14
STKN-19 PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL SUBMITTED VERSION] PROGRESS REPORT BY PERMITTEE FOR 2012 Primary Owner: CITY OF STOCKTON MUNICIPAL UTILITIES DEPT Primary Contact: CITY OF STOCKTON MUNICIPAL UTILITIES DEPT Date Submitted: 07/15/2013 Application Number: A030531A Permit Number: 021176 Source(s) of Water SAN JOAQUIN RIVER POD Parcel Number County Permitted Use(s) Industrial Municipal MAX Direct Diversion Rate: 317 CFS MAX Collection to Storage: 0 AC-FT Face Value: 33600 AC-FT Acres 0 0 Direct Diversion Season 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season Page 1 of3 -··----------:c--:::----::---:::-::--:cc:=------:-,:,--:c-c------------, 2. Compliance with Permit Terms and Conditions I am complying with all terms and conditions Yes Description of noncompliance with terms and conditions -----·-------···----------------------------------·------------·-·-·-·------------------------ - -----·- - ---------------·-- -- 3. Changes to the Project ----------------------------·----------·------------------------------- - Intake location has been changed Description of intake location changes · ·- Type of use has changed ---------·--------------------------·""""'--------------·-------------------------·----- -- Description of type of use changes -~----~~----~------ ------------------·-----; Place of use has changed Description of place of use changes Other changes-·----------·-·------·--·-·····---···-··------·----·----··----- Description of 9ther ~-h_an~g~e_s _________ ·-·-----·-----------------------1.-' ,-·--------------------· ------ 4-6. Permitted Project Status ---------·-- - --------------·----- ---- Project Status Not Complete 6a. Construction work has Yes commenced - 6b. Construction is completed Yes 6c. Beneficial uses of water has Yes commenced 6d. Project will be completed within the time period specified Yes in the permit ---- --·· file:///C:/U sers/atovar/Desktop/Statement%20of'/o20Water%20Diversions/2012%20PROG ... 8/10/2016

PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL …€¦ · 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season ... name this year at maximum storage emptied at minimum storage

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL …€¦ · 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season ... name this year at maximum storage emptied at minimum storage

STKN-19

PROGRESS REPORT BY PERMITTEE

[SUMMARY OF FINAL SUBMITTED VERSION]

PROGRESS REPORT BY PERMITTEE FOR 2012

Primary Owner: CITY OF STOCKTON MUNICIPAL UTILITIES DEPT Primary Contact: CITY OF STOCKTON MUNICIPAL UTILITIES DEPT

Date Submitted: 07/15/2013

Application Number: A030531A Permit Number: 021176

Source(s) of Water

SAN JOAQUIN RIVER POD Parcel Number County

Permitted Use(s)

Industrial

Municipal

MAX Direct Diversion Rate: 317 CFS MAX Collection to Storage: 0 AC-FT

Face Value: 33600 AC-FT

Acres

0

0

Direct Diversion Season

01/01 to 12/31

01/01 to 12/31

San Joaquin

Storage Season

Page 1 of3

-··----------:c--:::----::---:::-::--:cc:=------:-,:,--:c-c------------, 2. Compliance with Permit Terms and Conditions

I am complying with all terms and conditions Yes

Description of noncompliance with terms and conditions -----·-------···----------------------------------·------------·-·-·-·------------------------ - -----·-- ---------------·-- --

3. Changes to the Project ----------------------------·----------·------------------------------- -Intake location has been changed

Description of intake location changes · ·- -·

Type of use has changed ---------·--------------------------·""""'--------------·-------------------------·----- --Description of type of use changes -~----~~----~------------------------·-----; Place of use has changed

Description of place of use changes

Other changes-·----------·-·------·--·-·····---···-··------·----·----··-----Description of 9ther ~-h_an~g~e_s _________ ·-·-----·-----------------------1.-' ,-·--------------------· ------

4-6. Permitted Project Status ~ ---------·-- - --------------·----- ----Project Status Not Complete

