

533 Suspended ceiling & gyps 22/Nov/09 4/Mar/10 4/Mar/10 0 1214439 1214439 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0673 Doors & Windows 14/Jan/10 22/Mar/10 22/Mar/10 0 783044 783044 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0681 Wood Cladding 17/Jan/10 8/Mar/10 8/Mar/10 0 70876 70876 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0682 Glazing 17/Jan/10 8/Mar/10 8/Mar/10 0 342720 342720 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0692 Painting Final Stage 20/Jan/10 29/Mar/10 29/Mar/10 0 90108 90108 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 2/Nov/09 29/Mar/10 29/Mar/10 0 2101072 2101072 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0476 Wires & Cables 2/Nov/09 27/Jan/10 27/Jan/10 0 1661628 1661628 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0564 Panel Boards 10/Dec/09 7/Feb/10 7/Feb/10 0 54025 54025 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0696 Electrical Wiring Devices 20/Jan/10 29/Mar/10 29/Mar/10 0 385419 385419 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 14/Nov/09 29/Mar/10 29/Mar/10 0 526641 526641 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0511 HVAC Air Outlets 14/Nov/09 8/Feb/10 8/Feb/10 0 240588 240588 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

693 HVAC A/C Units 20/Jan/10 29/Mar/10 29/Mar/10 0 104159 104159 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0694 Exhaust Fans 20/Jan/10 29/Mar/10 29/Mar/10 0 181894 181894 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 16/Nov/09 10/Feb/10 10/Feb/10 0 246468 246468 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0524 Piping Accessories 16/Nov/09 10/Feb/10 10/Feb/10 0 246468 246468 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 13/Aug/09 3/Apr/10 3/Apr/10 0 1029849 1029849 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 31/Aug/09 3/Apr/10 3/Apr/10 0 227436 227436 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

331 Plaster Work 31/Aug/09 16/Dec/09 16/Dec/09 0 29304 29304 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0366 Waterproofing 12/Sep/09 28/Dec/09 28/Dec/09 0 15656 15656 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0446 Wall Covering ( Ceramic / 21/Oct/09 24/Jan/10 24/Jan/10 0 81982 81982 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

475 Painting 1st Stage 2/Nov/09 27/Jan/10 27/Jan/10 0 1085 1085 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

534 Floor Covering ( Ceramic 22/Nov/09 16/Feb/10 16/Feb/10 0 30720 30720 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0587 Suspended ceiling 19/Dec/09 11/Mar/10 11/Mar/10 0 21125 21125 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0753 Doors & Windows 7/Feb/10 29/Mar/10 29/Mar/10 0 18384 18384 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0765 Painting Final Stage 11/Feb/10 3/Apr/10 3/Apr/10 0 1085 1085 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0779 Toilet and Bath Accessori 20/Feb/10 3/Apr/10 3/Apr/10 0 28095 28095 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 5/Dec/09 9/Feb/10 9/Feb/10 0 558146 558146 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0552 Wires & Cables 5/Dec/09 9/Feb/10 9/Feb/10 0 22023 22023 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0584 Electrical Wiring Devices 16/Dec/09 4/Feb/10 4/Feb/10 0 536123 536123 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 10/Dec/09 15/Feb/10 15/Feb/10 0 55665 55665 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0563 HVAC - Air Outlets 10/Dec/09 15/Feb/10 15/Feb/10 0 55665 55665 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 13/Aug/09 17/Feb/10 17/Feb/10 0 188602 188602 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

287 Plumbing Works 13/Aug/09 12/Nov/09 12/Nov/09 0 32824 32824 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0555 Sanitary Fixtures & Toilet 5/Dec/09 24/Jan/10 24/Jan/10 0 110671 110671 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0572 Plumbing Accessories 13/Dec/09 17/Feb/10 17/Feb/10 0 45107 45107 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Third Floor 9/Jul/09 24/Apr/10 24/Apr/10 0 16103351 16103351 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 9/Jul/09 3/Apr/10 3/Apr/10 0 7667210 7667210 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 9/Jul/09 3/Apr/10 3/Apr/10 0 4385268 4385268 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0201 Block Work 9/Jul/09 7/Nov/09 7/Nov/09 0 1047052 1047052 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0747 Metal Works 3/Feb/10 3/Apr/10 3/Apr/10 0 3338216 3338216 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0785 Signage 27/Feb/10 3/Apr/10 3/Apr/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 2/Aug/09 5/Dec/09 5/Dec/09 0 368771 368771 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0251 Electrical Conduits & Box 2/Aug/09 28/Oct/09 28/Oct/09 0 235683 235683 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0353 Electrical Cable Tray 6/Sep/09 5/Dec/09 5/Dec/09 0 133088 133088 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 8/Aug/09 1/Dec/09 1/Dec/09 0 1651558 1651558 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0268 HVAC Ducting 8/Aug/09 1/Dec/09 1/Dec/09 0 1651558 1651558 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 15/Aug/09 28/Jan/10 28/Jan/10 0 1261613 1261613 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0292 Drainage Piping 15/Aug/09 24/Oct/09 24/Oct/09 0 79983 79983 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

293 Domestic Water Piping 15/Aug/09 26/Oct/09 26/Oct/09 0 118695 118695 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0440 Fire Fighting Piping 18/Oct/09 28/Jan/10 28/Jan/10 0 1062935 1062935 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 17/Sep/09 17/Apr/10 17/Apr/10 0 7166356 7166356 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 17/Sep/09 11/Apr/10 11/Apr/10 0 4535309 4535309 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0383 Plaster Work 17/Sep/09 20/Jan/10 20/Jan/10 0 210210 210210 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

449 Wall Covering ( Ceramic / 21/Oct/09 10/Feb/10 10/Feb/10 0 57236 57236 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0486 Painting 1st Stage 8/Nov/09 20/Feb/10 20/Feb/10 0 154409 154409 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0544 Floor Covering ( Ceramic 25/Nov/09 9/Mar/10 9/Mar/10 0 1435308 1435308 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0581 Suspended ceiling & gyps 16/Dec/09 27/Mar/10 27/Mar/10 0 1381599 1381599 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0680 Doors & Windows 17/Jan/10 24/Mar/10 24/Mar/10 0 251446 251446 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0736 Glazing 2/Feb/10 24/Mar/10 24/Mar/10 0 374136 374136 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0737 Wood Cladding 2/Feb/10 24/Mar/10 24/Mar/10 0 531475 531475 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0744 Painting Final Stage 3/Feb/10 11/Apr/10 11/Apr/10 0 139490 139490 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 10/Dec/09 17/Apr/10 17/Apr/10 0 1817115 1817115 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0567 Wires & Cables 10/Dec/09 4/Mar/10 4/Mar/10 0 1689245 1689245 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

663 Panel Boards 12/Jan/10 11/Mar/10 11/Mar/10 0 94428 94428 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0758 Electrical Wiring Devices 9/Feb/10 17/Apr/10 17/Apr/10 0 33442 33442 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 10/Dec/09 11/Apr/10 11/Apr/10 0 580843 580843 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0566 HVAC Air Outlets 10/Dec/09 4/Mar/10 4/Mar/10 0 292791 292791 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0745 HVAC A/C Units 3/Feb/10 11/Apr/10 11/Apr/10 0 106158 106158 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0746 Exhaust Fans 3/Feb/10 11/Apr/10 11/Apr/10 0 181894 181894 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 10/Dec/09 4/Mar/10 4/Mar/10 0 233089 233089 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0565 Piping Accessories 10/Dec/09 4/Mar/10 4/Mar/10 0 233089 233089 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 22/Aug/09 24/Apr/10 24/Apr/10 0 1269785 1269785 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 10/Oct/09 12/Apr/10 12/Apr/10 0 185337 185337 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

423 Plaster Work 10/Oct/09 21/Jan/10 21/Jan/10 0 16764 16764 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

450 Waterproofing 21/Oct/09 2/Feb/10 2/Feb/10 0 8601 8601 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0514 Wall Covering ( Ceramic / 14/Nov/09 17/Feb/10 17/Feb/10 0 46809 46809 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 299: Progress Monitoring Sheet Empty

Page 299 of 353

Sample Project

Dates Percentages % Quantities Data Date 25/Jan/09

Description % Var. Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14 Wk15

S.N Activity Name 13/Dec/08 20/May/10 30/Dec/99 20/May/10 -34 0.2% 0.00% -0.2% 372,500,011 372,500,011.0 616,292.7 0.0 -616,293

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

Planned Start

Planned Finish

Actual Start

Actual Finish

Days Var.

Planned %

Actual %

Total. QTY

Rem. QTY

Planned QTY

Actual QTY

QTY Var.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

554 Painting 1st Stage 5/Dec/09 27/Feb/10 27/Feb/10 0 420 420 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0600 Floor Covering ( Ceramic 22/Dec/09 16/Mar/10 16/Mar/10 0 31040 31040 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

649 Suspended ceiling 9/Jan/10 3/Apr/10 3/Apr/10 0 11830 11830 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0757 Doors & Windows 9/Feb/10 31/Mar/10 31/Mar/10 0 52342 52342 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0772 Painting Final Stage 17/Feb/10 8/Apr/10 8/Apr/10 0 420 420 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0788 Toilet and Bath Accessori 1/Mar/10 12/Apr/10 12/Apr/10 0 17111 17111 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 3/Jan/10 24/Apr/10 24/Apr/10 0 908780 908780 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

635 Wires & Cables 3/Jan/10 10/Mar/10 10/Mar/10 0 5652 5652 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0791 Electrical Wiring Devices 4/Mar/10 24/Apr/10 24/Apr/10 0 903128 903128 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 3/Jan/10 10/Mar/10 10/Mar/10 0 28848 28848 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0634 HVAC Air Outlets 3/Jan/10 10/Mar/10 10/Mar/10 0 28848 28848 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 22/Aug/09 13/Apr/10 13/Apr/10 0 146820 146820 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

312 Plumbing Works 22/Aug/09 22/Nov/09 22/Nov/09 0 17674 17674 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0633 Plumbing Accessories 3/Jan/10 10/Mar/10 10/Mar/10 0 19650 19650 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0781 Sanitary Fixtures & Toilet 22/Feb/10 13/Apr/10 13/Apr/10 0 109496 109496 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Upper Roof 13/Oct/09 26/Jan/10 26/Jan/10 0 718446 718446 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 13/Oct/09 26/Jan/10 26/Jan/10 0 718446 718446 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 27/Oct/09 23/Jan/10 23/Jan/10 0 701970 701970 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0464 Electrical Works 27/Oct/09 23/Jan/10 23/Jan/10 0 701970 701970 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 13/Oct/09 26/Jan/10 26/Jan/10 0 16476 16476 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0431 Plumbing Works 13/Oct/09 26/Jan/10 26/Jan/10 0 16476 16476 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Zone 3 17/Mar/09 5/May/10 5/May/10 0105856084 105856084 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Basement Floor 17/Mar/09 9/Mar/10 9/Mar/10 0 23139656 23139656 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 17/Mar/09 28/Feb/10 28/Feb/10 0 6571533 6571533 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 17/Mar/09 28/Feb/10 28/Feb/10 0 1530940 1530940 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

34 Block Work 17/Mar/09 11/Jul/09 11/Jul/09 0 309250 309250 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

628 Metal Works 31/Dec/09 28/Feb/10 28/Feb/10 0 1074323 1074323 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0710 Signage 24/Jan/10 28/Feb/10 28/Feb/10 0 147367 147367 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 30/Apr/09 15/Sep/09 15/Sep/09 0 1059220 1059220 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.080 Electrical Conduits & Box 30/Apr/09 9/Sep/09 9/Sep/09 0 253058 253058 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0157 Electrical Cable Tray 20/Jun/09 15/Sep/09 15/Sep/09 0 806162 806162 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 21/May/09 7/Sep/09 7/Sep/09 0 1450366 1450366 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0112 HVAC Ducting 21/May/09 7/Sep/09 7/Sep/09 0 1450366 1450366 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 24/May/09 14/Nov/09 14/Nov/09 0 2531007 2531007 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

119 Drainage Piping 24/May/09 28/Jul/09 28/Jul/09 0 78157 78157 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

136 Domestic Water Piping 8/Jun/09 19/Aug/09 19/Aug/09 0 371360 371360 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0164 Fire Fighting Piping 22/Jun/09 14/Nov/09 14/Nov/09 0 2081490 2081490 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 2/Jun/09 9/Mar/10 9/Mar/10 0 15435399 15435399 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 2/Jun/09 9/Mar/10 9/Mar/10 0 5946177 5946177 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

131 Plaster Work 2/Jun/09 1/Oct/09 1/Oct/09 0 154560 154560 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0173 Ramps Waterproofing 25/Jun/09 28/Jul/09 28/Jul/09 0 59013 59013 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0221 Wall Covering ( Ceramic / 19/Jul/09 9/Nov/09 9/Nov/09 0 7020 7020 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0351 Painting 1st Stage 3/Sep/09 20/Dec/09 20/Dec/09 0 1756632 1756632 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0367 Floor Covering ( Ceramic 12/Sep/09 29/Dec/09 29/Dec/09 0 1288408 1288408 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0448 Suspended ceiling & gyps 21/Oct/09 2/Feb/10 2/Feb/10 0 239656 239656 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0575 Doors & Windows 14/Dec/09 20/Feb/10 20/Feb/10 0 946016 946016 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0616 Glazing 29/Dec/09 16/Feb/10 16/Feb/10 0 1041652 1041652 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0629 Painting Final Stage 31/Dec/09 9/Mar/10 9/Mar/10 0 453220 453220 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 9/Sep/09 25/Feb/10 25/Feb/10 0 8162531 8162531 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0361 Wires & Cables 9/Sep/09 9/Dec/09 9/Dec/09 0 7687821 7687821 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

441 Panel Boards 19/Oct/09 20/Dec/09 20/Dec/09 0 18208 18208 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0591 Electrical Wiring Devices 20/Dec/09 25/Feb/10 25/Feb/10 0 456502 456502 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 13/Oct/09 27/Feb/10 27/Feb/10 0 638709 638709 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0432 HVAC - Air Outlets 13/Oct/09 7/Jan/10 7/Jan/10 0 281567 281567 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

593 HVAC A/C Units 21/Dec/09 27/Feb/10 27/Feb/10 0 255737 255737 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0594 Exhaust Fans 21/Dec/09 27/Feb/10 27/Feb/10 0 101405 101405 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 17/Sep/09 17/Dec/09 17/Dec/09 0 687982 687982 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0382 Piping Accessories 17/Sep/09 17/Dec/09 17/Dec/09 0 687982 687982 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 3/Jun/09 7/Mar/10 7/Mar/10 0 1132724 1132724 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 25/Jun/09 7/Mar/10 7/Mar/10 0 194378 194378 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

172 Plaster Work 25/Jun/09 7/Oct/09 7/Oct/09 0 17292 17292 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0284 Wall Covering ( Ceramic / 11/Aug/09 15/Nov/09 15/Nov/09 0 48867 48867 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0407 Painting 1st Stage 1/Oct/09 27/Dec/09 27/Dec/09 0 1330 1330 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0422 Floor Covering ( Ceramic 10/Oct/09 4/Jan/10 4/Jan/10 0 19920 19920 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0513 Suspended ceiling 14/Nov/09 8/Feb/10 8/Feb/10 0 12844 12844 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

642 Doors & Windows 6/Jan/10 25/Feb/10 25/Feb/10 0 81453 81453 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0665 Painting Final Stage 12/Jan/10 3/Mar/10 3/Mar/10 0 1330 1330 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0711 Toilet and Bath Accessori 24/Jan/10 7/Mar/10 7/Mar/10 0 11342 11342 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 7/Oct/09 3/Mar/10 3/Mar/10 0 222189 222189 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

417 Wires & Cables 7/Oct/09 16/Dec/09 16/Dec/09 0 14777 14777 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0664 Electrical Wiring Devices 12/Jan/10 3/Mar/10 3/Mar/10 0 207412 207412 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 21/Oct/09 4/Mar/10 4/Mar/10 0 106978 106978 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0452 HVAC - Air Outlets 21/Oct/09 30/Dec/09 30/Dec/09 0 10571 10571 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0667 Exhaust Fans 13/Jan/10 4/Mar/10 4/Mar/10 0 96407 96407 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 3/Jun/09 28/Dec/09 28/Dec/09 0 609179 609179 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

132 Plumbing Works 3/Jun/09 23/Aug/09 23/Aug/09 0 522667 522667 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0437 Plumbing Accessories 15/Oct/09 24/Dec/09 24/Dec/09 0 4409 4409 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0482 Sanitary Fixtures & Toilet 4/Nov/09 28/Dec/09 28/Dec/09 0 82103 82103 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators & Escalators 1/Sep/09 6/Apr/10 6/Apr/10 0 11132528 11132528 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 1/Sep/09 6/Apr/10 6/Apr/10 0 11132528 11132528 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 1/Sep/09 6/Apr/10 6/Apr/10 0 11132528 11132528 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0337 Elevators & Escalators 1/Sep/09 6/Apr/10 6/Apr/10 0 11132528 11132528 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 300: Progress Monitoring Sheet Empty

Page 300 of 353

Sample Project

Dates Percentages % Quantities Data Date 25/Jan/09

Description % Var. Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14 Wk15

S.N Activity Name 13/Dec/08 20/May/10 30/Dec/99 20/May/10 -34 0.2% 0.00% -0.2% 372,500,011 372,500,011.0 616,292.7 0.0 -616,293

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

Planned Start

Planned Finish

Actual Start

Actual Finish

Days Var.

