Month : November, 2016 Amount in Rs. Lakh
Sanctioned Scheme Agreement
Name Amount Date/ Ref. No. Amount
Total
Expendi-
ture
(11+13)
% Finan-
cial Achie-
vement
1 2 3 4 5 6 7 8 9 10
Circle : Ranchi
Div : Ranchi
1
OngoingReconstruction of Itki to Brambey via Rani Khatanga
Road from Km 0.00 to 16.35 for the year 2014-15.
Bridge-Ch- 8475 - 3x24Mx12M
Ch- 14525 -2x24Mx12M
16.35 4500.3459110 (S)
Dt. 26.12.144218.35 3070.73 73% 82%
M/S Vijeta Projects & Infra
Structure Pvt. Ltd.
West Morabadi, Ranchi
2
Reconstruction of Mander Chowk (on NH-75) to
Burmu Road from Km 0.00 to 14.80 for the year
2014-15.
Bridge-Ch- 10975 - 1x16Mx12M
Ch- 13250 -3x24Mx12M
Ch- 9825 - 2x21Mx12M
14.80 3801.999135(S)
Dt. 26.12.143372.01 3735.00 111% 100%
M/S Ganga Construction &
Puja Enterprises Joint
Venture, Piskamore, Hehal,
Ranchi
3
Widening and strengthening of Kanthitanr (Hurhuri More)
to Thakurgaon Road from Km 0.00 to 10.400 for the year
2015-16
Bridge-
8th KM- 1x16Mx12M
10.40 3222.0794868(S)
13.07.152784.94 2600.00 93% 98%
M/S Spica Projects and
Infrastructures Pvt. Ltd.
Ashok Kunj, Opp. Road No.-
3,
Ashok Nagar, Ranchi
4
Widening and Strengthening of Intake well more
(11th Km of Ormanjhi-Sikidri Road) to Getalsud Dam
Road for the year 2015-16.2.90 464.232
8177(S)
Dt.04.12.15414.91 220.00 53% 80%
M/S Sambhu Singh
Radium Road, Sahu Nursing
Home,
Ranchi
5
Widening and Strengthening/ Reconstruction of
Chama Chowk to Mccluskieganj - Damodar Bridge
Road from KM 0.00 to 18.350 for the year 2015-16. 18.35 3361.0408389(S)
11.12.153166.67 2072.00 65% 90%
M/S Spica Projects and
Infrastructures Pvt. Ltd.
Ashok Kunj, Opp. Road No.-
3,
Ashok Nagar, Ranchi
6Construction of Peripherial Roads near Jaganathpur
and Mausibari Mandir (Length 3.645 KM) for the
year 2015-16.
3.645 667.32RCD Lt. No. 2000
Dt.21.03.16631.58 555.05 88% 100%
M/S Ganga Construction,
Abadganj, Daltonganj.
7
Widening & Strengthening of Road from Thakur
Vishwanath Shahdeo Chowk (Dhurwa Golchakkar) to
road intersection prior to Dhurwa Bus stand
including link road to Engineers Hostel No. 1 & 2,
link road to JSCA Stadium and link road to CDO, RCD
office Jharkhand, Ranchi for the year 2015-16.
3.60 752.7073675(S)
27.05.15682.85 270.00 40% 75%
Sri Arvind Kumar Singh
Dhurwa, Ranchi
8
Reconstruction of Burmu (on Pithoria- Burmu- Rai
Khelari Road)– Umedanda- Hendgir Road (including
construction of Bridges) (Total Length-20.380 Km)
for the year 16-17.
Bridge -
Ch- 0.640 - 3x18Mx12M
Ch- 6.325 - 1x18Mx12M
Ch-18.035 1x12Mx12M
20.38 6220.003567(S)
Dt. 06.06.164788.13 450.00 9% 20%
M/S Spica Projects and
Infrastructures Pvt. Ltd.
Ashok Kunj, Opp. Road No.-
3,
Ashok Nagar, Ranchi
9Widening and Strengthening of Siram Toli Chowk
(RRB Ranchi) to Ram Mandir (Chutia) for the year
2016-17.
0.6 48.09 4236 (S) Dt. 11.07.16 42.4767 0.00 0% 10%Sri Ramashankar Yadav,
Virsa Chowk, Hinoo, Ranchi
10 Widening and Strengthening of Judicial Academy to
Nagri Railway Crossing via- Balalong, Kudlong road
(Length 8.70 Km) for the year 2016-17.
8.700 2353.22RCD Lt. No. 3853
Dt. 20.06.162150.87
M/S Ganga Construction
Daltonganj
11
Improvement of Riding Quality Pavement of Mangla
Hat to JSCA Stadium Road (Total Length 2.60 Km)
and Road furniture work in JSCA Peripheral Road for
the year 2016-17
2.60 222.91RCD Lt. No. 6569
Dt. 14.10.16228.80 228.00 100% 90%
Sri Arvind Kumar Singh,
Dhurwa, Ranchi
12
Widening and Strengthening of Chandni Chowk,
Hatia (at MDR-011) to Ring Road (Tonko Toli)
road for the year 2016-17. 3.475 1052.64RCD Lt. No. 3930
Dt. 22.06.17681.575
M/S Arunaditya Projects and
Mineral
188 C, Vidyalaya Marg,
Ashok Nagar,
Ranchi-834002.
13DelayedReconstruction of Meshra-Pithoria Road from Km
0.00 to 11.00 for the year 2015-16.
11.00 4076.0774515(S)
25.06.152742.00 1780.00 65% 85%
M/S Vijeta Projects & Infra
Structure Pvt. Ltd.
West Morabadi, Ranchi
14
Reconstruction of Shaheed Maidan Dhurwa to
Jharkhand Vidhan Sabha via Vivekanand Vidya
Mandir, Russion Hostel and Sudha Dairy Farm Road
from Km 0.00 to 1.860 for the year 2015-16.
1.87 325.77RCD Lt. No. 1721
Dt.11.03.16287.09 125.00 44% 80%
M/S Dilip Kuma
Sector-II, Dhurwa, Ranchi
DPW-R
ROAD CONSTRUCTION DEPARTMENT, JHARKHAND
(State Highways Wing)
Progress report of On-going works(Roads-Plan)
%
Physical
Achiev-
ement
Financial Progress
(in Lakh)
Name of ContractorSl.
No.
Length
(Km)
Administrative Approval
Page 1 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R
Month : November, 2016 Amount in Rs. Lakh
Sanctioned Scheme Agreement
Name Amount Date/ Ref. No. Amount
Total
Expendi-
ture
(11+13)
% Finan-
cial Achie-
vement
1 2 3 4 5 6 7 8 9 10
%
Physical
Achiev-
ement
Financial Progress
(in Lakh)
Name of ContractorSl.
No.
Length
(Km)
Administrative Approval
15
Widening and Strengthening of Nayasarai- Argora
Road from KM 0.00 to 5.8 including construction of
Bridges in 2nd and 5th KM for the year 2013-14.
Bridge
2nd KM 1x21Mx12M
5th KM 1x16Mx12M
5.80 3576.887628(S)
Dt. 13.10.141595.92 1617.30 101% 80%
M/S Quiyamuddin Khan
Engineers Pvt. Ltd.
Jamshedpur-
16
Widening and Strengthening of (A) Firayalal to
Karamtoli Chowk Road from Km 0.00 to 2.10 (B) SBI
Main Branch to Kutchery Chowk (Santoshi Mata
Mandir Chowk) Road (C) Kanke Ram Mandir to DC
Residence Part from 0.00 to 1.35 Km (Morabadi
State Guest House) (D) ATI More to Ram Mandir
Road from KM 0.00 to 0.60 for the year 2015-16.
4.45 1411.27
Lt. No3220 (S) Dated 11-05-
2015, No2978 (S) Dated 01-
05-2015, No 2975(S) Dated
01-05-2015 & No2976 (S) 01-
05-2015
1448.36 956.02 66% 90%M/s Rajesh Construction,
Mumbai.