6a. Construction work has Yes commenced

~· -6b. Construction is completed Yes

6c. Beneficial uses of water has Yes commenced

6d. Project will be completed within the time period specified Yes in the permit ---- --··

file:///C:/U sers/atovar/Desktop/Statement%20of'/o20Water%20Diversions/2012%20PROG ... 8/10/2016

Page 2: PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL …€¦ · 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season ... name this year at maximum storage emptied at minimum storage

STKN-19

PROGRESS REPORT BY PERMITTEE Page 2 of3

6e. Explanation of work remaining to be done

Current Municipal and Industrial demand has yet to reach the amount of water granted under Water Right 21176, but is estimated to reach that amount of water by the term stipulated in the permit.

61. Estimated date of completion 12/31/2020

Industrial

Municipal

---h----------,. • ._ ______

Month

'---January

February

March

April

,1\/lay ____

June -·---July

..

August ________

September ------------

c!:Jctober

November -December ---~-------------Total

7. Purpose of Use

Consumption

171634

8. Amount of Water Diverted and Used Amount directly diverted or

Amount used collected to storage (Gallons) (Gallons) ------

0 0 - --0 0

0 0 -·------ -- -·------·---------

0 0 ------------------·---··-·-------· ----·------------0 0 --0 0 -·--------- ---- -- --------0 0 ---------------------------------------·--------·----'--- --286110000 286110000 ----------------69440000 69440000

382590000 382590000 ··-- ---------

270270000 270270000 ------------------------------·-!-----------------216460000 216460000

- --·-----------------------·------ 1-------

1224870000 1224870000 --------------------------Comments ·-----··----·-------·---------------------------·----· ...

.... ,_ . ·------------------9. Maximum Rate of Diversion for each Month -- --------------

Month Maximum Rate of Diversion

(GPD) -- --------------------------------------------- -January 0 ·------ ---~-·---.. ----------------·---------···------ -----February 0 '---·------March 0 ·--------April 0 ··---·---------·----------

LMay _________ 0

June 0 L----·--~- --July 0

--·--·-·----------------------August 11000000

---------- -----September 87000000 -----October 13000000

.

November 93000000 ---------------

December 70000000

10. Storaae ~------Reservoir Spilled Feet below spillway Completely Feet below spillway

Method used to measure water name this year at maximum storage emptied at minimum storage

level

--

file:///C:/Users/atovar/Desktop/Statement%20of"/o20Water%20Diversions/2012%20PROG .. . 8/10/2016

Page 3: PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL …€¦ · 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season ... name this year at maximum storage emptied at minimum storage

STKN-19

PROGRESS REPORT BY PERMITTEE Page 3 of3

Conservation of Water

11. Are you now employing Yes water conservation efforts?

Description of water All 14 Demand Management Measures (DMM's) identified in the 201 O

conservation efforts Urban Water Management Plan adopted by the Stockton City Council o n June 21, 2011.

12. Amount of water conserved

---

Water Quality and Wastewater Reclamation ,__ _______________ ~ 13. During the period covered by this Report, did you use reclaimed water from a wastewater treatment facility, water from a desalination facility, or water polluted by waste to a degree which unreasonably affects the water for other beneficial uses? ------·---------------------+----1 14. Amount of reclaimed, desalinated, or pCJlluted water used ·-·-·---------·---------

No

Conjuctive Use of Groundwater and Surface Water

15. During the period covered by this Report, were you using groundwater in lieu of available Yes surface water a~!~<Jrized un~er your permit?

16. Amounts of groundwater used -···-----·----- - ----

~~struction on t~~-ln-t:ke ·:n __ d __ P __ u_m_p ~~a--t1~--~~~;-:-:~:~;ea;~~ August of 201_2 when diversions

~menced and continued through_the end of the year._______________________________ ----~

~- - --------------- ~--Attachments ------·--·-[ ----------------------------=i ---men:ile Name ____ ---________ .. _______ -__ Description __ --------------- - ----~~.! _______ _

-------------------------------------------·-------·-------

First Name Contact Information of the Person Submitting_the Form--------·

-,------; Robert ·--------------------------------------------------------------+---·--!

