Upload
nellyprinav
View
152
Download
1
Embed Size (px)
Citation preview
NIITNIIT
PROJECTREPORT
Month Year
Project Title: Smart Solutions
Project Report
Smart Solutions
Batch Code :
Start Date :
End Date :
Name of the Coordinator :
Names of Developers :
Date of Submission:
2
Project Report
CERTIFICATEThis is to certify that this report titled Smart Solutions. embodies the original work done by Nelisha Hoopraj in partial fulfillment of their course requirement at NIIT.
Coordinator:Ikraam Swadik
3
Project Report
ACKNOWLEDGEMENT
We have benefited a lot from the feedback and suggestions given to us by Your Faculty Name and other faculty members, and the machine room coordinator.
INTRODUCTION
4
Project Report
SMART SOLUTIONSmart Solutions is a company specializing in information technology, it provides solutions for online education and Web-based.He the company's network consists of 150 machines used Windows 98/2000 Professional operating system and configuration similar shape. As a policy organization, the employees working in shifts. The users are the content developers and web developers who work in groups. Each team has a leader
REQUIREMENTS ANALYSIS
5
Project Report
1. David has been analyzed to improve the system for the company need to make the following requirements: 1. 98/2000 Professional upgrade to Windows XP Professional. 2. Creating users on all computers 3. Provide a static IP address on all your computer user 4. Add users to the network. 5. Establish the relationship of the files and folders + Create two folders on the Project Schedule and specify that user.
+ Create 3 files as Pro1, Pro2, Pro3 in Project.Tat Schools Project and the Administrators group have full permissions on those files, but the developers only have read permissions on those files.
+ Create a file called Schedule1 3, Schedule2, Schedule3 in floder Schedule. All team leaders and Project Administrators have full rights on the file
6. Check the connection using TCP / IP. 7. Configure and test the internet connection sharing on a computer 8. made to optimize resources. To do so, Angela needs to set the option to reduce power consumption on all computer users 9. Create a narrative on the performance computer based on the following parameters: + Disk Performance. + Processor + Memory
10. Create a report on the status of all hardware devices.
11. Configure user accounts to generate log reports for every time the unauthorized access to files and try to log into the system must be recorded.
12. Create automatic backups of all data and Project Schedule. 13. Data Encryption: Each user can access all computers on the network. Thus, data encryption must be done on the folders that the user data
UPGRADING FROM 98 TO WIN WIN XP
6
Project Report
Insert the Win XP Professional
Click Next and then enter the CD-key click Next to continue
7
Project Report
Click Next to continue setup upload files
Press Enter to continue
8
Project Report
Press Enter to continue installation
Press Enter to continue installation
9
Project Report
Press C to continue the installation
If you want more security, then we should choose NTFS format then Enter to continue
10
Project Report
Press ESC to choose another folder
11
Project Report
Click Next to continue
12
Project Report
Enter your username and password of the computer no `management
Name and password for your computer
13
Project Report
Setting current date and time
If you want to customize the custom to select the function you need to establish otherwise click Next to continue
14
Project Report
Select group of stars to hit Next
15
Project Report
16
Project Report
17
Project Report
CREATE USER AND GROUP
The first: right-click My Computer - manager
As the selected interface: Local Users and Groups.To create users: right-click Users and select New User.
Here you can add a password to be secure and safe. Click Create to create User
18
Project Report
The process of creating users have completed the next is to create Groups. Just as we choose to create Users Groups.
Here we hit the create process is done to create Groups.
19
Project Report
20
Project Report
Provide a static IP address on all your computer user
Provide IP addresses for all users (Subnet Mask to the same class, wordgroup have the same name):
Start -> Settings -> Network Connections. Local Connections right click -> Properties
Select Internet Protocol (TCP / IP) - Properties
Add users to the network
21
Project Report
Right click on My Computer-> Select Properties-> Select Computer Name -> Select Change-> Options or workgroup to join Domian
FILE & FOLDER CREATION AND ESTABLISHMENT OF RELATIONS
22
NELISHA
Project Report
Create two folders and Project Schedule: My Computer - the drive - right click - New - Folder.Tao 2
folders named Project and schedule
Create bat file Proj1, proj2, proj3 in directory Project: Project folder you right click New - Text Document
Để authorize tar file or folder right click and select Properties:
23
Project Report
Next we will grant the three files Proj: Administrators are doing all the file (full access). Here you replace the Project 1, Porject2, Project3 only read access (read only).
24
Project Report
Like hands on a folder to create three file Scheduled Schedule1, Schedule2, Schedule3.
25
Project Report
Here we will grant permissions to file Schedule 3: Administrators can do it all (full access).
26
Project Report
CHECK CONNECTIONS
Check the network connection utility TCP / IP: Star - Run - CMD.
Use the ipconfig command check IP address, Subnet Mask
Ping command to test the operation of the network is stable 0
27
Project Report
28
Project Report
29
Configuration and test the Internet connection sharing on your computer
First we must add a network card for nature that after providing static IP address in question 3 would have set the sharing connection with other computersI set the network address of the first computer that was linked with computers to shareThen self-regulation of IP addresses for clientsTie p in infinite adjustment ICS host computer Allow network users to connect pther through this computer's internet connectWa-party client then check path completed
Project Report
LANGUAGE RESOURCE OPTIMIZATION
To optimize resources. Electricity savings for all the computers: Star - Settings - Control Panel
Editing screen for about 5-10 minutes of time will reduce some little power. Edit Power Scheme Minimal Power Management mode.
30
Project Report
31
Create reports on the status of all hardware devices
Go to Start-> Run-> type dxdiag to check the civil architecture
Project Report
TẠO BÁO CÁO VÀ BACKUP
Create report: (Performance: Disk Performance, Processor, Memory): Start -> Control Panel -> Administrative Tools -> Performance
32
Project Report
Configuring Account users to generate log reports for each bond spreads have access to the files and
try to log into the system must be recorded:
Start-> Control Panel-> Administrative Toll -> Local Security Policy-> Local Policies -> Audit Policy ->
Audit account logon events
Create automatic backups of all data and Project Schedule: Start => Programs => Accessories =>
System Tools => Bakup
33
Project Report
IDENTIFICATION OF RESOURCES
34
Project Report
Right click Folder -> Properties -> Advanced-> check "Encrypt Contents data security"
35