17
Reconstruction of Harmu Road to Telephone
Exchange Road via Avdhoot Ashram, Seva Sadan,
Jalan Timber for the year 2015-16.2.20 383.937
Dy. Sec. Lt. No. 8984(S)
16.12.15338.5 232.54 69% 72%
M/S Sambhu Singh
Radium Road, Sahu Nursing
Home,
Ranchi
18
Widening and Strengthening of Lalganj- Tatisilwey
Road from KM 0.00 to 3.20 for the year 2015-16.3.20 1506.00
5527(S)
05-08-151412.01 1022.08 72% 75%
Mohammad Quiyamuddin
Khan Engineers Private
Limited, Jamshedpur
19
Reconstruction of Crocodile Park Road from 8th KM
of Ormanjhi- Sikidri Road to Crocodile Park for the
year 2015-16. 3.650 829.345060(S)
20.07-2015686.58 350.00 51% 80%
M/S Apex Engicon Pvt. Ltd.
H. No.- 226/R-11,
Vidyapati Nagar, Gandhi
Nagar,
Ranchi
20Construction of Ranchi Ring Road (Section-VII) to
Jaguar Forces premises Approach road from Km 0.00
to 0.550 for the year 2015-16.
0.550 160.329Joint Sec. Lt. No. 19(S)
Dt.04.01.16136.55 11.70 9% 10%
M/S KNP Singh,
Khelari.
21
Reconstruction of Ranchi - Bariatu (MDR-004) to
Gymkhana Club (Vikash - Booty More- Kantatoli
Chowk Part of Old NH-33 of Ranchi Township) via
Mahabir Medica Hospital including Drain for the
year 2015-16.
0.975 244.552Joint Sec. Lt. No. 8790(S)
Dt.31.12.15218.019 105.00 48% 85%
M/S Arohan Builders
Krishna Puri, Ranchi
22
Rest WorkWidening and Strengthening of (A) Jharkhand High
Court Periferal Road (B) Old AG More (Central
School) to Jhalsa via Judge Colony and from New AG
More to Shyamali More Road for the year 2015-
2016.
3.50 611.86
7110(S)
12.10.15
&
7112(S)
12.10.15
(Combined)
588.15 139.51 24% 100%
M/S Altima Infrastructure
Pvt. Ltd.
351 A, Road No.-5, Ashok
Nagar, Ranchi
23Widening and Strengthening of Itki Road to Shayma
Prasad Mukhargee Nagar West End Park Link Road
for the year 2015-16.
1.36 285.1567446(S)
Dt. 29.10.15262.26 238.095 91% 95%
M/S Dilip Kuma
Sector-II, Dhurwa, Ranchi
24IRQP work of NH-33 to BIT Meshra Gate from km
0.00 to 2.50 for the year 2015-16.2.50 136.193
8083(S)
Dt. 01.02.15121.45 121.45 100% 100%
M/S Khanna Conctruction
Co, Circular Road, Ranchi
25(i)
Widening and Strengthening of Road Package No.-1
in Ranchi Urban area (Birsa Chowk to Rajendra
Chowk Road via Hinoo) including improvement of
Drainage System for the year 2014-15.
3.34 13224.75 1825(S) Dt. 03.03.14 1748.05 1186.70 68% 85%M/S Vijay Kumar Sahu
Khunti
25
(ii)
Widening and Strengthening of Road Package No.-2
in Ranchi Urban area (i. Tagore Hill Road Divyayan
more to RIMS ii. Main Road Urdu Library to
Koshoregunj Chowk via Ranchi Lake Road iii. Pahari
Mandir Road and Rani Sati Mandir Road to Harmu
Road iv. Sahid Chowk to Raj Bhawan via Gandhi
Chowk (Pustak Path) including improvement of
Drainage System for the year 2014-15.
8.01 1809.72 808.46 45% 90%M/S Vijay Kumar Sahu
Khunti
25
(iii)
Widening and Strengthening of Road Package No.-3
in Ranchi Urban area (i. Shahid Chowk to Harmu
Road via Nehru Park (JJ Road) ii. Shajanand Chowk to
Kadru via AG Colony iii. Sahjanand Chowk to Harmu
Chowk via Patel Chowk iv. Harmu Chowk to Bharat
Mata Chowk via Mukti Dham v. Construction of
Kadru to Hindpiri Road with Bridge over Harmu Nala
vi. Justice LPN Sahdeo Chowk to Durga Mandir
Chowk (Ratu Road)) including improvement of
Drainage System for the year 2014-15.
4.67 2029.72 1121.75 55% 80%M/S Vijay Kumar Sahu
Khunti
25
(iv)
Widening and Strengthening of Road Package No.-4
in Ranchi Urban area (i. Tupudana (Singh More) to
Latma Road ii. Mausibari Gol Chakkar to Site-IV
iii. Dhurwa Chech Post to Ranchi Bypass including
improvement of Drainage System for the year 2014-
15.
3.70 1956.83 1834.53 94% 98%M/S Vijay Kumar Sahu
Khunti
Page 2 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R
Month : November, 2016 Amount in Rs. Lakh
Sanctioned Scheme Agreement
Name Amount Date/ Ref. No. Amount
Total
Expendi-
ture
(11+13)
% Finan-
cial Achie-
vement
1 2 3 4 5 6 7 8 9 10
%
Physical
Achiev-
ement
Financial Progress
(in Lakh)
Name of ContractorSl.
No.
Length
(Km)
Administrative Approval
25
(v)
Widening and Strengthening of Road Package No.-5
in Ranchi Urban area (i. Bargain Basti Road ii. RIMS
Bijli Chowk to Cheshire Home Road via Joratalab iii.
Bahu Bazar Chowk to Namkom Thana iv. Udhav
Babu Lane to Kamil Bulke Road) including
improvement of Drainage System for the year 2014-
15.
2386.92 2219.06 93% 90%
M/S Ganga Construction
Abadganj, Daltonganj,
Palamu
25
(vi)
Road Package No.-6 in Ranchi Urban area
(i. Construction of Drain cum Footpath-Main Road ii.
Rehabilitation of Over bridge iii. Widening and
strengthening of Kali Mandir-Church Road to Bahu
Bazar Road) including improvement of Drainage
System for the year 2014-15.
1912.6 1272.86 67% 85%
M/S Ganga Construction
Abadganj, Daltonganj,
Palamu
26
Widening and Strengthening of Karamtoli Chowk to
Potpotto River for the year 2012-13.4.15 2911.62 1773(s) 03.03.2014 1113.33 684.23 61% 85%
M/S Quiyamuddin Khan
Engineers Pvt. Ltd.
Jamshedpur-
27
Widening and Strengthening of Brambe (on NH-75)-
Thankur Gaon -Ithe (Near Burmu) Road from KM
0.00 to 8.525 for the year 2014-15 8.53 1888.7051543(S)
02.03.151709.72 1718.12 100% 100%
M/S Spica Projects and
Infrastructures Pvt. Ltd.
Ashok Kunj, Opp. Road No.-
3,
Ashok Nagar, Ranchi
28Widening and Strengthening of Birsa Rajpath (New
Market Chowk to HEC Gate Chowk) for the year
2013-14.
7.80 20266104(S)
dt 14.08.20142038.10 1732.62 85% 87%
M/S Ram Kripal Singh
Construction Pvt. Ltd. ,
Ranchi
29Strengthening of Ranchi Bariatu Road (LPN Sahdeo
Chowk to Booty More Road) from KM 0.00 to 7.95
for the year 2014-15.
7.95 2243.8279128(S)
26.12.142253.97 1558.96 69% 62%
M/S Ram Kripal Singh
Construction Pvt. Ltd. ,
Ranchi
30Widening and Strengthening of Argora Chowk to
Kadru More Road for the year 2015-16.3.00 1153.425
3673(S)
27.05.151187.67 936.28 79% 95%
M/s Rajesh Construction,
Mumbai.
31
Widening and Strengthening of Kathal More Daladali
Kanthi Tand Road from Km 0.00 to 4.80 for the year
2015-16.4.80 365.565
3035(S)
05.05.15340.31 340.31 100% 110%
M/S Sambhu Singh
Radium Road, Sahu Nursing
Home,
Ranchi
32
Widening and Strengthening of Vidhan Sabha to
Nayasarai (on Ring Road) Road from Km 0.00 to
6.160 for the year 2015-16. 6.16 3922.2663382(S)
18.05.151996.24 2604.22 130% 70%
M/S Spica Projects and
Infrastructures Pvt. Ltd.
Ashok Kunj, Opp. Road No.-
3,
Ashok Nagar, Ranchi
33Widening and Strengthening of Beerkunwar Singh
Chowk to Judicial Academy Road from km 0.00 to
2.730 for the year 2015-16.
