Month : November, 2016 Amount in Rs. Lakh Sanctioned Scheme Agreement Name Amount Date/ Ref. No. Amount Total Expendi- ture (11+13) % Finan- cial Achie- vement 1 2 3 4 5 6 7 8 9 10 Circle : Ranchi Div : Ranchi 1 Ongoing Reconstruction of Itki to Brambey via Rani Khatanga Road from Km 0.00 to 16.35 for the year 2014-15. Bridge- Ch- 8475 - 3x24Mx12M Ch- 14525 -2x24Mx12M 16.35 4500.345 9110 (S) Dt. 26.12.14 4218.35 3070.73 73% 82% M/S Vijeta Projects & Infra Structure Pvt. Ltd. West Morabadi, Ranchi 2 Reconstruction of Mander Chowk (on NH-75) to Burmu Road from Km 0.00 to 14.80 for the year 2014-15. Bridge- Ch- 10975 - 1x16Mx12M Ch- 13250 -3x24Mx12M Ch- 9825 - 2x21Mx12M 14.80 3801.99 9135(S) Dt. 26.12.14 3372.01 3735.00 111% 100% M/S Ganga Construction & Puja Enterprises Joint Venture, Piskamore, Hehal, Ranchi 3 Widening and strengthening of Kanthitanr (Hurhuri More) to Thakurgaon Road from Km 0.00 to 10.400 for the year 2015-16 Bridge- 8th KM- 1x16Mx12M 10.40 3222.079 4868(S) 13.07.15 2784.94 2600.00 93% 98% M/S Spica Projects and Infrastructures Pvt. Ltd. Ashok Kunj, Opp. Road No.- 3, Ashok Nagar, Ranchi 4 Widening and Strengthening of Intake well more (11th Km of Ormanjhi-Sikidri Road) to Getalsud Dam Road for the year 2015-16. 2.90 464.232 8177(S) Dt.04.12.15 414.91 220.00 53% 80% M/S Sambhu Singh Radium Road, Sahu Nursing Home, Ranchi 5 Widening and Strengthening/ Reconstruction of Chama Chowk to Mccluskieganj - Damodar Bridge Road from KM 0.00 to 18.350 for the year 2015-16. 18.35 3361.040 8389(S) 11.12.15 3166.67 2072.00 65% 90% M/S Spica Projects and Infrastructures Pvt. Ltd. Ashok Kunj, Opp. Road No.- 3, Ashok Nagar, Ranchi 6 Construction of Peripherial Roads near Jaganathpur and Mausibari Mandir (Length 3.645 KM) for the year 2015-16. 3.645 667.32 RCD Lt. No. 2000 Dt.21.03.16 631.58 555.05 88% 100% M/S Ganga Construction, Abadganj, Daltonganj. 7 Widening & Strengthening of Road from Thakur Vishwanath Shahdeo Chowk (Dhurwa Golchakkar) to road intersection prior to Dhurwa Bus stand including link road to Engineers Hostel No. 1 & 2, link road to JSCA Stadium and link road to CDO, RCD office Jharkhand, Ranchi for the year 2015-16. 3.60 752.707 3675(S) 27.05.15 682.85 270.00 40% 75% Sri Arvind Kumar Singh Dhurwa, Ranchi 8 Reconstruction of Burmu (on Pithoria- Burmu- Rai Khelari Road)– Umedanda- Hendgir Road (including construction of Bridges) (Total Length-20.380 Km) for the year 16-17. Bridge - Ch- 0.640 - 3x18Mx12M Ch- 6.325 - 1x18Mx12M Ch-18.035 1x12Mx12M 20.38 6220.00 3567(S) Dt. 06.06.16 4788.13 450.00 9% 20% M/S Spica Projects and Infrastructures Pvt. Ltd. Ashok Kunj, Opp. Road No.- 3, Ashok Nagar, Ranchi 9 Widening and Strengthening of Siram Toli Chowk (RRB Ranchi) to Ram Mandir (Chutia) for the year 2016-17. 0.6 48.09 4236 (S) Dt. 11.07.16 42.4767 0.00 0% 10% Sri Ramashankar Yadav, Virsa Chowk, Hinoo, Ranchi 10 Widening and Strengthening of Judicial Academy to Nagri Railway Crossing via- Balalong, Kudlong road (Length 8.70 Km) for the year 2016-17. 8.700 2353.22 RCD Lt. No. 3853 Dt. 20.06.16 2150.87 M/S Ganga Construction Daltonganj 11 Improvement of Riding Quality Pavement of Mangla Hat to JSCA Stadium Road (Total Length 2.60 Km) and Road furniture work in JSCA Peripheral Road for the year 2016-17 2.60 222.91 RCD Lt. No. 6569 Dt. 14.10.16 228.80 228.00 100% 90% Sri Arvind Kumar Singh, Dhurwa, Ranchi 12 Widening and Strengthening of Chandni Chowk, Hatia (at MDR-011) to Ring Road (Tonko Toli) road for the year 2016-17. 3.475 1052.64 RCD Lt. No. 3930 Dt. 22.06.17 681.575 M/S Arunaditya Projects and Mineral 188 C, Vidyalaya Marg, Ashok Nagar, Ranchi-834002. 13 Delayed Reconstruction of Meshra-Pithoria Road from Km 0.00 to 11.00 for the year 2015-16. 11.00 4076.077 4515(S) 25.06.15 2742.00 1780.00 65% 85% M/S Vijeta Projects & Infra Structure Pvt. Ltd. West Morabadi, Ranchi 14 Reconstruction of Shaheed Maidan Dhurwa to Jharkhand Vidhan Sabha via Vivekanand Vidya Mandir, Russion Hostel and Sudha Dairy Farm Road from Km 0.00 to 1.860 for the year 2015-16. 1.87 325.77 RCD Lt. No. 1721 Dt.11.03.16 287.09 125.00 44% 80% M/S Dilip Kuma Sector-II, Dhurwa, Ranchi DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress report of On-going works(Roads-Plan) % Physical Achiev- ement Financial Progress (in Lakh) Name of Contractor Sl. No. Length (Km) Administrative Approval Page 1 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R

PROGRESS REPORT OF ROAD CIRCLE RANCHI NOVEMBER

Embed Size (px)

Citation preview

Page 1: PROGRESS REPORT OF ROAD CIRCLE RANCHI NOVEMBER

Month : November, 2016 Amount in Rs. Lakh

Sanctioned Scheme Agreement

Name Amount Date/ Ref. No. Amount

Total

Expendi-

ture

(11+13)

% Finan-

cial Achie-

vement

1 2 3 4 5 6 7 8 9 10

Circle : Ranchi

Div : Ranchi

1

OngoingReconstruction of Itki to Brambey via Rani Khatanga

Road from Km 0.00 to 16.35 for the year 2014-15.

Bridge-Ch- 8475 - 3x24Mx12M

Ch- 14525 -2x24Mx12M

16.35 4500.3459110 (S)

Dt. 26.12.144218.35 3070.73 73% 82%

M/S Vijeta Projects & Infra

Structure Pvt. Ltd.

West Morabadi, Ranchi

2

Reconstruction of Mander Chowk (on NH-75) to

Burmu Road from Km 0.00 to 14.80 for the year

2014-15.

Bridge-Ch- 10975 - 1x16Mx12M

Ch- 13250 -3x24Mx12M

Ch- 9825 - 2x21Mx12M

14.80 3801.999135(S)

Dt. 26.12.143372.01 3735.00 111% 100%

M/S Ganga Construction &

Puja Enterprises Joint

Venture, Piskamore, Hehal,

Ranchi

3

Widening and strengthening of Kanthitanr (Hurhuri More)

to Thakurgaon Road from Km 0.00 to 10.400 for the year

2015-16

Bridge-

8th KM- 1x16Mx12M

10.40 3222.0794868(S)

13.07.152784.94 2600.00 93% 98%

M/S Spica Projects and

Infrastructures Pvt. Ltd.

Ashok Kunj, Opp. Road No.-

3,

Ashok Nagar, Ranchi

4

Widening and Strengthening of Intake well more

(11th Km of Ormanjhi-Sikidri Road) to Getalsud Dam

Road for the year 2015-16.2.90 464.232

8177(S)

Dt.04.12.15414.91 220.00 53% 80%

M/S Sambhu Singh

Radium Road, Sahu Nursing

Home,

Ranchi

5

Widening and Strengthening/ Reconstruction of

Chama Chowk to Mccluskieganj - Damodar Bridge

Road from KM 0.00 to 18.350 for the year 2015-16. 18.35 3361.0408389(S)

11.12.153166.67 2072.00 65% 90%

M/S Spica Projects and

Infrastructures Pvt. Ltd.

Ashok Kunj, Opp. Road No.-

3,

Ashok Nagar, Ranchi

6Construction of Peripherial Roads near Jaganathpur

and Mausibari Mandir (Length 3.645 KM) for the

year 2015-16.

3.645 667.32RCD Lt. No. 2000

Dt.21.03.16631.58 555.05 88% 100%

M/S Ganga Construction,

Abadganj, Daltonganj.

7

Widening & Strengthening of Road from Thakur

Vishwanath Shahdeo Chowk (Dhurwa Golchakkar) to

road intersection prior to Dhurwa Bus stand

including link road to Engineers Hostel No. 1 & 2,

link road to JSCA Stadium and link road to CDO, RCD

office Jharkhand, Ranchi for the year 2015-16.