Planned %

Actual %

Total. QTY

Rem. QTY

Planned QTY

Actual QTY

QTY Var.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

Facade 24/Oct/09 4/Mar/10 4/Mar/10 0 9666846 9666846 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 24/Oct/09 4/Mar/10 4/Mar/10 0 9666846 9666846 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 24/Oct/09 4/Mar/10 4/Mar/10 0 9295968 9295968 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

458 Facade Plaster & Paint 24/Oct/09 18/Jan/10 18/Jan/10 0 401229 401229 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0546 Aluminum Panel cladding 26/Nov/09 4/Mar/10 4/Mar/10 0 8894739 8894739 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 24/Dec/09 4/Mar/10 4/Mar/10 0 370878 370878 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0606 FACADE LIGHTING INSTA 24/Dec/09 4/Mar/10 4/Mar/10 0 370878 370878 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

First Floor 17/Jun/09 7/Apr/10 7/Apr/10 0 8412116 8412116 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 17/Jun/09 1/Apr/10 1/Apr/10 0 3799593 3799593 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 17/Jun/09 1/Apr/10 1/Apr/10 0 1406062 1406062 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0150 Block Work 17/Jun/09 15/Oct/09 15/Oct/09 0 930836 930836 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

721 Metal Works 31/Jan/10 30/Mar/10 30/Mar/10 0 427061 427061 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0783 Signage 25/Feb/10 1/Apr/10 1/Apr/10 0 48165 48165 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 5/Aug/09 8/Dec/09 8/Dec/09 0 401085 401085 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0258 Electrical Conduits & Box 5/Aug/09 29/Oct/09 29/Oct/09 0 260064 260064 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0365 Electrical Cable Tray 10/Sep/09 8/Dec/09 8/Dec/09 0 141021 141021 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 29/Jul/09 10/Nov/09 10/Nov/09 0 878646 878646 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0244 HVAC Ducting 29/Jul/09 10/Nov/09 10/Nov/09 0 878646 878646 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 20/Aug/09 2/Jan/10 2/Jan/10 0 1113800 1113800 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0304 Drainage Piping 20/Aug/09 29/Oct/09 29/Oct/09 0 49855 49855 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0305 Domestic Water Piping 20/Aug/09 5/Nov/09 5/Nov/09 0 45644 45644 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0388 Fire Fighting Piping 26/Sep/09 2/Jan/10 2/Jan/10 0 1018301 1018301 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 6/Aug/09 7/Apr/10 7/Apr/10 0 4612523 4612523 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 6/Aug/09 7/Apr/10 7/Apr/10 0 2086919 2086919 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

261 Plaster Work 6/Aug/09 8/Dec/09 8/Dec/09 0 124950 124950 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0362 Wall Covering ( Ceramic / 10/Sep/09 4/Jan/10 4/Jan/10 0 20418 20418 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0391 Painting 1st Stage 27/Sep/09 7/Jan/10 7/Jan/10 0 102590 102590 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

489 Floor Covering ( Ceramic 9/Nov/09 20/Feb/10 20/Feb/10 0 557232 557232 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

557 Suspended ceiling & gyps 6/Dec/09 15/Mar/10 15/Mar/10 0 746243 746243 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0698 Wood Cladding 21/Jan/10 13/Mar/10 13/Mar/10 0 116458 116458 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0699 Glazing 21/Jan/10 13/Mar/10 13/Mar/10 0 174216 174216 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0706 Doors & Windows 24/Jan/10 31/Mar/10 31/Mar/10 0 167489 167489 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0722 Painting Final Stage 31/Jan/10 7/Apr/10 7/Apr/10 0 77323 77323 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 14/Oct/09 27/Mar/10 27/Mar/10 0 1841541 1841541 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0433 Wires & Cables 14/Oct/09 9/Jan/10 9/Jan/10 0 1757041 1757041 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0528 Panel Boards 18/Nov/09 18/Jan/10 18/Jan/10 0 42312 42312 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0685 Electrical Wiring Devices 19/Jan/10 27/Mar/10 27/Mar/10 0 42188 42188 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1/Nov/09 27/Mar/10 27/Mar/10 0 430205 430205 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0471 HVAC - Air Outlets 1/Nov/09 26/Jan/10 26/Jan/10 0 319219 319219 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0686 HVAC A/C Units 19/Jan/10 27/Mar/10 27/Mar/10 0 110986 110986 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 26/Nov/09 21/Feb/10 21/Feb/10 0 253858 253858 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0545 Piping Accessories 26/Nov/09 21/Feb/10 21/Feb/10 0 253858 253858 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ground Floor 29/Apr/09 1/Apr/10 1/Apr/10 0 13473860 13473860 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 29/Apr/09 1/Apr/10 1/Apr/10 0 4154628 4154628 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 29/Apr/09 1/Apr/10 1/Apr/10 0 1086504 1086504 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.076 Block Work 29/Apr/09 23/Aug/09 23/Aug/09 0 98227 98227 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

684 Metal Works 19/Jan/10 18/Mar/10 18/Mar/10 0 790546 790546 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0784 Signage 25/Feb/10 1/Apr/10 1/Apr/10 0 197731 197731 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 22/Jun/09 13/Oct/09 13/Oct/09 0 356865 356865 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0162 Electrical Conduits & Box 22/Jun/09 17/Sep/09 17/Sep/09 0 261111 261111 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0226 Electrical Cable Tray 21/Jul/09 13/Oct/09 13/Oct/09 0 95754 95754 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 10/Jun/09 28/Sep/09 28/Sep/09 0 835439 835439 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0139 HVAC Ducting 10/Jun/09 28/Sep/09 28/Sep/09 0 835439 835439 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 4/Jul/09 6/Dec/09 6/Dec/09 0 1875820 1875820 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0189 Drainage Piping 4/Jul/09 7/Sep/09 7/Sep/09 0 220771 220771 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0205 Fire Fighting Piping 12/Jul/09 6/Dec/09 6/Dec/09 0 1186664 1186664 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0299 Domestic Water Piping 18/Aug/09 14/Nov/09 14/Nov/09 0 468385 468385 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 2/Jul/09 27/Mar/10 27/Mar/10 0 8845911 8845911 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 2/Jul/09 27/Mar/10 27/Mar/10 0 6332678 6332678 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

185 Plaster Work 2/Jul/09 31/Oct/09 31/Oct/09 0 60060 60060 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0247 Waterproofing 1/Aug/09 2/Sep/09 2/Sep/09 0 1080908 1080908 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0264 Wall Covering ( Ceramic / 6/Aug/09 26/Nov/09 26/Nov/09 0 3116 3116 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0393 Painting 1st Stage 27/Sep/09 7/Jan/10 7/Jan/10 0 423342 423342 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0411 Floor Covering ( Ceramic 5/Oct/09 16/Jan/10 16/Jan/10 0 3169251 3169251 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

490 Suspended ceiling & gyps 9/Nov/09 20/Feb/10 20/Feb/10 0 286192 286192 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0631 Doors & Windows 2/Jan/10 9/Mar/10 9/Mar/10 0 887137 887137 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0679 Glazing 16/Jan/10 7/Mar/10 7/Mar/10 0 157080 157080 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0683 Painting Final Stage 19/Jan/10 27/Mar/10 27/Mar/10 0 265592 265592 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 14/Oct/09 15/Mar/10 15/Mar/10 0 1864086 1864086 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0434 Wires & Cables 14/Oct/09 9/Jan/10 9/Jan/10 0 1384732 1384732 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0530 Panel Boards 18/Nov/09 18/Jan/10 18/Jan/10 0 40490 40490 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0645 Electrical Wiring Devices 7/Jan/10 15/Mar/10 15/Mar/10 0 438864 438864 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1/Nov/09 15/Mar/10 15/Mar/10 0 402027 402027 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0472 HVAC Air Outlets 1/Nov/09 26/Jan/10 26/Jan/10 0 236163 236163 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0643 HVAC A/C Units 7/Jan/10 15/Mar/10 15/Mar/10 0 76104 76104 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0644 Exhaust Fans 7/Jan/10 15/Mar/10 15/Mar/10 0 89760 89760 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 17/Oct/09 11/Jan/10 11/Jan/10 0 247120 247120 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0438 Piping Accessories 17/Oct/09 11/Jan/10 11/Jan/10 0 247120 247120 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

SCECO ROOM 2/Aug/09 17/Oct/09 17/Oct/09 0 473321 473321 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 6/Aug/09 17/Oct/09 17/Oct/09 0 434259 434259 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0265 Block Work 6/Aug/09 8/Sep/09 8/Sep/09 0 83927 83927 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0298 Plaster Work 18/Aug/09 24/Sep/09 24/Sep/09 0 90370 90370 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0316 Waterproofing 24/Aug/09 1/Oct/09 1/Oct/09 0 58548 58548 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

330 Painting 1st Stage 30/Aug/09 7/Oct/09 7/Oct/09 0 53852 53852 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 301: Progress Monitoring Sheet Empty

Page 301 of 353

Sample Project

Dates Percentages % Quantities Data Date 25/Jan/09

Description % Var. Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14 Wk15

S.N Activity Name 13/Dec/08 20/May/10 30/Dec/99 20/May/10 -34 0.2% 0.00% -0.2% 372,500,011 372,500,011.0 616,292.7 0.0 -616,293

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

Planned Start

Planned Finish

Actual Start

Actual Finish

Days Var.

Planned %

Actual %

Total. QTY

Rem. QTY

Planned QTY

Actual QTY

QTY Var.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

357 Painting Final Stage 8/Sep/09 17/Oct/09 17/Oct/09 0 29268 29268 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0378 Doors & Windows 16/Sep/09 13/Oct/09 13/Oct/09 0 118294 118294 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 6/Aug/09 16/Sep/09 16/Sep/09 0 25671 25671 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0266 Electrical Works 6/Aug/09 16/Sep/09 16/Sep/09 0 25671 25671 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 2/Aug/09 15/Oct/09 15/Oct/09 0 3222 3222 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0253 HVAC Works 2/Aug/09 15/Oct/09 15/Oct/09 0 3222 3222 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 2/Aug/09 15/Oct/09 15/Oct/09 0 10169 10169 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0252 Drainage Piping 2/Aug/09 15/Oct/09 15/Oct/09 0 10169 10169 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Lower Roof 8/Sep/09 5/May/10 5/May/10 0 5995117 5995117 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 8/Sep/09 5/May/10 5/May/10 0 2099441 2099441 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 8/Sep/09 5/May/10 5/May/10 0 367528 367528 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0360 Block Work 8/Sep/09 16/Dec/09 16/Dec/09 0 173866 173866 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0804 Metal Works 16/Mar/10 5/May/10 5/May/10 0 193662 193662 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 30/Sep/09 30/Dec/09 30/Dec/09 0 198142 198142 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0404 Electrical Conduits & Box 30/Sep/09 30/Dec/09 30/Dec/09 0 198142 198142 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 30/Sep/09 3/Jan/10 3/Jan/10 0 1442601 1442601 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0405 HVAC Works 30/Sep/09 3/Jan/10 3/Jan/10 0 1442601 1442601 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 14/Oct/09 4/Feb/10 4/Feb/10 0 91170 91170 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0435 Piping Works 14/Oct/09 4/Feb/10 4/Feb/10 0 91170 91170 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 10/Nov/09 5/May/10 5/May/10 0 3895676 3895676 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 10/Nov/09 5/May/10 5/May/10 0 978613 978613 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

498 Plaster Work 10/Nov/09 22/Feb/10 22/Feb/10 0 57400 57400 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0548 Waterproofing 1/Dec/09 20/Jan/10 20/Jan/10 0 437859 437859 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0626 Painting 1st Stage 30/Dec/09 24/Mar/10 24/Mar/10 0 91023 91023 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0709 Glazing 24/Jan/10 15/Mar/10 15/Mar/10 0 191083 191083 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0719 Suspended ceiling & gyps 28/Jan/10 22/Apr/10 22/Apr/10 0 110565 110565 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0787 Doors & Windows 27/Feb/10 18/Apr/10 18/Apr/10 0 56405 56405 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0805 Painting Final Stage 16/Mar/10 5/May/10 5/May/10 0 34278 34278 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 11/Jan/10 24/Apr/10 24/Apr/10 0 500350 500350 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0661 Wires & Cables 11/Jan/10 20/Mar/10 20/Mar/10 0 370568 370568 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0760 Panel Boards 9/Feb/10 23/Mar/10 23/Mar/10 0 33326 33326 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0792 Electrical Wiring Devices 4/Mar/10 24/Apr/10 24/Apr/10 0 96456 96456 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 28/Jan/10 24/Apr/10 24/Apr/10 0 2405496 2405496 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0718 HVAC Air Outlets 28/Jan/10 6/Apr/10 6/Apr/10 0 305424 305424 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0793 HVAC A/C Units 4/Mar/10 24/Apr/10 24/Apr/10 0 1701370 1701370 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0794 Exhaust Fans 4/Mar/10 24/Apr/10 24/Apr/10 0 398702 398702 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 20/Jan/10 28/Mar/10 28/Mar/10 0 11217 11217 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0691 Piping Accessories 20/Jan/10 28/Mar/10 28/Mar/10 0 11217 11217 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Package 6A Access Area 15/Aug/09 11/Apr/10 11/Apr/10 0 7042765 7042765 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 15/Aug/09 11/Apr/10 11/Apr/10 0 1248469 1248469 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 15/Aug/09 11/Apr/10 11/Apr/10 0 772060 772060 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0290 Block Work 15/Aug/09 25/Oct/09 25/Oct/09 0 621930 621930 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0795 Metal Works 6/Mar/10 8/Apr/10 8/Apr/10 0 36900 36900 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0801 Signage 7/Mar/10 11/Apr/10 11/Apr/10 0 113230 113230 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1/Sep/09 2/Nov/09 2/Nov/09 0 388240 388240 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0339 Electrical Cable Tray 1/Sep/09 2/Nov/09 2/Nov/09 0 388240 388240 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 1/Sep/09 5/Dec/09 5/Dec/09 0 88169 88169 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0340 Drainage Piping 1/Sep/09 25/Oct/09 25/Oct/09 0 1401 1401 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0368 Domestic Water Piping 13/Sep/09 5/Nov/09 5/Nov/09 0 39379 39379 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0396 Fire Fighting Piping 29/Sep/09 5/Dec/09 5/Dec/09 0 47389 47389 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 26/Sep/09 10/Apr/10 10/Apr/10 0 4967397 4967397 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 26/Sep/09 10/Apr/10 10/Apr/10 0 4097827 4097827 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

390 Plaster Work 26/Sep/09 5/Dec/09 5/Dec/09 0 32060 32060 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0470 Wall Covering ( Ceramic / 31/Oct/09 31/Dec/09 31/Dec/09 0 18040 18040 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0527 Painting 1st Stage 17/Nov/09 10/Jan/10 10/Jan/10 0 204057 204057 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0568 Floor Covering ( Ceramic 12/Dec/09 30/Jan/10 30/Jan/10 0 1854932 1854932 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0675 Suspended ceiling & gyps 16/Jan/10 6/Mar/10 6/Mar/10 0 922086 922086 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0771 Doors & Windows 16/Feb/10 23/Mar/10 23/Mar/10 0 876427 876427 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0796 Painting Final Stage 6/Mar/10 10/Apr/10 10/Apr/10 0 190225 190225 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 8/Dec/09 4/Apr/10 4/Apr/10 0 726824 726824 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0561 Wires & Cables 8/Dec/09 11/Jan/10 11/Jan/10 0 606171 606171 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0797 Electrical Wiring Devices 6/Mar/10 4/Apr/10 4/Apr/10 0 120653 120653 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 26/Dec/09 4/Apr/10 4/Apr/10 0 96216 96216 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0612 HVAC Air Outlets 26/Dec/09 28/Jan/10 28/Jan/10 0 13505 13505 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0798 HVAC A/C Units 6/Mar/10 4/Apr/10 4/Apr/10 0 56680 56680 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0799 Exhaust Fans 6/Mar/10 4/Apr/10 4/Apr/10 0 26031 26031 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 29/Dec/09 31/Jan/10 31/Jan/10 0 46530 46530 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0614 Piping Accessories 29/Dec/09 31/Jan/10 31/Jan/10 0 46530 46530 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 1/Sep/09 13/Feb/10 13/Feb/10 0 826899 826899 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 19/Oct/09 12/Dec/09 12/Dec/09 0 820542 820542 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

444 Waterproofing 19/Oct/09 12/Dec/09 12/Dec/09 0 820542 820542 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Plumbing Works 1/Sep/09 13/Feb/10 13/Feb/10 0 6357 6357 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

341 Plumbing Works 1/Sep/09 17/Oct/09 17/Oct/09 0 567 567 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0697 Sanitary Fixtures & Toilet 21/Jan/10 13/Feb/10 13/Feb/10 0 5790 5790 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Second Floor 5/Jul/09 19/Apr/10 19/Apr/10 0 10093142 10093142 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 5/Jul/09 11/Apr/10 11/Apr/10 0 4294469 4294469 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 5/Jul/09 11/Apr/10 11/Apr/10 0 1683793 1683793 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0192 Block Work 5/Jul/09 2/Nov/09 2/Nov/09 0 1191281 1191281 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0764 Metal Works 11/Feb/10 11/Apr/10 11/Apr/10 0 428630 428630 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0803 Signage 7/Mar/10 11/Apr/10 11/Apr/10 0 63882 63882 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 16/Aug/09 13/Dec/09 13/Dec/09 0 368291 368291 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0296 Electrical Conduits & Box 16/Aug/09 16/Nov/09 16/Nov/09 0 246137 246137 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0377 Electrical Cable Tray 15/Sep/09 13/Dec/09 13/Dec/09 0 122154 122154 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 5/Aug/09 1/Dec/09 1/Dec/09 0 976200 976200 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0259 HVAC Ducting 5/Aug/09 1/Dec/09 1/Dec/09 0 976200 976200 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 27/Aug/09 24/Dec/09 24/Dec/09 0 1266185 1266185 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0321 Drainage Piping 27/Aug/09 5/Nov/09 5/Nov/09 0 49855 49855 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0322 Domestic Water Piping 27/Aug/09 12/Nov/09 12/Nov/09 0 45558 45558 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 302: Progress Monitoring Sheet Empty

Page 302 of 353

Sample Project

Dates Percentages % Quantities Data Date 25/Jan/09

Description % Var. Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14 Wk15

S.N Activity Name 13/Dec/08 20/May/10 30/Dec/99 20/May/10 -34 0.2% 0.00% -0.2% 372,500,011 372,500,011.0 616,292.7 0.0 -616,293

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

Planned Start

Planned Finish

Actual Start

Actual Finish

Days Var.

Planned %

Actual %

Total. QTY

Rem. QTY

Planned QTY

Actual QTY

QTY Var.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

375 Fire Fighting Piping 14/Sep/09 24/Dec/09 24/Dec/09 0 1170772 1170772 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Dry Area 30/Aug/09 19/Apr/10 19/Apr/10 0 5798673 5798673 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 30/Aug/09 19/Apr/10 19/Apr/10 0 3479467 3479467 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0327 Plaster Work 30/Aug/09 31/Dec/09 31/Dec/09 0 296870 296870 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0392 Wall Covering ( Ceramic / 27/Sep/09 16/Jan/10 16/Jan/10 0 62566 62566 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0445 Painting 1st Stage 20/Oct/09 31/Jan/10 31/Jan/10 0 222327 222327 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0532 Floor Covering ( Ceramic 21/Nov/09 3/Mar/10 3/Mar/10 0 1251086 1251086 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0586 Suspended ceiling & gyps 17/Dec/09 27/Mar/10 27/Mar/10 0 999083 999083 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0713 Doors & Windows 25/Jan/10 1/Apr/10 1/Apr/10 0 256462 256462 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0739 Wood Cladding 2/Feb/10 24/Mar/10 24/Mar/10 0 61743 61743 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0740 Glazing 2/Feb/10 24/Mar/10 24/Mar/10 0 171360 171360 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0763 Painting Final Stage 11/Feb/10 19/Apr/10 19/Apr/10 0 157970 157970 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 7/Nov/09 7/Apr/10 7/Apr/10 0 1667099 1667099 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0483 Wires & Cables 7/Nov/09 1/Feb/10 1/Feb/10 0 1585508 1585508 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0576 Panel Boards 15/Dec/09 10/Feb/10 10/Feb/10 0 20332 20332 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0727 Electrical Wiring Devices 31/Jan/10 7/Apr/10 7/Apr/10 0 61259 61259 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 18/Nov/09 7/Apr/10 7/Apr/10 0 391289 391289 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0529 HVAC Air Outlets 18/Nov/09 13/Feb/10 13/Feb/10 0 214849 214849 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0725 HVAC A/C Units 31/Jan/10 7/Apr/10 7/Apr/10 0 40020 40020 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0726 Exhaust Fans 31/Jan/10 7/Apr/10 7/Apr/10 0 136420 136420 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 15/Dec/09 8/Mar/10 8/Mar/10 0 260818 260818 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0577 Piping Accessories 15/Dec/09 8/Mar/10 8/Mar/10 0 260818 260818 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Third Floor 15/Aug/09 19/Apr/10 19/Apr/10 0 14722132 14722132 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 15/Aug/09 11/Apr/10 11/Apr/10 0 4443512 4443512 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 15/Aug/09 11/Apr/10 11/Apr/10 0 1407839 1407839 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0291 Block Work 15/Aug/09 16/Dec/09 16/Dec/09 0 926510 926510 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0762 Metal Works 11/Feb/10 11/Apr/10 11/Apr/10 0 438132 438132 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0802 Signage 7/Mar/10 11/Apr/10 11/Apr/10 0 43197 43197 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 7/Sep/09 30/Dec/09 30/Dec/09 0 403111 403111 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0355 Electrical Conduits & Box 7/Sep/09 7/Dec/09 7/Dec/09 0 263121 263121 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0410 Electrical Cable Tray 5/Oct/09 30/Dec/09 30/Dec/09 0 139990 139990 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 13/Sep/09 6/Jan/10 6/Jan/10 0 1357628 1357628 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0369 HVAC Ducting 13/Sep/09 6/Jan/10 6/Jan/10 0 1357628 1357628 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 7/Sep/09 18/Mar/10 18/Mar/10 0 1274934 1274934 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0354 Drainage Piping 7/Sep/09 25/Nov/09 25/Nov/09 0 53769 53769 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0398 Domestic Water Piping 29/Sep/09 16/Dec/09 16/Dec/09 0 152061 152061 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0526 Fire Fighting Piping 17/Nov/09 18/Mar/10 18/Mar/10 0 1069104 1069104 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 29/Sep/09 19/Apr/10 19/Apr/10 0 8110026 8110026 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 29/Sep/09 19/Apr/10 19/Apr/10 0 5556976 5556976 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