2.73 945.055 6124(S) Dt. 25.08.2015 950.04 1099.01 116% 98%M/S Puja Enterprises
Simariya, Chatra
34Widening and Strengthening of Beerkunwar Singh
Chowk to Sitio Bridge Road from KM 0.00 to 1.40 for
the year 2015-16.
1.40 420.942 6079(S) Dt. 24.08.15 394.07 399.02 101% 98%Sri Arvind Kumar Singh,
Dhurwa, Ranchi
35Widening and Strengthening of Khadgarha Bus
Stand Approach Road (Total length 0.700 km) for the
year 2015-2016.
0.70 298.6295945(S)
19.08.15302.95 275.00 91% 95%
Sri Laxmi Narayan jaiswal,
Sisai, Gumla.
36
4 Laning work of Birsa Chowk to Tupudana Chowk
Road with construction of 3 nos bridges for the year
2012-13.
Bridge (3 Nos)
(i) CH-1786 (1x10M)
(ii) CH-4248 (1x10M)
(iii) Ch-5101 (3x18M)
7.55 3929.251722(S)
Dt. 04.03.133786.1 5785.38 153% 98%
M/S Ram Kripal Singh
Construction Pvt. Ltd. ,
Ranchi
37
Widening and Strengthening of Namkum to Doranda
Road from Km 0.00 to 6.700 (Four Lane) with
construction of Bridge Over Subernarekha river for
the year 2013-14.
Bridge (1 No.)
CH-1700 (5x24M)
6.70 3037.898127(S)
05.09.132473.42 2798.69 113% 90%
M/S Ram Kripal Singh
Construction Pvt. Ltd. ,
Ranchi
38Widening and Strengthening of Dangratoli chowk to
Kantatoli Chowk Road with Drain and Footpath work
for the year 2015-16.
0.60 230.3036901(S)
Dt.05.10.15204.65 128.87 63% 90%
M/S Sahazadi Construction
Ranchi
39Widening and Strengthening of Khel Gaon Mega
Sports 4/2 Lane Road from KM 0.00 to 3.80 for the
year 2015-16.
3.80 979.686285(S)
03.09.15888.74 977.61 110% 98%
Sri Arvind Kumar Singh
Dhurwa, Ranchi
40Widening and Strengthening Work in road from NH-
33 to Sampression Grih near Jumar River for the year
2016-17.
6.691RCD Lt. No. 3741
Dt. 14.06.166.69 6.38 95% 75%
Sri Ramashankar Yadav,
Virsa Chowk, Hinoo, Ranchi
41Widening and Strengthening of Approach Road of
Women Probation Home, Namkum, Ranchi the year
2016-17.
18.57RCD Lt. No. 3741
Dt. 14.06.1618.57 17.01 92% 100%
Sri Sunil Kumar
Old Bazar Lane, Morabadi,
Ranchi
42Widening and Strengthening of Kathal More to
Argora Chowk from km 0.00 to 5.31 for the year
2011-12.
5.314 5853.483008(s)
Dt. 26.5.111354.58 4635.4500 87% 35%
Sri Santosh Kumar Singh,
Ranchi
43Construction of Bridge Over Sathiyari Nala in 17th
KM of Kathitand-Pithoria Road for the year 2012-13.2x10M=2
0M7675.49
7472(s)
dt. 14.11.11125.824 112.14 89% 65% M/s Lowkesh Singh
Page 3 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R
Month : November, 2016 Amount in Rs. Lakh
Sanctioned Scheme Agreement
Name Amount Date/ Ref. No. Amount
Total
Expendi-
ture
(11+13)
% Finan-
cial Achie-
vement
1 2 3 4 5 6 7 8 9 10
%
Physical
Achiev-
ement
Financial Progress
(in Lakh)
Name of ContractorSl.
No.
Length
(Km)
Administrative Approval
44Construction of Bridge Over Jumar River at KM
12.600 of Kathitand Pithoria Road for the year 2012-
13.
3x18.6M
=54M
7472(s)
dt. 14.11.11255.105 162.11 64% 80%
M/s Indian Electrical
Services, Daltonganj.
45Remaning work of Widning and strengthening of
Kanke Bazar Tand (PWD) to Block chowk
Boriya(PWD) for the year 2011-12.
3.90 2373.1751284(S)
22.02.12584.86 2633.17 450% 93%
M/s Khanna Construction,
lalpur, Ranchi
46IRQP Work from Project Building to Chandni Chowk
from Ch 0.00 to 0.950M for the year 2015-16. 0.950 74.4666037(S)
22.08.1566.23 72.85 110% 100%
M/S Jaimata Dee
Construction
Piska More, Ranchi
47Improvement of Harmu Chowk in New Market (Ratu
Road) to HEC gate Road (MDR-015) in Ranchi Town
for the year 2012-13.
295.931512(S)
23.02.130
M/S A.S. Construction,
Medni Nagar, Daltonganj.
48Improvement of different chowk (New Market
Chowk and Booty More Chowk) in Ranchi Town for
the year 2015-16.
58.766936(S)
06.10.1517.85
M/S Green Power Project,
Haru Road, Ranchi
49
Improvement of Junction at Kathitanr
Chowk (Jn. of Ranchi- Daltonganj Road NH-75 and
Kanthitand- Daladali- Kathalmore
Road MDR-012), Ranchi for the year 2012-13.
62.891515(S)
23.02.1338.5 39.62 #REF! 69%
M/s Bhawani Construction,
Daltonganj.
50Improvement of Sahajanand Chowk in Ranchi town
for the year 2012-13.459.2
1510(S)
23.02.1363.1 83.79 #REF! 95%
M/s R & R Construction,
Ranchi
51
Improvement of Kathalmore Chowk at Junction of
NH-23 ( anchi- Gumla Road) and Argora Chowk to
Kathal More Road (MDR-018) in Ranchi Town for the
year 2012-13.
724.611617(S)
02.03.130.00 #REF!
52Improvement of Karamtoli Chowk, Ranchi for the
year 2012-13.69.92
1509(S)
23002.1344.51 5.13 #REF! 7% Sri Mukesh Kumar, Palamu
53Improvement of Junction at Randhir Verma Chowk,
Ranchi for the year12-13.70.31
1507(S)
23.02.1326.76 2.47 #REF! 4% Sri Mukesh Kumar, Palamu
54Balance work for Improvement of Karamtoli Chowk,
Ranchi for the year 2012-13.69.92
1509(S)
23002.13
M/S A.S. Construction,
Medni Nagar, Daltonganj.
55
Tender ProcessConstruction of Drain from NH-33 Kunchi Sweet
House (Near Booty More) to Choudhary Petrol Pump
via Mahadeo Tola and from NH-33 Pitamber Place to
Mahadeo Tola via Ohdar Basti for the year 2016-17.
429.540RCD, Lt. No. 4117 Dt.
01.07.16
56
Widening and Strengthening of Harmu Chowk (On
MDR-015) to Chapu Toli (on MDR-018) via Sant
Francis School Road (Total Length 2.565 KM) for the
year 2016-17.
806.45 4281(S) Dt.13.07.16
M/S Jai Maa Kali
Constrution, Abadganj,
Daltonganj.
57
Widening and Strengthening of Birsa Munda Airport -
Namkum (Kutiatu More, on NH-75 Ext. ) via Hetu,
Tumbagutu Road for the year 2016-172830.34
5173(S)
Dt.16.08.16
58
Widening and Strengthening ITI Bus Stand (NH-23 to
St. Fransis School Road) road for the year 2016-17.
1677.005430(S)
24.08.16
M/S Arunaditya Projects and
Mineral
188 C, Vidyalaya Marg,
Ashok Nagar,
Ranchi-834002.
59Construction of Ranchi Ring Road(Section-7) to
Central University of Jharkhand from Km 0.00 to
1.78 for the year 2015-16.
1.78 1372.716902(S)
Dt. 05.10.150
M/S Jaimata Dee
Construction
Piska More, Ranchi
60
Construction of proposed ROB with approaches in
Lieu of LC no. RL-5 at RLY KM 427/2-3 between
Ranchi and Piska Stations. For the year 2016-17.2119.00
4880(S)
Dt.4-8-16
61
Provision of Road Appurtenances and Road Work
for traffic safety of Ranchi Railway Station to Kanta
Toli Chowk , Ranchi Railway station to Siram Toli
Chowk & Birsa Munda Airport (Ranchi) to Siram toli
road (Total Length 9.647) for the year 2016-17.