3.60 752.7073675(S)

27.05.15682.85 270.00 40% 75%

Sri Arvind Kumar Singh

Dhurwa, Ranchi

8

Reconstruction of Burmu (on Pithoria- Burmu- Rai

Khelari Road)– Umedanda- Hendgir Road (including

construction of Bridges) (Total Length-20.380 Km)

for the year 16-17.

Bridge -

Ch- 0.640 - 3x18Mx12M

Ch- 6.325 - 1x18Mx12M

Ch-18.035 1x12Mx12M

20.38 6220.003567(S)

Dt. 06.06.164788.13 450.00 9% 20%

M/S Spica Projects and

Infrastructures Pvt. Ltd.

Ashok Kunj, Opp. Road No.-

3,

Ashok Nagar, Ranchi

9Widening and Strengthening of Siram Toli Chowk

(RRB Ranchi) to Ram Mandir (Chutia) for the year

2016-17.

0.6 48.09 4236 (S) Dt. 11.07.16 42.4767 0.00 0% 10%Sri Ramashankar Yadav,

Virsa Chowk, Hinoo, Ranchi

10 Widening and Strengthening of Judicial Academy to

Nagri Railway Crossing via- Balalong, Kudlong road

(Length 8.70 Km) for the year 2016-17.

8.700 2353.22RCD Lt. No. 3853

Dt. 20.06.162150.87

M/S Ganga Construction

Daltonganj

11

Improvement of Riding Quality Pavement of Mangla

Hat to JSCA Stadium Road (Total Length 2.60 Km)

and Road furniture work in JSCA Peripheral Road for

the year 2016-17

2.60 222.91RCD Lt. No. 6569

Dt. 14.10.16228.80 228.00 100% 90%

Sri Arvind Kumar Singh,

Dhurwa, Ranchi

12

Widening and Strengthening of Chandni Chowk,

Hatia (at MDR-011) to Ring Road (Tonko Toli)

road for the year 2016-17. 3.475 1052.64RCD Lt. No. 3930

Dt. 22.06.17681.575

M/S Arunaditya Projects and

Mineral

188 C, Vidyalaya Marg,

Ashok Nagar,

Ranchi-834002.

13DelayedReconstruction of Meshra-Pithoria Road from Km

0.00 to 11.00 for the year 2015-16.

11.00 4076.0774515(S)

25.06.152742.00 1780.00 65% 85%

M/S Vijeta Projects & Infra

Structure Pvt. Ltd.

West Morabadi, Ranchi

14

Reconstruction of Shaheed Maidan Dhurwa to

Jharkhand Vidhan Sabha via Vivekanand Vidya

Mandir, Russion Hostel and Sudha Dairy Farm Road

from Km 0.00 to 1.860 for the year 2015-16.

1.87 325.77RCD Lt. No. 1721

Dt.11.03.16287.09 125.00 44% 80%

M/S Dilip Kuma

Sector-II, Dhurwa, Ranchi

DPW-R

ROAD CONSTRUCTION DEPARTMENT, JHARKHAND

(State Highways Wing)

Progress report of On-going works(Roads-Plan)

%

Physical

Achiev-

ement

Financial Progress

(in Lakh)

Name of ContractorSl.

No.

Length

(Km)

Administrative Approval

Page 1 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R

Page 2: PROGRESS REPORT OF ROAD CIRCLE RANCHI NOVEMBER

Month : November, 2016 Amount in Rs. Lakh

Sanctioned Scheme Agreement

Name Amount Date/ Ref. No. Amount

Total

Expendi-

ture

(11+13)

% Finan-

cial Achie-

vement

1 2 3 4 5 6 7 8 9 10

%

Physical

Achiev-

ement

Financial Progress

(in Lakh)

Name of ContractorSl.

No.

Length

(Km)

Administrative Approval

15

Widening and Strengthening of Nayasarai- Argora

Road from KM 0.00 to 5.8 including construction of

Bridges in 2nd and 5th KM for the year 2013-14.

Bridge

2nd KM 1x21Mx12M

5th KM 1x16Mx12M

5.80 3576.887628(S)

Dt. 13.10.141595.92 1617.30 101% 80%

M/S Quiyamuddin Khan

Engineers Pvt. Ltd.

Jamshedpur-

16

Widening and Strengthening of (A) Firayalal to

Karamtoli Chowk Road from Km 0.00 to 2.10 (B) SBI

Main Branch to Kutchery Chowk (Santoshi Mata

Mandir Chowk) Road (C) Kanke Ram Mandir to DC

Residence Part from 0.00 to 1.35 Km (Morabadi

State Guest House) (D) ATI More to Ram Mandir

Road from KM 0.00 to 0.60 for the year 2015-16.

4.45 1411.27

Lt. No3220 (S) Dated 11-05-

2015, No2978 (S) Dated 01-

05-2015, No 2975(S) Dated

01-05-2015 & No2976 (S) 01-

05-2015

1448.36 956.02 66% 90%M/s Rajesh Construction,

Mumbai.

17

Reconstruction of Harmu Road to Telephone

Exchange Road via Avdhoot Ashram, Seva Sadan,

Jalan Timber for the year 2015-16.2.20 383.937

Dy. Sec. Lt. No. 8984(S)

16.12.15338.5 232.54 69% 72%

M/S Sambhu Singh

Radium Road, Sahu Nursing

Home,

Ranchi

18

Widening and Strengthening of Lalganj- Tatisilwey

Road from KM 0.00 to 3.20 for the year 2015-16.3.20 1506.00

5527(S)

05-08-151412.01 1022.08 72% 75%

Mohammad Quiyamuddin

Khan Engineers Private

Limited, Jamshedpur

19

Reconstruction of Crocodile Park Road from 8th KM

of Ormanjhi- Sikidri Road to Crocodile Park for the

year 2015-16. 3.650 829.345060(S)

20.07-2015686.58 350.00 51% 80%

M/S Apex Engicon Pvt. Ltd.

H. No.- 226/R-11,

Vidyapati Nagar, Gandhi

Nagar,

Ranchi

20Construction of Ranchi Ring Road (Section-VII) to

Jaguar Forces premises Approach road from Km 0.00

to 0.550 for the year 2015-16.

0.550 160.329Joint Sec. Lt. No. 19(S)

Dt.04.01.16136.55 11.70 9% 10%

M/S KNP Singh,

Khelari.

21

Reconstruction of Ranchi - Bariatu (MDR-004) to

Gymkhana Club (Vikash - Booty More- Kantatoli

Chowk Part of Old NH-33 of Ranchi Township) via

Mahabir Medica Hospital including Drain for the

year 2015-16.

0.975 244.552Joint Sec. Lt. No. 8790(S)

Dt.31.12.15218.019 105.00 48% 85%

M/S Arohan Builders

Krishna Puri, Ranchi

22

Rest WorkWidening and Strengthening of (A) Jharkhand High

Court Periferal Road (B) Old AG More (Central

School) to Jhalsa via Judge Colony and from New AG

More to Shyamali More Road for the year 2015-

2016.

3.50 611.86

7110(S)

12.10.15

&

7112(S)

12.10.15

(Combined)

588.15 139.51 24% 100%

M/S Altima Infrastructure

Pvt. Ltd.

351 A, Road No.-5, Ashok

Nagar, Ranchi

23Widening and Strengthening of Itki Road to Shayma

Prasad Mukhargee Nagar West End Park Link Road

for the year 2015-16.

1.36 285.1567446(S)

Dt. 29.10.15262.26 238.095 91% 95%

M/S Dilip Kuma

Sector-II, Dhurwa, Ranchi

24IRQP work of NH-33 to BIT Meshra Gate from km

0.00 to 2.50 for the year 2015-16.2.50 136.193

8083(S)

Dt. 01.02.15121.45 121.45 100% 100%

M/S Khanna Conctruction

Co, Circular Road, Ranchi

25(i)

Widening and Strengthening of Road Package No.-1

in Ranchi Urban area (Birsa Chowk to Rajendra

Chowk Road via Hinoo) including improvement of

Drainage System for the year 2014-15.

3.34 13224.75 1825(S) Dt. 03.03.14 1748.05 1186.70 68% 85%M/S Vijay Kumar Sahu

Khunti

25

(ii)

Widening and Strengthening of Road Package No.-2

in Ranchi Urban area (i. Tagore Hill Road Divyayan

more to RIMS ii. Main Road Urdu Library to

Koshoregunj Chowk via Ranchi Lake Road iii. Pahari

Mandir Road and Rani Sati Mandir Road to Harmu

Road iv. Sahid Chowk to Raj Bhawan via Gandhi

Chowk (Pustak Path) including improvement of

Drainage System for the year 2014-15.

8.01 1809.72 808.46 45% 90%M/S Vijay Kumar Sahu

Khunti

25

(iii)

Widening and Strengthening of Road Package No.-3

in Ranchi Urban area (i. Shahid Chowk to Harmu

Road via Nehru Park (JJ Road) ii. Shajanand Chowk to

Kadru via AG Colony iii. Sahjanand Chowk to Harmu

Chowk via Patel Chowk iv. Harmu Chowk to Bharat

Mata Chowk via Mukti Dham v. Construction of

Kadru to Hindpiri Road with Bridge over Harmu Nala

vi. Justice LPN Sahdeo Chowk to Durga Mandir

Chowk (Ratu Road)) including improvement of

Drainage System for the year 2014-15.