397 Plaster Work 29/Sep/09 26/Jan/10 26/Jan/10 0 269850 269850 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0465 Wall Covering ( Ceramic / 28/Oct/09 16/Feb/10 16/Feb/10 0 56826 56826 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0516 Painting 1st Stage 15/Nov/09 25/Feb/10 25/Feb/10 0 223735 223735 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0556 Floor Covering ( Ceramic 6/Dec/09 15/Mar/10 15/Mar/10 0 2045761 2045761 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0601 Suspended ceiling & gyps 23/Dec/09 1/Apr/10 1/Apr/10 0 1926853 1926853 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0712 Doors & Windows 25/Jan/10 1/Apr/10 1/Apr/10 0 218365 218365 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0755 Glazing 8/Feb/10 30/Mar/10 30/Mar/10 0 185640 185640 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0756 Wood Cladding 8/Feb/10 30/Mar/10 30/Mar/10 0 463178 463178 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0761 Painting Final Stage 11/Feb/10 19/Apr/10 19/Apr/10 0 166768 166768 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 23/Dec/09 10/Apr/10 10/Apr/10 0 1881651 1881651 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0604 Wires & Cables 23/Dec/09 18/Feb/10 18/Feb/10 0 1785610 1785610 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0715 Panel Boards 27/Jan/10 4/Mar/10 4/Mar/10 0 51451 51451 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0789 Electrical Wiring Devices 1/Mar/10 10/Apr/10 10/Apr/10 0 44590 44590 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 23/Dec/09 7/Apr/10 7/Apr/10 0 442565 442565 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0603 HVAC Air Outlets 23/Dec/09 16/Mar/10 16/Mar/10 0 228783 228783 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0723 HVAC A/C Units 31/Jan/10 7/Apr/10 7/Apr/10 0 77362 77362 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0724 Exhaust Fans 31/Jan/10 7/Apr/10 7/Apr/10 0 136420 136420 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 23/Dec/09 16/Mar/10 16/Mar/10 0 228834 228834 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0602 Piping Accessories 23/Dec/09 16/Mar/10 16/Mar/10 0 228834 228834 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 19/Sep/09 18/Apr/10 18/Apr/10 0 2168594 2168594 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 22/Oct/09 18/Apr/10 18/Apr/10 0 199108 199108 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

453 Plaster Work 22/Oct/09 2/Feb/10 2/Feb/10 0 16830 16830 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0479 Waterproofing 3/Nov/09 14/Feb/10 14/Feb/10 0 9888 9888 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0560 Wall Covering ( Ceramic / 8/Dec/09 9/Mar/10 9/Mar/10 0 47435 47435 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0569 Painting 1st Stage 12/Dec/09 4/Mar/10 4/Mar/10 0 420 420 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0615 Floor Covering ( Ceramic 29/Dec/09 22/Mar/10 22/Mar/10 0 44010 44010 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0676 Suspended ceiling 16/Jan/10 8/Apr/10 8/Apr/10 0 13013 13013 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0778 Doors & Windows 17/Feb/10 8/Apr/10 8/Apr/10 0 56011 56011 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0786 Painting Final Stage 27/Feb/10 18/Apr/10 18/Apr/10 0 420 420 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0800 Toilet and Bath Accessori 7/Mar/10 18/Apr/10 18/Apr/10 0 11081 11081 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 10/Jan/10 12/Apr/10 12/Apr/10 0 1868687 1868687 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0650 Wires & Cables 10/Jan/10 23/Feb/10 23/Feb/10 0 7536 7536 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0780 Electrical Wiring Devices 21/Feb/10 12/Apr/10 12/Apr/10 0 1861151 1861151 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 16/Jan/10 23/Mar/10 23/Mar/10 0 27256 27256 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0678 HVAC Air Outlets 16/Jan/10 23/Mar/10 23/Mar/10 0 27256 27256 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 19/Sep/09 23/Mar/10 23/Mar/10 0 73543 73543 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0384 Plumbing Works 19/Sep/09 20/Jan/10 20/Jan/10 0 20048 20048 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0585 Sanitary Fixtures & Toilet 16/Dec/09 4/Feb/10 4/Feb/10 0 45818 45818 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0677 Plumbing Accessories 16/Jan/10 23/Mar/10 23/Mar/10 0 7677 7677 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Upper Roof 6/Oct/09 8/Apr/10 8/Apr/10 0 2177922 2177922 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 6/Oct/09 8/Apr/10 8/Apr/10 0 2177922 2177922 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 6/Oct/09 23/Jan/10 23/Jan/10 0 1017517 1017517 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0416 Block Work 6/Oct/09 25/Nov/09 25/Nov/09 0 82240 82240 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0512 Roofing System 14/Nov/09 23/Jan/10 23/Jan/10 0 935277 935277 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 9/Feb/10 8/Apr/10 8/Apr/10 0 622068 622068 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0759 Electrical Works 9/Feb/10 8/Apr/10 8/Apr/10 0 622068 622068 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 7/Dec/09 25/Feb/10 25/Feb/10 0 499856 499856 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0558 HVAC Works 7/Dec/09 25/Feb/10 25/Feb/10 0 499856 499856 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 10/Nov/09 4/Feb/10 4/Feb/10 0 38481 38481 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 303: Progress Monitoring Sheet Empty

Page 303 of 353

Sample Project

Dates Percentages % Quantities Data Date 25/Jan/09

Description % Var. Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14 Wk15

S.N Activity Name 13/Dec/08 20/May/10 30/Dec/99 20/May/10 -34 0.2% 0.00% -0.2% 372,500,011 372,500,011.0 616,292.7 0.0 -616,293

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

Planned Start

Planned Finish

Actual Start

Actual Finish

Days Var.

Planned %

Actual %

Total. QTY

Rem. QTY

Planned QTY

Actual QTY

QTY Var.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

496 Plumbing Works 10/Nov/09 4/Feb/10 4/Feb/10 0 38481 38481 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.013/Dec/08 11/Oct/09 11/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

General 13/Dec/08 11/Oct/09 11/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Floors 13/Dec/08 11/Oct/09 11/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 13/Dec/08 11/Oct/09 11/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Architecture Works 13/Dec/08 11/Oct/09 11/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

1 Precast concrete hollow b 13/Dec/08 15/Jan/09 15/Jan/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.030 Porcelain & Ceramic tiles 12/Mar/09 2/May/09 2/May/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.031 Marble and black granite 12/Mar/09 2/May/09 2/May/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.097 Painting Materials 13/May/09 17/Jun/09 17/Jun/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0144 Aluminum Panel cladding 14/Jun/09 3/Aug/09 3/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0171 Suspended gypsum board 25/Jun/09 30/Jul/09 30/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0271 Doors & Windows 8/Aug/09 19/Sep/09 19/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0343 Handrail & Balustrades 1/Sep/09 11/Oct/09 11/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 28/Jan/09 8/Oct/09 8/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.019 Conduits 28/Jan/09 4/Mar/09 4/Mar/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.064 Elevators & Escalators 22/Apr/09 26/May/09 26/May/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0129 Cable trays 31/May/09 5/Jul/09 5/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0130 Panelboards 31/May/09 5/Jul/09 5/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0163 Generator sets 22/Jun/09 11/Aug/09 11/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0295 Lighting Fixtures 15/Aug/09 8/Oct/09 8/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 22/Feb/09 19/Aug/09 19/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.024 Ducts 22/Feb/09 29/Mar/09 29/Mar/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.043 CHILLED WATER PUMP 29/Mar/09 18/May/09 18/May/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0153 Fans 17/Jun/09 22/Jul/09 22/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0182 WATER CHILLERS 30/Jun/09 19/Aug/09 19/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0195 A/C UNITS 5/Jul/09 9/Aug/09 9/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 28/Feb/09 30/Sep/09 30/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.026 UPVC & PVC pipes 28/Feb/09 4/Apr/09 4/Apr/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0137 Plumbing Accessories 8/Jun/09 28/Jul/09 28/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0188 Pumps 2/Jul/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0267 Sanitary fixtures 6/Aug/09 30/Sep/09 30/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

17/Jan/09 7/Apr/10 7/Apr/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0General 17/Jan/09 7/Apr/10 7/Apr/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Floors 17/Jan/09 7/Apr/10 7/Apr/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 17/Jan/09 7/Apr/10 7/Apr/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 17/Jan/09 7/Apr/10 7/Apr/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.017 Precast concrete hollow b 17/Jan/09 8/Nov/09 8/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.082 Porcelain & Ceramic tiles 2/May/09 31/Jan/10 31/Jan/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.083 Marble and black granite 2/May/09 31/Jan/10 31/Jan/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.089 Aluminum Panel cladding 10/May/09 13/Sep/09 13/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0151 Painting Materials 17/Jun/09 10/Mar/10 10/Mar/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0245 Suspended gypsum board 30/Jul/09 3/Mar/10 3/Mar/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0385 Doors & Windows 19/Sep/09 21/Mar/10 21/Mar/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0427 Handrail & Balustrades 11/Oct/09 7/Apr/10 7/Apr/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 4/Mar/09 28/Mar/10 28/Mar/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.027 Conduits 4/Mar/09 27/Oct/09 27/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0122 Elevators & Escalators 27/May/09 7/Dec/09 7/Dec/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0190 Cable trays 5/Jul/09 6/Feb/10 6/Feb/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0191 Panelboards 5/Jul/09 6/Feb/10 6/Feb/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0285 Generator sets 11/Aug/09 30/Dec/09 30/Dec/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0420 Lighting Fixtures 8/Oct/09 28/Mar/10 28/Mar/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 29/Mar/09 31/Jan/10 31/Jan/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.042 Ducts 29/Mar/09 27/Oct/09 27/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0107 CHILLED WATER PUMP 18/May/09 5/Nov/09 5/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0228 Fans 22/Jul/09 30/Jan/10 30/Jan/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0237 WATER CHILLERS 27/Jul/09 7/Dec/09 7/Dec/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0277 A/C UNITS 9/Aug/09 31/Jan/10 31/Jan/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 4/Apr/09 27/Mar/10 27/Mar/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.053 UPVC & PVC pipes 4/Apr/09 1/Dec/09 1/Dec/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0240 Plumbing Accessories 28/Jul/09 27/Mar/10 27/Mar/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0310 Pumps 22/Aug/09 13/Feb/10 13/Feb/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0406 Sanitary fixtures 30/Sep/09 6/Feb/10 6/Feb/10 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

13/Dec/08 16/Nov/09 16/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0General 13/Dec/08 16/Nov/09 16/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Floors 13/Dec/08 16/Nov/09 16/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 13/Dec/08 16/Nov/09 16/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 13/Dec/08 19/Sep/09 19/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.02 Precast concrete hollow b 13/Dec/08 15/Jan/09 15/Jan/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.040 Porcelain & Ceramic tiles 28/Mar/09 16/May/09 16/May/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.041 Marble and black granite 28/Mar/09 16/May/09 16/May/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0105 Painting Materials 16/May/09 20/Jun/09 20/Jun/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0123 Aluminum Panel cladding 27/May/09 16/Jul/09 16/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0158 Suspended gypsum board 20/Jun/09 25/Jul/09 25/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0233 Doors & Windows 25/Jul/09 5/Sep/09 5/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0294 Handrail & Balustrades 15/Aug/09 19/Sep/09 19/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 11/Jan/09 16/Sep/09 16/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.07 Conduits 11/Jan/09 15/Feb/09 15/Feb/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.044 Elevators & Escalators 30/Mar/09 3/May/09 3/May/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.098 Cable trays 13/May/09 17/Jun/09 17/Jun/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.099 Panelboards 13/May/09 17/Jun/09 17/Jun/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0133 Generator sets 4/Jun/09 25/Jul/09 25/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0243 Lighting Fixtures 28/Jul/09 16/Sep/09 16/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 4/Feb/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.020 Ducts 4/Feb/09 11/Mar/09 11/Mar/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0142 Fans 13/Jun/09 18/Jul/09 18/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0186 WATER CHILLERS 2/Jul/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0187 CHILLED WATER PUMP 2/Jul/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 304: Progress Monitoring Sheet Empty

Page 304 of 353

Sample Project

Dates Percentages % Quantities Data Date 25/Jan/09

Description % Var. Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14 Wk15

S.N Activity Name 13/Dec/08 20/May/10 30/Dec/99 20/May/10 -34 0.2% 0.00% -0.2% 372,500,011 372,500,011.0 616,292.7 0.0 -616,293

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

Planned Start

Planned Finish

Actual Start

Actual Finish

Days Var.

Planned %

Actual %

Total. QTY

Rem. QTY

Planned QTY

Actual QTY

QTY Var.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

219 A/C UNITS 18/Jul/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Plumbing Works 10/Feb/09 16/Nov/09 16/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

21 UPVC & PVC pipes 10/Feb/09 17/Mar/09 17/Mar/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0121 Plumbing Accessories 26/May/09 15/Jul/09 15/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0181 Pumps 30/Jun/09 19/Aug/09 19/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0395 Sanitary fixtures 28/Sep/09 16/Nov/09 16/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

26/Jan/09 14/Nov/09 14/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0General 26/Jan/09 14/Nov/09 14/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Basement Floor 26/Jan/09 2/Sep/09 2/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 26/Jan/09 2/Sep/09 2/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 26/Jan/09 16/Jun/09 16/Jun/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.018 Architecture Shop Drawin 26/Jan/09 16/Jun/09 16/Jun/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 14/Mar/09 2/Aug/09 2/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.032 Electrical Shop Drawings 14/Mar/09 2/Aug/09 2/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 7/Apr/09 27/Aug/09 27/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.054 HVAC Shop Drawings 7/Apr/09 27/Aug/09 27/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 13/Apr/09 2/Sep/09 2/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.059 Plumbing Shop Drawings 13/Apr/09 2/Sep/09 2/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators & Escalators 23/May/09 15/Aug/09 15/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 23/May/09 15/Aug/09 15/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 23/May/09 15/Aug/09 15/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0116 Elevators & Escalators S 23/May/09 15/Aug/09 15/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 23/May/09 15/Aug/09 15/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0117 Elevators & Escalators S 23/May/09 15/Aug/09 15/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade 29/Jun/09 12/Oct/09 12/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 29/Jun/09 12/Oct/09 12/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 16/Jul/09 12/Oct/09 12/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0214 Facade Shop Drawings 16/Jul/09 12/Oct/09 12/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 29/Jun/09 24/Sep/09 24/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0178 Facade Electrical Shop D 29/Jun/09 24/Sep/09 24/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

First Floor 19/Mar/09 13/Oct/09 13/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 19/Mar/09 13/Oct/09 13/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 19/Mar/09 8/Aug/09 8/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.035 Architecture Shop Drawin 19/Mar/09 8/Aug/09 8/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 12/Apr/09 31/Aug/09 31/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.058 Electrical Shop Drawings 12/Apr/09 31/Aug/09 31/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 11/May/09 4/Oct/09 4/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.094 HVAC Shop Drawings 11/May/09 4/Oct/09 4/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 20/May/09 13/Oct/09 13/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0111 Plumbing Shop Drawings 20/May/09 13/Oct/09 13/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ground Floor 8/Mar/09 10/Sep/09 10/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 8/Mar/09 10/Sep/09 10/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 8/Mar/09 27/Jul/09 27/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.028 Architecture Shop Drawin 8/Mar/09 27/Jul/09 27/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 31/Mar/09 19/Aug/09 19/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.046 Electrical Shop Drawings 31/Mar/09 19/Aug/09 19/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 22/Apr/09 10/Sep/09 10/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.065 HVAC Shop Drawings 22/Apr/09 10/Sep/09 10/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 21/Apr/09 9/Sep/09 9/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.063 Plumbing Shop Drawings 21/Apr/09 9/Sep/09 9/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Lower Roof 25/Jun/09 9/Nov/09 9/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 25/Jun/09 9/Nov/09 9/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 25/Jun/09 17/Sep/09 17/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0174 Architecture Shop Drawin 25/Jun/09 17/Sep/09 17/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 13/Aug/09 9/Nov/09 9/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0288 Electrical Shop Drawings 13/Aug/09 9/Nov/09 9/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 13/Jul/09 10/Oct/09 10/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0207 HVAC Shop Drawings 13/Jul/09 10/Oct/09 10/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 5/Aug/09 2/Nov/09 2/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0260 Plumbing Shop Drawings 5/Aug/09 2/Nov/09 2/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Second Floor 31/Mar/09 24/Sep/09 24/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 31/Mar/09 24/Sep/09 24/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 31/Mar/09 19/Aug/09 19/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.045 Architecture Shop Drawin 31/Mar/09 19/Aug/09 19/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 23/Apr/09 12/Sep/09 12/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.067 Electrical Shop Drawings 23/Apr/09 12/Sep/09 12/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 29/Apr/09 17/Sep/09 17/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.078 HVAC Shop Drawings 29/Apr/09 17/Sep/09 17/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 30/Apr/09 24/Sep/09 24/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.081 Plumbing Shop Drawings 30/Apr/09 24/Sep/09 24/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Third Floor 28/Apr/09 4/Oct/09 4/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 28/Apr/09 4/Oct/09 4/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 28/Apr/09 31/Aug/09 31/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.075 Architecture Shop Drawin 28/Apr/09 31/Aug/09 31/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 21/May/09 28/Sep/09 28/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0113 Electrical Shop Drawings 21/May/09 28/Sep/09 28/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 27/May/09 4/Oct/09 4/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0124 HVAC Shop Drawings 27/May/09 4/Oct/09 4/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 21/May/09 28/Sep/09 28/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0114 Plumbing Shop Drawings 21/May/09 28/Sep/09 28/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Upper Roof 6/Jul/09 14/Nov/09 14/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 6/Jul/09 14/Nov/09 14/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 6/Jul/09 25/Aug/09 25/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0197 Architecture Shop Drawin 6/Jul/09 25/Aug/09 25/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 22/Aug/09 15/Oct/09 15/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0311 Electrical Shop Drawings 22/Aug/09 15/Oct/09 15/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 10/Aug/09 4/Oct/09 4/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0283 HVAC Shop Drawings 10/Aug/09 4/Oct/09 4/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 305: Progress Monitoring Sheet Empty

Page 305 of 353

Sample Project

Dates Percentages % Quantities Data Date 25/Jan/09

Description % Var. Wk1 Wk2 Wk3 Wk4 Wk5 Wk6 Wk7 Wk8 Wk9 Wk10 Wk11 Wk12 Wk13 Wk14 Wk15

S.N Activity Name 13/Dec/08 20/May/10 30/Dec/99 20/May/10 -34 0.2% 0.00% -0.2% 372,500,011 372,500,011.0 616,292.7 0.0 -616,293

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

Planned Start

Planned Finish

Actual Start

Actual Finish

Days Var.

