9
Progress of Shintake M onitor Work KEK site meeting August 26, 2009 T. Yamanaka

Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka

Embed Size (px)

DESCRIPTION

Design of IP Target

Citation preview

Page 1: Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka

Progress of Shintake Monitor Work

KEK site meetingAugust 26, 2009

T. Yamanaka

Page 2: Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka

IP Target

• Design was fixed.• Fabrication is going on now.

Page 3: Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka

Design of IP TargetDesign of IP Target

Page 4: Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka

Collimator Scan

• Preparation of hardware is almost finished.– Only just lead collimator block is not prepared.

• Remaining task is to write scanning program

Page 5: Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka

Background Monitor

• Drive system of background monitor is prepared.

• It need just only lead converter sheet

Page 6: Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka

Cherenkov Detector

• Fabrication was finished.• Calibration of photon nu

mber using cosmic ray was almost finished.

• Put Cherenkov detector at the actual position as a trial

Page 7: Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka

Cosmic Ray Data

Page 8: Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka

Laser Transport

• Ordered a mount table for laser transport line as same as the EXT LW group

• It will be connected by PVC pipe to the mount table of EXT LW group.

Put this optical table on a mount

Page 9: Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka

Replacement of Actuators

• Mirror actuators are changed from old ones.• New actuators (Thorlabs) need Windows’s base

d control– Windows machine is prepared– They are connected to PC by USB

• By using “AnywhereUSB” USB devices are converted to LAN

– To control by program and communicate with EPICS, LabVIEW is installed

• Need to write LabVIEW program Now here