Project 071103

CIM Test Development Process

Author NameJohn Simmins

Weekly Status and Planning Meeting1/25/2011

Page 2: Project 071103 CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011

2© 2010 Electric Power Research Institute, Inc. All rights reserved.

CIM Test Process Overview

• CIM Test Methodology compatible with

– IEC WG 14

– CIM Users Group

– OpenSG• And possibly MultiSpeak

• Test process defined, documented and repeatable

• Vetted with multiple utilities, vendors and user groups

• Tests designed for multiple implementation environments (test only messages, implementation agnostic)

– Legacy point-to-point

– SOA with or without ESB

– Various ESBs (WebSphere, WebLogic, TIBCO, GlassFish)

• Tests openly available

Page 3: Project 071103 CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011

3© 2010 Electric Power Research Institute, Inc. All rights reserved.

Schedule & SOW Task Deliverables

Page 4: Project 071103 CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011

4© 2010 Electric Power Research Institute, Inc. All rights reserved.

Types of CIM-based Tests

Page 5: Project 071103 CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011

5© 2010 Electric Power Research Institute, Inc. All rights reserved.

Basic Title and Text LayoutWith Subheads and Take-Away Box

Subhead

• This is first level bullet text

– This is second level bullet text

• This is third level bullet text

Subhead

• This is first level bullet text

– This is second level bullet text

• This is third level bullet text

Subhead

• This is first level bullet text

This is a take-away box that fades in automatically

Page 6: Project 071103 CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011

6© 2010 Electric Power Research Institute, Inc. All rights reserved.

Abstract Test Conformance Case Development Process with Example

Page 7: Project 071103 CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011

7© 2010 Electric Power Research Institute, Inc. All rights reserved.

Abstract Interoperability Dev. Process

Page 8: Project 071103 CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011

8© 2010 Electric Power Research Institute, Inc. All rights reserved.

Next Steps

•Review and update sample abstract test case

– Walked through with group 1/18/2011

• Instructions and procedures to connect up to an web service endpoints (e.g. MDMS & CIS)

• POCs at Utilities/EPRI to coordinate testing

• POCs at venders

Page 9: Project 071103 CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011

9© 2010 Electric Power Research Institute, Inc. All rights reserved.

Status of Next Steps

•Write detailed sample concrete test procedure– Exchange of security certificates

• Certificate exchange

• Code examples

– Firewall setting

• Permission from relevant IT organization

• Port and IP address

– Address Venders’ IPR concerns

– ESB setup and cross-ESB configurations

– POC information of people responsible for executing tests at Utilities, Venders and EPRI.

Page 10: Project 071103 CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011

10© 2010 Electric Power Research Institute, Inc. All rights reserved.

Walkthrough of Interoperability Test Procedure