Planned %

Actual %

Total. QTY

Rem. QTY

Planned QTY

Actual QTY

QTY Var.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

Plumbing Works 24/Sep/09 14/Nov/09 14/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0386 Plumbing Shop Drawings 24/Sep/09 14/Nov/09 14/Nov/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

3/Jan/09 21/Oct/09 21/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0General 3/Jan/09 21/Oct/09 21/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Basement Floor 3/Jan/09 10/Aug/09 10/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 3/Jan/09 10/Aug/09 10/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 3/Jan/09 24/May/09 24/May/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.06 Architecture Shop Drawin 3/Jan/09 24/May/09 24/May/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 18/Feb/09 9/Jul/09 9/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.022 Electrical Shop Drawings 18/Feb/09 9/Jul/09 9/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 21/Mar/09 10/Aug/09 10/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.037 HVAC Shop Drawings 21/Mar/09 10/Aug/09 10/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 21/Mar/09 10/Aug/09 10/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.036 Plumbing Shop Drawings 21/Mar/09 10/Aug/09 10/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators & Escalators 29/Apr/09 15/Aug/09 15/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 29/Apr/09 15/Aug/09 15/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 29/Apr/09 22/Jul/09 22/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.079 Elevators & Escalators S 29/Apr/09 22/Jul/09 22/Jul/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 23/May/09 15/Aug/09 15/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0118 Elevators & Escalators S 23/May/09 15/Aug/09 15/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade 23/Jun/09 30/Sep/09 30/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 23/Jun/09 30/Sep/09 30/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 23/Jun/09 14/Sep/09 14/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0167 Facade Shop Drawings 23/Jun/09 14/Sep/09 14/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 5/Jul/09 30/Sep/09 30/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0193 Facade Electrical Shop D 5/Jul/09 30/Sep/09 30/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

First Floor 1/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 1/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 1/Apr/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.047 Architecture Shop Drawin 1/Apr/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1/Apr/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.048 Electrical Shop Drawings 1/Apr/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.070 HVAC Shop Drawings 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.069 Plumbing Shop Drawings 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ground Floor 21/Mar/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 21/Mar/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 21/Mar/09 10/Aug/09 10/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.038 Architecture Shop Drawin 21/Mar/09 10/Aug/09 10/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1/Apr/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.049 Electrical Shop Drawings 1/Apr/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1/Apr/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.051 HVAC Shop Drawings 1/Apr/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 1/Apr/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.050 Plumbing Shop Drawings 1/Apr/09 22/Aug/09 22/Aug/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Lower Roof 24/Jun/09 17/Oct/09 17/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 24/Jun/09 17/Oct/09 17/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 24/Jun/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0169 Architecture Shop Drawin 24/Jun/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 21/Jul/09 17/Oct/09 17/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0223 Electrical Shop Drawings 21/Jul/09 17/Oct/09 17/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 21/Jul/09 17/Oct/09 17/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0225 HVAC Shop Drawings 21/Jul/09 17/Oct/09 17/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 21/Jul/09 17/Oct/09 17/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0224 Plumbing Shop Drawings 21/Jul/09 17/Oct/09 17/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Second Floor 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.071 Architecture Shop Drawin 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.072 Electrical Shop Drawings 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.074 HVAC Shop Drawings 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.073 Plumbing Shop Drawings 27/Apr/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Third Floor 13/May/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 13/May/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 13/May/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0100 Architecture Shop Drawin 13/May/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 13/May/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0101 Electrical Shop Drawings 13/May/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 13/May/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0103 HVAC Shop Drawings 13/May/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 13/May/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0102 Plumbing Shop Drawings 13/May/09 15/Sep/09 15/Sep/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Upper Roof 23/Aug/09 21/Oct/09 21/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0All Areas 23/Aug/09 21/Oct/09 21/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Works 23/Aug/09 17/Oct/09 17/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0313 Architecture Shop Drawin 23/Aug/09 17/Oct/09 17/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 23/Aug/09 17/Oct/09 17/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0314 Electrical Shop Drawings 23/Aug/09 17/Oct/09 17/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 27/Aug/09 21/Oct/09 21/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0324 HVAC Shop Drawings 27/Aug/09 21/Oct/09 21/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 27/Aug/09 21/Oct/09 21/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0323 Plumbing Shop Drawings 27/Aug/09 21/Oct/09 21/Oct/09 0 0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 306: Progress Monitoring Sheet Empty

Sample Project Data Date 25/Jan/09

Previous Period 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09 27/Dec/08S.N Description Week1 Week2 Week3 Week4 Week5 Week6 Week7 Week8 Week9 Week101 Planned Quantity 0 0.0 64,774.3 97,161.4 97,161.4 132,748.4 168,335.4 168,335.4 168,335.4 124,236.7 80,138.02 Actual Quantity 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.03 Planned Manpower 0.0 194,322.9 291,484.3 291,484.3 398,245.2 505,006.1 505,006.1 505,006.1 372,710.0 240,414.04 Actual ManPower 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.05 Planned Productivity 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.36 Actual Productivity #DIV/0!

Total QTY 0 372,500,011.07 Planned QTY 616,292.7 0.17%8 Actual QTY 0.0 0.00%8 Remaining QTY 372,500,011.0 100.0%

Week1 Week2 Week3 Week4 Week5 Week6 Week7 Week8 Week9 Week10Previous Period 39795 39802 39809 39816 39823 39830 39837 39844 39851 39809

0

20000

40000

60000

80000

100000

120000

140000

160000

180000

0 0

64,774

97,161 97,161

132,748

168,335 168,335 168,335

124,237

80,138

0 0 0 0 0 0 0 0 0 0 0

Planned V.S Actual QTY

Planned Quantity Actual Quantity

Week1 Week2 Week3 Week4 Week5 Week6 Week7 Week8 Week9 Week1039795 39802 39809 39816 39823 39830 39837 39844 39851 39809

0.0

100,000.0

200,000.0

300,000.0

400,000.0

500,000.0

600,000.0

0

194,323

291,484 291,484

398,245

505,006 505,006 505,006

372,710

240,414

0 0 0 0 0 0 0 0 0 0

Planned V.S Actual ManPower

Planned Manpower Actual ManPower

Week1 Week2 Week3 Week4 Week5 Week6 Week7 Week8 Week9 Week10Previous Period 39795 39802 39809 39816 39823 39830 39837 39844 39851 39809

0.0

0.1

0.2

0.3

0.4

0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3

Planned V.S Actual Productivity

Planned Productivity Actual Productivity

100.0%

Actual V.S Remaining QTY

Actual QTY Remaining QTY

0.0

50,000,000.0

100,000,000.0

150,000,000.0

200,000,000.0

250,000,000.0

300,000,000.0

350,000,000.0

400,000,000.0 372,500,011.0

616,292.7 0.0

372,500,011.0

QTY Status

Total QTY Planned QTY Actual QTY Remaining QTY

0.0%

0.1%

0.2%

0.17%

0.00%

Planned V.S Actual

Planned QTY Actual QTY

Page 307: Progress Monitoring Sheet Empty

Data Date 25/Jan/09Wood Cladding Schedule Planned - QTY Actual QTY

Varia

nce

Productivity

Weekly QTY tracking

Week1 Week2 Week3 Week4 Week5 Week6 Week7 Week8 Week9 Week10 Week11 Week12 Week13 Week14 Week15 Week16 Week17 Week18 Week19 Week20 Week21 WK1 WK2

13/D

ec/0

8

20/D

ec/0

8

27/D

ec/0

8

3/Ja

n/09

10/J

an/0

9

17/J

an/0

9

24/J

an/0

9

31/J

an/0

9

7/Fe

b/09

14/F

eb/0

9

21/F

eb/0

9

28/F

eb/0

9

7/M

ar/0

9

14/M

ar/0

9

21/M

ar/0

9

28/M

ar/0

9

4/Ap

r/09

11/A

pr/0

9

18/A

pr/0

9

25/A

pr/0

9

2/M

ay/0

9

13/D

ec/0

8

20/D

ec/0

8

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Plan

ned

QTY

Actu

al Q

TY

Actu

al Q

TY

WBS-L1 WBS-L2 WBS-L3 WBS-L4 WBS-L5 WBS-L6 WBS-L7 DESCRIPTSum of ToSum of ReSum of WSum of WSum of WSum of WSum of WSum of WSum of WSum of WSum of WSum of WSum of WSum of WSum of WSum of WSum of WSum of WKSum of WKSum of WK18-Sum of WK19-P

Project name XXX 3.7E+08 3.7E+08 0.0 64,774.3 97,161.4 97,161.4 ### ### ### ### ### 80,138.0 91,376.3 94,309.6 ### ### ### 148,696.8 178,368.9 292,947.5 350,553.8

Package 6 B 3.7E+08 3.7E+08 0.0 64,774.3 97,161.4 97,161.4 ### ### ### ### ### 80,138.0 91,376.3 94,309.6 ### ### ### 148,696.8 178,368.9 292,947.5 350,553.8

Construction Works 3.7E+08 3.7E+08 0.0 64,774.3 97,161.4 97,161.4 ### ### ### ### ### 80,138.0 91,376.3 94,309.6 ### ### ### 148,696.8 178,368.9 292,947.5 350,553.8

All Zones 3.9E+07 3.9E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Floors 2.2E+07 2.2E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 2.2E+07 2.2E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 2023282 2023282 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Garbage 544532 544532 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Cleaning 1478750 1478750 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 6583546 6583546 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Generator2475048 2475048 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

MCC (Moto553356 553356 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

ATS (Auto 68123 68123 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

CCTV Sys 866178 866178 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Public Ad 715254 715254 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Telephon 150773 150773 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

MATV Sys 236460 236460 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

FIRE ALA 1518354 1518354 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1.1E+07 1.1E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Equ1.1E+07 1.1E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 2609206 2609206 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing2609206 2609206 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

External Works 1.7E+07 1.7E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 1.7E+07 1.7E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 5328019 5328019 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

LANDSCA5328019 5328019 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1.1E+07 1.1E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

STREET L 1.1E+07 1.1E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 963175 963175 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Irrigation 963175 963175 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

General 5622888 5622888 0.0 64,774.3 97,161.4 97,161.4 ### ### ### ### ### 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0

General Requirements 5622888 5622888 0.0 64,774.3 97,161.4 97,161.4 ### ### ### ### ### 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0

All Areas 5622888 5622888 0.0 64,774.3 97,161.4 97,161.4 ### ### ### ### ### 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0

General 5622888 5622888 0.0 64,774.3 97,161.4 97,161.4 ### ### ### ### ### 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0 80,138.0

Total - Qty REM-QTY This week

manpowerThis week

Productivity

Page 308: Progress Monitoring Sheet Empty

Site Offic 460900 460900 0.0 4,776.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2

Site Offic 115789 115789 0.0 1,199.9 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8

Insurance 632081 632081 0.0 58,798.2 88,197.3 88,197.3 88,197.3 88,197.3 88,197.3 88,197.3 44,098.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Access of 43469 43469 0.0 0.0 0.0 0.0 543.4 1,086.7 1,086.7 1,086.7 1,086.7 1,086.7 1,086.7 1,086.7 1,086.7 1,086.7 1,086.7 1,086.7 1,086.7 1,086.7 1,086.7

Limitation 34800 34800 0.0 0.0 0.0 0.0 435.0 870.0 870.0 870.0 870.0 870.0 870.0 870.0 870.0 870.0 870.0 870.0 870.0 870.0 870.0

Construct1205200 1205200 0.0 0.0 0.0 0.0 9,905.8 19,811.5 19,811.5 19,811.5 19,811.5 19,811.5 19,811.5 19,811.5 19,811.5 19,811.5 19,811.5 19,811.5 19,811.5 19,811.5 19,811.5

Water for 450000 450000 0.0 0.0 0.0 0.0 3,698.6 7,397.3 7,397.3 7,397.3 7,397.3 7,397.3 7,397.3 7,397.3 7,397.3 7,397.3 7,397.3 7,397.3 7,397.3 7,397.3 7,397.3

Temporary1686610 1686610 0.0 0.0 0.0 0.0 13,862.5 27,725.1 27,725.1 27,725.1 27,725.1 27,725.1 27,725.1 27,725.1 27,725.1 27,725.1 27,725.1 27,725.1 27,725.1 27,725.1 27,725.1

Site Work 388080 388080 0.0 0.0 0.0 0.0 3,189.7 6,379.4 6,379.4 6,379.4 6,379.4 6,379.4 6,379.4 6,379.4 6,379.4 6,379.4 6,379.4 6,379.4 6,379.4 6,379.4 6,379.4

Sheds and 39285 39285 0.0 0.0 0.0 0.0 322.9 645.8 645.8 645.8 645.8 645.8 645.8 645.8 645.8 645.8 645.8 645.8 645.8 645.8 645.8

Progress 14278 14278 0.0 0.0 0.0 0.0 117.4 234.7 234.7 234.7 234.7 234.7 234.7 234.7 234.7 234.7 234.7 234.7 234.7 234.7 234.7

Program 427260 427260 0.0 0.0 0.0 0.0 3,511.7 7,023.5 7,023.5 7,023.5 7,023.5 7,023.5 7,023.5 7,023.5 7,023.5 7,023.5 7,023.5 7,023.5 7,023.5 7,023.5 7,023.5

As-Built 125136 125136 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Project Close Out 2278074 2278074 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Floors 2278074 2278074 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Close Out & Testing 2278074 2278074 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 1682874 1682874 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wor 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators1682874 1682874 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 170200 170200 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 170200 170200 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 425000 425000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 425000 425000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

External Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Close Out & Testing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

General 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

External 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Close Out & Testing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

General 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade Wo 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Zone 1 8.9E+07 8.9E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11,238.3 11,238.3 17,149.9 31,995.5 36,462.6 39,433.0 69,105.0 174,006.8 229,677.7

Basement Floor 1.8E+07 1.8E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11,238.3 11,238.3 11,238.3 20,172.4 24,639.4 24,639.4 39,459.5 115,620.2 125,280.5

All Areas 4057905 4057905 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11,238.3 11,238.3 11,238.3 20,172.4 24,639.4 24,639.4 39,459.5 115,620.2 120,176.1

Architecture Work 418121 418121 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11,238.3 11,238.3 11,238.3 11,238.3 11,238.3 11,238.3 11,238.3 11,238.3 11,238.3

Block Wo 187305 187305 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11,238.3 11,238.3 11,238.3 11,238.3 11,238.3 11,238.3 11,238.3 11,238.3 11,238.3

Metal Wo 82772 82772 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 148044 148044 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1011943 1011943 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8,934.1 13,401.1 13,401.1 13,401.1 13,401.1 13,401.1

Electrica 212184 212184 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8,934.1 13,401.1 13,401.1 13,401.1 13,401.1 13,401.1

Electrical 799759 799759 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1386269 1386269 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14,747.5 88,485.3 88,485.3

Page 309: Progress Monitoring Sheet Empty

HVAC Duc1386269 1386269 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14,747.5 88,485.3 88,485.3

Plumbing Works 1241572 1241572 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 72.5 2,495.5 7,051.5

Domestic 2611 2611 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 72.5 217.6 217.6

Drainage 64922 64922 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2,278.0 6,833.9

Fire Fight1174039 1174039 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 1.4E+07 1.4E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5,104.4

Architecture Work 4321002 4321002 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5,104.4

Plaster W 127610 127610 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5,104.4

Ramps Wa 8769 8769 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 7922 7922 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 11812457 1812457 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 100826 100826 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov1327751 1327751 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 426958 426958 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended217087 217087 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 291622 291622 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 8564621 8564621 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C7524987 7524987 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 491139 491139 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 548495 548495 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 429421 429421 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC - Ai 208775 208775 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 101405 101405 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 119241 119241 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 523093 523093 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 523093 523093 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators & Escalators 8437607 8437607 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 8437607 8437607 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 8437607 8437607 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators8437607 8437607 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade 9372070 9372070 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 9372070 9372070 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 9150307 9150307 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Aluminum 8860149 8860149 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade Pl 290158 290158 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 221763 221763 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

FACADE L 221763 221763 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

First Floor 8053295 8053295 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 28,741.1 57,482.1

All Areas 3059020 3059020 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 28,741.1 57,482.1

Architecture Work 1306909 1306909 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 28,741.1 57,482.1

Block Wo 958035 958035 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 28,741.1 57,482.1

Metal Wo 323186 323186 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 25688 25688 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 363180 363180 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 310: Progress Monitoring Sheet Empty

Electrica 228315 228315 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 134865 134865 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 786792 786792 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Duc 786792 786792 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 602139 602139 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Domestic 40307 40307 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 50132 50132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fire Fight 511700 511700 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 4994275 4994275 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 2441280 2441280 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 297430 297430 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 45100 45100 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 145722 145722 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 154600 154600 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov 705059 705059 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 118390 118390 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended746088 746088 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 174216 174216 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wood Cla 54675 54675 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1909071 1909071 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C1680187 1680187 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 197243 197243 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 31641 31641 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 441831 441831 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC - Ai 350793 350793 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 91038 91038 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 202093 202093 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 202093 202093 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ground Floor 1.2E+07 1.2E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5,911.6 11,823.2 11,823.2 14,793.6 29,645.5 29,645.5 46,915.1

All Areas 3168411 3168411 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5,911.6 11,823.2 11,823.2 14,793.6 29,645.5 29,645.5 46,915.1

Architecture Work 798254 798254 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5,911.6 11,823.2 11,823.2 11,823.2 11,823.2 11,823.2 11,823.2

Block Wo 197053 197053 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5,911.6 11,823.2 11,823.2 11,823.2 11,823.2 11,823.2 11,823.2

Metal Wo 416483 416483 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 184718 184718 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 324890 324890 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2,970.4 17,822.4 17,822.4 17,822.4

Electrica 234661 234661 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2,970.4 17,822.4 17,822.4 17,822.4

Electrical 90229 90229 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 835439 835439 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9,387.0

HVAC Duc 835439 835439 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9,387.0

Plumbing Works 1209828 1209828 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7,882.6

Domestic 356209 356209 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 248301 248301 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7,882.6

Fire Fight 605318 605318 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 8363910 8363910 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 311: Progress Monitoring Sheet Empty

Architecture Work 5849928 5849928 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 47950 47950 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 2132 2132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro 911996 911996 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 418544 418544 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 843113 843113 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov2906735 2906735 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 288213 288213 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended274165 274165 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 157080 157080 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1866357 1866357 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C1317845 1317845 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 125958 125958 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 422554 422554 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 402953 402953 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 235625 235625 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 89760 89760 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 77568 77568 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 244672 244672 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 244672 244672 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

SCECO ROOM 590199 590199 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 443910 443910 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 99003 99003 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 90370 90370 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro 58548 58548 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 52487 52487 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 118294 118294 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 25208 25208 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 132590 132590 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 132590 132590 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 3222 3222 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Wor 3222 3222 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 10477 10477 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 10477 10477 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Lower Roof 6521000 6521000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 2089722 2089722 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 498244 498244 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 234472 234472 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wo 263772 263772 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 167637 167637 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 167637 167637 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1350747 1350747 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Wor1350747 1350747 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 73094 73094 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 312: Progress Monitoring Sheet Empty

Piping Wo 73094 73094 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 4431278 4431278 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 1339784 1339784 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 66990 66990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro 562359 562359 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 94141 94141 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 55853 55853 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov 4379 4379 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 34315 34315 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended230895 230895 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 290852 290852 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 522852 522852 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C 322331 322331 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 148539 148539 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 51982 51982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 2539625 2539625 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 296089 296089 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 392088 392088 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C1851448 1851448 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 29017 29017 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 29017 29017 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Package 6A Access Area 6932757 6932757 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 1483237 1483237 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 875937 875937 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 307395 307395 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wo 426751 426751 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 141791 141791 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 596726 596726 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 596726 596726 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1972 1972 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Duc 1972 1972 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 8602 8602 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 442 442 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fire Fight 8160 8160 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 4759258 4759258 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 3697393 3697393 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 79730 79730 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 31324 31324 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 158950 158950 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 934189 934189 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov1395494 1395494 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 148173 148173 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended949533 949533 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 970514 970514 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 313: Progress Monitoring Sheet Empty

Wires & C 865397 865397 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 105117 105117 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 45246 45246 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 13443 13443 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 3591 3591 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 28212 28212 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 46105 46105 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 46105 46105 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 690262 690262 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 690262 690262 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro 690262 690262 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Second Floor 7911216 7911216 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 3478035 3478035 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 1574297 1574297 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 908126 908126 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wo 643694 643694 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 22477 22477 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 341017 341017 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 217166 217166 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 123851 123851 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 884346 884346 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Duc 884346 884346 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 678375 678375 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Domestic 40307 40307 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 50132 50132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fire Fight 587936 587936 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 4433181 4433181 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 2249724 2249724 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 214410 214410 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 57400 57400 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 107403 107403 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 150136 150136 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov 669015 669015 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 96018 96018 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended741121 741121 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 171360 171360 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wood Cla 42861 42861 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1648765 1648765 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C1555235 1555235 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 55086 55086 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 38444 38444 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 347831 347831 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 189443 189443 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 136420 136420 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 314: Progress Monitoring Sheet Empty