525.298246(S)
Dt.11.11.16
62
Improvement of riding quality & other allied work at
Khelgaon Mega Sports Complex road on the
occasion of Global Investors Summit for the year
2016-17.
557.388526(S)
Dt.25-11-16
63Reconstruction of Road from Dhurwa Site-4 (Tempo
Stand) to Sail City Road (Length 1.175KM) for the
year 2016-17.
596.098121(S)
Dt.09-11-16
64
Fund Transferred
Reconstruction, Widening and strengthening and improvement of work
two lane / two lane with paved shoulder as per standard of 9 (nine)
roads and by pass (Total length 335.08 KM) from the credit of Asian
Development Bank under External sponsored progranne (Including land
acquisition, rehabilitation & resettlement, Environmental protection,
forest land acquisition monitoring etc.) to be constructed by State
Highway Authority of India.
UNDER HEAD
41P505403337080545
203600.00 4500.00 SHAJ
Page 4 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R
Month : November, 2016 Amount in Rs. Lakh
Sanctioned Scheme Agreement
Name Amount Date/ Ref. No. Amount
Total
Expendi-
ture
(11+13)
% Finan-
cial Achie-
vement
1 2 3 4 5 6 7 8 9 10
%
Physical
Achiev-
ement
Financial Progress
(in Lakh)
Name of ContractorSl.
No.
Length
(Km)
Administrative Approval
65
Reconstruction, Widening and strengthening and improvement of work
two lane / two lane with paved shoulder as per standard of 9 (nine)
roads and by pass (Total length 335.08 KM) from the credit of Asian
Development Bank under External sponsored progranne (Including land
acquisition, rehabilitation & resettlement, Environmental protection,
forest land acquisition monitoring etc.) to be constructed by State
Highway Authority of India.
UNDER HEAD
41P505403796080545
203600.00 4500.00 SHAJ
66Construction work of Ranchi Ring Road Section-VII (NH-75 Ranchi-
Daltonganj Section to Karma) (Karma NH-33 Ranchi Hazaribagh Section)
(for Land Acquisition Work).
2278.60
67Under (Jharkhand Accelerated Road Development Programme, JARDP)
Ring Road (Section-VII)) (Packaged ID-RRR-VII) for Electric Utility Shifting 284.283742(S)
Dt. 14.06.16284.28 JSEB
68Construction of ROB at KM 358/31-33 on Level Crossing No.- MH-4 in
between Hatia-Muri Railway Station of Hatia Muri Road (SH-1) for the
year 2015-16.
1597.27409(S)
18.01.16200.00 S.E. Railway
69Construction of ROB at KM 411/23-25 on Level Crossing No.- MH-23 in
between Namkum-Tatisilway Railway Station of Ranchi- Muri Road (SH-
1) for the year 2015-16.
1783.03413(S)
18.01.16200.00 S.E. Railway
70Construction of ROB at KM 408/5-7 on Level Crossing No.- MH-21 in
between Namkum-Tatisilway Railway Station of Ranchi- Muri Road (SH-
1) for the year 2015-16.
1648.52412(S)
18.01.16200.00 S.E. Railway
71Wideing of ROB at KM 423/30-32 near Birsa Chowk in between Ranchi-
Hatia for the year 2014-15. 442.601319(S)
20.02.15442.60 S.E. Railway
Total 244.38 519474.74 67085.78 69756.76 Total
Circle : Ranchi
Div : Gumla
1W/S Manoharpur-Anandpur-Bano-Kolebira
Road (SH 4 ) Km. 26.4 to 55.4 ) [i]29.00 8673.91
7978 (S)
24-12-073409.44 3430.72 100.00 100.00
Khokhar Infrastructure
Pvt. Ltd. Tata Road,
Chaibasa
2
W/s of Palkot (on NH-23) Nathpur-Konbir
(on SH-03) in Km. 00 to 16.84
16.84 2626.61 2995(s) 25.03.13 3147.56 3338.16100.00
100.00M/s Satish Prasad ,
Mahuadanr
3W/S of Kamdara-Bero Road (MDR-34) in
Km 0 to 23.6 23.46 2348.43 2245(S) 14.03.13 2867.28 2650.00 92.42 98.00VKS-AKS-AIPL (JV) Pipra
Toli, Khunti 835210,
Jharkhand
4
W/S of Nathpur -Bharda -Tukutoli -
Baghima in km. 0 to 20.750 alongwith with
bridge in different km.
20.75 4843.812005(S)
20.03.154618.86 1728.00 37.41 35.00
M/S Shivalaya Const. Co.
Pvt. Ltd,359,sector-14,
Rohtak-124001
5
Construction of Check Naka near
Manjhatoli on NH-78 on Jharkhand-
Chhattisgarh Border1.612 976.018
3223(S)
dt11.05.15934.567 856.375 91.63 93%
Vinod Kumar Jain
Jashpur ,
Chhattisgarh
6
widening strengthning of Banari-Banalat
road including Bridge (Total length 14.20
km)
14.20 3706.2646342(S)
dt.08.09.153531.95 1006.91 28.50 32%M/s Satish Prasad , Mahuadanr
7
Widening and Strengthening of Dumri-
Govindpur Road from km 0.00 to 24.100
including bridges ( Total Length-24.100
km)
24.10 6366.006577(S)
21.09.156451.27 825.00 12.78 12%
M/s Sivalaya Cont. Co.
Pvt. Ltd.
Sector-14, Rohatak
8
Reconstruction of Manjhatoli (NH-78) -
Birkera - Kondra Road From Km 0.00 TO
21.600 including Bridges. ( Total Length-
21.600 km)
21.60 4162.9446580(S)
21.09.154158.24 1905.21 45.81 35%
M/s Sivalaya Cont. Co.
Pvt. Ltd.
Sector-14, Rohatak
9
Widening and strengthening of Bakutoli(SH-
03) Kurkura-Bano Road (km 0 to 34.650) 34.65 5629.8207870(S)
23.11.15
5661.38911.91 16.1 20%
M/s Vinod Kr. Jain
Jashpur, Chhattisgargh
10
Widening and Strengthening of Sisai -
Bhandra Road (Total Length 26.420 km)
26.42 4736.1518392(S)
11.12.154706.62 1411.72 29.99 35%
VKS-Altima
Infrastructure Private
Ltd.(JV) 351A,
Road No.-5
Ashok Nagar, Ranchi
11
Widening and Strengthening/ reconstruction
of Toto to Anjandham Road (Total length
9.350 km) 9.35 1963.620
788(S)
05.02.161944.24 892.98 45.42 45%
Altima Infrastructure
Private Ltd.
351A, Road No.-5
Ashok Nagar, Ranchi
12
Reconstruction of Kumhari to Jhatnitoli via
Nawadih Road 26.878 5328.400514(S)
dt. 22.01.165282.91 608.30 11.51 10%
M/s Sivalaya Cont. Co.
Pvt. Ltd.
Sector-14, Rohatak
13
Reconstruction of Bharno Block Chowk
(NH-23) to Chatti (SH) Lohardaga Path
(Total Length- 11.600 km)
11.600 2564.1262172(S)
dt. 31.03.161780.099 8%
M/s Dewanti
Construction
Sisai road,Gumla
Page 5 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R
Month : November, 2016 Amount in Rs. Lakh
Sanctioned Scheme Agreement
Name Amount Date/ Ref. No. Amount
Total
Expendi-
ture
(11+13)
% Finan-
cial Achie-
vement
1 2 3 4 5 6 7 8 9 10
%
Physical
Achiev-
ement
Financial Progress
(in Lakh)
Name of ContractorSl.
No.
Length
(Km)
Administrative Approval
14
Widening and Strengthening of Kurgi
Lalpur (on Sisai-Bhandra road)-Puso-
Korambo (on NH-143A/SH-08) Road
(Total Length-13.100km)
13.100 2392.0003429(S)
dt. 01.06.16 SSVM Const. Pvt. Ltd.
15Preparation of Five no. DPR under RCD,
Gumla 133.00
Intregrated
(RCD)
427.33
12.23
4427(S) 10.05.13
7691(s) 15.10.1431.03 24.557 79.14
Ayolleza Consultant
Pvt. Ltd.
Sub Total 406.56 56318.10 42864.07 19589.84
LWE
Original Revised Amt in Cr. %As per
SBD%
1 2 4 5 6 9 14 15 26 17
1
Widening and strengthing of Sisai - Basia Road from Km.
