Small Business Development Division Project Worksheet Project/Contract Title: MIA TANK FAR M UTILIT IES MODIFICATIONS Received Date: 08/10/2017 Project/Contract No: WOl6A Funding Source: Department: AVIATION TAC-R ADrvllNISTERED BY THE FUEL FACILITY Estimated Cost of Project/Bid : $1 ,220,000.00 Resubmittal Date(s): Description of Project/Bid: The project gOfll is 10 relocate th e Qver heCld clecrric;ll (FPL) and Telecommunications (AT&T) line 10 under·ground duel banks in the \ ' ICilllry ofPelimc ler RO<ld and th e MIA Trink Fann. Contract Measures Recommendation lVleasu re Program Goal Percent Goal SBE/GS 4.23% Goa l SBE/CONS 12.58% Workforce Goal CWP 10.00% Reasons for Recommendation SMA LL BUSINESS ENTERPRISE - CONSTRUCTION (SBE/CONS) An analysis of th e factors contained in Section VI . C of [mplement lll g Order 3-22 indicates that a 12.58% Small Business Enterprise - Construction (SBE-CONS) subcontrac tor goa l is appropriate for the trades of. 237 tl0-Water And Sewer LlIle And Related Structures Construction (Modification to existing irrigation system workO at 5. t8% , 238320-Painting And Wall Covering Contractors (6 inch ye llow pavement painting and bituminous prime coat work) at 0.29% and 2389 1 O-Site Preparation Cont ractors (Cleaning and Grubbing -earth work , demolition of existing bituminous pavement , on slle excavation and material removal wok and prof rolling wo rk) at 7. tl % SMALL BUSINESS ENTERPRI SE - GOODS & SERV I CES (SBElGS) An analysis of til e factors contained in section VIII . B. of Implementmg Order 3-41& Ordinance 14-41 indicates that a 423% is appropriate for th e , goods and services portIOn of thi s con tract in Landscapmg (Including Design , Fertilizing, Planting, Etc . But Not Grounds Maintenan ce or Tree Trimming Services) (Sodding) at 0.8% and (Modification of existing landscape) at 3.45%. CWP Estimated Workforce : CWP Workforce Recommendation Commodity Code 98852-Landscaping (I ncluding Design, Fertilizing, Planting, Etc., But Not Grounds Maintenance Or Tree Trimming Services) Trade Category 237 110-Wa ter And Sewer Line And Retated Structures Construction; 238320-Painting And Wall Covering Contractors; 238910-Sne Preparation ____ Small Business Contract Measure Recommendation % of Item s ! Subtrade Cat. Estimated Value to Base Bid Availability Landscaping (Including Design , Fe rtili z in g, Planting, e tc., But SBE/GS $51,606.00 4.23% Not Grounds Maintenance or Tree Trimming Serv ices) , Site Preparation Con tractors SBE/CONS $86,742.00 7.11% . Painting and Wall Covering Contractors SBE/CONS $3,538.00 0.29% : Water and Sewer Line and Related Structures Co nstruction SBE/CONS $63,196.00 5.18% Total l __ $205,082.00 16.81 % Living Wages : Responsible Wages: YES YES D [XJ NO [XJ NO D Highway: Building : YES YES D D NO [XJ NO [KJ Heavy Construction: YES [XJ NO D Responsible Wages and Beneflls applies 10 all conslruclion projecls Ol'er 5 100. 000 Ihal do nOI ulllize federal fund. For federally funded projeclS. unless prohibiled by federal or Slale Iml' or dlsallolVed by a gOI'ernmelllal funding source. Ihe H/G HER wage be/Ween DOI'is Bacon and Responsible Wages and Beneflls shall apply DBDR0090 v 20160928

Project Worksheet · 2017. 9. 28. · Project Worksheet . Project/Contract Title: MIA TANK FAR M UTILIT IES MODIFICATIONS . Received Date: 08/10/2017 . Project/Contract No: WOl6A

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Worksheet · 2017. 9. 28. · Project Worksheet . Project/Contract Title: MIA TANK FAR M UTILIT IES MODIFICATIONS . Received Date: 08/10/2017 . Project/Contract No: WOl6A

Small Business Development Division Project Worksheet

ProjectContract Title MIA TANK FAR M UTILIT IES MODIFICATIONS Received Date 08102017 ProjectContract No WOl6A Funding Source

Department AVIATION TAC-R ADrvllNISTERED BY THE FUEL FACILITYEstimated Cost of ProjectBid $1 22000000

Resubmittal Date(s) Description of ProjectBid The project gOfll is 10 relocate the QverheCld clecrricll (FPL) and Telecommunications (ATampT) line 10 undermiddotground duel banks in the

