10
Item No: 5C_supp Date of Meeting: March 5, 2020 Project Authorization For WUT Utility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager 1

Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise

  • Upload
    others

  • View
    12

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise

Item No: 5C_supp Date of Meeting: March 5, 2020

Project Authorization ForWUT Utility Vault Upgrades

Presenter: Elly BulegaTitle: Engineering Project Manager

1

Page 2: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise

Action RequestedWUT Utility Vault Upgrades

Request project authorization in the amount $1,160,000, for a total authorized amount of $1,310,000, for the WUT Utility Vault Upgrades, Master Identification No. 201090.01.

2

Page 3: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise

BackgroundWUT Utility Vault Upgrades

[Add photos/drawings as pertinent to explain location/background] –use next page, a blank page.

3

Page 4: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise

BackgroundWUT Utility Vault Upgrades

4

Settlement Around Utility 

Lid

Settlement Around Utility 

Lid

Hatch Cover Damage

Hatch Cover Damage

Cracked frame Cracked frame 

Page 5: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise

5

BackgroundWUT Utility Vault Upgrades

Page 6: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise

Project Description and DetailsWUT Utility Vault Upgrades

The overall scope

6

Page 7: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise

Project ScheduleWUT Utility Vault Upgrades

Advertise Bids March 2020Bid Opening April 2020Contract Award April 2020Phase I September 2020Phase II June 2021

7

Page 8: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise

Financial SummaryWUT Utility Vault Upgrades

This Request

Total Project Cost

Cost to Date

Remaining Cost

DESIGN $0 $150,000 $36,443 $113,557CONSTRUCTION $1,160,000 $1,160,000 $0 $1,160,000

$1,160,000 $1,310,000 $1,273,557

Item

PROJECT TOTAL

8

Page 9: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise

Environmental Impacts/ReviewWUT Utility Vault Upgrades

Permitting:

• No permitting is anticipated on the project.

Stormwater:

• No water quality impacts are anticipated. Best Management Practices (BMPs) will be implemented to protect water during construction activities.

9

Page 10: Project Authorization For WUTUtility Vault Upgrades... · Project Authorization For WUTUtility Vault Upgrades Presenter: Elly Bulega Title: Engineering Project Manager ... Advertise

ConclusionWUT Utility Vault Upgrades

Request project authorization in the amount $1,160,000, for a total authorized amount of $1,310,000, for the WUT Utility Vault Upgrades, Master Identification No. 201090.01.

10