HVAC A/C 21968 21968 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 186861 186861 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 186861 186861 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Third Floor 9903178 9903178 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 3899100 3899100 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 1652986 1652986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 984951 984951 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wo 651980 651980 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 16055 16055 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 340490 340490 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 235650 235650 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 104840 104840 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1265774 1265774 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Duc1265774 1265774 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 639850 639850 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Domestic 53567 53567 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 52123 52123 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fire Fight 534160 534160 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 5237555 5237555 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 2963596 2963596 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 165830 165830 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 22714 22714 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro 88452 88452 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 99857 99857 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 154862 154862 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov 650016 650016 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 80910 80910 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended782634 782634 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 185640 185640 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wood Cla 732681 732681 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1553040 1553040 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C1427222 1427222 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 92376 92376 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 33442 33442 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 522758 522758 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 240825 240825 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 136420 136420 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 145513 145513 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 198161 198161 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 198161 198161 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 766523 766523 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 172283 172283 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 16764 16764 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 46809 46809 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 315: Progress Monitoring Sheet Empty

Waterpro 8601 8601 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 420 420 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 43488 43488 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov 31040 31040 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 420 420 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended 11830 11830 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Toilet an 12911 12911 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 563185 563185 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C 5652 5652 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 557533 557533 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 23152 23152 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 23152 23152 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 7903 7903 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 1039 1039 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 6864 6864 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Upper Roof 1835276 1835276 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 1835276 1835276 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 927688 927688 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 77632 77632 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Roofing S 850056 850056 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 499929 499929 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 499929 499929 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 363652 363652 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Wor363652 363652 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 44007 44007 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 44007 44007 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Zone 2 1.3E+08 1.3E+08 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2,933.3 2,933.3 2,933.3 5,479.1 10,570.9 10,570.9 20,247.7 22,183.1

Basement Floor 2.3E+07 2.3E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2,933.3 2,933.3 2,933.3 2,933.3 2,933.3 2,933.3 12,610.1 14,545.5

All Areas 5050377 5050377 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2,933.3 2,933.3 2,933.3 2,933.3 2,933.3 2,933.3 12,610.1 14,545.5

Architecture Work 266666 266666 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2,933.3 2,933.3 2,933.3 2,933.3 2,933.3 2,933.3 2,933.3 2,933.3

Block Wo 48888 48888 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2,933.3 2,933.3 2,933.3 2,933.3 2,933.3 2,933.3 2,933.3 2,933.3

Metal Wo 69734 69734 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 148044 148044 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1124734 1124734 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9,676.9 11,612.2

Electrica 218697 218697 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9,676.9 11,612.2

Electrical 906037 906037 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1955276 1955276 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Duc1955276 1955276 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 1703701 1703701 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Domestic 3489 3489 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 79529 79529 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fire Fight1620683 1620683 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 1.8E+07 1.8E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 6856888 6856888 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 316: Progress Monitoring Sheet Empty

Plaster W 37450 37450 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ramps Wa 12956 12956 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 8584 8584 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 11687773 1687773 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 75567 75567 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov2190548 2190548 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 405680 405680 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended580064 580064 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 1858266 1858266 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 9787623 9787623 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C8659006 8659006 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 390436 390436 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 738181 738181 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 505254 505254 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC - Ai 280861 280861 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 128133 128133 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 96260 96260 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 567296 567296 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 567296 567296 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators & Escalators 1.2E+07 1.2E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 1.2E+07 1.2E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 1.2E+07 1.2E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators 1.2E+07 1.2E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade 5896357 5896357 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 5896357 5896357 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 5681308 5681308 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Aluminum 5425594 5425594 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade Pl 255714 255714 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 215049 215049 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

FACADE L 215049 215049 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

First Floor 1.5E+07 1.5E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 5235933 5235933 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 2485956 2485956 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 384158 384158 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wo2062758 2062758 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 39040 39040 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 448413 448413 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 214350 214350 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 234063 234063 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1035573 1035573 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Duc1035573 1035573 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 1265991 1265991 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Domestic 137759 137759 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 105476 105476 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 317: Progress Monitoring Sheet Empty

Fire Fight1022756 1022756 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 8367448 8367448 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 4866612 4866612 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 302190 302190 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 75850 75850 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 143978 143978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 167950 167950 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov1355874 1355874 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 127550 127550 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended1211670 1211670 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 1389562 1389562 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wood Cla 91988 91988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 2628630 2628630 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C2153269 2153269 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 90248 90248 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 385113 385113 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 617838 617838 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC - Ai 407986 407986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 7174 7174 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 202678 202678 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 254368 254368 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 254368 254368 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 1259335 1259335 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 326751 326751 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 29304 29304 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 81982 81982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro 31312 31312 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 2188 2188 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 99837 99837 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov 30720 30720 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 2188 2188 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended 21125 21125 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Toilet an 28095 28095 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 668973 668973 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C 22023 22023 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 646950 646950 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 59837 59837 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 59837 59837 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 203774 203774 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 57491 57491 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 32970 32970 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Sanitary F 113313 113313 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ground Floor 1.6E+07 1.6E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2,545.9 7,637.6 7,637.6 7,637.6 7,637.6

All Areas 5405376 5405376 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2,545.9 7,637.6 7,637.6 7,637.6 7,637.6

Page 318: Progress Monitoring Sheet Empty

Architecture Work 1856278 1856278 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2,545.9 7,637.6 7,637.6 7,637.6 7,637.6

Block Wo 127293 127293 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2,545.9 7,637.6 7,637.6 7,637.6 7,637.6

Metal Wo1553562 1553562 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 175423 175423 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 339352 339352 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 224475 224475 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 114877 114877 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1255871 1255871 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Duc1255871 1255871 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 1953875 1953875 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Domestic 466938 466938 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 319825 319825 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fire Fight1167112 1167112 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 9901698 9901698 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 7126809 7126809 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 42490 42490 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 4100 4100 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro 739312 739312 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 439031 439031 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 1268410 1268410 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov3389057 3389057 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 303015 303015 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended621522 621522 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 319872 319872 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1850620 1850620 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C1379509 1379509 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 86456 86456 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 384655 384655 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 637325 637325 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 424947 424947 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 134640 134640 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 77738 77738 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 286944 286944 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 286944 286944 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

SCECO ROOM 983669 983669 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 895945 895945 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 197934 197934 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 186620 186620 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro 108834 108834 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 111603 111603 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 230822 230822 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 60132 60132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 71111 71111 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 71111 71111 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 319: Progress Monitoring Sheet Empty

HVAC Works 6444 6444 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Wor 6444 6444 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 10169 10169 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 10169 10169 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Lower Roof 1.8E+07 1.8E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 5883906 5883906 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 915680 915680 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 196232 196232 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wo 719448 719448 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 266559 266559 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 266559 266559 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 4620066 4620066 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Wor4620066 4620066 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 81601 81601 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Wo 81601 81601 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 1.2E+07 1.2E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 3938580 3938580 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 114870 114870 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro1365886 1365886 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 176338 176338 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 72222 72222 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 56740 56740 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended970515 970515 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 1182009 1182009 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 865722 865722 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C 580254 580254 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 233303 233303 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 52165 52165 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 7516908 7516908 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 786871 786871 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F1205702 1205702 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C5524335 5524335 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 11021 11021 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 11021 11021 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Package 6A Access Area 8455323 8455323 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 1530753 1530753 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 687852 687852 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 261514 261514 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wo 383750 383750 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 42588 42588 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 827274 827274 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 827274 827274 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1260 1260 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Duc 1260 1260 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 320: Progress Monitoring Sheet Empty

Plumbing Works 14367 14367 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 597 597 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fire Fight 13770 13770 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 6589988 6589988 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 4702700 4702700 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 63070 63070 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 14268 14268 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 131781 131781 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 1889815 1889815 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov1285852 1285852 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 129465 129465 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended1188449 1188449 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1778703 1778703 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C 544579 544579 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 1234124 1234124 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 53194 53194 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 16481 16481 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 3591 3591 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 33122 33122 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 55391 55391 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 55391 55391 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 334582 334582 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 290758 290758 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro 290758 290758 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 43227 43227 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C 26607 26607 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 16620 16620 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 597 597 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 597 597 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Second Floor 1.5E+07 1.5E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 7298236 7298236 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 4360620 4360620 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo1021084 1021084 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wo3300496 3300496 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 39040 39040 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 352560 352560 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 217244 217244 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 135316 135316 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1173314 1173314 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Duc1173314 1173314 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 1411742 1411742 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Domestic 131969 131969 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 104546 104546 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fire Fight1175227 1175227 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 321: Progress Monitoring Sheet Empty

Dry Area 6722746 6722746 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 3848565 3848565 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 154630 154630 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 73472 73472 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 106767 106767 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 783044 783044 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov1012509 1012509 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 90108 90108 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended1214439 1214439 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 342720 342720 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wood Cla 70876 70876 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 2101072 2101072 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C1661628 1661628 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 54025 54025 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 385419 385419 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 526641 526641 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 240588 240588 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 181894 181894 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 104159 104159 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 246468 246468 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 246468 246468 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 1029849 1029849 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 227436 227436 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 29304 29304 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 81982 81982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro 15656 15656 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 1085 1085 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 18384 18384 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov 30720 30720 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 1085 1085 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended 21125 21125 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Toilet an 28095 28095 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 558146 558146 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C 22023 22023 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 536123 536123 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 55665 55665 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC - Ai 55665 55665 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 188602 188602 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 45107 45107 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 32824 32824 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Sanitary F 110671 110671 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Third Floor 1.6E+07 1.6E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 7667210 7667210 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 4385268 4385268 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 322: Progress Monitoring Sheet Empty

Block Wo1047052 1047052 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wo3338216 3338216 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 368771 368771 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 235683 235683 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 133088 133088 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1651558 1651558 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Duc1651558 1651558 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 1261613 1261613 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Domestic 118695 118695 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 79983 79983 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fire Fight1062935 1062935 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 7166356 7166356 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 4535309 4535309 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 210210 210210 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 57236 57236 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 154409 154409 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 251446 251446 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov1435308 1435308 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 139490 139490 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended1381599 1381599 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 374136 374136 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wood Cla 531475 531475 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1817115 1817115 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C1689245 1689245 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 94428 94428 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 33442 33442 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 580843 580843 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 292791 292791 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 181894 181894 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 106158 106158 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 233089 233089 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 233089 233089 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 1269785 1269785 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 185337 185337 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 16764 16764 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 46809 46809 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro 8601 8601 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 420 420 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 52342 52342 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov 31040 31040 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 420 420 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended 11830 11830 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Toilet an 17111 17111 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 323: Progress Monitoring Sheet Empty

Electrical Works 908780 908780 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C 5652 5652 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 903128 903128 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 28848 28848 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 28848 28848 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 146820 146820 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 19650 19650 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 17674 17674 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Sanitary F 109496 109496 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Upper Roof 718446 718446 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 718446 718446 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 701970 701970 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 701970 701970 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 16476 16476 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 16476 16476 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Zone 3 1.1E+08 1.1E+08 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9,277.5 18,555.0 18,555.0 18,555.0 18,555.0 18,555.0

Basement Floor 2.3E+07 2.3E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9,277.5 18,555.0 18,555.0 18,555.0 18,555.0 18,555.0

All Areas 6571533 6571533 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9,277.5 18,555.0 18,555.0 18,555.0 18,555.0 18,555.0

Architecture Work 1530940 1530940 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9,277.5 18,555.0 18,555.0 18,555.0 18,555.0 18,555.0

Block Wo 309250 309250 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9,277.5 18,555.0 18,555.0 18,555.0 18,555.0 18,555.0

Metal Wo1074323 1074323 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 147367 147367 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1059220 1059220 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 253058 253058 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 806162 806162 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1450366 1450366 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Duc1450366 1450366 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 2531007 2531007 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Domestic 371360 371360 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 78157 78157 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fire Fight2081490 2081490 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 1.5E+07 1.5E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 5946177 5946177 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 154560 154560 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ramps Wa 59013 59013 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 7020 7020 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 11756632 1756632 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 946016 946016 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov1288408 1288408 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 453220 453220 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended239656 239656 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 1041652 1041652 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 8162531 8162531 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C7687821 7687821 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 324: Progress Monitoring Sheet Empty

Panel Boa 18208 18208 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 456502 456502 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 638709 638709 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC - Ai 281567 281567 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 101405 101405 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 255737 255737 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 687982 687982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 687982 687982 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 1132724 1132724 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 194378 194378 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 17292 17292 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 48867 48867 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 1330 1330 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 81453 81453 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov 19920 19920 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 1330 1330 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended 12844 12844 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Toilet an 11342 11342 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 222189 222189 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C 14777 14777 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 207412 207412 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 106978 106978 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC - Ai 10571 10571 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 96407 96407 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 609179 609179 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 4409 4409 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 522667 522667 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Sanitary F 82103 82103 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators & Escalators 1.1E+07 1.1E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 1.1E+07 1.1E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 1.1E+07 1.1E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators 1.1E+07 1.1E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade 9666846 9666846 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 9666846 9666846 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 9295968 9295968 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Aluminum 8894739 8894739 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade Pl 401229 401229 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 370878 370878 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

FACADE L 370878 370878 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

First Floor 8412116 8412116 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 3799593 3799593 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 1406062 1406062 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 930836 930836 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wo 427061 427061 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 325: Progress Monitoring Sheet Empty

Signage 48165 48165 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 401085 401085 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 260064 260064 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 141021 141021 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 878646 878646 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Duc 878646 878646 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 1113800 1113800 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Domestic 45644 45644 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 49855 49855 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fire Fight1018301 1018301 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 4612523 4612523 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 2086919 2086919 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 124950 124950 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 20418 20418 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 102590 102590 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 167489 167489 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov 557232 557232 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 77323 77323 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended746243 746243 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 174216 174216 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wood Cla 116458 116458 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1841541 1841541 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C1757041 1757041 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 42312 42312 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 42188 42188 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 430205 430205 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC - Ai 319219 319219 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 110986 110986 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 253858 253858 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 253858 253858 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ground Floor 1.3E+07 1.3E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 4154628 4154628 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 1086504 1086504 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 98227 98227 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wo 790546 790546 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 197731 197731 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 356865 356865 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 261111 261111 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 95754 95754 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 835439 835439 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Duc 835439 835439 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 1875820 1875820 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Domestic 468385 468385 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 220771 220771 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 326: Progress Monitoring Sheet Empty

Fire Fight1186664 1186664 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 8845911 8845911 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 6332678 6332678 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 60060 60060 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 3116 3116 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro1080908 1080908 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 423342 423342 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 887137 887137 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov3169251 3169251 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 265592 265592 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended286192 286192 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 157080 157080 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1864086 1864086 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C1384732 1384732 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 40490 40490 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 438864 438864 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 402027 402027 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 236163 236163 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 89760 89760 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 76104 76104 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 247120 247120 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 247120 247120 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

SCECO ROOM 473321 473321 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 434259 434259 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 83927 83927 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 90370 90370 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro 58548 58548 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 53852 53852 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 118294 118294 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 29268 29268 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 25671 25671 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 25671 25671 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 3222 3222 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Wor 3222 3222 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 10169 10169 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 10169 10169 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Lower Roof 5995117 5995117 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 2099441 2099441 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 367528 367528 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 173866 173866 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wo 193662 193662 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 198142 198142 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 198142 198142 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1442601 1442601 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 327: Progress Monitoring Sheet Empty

HVAC Wor1442601 1442601 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 91170 91170 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Wo 91170 91170 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 3895676 3895676 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 978613 978613 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 57400 57400 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro 437859 437859 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 91023 91023 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 56405 56405 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 34278 34278 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended110565 110565 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 191083 191083 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 500350 500350 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C 370568 370568 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 33326 33326 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 96456 96456 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 2405496 2405496 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 305424 305424 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 398702 398702 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C1701370 1701370 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 11217 11217 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 11217 11217 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Package 6A Access Area 7042765 7042765 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 1248469 1248469 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 772060 772060 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 621930 621930 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wo 36900 36900 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 113230 113230 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 388240 388240 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 388240 388240 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 88169 88169 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Domestic 39379 39379 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 1401 1401 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fire Fight 47389 47389 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 4967397 4967397 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 4097827 4097827 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 32060 32060 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 18040 18040 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 204057 204057 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 876427 876427 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov1854932 1854932 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 190225 190225 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended922086 922086 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 726824 726824 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 328: Progress Monitoring Sheet Empty

Wires & C 606171 606171 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 120653 120653 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 96216 96216 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 13505 13505 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 26031 26031 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 56680 56680 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 46530 46530 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 46530 46530 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 826899 826899 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 820542 820542 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro 820542 820542 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 6357 6357 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 567 567 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Sanitary F 5790 5790 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Second Floor 1E+07 1E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 4294469 4294469 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 1683793 1683793 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo1191281 1191281 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wo 428630 428630 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 63882 63882 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 368291 368291 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 246137 246137 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 122154 122154 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 976200 976200 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Duc 976200 976200 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 1266185 1266185 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Domestic 45558 45558 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 49855 49855 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fire Fight1170772 1170772 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 5798673 5798673 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 3479467 3479467 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 296870 296870 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 62566 62566 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 222327 222327 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 256462 256462 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov1251086 1251086 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 157970 157970 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended999083 999083 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 171360 171360 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wood Cla 61743 61743 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1667099 1667099 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C1585508 1585508 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 20332 20332 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 61259 61259 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 329: Progress Monitoring Sheet Empty

HVAC Works 391289 391289 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 214849 214849 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 136420 136420 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 40020 40020 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 260818 260818 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 260818 260818 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Third Floor 1.5E+07 1.5E+07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 4443512 4443512 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 1407839 1407839 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 926510 926510 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Metal Wo 438132 438132 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Signage 43197 43197 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 403111 403111 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 263121 263121 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 139990 139990 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 1357628 1357628 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Duc1357628 1357628 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 1274934 1274934 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Domestic 152061 152061 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Drainage 53769 53769 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fire Fight1069104 1069104 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Dry Area 8110026 8110026 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 5556976 5556976 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plaster W 269850 269850 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 56826 56826 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 223735 223735 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 218365 218365 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov2045761 2045761 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 166768 166768 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended1926853 1926853 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Glazing 185640 185640 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wood Cla 463178 463178 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1881651 1881651 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C1785610 1785610 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panel Boa 51451 51451 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 44590 44590 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 442565 442565 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 228783 228783 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Exhaust F 136420 136420 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC A/C 77362 77362 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 228834 228834 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Piping Ac 228834 228834 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wet Area 2168594 2168594 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 199108 199108 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 330: Progress Monitoring Sheet Empty

Plaster W 16830 16830 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wall Cove 47435 47435 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Waterpro 9888 9888 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 1 420 420 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 56011 56011 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Floor Cov 44010 44010 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting F 420 420 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended 13013 13013 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Toilet an 11081 11081 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 1868687 1868687 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Wires & C 7536 7536 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical 1861151 1861151 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 27256 27256 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Air 27256 27256 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 73543 73543 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 7677 7677 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 20048 20048 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Sanitary F 45818 45818 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Upper Roof 2177922 2177922 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 2177922 2177922 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 1017517 1017517 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Block Wo 82240 82240 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Roofing S 935277 935277 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 622068 622068 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 622068 622068 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 499856 499856 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Wor499856 499856 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 38481 38481 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 38481 38481 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Materia Approval 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

General 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Floors 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Precast c 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Porcelain 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Marble an 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Aluminum 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Handrail 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Conduits 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 331: Progress Monitoring Sheet Empty

Cable tra 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panelboa 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Generator 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Lighting F 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ducts 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

CHILLED 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fans 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

WATER CH 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

A/C UNIT 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

UPVC & P 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Pumps 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Sanitary f 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Material Procurement & Deliver on Site 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

General 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Floors 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Precast c 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Porcelain 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Marble an 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Aluminum 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Handrail 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Conduits 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Cable tra 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panelboa 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Generator 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Lighting F 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ducts 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

CHILLED 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fans 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

WATER CH 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

A/C UNIT 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

UPVC & P 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 332: Progress Monitoring Sheet Empty