Last Name -----------------Relation to Water Right

Has read the form and agrees the information in the report is true to the best of his/her knowledge and belief

-----·-- Granberg Owner

Yes

file:///C:/Users/atovar/Desktop/Statement%20of"/o20W ater%20Diversions/2012%20PROG... 8/10/2016

Page 4: PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL …€¦ · 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season ... name this year at maximum storage emptied at minimum storage

STKN-19

PROGRESS REPORT BY PERMITTEE

[SUMMARY OF FINAL SUBMITTED VERSION]

PROGRESS REPORT BY PERMITTEE FOR 2013

Primary Owner: CITY OF STOCKTON MUNICIPAL UTILITIES DEPT Primary Contact: CITY OF STOCKTON MUNICIPAL UTILITIES DEPT

Date Submitted: 04/11/2014

Application Number: A030531A Permit Number: 021176

Source(s) of Water SAN JOAQUIN RIVER

POD Parcel Number County

Permitted Use(s)

Municipal

Industrial

MAX Direct Diversion Rate: 317 CFS MAX Collection to Storage: O AC-FT

Face Value: 33600 AC-FT

Acres

0

0

Direct Diversion Season

01/01 to 12/31

01/01 to 12/31

San Joaquin

Storage Season

Page 1 of3

fiF;:-~e:::~~~-=:~er right permit ___ 1_._PermitReview ____________________ lYes ____ __j

,___ _________ 2_. C_o_m~pli_ance with Permit Terms and Condition_s ______ :::_-=_-=_·-_---:-~ I am complying with all terms and conditions =£Yes ----------·--··"---------·------------------------------------· ·--_Description of noncompliance with terms and_ conditions ____ _

__________________________________ 3. Changes to the Project ------------------Intake location has been changed ---------------------~-----------------------------------+-1 Description of intake location changes f-----~---------~--- ----·-·--------------------------------------- -· Type of_use has changed-----------------------------------------+­Description of type of use changes

Place of use has changed i-----------------------------------------1-Description of place of use changes_

Other changes --------------------------- ·--·

---------·-----------------------------+--< Description of other changes --~---------------------------------~~ ---------------- --

4-6. Permitted Project Status --- ----- ---Project Status Not Complete -6a. Construction work has Yes commenced ~

6b. Construction is Yes completed

6c. Beneficial uses of water Yes has commenced

--

6d. Project will be completed Yes within the time period

file:///C:/U sers/atovar/Desktop/Statement%20of>/o20Water%20Diversions/20 l 3%20PROG... 8/10/2016

Page 5: PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL …€¦ · 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season ... name this year at maximum storage emptied at minimum storage

STKN-19

PROGRESS REPORT BY PERMITTEE Page 2 of3

specified in the permit

Current municipal water demands do not require full use of the maximum 6e. Explanation of work amount of permitted diversion during the year, but it is anticipated that remaining to be done demand will use the permitted amount authorized under this permit by the

December 31, 2020 date.

61. Estimated date of 12/31/2020 completion

C 7. Purpose of Use I ~>-M-u-_n-ic-ip-a_-1:::===--------~-_-_-_-_~]-17_3_2_-4_2-::_-::_-=_---------~

8. Amount of Water Diverted and Used "--- ----· -·

Amount directly diverted or Amount used Month collected to storage

(Acre-Feet) (Acre-Feet)

January 772.10 772.10

February 788.77 788.77 -------------·---·--·-·--·------ -------- -March 196.26 196.26 I-----·---------i--·----.. --.. - ·--·---·-----April 2.35 2.35

·--·-May 37.56 37.56 ~ ------·--·---------.. ·---------------June 33.02 33.02 -------· ---------·-----------------------------------July 19.83 19.83 ------·--·--------.. ·-·----------·--· August 747.80 747.80 -· . ----September 1285.19 1285.19

