Project Type: Pavement
Application: Replace newly placed PC panels
Location: 710 Freeway in Downey, CA
Project Date: August 29, 2015
Project Size: 300 cu. yds.
Project Owner: California Department of Transportation
Contractors: Shimmick Construction with Joint Venture Partner, Myers & Sons Construction; Short Load
Products: Rapid Set® Cement
The project to replace recently poured PC panels was restricted to a tight timeframe between 1:35 a.m. and 8 a.m. the same morning. Rapid Set® Cement was mixed in a volumetric mixer, finished with a roller screed, bull float, fresno and tine, and cured with a spray-on ASTM C309 Type II Class B curing compound. Despite the challenge of the short window of time to work, crews successfully placed 300 cubic yards of concrete.
PRO
JECT
BRI
EF
REBUILDING THE 710 FREEWAY WITH PC PANEL REPLACEMENTS
© 2
020
CTS
Cem
ent M
anuf
actu
ring
Corp
. AR_
130_
EN_0
6032
0M
CTS Cement Manufacturing Corp. | 12442 Knott St. Garden Grove, CA 92841 | 800-929-3030 | Fax: 714-379-8270 | www.CTScement.com | [email protected]