4.67 2029.72 1121.75 55% 80%M/S Vijay Kumar Sahu

Khunti

25

(iv)

Widening and Strengthening of Road Package No.-4

in Ranchi Urban area (i. Tupudana (Singh More) to

Latma Road ii. Mausibari Gol Chakkar to Site-IV

iii. Dhurwa Chech Post to Ranchi Bypass including

improvement of Drainage System for the year 2014-

15.

3.70 1956.83 1834.53 94% 98%M/S Vijay Kumar Sahu

Khunti

Page 2 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R

Page 3: PROGRESS REPORT OF ROAD CIRCLE RANCHI NOVEMBER

Month : November, 2016 Amount in Rs. Lakh

Sanctioned Scheme Agreement

Name Amount Date/ Ref. No. Amount

Total

Expendi-

ture

(11+13)

% Finan-

cial Achie-

vement

1 2 3 4 5 6 7 8 9 10

%

Physical

Achiev-

ement

Financial Progress

(in Lakh)

Name of ContractorSl.

No.

Length

(Km)

Administrative Approval

25

(v)

Widening and Strengthening of Road Package No.-5

in Ranchi Urban area (i. Bargain Basti Road ii. RIMS

Bijli Chowk to Cheshire Home Road via Joratalab iii.

Bahu Bazar Chowk to Namkom Thana iv. Udhav

Babu Lane to Kamil Bulke Road) including

improvement of Drainage System for the year 2014-

15.

2386.92 2219.06 93% 90%

M/S Ganga Construction

Abadganj, Daltonganj,

Palamu

25

(vi)

Road Package No.-6 in Ranchi Urban area

(i. Construction of Drain cum Footpath-Main Road ii.

Rehabilitation of Over bridge iii. Widening and

strengthening of Kali Mandir-Church Road to Bahu

Bazar Road) including improvement of Drainage

System for the year 2014-15.

1912.6 1272.86 67% 85%

M/S Ganga Construction

Abadganj, Daltonganj,

Palamu

26

Widening and Strengthening of Karamtoli Chowk to

Potpotto River for the year 2012-13.4.15 2911.62 1773(s) 03.03.2014 1113.33 684.23 61% 85%

M/S Quiyamuddin Khan

Engineers Pvt. Ltd.

Jamshedpur-

27

Widening and Strengthening of Brambe (on NH-75)-

Thankur Gaon -Ithe (Near Burmu) Road from KM

0.00 to 8.525 for the year 2014-15 8.53 1888.7051543(S)

02.03.151709.72 1718.12 100% 100%

M/S Spica Projects and

Infrastructures Pvt. Ltd.

Ashok Kunj, Opp. Road No.-

3,

Ashok Nagar, Ranchi

28Widening and Strengthening of Birsa Rajpath (New

Market Chowk to HEC Gate Chowk) for the year

2013-14.

7.80 20266104(S)

dt 14.08.20142038.10 1732.62 85% 87%

M/S Ram Kripal Singh

Construction Pvt. Ltd. ,

Ranchi

29Strengthening of Ranchi Bariatu Road (LPN Sahdeo

Chowk to Booty More Road) from KM 0.00 to 7.95

for the year 2014-15.

7.95 2243.8279128(S)

26.12.142253.97 1558.96 69% 62%

M/S Ram Kripal Singh

Construction Pvt. Ltd. ,

Ranchi

30Widening and Strengthening of Argora Chowk to

Kadru More Road for the year 2015-16.3.00 1153.425

3673(S)

27.05.151187.67 936.28 79% 95%

M/s Rajesh Construction,

Mumbai.

31

Widening and Strengthening of Kathal More Daladali

Kanthi Tand Road from Km 0.00 to 4.80 for the year

2015-16.4.80 365.565

3035(S)

05.05.15340.31 340.31 100% 110%

M/S Sambhu Singh

Radium Road, Sahu Nursing

Home,

Ranchi

32

Widening and Strengthening of Vidhan Sabha to

Nayasarai (on Ring Road) Road from Km 0.00 to

6.160 for the year 2015-16. 6.16 3922.2663382(S)

18.05.151996.24 2604.22 130% 70%

M/S Spica Projects and

Infrastructures Pvt. Ltd.

Ashok Kunj, Opp. Road No.-

3,

Ashok Nagar, Ranchi

33Widening and Strengthening of Beerkunwar Singh

Chowk to Judicial Academy Road from km 0.00 to

2.730 for the year 2015-16.

2.73 945.055 6124(S) Dt. 25.08.2015 950.04 1099.01 116% 98%M/S Puja Enterprises

Simariya, Chatra

34Widening and Strengthening of Beerkunwar Singh

Chowk to Sitio Bridge Road from KM 0.00 to 1.40 for

the year 2015-16.

1.40 420.942 6079(S) Dt. 24.08.15 394.07 399.02 101% 98%Sri Arvind Kumar Singh,

Dhurwa, Ranchi

35Widening and Strengthening of Khadgarha Bus

Stand Approach Road (Total length 0.700 km) for the

year 2015-2016.

0.70 298.6295945(S)

19.08.15302.95 275.00 91% 95%

Sri Laxmi Narayan jaiswal,

Sisai, Gumla.

36

4 Laning work of Birsa Chowk to Tupudana Chowk

Road with construction of 3 nos bridges for the year

2012-13.

Bridge (3 Nos)

(i) CH-1786 (1x10M)

(ii) CH-4248 (1x10M)

(iii) Ch-5101 (3x18M)

7.55 3929.251722(S)

Dt. 04.03.133786.1 5785.38 153% 98%

M/S Ram Kripal Singh

Construction Pvt. Ltd. ,

Ranchi

37

Widening and Strengthening of Namkum to Doranda

Road from Km 0.00 to 6.700 (Four Lane) with

construction of Bridge Over Subernarekha river for

the year 2013-14.

Bridge (1 No.)

CH-1700 (5x24M)

6.70 3037.898127(S)

05.09.132473.42 2798.69 113% 90%

M/S Ram Kripal Singh

Construction Pvt. Ltd. ,

Ranchi

38Widening and Strengthening of Dangratoli chowk to

Kantatoli Chowk Road with Drain and Footpath work

for the year 2015-16.

0.60 230.3036901(S)

Dt.05.10.15204.65 128.87 63% 90%

M/S Sahazadi Construction

Ranchi

39Widening and Strengthening of Khel Gaon Mega

Sports 4/2 Lane Road from KM 0.00 to 3.80 for the

year 2015-16.

3.80 979.686285(S)

03.09.15888.74 977.61 110% 98%

Sri Arvind Kumar Singh

Dhurwa, Ranchi

40Widening and Strengthening Work in road from NH-

33 to Sampression Grih near Jumar River for the year

2016-17.

6.691RCD Lt. No. 3741

Dt. 14.06.166.69 6.38 95% 75%

Sri Ramashankar Yadav,

Virsa Chowk, Hinoo, Ranchi

41Widening and Strengthening of Approach Road of

Women Probation Home, Namkum, Ranchi the year

2016-17.

18.57RCD Lt. No. 3741

Dt. 14.06.1618.57 17.01 92% 100%

Sri Sunil Kumar

Old Bazar Lane, Morabadi,

Ranchi

42Widening and Strengthening of Kathal More to

Argora Chowk from km 0.00 to 5.31 for the year

2011-12.

5.314 5853.483008(s)

Dt. 26.5.111354.58 4635.4500 87% 35%

Sri Santosh Kumar Singh,

Ranchi

43Construction of Bridge Over Sathiyari Nala in 17th

KM of Kathitand-Pithoria Road for the year 2012-13.2x10M=2

0M7675.49

7472(s)

dt. 14.11.11125.824 112.14 89% 65% M/s Lowkesh Singh

Page 3 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R

Page 4: PROGRESS REPORT OF ROAD CIRCLE RANCHI NOVEMBER

Month : November, 2016 Amount in Rs. Lakh

Sanctioned Scheme Agreement

Name Amount Date/ Ref. No. Amount

Total

Expendi-

ture

(11+13)

% Finan-

cial Achie-

vement

1 2 3 4 5 6 7 8 9 10

%

Physical

Achiev-

ement

Financial Progress

(in Lakh)

Name of ContractorSl.

No.

Length

(Km)

Administrative Approval

44Construction of Bridge Over Jumar River at KM

12.600 of Kathitand Pithoria Road for the year 2012-

13.

3x18.6M

=54M

7472(s)

dt. 14.11.11255.105 162.11 64% 80%

M/s Indian Electrical

Services, Daltonganj.

45Remaning work of Widning and strengthening of

Kanke Bazar Tand (PWD) to Block chowk

Boriya(PWD) for the year 2011-12.

3.90 2373.1751284(S)

22.02.12584.86 2633.17 450% 93%

M/s Khanna Construction,

lalpur, Ranchi

46IRQP Work from Project Building to Chandni Chowk

from Ch 0.00 to 0.950M for the year 2015-16. 0.950 74.4666037(S)

22.08.1566.23 72.85 110% 100%

M/S Jaimata Dee

Construction

Piska More, Ranchi

47Improvement of Harmu Chowk in New Market (Ratu

Road) to HEC gate Road (MDR-015) in Ranchi Town

for the year 2012-13.