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Pumps 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Sanitary f 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Material Submittals 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

General 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Floors 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Precast c 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Porcelain 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Marble an 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Aluminum 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Painting 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Suspended 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Doors & 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Handrail 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Conduits 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Cable tra 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Panelboa 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Generator 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Lighting F 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ducts 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

CHILLED 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Fans 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

WATER CH 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

A/C UNIT 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

UPVC & P 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Pumps 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Sanitary f 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Shop Drawing Approval 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

General 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Basement Floor 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architect 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Sho 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 333: Progress Monitoring Sheet Empty

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators & Escalators 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade S 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade El 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

First Floor 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architect 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Sho 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ground Floor 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architect 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Sho 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Lower Roof 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architect 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Sho 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 334: Progress Monitoring Sheet Empty

Second Floor 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architect 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Sho 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Third Floor 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architect 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Sho 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Upper Roof 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architect 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Sho 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Shop Drawing Submittals 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

General 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Basement Floor 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architect 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Sho 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators & Escalators 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 335: Progress Monitoring Sheet Empty

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Elevators 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade S 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Facade El 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

First Floor 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architect 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Sho 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Ground Floor 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architect 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Sho 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Lower Roof 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architect 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Sho 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Second Floor 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architect 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 336: Progress Monitoring Sheet Empty

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Sho 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Third Floor 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architect 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Sho 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Upper Roof 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

All Areas 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architecture Work 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Architect 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrical Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Electrica 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HVAC Sho 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing Works 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Plumbing 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 337: Progress Monitoring Sheet Empty

Page 337 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09

S.N DESCRIPTION Sum of Total Min of Materials StarMax of Materials ESum of MaterialSum of materialsSum of WK1Sum of WK2Sum of WK3Sum of WK4Sum of WK5Sum of WK6Sum of WK7Sum of WK8-Sum of WK9-Sum of WK10-Pl-QTY1 Precast concrete hollow block 0 6/Dec/08 8/Jan/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.02 Precast concrete hollow block 0 6/Dec/08 8/Jan/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.03 Site Offices for Consultants 460900 15/Dec/08 9/Mar/10 36,954.1 0.0 4,776.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.2 7,164.24 Site Offices and Stores for Contractors 115789 15/Dec/08 9/Mar/10 9,283.8 0.0 1,199.9 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.8 1,799.85 Insurances 632081 15/Dec/08 2/Feb/09 464,386.0 0.0 58,798.2 88,197.3 88,197.3 88,197.3 88,197.3 88,197.3 88,197.3 44,098.7 0.06 Architecture Shop Drawings 0 27/Dec/08 17/May/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.07 Conduits 0 4/Jan/09 8/Feb/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.08 Access of Site 43469 6/Jan/09 12/Oct/09 2,648.6 0.0 0.0 0.0 0.0 543.4 1,086.7 1,086.7 1,086.7 1,086.7 1,086.79 Limitations of the Site 34800 6/Jan/09 12/Oct/09 2,120.4 0.0 0.0 0.0 0.0 435.0 870.0 870.0 870.0 870.0 870.010 Constructional Plant 1205200 6/Jan/09 7/Mar/10 48,208.0 0.0 0.0 0.0 0.0 9,905.8 19,811.5 19,811.5 19,811.5 19,811.5 19,811.511 Water for the Works 450000 6/Jan/09 7/Mar/10 18,000.0 0.0 0.0 0.0 0.0 3,698.6 7,397.3 7,397.3 7,397.3 7,397.3 7,397.312 Temporary Lighting and Power for the Works 1686610 6/Jan/09 7/Mar/10 67,464.4 0.0 0.0 0.0 0.0 13,862.5 27,725.1 27,725.1 27,725.1 27,725.1 27,725.113 Site Working Conditions 388080 6/Jan/09 7/Mar/10 15,523.2 0.0 0.0 0.0 0.0 3,189.7 6,379.4 6,379.4 6,379.4 6,379.4 6,379.414 Sheds and Storage Facilities 39285 6/Jan/09 7/Mar/10 1,571.4 0.0 0.0 0.0 0.0 322.9 645.8 645.8 645.8 645.8 645.815 Progress Photographs 14278 6/Jan/09 7/Mar/10 571.1 0.0 0.0 0.0 0.0 117.4 234.7 234.7 234.7 234.7 234.716 Program 427260 6/Jan/09 7/Mar/10 17,090.4 0.0 0.0 0.0 0.0 3,511.7 7,023.5 7,023.5 7,023.5 7,023.5 7,023.517 Precast concrete hollow block 0 10/Jan/09 1/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.018 Architecture Shop Drawings 0 19/Jan/09 9/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.019 Conduits 0 21/Jan/09 25/Feb/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.020 Ducts 0 28/Jan/09 4/Mar/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.021 UPVC & PVC pipes 0 3/Feb/09 10/Mar/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.022 Electrical Shop Drawings 0 11/Feb/09 2/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.023 Block Work 187305 14/Feb/09 9/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.024 Ducts 0 15/Feb/09 22/Mar/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.025 Block Work 48888 21/Feb/09 16/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.026 UPVC & PVC pipes 0 21/Feb/09 28/Mar/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.027 Conduits 0 25/Feb/09 20/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.028 Architecture Shop Drawings 0 1/Mar/09 20/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.029 Block Work 197053 3/Mar/09 27/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.030 Porcelain & Ceramic tiles 0 5/Mar/09 25/Apr/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.031 Marble and black granite 0 5/Mar/09 25/Apr/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.032 Electrical Shop Drawings 0 7/Mar/09 26/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.033 Electrical Conduits & Boxes 212184 9/Mar/09 27/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.034 Block Work 309250 10/Mar/09 4/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.035 Architecture Shop Drawings 0 12/Mar/09 1/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.036 Plumbing Shop Drawings 0 14/Mar/09 3/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.037 HVAC Shop Drawings 0 14/Mar/09 3/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.038 Architecture Shop Drawings 0 14/Mar/09 3/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.039 Block Work 127293 18/Mar/09 12/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.040 Porcelain & Ceramic tiles 0 21/Mar/09 9/May/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.041 Marble and black granite 0 21/Mar/09 9/May/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.042 Ducts 0 22/Mar/09 20/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.043 CHILLED WATER PUMP 0 22/Mar/09 11/May/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.044 Elevators & Escalators 0 23/Mar/09 26/Apr/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.045 Architecture Shop Drawings 0 24/Mar/09 12/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.046 Electrical Shop Drawings 0 24/Mar/09 12/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.047 Architecture Shop Drawings 0 25/Mar/09 15/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.048 Electrical Shop Drawings 0 25/Mar/09 15/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.049 Electrical Shop Drawings 0 25/Mar/09 15/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.050 Plumbing Shop Drawings 0 25/Mar/09 15/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

This shape represents a slicer. Slicers are supported in Excel 2010 or later.

If the shape was modified in an earlier version of Excel, or if the workbook was saved in Excel 2003 or earlier, the slicer cannot be used.

Page 338: Progress Monitoring Sheet Empty

Page 338 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

51 HVAC Shop Drawings 0 25/Mar/09 15/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.052 Electrical Conduits & Boxes 234661 26/Mar/09 25/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.053 UPVC & PVC pipes 0 28/Mar/09 24/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.054 HVAC Shop Drawings 0 31/Mar/09 20/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.055 Domestic Water Piping 2611 1/Apr/09 23/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.056 HVAC Ducting 1386269 2/Apr/09 20/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.057 Electrical Conduits & Boxes 218697 5/Apr/09 13/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.058 Electrical Shop Drawings 0 5/Apr/09 24/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.059 Plumbing Shop Drawings 0 6/Apr/09 26/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.060 Block Work 958035 7/Apr/09 1/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.061 Drainage Piping 64922 8/Apr/09 13/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.062 Plaster Work 127610 13/Apr/09 6/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.063 Plumbing Shop Drawings 0 14/Apr/09 2/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.064 Elevators & Escalators 0 15/Apr/09 19/May/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.065 HVAC Shop Drawings 0 15/Apr/09 3/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.066 Drainage Piping 248301 15/Apr/09 27/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.067 Electrical Shop Drawings 0 16/Apr/09 5/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.068 HVAC Ducting 835439 16/Apr/09 28/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.069 Plumbing Shop Drawings 0 20/Apr/09 8/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.070 HVAC Shop Drawings 0 20/Apr/09 8/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.071 Architecture Shop Drawings 0 20/Apr/09 8/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.072 Electrical Shop Drawings 0 20/Apr/09 8/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.073 Plumbing Shop Drawings 0 20/Apr/09 8/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.074 HVAC Shop Drawings 0 20/Apr/09 8/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.075 Architecture Shop Drawings 0 21/Apr/09 24/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.076 Block Work 98227 22/Apr/09 16/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.077 Plaster Work 37450 22/Apr/09 17/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.078 HVAC Shop Drawings 0 22/Apr/09 10/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.079 Elevators & Escalators Shop Drawing 0 22/Apr/09 15/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.080 Electrical Conduits & Boxes 253058 23/Apr/09 2/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.081 Plumbing Shop Drawings 0 23/Apr/09 17/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.082 Porcelain & Ceramic tiles 0 25/Apr/09 24/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.083 Marble and black granite 0 25/Apr/09 24/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.084 Fire Fighting Piping 1174039 25/Apr/09 9/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.085 Block Work 384158 29/Apr/09 23/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.086 Electrical Conduits & Boxes 228315 30/Apr/09 30/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.087 Plaster Work 47950 2/May/09 26/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.088 HVAC Ducting 1255871 2/May/09 19/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.089 Aluminum Panel cladding 0 3/May/09 6/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.090 Drainage Piping 79529 4/May/09 1/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.091 Domestic Water Piping 3489 4/May/09 23/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.092 Fire Fighting Piping 1620683 4/May/09 31/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.093 HVAC Ducting 1955276 4/May/09 13/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.094 HVAC Shop Drawings 0 4/May/09 27/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.095 Electrical Cable Tray 799759 6/May/09 6/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.096 Ramps Waterproofing 8769 6/May/09 8/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.097 Painting Materials 0 6/May/09 10/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.098 Cable trays 0 6/May/09 10/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.099 Panelboards 0 6/May/09 10/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0100 Architecture Shop Drawings 0 6/May/09 8/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0101 Electrical Shop Drawings 0 6/May/09 8/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 339: Progress Monitoring Sheet Empty

Page 339 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

102 Plumbing Shop Drawings 0 6/May/09 8/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0103 HVAC Shop Drawings 0 6/May/09 8/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0104 Domestic Water Piping 356209 9/May/09 30/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0105 Painting Materials 0 9/May/09 13/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0106 Electrical Cable Tray 906037 10/May/09 10/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0107 CHILLED WATER PUMP 0 11/May/09 29/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0108 Block Work 908126 12/May/09 5/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0109 Fire Fighting Piping 605318 12/May/09 5/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0110 Plaster Work 42490 12/May/09 6/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0111 Plumbing Shop Drawings 0 13/May/09 6/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0112 HVAC Ducting 1450366 14/May/09 31/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0113 Electrical Shop Drawings 0 14/May/09 21/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0114 Plumbing Shop Drawings 0 14/May/09 21/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0115 Ramps Waterproofing 12956 16/May/09 18/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0116 Elevators & Escalators Shop Drawing 0 16/May/09 8/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0117 Elevators & Escalators Shop Drawing 0 16/May/09 8/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0118 Elevators & Escalators Shop Drawing 0 16/May/09 8/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0119 Drainage Piping 78157 17/May/09 21/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0120 Electrical Conduits & Boxes 224475 18/May/09 18/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0121 Plumbing Accessories 0 19/May/09 8/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0122 Elevators & Escalators 0 20/May/09 30/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0123 Aluminum Panel cladding 0 20/May/09 9/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0124 HVAC Shop Drawings 0 20/May/09 27/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0125 Block Work 307395 23/May/09 28/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0126 Drainage Piping 319825 23/May/09 13/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0127 Domestic Water Piping 466938 23/May/09 13/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0128 Domestic Water Piping 40307 24/May/09 24/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0129 Cable trays 0 24/May/09 28/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0130 Panelboards 0 24/May/09 28/Jun/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0131 Plaster Work 154560 26/May/09 24/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0132 Plumbing Works 522667 27/May/09 16/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0133 Generator sets 0 28/May/09 18/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0134 HVAC Ducting 786792 30/May/09 24/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0135 Wall Covering ( Ceramic / Porcelain/ Marble ) 7922 30/May/09 19/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0136 Domestic Water Piping 371360 1/Jun/09 12/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0137 Plumbing Accessories 0 1/Jun/09 21/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0138 Block Work 1021084 3/Jun/09 1/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0139 HVAC Ducting 835439 3/Jun/09 21/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0140 Electrical Conduits & Boxes 217166 4/Jun/09 3/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0141 Plaster Work 297430 6/Jun/09 5/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0142 Fans 0 6/Jun/09 11/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0143 Waterproofing 911996 6/Jun/09 8/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0144 Aluminum Panel cladding 0 7/Jun/09 27/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0145 Drainage Piping 50132 7/Jun/09 18/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0146 Wall Covering ( Ceramic / Porcelain/ Marble ) 8584 8/Jun/09 29/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0147 Electrical Cable Tray 134865 8/Jun/09 3/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0148 Drainage Piping 442 9/Jun/09 28/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0149 HVAC Ducting 1972 9/Jun/09 15/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0150 Block Work 930836 10/Jun/09 8/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0151 Painting Materials 0 10/Jun/09 3/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0152 HVAC Ducting 884346 10/Jun/09 8/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 340: Progress Monitoring Sheet Empty

Page 340 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

153 Fans 0 10/Jun/09 15/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0154 HVAC Ducting 1035573 10/Jun/09 24/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0155 Waterproofing 739312 10/Jun/09 14/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0156 Drainage Piping 50132 11/Jun/09 16/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0157 Electrical Cable Tray 806162 13/Jun/09 8/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0158 Suspended gypsum board ceiling 0 13/Jun/09 18/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0159 Electrical Conduits & Boxes 214350 15/Jun/09 11/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0160 Drainage Piping 105476 15/Jun/09 19/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0161 Domestic Water Piping 137759 15/Jun/09 26/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0162 Electrical Conduits & Boxes 261111 15/Jun/09 10/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0163 Generator sets 0 15/Jun/09 4/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0164 Fire Fighting Piping 2081490 15/Jun/09 7/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0165 Fire Fighting Piping 511700 16/Jun/09 20/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0166 Block Work 984951 16/Jun/09 14/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0167 Facade Shop Drawings 0 16/Jun/09 7/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0168 Plaster Work 302190 16/Jun/09 15/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0169 Architecture Shop Drawings 0 17/Jun/09 8/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0170 Wall Covering ( Ceramic / Porcelain/ Marble ) 2132 17/Jun/09 8/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0171 Suspended gypsum board ceiling 0 18/Jun/09 23/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0172 Plaster Work 17292 18/Jun/09 30/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0173 Ramps Waterproofing 59013 18/Jun/09 21/Jul/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0174 Architecture Shop Drawings 0 18/Jun/09 10/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0175 Block Work 261514 20/Jun/09 25/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0176 Fire Fighting Piping 1167112 20/Jun/09 9/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0177 Block Work 99003 22/Jun/09 2/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0178 Facade Electrical Shop Drawings 0 22/Jun/09 17/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0179 Electrical Cable Tray 114877 22/Jun/09 27/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0180 Electrical Works 132590 22/Jun/09 19/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0181 Pumps 0 23/Jun/09 12/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0182 WATER CHILLERS 0 23/Jun/09 12/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0183 Drainage Piping 10477 24/Jun/09 6/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0184 HVAC Works 3222 24/Jun/09 5/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0185 Plaster Work 60060 25/Jun/09 24/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0186 WATER CHILLERS 0 25/Jun/09 15/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0187 CHILLED WATER PUMP 0 25/Jun/09 15/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0188 Pumps 0 25/Jun/09 15/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0189 Drainage Piping 220771 27/Jun/09 31/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0190 Cable trays 0 28/Jun/09 30/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0191 Panelboards 0 28/Jun/09 30/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0192 Block Work 1191281 28/Jun/09 26/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0193 Facade Electrical Shop Drawings 0 28/Jun/09 23/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0194 Wall Covering ( Ceramic / Porcelain/ Marble ) 4100 28/Jun/09 19/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0195 A/C UNITS 0 28/Jun/09 2/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0196 Domestic Water Piping 40307 29/Jun/09 24/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0197 Architecture Shop Drawings 0 29/Jun/09 18/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0198 Block Work 197934 1/Jul/09 10/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0199 Electrical Cable Tray 596726 2/Jul/09 29/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0200 Fire Fighting Piping 8160 2/Jul/09 9/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0201 Block Work 1047052 2/Jul/09 31/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0202 Drainage Piping 10169 2/Jul/09 4/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0203 HVAC Works 6444 2/Jul/09 4/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 341: Progress Monitoring Sheet Empty

Page 341 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

204 Plumbing Works 32970 4/Jul/09 26/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0205 Fire Fighting Piping 1186664 5/Jul/09 29/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0206 Plaster Work 79730 5/Jul/09 9/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0207 HVAC Shop Drawings 0 6/Jul/09 3/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0208 Drainage Piping 597 7/Jul/09 25/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0209 HVAC Ducting 1260 7/Jul/09 12/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0210 Fire Fighting Piping 1022756 8/Jul/09 19/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0211 Drainage Piping 52123 9/Jul/09 27/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0212 Electrical Conduits & Boxes 235650 9/Jul/09 5/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0213 Plaster Work 90370 9/Jul/09 19/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0214 Facade Shop Drawings 0 9/Jul/09 5/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0215 HVAC Ducting 1173314 9/Jul/09 31/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0216 Plaster Work 29304 9/Jul/09 22/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0217 Electrical Works 71111 9/Jul/09 6/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0218 Wall Covering ( Ceramic / Porcelain/ Marble ) 45100 11/Jul/09 1/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0219 A/C UNITS 0 11/Jul/09 15/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0220 Plaster Work 214410 11/Jul/09 9/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0221 Wall Covering ( Ceramic / Porcelain/ Marble ) 7020 12/Jul/09 2/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0222 Plaster Work 186620 13/Jul/09 22/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0223 Electrical Shop Drawings 0 14/Jul/09 10/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0224 Plumbing Shop Drawings 0 14/Jul/09 10/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0225 HVAC Shop Drawings 0 14/Jul/09 10/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0226 Electrical Cable Tray 95754 14/Jul/09 6/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0227 Block Work 234472 14/Jul/09 26/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0228 Fans 0 15/Jul/09 23/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0229 Painting 1st Stage 1812457 15/Jul/09 27/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0230 HVAC Ducting 1265774 15/Jul/09 4/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0231 Electrical Cable Tray 123851 18/Jul/09 22/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0232 Electrical Conduits & Boxes 217244 18/Jul/09 4/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0233 Doors & Windows 0 18/Jul/09 29/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0234 Piping Accessories 244672 19/Jul/09 15/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0235 Electrical Cable Tray 234063 20/Jul/09 28/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0236 Facade Plaster & Paint 290158 20/Jul/09 15/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0237 WATER CHILLERS 0 20/Jul/09 30/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0238 Plumbing Works 6864 21/Jul/09 18/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0239 Waterproofing 58548 21/Jul/09 23/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0240 Plumbing Accessories 0 21/Jul/09 20/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0241 Waterproofing 31312 21/Jul/09 3/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0242 Wall Covering ( Ceramic / Porcelain/ Marble ) 75850 21/Jul/09 11/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0243 Lighting Fixtures 0 21/Jul/09 9/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0244 HVAC Ducting 878646 22/Jul/09 3/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0245 Suspended gypsum board ceiling 0 23/Jul/09 24/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0246 Floor Covering ( Ceramic / Porcelain/ Marble ) 1327751 23/Jul/09 4/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0247 Waterproofing 1080908 25/Jul/09 26/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0248 Waterproofing 108834 25/Jul/09 26/Aug/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0249 Block Work 196232 25/Jul/09 5/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0250 Painting 1st Stage 1687773 25/Jul/09 7/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0251 Electrical Conduits & Boxes 235683 26/Jul/09 21/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0252 Drainage Piping 10169 26/Jul/09 8/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0253 HVAC Works 3222 26/Jul/09 8/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0254 Painting 1st Stage 52487 27/Jul/09 6/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 342: Progress Monitoring Sheet Empty