0.00 to 37.775 (Widening to Intermediate lane and
Improvement of Sisai-Basia Road)
LWE-JH-
2011-12-
205
39.09 47.26 45.32 14.48 32.00
Tipper
Trucks-15
Motor
grader-3
Dozer-01
Front End
Loader-02
Smooth
Wheel
Roller-03
Vibratory
Roller-02
HMP with
electronic
controls-
01
Paver
Finisher-
01
Water
Tanker-04
bitumen
Sprayer-01
Tandem
Roller -01
Concrete
mixers
with
integral
weight
batching
facility-01
Concrete
Batching
30.4
5
2
Remaining work of strengthing and Widening of Sisai -
Basia Road from Km. 0.00 to 37.775 (Widening to
Intermediate lane and Improvement of Sisai-Basia Road
from Km. 0.00 to 37.775 )
LWE-JH-
2011-12-
205
41.77
Circle : Ranchi
Div : Khunti
1
Reconstruction of Dasmile - Chukru -
Remta - Sonadasome - Kujuram Length
22.200
22.200 6105.893letter No. 7025(S)
dt. 08.10.153857.897 4413.254
PHED-
9.16 lac
Electrial-
89.48 lac
L/A-
400.00
lac
Total-
498.64
Lac
100%
100%
M/S GC PE (Jv) (
Dasmile - Chukru-
Remta - Sonadasome -
Kujuram Road)
Total:- C.D. work-41
Sl.
No.Name of Work
Awarded Cost (Rs. in
Cr.)
Cumulative Financial Comulative Physical Progress upto
Sub Total
Sanctioned cost (Rs. in Cr.)Awarded Cost (Rs. in
Cr.)Job No.
Page 6 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R
Month : November, 2016 Amount in Rs. Lakh
Sanctioned Scheme Agreement
Name Amount Date/ Ref. No. Amount
Total
Expendi-
ture
(11+13)
% Finan-
cial Achie-
vement
1 2 3 4 5 6 7 8 9 10
%
Physical
Achiev-
ement
Financial Progress
(in Lakh)
Name of ContractorSl.
No.
Length
(Km)
Administrative Approval
2
Widening Strengthening / Reconstruction of
Khunti - Siladone - Chukru - Bhusur Road
Length 28-205KM
28.205 4579.37letter No. 8099(s)
dated 05.09.134411.126 4865.371
PHED-
9.73 lac
Electrial-
44.34 lac
Tota-
54.07
Lac
100% &
P.A
100%
M/S VKS-AKS-
AIPL(JV), Siladone,
Khunti (Khunti -
Siladone - Chukru -
Bhusur Road)
Total:- C.D. Work-47,
HP Culver- 19
3Widening & Strengthening of Hatia
Lodhma Karra Khunti Road 43.76 5902.917
letter No. 351(s)
dated 17-01-125484.577 6009.143
L/A
&U/S-
634.9442
0
91.15%
100%
M/S K.P.C. Project
Limited, (B.V.
Sambasiva Rao), Gagan
Mahal, Domalguda,
Hyderabad (Hatia -
Lodhma - Karra -
Khunti Road)
Total :- C.D. 47
4
Improvement of riding qualioty of Huser
hatu to Dasam fall & kujram to Dasmfall
Road (6.7+2.620) KM
9.320
KM472.705
letter No. 7113(s)
dated 12.10.2015487.738 468.031 96.0% 100%
Vijay Kumar Sahu
Infrastructure Pvt. Ltd.
(Improvement of riding
qualioty of Huser hatu
to Dasam fall & kujram
to Dasmfall Road)
5Widening and Strengthening of Kamdara -
Bero Road From KM 23.46 to 51.125 27.665 4091.25
Govt. of India No.
RW/NH-
28014/2/2013/JHR/
P-3 (CRF) dt.
02.01.14
4611.513 3405.08 73.8% 90%
M/S Ksheeraabd
Construction Pvt. Ltd.
Banjara Hills,
Hyderabad
( Kamdara - Bero Road
) Total:- C.D.
work-18
6Reconstruction of Murhu - Tapkara - Torpa
Road KM 0 to 27.07027.07 4083.19
letter No. 2953(s)
dated 25.03.134250.408 3430.29
L/A-800
61.88% 80%
M/S Sanjay Agarwal
(Murhu - Tapkara -
Torpa)
Total:- C.D. work-44
7 Reconstrction of SH-3 to Ulihatu road 12.876
KM2915.475
letter No. 6568(s)
dated 21.09.152792.069 2063.02 73.9% 62%
Vijay Kumar Sahu
Infrastructure Pvt. Ltd.
Reconstrction of SH-3
to Ulihatu road
Total:- C.D. work- 30
8
Reconstruction of Khunti - Bhunda - Jurdag
-Karra - Birda - Bero Road from KM 0.00
to 44 (Working Length 39.07KM)
39.07 5797.68
Govt. of India No.
RW/NH-
28014/2/2013/JHR/
P-3 (CRF) dt.
02.01.14
6008.584 2285.76 38.0% 62%
M/S Ksheeraabd
Construction Pvt. Ltd.
Banjara Hills,
Hyderabad (Khunti -
Bhunda - Jurdag -Karra -
Birda - Bero Road)
Total:- C.D. work-23
9Widening & Strengthening of Sisai Lapung
Dorma Road 43.4 5487.673
letter No. 352(s)
dated 17-01-125455.455 2081.11
L/A
&U/S-
425.4512
2
38.143%
47%
M/S Ksheeraabd
Construction Pvt. Ltd.
Banjara Hills,
Hyderabad (Sisai -
Lapung - dhorma Road)
Total:- C.D. work- 19
10
Widening and Strengthening of Kara More
(Torpa) to Karra Road from KM 0.00 to
21.750
21.750
KM4866.909
letter No. 6571(s)
dated 21.09.154055.194 2140.00 52.77% 57%
M/S GC PE (Jv)
(Widening and
Strengthening of Kara
More (Torpa) to Karra
Road)
Total:- C.D. work- 46
11
Widening and Strengthening of Sarsa (Bero-
Khunti Road) to Daranda, Latratu Dam via Sai
Temple
7.817K
M1708.744
letter No. 782(s)
dated 05.02.161699.366 - - 15%
M/S Kumar Narendra
Prasad Singh
K. D. Road khalari, Ranchi
(Jharkhand).
Page 7 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R
Month : November, 2016 Amount in Rs. Lakh
Sanctioned Scheme Agreement
Name Amount Date/ Ref. No. Amount
Total
Expendi-
ture
(11+13)
% Finan-
cial Achie-
vement
1 2 3 4 5 6 7 8 9 10
%
Physical
Achiev-
ement
Financial Progress
(in Lakh)
Name of ContractorSl.
No.
Length
(Km)
Administrative Approval
12
Widening & Strengthening of Konsa -
Bakaspur - Govindpur - Karra Road (Length -
30.4000 KM)
30.4 5882.487letter No. 3549(s)
dated 06.06.165690.080 - - -
VKS – AIPL (JV)
House NO. 75, Old AG
Colony, Kadru
Ranchi, Jharkhand
261.77 51894.29 48804.01 31161.1
Circle : Ranchi
Div : Ranchi (Rural)1 IRQP of Angarha - Hahe-Rahe Road from KM 20.00 to 25.00 for
the year 2014-15. 6.00 287.10509.03.15
1710 (s)298.1 297.64 99.88% 100%
M/s Khanna Construction
Khanna Building, Lalpur, Ranchi
2
IRQP OF JONHA TO JONHA FALL-SITA FALL ROAD 6.87 342.62324.08.15
6089(S)
324.56
+ 39.99 (variation sanction
by letter no. 1448anu
dt.27.06.16)
353.69 97% 100%M/S RBCON ,H No.70 Shiv gang
Hrmu Road Ranchi
3 Widening and Strengthening of Bundu-Sonahatu-Jamudag-Jaria
Missing Link Road. 5.80 1278.00 12376 (S) 04.12.13 1284.00 1244.58 97% 98%Md. Q. Khan Engineers Pvt. Ltd.,
110, B Block
4 IRQP Work of Angara- Hundrufall Road from KM 20.00 to 21.100
for the year 2015-16. 2.10 76,06,20018-02-16
1107 (s)68.45 54.12 79.12% 100%
Sri Chandan Kumar,
Harmu Colony, Ranchi
5 Widening and Strengthening of Road from 11th km of Ranchi-
Muri Road (Tati-Chatra) to Bongaibera. 9.81 1764.0618.12.13
/ 13121 (S)1775.80 627.00 35% 60%
M/S Khanna Construction
Circular Road, Ranchi
6 Improvement of Sonahatu Milan Chowk Road in k.m. 0 to 23.90
MDR-29 23.90 2677.534514(S)
Dt. 25.06.152651.13 495.39 18.68% 35%
M/S AIPL-AKS
(Joint Venture)
351 A, Road No.-5, Ashok Nagar, 7 Widening & Stregthning of Gola-Muri Road from 14.50 to 26.46
for the year 2016-17 11.96 79.648 5453(S) 26.08.16 - - - -
M/s Classic Engicon Pvt. Ltd.