295.931512(S)

23.02.130

M/S A.S. Construction,

Medni Nagar, Daltonganj.

48Improvement of different chowk (New Market

Chowk and Booty More Chowk) in Ranchi Town for

the year 2015-16.

58.766936(S)

06.10.1517.85

M/S Green Power Project,

Haru Road, Ranchi

49

Improvement of Junction at Kathitanr

Chowk (Jn. of Ranchi- Daltonganj Road NH-75 and

Kanthitand- Daladali- Kathalmore

Road MDR-012), Ranchi for the year 2012-13.

62.891515(S)

23.02.1338.5 39.62 #REF! 69%

M/s Bhawani Construction,

Daltonganj.

50Improvement of Sahajanand Chowk in Ranchi town

for the year 2012-13.459.2

1510(S)

23.02.1363.1 83.79 #REF! 95%

M/s R & R Construction,

Ranchi

51

Improvement of Kathalmore Chowk at Junction of

NH-23 ( anchi- Gumla Road) and Argora Chowk to

Kathal More Road (MDR-018) in Ranchi Town for the

year 2012-13.

724.611617(S)

02.03.130.00 #REF!

52Improvement of Karamtoli Chowk, Ranchi for the

year 2012-13.69.92

1509(S)

23002.1344.51 5.13 #REF! 7% Sri Mukesh Kumar, Palamu

53Improvement of Junction at Randhir Verma Chowk,

Ranchi for the year12-13.70.31

1507(S)

23.02.1326.76 2.47 #REF! 4% Sri Mukesh Kumar, Palamu

54Balance work for Improvement of Karamtoli Chowk,

Ranchi for the year 2012-13.69.92

1509(S)

23002.13

M/S A.S. Construction,

Medni Nagar, Daltonganj.

55

Tender ProcessConstruction of Drain from NH-33 Kunchi Sweet

House (Near Booty More) to Choudhary Petrol Pump

via Mahadeo Tola and from NH-33 Pitamber Place to

Mahadeo Tola via Ohdar Basti for the year 2016-17.

429.540RCD, Lt. No. 4117 Dt.

01.07.16

56

Widening and Strengthening of Harmu Chowk (On

MDR-015) to Chapu Toli (on MDR-018) via Sant

Francis School Road (Total Length 2.565 KM) for the

year 2016-17.

806.45 4281(S) Dt.13.07.16

M/S Jai Maa Kali

Constrution, Abadganj,

Daltonganj.

57

Widening and Strengthening of Birsa Munda Airport -

Namkum (Kutiatu More, on NH-75 Ext. ) via Hetu,

Tumbagutu Road for the year 2016-172830.34

5173(S)

Dt.16.08.16

58

Widening and Strengthening ITI Bus Stand (NH-23 to

St. Fransis School Road) road for the year 2016-17.

1677.005430(S)

24.08.16

M/S Arunaditya Projects and

Mineral

188 C, Vidyalaya Marg,

Ashok Nagar,

Ranchi-834002.

59Construction of Ranchi Ring Road(Section-7) to

Central University of Jharkhand from Km 0.00 to

1.78 for the year 2015-16.

1.78 1372.716902(S)

Dt. 05.10.150

M/S Jaimata Dee

Construction

Piska More, Ranchi

60

Construction of proposed ROB with approaches in

Lieu of LC no. RL-5 at RLY KM 427/2-3 between

Ranchi and Piska Stations. For the year 2016-17.2119.00

4880(S)

Dt.4-8-16

61

Provision of Road Appurtenances and Road Work

for traffic safety of Ranchi Railway Station to Kanta

Toli Chowk , Ranchi Railway station to Siram Toli

Chowk & Birsa Munda Airport (Ranchi) to Siram toli

road (Total Length 9.647) for the year 2016-17.

525.298246(S)

Dt.11.11.16

62

Improvement of riding quality & other allied work at

Khelgaon Mega Sports Complex road on the

occasion of Global Investors Summit for the year

2016-17.

557.388526(S)

Dt.25-11-16

63Reconstruction of Road from Dhurwa Site-4 (Tempo

Stand) to Sail City Road (Length 1.175KM) for the

year 2016-17.

596.098121(S)

Dt.09-11-16

64

Fund Transferred

Reconstruction, Widening and strengthening and improvement of work

two lane / two lane with paved shoulder as per standard of 9 (nine)

roads and by pass (Total length 335.08 KM) from the credit of Asian

Development Bank under External sponsored progranne (Including land

acquisition, rehabilitation & resettlement, Environmental protection,

forest land acquisition monitoring etc.) to be constructed by State

Highway Authority of India.

UNDER HEAD

41P505403337080545

203600.00 4500.00 SHAJ

Page 4 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R

Page 5: PROGRESS REPORT OF ROAD CIRCLE RANCHI NOVEMBER

Month : November, 2016 Amount in Rs. Lakh

Sanctioned Scheme Agreement

Name Amount Date/ Ref. No. Amount

Total

Expendi-

ture

(11+13)

% Finan-

cial Achie-

vement

1 2 3 4 5 6 7 8 9 10

%

Physical

Achiev-

ement

Financial Progress

(in Lakh)

Name of ContractorSl.

No.

Length

(Km)

Administrative Approval

65

Reconstruction, Widening and strengthening and improvement of work

two lane / two lane with paved shoulder as per standard of 9 (nine)

roads and by pass (Total length 335.08 KM) from the credit of Asian

Development Bank under External sponsored progranne (Including land

acquisition, rehabilitation & resettlement, Environmental protection,

forest land acquisition monitoring etc.) to be constructed by State

Highway Authority of India.

UNDER HEAD

41P505403796080545

203600.00 4500.00 SHAJ

66Construction work of Ranchi Ring Road Section-VII (NH-75 Ranchi-

Daltonganj Section to Karma) (Karma NH-33 Ranchi Hazaribagh Section)

(for Land Acquisition Work).

2278.60

67Under (Jharkhand Accelerated Road Development Programme, JARDP)

Ring Road (Section-VII)) (Packaged ID-RRR-VII) for Electric Utility Shifting 284.283742(S)

Dt. 14.06.16284.28 JSEB

68Construction of ROB at KM 358/31-33 on Level Crossing No.- MH-4 in

between Hatia-Muri Railway Station of Hatia Muri Road (SH-1) for the

year 2015-16.

1597.27409(S)

18.01.16200.00 S.E. Railway

69Construction of ROB at KM 411/23-25 on Level Crossing No.- MH-23 in

between Namkum-Tatisilway Railway Station of Ranchi- Muri Road (SH-

1) for the year 2015-16.

1783.03413(S)

18.01.16200.00 S.E. Railway

70Construction of ROB at KM 408/5-7 on Level Crossing No.- MH-21 in

between Namkum-Tatisilway Railway Station of Ranchi- Muri Road (SH-

1) for the year 2015-16.

1648.52412(S)

18.01.16200.00 S.E. Railway

71Wideing of ROB at KM 423/30-32 near Birsa Chowk in between Ranchi-

Hatia for the year 2014-15. 442.601319(S)

20.02.15442.60 S.E. Railway

Total 244.38 519474.74 67085.78 69756.76 Total

Circle : Ranchi

Div : Gumla

1W/S Manoharpur-Anandpur-Bano-Kolebira

Road (SH 4 ) Km. 26.4 to 55.4 ) [i]29.00 8673.91

7978 (S)

24-12-073409.44 3430.72 100.00 100.00

Khokhar Infrastructure

Pvt. Ltd. Tata Road,

Chaibasa

2

W/s of Palkot (on NH-23) Nathpur-Konbir

(on SH-03) in Km. 00 to 16.84

16.84 2626.61 2995(s) 25.03.13 3147.56 3338.16100.00

100.00M/s Satish Prasad ,

Mahuadanr

3W/S of Kamdara-Bero Road (MDR-34) in

Km 0 to 23.6 23.46 2348.43 2245(S) 14.03.13 2867.28 2650.00 92.42 98.00VKS-AKS-AIPL (JV) Pipra

Toli, Khunti 835210,

Jharkhand

4

W/S of Nathpur -Bharda -Tukutoli -

Baghima in km. 0 to 20.750 alongwith with

bridge in different km.

20.75 4843.812005(S)

20.03.154618.86 1728.00 37.41 35.00

M/S Shivalaya Const. Co.

Pvt. Ltd,359,sector-14,

Rohtak-124001

5

Construction of Check Naka near

Manjhatoli on NH-78 on Jharkhand-

Chhattisgarh Border1.612 976.018

3223(S)

dt11.05.15934.567 856.375 91.63 93%

Vinod Kumar Jain

Jashpur ,

Chhattisgarh

6

widening strengthning of Banari-Banalat

road including Bridge (Total length 14.20

km)

14.20 3706.2646342(S)

dt.08.09.153531.95 1006.91 28.50 32%M/s Satish Prasad , Mahuadanr

7

Widening and Strengthening of Dumri-

Govindpur Road from km 0.00 to 24.100

including bridges ( Total Length-24.100

km)

24.10 6366.006577(S)

21.09.156451.27 825.00 12.78 12%

M/s Sivalaya Cont. Co.

Pvt. Ltd.

Sector-14, Rohatak

8

Reconstruction of Manjhatoli (NH-78) -

Birkera - Kondra Road From Km 0.00 TO

21.600 including Bridges. ( Total Length-

21.600 km)

21.60 4162.9446580(S)

21.09.154158.24 1905.21 45.81 35%

M/s Sivalaya Cont. Co.

