Project 1.3.1

Natural and Technological

Hazards in Europe

Philipp Schmidt-Thomé

Page 2: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Contents

Summarizing final results of ESPON 1.3.1 ”Hazards”

• Examples of policy recommendations• Planning response towards natural and technological

hazards• Selected hazard maps• Aggregated hazard and risk maps• Climate change affecting natural hazards• European Regions with specific hazard typologies

Page 3: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Summary of selected policy recommendations

I. Guiding principles:

1. Employ risk management as an integral and explicit part of EU cohesion policy. Improve coordination of policy measures at all spatial scales

2. Integration of both substantial goals and procedural rules related to vulnerability reduction and risk mitigation into policies and programmes

Page 4: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Policy recommendations II

II. EU-level instruments

1. Coordination of the use of Structural Funds for risk management, by e.g. using criteria relevant to risk and vulnerability to guide and support funding through the Structural Fund objectives

2. Ensuring the effective implementation of the strategic environmental assessment (SEA) directive; integrating risk mitigation principles for planning into its implementation

Page 5: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Policy recommendations III

III. Meso-level (national, transnational co-operation, Interreg)

Recognition of the upgraded status of risk mitigation in the remodelled cohesion policy for the period 2007-2013, including principles of vulnerability reduction and risk mitigation in the programme guidelines.

Adoption of Strategic Environmental Assessment directive (2001/42/EC) by member states, preferably in a uniform fashion across Europe

Enhancing the use of the Water Framework Directive (2000/60/EC) for integrating land use planning and water resources management in support of risk management (not only water quality) purposes

Page 6: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Planning response, example on risks

• Split up "risk" into the elements: hazard potential, damage potential and coping capacity

• Framework for monitoring not only on risk but also for monitoring the elements of risk

• Within this framework it is possible to monitor the hazards impact and the vulnerability (damage potential and coping capacity) of an area

• Risk monitoring thus has a major role in defining and deciding on actions like mitigation and reaction (preparedness, response, recovery)

Page 7: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Natural hazards

• Avalanches• Drought potential• Earthquakes• Extreme temperatures• Floods• Forest fires• Landslides • Storms • Storm surges • Tsunamis• Volcanic activities

Page 8: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Technological hazards

• Air traffic• Major accident hazards (chemical plants)• Nuclear Power plants• Oil transport, storage and handling

Page 9: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

The making of the Forest fires map I

Page 10: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

The making of the Forest fires map II

Page 11: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Resulting forest fire hazard map

Page 12: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Landslides

Page 13: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Tsunamis

Page 14: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Chemical production plants

Page 15: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Weighting of hazards – the Delphi method

Page 16: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Aggregated natural hazards

Page 17: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Aggregated technological hazards

Page 18: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Aggregated hazards map

Page 19: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Vulnerability concept

Page 20: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Vulnerability map

Page 21: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Aggregated risk map

Page 22: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Change of dry spell affecting drought potential

Page 23: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Change in precipitation affecting flood potential

Page 24: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Length of dry spell affecting forest fires

Page 25: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Hazard interactions (of highest hazard degrees)

Page 26: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Hazard clusters: flood and landslides

Page 27: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Hazard interactions in Interreg IIIB areas

Page 28: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

1.3.1 indicators on NUTS 3 level covering the entire ESPON 27+2 area

• 11 Natural hazard indicators

• 4 Technological hazard indicators

• 3 Aggregated hazard indicators

• 3 Vulnerability indicators

• 3 Risk indicators

• 5 Climate change indicators (not available for

remote areas)

Page 29: Project 1.3.1 Natural and Technological Hazards in Europe Philipp Schmidt-Thomé

Thank you very much for your attention!

Thanks to the HAZARDS Consortium and to the

ESPON CU for the excellent cooperation!