·----------------- ..... October 1515.66 1515.66 .. ~--------·-·--------------------------------------·----··--November 1270.18 1270.18 --------·--·-··-·-------- ·-----------·--------------- ..... December 934.32 934.32 ·-------·-------·----------Total 7603.04 7603.04 ---------·-··--------------------------«------------------ ----------------Comments --·------·-------------··-·----- ----------------·----------· - --------------------------------------------------------- -

9. Maximum Rate of Diversion for each Month -----·------·----------- -----------------------------·--·-··----Month

Maximum Rate of Diversion

-·---------·---------·--· (CFS)

January 12.55 . ·----- ·-February 14.20 ~ -------------- --·-.. ------- ------March 3.19

April 0.04 May 0.61 -------··---~----- ·-------June 0.56 ·------·-·-------July·-·--·-· 0.32

August 12.16 I-· . September 21.60 ... October 24.65

--· November 21.35

December 15.20 ..

10. Storage

Reservoir Spilled Feet below spillway Completely Feet below spillway Method used to name this year at maximum storage emptied at minimum storage measure water

file:///C:/U sers/atovar/Desktop/Statement%20of%20Water%20Diversions/2013 %20PROG... 8/10/2016

Page 6: PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL …€¦ · 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season ... name this year at maximum storage emptied at minimum storage

STKN-19

PROGRESS REPORT BY PERMITTEE Page 3 of3

level

I Conservation of Water

11. Are you now employing Yes water conservation efforts?

Description of water All 14 Demand Management Measures (DMM's) identified in the 201 O

conservation efforts Urban Water Management Plan adopted by the Stockton City Council on June 21, 2011.

12. Amount of water

I conserved ~-----

-----------1----------....:Water Quality and_ Wastewater Reclamatio_n ____________ ____, 13. During the period covered by this Report, did you use reclaimed water from a wastewater treatment facility, water from a desalination facility, or water polluted by waste to a degree which No unreasonably affects the water for other beneficial uses?

-----·-·----------------·--~-~---------- - -14. Amount of reclaimed, desalinated,_or polluted water used

------------ConjActive Use of Groundwater and Surface Water . _ - l 15. During the period covered by this Report, were you using groundwater in lieu of availab~e y surface water authorized under your permit? es

-----16. Amounts of groundwater used______________ ________ _ ____ _ --------- a Additional Remarks Diversions complied with Water Rights. Permit 021176 and California Department of Fish and Ga Incidental Take Permit No. 2081-2009-005-03, Condition 6.2, issued June 29, 2009 (see attached

Attachments

-·-------- File_ Name ----------------------1---------Description ________ 1--'-S-'--iz.:.:e------1 ITP Final Signed 072409.pdf ,Incidental Take Permit 1 MB

---------- Contact Information of_the Person Submitting the Form First Name Robert

Last Name Granberg --------------------------------------------+----"----I Relation to Water Right

--~~----------------------Has read the form and agrees the information in the report is true to the best of

Primary Owner of Record

Yes his/her knowledge and belief ________ _ ·---·------------------

file:///C:/U sers/atovar/Desktop/Statement%20of"/o20Water%20Diversions/2013 %20PROG... 8/10/2016

Page 7: PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL …€¦ · 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season ... name this year at maximum storage emptied at minimum storage

STKN-19

PROGRESS REPORT BY PERMITTEE

[SUMMARY OF FINAL SUBMITTED VERSION]

PROGRESS REPORT BY PERMITTEE FOR 2014

Primary Owner: CITY OF STOCKTON MUNICIPAL UTILITIES DEPT Primary Contact: CITY OF STOCKTON MUNICIPAL UTILITIES DEPT

Date Submitted: 06/24/2015

Application Number: A030531A Permit Number: 021176

Source(s) of Water

SAN JOAQUIN RIVER POD Parcel Number

Permitted Use(s)