ICilllry ofPelimcler ROltld and the MIA Trink Fann

Contract Measures Recommendation

lVleasu re Program Goal Percent Goal SBEGS 423

Goa l SBECONS 1258

Workforce Goal CWP 1000

Reasons for Recommendation

SMA LL BUSINESS ENTERPRISE - CONSTRUCTION (SBECONS) An analysis of the factors contained in Section VI C of [mplement lllg Order 3-22 indicates that a 1258 Small Business Enterprise - Construction (SBE-CONS) subcontrac tor goa l is appropriate for the trades of 237 tl0-Water And Sewer LlIle And Related Structures Construction (Modification to existing irrigation system workO at 5 t8 238320-Painting And Wall Covering Contractors (6 inch yellow pavement painting and bituminous prime coat work) at 029 and 2389 1 O-Site Preparation Cont ractors (Cleaning and Grubbing -earth work demolition of existing bituminous pavement onslle excavation and material removal wok and prof rolling work) at 7 tl

SMALL BUSINESS ENTERPRI SE - GOODS amp SERV ICES (SBElGS) An analysis of til e factors contained in section VIII B of Implementmg Order 3-41amp Ordinance 14-41 indicates that a 423 is appropriate for the

goods and services portIOn of thi s con tract in Landscapmg (Including Design Fertilizing Planting Etc But Not Grounds Maintenance or Tree Trimming Services) (Sodding) at 08 and (Modification of existing landscape) at 345

CWP Estimated Workforce CWP Workforce Recommendation

Commodity Code 98852-Landscaping (I ncluding Design Fertilizing Planting Etc But Not Grounds Maintenance Or Tree Trimming Services) Trade Category 237 110-Water And Sewer Line And Retated Structures Construction 238320-Painting And Wall Covering Contractors 238910-Sne Preparation ~ontractors ____

Small Business Contract Measure Recommendation

of Item s

Subtrade Cat Estimated Value to Base Bid Availability

Landscaping (Including Design Fe rtili zin g Planting e tc But SBEGS $5160600 423 Not Grounds Maintenance or Tree Trimming Serv ices)

Site Preparation Con tractors SBECONS $8674200 711

Painting and Wall Covering Contractors SBECONS $353800 029

Water and Sewer Line and Related Structures Construction SBECONS $6319600 518

Total l__ $20508200 1681

Living Wages

Responsible Wages

YES

YES

D [XJ

NO [XJ NO D

Highway

Building

YES

YES

D D

NO [XJ NO [KJ

Heavy Construction YES [XJ NO D

Responsible Wages and Beneflls applies 10 all conslruclion projecls Oler 5 100000 Ihal do nOI ulllize federal fund For federally funded projeclS unless prohibiled by federal or Slale Iml or dlsallolVed by a gOIernmelllal funding source Ihe HG HER wage beWeen DOIis Bacon and Responsible Wages and Beneflls shall apply

DBDR0090 v 20160928

______ _ _______ __

Small Business Development Division MIAM Project Worksheet

ProjectlContract Title MI A TANK FARM UTILITIES MODIFICATIONS Received Date 081102017 ProjectContract No WOl6A FundingSource

Department AVIATION TAC-R ADMINI STERED BY THE FU EL FACILITY Estimated Cost of P rojectlBiu $1220000 00 ResubmittaIDate(s)

-shy - ---shyREVIEW

----shyRECOMMENDATION

Tier J Set Aside Tier 2 Set Aside _ _____________ _

Set Aside Level 1 Level 2 _______ _ Level 3 _ ________

Trade Set Aside (MCC) ____________ _ Goal _______ _ _ Bid Preference _____ _

No Measure _________________

CWP

Defer red -----fF---lt-I--f-

Date

DBDR0090 v20160928

Page 2: Project Worksheet · 2017. 9. 28. · Project Worksheet . Project/Contract Title: MIA TANK FAR M UTILIT IES MODIFICATIONS . Received Date: 08/10/2017 . Project/Contract No: WOl6A

______ _ _______ __

Small Business Development Division MIAM Project Worksheet

ProjectlContract Title MI A TANK FARM UTILITIES MODIFICATIONS Received Date 081102017 ProjectContract No WOl6A FundingSource

Department AVIATION TAC-R ADMINI STERED BY THE FU EL FACILITY Estimated Cost of P rojectlBiu $1220000 00 ResubmittaIDate(s)

-shy - ---shyREVIEW

----shyRECOMMENDATION

Tier J Set Aside Tier 2 Set Aside _ _____________ _

Set Aside Level 1 Level 2 _______ _ Level 3 _ ________

Trade Set Aside (MCC) ____________ _ Goal _______ _ _ Bid Preference _____ _

No Measure _________________

CWP

Defer red -----fF---lt-I--f-

Date