Pvt. Ltd.

Sector-14, Rohatak

9

Widening and strengthening of Bakutoli(SH-

03) Kurkura-Bano Road (km 0 to 34.650) 34.65 5629.8207870(S)

23.11.15

5661.38911.91 16.1 20%

M/s Vinod Kr. Jain

Jashpur, Chhattisgargh

10

Widening and Strengthening of Sisai -

Bhandra Road (Total Length 26.420 km)

26.42 4736.1518392(S)

11.12.154706.62 1411.72 29.99 35%

VKS-Altima

Infrastructure Private

Ltd.(JV) 351A,

Road No.-5

Ashok Nagar, Ranchi

11

Widening and Strengthening/ reconstruction

of Toto to Anjandham Road (Total length

9.350 km) 9.35 1963.620

788(S)

05.02.161944.24 892.98 45.42 45%

Altima Infrastructure

Private Ltd.

351A, Road No.-5

Ashok Nagar, Ranchi

12

Reconstruction of Kumhari to Jhatnitoli via

Nawadih Road 26.878 5328.400514(S)

dt. 22.01.165282.91 608.30 11.51 10%

M/s Sivalaya Cont. Co.

Pvt. Ltd.

Sector-14, Rohatak

13

Reconstruction of Bharno Block Chowk

(NH-23) to Chatti (SH) Lohardaga Path

(Total Length- 11.600 km)

11.600 2564.1262172(S)

dt. 31.03.161780.099 8%

M/s Dewanti

Construction

Sisai road,Gumla

Page 5 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R

Page 6: PROGRESS REPORT OF ROAD CIRCLE RANCHI NOVEMBER

Month : November, 2016 Amount in Rs. Lakh

Sanctioned Scheme Agreement

Name Amount Date/ Ref. No. Amount

Total

Expendi-

ture

(11+13)

% Finan-

cial Achie-

vement

1 2 3 4 5 6 7 8 9 10

%

Physical

Achiev-

ement

Financial Progress

(in Lakh)

Name of ContractorSl.

No.

Length

(Km)

Administrative Approval

14

Widening and Strengthening of Kurgi

Lalpur (on Sisai-Bhandra road)-Puso-

Korambo (on NH-143A/SH-08) Road

(Total Length-13.100km)

13.100 2392.0003429(S)

dt. 01.06.16 SSVM Const. Pvt. Ltd.

15Preparation of Five no. DPR under RCD,

Gumla 133.00

Intregrated

(RCD)

427.33

12.23

4427(S) 10.05.13

7691(s) 15.10.1431.03 24.557 79.14

Ayolleza Consultant

Pvt. Ltd.

Sub Total 406.56 56318.10 42864.07 19589.84

LWE

Original Revised Amt in Cr. %As per

SBD%

1 2 4 5 6 9 14 15 26 17

1

Widening and strengthing of Sisai - Basia Road from Km.

0.00 to 37.775 (Widening to Intermediate lane and

Improvement of Sisai-Basia Road)

LWE-JH-

2011-12-

205

39.09 47.26 45.32 14.48 32.00

Tipper

Trucks-15

Motor

grader-3

Dozer-01

Front End

Loader-02

Smooth

Wheel

Roller-03

Vibratory

Roller-02

HMP with

electronic

controls-

01

Paver

Finisher-

01

Water

Tanker-04

bitumen

Sprayer-01

Tandem

Roller -01

Concrete

mixers

with

integral

weight

batching

facility-01

Concrete

Batching

30.4

5

2

Remaining work of strengthing and Widening of Sisai -

Basia Road from Km. 0.00 to 37.775 (Widening to

Intermediate lane and Improvement of Sisai-Basia Road

from Km. 0.00 to 37.775 )

LWE-JH-

2011-12-

205

41.77

Circle : Ranchi

Div : Khunti

1

Reconstruction of Dasmile - Chukru -

Remta - Sonadasome - Kujuram Length

22.200

22.200 6105.893letter No. 7025(S)

dt. 08.10.153857.897 4413.254

PHED-

9.16 lac

Electrial-

89.48 lac

L/A-

400.00

lac

Total-

498.64

Lac

100%

100%

M/S GC PE (Jv) (

Dasmile - Chukru-

Remta - Sonadasome -

Kujuram Road)

Total:- C.D. work-41

Sl.

No.Name of Work

Awarded Cost (Rs. in

Cr.)

Cumulative Financial Comulative Physical Progress upto

Sub Total

Sanctioned cost (Rs. in Cr.)Awarded Cost (Rs. in

Cr.)Job No.

Page 6 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R

Page 7: PROGRESS REPORT OF ROAD CIRCLE RANCHI NOVEMBER

Month : November, 2016 Amount in Rs. Lakh

Sanctioned Scheme Agreement

Name Amount Date/ Ref. No. Amount

Total

Expendi-

ture

(11+13)

% Finan-

cial Achie-

vement

1 2 3 4 5 6 7 8 9 10

%

Physical

Achiev-

ement

Financial Progress

(in Lakh)

Name of ContractorSl.

No.

Length

(Km)

Administrative Approval

2

Widening Strengthening / Reconstruction of

Khunti - Siladone - Chukru - Bhusur Road

Length 28-205KM

28.205 4579.37letter No. 8099(s)

dated 05.09.134411.126 4865.371

PHED-

9.73 lac

Electrial-

44.34 lac

Tota-

54.07

Lac

100% &

P.A

100%

M/S VKS-AKS-

AIPL(JV), Siladone,

Khunti (Khunti -

Siladone - Chukru -

Bhusur Road)

Total:- C.D. Work-47,

HP Culver- 19

3Widening & Strengthening of Hatia

Lodhma Karra Khunti Road 43.76 5902.917

letter No. 351(s)

dated 17-01-125484.577 6009.143

L/A

&U/S-

634.9442

0

91.15%

100%

M/S K.P.C. Project

Limited, (B.V.

Sambasiva Rao), Gagan

Mahal, Domalguda,

Hyderabad (Hatia -

Lodhma - Karra -

Khunti Road)

Total :- C.D. 47

4

Improvement of riding qualioty of Huser

hatu to Dasam fall & kujram to Dasmfall

Road (6.7+2.620) KM

9.320

KM472.705

letter No. 7113(s)

dated 12.10.2015487.738 468.031 96.0% 100%

Vijay Kumar Sahu

Infrastructure Pvt. Ltd.

(Improvement of riding

qualioty of Huser hatu

to Dasam fall & kujram

to Dasmfall Road)

5Widening and Strengthening of Kamdara -

Bero Road From KM 23.46 to 51.125 27.665 4091.25

Govt. of India No.

RW/NH-

28014/2/2013/JHR/

P-3 (CRF) dt.

02.01.14

4611.513 3405.08 73.8% 90%

M/S Ksheeraabd

Construction Pvt. Ltd.

Banjara Hills,

Hyderabad

( Kamdara - Bero Road

) Total:- C.D.

work-18

6Reconstruction of Murhu - Tapkara - Torpa

Road KM 0 to 27.07027.07 4083.19

letter No. 2953(s)

dated 25.03.134250.408 3430.29

L/A-800

61.88% 80%

M/S Sanjay Agarwal

(Murhu - Tapkara -

Torpa)

Total:- C.D. work-44

7 Reconstrction of SH-3 to Ulihatu road 12.876

KM2915.475

letter No. 6568(s)

dated 21.09.152792.069 2063.02 73.9% 62%

Vijay Kumar Sahu

Infrastructure Pvt. Ltd.

Reconstrction of SH-3

to Ulihatu road

Total:- C.D. work- 30

8

Reconstruction of Khunti - Bhunda - Jurdag

-Karra - Birda - Bero Road from KM 0.00

to 44 (Working Length 39.07KM)

39.07 5797.68

Govt. of India No.

RW/NH-

28014/2/2013/JHR/

P-3 (CRF) dt.

02.01.14

6008.584 2285.76 38.0% 62%

M/S Ksheeraabd

Construction Pvt. Ltd.

Banjara Hills,

Hyderabad (Khunti -

Bhunda - Jurdag -Karra -

Birda - Bero Road)

Total:- C.D. work-23

9Widening & Strengthening of Sisai Lapung

Dorma Road 43.4 5487.673

letter No. 352(s)

dated 17-01-125455.455 2081.11

L/A

&U/S-

425.4512

2

38.143%

47%

M/S Ksheeraabd

Construction Pvt. Ltd.

Banjara Hills,

Hyderabad (Sisai -

Lapung - dhorma Road)

Total:- C.D. work- 19

10

Widening and Strengthening of Kara More

(Torpa) to Karra Road from KM 0.00 to

21.750

21.750

KM4866.909

letter No. 6571(s)

dated 21.09.154055.194 2140.00 52.77% 57%

M/S GC PE (Jv)

(Widening and

Strengthening of Kara

More (Torpa) to Karra

Road)

Total:- C.D. work- 46

11

Widening and Strengthening of Sarsa (Bero-

Khunti Road) to Daranda, Latratu Dam via Sai

Temple

7.817K

M1708.744

letter No. 782(s)

dated 05.02.161699.366 - - 15%

M/S Kumar Narendra

Prasad Singh

K. D. Road khalari, Ranchi

(Jharkhand).