Vatika Apartment, Line Tank Road,
Ranchi - 01
Sub Total 66.44 6428.97 6077.48 3072.42
Circle : Ranchi
Div : Lohardaga
1Widening & Strengthening of Kuru-Lohardaga-
Ghagra Road from km 0 to 44.044.00 5386.099
25.06.15 / 4212 (S)
(Revised A/A)5367.29 4672.68 87% 92%
M/s S. & P. Infrastructure
Development Pvt. Ltd.,
907, New Delhi, House-
27, Barakhamba Road.
2Widening & Strengthening of Lohardaga-Gangupara-
Peshrar Road from km 0 to 27.627.60 7797.553
26.12.14 / 9127 (S)(Revised A/A)
7471.50 960.00 13% 50%Shivalaya Construction Co.
Pvt. Ltd., New Delhi
3Construction of Shankh-Chatra (Lukaiya More on NH-
75) Road from km 0 to 21.3521.35 4886.029
26.12.14 / 9119 (S)(Revised A/A)
5111.82 4910.00 96% 100%
Kaushik - Jai Maa Durga -
J.V.
Garwah.
4Re-construction of Kesa More (NH-23) Tangarbasli-
Mandar (NH-75) Road18.95 3289.100 14.03.13 / 2235 (S) 3073.67 2568.50 84% 85%
M/s SKS - MC Joint
Venture
5Strengthening (IRQP) of Bero-Lohardaga Road from
k.m. 0.00 to 39.1039.10 2443.220 10.10.14 / 7594 (S) 2512.99 2528.05 100% 100%
M/s K.N.P. Singh-A.B.P.L.-
N.Pandey - J.V.
Ranchi.
6Widening and Strengthening of Chatti to Kuru (Tati
Chouk) & Kairo Naya Toli to Zingi More Road from
k.m. 0.00 to 36.535
36.53 8608.965 06.06.16 / 3543 (S) 7749.41 0.00
Dinesh Chandra R.
Agrawal infracon Pvt. Ltd.,
S.M. Road, Ambawadi,
Ahmedabad.
Sub Total 187.53 32410.97 31286.68 15639.23
Original Revised Amt. in Cr. %As per
SBD%
1 2 4 5 6 9 14 15 26 17
Moror
Grader -3
Dozer -1
(pocklen)
Front end
Loader-2
Smooth
Wheel
Rollers-2
Vibratory
Roller-1
Hot Mix
Plant with
electronic
controls
(Minimum
80-100
TPH
capacity)-1
Sub Total
Sanctioned Cost Cumulative physical progress upto 31.03.14
25%
Total
Sl.
No.
1
Cumulative Financial
Widening and Strengthening of 2 Lane & Improvement of
Lohardaga Kisko More to Richuguta Road from Km 0.00 to
31.50 in Jharkhand under LWE Scheme
(Job No.
LWE/JH/2
010-11-
190)
31.5765 42.8201
Name of WorkAwarded Cost
(Rs. In Cr.)Job No.
14.12
(R.A. Bill)
14.12
40.637871 35%
Page 8 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R
Month : November, 2016 Amount in Rs. Lakh
Sanctioned Scheme Agreement
Name Amount Date/ Ref. No. Amount
Total
Expendi-
ture
(11+13)
% Finan-
cial Achie-
vement
1 2 3 4 5 6 7 8 9 10
%
Physical
Achiev-
ement
Financial Progress
(in Lakh)
Name of ContractorSl.
No.
Length
(Km)
Administrative Approval
Paver
Finisher
with
electronic
sensor -1
Water
Tanker-3
Bitumen
Sprayer -1
Tandem
Roller -2
Concrete
Mixer with
integral
Weigh
Batching
facility -1
Circle : Ranchi
Div : Simdega
Strengthening /Re-Construction Of Putritoli-Barasloya-
Lacharagarh-Jaldega upto pandripani NH-23
&73.6 4921.61000 1720(s)/ 04.03.13
Strengthening /Re-Construction Of Simdega-Jaldega-
Hurda-Girda Upto Manoharpur Road.73.7 6796.23500 1721(s)/ 04.03.13
2IRQP/Reconstruction of Bano (Birsa Chowk) to Ketunga for
diversion of damaged bridge in Lacharagarh Bano Road.10.9 374.79000 7293(s)/ 14.08.13 403.74771/ 445.87144 384.6353 86% 100%
Plateaue Road Engineering,
Ranchi
3Widening & Strengthening/Reconstruction of Kochedega-
Ramrekha Dham upto Chhatisgarh Boarder Road.27.325 6735.97800 5340(s)/ 17.07.14 7089.91767 3100.0000 44% 60%
Shivalaya Construction Co. Pvt.
Ltd.
4
Widening & Strengthening/Reconstruction of
Putritoli(Dolongsera on MDR-45)-Timbermore-Rampur-
Boroseta-Jitutoli-Beraergi(upto Koel river) road.
31.80 6770.93500 5344(s)/ 17.07.14 6211.76879 2075.0000 33% 40%M/s Dineshchandra R. Agrawal
Infracon Pvt. Ltd.
5Construction of Check Post (Road) near Bansjor at
Simdega Jharkhand-Orissa Border on NH-143.2.00 1092.51000 3222(S) 11.05.15 1155.59904 1049.8501 91% 100% Superior Costruction Pvt. Ltd.
6
Widening and Strengthening of Kolebira(SH-04)-Gangutoli-
Jamdih ( NH-143.) Road (Part-A KM 0.00 to 10.36 and
Part-B KM 22.00 to 38.95)
28.31 5843.43000 5617(S)/ 06.08.15 6048.11358 810.0000 13% 20%M/s Dineshchandra R. Agrawal
Infracon Pvt. Ltd.
7
Widening and Strengthening of Kurdeg-Karamadiha-
Gariajor upto Chattisgarh border Road & Construction of
High level Bridge on Mission Bandh at KM 4.40.
11.85 3041.166004871(S)/
13.07.153034.87073 1789.4722 59% 75% Barbrik Project Ltd.
8W/S Of Simdega Rengari-Kersai-Bolba Road Up To
Orissa Border Road (Remaining work)48.21 7471.40400 3568(S)/ 06.06.16 -
M/s Dineshchandra R. Agrawal
Infracon Pvt. Ltd.
Sub Total 19824.779
CRF
1W/S Of Simdega Sewai -Kinkel -Kurdeg -Kutumakachhar Upto
Chhatisgarh Boarder Road. 63.2 13035.887 9131(s) Dt. 26.12.14 10099.47505 #REF! 95% 99%
Shivalaya Construction Co.
Pvt. Ltd.
1 11738.65857
25%1
10615.8213 90.43% 97%M/s Dineshchandra R. Agrawal
Infracon Pvt. Ltd.
Widening and Strengthening of 2 Lane & Improvement of
Lohardaga Kisko More to Richuguta Road from Km 0.00 to
31.50 in Jharkhand under LWE Scheme
(Job No.
LWE/JH/2
010-11-
190)
31.5765 42.820114.12
(R.A. Bill)
14.12
40.637871 35%
Page 9 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-R
Month : November, 2016
Sanctioned Scheme Agreement
Name AmountDate/ Ref.
No.Amount
Total
Expendi-ture
(11+13)
% Finan-
cial Ach.
1 2 3 4 5 6 7 8 9 10
Circle : Ranchi
Div : Ranchi
1
Construction of HL Bridge over Potpoto river in Km
4.15 of Karamtoli Ormanjhi Road for the year 2014-15.
(9 x 10M)709.02
4619(S)
Dt.18.06.14
2
Construction of Bridge Over Jumar River at KM 6.85 of
Karamtoli Ormanjhi Road for the year 2014-15.
(4 x 24M)550.57
4462(S)
Dt.12.06.14
3
Construction of HL Bridge over Dubaliya river in Km
8.85 of Karamtoli Ormanjhi Road for the year 2014-15.
