33
Progress Report on activities by Urs Wegmüller, Tazio Strozzi, Charles Werner Gamma Remote Sensing AG, Gümligen, Switzerland, http://www.gamma-rs.ch, [email protected] Himalayan Glacier Dynamics Project (ID 10302) This work is supported by ESA under the Dragon 3 Project

Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Progress Report on activities by

Urs Wegmüller, Tazio Strozzi, Charles Werner

Gamma Remote Sensing AG, Gümligen, Switzerland, http://www.gamma-rs.ch, [email protected]

Himalayan Glacier Dynamics Project (ID 10302)

This work is supported by ESA under the Dragon 3 Project

Page 2: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

- Swiss Corporation - SAR and INSAR competence - Active in research and development projects - Gamma SAR & INSAR Software - Gamma Portable Radar Interferometer (GPRI) - Providing services and products (deformation, biomass, …) Glacier related activities: - ESA GlobGlacier / Glacier_CCI Projects (2007 - 2013) - FP7 - Cryoland Project (2011-2014) - Glacier lake mapping projects - GPRI measurements over glaciers

Gamma Remote Sensing AG http:/ / www.gamma-rs.ch

Page 3: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Part 1: Methodological work Part 2: Production results over Karakorum Part 3: Field trip to Kleine Scheidegg

Contents of presentation

Page 4: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

In the beginning of Dragon 3 our focus was on the assessment of Radar based techniques to map glacier dynamics: - Differential SAR Interferometry - SAR image offset tracking - Split-beam interferometry Now the focus is on the assessment of novel Radar sensors to map glacier dynamics using these techniques: - Sentinel-1 (and in particular IWS data) - ALOS PALSAR-2

Methodological work

Page 5: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Sentinel-1 (S1) Interferometric Wide-Swath (IWS )

“TOPS mode”: for each burst the radar beam scans through a wide Doppler spectrum very strong Doppler variation (Doppler ramp on each burst)

- As a consequence interpolation concepts need to be adapted - As a consequence a small azimuth co-registration error results in

an significant phase effect (about 0.1 azimuth pixel error results in a ramp of a full phase cycle in an interferogram of a burst) very high co-registration quality required (0.001 pixel)

Page 6: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

S1 IWS SLC DInSAR procedure: 1) Geocoding of multi-look MLI mosaic ( refined geocoding lookup table,

geocoded backscatter, DEM heights in MLI SAR geometry)

2) Calculation of S1 IWS SLC co-registration lookup table (considering terrain topography)

3) Refinement of co-registration using intensity matching procedures

4) Refinement of co-registration using spectral diversity method (considering double difference phase of burst overlap regions)

5) S1 IWS burst SLC resampling to master geometry (considering procedure that takes into account the strong Doppler Centroid variation in azimuth)

6) Generation of mosaic SLC and mosaic MLI

7) Simulation of topographic phase

8) Calculation of differential interferogram

Page 7: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

S1 IWS SLC DInSAR example: Nepal

Nepal earthquake: Co-seismic, 20150417_20150429 Color scale: 100mm los displ. / color cycle

Page 8: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

PALSAR-2 ScanSAR SLC DInSAR example: Nepal

Nepal earthquake: Co-seismic, 20150405_20150503 Color scale: 100mm los displ. / color cycle

Page 9: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

S1 IWS usefulness for glaciers

Feasibility - Differential SAR Interferometry demonstrated - SAR image offset tracking demonstrated - Split-beam interferometry demonstrated Potential - To be further elaborated - Initial results are not too convincing for the mountain glaciers yet - 12-day interval is quite long for InSAR - IWS azimuth resolution is quite low for tracking

Page 10: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Sentinel-1 offset tracking: Svalbard Sentinel-1 EW GRDM

19/31.03.2015 40 m ground-resolution

0 m/yr 2500

Sentinel-1 IW SLC 19/31.01.2015 – 20.01/02.01.2015

10 m ground-resolution

200 km

Page 11: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

characteristic azimuth offsets characteristic SBI phase

Ionospheric effects:

Page 12: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Part 2: Production results over Karakorum