Page 7 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R

Page 8: PROGRESS REPORT OF ROAD CIRCLE RANCHI NOVEMBER

Month : November, 2016 Amount in Rs. Lakh

Sanctioned Scheme Agreement

Name Amount Date/ Ref. No. Amount

Total

Expendi-

ture

(11+13)

% Finan-

cial Achie-

vement

1 2 3 4 5 6 7 8 9 10

%

Physical

Achiev-

ement

Financial Progress

(in Lakh)

Name of ContractorSl.

No.

Length

(Km)

Administrative Approval

12

Widening & Strengthening of Konsa -

Bakaspur - Govindpur - Karra Road (Length -

30.4000 KM)

30.4 5882.487letter No. 3549(s)

dated 06.06.165690.080 - - -

VKS – AIPL (JV)

House NO. 75, Old AG

Colony, Kadru

Ranchi, Jharkhand

261.77 51894.29 48804.01 31161.1

Circle : Ranchi

Div : Ranchi (Rural)1 IRQP of Angarha - Hahe-Rahe Road from KM 20.00 to 25.00 for

the year 2014-15. 6.00 287.10509.03.15

1710 (s)298.1 297.64 99.88% 100%

M/s Khanna Construction

Khanna Building, Lalpur, Ranchi

2

IRQP OF JONHA TO JONHA FALL-SITA FALL ROAD 6.87 342.62324.08.15

6089(S)

324.56

+ 39.99 (variation sanction

by letter no. 1448anu

dt.27.06.16)

353.69 97% 100%M/S RBCON ,H No.70 Shiv gang

Hrmu Road Ranchi

3 Widening and Strengthening of Bundu-Sonahatu-Jamudag-Jaria

Missing Link Road. 5.80 1278.00 12376 (S) 04.12.13 1284.00 1244.58 97% 98%Md. Q. Khan Engineers Pvt. Ltd.,

110, B Block

4 IRQP Work of Angara- Hundrufall Road from KM 20.00 to 21.100

for the year 2015-16. 2.10 76,06,20018-02-16

1107 (s)68.45 54.12 79.12% 100%

Sri Chandan Kumar,

Harmu Colony, Ranchi

5 Widening and Strengthening of Road from 11th km of Ranchi-

Muri Road (Tati-Chatra) to Bongaibera. 9.81 1764.0618.12.13

/ 13121 (S)1775.80 627.00 35% 60%

M/S Khanna Construction

Circular Road, Ranchi

6 Improvement of Sonahatu Milan Chowk Road in k.m. 0 to 23.90

MDR-29 23.90 2677.534514(S)

Dt. 25.06.152651.13 495.39 18.68% 35%

M/S AIPL-AKS

(Joint Venture)

351 A, Road No.-5, Ashok Nagar, 7 Widening & Stregthning of Gola-Muri Road from 14.50 to 26.46

for the year 2016-17 11.96 79.648 5453(S) 26.08.16 - - - -

M/s Classic Engicon Pvt. Ltd.

Vatika Apartment, Line Tank Road,

Ranchi - 01

Sub Total 66.44 6428.97 6077.48 3072.42

Circle : Ranchi

Div : Lohardaga

1Widening & Strengthening of Kuru-Lohardaga-

Ghagra Road from km 0 to 44.044.00 5386.099

25.06.15 / 4212 (S)

(Revised A/A)5367.29 4672.68 87% 92%

M/s S. & P. Infrastructure

Development Pvt. Ltd.,

907, New Delhi, House-

27, Barakhamba Road.

2Widening & Strengthening of Lohardaga-Gangupara-

Peshrar Road from km 0 to 27.627.60 7797.553

26.12.14 / 9127 (S)(Revised A/A)

7471.50 960.00 13% 50%Shivalaya Construction Co.

Pvt. Ltd., New Delhi

3Construction of Shankh-Chatra (Lukaiya More on NH-

75) Road from km 0 to 21.3521.35 4886.029

26.12.14 / 9119 (S)(Revised A/A)

5111.82 4910.00 96% 100%

Kaushik - Jai Maa Durga -

J.V.

Garwah.

4Re-construction of Kesa More (NH-23) Tangarbasli-

Mandar (NH-75) Road18.95 3289.100 14.03.13 / 2235 (S) 3073.67 2568.50 84% 85%

M/s SKS - MC Joint

Venture

5Strengthening (IRQP) of Bero-Lohardaga Road from

k.m. 0.00 to 39.1039.10 2443.220 10.10.14 / 7594 (S) 2512.99 2528.05 100% 100%

M/s K.N.P. Singh-A.B.P.L.-

N.Pandey - J.V.

Ranchi.

6Widening and Strengthening of Chatti to Kuru (Tati

Chouk) & Kairo Naya Toli to Zingi More Road from

k.m. 0.00 to 36.535

36.53 8608.965 06.06.16 / 3543 (S) 7749.41 0.00

Dinesh Chandra R.

Agrawal infracon Pvt. Ltd.,

S.M. Road, Ambawadi,

Ahmedabad.

Sub Total 187.53 32410.97 31286.68 15639.23

Original Revised Amt. in Cr. %As per

SBD%

1 2 4 5 6 9 14 15 26 17

Moror

Grader -3

Dozer -1

(pocklen)

Front end

Loader-2

Smooth

Wheel

Rollers-2

Vibratory

Roller-1

Hot Mix

Plant with

electronic

controls

(Minimum

80-100

TPH

capacity)-1

Sub Total

Sanctioned Cost Cumulative physical progress upto 31.03.14

25%

Total

Sl.

No.

1

Cumulative Financial

Widening and Strengthening of 2 Lane & Improvement of

Lohardaga Kisko More to Richuguta Road from Km 0.00 to

31.50 in Jharkhand under LWE Scheme

(Job No.

LWE/JH/2

010-11-

190)

31.5765 42.8201

Name of WorkAwarded Cost

(Rs. In Cr.)Job No.

14.12

(R.A. Bill)

14.12

40.637871 35%

Page 8 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R

Page 9: PROGRESS REPORT OF ROAD CIRCLE RANCHI NOVEMBER

Month : November, 2016 Amount in Rs. Lakh

Sanctioned Scheme Agreement

Name Amount Date/ Ref. No. Amount

Total

Expendi-

ture

(11+13)

% Finan-

cial Achie-

vement

1 2 3 4 5 6 7 8 9 10

%

Physical

Achiev-

ement

Financial Progress

(in Lakh)

Name of ContractorSl.

No.

Length

(Km)

Administrative Approval

Paver

Finisher

with

electronic

sensor -1

Water

Tanker-3

Bitumen

Sprayer -1

Tandem

Roller -2

Concrete

Mixer with

integral

Weigh

Batching

facility -1

Circle : Ranchi

Div : Simdega

Strengthening /Re-Construction Of Putritoli-Barasloya-

Lacharagarh-Jaldega upto pandripani NH-23

&73.6 4921.61000 1720(s)/ 04.03.13

Strengthening /Re-Construction Of Simdega-Jaldega-

Hurda-Girda Upto Manoharpur Road.73.7 6796.23500 1721(s)/ 04.03.13

2IRQP/Reconstruction of Bano (Birsa Chowk) to Ketunga for

diversion of damaged bridge in Lacharagarh Bano Road.10.9 374.79000 7293(s)/ 14.08.13 403.74771/ 445.87144 384.6353 86% 100%

Plateaue Road Engineering,

Ranchi

3Widening & Strengthening/Reconstruction of Kochedega-

Ramrekha Dham upto Chhatisgarh Boarder Road.27.325 6735.97800 5340(s)/ 17.07.14 7089.91767 3100.0000 44% 60%

Shivalaya Construction Co. Pvt.

Ltd.

4

Widening & Strengthening/Reconstruction of

Putritoli(Dolongsera on MDR-45)-Timbermore-Rampur-

Boroseta-Jitutoli-Beraergi(upto Koel river) road.

31.80 6770.93500 5344(s)/ 17.07.14 6211.76879 2075.0000 33% 40%M/s Dineshchandra R. Agrawal

Infracon Pvt. Ltd.

5Construction of Check Post (Road) near Bansjor at

Simdega Jharkhand-Orissa Border on NH-143.2.00 1092.51000 3222(S) 11.05.15 1155.59904 1049.8501 91% 100% Superior Costruction Pvt. Ltd.

6

Widening and Strengthening of Kolebira(SH-04)-Gangutoli-

Jamdih ( NH-143.) Road (Part-A KM 0.00 to 10.36 and

Part-B KM 22.00 to 38.95)

28.31 5843.43000 5617(S)/ 06.08.15 6048.11358 810.0000 13% 20%M/s Dineshchandra R. Agrawal

Infracon Pvt. Ltd.

7

Widening and Strengthening of Kurdeg-Karamadiha-

Gariajor upto Chattisgarh border Road & Construction of

High level Bridge on Mission Bandh at KM 4.40.

11.85 3041.166004871(S)/

13.07.153034.87073 1789.4722 59% 75% Barbrik Project Ltd.

8W/S Of Simdega Rengari-Kersai-Bolba Road Up To

Orissa Border Road (Remaining work)48.21 7471.40400 3568(S)/ 06.06.16 -

M/s Dineshchandra R. Agrawal

Infracon Pvt. Ltd.

