Project 071103
CIM Test Development Process
Author NameJohn Simmins
Weekly Status and Planning Meeting1/25/2011
2© 2010 Electric Power Research Institute, Inc. All rights reserved.
CIM Test Process Overview
• CIM Test Methodology compatible with
– IEC WG 14
– CIM Users Group
– OpenSG• And possibly MultiSpeak
• Test process defined, documented and repeatable
• Vetted with multiple utilities, vendors and user groups
• Tests designed for multiple implementation environments (test only messages, implementation agnostic)
– Legacy point-to-point
– SOA with or without ESB
– Various ESBs (WebSphere, WebLogic, TIBCO, GlassFish)
• Tests openly available
3© 2010 Electric Power Research Institute, Inc. All rights reserved.
Schedule & SOW Task Deliverables
4© 2010 Electric Power Research Institute, Inc. All rights reserved.
Types of CIM-based Tests
5© 2010 Electric Power Research Institute, Inc. All rights reserved.
Basic Title and Text LayoutWith Subheads and Take-Away Box
Subhead
• This is first level bullet text
– This is second level bullet text
• This is third level bullet text
Subhead
• This is first level bullet text
– This is second level bullet text
• This is third level bullet text
Subhead
• This is first level bullet text
This is a take-away box that fades in automatically
6© 2010 Electric Power Research Institute, Inc. All rights reserved.
Abstract Test Conformance Case Development Process with Example
7© 2010 Electric Power Research Institute, Inc. All rights reserved.
Abstract Interoperability Dev. Process
8© 2010 Electric Power Research Institute, Inc. All rights reserved.
Next Steps
•Review and update sample abstract test case
– Walked through with group 1/18/2011
–
• Instructions and procedures to connect up to an web service endpoints (e.g. MDMS & CIS)
• POCs at Utilities/EPRI to coordinate testing
• POCs at venders
9© 2010 Electric Power Research Institute, Inc. All rights reserved.
Status of Next Steps
•Write detailed sample concrete test procedure– Exchange of security certificates
• Certificate exchange
• Code examples
– Firewall setting
• Permission from relevant IT organization
• Port and IP address
– Address Venders’ IPR concerns
– ESB setup and cross-ESB configurations
– POC information of people responsible for executing tests at Utilities, Venders and EPRI.
10© 2010 Electric Power Research Institute, Inc. All rights reserved.
Walkthrough of Interoperability Test Procedure