(2 x 14M)167.01 4624(S)
Dt.18.06.14
4
Construction of HL Bridge over Bangaraha river in Km
10.55 of Karamtoli Ormanjhi Road for the year 2014-
15.
(1 x 18M)
247.85
4623(S)
Dt.18.06.14
5
Construction of HL Bridge over Gobardaha
(Gobarhappa) river in Km 13.75 of Karamtoli Ormanjhi
Road for the year 2014-15.
(1 x 16M)
195.72
4621(S)
Dt.18.06.14
6
Construction of HL Bridge over Kuchhu river in Km
14.15 of Karamtoli Ormanjhi Road for the year 2014-
15.
(3x 16)
281.784627(S)
Dt.18.06.14
7
Construction of Bridge over Distillery Nala in
2nd KM of Kokar- Lalpur- Albert Ekka Chowk
Road for the year 2015-16.
(1.00 x 21.00 M)
274.223309(S)
27.05.16277.40 169.72 61% 70%
M/S A.S Construction,
Medninagar,
Palamu
8
Construction of Bridge over Sapahi River at
Ch. - 3.650 km of Ranchi-Muri Road.
(2 x 18.00 M)
37.24 189.54709.07.13 /
6421(s)171.74 184.14 107% 100% M/s Nagendra Pandey
9
Construction of remaining work H.L. R.C.C.
Bridge over Harmu Nala in Kadru Chowk to
Ranchi Railway Station Road for the year
2013-14.
1x16.6M
= 16.6M117.76
3636 (S) Dt.
09.05.1493.05 232.93 250% 100%
M/S Haque Const. Co.
Agrora, Ranchi
Total 2537.76 2761.95 2223.79
Circle : Ranchi
Div : Gumla
2 Construction of H.L.Bridge with approach road
over Deo River in KM 64 of Manoharpur-
Anandpur-Bano-Kolebira Road (6x24) 144 609.98
4399 (S) dt.
09.05.13634.42 419.723 66.16 80%
M/s Dhanpati Singh Const.
Sai Colony, Chutia, Ranchi
Sub Total 176.00 798.00 819.22 525.19
1637.00M/S Ganga Construction
Daltonganj
ROAD CONSTRUCTION DEPARTMENT, JHARKHAND
(State Highways Wing)
Progress report of On-going works(Bridges-Plan)
2219.76 90%74%
Amount in Rs. Lakh
Sl.
No.
57.07 80%184.80
Sub Total
105.466
DPW-B
Financial Progress (in
Lakh)Length
(m)
Administrative
Approval
M/s Vijay Kant Pandey
Amba Nagar Pandra , Po-
Hehal, P.S- Sukhdeo Nagar,
%
Physical
Achiev-
ement
Name of Contractor
132 188.02
8298(s)
29.11.12
Construction of H.L.Bridge over Redwa River in
KM 16 of Kamdara-Bero Road (2x16m)
MDR_38
Page 10 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-B
Month : November, 2016
Sanctioned Scheme Agreement
Name AmountDate/ Ref.
No.Amount
Total
Expendi-ture
(11+13)
% Finan-
cial Ach.
1 2 3 4 5 6 7 8 9 10
Amount in Rs. Lakh
Sl.
No.
Financial Progress (in
Lakh)Length
(m)
Administrative
Approval %
Physical
Achiev-
ement
Name of Contractor
Circle : Ranchi
Div : Khunti
1
The Constructionof Bridge Over Changer
Jhore River At- CH- 24.950 KM of Khunti
Torpa Kolebira Road (5X18.6M)
93.04 352.499
Govt. of.
Jharkhand
Dy. Sec.
Letter
No.9064(
S) Dt. 24-
12-12
357.44257 408.2948
L/A16.25
(12-13)
100%
100%
M/S Maa Gayatri
Builder
(Chengarjhor river
24.950KM)
2
The construction of Bridge over Bhamni
River at ch. 3.532KM of Murhu-Tapkara
Road (4X24M)
96.00 450.460
Govt. of.
Jharkhand
Dy. Sec.
Letter No.
904(S) Dt.
03.02.14
468.20437 446.2056 95.30% 100%
M/S Ganga Const.
(Bhamni River at
3.532KM)
3
The construction of Bridge over Local Nala
in KM 5th at ch. 4.230 of Murhu (On NH-
75E)- Tapkara- Torpa Road (1X10M)
10.46 140.110
Govt. of.
Jharkhand
Dy. Sec.
Letter No.
156(S) Dt.
08.01.15
122.81507 110.0146 89.58% 100%
RAVI MISHRA
Ethe, Khunti
(Local Nala 5th
KM)
4
The construction of Bridge over Karamgarha Nala
in KM 22nd at ch. 21.325 of Murhu (On NH-75E)-
Tapkara- Torpa Road (1X24M)
24.64 174.580
Govt. of.
Jharkhand
Dy. Sec.
Letter No.
1315(S)
Dt.
20.02.15
166.66636 75.0000 45.00% 95%
M/S ANOKHA
RAM (Karamgarha
Nala 22nd KM)
5
The Constructionof Bridge Over Karo River
At- CH- 32.075 KM of Khunti Torpa
Kolebira Road (7X21.60M)
151.24 511.2140
Govt. of.
Jharkhand
Dy. Sec.
Letter
No.9066(
S) Dt. 24-
12-12
547.94214 534.3462
L/A -
14.75(12-
13)
94%
95%
M/S Maa Gayatri
Builder (Karo
River 32.075KM)
6
The Construction of H.L.Bridge over
Jahirdar Nala In 38Th Km. of Khunti
(2X10M)
20.80 91.3480
Govt. of.
Jharkhand
Dy. Sec.
Letter No.
4085(S)
Dt. 09-07-
11
91.80901 83.6995 91% 90%
Lal Babu Singh
(Jahirdar Nala 38th
KM)
Page 11 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-B
Month : November, 2016
Sanctioned Scheme Agreement
Name AmountDate/ Ref.
No.Amount
Total
Expendi-ture
(11+13)
% Finan-
cial Ach.
1 2 3 4 5 6 7 8 9 10
Amount in Rs. Lakh
Sl.
No.
Financial Progress (in
Lakh)Length
(m)
Administrative
Approval %
Physical
Achiev-
ement
Name of Contractor
7
Construction of High-Level R.C.C Bridge
(with Approach road) Over Tajna River in 6th
Km. of Khunti-Tamar Road. (3X24M)
73.84
160.807
+43.869
204.676
Govt. of.
Jharkhand
Dy. Sec.
Letter No.
5408(S)
Dt.
04.08.200
8 /
8109(S)
dt. 22-11-
2012
(Revised)
172.26304 189.3252
L/A
7.27376
(10-11) +
11.57144
(11-12)
=18.8452
0,
98%
85%Amit Kumar (6th
KM Tajna River)
8
The Construction of H.L. RCC Bridge over
Narda Nala In 24Th Km. of Khunti-Tamar
road (2X10M)
20.80
104.02
(Revised
A/A)
Govt. of.
Jharkhand
Dy. Sec.
Letter No.
4084(S)
Dt. 09-07-
11
78.72951 86.7079 90% 85%
Lal Babu Singh
(Narda Nala 24th
KM)
9
The construction of Bridge over Chhata
River at Ch. 32.00 km of Hatia – Lodhma –
Karra – Khunti Road (3X18M)
54.00 324.620
Govt. of.
Jharkhand
Dy. Sec.
Letter No.
905(S) Dt.
03.02.14
341.70188 214.2403 62.70% 93%
M/S Kumar & Ray
(Chhata River at
KM 32.00)
10
The Constructionof Bridge over south koel
river At- CH- 14.500 KM of Rania - Soude -
Bano Road (10X24M)
246.00 766.833
Govt. of.
Jharkhand
Dy. Sec.
Letter
No.3759(
S) Dt.
13.05.14
829.73364 687.9829 82.92% 86%
M/S Kumar & Ray
(South Koel in KM
14.500)
11Const. of H.L. Bridge in Dasmile- Chukru – Remta
– Sondasome – Kujuram RoadM/S Ganga Const.
(i) Over Local Nala at ch. 15.400KM (3X21M) 64.84M 52%Over Local Nala at ch.
15.400KM (3X21M)
(ii) Over Remta Nala at ch. 17.400KM (3X24M) 73.84M 45%Over Remta Nala at ch.