Sub Total 19824.779

CRF

1W/S Of Simdega Sewai -Kinkel -Kurdeg -Kutumakachhar Upto

Chhatisgarh Boarder Road. 63.2 13035.887 9131(s) Dt. 26.12.14 10099.47505 #REF! 95% 99%

Shivalaya Construction Co.

Pvt. Ltd.

1 11738.65857

25%1

10615.8213 90.43% 97%M/s Dineshchandra R. Agrawal

Infracon Pvt. Ltd.

Widening and Strengthening of 2 Lane & Improvement of

Lohardaga Kisko More to Richuguta Road from Km 0.00 to

31.50 in Jharkhand under LWE Scheme

(Job No.

LWE/JH/2

010-11-

190)

31.5765 42.820114.12

(R.A. Bill)

14.12

40.637871 35%

Page 9 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R

Page 10: PROGRESS REPORT OF ROAD CIRCLE RANCHI NOVEMBER

Month : November, 2016

Sanctioned Scheme Agreement

Name AmountDate/ Ref.

No.Amount

Total

Expendi-ture

(11+13)

% Finan-

cial Ach.

1 2 3 4 5 6 7 8 9 10

Circle : Ranchi

Div : Ranchi

1

Construction of HL Bridge over Potpoto river in Km

4.15 of Karamtoli Ormanjhi Road for the year 2014-15.

(9 x 10M)709.02

4619(S)

Dt.18.06.14

2

Construction of Bridge Over Jumar River at KM 6.85 of

Karamtoli Ormanjhi Road for the year 2014-15.

(4 x 24M)550.57

4462(S)

Dt.12.06.14

3

Construction of HL Bridge over Dubaliya river in Km

8.85 of Karamtoli Ormanjhi Road for the year 2014-15.

(2 x 14M)167.01 4624(S)

Dt.18.06.14

4

Construction of HL Bridge over Bangaraha river in Km

10.55 of Karamtoli Ormanjhi Road for the year 2014-

15.

(1 x 18M)

247.85

4623(S)

Dt.18.06.14

5

Construction of HL Bridge over Gobardaha

(Gobarhappa) river in Km 13.75 of Karamtoli Ormanjhi

Road for the year 2014-15.

(1 x 16M)

195.72

4621(S)

Dt.18.06.14

6

Construction of HL Bridge over Kuchhu river in Km

14.15 of Karamtoli Ormanjhi Road for the year 2014-

15.

(3x 16)

281.784627(S)

Dt.18.06.14

7

Construction of Bridge over Distillery Nala in

2nd KM of Kokar- Lalpur- Albert Ekka Chowk

Road for the year 2015-16.

(1.00 x 21.00 M)

274.223309(S)

27.05.16277.40 169.72 61% 70%

M/S A.S Construction,

Medninagar,

Palamu

8

Construction of Bridge over Sapahi River at

Ch. - 3.650 km of Ranchi-Muri Road.

(2 x 18.00 M)

37.24 189.54709.07.13 /

6421(s)171.74 184.14 107% 100% M/s Nagendra Pandey

9

Construction of remaining work H.L. R.C.C.

Bridge over Harmu Nala in Kadru Chowk to

Ranchi Railway Station Road for the year

2013-14.

1x16.6M

= 16.6M117.76

3636 (S) Dt.

09.05.1493.05 232.93 250% 100%

M/S Haque Const. Co.

Agrora, Ranchi

Total 2537.76 2761.95 2223.79

Circle : Ranchi

Div : Gumla

2 Construction of H.L.Bridge with approach road

over Deo River in KM 64 of Manoharpur-

Anandpur-Bano-Kolebira Road (6x24) 144 609.98

4399 (S) dt.

09.05.13634.42 419.723 66.16 80%

M/s Dhanpati Singh Const.

Sai Colony, Chutia, Ranchi

Sub Total 176.00 798.00 819.22 525.19

1637.00M/S Ganga Construction

Daltonganj

ROAD CONSTRUCTION DEPARTMENT, JHARKHAND

(State Highways Wing)

Progress report of On-going works(Bridges-Plan)

2219.76 90%74%

Amount in Rs. Lakh

Sl.

No.

57.07 80%184.80

Sub Total

105.466

DPW-B

Financial Progress (in

Lakh)Length

(m)

Administrative

Approval

M/s Vijay Kant Pandey

Amba Nagar Pandra , Po-

Hehal, P.S- Sukhdeo Nagar,

%

Physical

Achiev-

ement

Name of Contractor

132 188.02

8298(s)

29.11.12

Construction of H.L.Bridge over Redwa River in

KM 16 of Kamdara-Bero Road (2x16m)

MDR_38

Page 10 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-B

Page 11: PROGRESS REPORT OF ROAD CIRCLE RANCHI NOVEMBER

Month : November, 2016

Sanctioned Scheme Agreement

Name AmountDate/ Ref.

No.Amount

Total

Expendi-ture

(11+13)

% Finan-

cial Ach.

1 2 3 4 5 6 7 8 9 10

Amount in Rs. Lakh

Sl.

No.

Financial Progress (in

Lakh)Length

(m)

Administrative

Approval %

Physical

Achiev-

ement

Name of Contractor

Circle : Ranchi

Div : Khunti

1

The Constructionof Bridge Over Changer

Jhore River At- CH- 24.950 KM of Khunti

Torpa Kolebira Road (5X18.6M)

93.04 352.499

Govt. of.

Jharkhand

Dy. Sec.

Letter

No.9064(

S) Dt. 24-

12-12

357.44257 408.2948

L/A16.25

(12-13)

100%

100%

M/S Maa Gayatri

Builder

(Chengarjhor river

24.950KM)

2

The construction of Bridge over Bhamni

River at ch. 3.532KM of Murhu-Tapkara

Road (4X24M)

96.00 450.460

Govt. of.

Jharkhand

Dy. Sec.

Letter No.

904(S) Dt.

03.02.14

468.20437 446.2056 95.30% 100%

M/S Ganga Const.

(Bhamni River at

3.532KM)

3

The construction of Bridge over Local Nala

in KM 5th at ch. 4.230 of Murhu (On NH-

75E)- Tapkara- Torpa Road (1X10M)

10.46 140.110

Govt. of.

Jharkhand

Dy. Sec.

Letter No.

156(S) Dt.

08.01.15

122.81507 110.0146 89.58% 100%

RAVI MISHRA

Ethe, Khunti

(Local Nala 5th

KM)

4

The construction of Bridge over Karamgarha Nala

in KM 22nd at ch. 21.325 of Murhu (On NH-75E)-

Tapkara- Torpa Road (1X24M)

24.64 174.580

Govt. of.

Jharkhand

Dy. Sec.

Letter No.

1315(S)

Dt.

20.02.15

166.66636 75.0000 45.00% 95%

M/S ANOKHA

RAM (Karamgarha

Nala 22nd KM)

5

The Constructionof Bridge Over Karo River

At- CH- 32.075 KM of Khunti Torpa

Kolebira Road (7X21.60M)

151.24 511.2140

Govt. of.

Jharkhand

Dy. Sec.

Letter

No.9066(

S) Dt. 24-

12-12

547.94214 534.3462

L/A -

14.75(12-

13)

94%

95%

M/S Maa Gayatri

Builder (Karo

River 32.075KM)

6

The Construction of H.L.Bridge over

Jahirdar Nala In 38Th Km. of Khunti

(2X10M)

20.80 91.3480

Govt. of.

Jharkhand

Dy. Sec.

Letter No.

4085(S)

Dt. 09-07-

11

91.80901 83.6995 91% 90%

Lal Babu Singh

(Jahirdar Nala 38th

KM)

Page 11 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-B

Page 12: PROGRESS REPORT OF ROAD CIRCLE RANCHI NOVEMBER

Month : November, 2016

Sanctioned Scheme Agreement

Name AmountDate/ Ref.

No.Amount

Total

Expendi-ture

(11+13)

% Finan-

cial Ach.

1 2 3 4 5 6 7 8 9 10

Amount in Rs. Lakh

Sl.

No.

Financial Progress (in

Lakh)Length

(m)

Administrative

Approval %

Physical

Achiev-

ement

Name of Contractor

7

Construction of High-Level R.C.C Bridge

(with Approach road) Over Tajna River in 6th

Km. of Khunti-Tamar Road. (3X24M)

73.84

160.807

+43.869

204.676

Govt. of.

Jharkhand

Dy. Sec.

Letter No.

5408(S)

Dt.

04.08.200

8 /

8109(S)

dt. 22-11-

2012

(Revised)

172.26304 189.3252

L/A

7.27376

(10-11) +

11.57144

(11-12)

=18.8452

0,

98%

85%Amit Kumar (6th

KM Tajna River)

8

The Construction of H.L. RCC Bridge over

Narda Nala In 24Th Km. of Khunti-Tamar

road (2X10M)

20.80

104.02

(Revised

A/A)

Govt. of.

Jharkhand

Dy. Sec.

Letter No.

4084(S)

Dt. 09-07-

11

78.72951 86.7079 90% 85%

Lal Babu Singh

(Narda Nala 24th

KM)

9

The construction of Bridge over Chhata

River at Ch. 32.00 km of Hatia – Lodhma –

Karra – Khunti Road (3X18M)

54.00 324.620

Govt. of.

Jharkhand

Dy. Sec.

Letter No.

905(S) Dt.