Industrial

Municipal

MAX Direct Diversion Rate: 317 CFS MAX Collection to Storage: 0 AC-FT

Face Value: 33600 AC-FT

Acres

0

0

Direct Diversion Season

01/01 to 12/31

01101 to 12/31

County San Joaquin

Storage Season

----------------- ---1. Permit Review ,______________________ ----

I have reviewed my water right permit----------·---

------------·----- - -· _______________ __3._Changes to the Project _

Intake lo _cation has been changed----·-···------------·-··---··· !ion of intake location changes_

Page 1 of 4

---------- ---

··-·----·-- f--

use _has changed

Descrip

Type of

Descrip

Place of

Descrip

Other ch

------------------------------------------------- ·-!ion of type of use changes

use has changed

!ion of place of use changes

anges _________ ·-------------------·--------------- --tio~~~t_t,erchanges .. --- --

---- -----------··-- -----------~--------------------· 4-6. Permitted Project Status ____ Project Status Not Complete

6a. Construction work has Yes commenced

·--- -6b. Construction is

Yes completed -

6c. Beneficial uses of water Yes has commenced

6d. Project will be completed Yes within the time period

file:///C:/U sers/atovar/Desktop/Statement%20of'/o20Water%20Diversions/2014%20PROG... 8/10/2016

Page 8: PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL …€¦ · 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season ... name this year at maximum storage emptied at minimum storage

STKN-19

PROGRESS REPORT BY PERMITTEE Page 2 of 4

specified in the permit

6e. Explanation of work remaining to be done

Current municipal demands do not require full use of the maximum amount of permitted diversion during the year, but it is anticipated that water demands will use the permitted amount authorized under this permit by the December 31, 2020 date.

--·---+~---6f. Estimated date of completion

12/31/2020 ~---------~-------------------·----------

[Mun~ .. 7. Purpose of Use

1173242

-----------------·-----·-----------------8. Amount of Water Diverted and Used ---------------·-

Month Amount directly diverted (Acre-Feet)

Amount used (Acre-Feet)

Amount diverted or collected to storage

(Acre-Feet) ._ __________ ---··----------+---~---~--+----------! January e----~----+-------------------1---·-------·--- -·------,

573.68 0 573.68

February 296.35 0 296.35 -------------- -1------------

March 15.74 o 15.74 -------··--------------------------- - ---·----

April _____ _,,o _________________ ,_o ___________ -+-0 _____ ___, May 0 e--~------l-------·---'------------------------------------------------------

0 0

June 0 0 0 -··---.. ·----------------··----------------------------July __ .. ____ .. ___ ~97.35 ·------ O 797.35 August--.. -_ 589.88 O 589.88 September >--~ .. ----+--------------------------------·--------- ·--------------263.08 0 263.08 October 574.26 O 574.26 -----·--··-----·--------··------------l-·-·----------------·-------------------------------· November 863.37 0 863.37 ·-----·--·- -----·---·-----.. ----- - -------December 763.01 0 763.01

- .. ---·---·-------·-----Total 4736.72 O 4736.72 ,--------+------------------------------ --------------------'------------------Comments ·-----------------.. ·-------·----------------------~

----------·----·------------·---------------------·----·-----·-··-·--------Water Transfers _____ ,,,,,.,, ____ ,,,_,,,_,,_,, __________ ·---------,--.. ·-----·-·

8e. Water transfered No ._ ______________ , _______ ,, __ _ 81. Quantity transfered (Acre-Fee.~t) ___________ ·--·---·---------·-·---Bg. Dates which transfer occurred /to/

-------·---·-----------"·-··--------------·- ---·--

Bh. Transfer approved by -------·----·----·-----------~-----•

-·------ ··---,-----------.. Water sueel~ Contracts 81. Water supply contract No ~·

8j. Contract with

8k. Other provider ----- ·---------81. Contract number

Bm. Source from which contract water was diverted

8n. Point of diversion same as identified water right No

Bo. Amount (Acre-Feet) authorized to divert under this contract

Sp. Amount (Acre-Feet) authorized to be diverted in 2014

Sq. Amount (Acre-Feet) projected for 2015 Br. Exchange or settlement of prior rights No .. Bs. All monthly reported diversion claimed u_nder_~he p~ior rights

file:///C:/Users/atovar/Desktop/Statement%20of"/o20Water%20Diversions/2014%20PROG... 8/10/2016