Page 342 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

255 Electrical Cable Tray 90229 27/Jul/09 12/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0256 Waterproofing 690262 28/Jul/09 21/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0257 Roofing System 850056 29/Jul/09 8/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0258 Electrical Conduits & Boxes 260064 29/Jul/09 22/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0259 HVAC Ducting 976200 29/Jul/09 24/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0260 Plumbing Shop Drawings 0 29/Jul/09 26/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0261 Plaster Work 124950 30/Jul/09 1/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0262 Electrical Cable Tray 827274 30/Jul/09 22/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0263 Fire Fighting Piping 13770 30/Jul/09 12/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0264 Wall Covering ( Ceramic / Porcelain/ Marble ) 3116 30/Jul/09 19/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0265 Block Work 83927 30/Jul/09 1/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0266 Electrical Works 25671 30/Jul/09 9/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0267 Sanitary fixtures 0 30/Jul/09 23/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0268 HVAC Ducting 1651558 1/Aug/09 24/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0269 Plaster Work 154630 1/Aug/09 3/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0270 HVAC Works 1350747 1/Aug/09 12/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0271 Doors & Windows 0 1/Aug/09 12/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0272 Wires & Cables 7524987 2/Aug/09 12/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0273 Domestic Water Piping 53567 2/Aug/09 20/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0274 Drainage Piping 104546 2/Aug/09 11/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0275 Domestic Water Piping 131969 2/Aug/09 25/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0276 Floor Covering ( Ceramic / Porcelain/ Marble ) 2190548 2/Aug/09 15/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0277 A/C UNITS 0 2/Aug/09 24/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0278 Plaster Work 63070 2/Aug/09 12/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0279 Plaster Work 165830 3/Aug/09 6/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0280 Wall Covering ( Ceramic / Porcelain/ Marble ) 57400 3/Aug/09 28/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0281 Fire Fighting Piping 587936 3/Aug/09 28/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0282 Painting 1st Stage 418544 3/Aug/09 15/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0283 HVAC Shop Drawings 0 3/Aug/09 27/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0284 Wall Covering ( Ceramic / Porcelain/ Marble ) 48867 4/Aug/09 8/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0285 Generator sets 0 4/Aug/09 23/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0286 Painting 1st Stage 111603 5/Aug/09 19/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0287 Plumbing Works 32824 6/Aug/09 5/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0288 Electrical Shop Drawings 0 6/Aug/09 2/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0289 Block Work 77632 6/Aug/09 30/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0290 Block Work 621930 8/Aug/09 18/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0291 Block Work 926510 8/Aug/09 9/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0292 Drainage Piping 79983 8/Aug/09 17/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0293 Domestic Water Piping 118695 8/Aug/09 19/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0294 Handrail & Balustrades 0 8/Aug/09 12/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0295 Lighting Fixtures 0 8/Aug/09 1/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0296 Electrical Conduits & Boxes 246137 9/Aug/09 9/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0297 Wall Covering ( Ceramic / Porcelain/ Marble ) 31324 9/Aug/09 11/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0298 Plaster Work 90370 11/Aug/09 17/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0299 Domestic Water Piping 468385 11/Aug/09 7/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0300 Electrical Conduits & Boxes 266559 11/Aug/09 20/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0301 HVAC Works 4620066 11/Aug/09 26/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0302 Floor Covering ( Ceramic / Porcelain/ Marble ) 2906735 11/Aug/09 28/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0303 Wires & Cables 8659006 11/Aug/09 26/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0304 Drainage Piping 49855 13/Aug/09 22/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0305 Domestic Water Piping 45644 13/Aug/09 29/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 343: Progress Monitoring Sheet Empty

Page 343 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

306 Electrical Cable Tray 104840 13/Aug/09 9/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0307 Doors & Windows 118294 13/Aug/09 21/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0308 Painting 1st Stage 439031 13/Aug/09 30/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0309 Piping Works 81601 13/Aug/09 9/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0310 Pumps 0 15/Aug/09 6/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0311 Electrical Shop Drawings 0 15/Aug/09 8/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0312 Plumbing Works 17674 15/Aug/09 15/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0313 Architecture Shop Drawings 0 16/Aug/09 10/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0314 Electrical Shop Drawings 0 16/Aug/09 10/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0315 Aluminum Panel cladding 8860149 16/Aug/09 9/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0316 Waterproofing 58548 17/Aug/09 24/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0317 Piping Accessories 567296 18/Aug/09 15/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0318 HVAC - Air Outlets 208775 19/Aug/09 15/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0319 Wires & Cables 1317845 19/Aug/09 15/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0320 Painting Final Stage 25208 20/Aug/09 5/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0321 Drainage Piping 49855 20/Aug/09 29/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0322 Domestic Water Piping 45558 20/Aug/09 5/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0323 Plumbing Shop Drawings 0 20/Aug/09 14/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0324 HVAC Shop Drawings 0 20/Aug/09 14/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0325 Floor Covering ( Ceramic / Porcelain/ Marble ) 3389057 22/Aug/09 8/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0326 Electrical Cable Tray 135316 22/Aug/09 8/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0327 Plaster Work 296870 23/Aug/09 24/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0328 Doors & Windows 230822 23/Aug/09 30/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0329 Painting Final Stage 60132 23/Aug/09 6/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0330 Painting 1st Stage 53852 23/Aug/09 30/Sep/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0331 Plaster Work 29304 24/Aug/09 9/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0332 Wall Covering ( Ceramic / Porcelain/ Marble ) 73472 24/Aug/09 17/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0333 HVAC Equipments 10965925 24/Aug/09 15/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0334 Piping Works 73094 24/Aug/09 17/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0335 Elevators & Escalators 8437607 25/Aug/09 30/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0336 Elevators & Escalators 12404477 25/Aug/09 30/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0337 Elevators & Escalators 11132528 25/Aug/09 30/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0338 Facade Plaster & Paint 255714 25/Aug/09 24/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0339 Electrical Cable Tray 388240 25/Aug/09 26/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0340 Drainage Piping 1401 25/Aug/09 18/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0341 Plumbing Works 567 25/Aug/09 10/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0342 Wall Covering ( Ceramic / Porcelain/ Marble ) 81982 25/Aug/09 3/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0343 Handrail & Balustrades 0 25/Aug/09 4/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0344 Waterproofing 290758 25/Aug/09 19/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0345 Painting 1st Stage 145722 26/Aug/09 12/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0346 Plaster Work 16764 26/Aug/09 12/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0347 Waterproofing 88452 26/Aug/09 20/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0348 Painting 1st Stage 158950 26/Aug/09 20/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0349 Piping Accessories 523093 27/Aug/09 14/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0350 Suspended ceiling & gypsum board partition 217087 27/Aug/09 13/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0351 Painting 1st Stage 1756632 27/Aug/09 13/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0352 HVAC - Air Outlets 280861 29/Aug/09 28/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0353 Electrical Cable Tray 133088 30/Aug/09 28/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0354 Drainage Piping 53769 31/Aug/09 18/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0355 Electrical Conduits & Boxes 263121 31/Aug/09 30/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0356 Electrical Conduits & Boxes 167637 31/Aug/09 20/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 344: Progress Monitoring Sheet Empty

Page 344 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

357 Painting Final Stage 29268 1/Sep/09 10/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0358 Wall Covering ( Ceramic / Porcelain/ Marble ) 22714 1/Sep/09 27/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0359 Plaster Work 66990 1/Sep/09 17/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0360 Block Work 173866 1/Sep/09 9/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0361 Wires & Cables 7687821 2/Sep/09 2/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0362 Wall Covering ( Ceramic / Porcelain/ Marble ) 20418 3/Sep/09 28/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0363 Floor Covering ( Ceramic / Porcelain/ Marble ) 705059 3/Sep/09 21/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0364 Piping Accessories 286944 3/Sep/09 5/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0365 Electrical Cable Tray 141021 3/Sep/09 1/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0366 Waterproofing 15656 5/Sep/09 21/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0367 Floor Covering ( Ceramic / Porcelain/ Marble ) 1288408 5/Sep/09 22/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0368 Domestic Water Piping 39379 6/Sep/09 29/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0369 HVAC Ducting 1357628 6/Sep/09 30/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0370 Painting 1st Stage 143978 6/Sep/09 23/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0371 Suspended ceiling & gypsum board partition 580064 6/Sep/09 23/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0372 Wall Covering ( Ceramic / Porcelain/ Marble ) 14268 6/Sep/09 8/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0373 Waterproofing 8601 7/Sep/09 23/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0374 Painting 1st Stage 107403 7/Sep/09 23/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0375 Fire Fighting Piping 1170772 7/Sep/09 17/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0376 Aluminum Panel cladding 5425594 8/Sep/09 9/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0377 Electrical Cable Tray 122154 8/Sep/09 6/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0378 Doors & Windows 118294 9/Sep/09 6/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0379 Wires & Cables 1680187 9/Sep/09 9/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0380 Fire Fighting Piping 534160 9/Sep/09 10/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0381 HVAC Works 363652 10/Sep/09 19/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0382 Piping Accessories 687982 10/Sep/09 10/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0383 Plaster Work 210210 10/Sep/09 13/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0384 Plumbing Works 20048 12/Sep/09 13/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0385 Doors & Windows 0 12/Sep/09 14/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0386 Plumbing Shop Drawings 0 17/Sep/09 7/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0387 Wires & Cables 865397 17/Sep/09 21/Oct/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0388 Fire Fighting Piping 1018301 19/Sep/09 26/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0389 Floor Covering ( Ceramic / Porcelain/ Marble ) 1355874 19/Sep/09 31/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0390 Plaster Work 32060 19/Sep/09 28/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0391 Painting 1st Stage 102590 20/Sep/09 31/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0392 Wall Covering ( Ceramic / Porcelain/ Marble ) 62566 20/Sep/09 9/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0393 Painting 1st Stage 423342 20/Sep/09 31/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0394 Floor Covering ( Ceramic / Porcelain/ Marble ) 1395494 21/Sep/09 9/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0395 Sanitary fixtures 0 21/Sep/09 9/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0396 Fire Fighting Piping 47389 22/Sep/09 28/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0397 Plaster Work 269850 22/Sep/09 19/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0398 Domestic Water Piping 152061 22/Sep/09 9/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0399 HVAC - Air Outlets 407986 22/Sep/09 17/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0400 Wires & Cables 1379509 22/Sep/09 22/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0401 HVAC Air Outlets 424947 22/Sep/09 19/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0402 Painting 1st Stage 99857 23/Sep/09 4/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0403 Waterproofing 562359 23/Sep/09 12/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0404 Electrical Conduits & Boxes 198142 23/Sep/09 23/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0405 HVAC Works 1442601 23/Sep/09 27/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0406 Sanitary fixtures 0 23/Sep/09 30/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0407 Painting 1st Stage 1330 24/Sep/09 20/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 345: Progress Monitoring Sheet Empty

Page 345 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

408 Piping Accessories 202093 26/Sep/09 21/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0409 Electrical Works 499929 27/Sep/09 22/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0410 Electrical Cable Tray 139990 28/Sep/09 23/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0411 Floor Covering ( Ceramic / Porcelain/ Marble ) 3169251 28/Sep/09 9/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0412 Panel Boards 125958 28/Sep/09 29/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0413 Painting 1st Stage 131781 28/Sep/09 17/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0414 HVAC - Air Outlets 350793 29/Sep/09 24/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0415 Wires & Cables 1555235 29/Sep/09 24/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0416 Block Work 82240 29/Sep/09 18/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0417 Wires & Cables 14777 30/Sep/09 9/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0418 Suspended ceiling & gypsum board partition 621522 30/Sep/09 12/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0419 Floor Covering ( Ceramic / Porcelain/ Marble ) 669015 1/Oct/09 13/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0420 Lighting Fixtures 0 1/Oct/09 21/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0421 Painting 1st Stage 106767 3/Oct/09 13/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0422 Floor Covering ( Ceramic / Porcelain/ Marble ) 19920 3/Oct/09 28/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0423 Plaster Work 16764 3/Oct/09 14/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0424 Panel Boards 491139 4/Oct/09 3/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0425 Wires & Cables 2153269 4/Oct/09 29/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0426 Painting 1st Stage 2188 4/Oct/09 29/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0427 Handrail & Balustrades 0 4/Oct/09 31/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0428 HVAC Air Outlets 235625 5/Oct/09 31/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0429 HVAC Air Outlets 13443 5/Oct/09 8/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0430 Suspended ceiling & gypsum board partition 746088 5/Oct/09 17/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0431 Plumbing Works 16476 6/Oct/09 19/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0432 HVAC - Air Outlets 281567 6/Oct/09 31/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0433 Wires & Cables 1757041 7/Oct/09 2/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0434 Wires & Cables 1384732 7/Oct/09 2/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0435 Piping Works 91170 7/Oct/09 28/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0436 Piping Accessories 46105 8/Oct/09 10/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0437 Plumbing Accessories 4409 8/Oct/09 17/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0438 Piping Accessories 247120 10/Oct/09 4/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0439 Piping Accessories 254368 10/Oct/09 5/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0440 Fire Fighting Piping 1062935 11/Oct/09 21/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0441 Panel Boards 18208 12/Oct/09 13/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0442 Suspended ceiling & gypsum board partition 274165 12/Oct/09 24/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0443 Floor Covering ( Ceramic / Porcelain/ Marble ) 30720 12/Oct/09 7/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0444 Waterproofing 820542 12/Oct/09 5/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0445 Painting 1st Stage 222327 13/Oct/09 24/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0446 Wall Covering ( Ceramic / Porcelain/ Marble ) 81982 14/Oct/09 17/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0447 HVAC Air Outlets 189443 14/Oct/09 9/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0448 Suspended ceiling & gypsum board partition 239656 14/Oct/09 26/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0449 Wall Covering ( Ceramic / Porcelain/ Marble ) 57236 14/Oct/09 3/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0450 Waterproofing 8601 14/Oct/09 26/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0451 Plaster Work 114870 14/Oct/09 26/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0452 HVAC - Air Outlets 10571 14/Oct/09 23/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0453 Plaster Work 16830 15/Oct/09 26/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0454 As-Built Drawings & Operation & Maintenance 125136 15/Oct/09 10/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0455 Wires & Cables 544579 15/Oct/09 18/Nov/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0456 Wall Covering ( Ceramic / Porcelain/ Marble ) 46809 17/Oct/09 19/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0457 Painting 1st Stage 420 17/Oct/09 11/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0458 Facade Plaster & Paint 401229 17/Oct/09 11/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 346: Progress Monitoring Sheet Empty

Page 346 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

459 Suspended ceiling & gypsum board partition 1211670 17/Oct/09 28/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0460 Floor Covering ( Ceramic / Porcelain/ Marble ) 1285852 19/Oct/09 10/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0461 Panel Boards 197243 19/Oct/09 20/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0462 Piping Accessories 186861 19/Oct/09 11/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0463 Panel Boards 390436 19/Oct/09 20/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0464 Electrical Works 701970 20/Oct/09 16/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0465 Wall Covering ( Ceramic / Porcelain/ Marble ) 56826 21/Oct/09 9/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0466 Doors & Windows 100826 21/Oct/09 30/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0467 Floor Covering ( Ceramic / Porcelain/ Marble ) 1012509 22/Oct/09 2/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0468 HVAC Air Outlets 240825 22/Oct/09 17/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0469 Painting 1st Stage 94141 22/Oct/09 17/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0470 Wall Covering ( Ceramic / Porcelain/ Marble ) 18040 24/Oct/09 24/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0471 HVAC - Air Outlets 319219 25/Oct/09 19/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0472 HVAC Air Outlets 236163 25/Oct/09 19/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0473 Suspended ceiling & gypsum board partition 949533 26/Oct/09 17/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0474 Fire Fighting Piping 1175227 26/Oct/09 10/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0475 Painting 1st Stage 1085 26/Oct/09 20/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0476 Wires & Cables 1661628 26/Oct/09 20/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0477 Exhaust Fans 7174 26/Oct/09 4/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0478 Plumbing Works 44007 26/Oct/09 14/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0479 Waterproofing 9888 27/Oct/09 7/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0480 Wires & Cables 22023 27/Oct/09 5/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0481 Wires & Cables 1427222 28/Oct/09 29/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0482 Sanitary Fixtures & Toilet and Bath accessories 82103 28/Oct/09 21/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0483 Wires & Cables 1585508 31/Oct/09 25/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0484 Floor Covering ( Ceramic / Porcelain/ Marble ) 650016 31/Oct/09 11/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0485 Doors & Windows 75567 1/Nov/09 10/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0486 Painting 1st Stage 154409 1/Nov/09 13/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0487 Waterproofing 1365886 1/Nov/09 24/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0488 MCC (Motor Control Center) 553356 2/Nov/09 30/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0489 Floor Covering ( Ceramic / Porcelain/ Marble ) 557232 2/Nov/09 13/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0490 Suspended ceiling & gypsum board partition 286192 2/Nov/09 13/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0491 Panel Boards 86456 2/Nov/09 3/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0492 Plumbing Accessories 57491 2/Nov/09 11/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0493 HVAC Air Outlets 16481 2/Nov/09 9/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0494 FACADE LIGHTING INSTALLATIONS 215049 3/Nov/09 9/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0495 Panel Boards 55086 3/Nov/09 4/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0496 Plumbing Works 38481 3/Nov/09 28/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0497 FACADE LIGHTING INSTALLATIONS 221763 3/Nov/09 9/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0498 Plaster Work 57400 3/Nov/09 15/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0499 ATS (Automatic transformer switch) 68123 4/Nov/09 3/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0500 CCTV System 866178 4/Nov/09 3/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0501 Public Address System 715254 4/Nov/09 3/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0502 Telephone System 150773 4/Nov/09 3/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0503 MATV System 236460 4/Nov/09 3/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0504 FIRE ALARM SYSTEM 1518354 4/Nov/09 3/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0505 Glazing 291622 4/Nov/09 28/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0506 Piping Accessories 55391 5/Nov/09 12/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0507 Wires & Cables 5652 5/Nov/09 14/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0508 Piping Accessories 198161 5/Nov/09 28/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0509 Suspended ceiling & gypsum board partition 741121 5/Nov/09 17/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 347: Progress Monitoring Sheet Empty