17.400KM (3X24M)
(iii)Over Kudagara Nala at ch.21.900KM
(4X10M)42.44M 50%
Over Kudagara Nala at
ch.21.900KM (4X10M)
(iv) Over Kujram river at ch.22.100KM(2X21M) 43.24M 21%Over Kujram river at
ch.22.100KM(2X21M)
12
The construction of Bridge over Changerjhore
River in KM 12th at ch. 11.700 KM of Murhu (On
NH-75E)- Tapkara- Torpa Road (3X21.6M)
64.84 314.520
Govt. of.
Jharkhand
Dy. Sec.
Letter No.
157(S) Dt.
08.01.15
323.07307 40.00 12.38% 35%
M/S Maa Gayatri
Builder
(Chengarjhor river
11.70KM)
1058.05
Govt. of.
Jharkhand
Dy. Sec.
Letter No.
4432(S)
Dt.
24.06.15
665.73321140.43947 58.38%
Page 12 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-B
Month : November, 2016
Sanctioned Scheme Agreement
Name AmountDate/ Ref.
No.Amount
Total
Expendi-ture
(11+13)
% Finan-
cial Ach.
1 2 3 4 5 6 7 8 9 10
Amount in Rs. Lakh
Sl.
No.
Financial Progress (in
Lakh)Length
(m)
Administrative
Approval %
Physical
Achiev-
ement
Name of Contractor
13
The Construction of 4x21M High Level Bridge in
34th KM over River Tajna in Namkum – Khunti -
Chaibasa – Jaitgarh Road (NH 75-E)
485.910
Govt. of.
Jharkhand
Dy. Sec.
Letter No.
7506(S)
Dt.
30.10.15
487.18966 48.70 10% -M/S Maa Kali
Const.
14Const. of H.L. Bridge in Hatia- Lodma- Karra-
Khunti Road.
M/S Ganga Const.(Const. of
H.L. Bridge in Hatia-
Lodma- Karra- Khunti
Road. )
(i) Over Chhata River In 25th Km 49.24 370.58
Lt. No.
8632(S) Dt.
22.12.15
- - -Over Chhata River In
25th Km
(ii) Over Malgo River In 22nd Km 43.24 257.80
Lt. No.
8633(S) Dt.
22.12.15
- - -Over Malgo River In
22nd Km
(iii) Over Patra Toli River In 18th Km 43.24 291.84
Lt. No.
8634(S) Dt.
22.12.15
- - -Over Patra Toli River In
18th Km
(iv) Over Swarnrekha River In 4th Km 86.40 511.76
Lt. No.
8637(S) Dt.
22.12.15
- - -Over Swarnrekha River
In 4th Km
(v) Over Tajna River In 13th Km 43.24 275.39
Lt. No.
8636(S) Dt.
22.12.15
- - -Over Tajna River In 13th
Km
(vi) Over Tigga River In 16t Km 37.24 308.92
Lt. No.
8635(S) Dt.
22.12.15
- - -Over Tigga River In 16t
Km
15Const. of H.L. Bridge in Khunti- Siladon- Chukru-
Bhusur Road.
M/S Ganga Const.(Const. of
H.L. Bridge in Khunti-
Siladon- Chukru- Bhusur
Road. )
(i) Over Tajna River at ch. 5th KM 72.00 322.270
Lt. No.
857(S)
09.02.16
- - -Over Tajna River at ch.
5th KM
(ii) Over Canal River at ch. 7th KM 20.00 154.470
Lt. No.
859(S)
09.02.16
- - -Over Canal River at ch.
7th KM
(iii) Over Kanchi River at ch. 12th KM 105.00 402.180
Lt. No.
855(S)
09.02.16
- - -Over Kanchi River at ch.
12th KM
(iv) Over Tunju Nala at ch. 21st KM 63.00 253.205
Lt.
No.858(S)
09.02.16
- - -Over Tunju Nala at ch.
21st KM
1418.26 7818.56 8466.32 3590.25
Circle : Ranchi
Div : Ranchi (Rural)
1Construction of High Level Bridge over
Bhorongdih Nala in km 30th (CH. - 29.900) of
Banta-Rahe-Bundu Road.
21.6 201.82224.12.12 /
9065(s)173.35 116.38 67% 60% M/s Nagendra Pandey
Total 201.82 173.35 116.38
1143.93086
2194.38242
Page 13 of 14 PR_Uploading_Nov_2016_-Ranchi_DivisionDPW-B
Month : November, 2016
Sanctioned Scheme Agreement
Name AmountDate/ Ref.
No.Amount
Total
Expendi-ture
(11+13)
% Finan-
cial Ach.
1 2 3 4 5 6 7 8 9 10
Amount in Rs. Lakh
Sl.
No.
Financial Progress (in
Lakh)Length
(m)
Administrative
Approval %
Physical
Achiev-
ement
Name of Contractor
Circle : Ranchi
Div : Lohardaga
1
Construction of H.L. R.C.C. Bridge with
approach road over Gamaharia Nala in 36th
km of Kuru-Lohardaga-Ghaghara Road (SH-
8).
55.80 304.482
13.09.12
/
6688 (S)
360.96 215.24 60% 80%
M/s Kashyap
Construction,
Daltonganj
2
Construction of H.L. R.C.C. Bridge with
approach road over Temra Nala in 11th km
of Kesha More (Bero) to Mandar Road.
24.64 229.71
20.02.15
/
1301 (S)
207.63 205.00 99% 100%M/s Jai Mata Dee
Construction, Ranchi
3
Construction of H.L. R.C.C. Bridge over
Sankh River in 16th km of Kuru-Lohardaga-
Ghagra Road (SH-8).
347.473 232.17 67% 3M/s Jai Shokha Baba
Construction Pvt. Ltd.,
Daltonganj
4
Remaining work of Construction of H.L.
Bridge with Approach Road over Sankh
River in 16th km of Kuru-Lohardaga-Ghagra
Road.
178.76 40.88 23% 35%
Sri Gopal Krishna
Choubey,
Garhwa.
5
Construction of Bridge over South Koel
River at 15.940 k.m. of Kesa More-Mandar
Road.
50.00 331.000
19.05.16
/
3197 (S)
323.14 0.00Haque Construction
Company, Ranchi.
6
Construction of H.L. Bridge over South Koel
River (With Approach Road) in 34th km of
Bero-Lohardaga Road.
(Job No. : CRF-JHR-2014-15/38)
172.24 809.047
09.12.14
/
RW/NH -
28014 / 5
2 2005 -
JHR/NH-
3
678.41 0.00
M/s Kashyap
Construction,
Daltonganj
Sub Total 395.68 2026.49 2096.37 693.29
Circle : Ranchi
Div : Simdega
1
Construction of High Level Bridge over Girma
river(Sewai) in Ch. 23rd Km (including construction of
Approach road) of Simdega Sewai -Kinkel-Kurdeg-
Kutumakachhar Upto Chhatisgarh Boarder Road (MDR-
044).
84.00 306.47017.06.15/
4195(S)321.74000 152.14010 47% 65%
Sirha Construction &
Developers (P) Ltd.,
2
Construction of High level RCC Bridge over Local Nala
at Chainage 2.830 KM of Simdega-Jaldega-Hurda-
Girda upto Manoharpur Road (including construction of
approach roads.)
20.00 172.38017.06.15/
4195(S)153.91856 153.90018 100% 100% Dev Kripa Construction
3
Construction of High level RCC Bridge over Local nala
at Chainage 2.960 KM of Simdega-Jaldega-Hurda-girda
upto Manoharpur Road.
10.44 116.87015.03.16/
1813(S)103.04530 0.00000 0% -
Superior Costruction Pvt.
Ltd.-
4
Construction of High level RCC Bridge over Bergarha
Nala in Chainage at 7+850 of Simdega-Jaldega-Hurda-
girda upto Manoharpur Road (including construction of
Approach roads).
49.24 234.03015.03.16/
1814(S)204.32345 28.57268 14% 30% Dev Kripa Construction
5
Construction of High level RCC Bridge over Devlakar
river at KM 12.183 of Simdega-Jaldega-Hurda-girda
upto Manoharpur Road (including construction of
Approach roads).
64.84 228.00015.03.16/
1812(S)200.21440 0.00000 0% 20%
Rameshwaram Projects Pvt.
Ltd.
228.52 1057.75 983.24171 334.61296
93.00 352.249
31.10.12
/
7677 (S)
Sub Total