Page 9: PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL …€¦ · 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season ... name this year at maximum storage emptied at minimum storage

STKN-19

PROGRESS REPORT BY PERMITTEE Page 3 of 4

j st. Amount (Acre-Feet) of reported diversion solely under contract

-9. Maximum Rate of Diversion for each Month

Month Maximum Rate of Diversion

(CFS) January 9.33

February 5.34

March 0.26 --·----------·-~-April 0 -May 0 - -----·-·-· June 0 .. ·-·-July 12.97

August 9.59 ----· ·-·

September 4.42 ------·---------··----·---October 9.34 -------·-- --------November 14.51 - ----------------December 12.41 -· ·------------------·-----~------·-----·-~-----·---------·-------------------

____ 10. Stor~~- _____

Reservoir Spiller cEet belows pillway Completely Feet below spillway Method used to

name this ye maximum s torage emptied at minimum storage measure water level --------·---

~------·---~-- .. ------·-----

11. Are you now employing water conservation efforts?

Yes

Conservation of Water

- ----------------- -----·-------------------------

Description of water conservation efforts

All 14 Demand Management Measures identified in the 2010 Urban Water Management Plan, adopted by the Stockton City Council on June 21,2011.

---· --- .. -------·-·-·--12. Amount of water conserved ---------·---------

·-----·--------------------------------------------·-----1-------------Water Quality_ and Was_te_w_a_t_e __ r __ R_e __ c __ la_m __ a_t_io_n __________ ,r--1

13. During the period covered by this Report, did you use reclaimed water from a wastewater No treatment facility, water from a desalination facility, or water polluted by waste to a degree which

unreasonably affects the water for other beneficial uses? ----------·-------------+--1 14. Amount of reclaimed, desalinated, or polluted water used

--·----·--·-----·---·-·----·---·---------------'--' ~-----------------------------------·--------·-----~

, _______ c_o_n~juctive Use of Grou_ndwater and Surface_W_at_e __ r ________ ~-1

15. During the period covered by this Report, were you using groundwater in lieu of available s_1:1r.~~ce water authorized _under your permit? 16. Amounts of groundwater used

Yes

--------- ·----------------------------------· -

Additional Remarks --- -] D-iv-e-;:-sio._n_s_c_o_m_p_lie_d_w-ith_W_a-te-·r-R-ig_h_t_s_P_e~rm=it~0~2~11~7~6~a~n~d~C

0

~a~li~fo-r-ni_a_D_e_p_a-rt_m_e_n_t o-f-F-is-h-an_d_G_a-me

Incidental Take Permit No. 2081-2009-005-03. Condition 6.2, issued June 29, 2009 (see attachment).

-----~---Attachments

File Name Description Size Contract C-09-067 P First Amendment - Ca Degt of Fish .Qdf Incidental Take Permit 14 MB - .

file:///C:/Users/atovar/Desktop/Statement%20of"/o20Water%20Diversions/2014%20PROG... 8/10/2016

Page 10: PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL …€¦ · 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season ... name this year at maximum storage emptied at minimum storage

STKN-19

PROGRESS REPORT BY PERMITTEE

F L

..

irst Name ~---· ast Name

Contact Information of the Person Submitting the Form

R

H h

elation to Water Right -· as read the form and agrees the information in the report is true to the best of is/her knowledge and belief

Page 4 of 4

Antonio

Tovar

Primary Owner of Record

Yes

file:///C:/U sers/atovar/Desktop/Statement%20of"/o20Water%20Diversions/2014%20PROG .. . 8/10/2016

Page 11: PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL …€¦ · 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season ... name this year at maximum storage emptied at minimum storage

STKN-19

PROGRESS REPORT BY PERMITTEE

[SUMMARY OF FINAL SUBMITTED VERSION]