Page 347 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

510 Panel Boards 92376 5/Nov/09 24/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0511 HVAC Air Outlets 240588 7/Nov/09 1/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0512 Roofing System 935277 7/Nov/09 16/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0513 Suspended ceiling 12844 7/Nov/09 1/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0514 Wall Covering ( Ceramic / Porcelain/ Marble ) 46809 7/Nov/09 10/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0515 Painting 1st Stage 176338 7/Nov/09 2/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0516 Painting 1st Stage 223735 8/Nov/09 18/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0517 HVAC Air Outlets 59837 8/Nov/09 17/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0518 HVAC A/C Units 119241 8/Nov/09 17/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0519 Exhaust Fans 101405 8/Nov/09 17/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0520 Metal Works 82772 8/Nov/09 9/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0521 Painting Final Stage 426958 8/Nov/09 17/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0522 Electrical Wiring Devices & Lighting Fixtures 548495 8/Nov/09 17/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0523 Wires & Cables 26607 8/Nov/09 16/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0524 Piping Accessories 246468 9/Nov/09 3/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0525 Wires & Cables 322331 9/Nov/09 18/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0526 Fire Fighting Piping 1069104 10/Nov/09 11/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0527 Painting 1st Stage 204057 10/Nov/09 3/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0528 Panel Boards 42312 11/Nov/09 11/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0529 HVAC Air Outlets 214849 11/Nov/09 6/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0530 Panel Boards 40490 11/Nov/09 11/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0531 Suspended ceiling & gypsum board partition 782634 11/Nov/09 23/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0532 Floor Covering ( Ceramic / Porcelain/ Marble ) 1251086 14/Nov/09 24/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0533 Suspended ceiling & gypsum board partition 1214439 15/Nov/09 25/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0534 Floor Covering ( Ceramic / Porcelain/ Marble ) 30720 15/Nov/09 9/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0535 Suspended ceiling 21125 15/Nov/09 9/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0536 Floor Covering ( Ceramic / Porcelain/ Marble ) 4379 15/Nov/09 9/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0537 Glazing 1858266 15/Nov/09 7/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0538 Plumbing Accessories 597 17/Nov/09 23/Dec/09 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0539 HVAC Air Outlets 23152 17/Nov/09 26/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0540 HVAC A/C Units 96260 18/Nov/09 27/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0541 Exhaust Fans 128133 18/Nov/09 27/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0542 Metal Works 69734 18/Nov/09 19/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0543 Painting Final Stage 405680 18/Nov/09 27/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0544 Floor Covering ( Ceramic / Porcelain/ Marble ) 1435308 18/Nov/09 2/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0545 Piping Accessories 253858 19/Nov/09 14/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0546 Aluminum Panel cladding 8894739 19/Nov/09 25/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0547 HVAC Air Outlets 296089 24/Nov/09 30/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0548 Waterproofing 437859 24/Nov/09 13/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0549 Panel Boards 90248 26/Nov/09 23/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0550 Suspended ceiling & gypsum board partition 1188449 26/Nov/09 14/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0551 Floor Covering ( Ceramic / Porcelain/ Marble ) 31040 26/Nov/09 17/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0552 Wires & Cables 22023 28/Nov/09 2/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0553 Glazing 157080 28/Nov/09 16/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0554 Painting 1st Stage 420 28/Nov/09 20/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0555 Sanitary Fixtures & Toilet and Bath accessories 110671 28/Nov/09 17/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0556 Floor Covering ( Ceramic / Porcelain/ Marble ) 2045761 29/Nov/09 8/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0557 Suspended ceiling & gypsum board partition 746243 29/Nov/09 8/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0558 HVAC Works 499856 30/Nov/09 18/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0559 Doors & Windows 934189 30/Nov/09 4/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0560 Wall Covering ( Ceramic / Porcelain/ Marble ) 47435 1/Dec/09 2/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 348: Progress Monitoring Sheet Empty

Page 348 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

561 Wires & Cables 606171 1/Dec/09 4/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0562 Electrical Wiring Devices & Lighting Fixtures 738181 2/Dec/09 7/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0563 HVAC - Air Outlets 55665 3/Dec/09 8/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0564 Panel Boards 54025 3/Dec/09 31/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0565 Piping Accessories 233089 3/Dec/09 25/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0566 HVAC Air Outlets 292791 3/Dec/09 25/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0567 Wires & Cables 1689245 3/Dec/09 25/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0568 Floor Covering ( Ceramic / Porcelain/ Marble ) 1854932 5/Dec/09 23/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0569 Painting 1st Stage 420 5/Dec/09 25/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0570 Signage 148044 5/Dec/09 9/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0571 Doors & Windows 843113 6/Dec/09 10/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0572 Plumbing Accessories 45107 6/Dec/09 10/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0573 Piping Accessories 29017 6/Dec/09 10/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0574 Plumbing Pumbs 2609206 6/Dec/09 10/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0575 Doors & Windows 946016 7/Dec/09 13/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0576 Panel Boards 20332 8/Dec/09 3/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0577 Piping Accessories 260818 8/Dec/09 1/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0578 Glazing 319872 8/Dec/09 27/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0579 Suspended ceiling 11830 8/Dec/09 1/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0580 Doors & Windows 1268410 9/Dec/09 14/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0581 Suspended ceiling & gypsum board partition 1381599 9/Dec/09 20/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0582 Wires & Cables 580254 9/Dec/09 14/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0583 HVAC Air Outlets 786871 9/Dec/09 14/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0584 Electrical Wiring Devices & Lighting Fixtures 536123 9/Dec/09 28/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0585 Sanitary Fixtures & Toilet and Bath accessories 45818 9/Dec/09 28/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0586 Suspended ceiling & gypsum board partition 999083 10/Dec/09 20/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0587 Suspended ceiling 21125 12/Dec/09 4/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0588 Suspended ceiling & gypsum board partition 230895 12/Dec/09 4/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0589 Wood Cladding 54675 13/Dec/09 31/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0590 Glazing 174216 13/Dec/09 31/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0591 Electrical Wiring Devices & Lighting Fixtures 456502 13/Dec/09 18/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0592 Plumbing Accessories 1039 14/Dec/09 18/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0593 HVAC A/C Units 255737 14/Dec/09 20/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0594 Exhaust Fans 101405 14/Dec/09 20/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0595 Signage 148044 15/Dec/09 19/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0596 Painting Final Stage 303015 15/Dec/09 20/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0597 HVAC A/C Units 77738 15/Dec/09 20/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0598 Exhaust Fans 134640 15/Dec/09 20/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0599 Metal Works 1553562 15/Dec/09 11/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0600 Floor Covering ( Ceramic / Porcelain/ Marble ) 31040 15/Dec/09 9/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0601 Suspended ceiling & gypsum board partition 1926853 16/Dec/09 25/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0602 Piping Accessories 228834 16/Dec/09 9/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0603 HVAC Air Outlets 228783 16/Dec/09 9/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0604 Wires & Cables 1785610 16/Dec/09 11/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0605 Panel Boards 148539 17/Dec/09 27/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0606 FACADE LIGHTING INSTALLATIONS 370878 17/Dec/09 25/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0607 Metal Works 426751 17/Dec/09 20/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0608 Painting Final Stage 148173 17/Dec/09 21/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0609 Electrical Wiring Devices & Lighting Fixtures 105117 17/Dec/09 16/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0610 HVAC A/C Units 28212 17/Dec/09 16/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0611 Exhaust Fans 3591 17/Dec/09 16/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 349: Progress Monitoring Sheet Empty

Page 349 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

612 HVAC Air Outlets 13505 19/Dec/09 21/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0613 Suspended ceiling & gypsum board partition 970515 20/Dec/09 14/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0614 Piping Accessories 46530 22/Dec/09 24/Jan/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0615 Floor Covering ( Ceramic / Porcelain/ Marble ) 44010 22/Dec/09 15/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0616 Glazing 1041652 22/Dec/09 9/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0617 Electrical Wiring Devices & Lighting Fixtures 384655 22/Dec/09 27/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0618 Doors & Windows 154600 23/Dec/09 28/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0619 Painting Final Stage 288213 23/Dec/09 28/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0620 HVAC A/C Units 77568 23/Dec/09 28/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0621 Exhaust Fans 89760 23/Dec/09 28/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0622 Metal Works 416483 23/Dec/09 20/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0623 Wood Cladding 91988 23/Dec/09 11/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0624 Glazing 1389562 23/Dec/09 11/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0625 Generator sets 2475048 23/Dec/09 3/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0626 Painting 1st Stage 91023 23/Dec/09 17/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0627 Piping Accessories 11021 24/Dec/09 24/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0628 Metal Works 1074323 24/Dec/09 21/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0629 Painting Final Stage 453220 24/Dec/09 2/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0630 Electrical Wiring Devices & Lighting Fixtures 31641 26/Dec/09 2/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0631 Doors & Windows 887137 26/Dec/09 2/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0632 LANDSCAPING 5328019 26/Dec/09 2/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0633 Plumbing Accessories 19650 27/Dec/09 3/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0634 HVAC Air Outlets 28848 27/Dec/09 3/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0635 Wires & Cables 5652 27/Dec/09 3/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0636 Irrigation system 963175 27/Dec/09 4/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0637 Doors & Windows 1889815 28/Dec/09 1/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0638 Doors & Windows 154862 29/Dec/09 6/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0639 Doors & Windows 150136 29/Dec/09 6/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0640 HVAC A/C Units 145513 29/Dec/09 7/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0641 Exhaust Fans 136420 29/Dec/09 7/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0642 Doors & Windows 81453 30/Dec/09 18/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0643 HVAC A/C Units 76104 31/Dec/09 8/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0644 Exhaust Fans 89760 31/Dec/09 8/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0645 Electrical Wiring Devices & Lighting Fixtures 438864 31/Dec/09 8/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0646 Wood Cladding 42861 2/Jan/10 20/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0647 Glazing 171360 2/Jan/10 20/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0648 Doors & Windows 167950 2/Jan/10 9/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0649 Suspended ceiling 11830 2/Jan/10 27/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0650 Wires & Cables 7536 3/Jan/10 16/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0651 Metal Works 323186 4/Jan/10 3/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0652 Painting Final Stage 118390 4/Jan/10 11/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0653 HVAC A/C Units 91038 4/Jan/10 11/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0654 Painting Final Stage 96018 4/Jan/10 11/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0655 HVAC A/C Units 21968 4/Jan/10 11/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0656 Exhaust Fans 136420 4/Jan/10 11/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0657 Metal Works 643694 4/Jan/10 3/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0658 Electrical Wiring Devices & Lighting Fixtures 38444 4/Jan/10 11/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0659 Painting Final Stage 80910 4/Jan/10 13/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0660 Metal Works 651980 4/Jan/10 3/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0661 Wires & Cables 370568 4/Jan/10 13/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0662 STREET LIGHTING 10519032 5/Jan/10 18/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 350: Progress Monitoring Sheet Empty

Page 350 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

663 Panel Boards 94428 5/Jan/10 4/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0664 Electrical Wiring Devices & Lighting Fixtures 207412 5/Jan/10 24/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0665 Painting Final Stage 1330 5/Jan/10 24/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0666 Garbage chute 544532 6/Jan/10 30/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0667 Exhaust Fans 96407 6/Jan/10 25/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0668 Electrical Wiring Devices & Lighting Fixtures 422554 7/Jan/10 15/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0669 Electrical Wiring Devices & Lighting Fixtures 385113 7/Jan/10 15/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0670 Metal Works 2062758 7/Jan/10 7/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0671 Painting Final Stage 127550 7/Jan/10 15/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0672 HVAC A/C Units 202678 7/Jan/10 15/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0673 Doors & Windows 783044 7/Jan/10 15/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0674 Doors & Windows 55853 7/Jan/10 27/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0675 Suspended ceiling & gypsum board partition 922086 9/Jan/10 27/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0676 Suspended ceiling 13013 9/Jan/10 1/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0677 Plumbing Accessories 7677 9/Jan/10 16/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0678 HVAC Air Outlets 27256 9/Jan/10 16/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0679 Glazing 157080 9/Jan/10 28/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0680 Doors & Windows 251446 10/Jan/10 17/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0681 Wood Cladding 70876 10/Jan/10 1/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0682 Glazing 342720 10/Jan/10 1/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0683 Painting Final Stage 265592 12/Jan/10 20/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0684 Metal Works 790546 12/Jan/10 11/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0685 Electrical Wiring Devices & Lighting Fixtures 42188 12/Jan/10 20/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0686 HVAC A/C Units 110986 12/Jan/10 20/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0687 Electrical Wiring Devices & Lighting Fixtures 33442 12/Jan/10 20/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0688 Glazing 185640 13/Jan/10 3/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0689 Wood Cladding 732681 13/Jan/10 3/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0690 Panel Boards 233303 13/Jan/10 24/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0691 Piping Accessories 11217 13/Jan/10 21/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0692 Painting Final Stage 90108 13/Jan/10 22/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0693 HVAC A/C Units 104159 13/Jan/10 22/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0694 Exhaust Fans 181894 13/Jan/10 22/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0695 Metal Works 3300496 13/Jan/10 13/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0696 Electrical Wiring Devices & Lighting Fixtures 385419 13/Jan/10 22/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0697 Sanitary Fixtures & Toilet and Bath accessories 5790 14/Jan/10 6/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0698 Wood Cladding 116458 14/Jan/10 6/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0699 Glazing 174216 14/Jan/10 6/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0700 Metal Works 383750 14/Jan/10 17/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0701 Painting Final Stage 129465 14/Jan/10 18/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0702 Electrical Wiring Devices & Lighting Fixtures 1234124 14/Jan/10 13/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0703 HVAC A/C Units 33122 14/Jan/10 13/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0704 Exhaust Fans 3591 14/Jan/10 13/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0705 Signage 184718 16/Jan/10 20/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0706 Doors & Windows 167489 17/Jan/10 24/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0707 Glazing 290852 17/Jan/10 8/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0708 Glazing 1182009 17/Jan/10 8/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0709 Glazing 191083 17/Jan/10 8/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0710 Signage 147367 17/Jan/10 21/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0711 Toilet and Bath Accessories 11342 17/Jan/10 28/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0712 Doors & Windows 218365 18/Jan/10 25/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0713 Doors & Windows 256462 18/Jan/10 25/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 351: Progress Monitoring Sheet Empty

Page 351 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

714 Signage 175423 19/Jan/10 23/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0715 Panel Boards 51451 20/Jan/10 25/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0716 Doors & Windows 43488 21/Jan/10 11/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0717 Painting Final Stage 420 21/Jan/10 13/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0718 HVAC Air Outlets 305424 21/Jan/10 30/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0719 Suspended ceiling & gypsum board partition 110565 21/Jan/10 15/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0720 Doors & Windows 72222 24/Jan/10 15/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0721 Metal Works 427061 24/Jan/10 23/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0722 Painting Final Stage 77323 24/Jan/10 31/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0723 HVAC A/C Units 77362 24/Jan/10 31/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0724 Exhaust Fans 136420 24/Jan/10 31/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0725 HVAC A/C Units 40020 24/Jan/10 31/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0726 Exhaust Fans 136420 24/Jan/10 31/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0727 Electrical Wiring Devices & Lighting Fixtures 61259 24/Jan/10 31/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0728 Metal Works 263772 24/Jan/10 15/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0729 Toilet and Bath Accessories 28095 25/Jan/10 7/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0730 Painting Final Stage 2188 25/Jan/10 16/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0731 Doors & Windows 99837 25/Jan/10 16/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0732 Sanitary Fixtures & Toilet and Bath accessories 113313 25/Jan/10 16/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0733 HVAC A/C Units 1851448 25/Jan/10 16/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0734 Exhaust Fans 392088 25/Jan/10 16/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0735 Painting Final Stage 34315 25/Jan/10 16/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0736 Glazing 374136 26/Jan/10 17/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0737 Wood Cladding 531475 26/Jan/10 17/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0738 Electrical Wiring Devices & Lighting Fixtures 16620 26/Jan/10 18/Feb/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0739 Wood Cladding 61743 26/Jan/10 17/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0740 Glazing 171360 26/Jan/10 17/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0741 Signage 25688 27/Jan/10 3/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0742 Signage 141791 27/Jan/10 3/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0743 Signage 22477 27/Jan/10 3/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0744 Painting Final Stage 139490 27/Jan/10 4/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0745 HVAC A/C Units 106158 27/Jan/10 4/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0746 Exhaust Fans 181894 27/Jan/10 4/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0747 Metal Works 3338216 27/Jan/10 27/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0748 Signage 16055 27/Jan/10 3/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0749 Electrical Wiring Devices & Lighting Fixtures 51982 27/Jan/10 18/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0750 Electrical Wiring Devices & Lighting Fixtures 557533 30/Jan/10 21/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0751 Electrical Wiring Devices & Lighting Fixtures 646950 31/Jan/10 22/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0752 Signage 39040 31/Jan/10 7/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0753 Doors & Windows 18384 31/Jan/10 22/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0754 Toilet and Bath Accessories 12911 31/Jan/10 14/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0755 Glazing 185640 1/Feb/10 23/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0756 Wood Cladding 463178 1/Feb/10 23/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0757 Doors & Windows 52342 2/Feb/10 24/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0758 Electrical Wiring Devices & Lighting Fixtures 33442 2/Feb/10 10/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0759 Electrical Works 622068 2/Feb/10 1/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0760 Panel Boards 33326 2/Feb/10 16/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0761 Painting Final Stage 166768 4/Feb/10 12/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0762 Metal Works 438132 4/Feb/10 4/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0763 Painting Final Stage 157970 4/Feb/10 12/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0764 Metal Works 428630 4/Feb/10 4/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 352: Progress Monitoring Sheet Empty

Page 352 of 353

Materials Status

Sample Project Data Date: 25/Jan/09 WK1 WK2 WK3 WK4 WK5 WK6 WK7 WK8 WK9 WK10

S.N Activity Name 6/Dec/08 13/Dec/08 20/Dec/08 27/Dec/08 3/Jan/09 10/Jan/09 17/Jan/09 24/Jan/09 31/Jan/09 7/Feb/09MaterialsTotal QTY

MaterialsStart Of Delivery

MaterialsEnd Of Delivery

Actual Deliveryas of DD

Planned Deliveryas of DD

765 Painting Final Stage 1085 4/Feb/10 27/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0766 Signage 42588 6/Feb/10 13/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0767 Signage 39040 6/Feb/10 13/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0768 Electrical Works Close Out 170200 8/Feb/10 13/May/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0769 Plumbing Close Out 425000 8/Feb/10 13/May/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0770 Cleaning equipment 1478750 9/Feb/10 30/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0771 Doors & Windows 876427 9/Feb/10 16/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0772 Painting Final Stage 420 10/Feb/10 1/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0773 Electrical Wiring Devices & Lighting Fixtures 52165 10/Feb/10 1/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0774 Metal Works 719448 10/Feb/10 1/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0775 HVAC A/C Units 5524335 10/Feb/10 1/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0776 Exhaust Fans 1205702 10/Feb/10 1/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0777 Painting Final Stage 56740 10/Feb/10 1/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0778 Doors & Windows 56011 10/Feb/10 1/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0779 Toilet and Bath Accessories 28095 13/Feb/10 27/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0780 Electrical Wiring Devices & Lighting Fixtures 1861151 14/Feb/10 5/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0781 Sanitary Fixtures & Toilet and Bath accessories 109496 15/Feb/10 6/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0782 Doors & Windows Close Out 0 18/Feb/10 13/May/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0783 Signage 48165 18/Feb/10 25/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0784 Signage 197731 18/Feb/10 25/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0785 Signage 0 20/Feb/10 27/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0786 Painting Final Stage 420 20/Feb/10 11/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0787 Doors & Windows 56405 20/Feb/10 11/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0788 Toilet and Bath Accessories 17111 22/Feb/10 5/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0789 Electrical Wiring Devices & Lighting Fixtures 44590 22/Feb/10 3/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0790 Facade Works Close Out 0 25/Feb/10 25/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0791 Electrical Wiring Devices & Lighting Fixtures 903128 25/Feb/10 17/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0792 Electrical Wiring Devices & Lighting Fixtures 96456 25/Feb/10 17/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0793 HVAC A/C Units 1701370 25/Feb/10 17/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0794 Exhaust Fans 398702 25/Feb/10 17/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0795 Metal Works 36900 27/Feb/10 1/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0796 Painting Final Stage 190225 27/Feb/10 3/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0797 Electrical Wiring Devices & Lighting Fixtures 120653 27/Feb/10 28/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0798 HVAC A/C Units 56680 27/Feb/10 28/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0799 Exhaust Fans 26031 27/Feb/10 28/Mar/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0800 Toilet and Bath Accessories 11081 28/Feb/10 11/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0801 Signage 113230 28/Feb/10 4/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0802 Signage 43197 28/Feb/10 4/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0803 Signage 63882 28/Feb/10 4/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0804 Metal Works 193662 9/Mar/10 28/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0805 Painting Final Stage 34278 9/Mar/10 28/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0806 External Works Close Out 0 18/Mar/10 22/Apr/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0807 Painting Touch Up & Close Out 0 23/Mar/10 12/May/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0808 Elevators & Escalators 1682874 24/Mar/10 12/May/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0809 Metal Works Close Out 0 5/Apr/10 12/May/10 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Result 372500011 6/Dec/08 13/May/10 683,821.5 0.0 64,774.3 97,161.4 97,161.4 132,748.4 168,335.4 168,335.4 168,335.4 124,236.7 80,138.0

Page 353: Progress Monitoring Sheet Empty

If you have any questions or suggestions regarding this sheet, please send me an email from the email you

purchased the Excel sheet and I will reply you very soon.My Email [email protected]