Context of work Status

Page 13: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Project Scope: The Glaciers_CCI project will contribute to complete the baseline inventory of glaciers worldwide and by regional change assessments. The project focuses on: - glacier area in the form of detailed glacier inventory data - change assessment for glacier parameters a) length, b) area and c) elevation - ice velocity fields (from optical and SAR sensors) Team: University of Zurich (Switzerland), University of Oslo (Norway), GAMMA Remote Sensing (Switzerland), University of Leeds (UK), ENVEO (Austria) Cooperation: World Glacier Monitoring Service (WGMS) Global Land Ice Measurements from Space (GLIMS - NASA)

ESA Glaciers CCI Project

Page 14: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

GAMMA Contribution a) InSAR coherence for debris-covered glaciers (on-demand) b) Global set of velocity products for ice caps and glaciers Take into account already processed regions within other projects (e.g GlobGlacier, CCI Phase 1, EU FP6/FP7 projects, etc.): → 1991-1998 (ERS-1, ERS-1/2, JERS-1) → 2004-2011 (ALOS PALSAR, ENVISAT, ERS-2) Production Year 1 (2014/15): complete historical snap-shots (mainly PALSAR-1) Production Year 2 (2015/16): Sentinel-1 2015 Production Year 3 (2016/17): Sentinel-1 2016 ALOS PALSAR-2 2015/2016 ?

Page 15: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

ALOS FBD Summer 46 days coherence

A linear gray scale between 0 (black) and 1 (white) is used

High priority Medium priority Low priority

Page 16: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Mapping of debris-covered glacier parts by using coherence images (20070712_20070827, ALOS PALSAR, FBD-FBD 46 days, 275 m) in the region of Chhota Shigri. The long debris-covered tongue on the eastern part of the image is Bara Shigri glacier. Red lines show the raw glacier outlines resulting from the ETM3/ETM5 ratio, corrected glacier outlines are shown in yellow. a) Shows a false-color composite of the ETM+ scene (RGB 543), b) is a coherence image from two ALOS PALSAR scenes. (Frei et al., 2012)

ALOS FBD Summer 46 days coherence

Page 17: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

ALOS 12.07/27.08.2007 Coherence

Phase (left) and coherence (right) image, red are glacier outlines from ETM

Page 18: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Karakoram Summer (ALOS FBD)

0 m/year 300

Page 19: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Karakoram Winter (ALOS FBS)

0 m/year 300

Page 20: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Karakoram Summer (ALOS FBD)

0 m/year 300

Page 21: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Karakoram Winter (ALOS FBS)

0 m/year 300

Page 22: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

ASAR 04.04.2004 / 25.04.2005

0 m/year 300

Page 23: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Sentinel-1 28.02.2015 / 12.03.2015

0 m/year 300

Page 24: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Svalbard (Time Series)

0 m/year 300

ERS-1/2 1995/1996 InSAR & offset-tracking

ERS-2 2011 InSAR & offset-tracking

ALOS PALSAR 2008 offset-tracking

JERS-1 1997 offset-tracking

ALOS PALSAR 2010 offset-tracking

Sentinel-1 2015 offset-tracking

Page 25: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Part 3: Field trip to Kleine Scheidegg

Yesterday, we undertook as our team meeting a trip to Kleine Scheidegg, where we set up GAMMA´s terrestrial Radar to measure the velocity of some ten Alpine glaciers.

Page 26: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Part 3: Field trip to Kleine Scheidegg

Part 3: Field trip to Kleine Scheidegg

Page 27: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Glaciers measured

As seen from Kleine Scheidegg (at distances of about 3 to 6 km)

Page 28: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

Part 3: Field trip to Kleine Scheidegg

Part 3: Field trip to Kleine Scheidegg

Page 29: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

5 km

130 degrees

GPRI backscattering

Page 30: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

5 km

12:36 − 12:39

2π ⇔ 8.72 mm @ 17.2 GHz

Interferogram: 3 minutes

Page 31: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

5 km

12:08 − 12:39

2π ⇔ 8.72 mm @ 17.2 GHz

Interferogram: 30 minutes

Page 32: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

5 km

12:08 − 13:12

2π ⇔ 8.72 mm @ 17.2 GHz

Interferogram: 63 minutes

Page 33: Progress Report on activities by Urs Wegmüller, Tazio ...earth.esa.int/dragon-2015-programme/wegm@c3@bcller... · Himalayan Glacier Dynamics Project (ID 10302) This work is supported

5 km

12:08 − 14:12

2π ⇔ 8.72 mm @ 17.2 GHz

Interferogram: 123 minutes