PROGRESS REPORT BY PERMITTEE FOR 2015

Primary Owner: CITY OF STOCKTON MUNICIPAL UTILITIES DEPT Primary Contact: CITY OF STOCKTON MUNICIPAL UTILITIES DEPT

Date Submitted: 06/01/2016

Application Number: A030531A Permit Number: 021176

Source(s) of Water SAN JOAQUIN RIVER

POD Parcel Number County

Permitted Use(s)

Municipal

Industrial

MAX Direct Diversion Rate: 317 CFS MAX Collection to Storage: O AC-FT

Face Value: 33600 AC-FT

Acres

0

0

Direct Diversion Season

01/01 to 12/31

01/01 to 12/31

San Joaquin

Storage Season

Page 1 of 4

I_ have reviewed my water righ~~-er~-it ~~-~--~-P-e--r-_m:_R~~iew _________ -:_------ ,_I_Y_ea

2. Compliance with Permit Terms and Conditions I am complying with all terms and conditions Yes L---· - ----------------------------1----DeSCriptiOn of noncompliance with terms and conditions '---------------------------·--------------------------·--------------------•-L.....,. -

------------·-------------3. Changes to the Project --·--------------------Intake location has been changed ----------------------------·--------------------·---------------------~. Description of intake location c,,h,-=-anc.,g<.:e..:.s ______________________ --1-_, Type of use haschange __ d ------------------------·--- --------·--'-' Description of type of use changes

--"'---------Place of use has changed -=------------------------------1-1 Description of place of use changes

Other chang,.::.e.:...s __ _ _______________________ .__, __________________ ~ Description of other changes -----------------------·----------------------

4-6. Permitted Project Status -----Project Status Not Complete

6a. Construction work has Yes commenced ~-

6b. Construction is Yes completed

6c. Beneficial uses of water Yes

~commenced

6d. Project will be completed Yes within the time period

file:// IC :/U sers/atovar/Desktop/Statement%20of%20Water%20Diversions/20 l 5%20PROG... 8/10/2016

Page 12: PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL …€¦ · 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season ... name this year at maximum storage emptied at minimum storage

STKN-19

PROGRESS REPORT BY PERMITTEE Page 2 of 4

specified in the permit

Current municipal demands do not require full use of the maximum 6e. Explanation of work amount of permitted diversion during the year, but it is anticipated that remaining to be done water demands will use the permitted amount authorized under this permit

by the December 31, 2020 date. -·

61. Estimated date of 12/31/2020 completion

f Municipal _________ 7_._P_u_r.,__p_o_se---'--of_Ur-=-se'--------------~

!182963 ~ -

8. Amount of Water Diverted and Used - ·-

Amount directly diverted Amount diverted or Amount used Month collected to storage (Acre-Feet) (Acre-Feet)

~----------- l----.----------- (Acre-Feet) January 29.86 0 29.86 ·-------- -------------------------February 529.38 0 529.38 --~--------- .~. -----------March 201.23 0 201.23 -·--·---------C-- ·------------------- - ---A~i:!!_ __ 43.96 0 43.96 May 376.37 0 376.37 ·--.. -- -------- --------- ----------------June 1084.73 0 1084.73

- ·------------·---------L__ ___ -July 1388.05 0 1388.05 ----------·--------- ----- --

1629.85 0 1629.85 August ! .. ,,, ____ : ________________

September 1683.62 0 1683.62 - --------- ---------October 1301.36 0 1301.36 -------------------- ---------------------·-------- ------------November 566.21 0 566.21

' .r ------------- ---------December 436.30 0 436.30 -- --

, __________ Total 9270.92 0 9270.92 ------------------- --------------- ---Type of Diversion Direct Diversion Only

.. -----·----· - - --Comments l.-....----------------

----------------------- -----------------------------Water Transfers ·-------------------·----------=-==--===-=-----------------1

8e. Water transfered No ------------------------------ --------81. Quantity transfered (Acre-Feet)

-----------------------------·+----·---8g. Dates which transfer occurred _______________________ ___ __,_l_to_l ____ _