03.02.14

341.70188 214.2403 62.70% 93%

M/S Kumar & Ray

(Chhata River at

KM 32.00)

10

The Constructionof Bridge over south koel

river At- CH- 14.500 KM of Rania - Soude -

Bano Road (10X24M)

246.00 766.833

Govt. of.

Jharkhand

Dy. Sec.

Letter

No.3759(

S) Dt.

13.05.14

829.73364 687.9829 82.92% 86%

M/S Kumar & Ray

(South Koel in KM

14.500)

11Const. of H.L. Bridge in Dasmile- Chukru – Remta

– Sondasome – Kujuram RoadM/S Ganga Const.

(i) Over Local Nala at ch. 15.400KM (3X21M) 64.84M 52%Over Local Nala at ch.

15.400KM (3X21M)

(ii) Over Remta Nala at ch. 17.400KM (3X24M) 73.84M 45%Over Remta Nala at ch.

17.400KM (3X24M)

(iii)Over Kudagara Nala at ch.21.900KM

(4X10M)42.44M 50%

Over Kudagara Nala at

ch.21.900KM (4X10M)

(iv) Over Kujram river at ch.22.100KM(2X21M) 43.24M 21%Over Kujram river at

ch.22.100KM(2X21M)

12

The construction of Bridge over Changerjhore

River in KM 12th at ch. 11.700 KM of Murhu (On

NH-75E)- Tapkara- Torpa Road (3X21.6M)

64.84 314.520

Govt. of.

Jharkhand

Dy. Sec.

Letter No.

157(S) Dt.

08.01.15

323.07307 40.00 12.38% 35%

M/S Maa Gayatri

Builder

(Chengarjhor river

11.70KM)

1058.05

Govt. of.

Jharkhand

Dy. Sec.

Letter No.

4432(S)

Dt.

24.06.15

665.73321140.43947 58.38%

Page 12 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-B

Page 13: PROGRESS REPORT OF ROAD CIRCLE RANCHI NOVEMBER

Month : November, 2016

Sanctioned Scheme Agreement

Name AmountDate/ Ref.

No.Amount

Total

Expendi-ture

(11+13)

% Finan-

cial Ach.

1 2 3 4 5 6 7 8 9 10

Amount in Rs. Lakh

Sl.

No.

Financial Progress (in

Lakh)Length

(m)

Administrative

Approval %

Physical

Achiev-

ement

Name of Contractor

13

The Construction of 4x21M High Level Bridge in

34th KM over River Tajna in Namkum – Khunti -

Chaibasa – Jaitgarh Road (NH 75-E)

485.910

Govt. of.

Jharkhand

Dy. Sec.

Letter No.

7506(S)

Dt.

30.10.15

487.18966 48.70 10% -M/S Maa Kali

Const.

14Const. of H.L. Bridge in Hatia- Lodma- Karra-

Khunti Road.

M/S Ganga Const.(Const. of

H.L. Bridge in Hatia-

Lodma- Karra- Khunti

Road. )

(i) Over Chhata River In 25th Km 49.24 370.58

Lt. No.

8632(S) Dt.

22.12.15

- - -Over Chhata River In

25th Km

(ii) Over Malgo River In 22nd Km 43.24 257.80

Lt. No.

8633(S) Dt.

22.12.15

- - -Over Malgo River In

22nd Km

(iii) Over Patra Toli River In 18th Km 43.24 291.84

Lt. No.

8634(S) Dt.

22.12.15

- - -Over Patra Toli River In

18th Km

(iv) Over Swarnrekha River In 4th Km 86.40 511.76

Lt. No.

8637(S) Dt.

22.12.15

- - -Over Swarnrekha River

In 4th Km

(v) Over Tajna River In 13th Km 43.24 275.39

Lt. No.

8636(S) Dt.

22.12.15

- - -Over Tajna River In 13th

Km

(vi) Over Tigga River In 16t Km 37.24 308.92

Lt. No.

8635(S) Dt.

22.12.15

- - -Over Tigga River In 16t

Km

15Const. of H.L. Bridge in Khunti- Siladon- Chukru-

Bhusur Road.

M/S Ganga Const.(Const. of

H.L. Bridge in Khunti-

Siladon- Chukru- Bhusur

Road. )

(i) Over Tajna River at ch. 5th KM 72.00 322.270

Lt. No.

857(S)

09.02.16

- - -Over Tajna River at ch.

5th KM

(ii) Over Canal River at ch. 7th KM 20.00 154.470

Lt. No.

859(S)

09.02.16

- - -Over Canal River at ch.

7th KM

(iii) Over Kanchi River at ch. 12th KM 105.00 402.180

Lt. No.

855(S)

09.02.16

- - -Over Kanchi River at ch.

12th KM

(iv) Over Tunju Nala at ch. 21st KM 63.00 253.205

Lt.

No.858(S)

09.02.16

- - -Over Tunju Nala at ch.

21st KM

1418.26 7818.56 8466.32 3590.25

Circle : Ranchi

Div : Ranchi (Rural)

1Construction of High Level Bridge over

Bhorongdih Nala in km 30th (CH. - 29.900) of

Banta-Rahe-Bundu Road.

21.6 201.82224.12.12 /

9065(s)173.35 116.38 67% 60% M/s Nagendra Pandey

Total 201.82 173.35 116.38

1143.93086

2194.38242

Page 13 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-B

Page 14: PROGRESS REPORT OF ROAD CIRCLE RANCHI NOVEMBER

Month : November, 2016

Sanctioned Scheme Agreement

Name AmountDate/ Ref.

No.Amount

Total

Expendi-ture

(11+13)

% Finan-

cial Ach.

1 2 3 4 5 6 7 8 9 10

Amount in Rs. Lakh

Sl.

No.

Financial Progress (in

Lakh)Length

(m)

Administrative

Approval %

Physical

Achiev-

ement

Name of Contractor

Circle : Ranchi

Div : Lohardaga

1

Construction of H.L. R.C.C. Bridge with

approach road over Gamaharia Nala in 36th

km of Kuru-Lohardaga-Ghaghara Road (SH-

8).

55.80 304.482

13.09.12

/

6688 (S)

360.96 215.24 60% 80%

M/s Kashyap

Construction,

Daltonganj

2

Construction of H.L. R.C.C. Bridge with

approach road over Temra Nala in 11th km

of Kesha More (Bero) to Mandar Road.

24.64 229.71

20.02.15

/

1301 (S)

207.63 205.00 99% 100%M/s Jai Mata Dee

Construction, Ranchi

3

Construction of H.L. R.C.C. Bridge over

Sankh River in 16th km of Kuru-Lohardaga-

Ghagra Road (SH-8).

347.473 232.17 67% 3M/s Jai Shokha Baba

Construction Pvt. Ltd.,

Daltonganj

4

Remaining work of Construction of H.L.

Bridge with Approach Road over Sankh

River in 16th km of Kuru-Lohardaga-Ghagra

Road.

178.76 40.88 23% 35%

Sri Gopal Krishna

Choubey,

Garhwa.

5

Construction of Bridge over South Koel

River at 15.940 k.m. of Kesa More-Mandar

Road.

50.00 331.000

19.05.16

/

3197 (S)

323.14 0.00Haque Construction

Company, Ranchi.

6

Construction of H.L. Bridge over South Koel

River (With Approach Road) in 34th km of

Bero-Lohardaga Road.

(Job No. : CRF-JHR-2014-15/38)

172.24 809.047

09.12.14

/

RW/NH -

28014 / 5

2 2005 -

JHR/NH-

3

678.41 0.00

M/s Kashyap

Construction,

Daltonganj

Sub Total 395.68 2026.49 2096.37 693.29

Circle : Ranchi

Div : Simdega

1

Construction of High Level Bridge over Girma

river(Sewai) in Ch. 23rd Km (including construction of

Approach road) of Simdega Sewai -Kinkel-Kurdeg-

Kutumakachhar Upto Chhatisgarh Boarder Road (MDR-

044).

84.00 306.47017.06.15/

4195(S)321.74000 152.14010 47% 65%

Sirha Construction &

Developers (P) Ltd.,

2

Construction of High level RCC Bridge over Local Nala

at Chainage 2.830 KM of Simdega-Jaldega-Hurda-

Girda upto Manoharpur Road (including construction of

approach roads.)

20.00 172.38017.06.15/

4195(S)153.91856 153.90018 100% 100% Dev Kripa Construction

3

Construction of High level RCC Bridge over Local nala

at Chainage 2.960 KM of Simdega-Jaldega-Hurda-girda

upto Manoharpur Road.

10.44 116.87015.03.16/

1813(S)103.04530 0.00000 0% -

Superior Costruction Pvt.

Ltd.-

4

Construction of High level RCC Bridge over Bergarha

Nala in Chainage at 7+850 of Simdega-Jaldega-Hurda-

girda upto Manoharpur Road (including construction of

Approach roads).

49.24 234.03015.03.16/

1814(S)204.32345 28.57268 14% 30% Dev Kripa Construction

5

Construction of High level RCC Bridge over Devlakar

river at KM 12.183 of Simdega-Jaldega-Hurda-girda

upto Manoharpur Road (including construction of

Approach roads).

64.84 228.00015.03.16/

1812(S)200.21440 0.00000 0% 20%

Rameshwaram Projects Pvt.

Ltd.

228.52 1057.75 983.24171 334.61296

93.00 352.249

31.10.12

/

7677 (S)

Sub Total

Page 14 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-B