8h. Transfe_i:_§l_,-PPr:.-r.::.o_:_ve::::d:..::bY,___ _________________________ _[ ______ -1 ----

Water Supply Contracts -ater supply contract

ntract with --ther provider

ntract number

ource from which contract water was diverted

oint of diversion same as identified water right

8i.W

8j. Co

8k. 0

81. Co

8m.S

Sn. P

80.A

Sp. A

Sq. A

Sr. Ex

mount (Acre-Feet) authorized to divert under this contract

mount (Acre-Feet) authorized to be diverted in 2015 mount (Acre-Feet) projected for 2016

change or settlement of prior rights -

No

--

-~-

file:/ //C:/U sers/atovar/Desktop/Statement%20of'/o20Water%20Diversions/20 l 5%20PROG. .. 8/10/2016

Page 13: PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL …€¦ · 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season ... name this year at maximum storage emptied at minimum storage

STKN-19

PROGRESS REPORT BY PERMITTEE Page 3 of 4

8s. All monthly reported diversion claimed under the prior rights

8!. Amount (Acre-Feet) of reported diversion solely under contract

9. Maximum Rate of Diversion for each Month

Month Maximum Rate of Diversion

(CFS) January 0.48

February 9.53 ----March 3.27

April 0.74

May 6.12 ,__ ____________ -----June 18.23

..

July 22.57 .

August 26.51 -----------September 28.29

. --·--------------October 21.16 -----------------·----------------November 9.52 . __________________ ,, ____________ December 7.10 ~-------------- --

10. Storage -----~---Reservoir Spilled Fee --·~-----~ ----

t below spillway Completely Feet below spillway Method used to

name this year at m aximum storage emptied at minimum storage measure water

level

,._,._._ · .. ·-- -------- ---- -----·-------

~·--· ---------- L____., ______________ -------------------------------- ------ ---------------~

--------------------·-----------------------------------------Conservation of Water

11. Are you now employing water Yes conservation efforts? ----·-------1------------------------·

All 14 Demand Management Measures identified in the 2010 Urban Water Description of water Management Plan, adopted by the Stockton City Council on June 21, 2011. In conservation efforts addition, the City achieved the required 28% water use reduction, as mandated

_________ .. ______ by the State Governor and State Water Resources Control Board.

12. Amount of water conserved

~-----------------------------------------------------~ Wate~_Quality and Wastewater Reclamation

13. During the period covered by this Report, did you use reclaimed water from a wastewater treatment facility, water from a desalination facility, or water polluted by waste to a degree which No unreasonably affects the water for other beneficial uses?

------ -----------------------1--14. Amount of reclaimed, desalinated, or polluted water used

-----------------------------------------------------------------·---Conjuctive Use of Groundwater and Surface Water ___ __ ----

Yes 15. During the period covered by this Report, were you using groundwater in lieu of available surface water authorized under your permit?

-~----------------------+----! 16. Amounts_ of groundwater used

Additional Remarks Diversions complied with Water Rights Permit 21176 and California Department of Fish and Game Incidental Take Permit No. 2081-2009-005-03, Condition 6.2, issued June 29, 2009 (see attachment).

file:///C:/U sers/atovar/Desktop/Statement%20of"/o20Water%20Diversions/20 l 5%20PROG... 8/10/2016

Page 14: PROGRESS REPORT BY PERMITTEE [SUMMARY OF FINAL …€¦ · 01/01 to 12/31 01/01 to 12/31 San Joaquin Storage Season ... name this year at maximum storage emptied at minimum storage

STKN-19

PROGRESS REPORT BY PERMITTEE Page 4 of 4

Attachments File Name Description Size

ct C-09-067 P First Amendment - Ca DeQt of Fish .i;idf.i;idf Incidental Take Permit 14 MB

Contact Information of the Person Submittina the Form First Name Antonio

Last Name Tovar ---

Relation to Water Right Primary Owner of Record

Has read the form and agrees the information in the report is true to the best of Yes his/her knowledge and belief

-·-----------